Committee Input No NFPA [ New Section after ]

Size: px
Start display at page:

Download "Committee Input No NFPA [ New Section after ]"

Transcription

1 Committee Input No NFPA [ New Section after ] Risk Analysis for Mass Notification Systems. A risk analysis for mass notification systems shall be provided in accordance with Section Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri Aug 28 09:28:17 EDT 2015 Committee Statement Committee Statement: Response Message: New language has been added to Chapter 55 regarding conducting a risk analysis to determine the need for the installation of a mass notification system in a building. The committee is generally interested in this subject area but is seeking additional information regarding the application of new Section specific to Mercantile occupancies. A task group has been formed to further explore the issue and will present its findings for the Second Draft phase. Page 1

2 Committee Input No NFPA [ Section No ] Mall Buildings Scope. Subsection shall establish the minimum requirements for mall buildings having not more than three stories and any number of anchor buildings Special Definitions. A list of special terms used in this chapter follows * Anchor Building. A building housing any occupancies having low or ordinary hazard contents and having direct access to a mall building, but having all required means of egress independent of the mall * Mall Building. A single building enclosing a number of tenants and occupancies wherein two or more tenants have a main entrance into one or more malls. For the purpose of this chapter, anchor buildings shall not be considered as a part of the mall building. (See ) a: Enclosed Mall Concourse. A mall concourse which has less than 50 % of the total area of the perimeter walls and roof open to the outer air. b: Open mall Concourse. * A mall concourse which has 50 % or more of the total area of the perimeter walls and roof open to the outer air. Such openings shall be distributed uniformly over the length of the mall concourse A (4)(b) An open mall concourse is permitted to serve as the public way provided that the open mall concourse meets the definition of public way in accordance with this Code Food Court. A public seating area located in a mall that serves adjacent food preparation tenant spaces Gross Leasable Area. The total floor area designated for tenant occupancy and exclusive use. The area of tenant occupancy is measured from the centerlines of joint partitions to the outside of the tenant walls. All tenant areas, including areas used for storage, are part of the gross leasable area Mall. Structure A roofed or covered common pedestrian area within a mall building that serves as access for two or more tenants and does not exceed three levels that are open to A (5) A mall structure can include either an enclosed mall concourse or an open mall concourse. A mall structure may be enclosed by construction which could range from total enclosure to construction which is open, either partially or totally, to the outer air. For structures without complete walls and/or roof, the termination of the mall exit discharge would determine the extent of the structure. each other. (See ) Major Tenant. A tenant space, in a mall building, with one or more main entrances from the exterior that also serve as exits and are independent of the mall. (See ) Page 2

3 Minimum Construction Requirements. Construction shall be in accordance with all of the following: (1) Chapter 7, Construction Types and Height and Area Requirements (2) Chapter 8, Fire-Resistive Materials and Construction (3) Chapter 13, Encroachments into the Public Right-of-Way (4) Chapter 14, Safeguards During Construction (5) Chapter 31, Occupancies in Special Structures (6) Chapter 35, Structural Design (7) Chapter 36, Soils, Foundations, and Retaining Walls (8) Chapter 37, Exterior Wall Construction (9) Chapter 38, Roof Assemblies and Roof Structures (10) Chapter 39, Flood-Resistant Design and Construction (11) Chapter 40, Quality Assurance During Construction Types of Construction. The area of mall buildings and attached anchor buildings shall not be limited where the mall buildings, anchor buildings, and attached parking structures are surrounded on all sides by a permanent open space of not less than 60 ft (18.3 m) under any one of the following conditions: (1) Mall buildings and anchor buildings of Type I, Type II, or Type IV construction shall not exceed three stories in height. (2) Mall buildings and anchor buildings of Type III construction shall not exceed two stories in height Anchor Building Separations Each anchor building three stories or less in height of Type I, Type II, or Type IV construction, or two stories or less in height of Type III construction, shall be separated from the mall building and other anchor buildings by a fire barrier having a fire resistance rating determined in accordance with Table (a) for the uses being separated, but with a rating of not less than 2 hours Anchor buildings of more than three stories in height of Type I, Type II, or Type IV construction, or of more than two stories in height of Type III construction, or any anchor building of Type V construction, shall be separated from the mall building and other anchor buildings by fire walls Anchor Building Openings. Openings in the fire barrier provided in accordance with between an anchor building and the pedestrian area of the mall shall not be required to be protected for those anchor buildings housing assembly occupancies, business occupancies, and mercantile occupancies other than bulk merchandising retail buildings. Page 3

4 Parking Structures. Parking structures within 60 ft (18.3 m) of the mall building or anchor building shall meet all of the following criteria: (1) They shall be of Type I or Type II construction. (2) They shall be limited in height in accordance with Section (3) They shall be separated in accordance with Tenant Separations Each tenant space shall be separated from other tenant spaces by partitions having a fire resistance rating of not less than 1 hour * The partition shall extend to the underside of the ceiling No separation shall be required between the tenant space and the mall Mixed Occupancies. Assembly occupancies, other than stadiums and arenas, and business and mercantile occupancies located in mall buildings shall not be required to comply with the provisions of Means of Egress All means of egress shall be in accordance with Chapter 11 and this chapter The mall concourse shall be permitted to be considered a pedestrian way, provided that the criteria of through are met The travel distance within a tenant space to an exit or to the mall shall not exceed the maximum travel distance permitted by the occupancy chapter. Page 4

5 An additional 200 ft (61 m) shall be permitted for travel through the enclosed mall space or 300 ft (91 m)for travel through the open mall space,, provided that all of the following requirements are met: (1) The mall shall be of a clear width not less than that needed to accommodate egress requirements as set forth in other sections of this chapter, but shall be not less than 20 ft (6100 mm) wide in its narrowest dimension. (2) A See Section (3) On each side of the mall floor area, the mall shall be provided with an unobstructed exit access of not less than 10 ft (3050 mm) in clear width parallel to, and adjacent to, the mall tenant front. (4) (5) The mall, and all buildings connected thereto, except open parking structures, shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with (1). (6) The sprinkler system specified in (4) shall be installed in such a manner that any portion of the system serving tenant spaces can be taken out of service without affecting the operation of the portion of the system serving the mall. (7) * The exit access from a mall, as specified in (2), shall lead to an exit having a width of not less than 66 in. (1675 mm). * Walls dividing tenant spaces from each other shall have a fire resistance rating of not less than 1 hour, and all of the following also shall apply: (8) (9) The partition shall extend to the underside of the ceiling or to the roof or floor above. No separation shall be required between a tenant space and the mall. (10)* Malls with a floor opening connecting more than two levels shall be provided with a smoke control system Dead ends not exceeding a length equal to twice the width of the mall concourse for enclosed mall concourses or two and a half times the width of the mall concourse for open mall concourses, measured at the narrowest location within the dead-end portion of the mall, shall be permitted Each assembly occupancy with an occupant load of 500 or more shall have not less than one-half of its required means of egress independent of the mall Every story of a mall building shall be provided with the number of means of egress specified by Section 11.4 and as modified by or Exit access travel shall be permitted to be common for the distances permitted as common paths of travel by A single means of egress shall be permitted in a Class C mercantile occupancy or a business occupancy, provided that the travel distance to the exit or to a mall does not exceed 100 ft (30 m). Page 5

6 Every floor of a mall shall be provided with the number of means of egress specified by Section 11.4, with not less than two means of egress remotely located from each other Class A and Class B mercantile occupancies connected to a mall shall be provided with the number of means of egress required by Section 11.4, with not less than two means of egress remotely located from one another Each individual major tenant of a mall building shall have a minimum of one-half of its required means of egress independent of the mall * Each individual anchor building shall have means of egress independent of the mall Each individual tenant space shall have means of egress to the outside or to the mall based on occupant load calculated in accordance with Table Exit passageways shall comply with and Exit passageways in a mall building shall be permitted to accommodate the following independently: (1) Portion of the occupant load assigned to the exit passageway from only the mall (2) Largest occupant load assigned to the exit passageway from a single tenant space * Rooms housing building service equipment, janitor closets, and service elevators shall be permitted to open directly onto exit passageways, provided that all of the following criteria are met: (1) The required fire resistance rating between such rooms or areas and the exit passageway shall be maintained in accordance with (2) Such rooms or areas shall be protected by an approved, supervised automatic sprinkler system in accordance with NFPA 13 and ; however, the exceptions in NFPA 13 that permit the omission of sprinklers from such rooms shall not be permitted. (3) Service elevators opening into the exit passageway shall not open into areas other than exit passageways. (4) Where exit stair enclosures discharge into the exit passageway, the provisions of shall apply, regardless of the number of stories served Mall Exit Capacity. The capacity of the required exits from the mall shall accommodate the occupant load calculated as the sum of the occupant loads required in and The gross leasable area of the mall building (not including anchor buildings) shall be divided by the appropriate lowest whole number occupant load factor (OLF) from Figure The occupant load factor shall not be less than 30 and shall not exceed 55. Page 6

7 For any food court or other assembly occupancy areas located in the mall that are not included as a portion of the gross leasable area of the mall building, an occupant load shall be calculated based on the occupant load factor for the appropriate use, as specified in Table The remaining mall area shall not be assigned an occupant load Fire Protection Systems Automatic Extinguishing Systems The mall building and all anchor buildings shall be protected throughout by an approved, supervised automatic sprinkler system in accordance with NFPA 13, , and The system shall be installed in such a manner that any portion of the system serving tenant spaces can be taken out of service without affecting the operation of the portion of the system serving the mall Any shade structures, canopies, awnings, or similar structures in the open mall concourse shall be protected by an approved, supervised automatic sprinkler system where required by NFPA 13 and Hose Connections. Where the mall is not protected by a standpipe system in accordance with NFPA 14, hose connections shall be installed in accordance with through There shall be a hose outlet connected to a system sized to deliver 250 gal/min (946 L/min) at the most hydraulically remote outlet The outlet shall be supplied from the mall zone sprinkler system and shall be hydraulically calculated Hose outlets shall be provided at each of the following locations: (1) Within the mall at the entrance to each exit passage or corridor (2) At each floor level landing within enclosed stairways opening directly onto the mall (3) At exterior public entrances to the mall * Smoke Control. A smoke control system in accordance with Section 55.7 and complying with (5) shall be provided in a an enclosed mall concourse with floor openings connecting more than two levels Fire Department Access to Equipment. Rooms or areas containing controls for air-conditioning systems; automatic fire-extinguishing systems; or other detection, suppression, or control elements shall be identified for use by the fire department Emergency lighting shall be provided in accordance with A See Page 7

8 General. Malls shall be provided with a fire alarm system in accordance with Section 55.2, as modified by Initiation. Initiation of the required fire alarm system shall be by means of the required automatic sprinkler system in accordance with (3) and by manual means in accordance with and Notification Occupant Notification. During all times that the mall is occupied, the required fire alarm system, once initiated, shall perform one of the following functions: (1) It shall activate a general alarm in accordance with throughout the mall, except a positive alarm sequence in accordance with shall be permitted. (2) Occupant notification shall be permitted to be made via a voice communication or public address system in accordance with * Visible signals shall not be required in malls. (See ) Emergency Forces Notification. Emergency forces notification shall be provided and shall include notifying all of the following: (1) Fire department in accordance with (2) Approved local emergency organization, if provided Emergency Control. The fire alarm system shall be arranged to automatically actuate smoke management or smoke-control systems in accordance with (3) Tenant Spaces. Each individual tenant space shall have means of egress to the outside or to the mall, based on occupant load calculated by using Table Kiosks. Page 8

9 Kiosks and similar structures (temporary or permanent) shall not be considered as tenant spaces and shall be constructed of noncombustible or limited-combustible materials, or of combustible materials meeting any of the following criteria: (1) Listed fire-retardant-treated wood complying with the requirements of (2) Light-transmitting plastics complying with Chapter 48 (3) Foamed plastics having a maximum heat release rate not greater than 100 kw when tested in accordance with UL 1975 or in accordance with NFPA 289, Standard Method of Fire Test for Individual Fuel Packages, using the 20 kw ignition source (4) Metal composite material (MCM) having a flame spread index not greater than 25 and a smoke developed index not greater than 450 in accordance with ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, or ANSI/UL 723, Standard for Test for Surface Burning Characteristics of Building Materials, when tested as an assembly in the maximum thickness intended for use (5) Textiles and films meeting the flame propagation performance criteria contained in Test Method 1 or Test Method 2, as appropriate, of NFPA 701, Standard Methods of Fire Tests for Flame Propagation of Textiles and Films Kiosks or similar structures located within the enclosed mall concourse shall be protected with approved fire suppression and detection devices * The minimum horizontal separation between kiosks, or groups of kiosks, and other structures within the mall shall be 20 ft (6100 mm) Each kiosk, or group of kiosks, or similar structure shall have a maximum area of 300 ft 2 (27.8 m 2 ). Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Wed Sep 02 15:45:26 EDT 2015 Committee Statement Committee Statement: The proposed changes are the result of task group work that was initiated at the completion of the 2015 revision cycle and will continue through the 2018 cycle. The focus of the task group was to update terminology related to shopping malls to better describe the applicability and intent of the Code sections as well as develop language to address both enclosed and open type mall concourses. The proposed Committee Input is developed with the intent of soliciting public comment and additional review by the mall Page 9

10 0 task group and is focused on the definition of open and enclosed mall concourses as well as the impact of open mall concourses on existing code requirements. Prior to the Second Draft meeting the task group will continue to meet and review the code requirements for open versus enclosed mall concourses and determine how the code is to be appropriately applied to either open or enclosed mall concourses. The task group is looking at areas such as egress travel, fire protection systems and protection of the mall concourse, as well as protection and presence of kiosks and equipment within the mall concourse. Response Message: It should be noted that the term 'mall' will be replaced with 'mall concourse' and 'mall building' will be replaced with 'mall structure' pending the results of revisions made by the Committee during the First Draft meeting. Public Input No. 102-NFPA [Section No. A ] Public Input No. 103-NFPA [New Section after A ] Public Input No. 100-NFPA [Section No ] Page 10

11 1 Committee Input No NFPA [ Section No ] Occupant Load The occupant load, in number of persons for whom means of egress and other provisions are required, shall be determined on the basis of the occupant load factors of Table that are characteristic of the use of the space, or shall be determined as the maximum probable population of the space under consideration, whichever is greater The occupant load for business use shall be 150 ft 2 /person. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Mon Aug 31 15:21:29 EDT 2015 Committee Statement Committee Statement: This CI proposes to revise the current maximum floor area allowance per occupant in Table for business occupancies from 100 ft2/occupant (gross) to 150 ft2/occupant (gross) for determining the means of egress requirements in business areas for public consideration in an effort to solicit public comments on this important subject. The rationale is based on several past research studies that have concluded that the 100 ft2/occupant (gross) occupant load factor for business occupancies is very conservative which has led to requiring Group B occupancies and office buildings in general to have additional egress capacity and a greater number of exits to accommodate an "overestimated" building population. The increase from 100 ft2/occupant (gross) to 150 ft2/occupant (gross) for business occupancies is still a conservative figure; yet reasonable, based on recent changes in office building design as well as changes in the North American workplace and work style trends; such as work station configurations, flexible work schedules, telecommuting, work at home, etc. The existing occupant load factor of 100 ft2/occupant (gross) for business occupancies first appeared in the 3rd edition of the Building Exits Code that was published in The occupant load factor of 100 ft2/occupant (gross) was specified for office, factory, and workrooms. All occupant load factors were based on the gross floor area of the building, such that no deduction was permitted for corridors, closets, restrooms, or other subdivisions. However, since the initial NBS study in 1935, several other studies have been conducted to determine the occupant load factors for various occupancies. One common similarity of each of the studies was that all of the subsequent studies have concluded that the 100 ft2/occupant (gross) occupant load factor for business Page 11

12 2 occupancies is conservative. Studies conducted between 1966 and 1992 have indicated that occupant load factors in business occupancies ranged from 150 ft2/occupant (gross) to 278 ft2/occupant (gross). In addition, a 1995 study of 23 Federal sector and private sector office buildings also indicated a mean occupant load factor of 248 ft2/occupant for all office buildings. Lastly, a recent project to study the appropriateness of the 100 ft2/occupant load factor for business occupancies was recently undertaken by the NFPA Fire Protection Research Foundation. The study was conducted by WPI undergrad students. The recommendations of this study have indicated that it is reasonable to increase the occupant load factor to 150 ft2/occupant in business. Response Message: Page 12

13 3 Committee Input No NFPA [ New Section after ] Where approved by the Authority Having Jurisdiction doors shall be permitted to be provided with locking devices that are capable of being unlocked from outside the room. Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri Aug 28 13:50:07 EDT 2015 Committee Statement Committee Statement: Response Message: In the wake of many recent events, offering adequate protection for occupants in business occupancies used for educational purposes, such as college and university buildings, is an important and relevant issue. The committee is interested in the subject of door locking in locations such as classroom doors and is seeking guidance of the Educational and Daycare Technical Committee to provide consistent provisions for the educational facilities that fall under the definition of Business occupancies. It is recognized that the Educational committee is developing language on this subject and it will be reviewed by this committee through direction of the Correlating Committee prior to the Second Draft stage. Additional input from the college and university industry is welcome. Page 13

14 4 Committee Input No NFPA [ New Section after ] Risk Analysis for Mass Notification Systems. A risk analysis for mass notification systems shall be provided in accordance with Section Submitter Information Verification Submitter Full Name: Kristin Bigda Organization: [ Not Specified ] Street Address: City: State: Zip: Submittal Date: Fri Aug 28 09:29:56 EDT 2015 Committee Statement Committee Statement: New language has been added to Chapter 55 regarding conducting a risk analysis to determine the need for the installation of a mass notification system in a building. The committee is generally interested in this subject area but is seeking additional information regarding the application of new Section specific to college and university campus buildings. A task group has been formed to further explore the issue and will be looking at the following issues prior to the Second Draft meeting: -Qualifications of person completing risk analysis -Feedback from college and university industry on the impact of new How are the provisions applied to an entire campus versus a single building, and are their implications of applying provisions for mass notification on a building by building basis only. -Extent of application: what types of buildings should this apply to? How can the Code properly identify the type of college and university buildings that this requirement should apply to? -Extent of the application of the required emergency plan. Response Message: -How would enforcing new impact non-classroom buildings? Public Input No. 80-NFPA [New Section after ] Page 14

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT

Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE Sec. 58.1. Division D-O occupancies. 58.2. Separation and mixed occupancy. OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes. 1. Authority Orange County Fire Rescue Department Tents & Membrane Structures Office of The Fire Marshall - 109 E. Church Street, Lower Level - Orlando, Florida 32801-3319 Phone: 407-836-0004 Fax: 407-836-8310

More information

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE

More information

Fire Alarm Systems Requirements by Occupancy Type

Fire Alarm Systems Requirements by Occupancy Type WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Fire Alarm Systems Requirements by Occupancy Type 2013 California Building

More information

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1 Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection OSHA Office of Training and Education 1 Introduction Fires and explosions kill more than 200 and injure more than 5,000 workers

More information

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission

General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission General Safety & Health Standards Published by the Division of Building Safety In Cooperation with the Idaho Industrial Commission Local Fire Alarm 064. FIRE ALARM SYSTEMS 01. Scope 02. Definitions 03.

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or comments regarding the

More information

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application

Educational. Educational-Existing 1/28/2014. OCCUPANT LOADS [no change] Application. Application February 2014 Code Requirements and Inspections in Educational Occupancies Presented By: Barry W. Rickert Douglas M. Schanne Fire Marshal Training Program Supervisor Office of Education & Data Management

More information

CHAPTER 9 FIRE PROTECTION SYSTEMS

CHAPTER 9 FIRE PROTECTION SYSTEMS CHAPTER 9 FIRE PROTECTION SYSTEMS SECTION 901 GENERAL 901.1 Scope. Provisions of this chapter shall govern the application, design, installation, testing and maintenance of automatic sprinklers, standpipes

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS

FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS FIRE AND LIFE SAFETY REQUIREMENTS FOR CONVENTIONS, TRADE SHOWS AND EXHIBITS November 2011, Updated March 2012 COLORADO SPRINGS FIRE DEPARTMENT Division of the Fire Marshal If you have any questions or

More information

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc. LIFE SAFETY UPDATE FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc. The purpose of this update is as follows: Remind all state

More information

Life Safety Code Enabling References

Life Safety Code Enabling References SUPPLEMENT 4 Life Safety Code Enabling References Editor s Note: Supplement 4 provides users of NFPA 72, National Fire Alarm and Signaling Code, with a summary of requirements from NFPA 101, Life Safety

More information

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this

More information

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44

More information

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM

EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM EMERGENCY ACTION, EVACUATION AND FIRE PREVENTION SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29CFR1910.36-29CFR1910.38-29CFR1910.157-29CFR1910.165 NFPA-10 BASIS: The OSHA Emergency Action Planning and the

More information

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

Building Codes Update: The 2009 International Fire Code and the Apartment Industry ! Building Codes Update: The 2009 International Fire Code and the Apartment Industry Apartment operators and developers should be aware of organizational changes in the 2009 edition of the International

More information

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES

CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES CONSTRUCTION FIRE SAFETY PLANNING GUIDELINES Review the following information pertaining to Construction Fire Safety Planning: B.C. Building Code Sections 8.1 up to and including Subsection 8.2.3 B.C.

More information

SPECIAL RESIDENCE (ASSISTED SELF-PRESERVATION) OCCUPANCIES (Adopted by the State of Oregon)

SPECIAL RESIDENCE (ASSISTED SELF-PRESERVATION) OCCUPANCIES (Adopted by the State of Oregon) SPECIAL RESIDENCE (ASSISTED SELF-PRESERVATION) OCCUPANCIES (Adopted by the State of Oregon) SECTION SR101 GENERAL SR101.1 General. Group SR occupancies shall comply with the provisions of this appendix

More information

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST

SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST SCHOOL FIRE AND LIFE SAFETY INSPECTION CHECKLIST School Name: School Address: Town: Phone: Inspected By (Please Print): Inspection Organization Name: Inspector Phone: Date of Inspection: Building Name:

More information

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013 Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems April 2013 The National Multi Housing Council and the National Apartment Association (NMHC/NAA) have

More information

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems

More information

Healthcare Engineering. Code Summary Report

Healthcare Engineering. Code Summary Report American Society for Healthcare Engineering Code Summary Report CODE SUMMARY HEALTH CARE NEW BUILDINGS This code summary is based on the following codes: 2000 Edition NFPA 101, The Life Safety Code (LSC),

More information

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings Note: This information addresses complex issues in a summary fashion. Consideration should be given to the official version of the

More information

CHILD CARE CENTER INFORMATION SHEET

CHILD CARE CENTER INFORMATION SHEET CHILD CARE CENTER INFORMATION SHEET SECTION 1 INTRODUCTION This fire safety information sheet is based on the 2007 Minnesota State Fire Code (MSFC) and the 2007 Minnesota State Building Code (MSBC). It

More information

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology.

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. Page 1 of 17 Page 2 of 17 Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. CODE PARAGRAPH WITH SUGGESTED CHANGES: 6.4.6.1.2 Residents should be rated as response probable

More information

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No General Inspection FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS 1. All Floors (inspect from top floor to basement): Yes are fire exits and directional signs properly illuminated? is the emergency

More information

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02

NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02 NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02 PART A: Project Data and Classification 1. Project name & location Renovation of the Cheerwine Building, 322 East Council St.,

More information

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use.

c. As mandated by law, facilities must obtain and maintain valid zoning permits as well as permits for intended use. Walmart Standards for Suppliers Section 7. Health and Safety 7. Health and Safety Suppliers must provide workers with a safe and healthy work environment. Suppliers must take proactive measures to prevent

More information

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9

COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 6 th Edition FIRE PROTECTION SYSTEMS CHAPTER 9 GUIDELINES FOR THE PREPARATION OF FIRE PROTECTION SYSTEM NARRATIVE REPORTS 780 CMR 903.1.1 State

More information

Indiana Building Rehabilitation Standard

Indiana Building Rehabilitation Standard Rule 8. Indiana Building Rehabilitation Standard 675 IAC 12-8-1 Definitions Sec. 1. The following definitions apply throughout this rule: (1) "Building code" means the Indiana Building Code under 675 IAC

More information

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors.

We hope these Frequently Asked Questions will be of use both to municipal officials and fire inspectors. September 14, 2012 Dear AMM Member: Please see the attached Fire Code Frequently Asked Questions. This document was compiled by the Office of the Fire Commissioner at the AMM s request to help clarify

More information

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL January, 2003 Environmental Health and Safety Florida Atlantic University 777 Glades Rd. Boca Raton, FL 33431 Phone: 561-297-3129 Fax:

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

Fire Alarm System Plans Review Checklist Property location Date of Review

Fire Alarm System Plans Review Checklist Property location Date of Review Fire Alarm System Plans Review Checklist Property location Date of Review 1. Is application completed in entirety? 2. Are the plans review fee submitted with the application? 3. Does floor plan include

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

SECTION 903 AUTOMATIC SPRINKLER SYSTEMS

SECTION 903 AUTOMATIC SPRINKLER SYSTEMS Page 25 ABOUT CODE CORNER CCFS would like to remind you to check with your local Authority Having Jurisdiction (AHJ) for questions and opinions concerning your local Fire and Building Codes. The information

More information

The Mission Critical Fire Protection Experts

The Mission Critical Fire Protection Experts The Mission Critical Fire Protection Experts Protection Systems Protection Systems HFC-227ea / FM200 / FE-227 FE-25 / ECARO-25 Novec 1230 Inergen / Argonite Halon Drop-in Systems High and Low Pressure

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

Code Requirements for Existing Buildings

Code Requirements for Existing Buildings Code Requirements for Existing Buildings Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS)

More information

Errata NFPA 1. Fire Code. 2015 Edition

Errata NFPA 1. Fire Code. 2015 Edition Errata NFPA 1 Fire Code 2015 Edition Reference: 2.2, Table 6.1.14.4.1(a) and (b), 13.3.1.6, 13.7.2.13.2.1, 14.11.3.3, 18.5.2, 18.5.3, 20.1.2, 20.1.5.12, 25.1.1, 25.3, 25.4, A.3.3.164.2, and A.13.3.2.9.1

More information

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Area of Rescue Assistance Communication System ADA Code Applicable excerpts: Area of Rescue Assistance Communication System ADA Code Applicable excerpts: CONTENTS (Guidelines and Definitions) Page 1 Area of Rescue Assistance Requirements Page 2 Emergency Communication Equipment

More information

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS 2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS IBC CODE DESIGN CHECKLIST (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Transfer the resulting data on the building plans Life Safety & Building

More information

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal

Ontario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable

More information

New York City Department of Buildings

New York City Department of Buildings The New NYC Building Code Chapter 10 Means of Egress New York City Department of Buildings Technical Affairs Fatma M. Amer, P.E. Copyright Materials This presentation is protected by US and International

More information

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS The attached self-inspection form is intended for staff use at regular, frequent intervals. It should not take the place of two other vital measures

More information

Overview of Hotel Fire Safety Requirements

Overview of Hotel Fire Safety Requirements Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined

More information

MINNESOTA HEALTH CARE ENGINEERS IN ASSISTED LIVING FACILITIES

MINNESOTA HEALTH CARE ENGINEERS IN ASSISTED LIVING FACILITIES MINNESOTA HEALTH CARE ENGINEERS FIRE/LIFE SAFETY IN ASSISTED LIVING FACILITIES September 13, 2012 MINNESOTA HEALTH CARE ENGINEERS FIRE/LIFE SAFETY IN ASSISTED LIVING FACILITIES WELCOME Exits Restrooms

More information

Automatic Fire Sprinkler Submittal Requirements

Automatic Fire Sprinkler Submittal Requirements Automatic Fire Sprinkler Submittal Requirements All commercial and industrial buildings with a total floor area of 5000 sq. ft. shall have an approved automatic sprinkler system installed. The Windsor-Severance

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA)

GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA) GENERAL + MEANS OF ESCAPE (Part One) By Mdm Eng Yew Hoon (SIA) Chapter 1 : Definitions clause 1.2.10 : circulation space OLD CLAUSE A space mainly used as means of access between a room or protected shaft

More information

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING FIRE SUPPRESSION SYSTEMS APPLICATION PACKET CITY OF NAPERVILLE 400 S. EAGLE STREET NAPERVILLE, Il 60540 PHONE: 630.420.6070 FAX: 630.420.6657 Fire

More information

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report?

Rhode Island State Fire Marshal Fire Protection Systems Narrative Reports. What is a Narrative Report? RHODE ISLAND DIVISION OF STATE FIRE MARSHAL 1951 Smith Street, North Providence, RI 02911 Telephone: (401) 383-7717 Fax: (401) 383-8879 John E. Chartier, EFO, CFI State Fire Marshal Rhode Island State

More information

A Code Review for Emergency Generators and Indoor Use of Portable Generators

A Code Review for Emergency Generators and Indoor Use of Portable Generators A Code Review for Emergency Generators and Indoor Use of Portable Generators By: the Fire and Life-Safety Group (FLS) Fire Code requires that emergency generators be stationary generators. Therefore, a

More information

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009

FIRE ALARM PLAN REVIEW. Office of the State Fire Marshal Massachusetts Department of Fire Services December 2009 FIRE ALARM PLAN REVIEW Office of the State Fire Marshal Massachusetts December 2009 SURPRISE QUIZ 1. A fire alarm system is required to be installed by the MSBC, what edition of NFPA 72 do you use? 2.

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief Dennis Fire Department Fire Prevention Mark Dellner Fire Chief FIRE SAFETY INSPECTION GUIDELINES FOR COMMERCIAL PROPERTIES (MA Fire Prevention Regulations 527 CMR, MGL Chapter 148) FIRE PREVENTION CHECKLIST-

More information

Learn how all this can be achieved. architecture AND save money. exceptional. with the SALT LAKE CITY, UT PERMIT # US POSTAGE PAID FIRST CLASS

Learn how all this can be achieved. architecture AND save money. exceptional. with the SALT LAKE CITY, UT PERMIT # US POSTAGE PAID FIRST CLASS The ONLY horizontal sliding fire-door with these unique features: Spans unlimited widths, heights up to 23 feet Meets fire codes without being seen Approved for egress applications Automatic closing and

More information

5-8.1.4* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness.

5-8.1.4* Any required illumination shall be arranged so that the failure of any single lighting unit shall not leave any area in darkness. NFPA 101 Life Safety Code Section 5-8 Illumination of Means of Egress 5-8.1 General. 5-8.1* Illumination of means of egress shall be provided in accordance with this section for every building and structure

More information

MEANS OF EGRESS CHAPTER 10

MEANS OF EGRESS CHAPTER 10 CHAPTER 10 MEANS OF EGRESS SECTION BC 1001 ADMINISTRATION 1001.1 General. Buildings or portions thereof shall be provided with a means of egress system as required by this chapter. The provisions of this

More information

Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE Health Chapter 420-5-22 ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE CHAPTER 420-5-22 SUBMISSION OF PLANS AND SPECIFICATIONS FOR HEALTH CARE FACILITIES TABLE OF

More information

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS I. APPLICATION AND DEFINITIONS 1.01 Authorization for Standards 1.02 Application of Standards 1.03 Definitions

More information

FIRE SAFETY INSPECTION REPORT

FIRE SAFETY INSPECTION REPORT FIRE SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LTD UNIT-1 EAST ISDAIR, CHANDMARI, FATULLAH OTHER FACTORIES: FAKIR KNIT LTD. July 20, 2014 Page 2 SUMMARY was surveyed for fire safety on 7/20/2014 by

More information

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

Rancho Cucamonga Fire Protection District Prevention Bureau Standard Rancho Cucamonga Fire Protection District Prevention Bureau Standard Title: Fire Alarm and Monitoring Systems Standard # 9-3 Effective: May 2002 Number of Pages: 7 Revised: January 2014 INTENT The intent

More information

CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE 1999 2002

CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE 1999 2002 CHANGES IN NFPA 72 NATIONAL FIRE ALARM CODE 1999 2002 Three new chapters were added. What was chapter 1 in 1999 was reorganized into chapters 1 (Fundamentals), 2 (Referenced Publications), and 3 (Definitions).

More information

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems.

Required Certification Documentation. Contractor's installation certification for range hood fire suppression systems. OFFICE OF UNIVERSIT BUILDING OFFICIAL PROJECT/CONSTRUCTION MAGER: Sample Manager Required Aboveground only Required Certification Documentation Contractor s material and test certifications for both above

More information

Errata has been identified as follows:

Errata has been identified as follows: 2009 IFC Performing Commercial Fire Inspections Inventory Number: 1424S09 Second Printing; July 2014 Changes HAVE been made- Third Printing: September 2014 Errata has been identified as follows: 1. Page

More information

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012

Medicine Hat Fire Department. Special Event Requirements. medicinehat.ca/fire. August 2012 Medicine Hat Fire Department Special Event Requirements August 202 medicinehat.ca/fire The following is a standard guide for event organizers to ensure occupant safety and compliance with the Alberta Fire

More information

NFPA 101 SAF-FIR PUBLIC COMMENTS

NFPA 101 SAF-FIR PUBLIC COMMENTS Page 50 of 195 8.2.3.1.2 ] Public Comment No. 82-NFPA 101-2013 [ New Section after 8.2.3.1.3* The fire resistance rating of an element or assembly determined by tests conducted in accordance with NFPA

More information

Requirements for Hydrogen Storage and Use

Requirements for Hydrogen Storage and Use Requirements for Hydrogen Storage and Use I. INTRODUCTION Fire and Life-Safety Group (FLS) The following is a summary of the fire and building code requirements for the storage and use of hydrogen. These

More information

2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes. Questions. 1004.1 Design Occupant Load. 1005 - Means of Egress Capacity Determination

2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes. Questions. 1004.1 Design Occupant Load. 1005 - Means of Egress Capacity Determination 2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes Clay Aler, P.E. Principal caler@koffel.com Andrew M. Schneider, P.E. Senior Fire Protection Engineer aschneider@koffel.com Questions Submit

More information

HERNANDO COUNTY FIRE ALARM GUIDELINES

HERNANDO COUNTY FIRE ALARM GUIDELINES HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a

More information

Orange County Fire Rescue Division Fire Loss Management Bureau 109 East Church Street Lower Level Orlando, Florida 32801-3319

Orange County Fire Rescue Division Fire Loss Management Bureau 109 East Church Street Lower Level Orlando, Florida 32801-3319 Standard 6005 Orange County Fire Rescue Division Fire Loss Management Bureau 109 East Church Street Lower Level Orlando, Florida 32801-3319 Orange County Fire Loss Management Bureau Standard 6005 AUTHORITY

More information

CHAPTER 24 TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES

CHAPTER 24 TENTS, CANOPIES AND OTHER MEMBRANE STRUCTURES Page 25 ABOUT CODE CORNER CCFS would like to remind you to check with your local Authority Having Jurisdiction (AHJ) for questions and opinions concerning your local Fire and Building Codes. The information

More information

FIRE AND LIFE SAFETY REQUIREMENTS FOR EXISTING BUILDINGS

FIRE AND LIFE SAFETY REQUIREMENTS FOR EXISTING BUILDINGS CHAPTER 46 FIRE AND LIFE SAFETY REQUIREMENTS FOR EXISTING BUILDINGS SECTION 4601 GENERAL 4601.1 Scope. The provisions of this chapter shall apply to existing buildings constructed prior to a state building

More information

NFPA 101 2012 SELECT SIGNIFICANT CHANGES

NFPA 101 2012 SELECT SIGNIFICANT CHANGES NFPA 101 2012 SELECT SIGNIFICANT CHANGES William E. Koffel, P.E., FSFPE President Koffel Associates, Inc. www.koffel.com wkoffel@koffel.com Expertly Engineering Safety From Fire INTRODUCTION NFPA 101 is

More information

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

Beth Israel Deaconess Medical Center Environment of Care Manual

Beth Israel Deaconess Medical Center Environment of Care Manual Beth Israel Deaconess Medical Center Environment of Care Manual Title: Interim Life Safety Measures (ILSM) Plan Policy #: EC39 Purpose: ILSM are fully adhered to in areas where the hospital/site occupants

More information

St. John s University

St. John s University St. John s University Fire Safety Plan Founder s Village Townhouses Page 1 St. John s University Fire Safety Plan Part 1-Building Information Section Founder s Village Townhouses 8000 Utopia Parkway Jamaica

More information

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST

MEANS OF EXIT / ESCAPE / EGRESS SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: MEANS OF EXIT / ESCAPE / EGRESS Guidelines: This checklist covers some of the regulations

More information

2007 ICC FINAL ACTION AGENDA

2007 ICC FINAL ACTION AGENDA 907.2.1.1 System initiation in Group A occupancies with an occupant load of 1,000 or more. Activation of the fire alarm in Group A occupancies with an occupant load of 1,000 or more shall initiate a signal

More information

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services

The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services MITT ROMNEY GOVERNOR KERRY HEALEY LT. GOVERNOR EDWARD A. FLYNN SECRETARY The Commonwealth of Massachusetts Executive Office of Public Safety Department of Fire Services P.O. Box 1025 State Road Stow, Massachusetts

More information

Tents and Other Membrane Structures

Tents and Other Membrane Structures ORANGE COUNTY FIRE AUTHORITY Safety & Environmental Services Section 1 Fire Authority Road, Building A, Irvine, CA 92602 714-573-6180 www.ocfa.org Tents and Other Membrane Structures Approved and Authorized

More information

NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted.

NFPA 72. Exception No. 1: Where ambient conditions prohibit installation of automatic smoke detection, automatic heat detection shall be permitted. NFPA 72 3.3.7.2 3.3.7.2 False Alarm. Activation or reporting of an alarm for which no such alarm condition, fire or emergency actually exists. Additionally, False Alarm is the willful and knowing initiating

More information

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated

More information

CHAPTER 29 PLUMBING SYSTEMS

CHAPTER 29 PLUMBING SYSTEMS CHAPTER 29 SYSTEMS Note: The amendments to Chapter 29 are different than the 2009 Seattle Building Code and are not marked with margin bars or arrows. SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions

More information

NFPA 13 2002 FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13?

NFPA 13 2002 FAQs. 3. Can plastic pipe be used on a sprinkler system complying with NFPA 13? NFPA 13 2002 FAQs Responses to FAQs are prepared by NFPA technical staff to assist users in reading and understanding NFPA codes and standards. The responses, however, are not Formal Interpretations issued

More information

NFPA 101 2015 20 Frequently Asked Questions

NFPA 101 2015 20 Frequently Asked Questions February 2015 NFPA 101 2015 20 Frequently Asked Questions By Ron Coté, P.E. Ask an NFPA Expert The Technical Questions Service is free with your NFPA Membership. Our Technical Questions Service provides

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

2010 FLORIDA BUILDNG CODE, FIRE AND LIFE SAFETY i

2010 FLORIDA BUILDNG CODE, FIRE AND LIFE SAFETY i 2010 FLORIDA BUILDNG CODE, FIRE AND LIFE SAFETY i Changes between the 2006 and 2009 Editions of the International Codes account for the vast majority of changes to the 2010 Florida Building Code. In many

More information

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.) APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of

More information

Fire Safety Requirements for Child Care Centre

Fire Safety Requirements for Child Care Centre Fire Safety Requirements for Child Care Centre A. Restrictions on Location Child care centre shall not be located : - (a) (b) in any premises designed for residential use; in any industrial building, warehouses,

More information

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 **Disclaimer: This document is to serve as informational purposes only. This is not a code book or a final interpretation of the

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION PERMITS AND INSPECTIONS FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT LOCATION Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number

More information