1 SECTION PORTLAND CEMENT CONCRETE PAVING PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes specifications for constructing concrete curb, gutter and sidewalk, concrete base, concrete pavement, and curb ramps at the locations and to the dimensions shown on the plans, in accordance with the Project Manual. B. Preparation of subgrade to proper elevation including excavating, backfilling, removal of existing curb, existing sidewalk, existing road base, existing pavement, existing curb ramp, and compaction as required shall be done as Incidental Work to the above mentioned new concrete work. C. Tree roots under sidewalk and pavement areas shall be removed with a sharp edge instrument to a depth of eight (8) inches below finished grade as Incidental Work. Feeder roots greater than two (2) inches in diameter shall be checked by the Bureau of Urban Forestry. Call the Customer Service number 311 prior to removal by the Contractor REFERENCE A. Standard Specifications of the City and County of San Francisco, Department of Public Works, Bureau of Engineering (SSDPWSF), revised November, B. Standard Plans of the City and County of San Francisco, Department of Public Works, Bureau of Engineering dated April SPECIAL INSTRUCTIONS A. Notifications 1. Underground Service Alert a. Before commencing any excavation, obtain Underground Service Alert inquiry I.D. number by calling the following phone number: Underground Service Alert: b. Allow four (4) calendar days after I.D. number is obtained and before excavation work is started so that utility owners can be notified by Contractor. c. I.D. numbers will not be given more than 10 calendar days prior to starting excavation work Portland Cement Concrete Paving
2 B. Curb Ramps 1. Curb ramps shall be constructed in accordance with the details shown in the Standard Plans. 2. Investigate subsidewalk basement in sidewalk area prior to saw cutting and excavation for curb ramps. If there is a subsidewalk basement and there is sufficient cover to construct the curb ramp, proceed with saw cutting and excavation with care. If there is not sufficient cover to construct the curb ramp, notify the Engineer and stop the construction of the curb ramp. 3. The Contractor shall notify the County Surveyor at (415) of any monuments in danger of disturbance destruction or removal. All city monuments must be protected per State Land Surveyors Act and these Specifications. The Contractor shall not disturb, destroy or remove any survey monuments without the approval from the County Surveyor. The Contractor shall salvage any monuments removed during construction and shall deliver these monuments to the survey department at 1680 Mission Street. 4. The Contractor shall complete the construction of curb ramp, curb and sidewalk repairs work within 72 hours from commencement of excavation work, so as not to obstruct pedestrian traffic or travel thereon more than is reasonably necessary. C. Broken Water Meter Boxes 1. Replace any broken San Francisco Water Department (SFWD) meter boxes before placing new sidewalk. Call SFWD at (415) to pick up the meter boxes free of charge. D. Temporary Asphalt Concrete 1. The temporary asphalt concrete on the restored concrete base shall be removed by the Contractor before placing the asphalt concrete wearing surface. 2. Full compensation for installing and removing the temporary asphalt concrete surface on the concrete base areas before placing asphalt concrete wearing surface shall be considered as Incidental Work to the appropriate bid items. E. California Code and Regulations 1. The Contractor shall comply with all OSHA Code requirements during this contract. Article 37, Section 2946 Provisions for Preventing Accidents Due to Proximity to Overhead Lines and Article 37, Section 2947 Warning Signs Required. F. Muni Railway 1. If Muni overhead wires are encountered, the overhead wires will be kept energized at all times. The overhead trolley wires carry a minimum of 600 Volts DC and have an 18 +/- feet clearance from the existing roadway. The Contractor shall adapt his methods and equipment to this condition, and shall take Portland Cement Concrete Paving
3 G. Local Access precautions against accidents and damage to the overhead wires and feeder cables when performing paving work with lines and feeders energized. 1. The Contractor shall provide local access to garages by the end of each work shift by placing steel plate(s) over excavated area(s). It shall be the Contractor s responsibility to notify residents of the construction schedule prior to any work that may disrupt access to garages or other entrances and provide access during construction where as needed or requested by the Engineer. H. Spray Paint 1. Prior to the start of construction, the Contractor shall furnish the Engineer with ten (10) spray paint cans as Incidental Work at no additional cost to the City. I. Limit Construction Activities: 1. Excavation site may not exceed 1,200 linear feet at any time. J. Survey Control 1. Where roadway pavement reconstruction occurs, the Contractor shall be responsible for providing primary control, with control line and grades, from existing off-site monument markers and lines. The Contractor shall maintain and preserve all lines, grades, and benchmarks and provide for all other survey control work. The Contractor shall establish construction control line with hubs every 25 feet prior to construction work. 2. The Contractor shall replace or reestablish hubs missing or displaced during construction at no cost to the City. 3. The Contractor shall retain the services of s State of California registered land surveyor with minimum of one (1) year experience in engineering surveying and control procedure for public works construction, who shall establish horizontal and vertical controls as needed by the Contractor. 4. The survey control work shall be considered Incidental Work and no separate payment will be made. K. Cobblestones 1. In the event cobblestones are encountered in any street under construction, the Contractor shall remove them from the work site as City property. The cobblestones shall be neatly and securely placed on pallets so they can be moved about safely after delivery. The cobblestones shall be delivered, including off loading, to the lower lot at the Cesar Chavez Street Yard located at 2323 Cesar Chavez Street or where directed by the Engineer within the City of San Francisco. Contact Ms. Liz Lerma of the Bureau of Urban Forestry at (415) hours prior to delivery Portland Cement Concrete Paving
4 1.04 SUBMITTALS 2. The Contractor shall clean the cobblestones of dirt and exercise care in transporting the cobblestones so as to minimize damage. 3. Salvage, hauling and delivery of existing cobblestones to the designated areas from the project site shall be done as incidental work. A. The Contractor shall submit eight (8) copies of manufacturer s literature, specifications, applications and installations for Carbon Black (Gray or Charcoal Color); L.M Scofield C-24 Charcoal Gray ; QC Integral Colors IC-3 Ash Gray ; Solomon colors Charcoal Gray 920; or approved equal for curb ramps for the Engineer s approval. PART 2 PRODUCTS 2.01 MATERIALS 2.02 MIXES A. Portland Cement: In accordance with the requirements of Section of B. Aggregate: In accordance with the requirements of Sections , , , and of The contractor shall substitute recycled concrete for a portion of the virgin aggregate in an amount no less than 15% of the total dry aggregate mass. The recycled concrete material shall meet or exceed the specified requirements. When recycled material is used for concrete base, exposed concrete applications, such as, sidewalk, curb, gutter, parking strip, pavement, and curb ramp, the Sodium Sulfate Soundness test (ASTM C88) is waived. Recycled concrete material will not be allowed in structural concrete. C. Concrete Color: It shall be Gray or Charcoal in color, extra high strength, non-floating, dispersible, non-glare, permanent and unaffected by sunlight. It shall be composed of extremely fine-sub-micron particle size, and shall not create the loss of concrete strength. D. Cast-In-Place Detectable Surface Tiles: In accordance with the requirements of Section E. Surface Applied Detectable Surface Tiles: In accordance with the requirements of Section A. Concrete Curb: In accordance with the requirements of Section and of B. Combined Concrete Curb and Gutter: In accordance with the requirements of Section and of C. Concrete Sidewalk: In accordance with the requirements of Sections and of Portland Cement Concrete Paving
5 D. Concrete Base: Concrete for concrete base shall be Class /4, and contain the admixture 2 pounds calcium chloride per sack of cement ( and ) to accelerate the setting of the concrete in accordance with the requirements of Section 800 of E. Concrete Pavement: In accordance with the requirements of Sections , and of F. Curb Ramps: 1. Curb Portion of Work: In accordance with the requirements of Sections and of 2. Sidewalk Portion of Work: In accordance with the requirements of Sections and of 3. Curb Ramp Color: To obtain the approved permanent dark visual color contrast between the ramp and the adjacent sidewalk, add five (5) pounds of Carbon Black with a dispersing agent per cubic yard of concrete mix or use one of the following approved equal manufacturers and color types to match the Carbon Black color: 1) L.M. Scofield C-24 Charcoal Gray; 2) QC Integral Colors IC-3 Ash Gray ; 3) Solomon Colors Charcoal 920 ; 4) Carbon Black PART 3 EXECUTION 3.01 PREPARATION A. Preparation and Compaction of subgrade: In accordance with the requirements of Section 200 of 1. Concrete Curb: In accordance with the requirements of Section 202 of 2. Combined Concrete Curb and Gutter: In accordance with the requirements of Section 203 of 3. Concrete Sidewalk: In accordance with the requirements of Section 204 of 4. Concrete Base: In accordance with the requirements of Section 207 of 5. Concrete Pavement: In accordance with the requirements of Section 210 of 6. Concrete Curb Ramps: a. Curb Portion of Work: In accordance with the requirements of Sections 202 of Portland Cement Concrete Paving
6 b. Sidewalk Portion of Work: In accordance with the requirements of Section 204 of B. Preparation of subgrade to proper grade, excavating, backfilling, and compacting shall be considered as Incidental Work to the applicable bid items where excavation is required to perform the work. Asphalt shaving or grindings shall not be used as fill material. C. Saw cutting and removal of parking strip, concrete sidewalk, curb, gutter, roadway pavement and curb ramps to construct and/or reconstruct curb ramps, and to remove existing curb ramp shall be considered as Incidental Work to the applicable bid items where removal of said items are required to perform the work PROTECTION A. Concrete base shall not be allowed as a temporary wearing surface. Restored concrete base areas are to be temporarily filled with hot asphalt concrete to the level of adjacent existing pavement or gutter surface before opening to traffic INSTALLATION A. CONCRETE CURBS 1. Concrete Curb: In accordance with the requirements of Section 202 of 2. Placing Concrete: In accordance with the requirements of Section of 3. Construction Joints: In accordance with the requirements of Section of 4. Finishing: In accordance with the requirements of Section of 5. Protection and Curing: In accordance with the requirements of Section of 6. Repair and Replacement: In accordance with the requirements of Section of 7. Painting: In accordance with the requirements of Section of B. CONCRETE COMBINED CURBS AND GUTTER 1. Concrete Curb and Gutter: In accordance with the requirements of Section 203 of 2. Placing Concrete: In accordance with the requirements of Section of Portland Cement Concrete Paving
7 3. Construction Joints: In accordance with the requirements of Section and of 4. Finishing: In accordance with the requirements of Section of 5. Protection and Curing: In accordance with the requirements of Section of 6. Repair and Replacement: In accordance with the requirements of Section of 7. Painting: In accordance with the requirements of Section of C. CONCRETE SIDEWALK 1. Concrete Sidewalk: In accordance with the requirements of Section 204 of 2. Placing Concrete: In accordance with the requirements of Section of 3. Finishing: In accordance with the requirements of Section of 4. Joints: In accordance with the requirements of Section of 5. Protection and Curing: In accordance with the requirements of Section of 6. Sidewalk shall not be constructed monolithic with curb. 7. Street Names: In accordance with the requirements of Section of D. CONCRETE BASE 1. Concrete Base: In accordance with the requirements of Section 207 of 2. Placing Concrete: In accordance with the requirements of Section of 3. Construction Joints: In accordance with the requirements of Section of 4. Dummy Joints: In accordance with the requirements of Section of 5. Protection and Curing: In accordance with the requirements of Section of E. CONCRETE PAVEMENT Portland Cement Concrete Paving
8 1. Concrete Pavement: In accordance with the requirements of Section 210 of SSDPWSF, except that the pavement thickness shall be eight (8) inches unless otherwise noted. 2. Placing Concrete: In accordance with the requirements of Section of 3. Construction Joints: In accordance with the requirements of Section of 4. Dummy Joints: In accordance with the requirements of Section of 5. Protection and Curing: In accordance with the requirements of Section of F. CONCRETE CURB RAMP 1. Curb portion of work: In accordance with the requirements of Section 202 of 2. Sidewalk portion of work: In accordance with the requirements of Section 204 of 3. All curb ramps shall be poured separately from any adjacent construction, such as, curb, sidewalk or gutter. 4. Curb ramps shall be constructed in accordance with the requirements of the Standard Plans FIELD QUALITY CONTROL A. The City may test to satisfactorily demonstrate the proper drainage of the constructed curb and gutter work. The City will flush with water approximately 50 feet of the upstream end of each curb and gutter work for two minutes with minimum flow rate of 0.02 cubic feet per second or approximately 20 gallons equivalence. After five minutes, the Engineer and Contractor shall make visual inspection of gutter for ponding. B. Contractor shall make corrections necessary to demonstrate proper drainage and shall be considered Incidental Work and no separate payment will be made. The Contractor s correction method must be approved by the Engineer. The Engineer s approval does not release the Contractor from the successful execution of the remedy and the requirement to demonstrate proper drainage of the constructed curb and gutter work. END OF SECTION Portland Cement Concrete Paving
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationSECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationSTANDARD SPECIFICATIONS
STANDARD SPECIFICATIONS Standard Slope: Unless otherwise specified on the permit, the sidewalk grade shall be sloped upward from the existing curb at a rate of 2% (approx. ¼ inch per foot). New work required
More informationWILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)
BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset
More informationConstruction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
More informationSECTION 02845 GUARDRAILS
SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL
VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial
More informationElectric Engineering Division FIBER CONDUIT RULES AND REGULATIONS
Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...
More informationTECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
More informationSECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationItem No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description
Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade
More informationPTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
More informationSTANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS
STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains
More informationSPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationSECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK
13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,
More information32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
More informationSECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General
SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationThe Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
More informationSECTION 33 11 00.19 ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section 01 33 00 - Submittals.
SECTION 33 11 00.19 ABANDONMENT OF WATER MAINS PART 1: GENERAL 1.01 SCOPE A. Abandonment in place, by cutting and capping, of existing water mains, hydrants, service lines, and valves. B. Abandonment in
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices
More informationResidential Driveway Installation Requirements. Table of Contents
Residential Driveway Installation Requirements Table of Contents Residential Driveway Requirements Sidewalk Construction Specifications for Residential Properties Hold Harmless Agreement for Residential
More informationSECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
More informationLS 2540 SEWER LATERALS AND INSPECTION TEES
LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal
More informationSPECIAL SPECIFICATION 5757 Power Duct System
2004 Specifications CSJ 0353-04-088 SPECIAL SPECIFICATION 5757 Power Duct System 1. Description. This Item shall govern for the furnishing and installing of all materials, equipment, and labor listed in
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationSECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE
PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationConstruction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
More informationSECTION 5 DRAFTING STANDARDS
SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.
More informationCONSTRUCTION PERMIT REQUIREMENTS
CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationCOMMERCIAL CONDUIT RULES AND REGULATION
Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More informationSANITARY SEWER SERVICE CONNECTION INSTRUCTIONS
1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSTORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES
CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationA. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.
PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,
More information1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.
CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications
More informationPermit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
More informationGrinding equipment that causes raveling, aggregate fractures or disturbance to the joints shall not be permitted.
Guide Specification: Diamond Grinding for City Streets Publication Date: May 24, 2010 SCOPE City streets are defined as roadways with a closed drainage system along with numerous structures such as manholes,
More informationHIGH TENSION CABLE BARRIER
Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationCITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03
CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT
More information2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA
2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationSECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
More informationSECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationTable 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
More informationSTANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationEXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309
EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationCID STREET INFRASTRUCTURE ASSESSMENT
ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for
More informationSTANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY
STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water
More informationADA POST INSPECTION CHECKLIST. Job No. Route County Location
ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks
More informationCHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION
CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in
More informationBRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:
412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationClose-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
More informationCity of Hilshire Village Pine Creek Ln Reconstruction
City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project
More informationSUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES
BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION
More informationBUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE
BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE Toll Free Telephone Numbers Residential Services 800.454.3853 Commercial Services 800.653.5307 Utility Locating Company N.C. 800.632.4949 S.C. 888.721.7877
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More information40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement
More informationARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION
ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of
More informationSection 01562 TREE AND PLANT PROTECTION
Section 01562 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Tree and plant protection. B. Minimum qualifications of Arborist and Urban Forester. 1.02 MEASUREMENT AND PAYMENT A. Payment for Tree Protection,
More informationSC-07 STORM DRAIN INLET PROTECTION
Greenville County Technical Specification for: SC-07 STORM DRAIN INLET PROTECTION 1.0 Storm Drain Inlet Protection 1.1 Description Provide Storm Drain Inlet Protection at all existing and newly installed
More informationIAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
More informationHow To Get A Street Opening Permit In Belham
TOWN OF BELLINGHAM STREET OPENING SPECIFICATION December 2004 - Revisions I. GENERAL A. Definitions and Abbreviations: Town Street shall mean a Town owned right of way or public travel way that the Town
More informationThe New York City Sidewalk Law
HARLEYSVILLE RISK SERVICES Your Partner in Preventing Losses SM The New York City Sidewalk Law Know your responsibilities and take action THE NEW YORK CITY SIDEWALK LAW 2 The New York City Sidewalk Law
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationSECTION 03400 PRECAST CONCRETE STRUCTURES
SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for
More informationCW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS
December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...
More informationFIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
More informationMOBILE HOME SERVICE REQUIREMENTS GAS
ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS
More informationVERTICAL SPEED CONTROL DEVICES
H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS
San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these
More informationASPHALT & CONCRETE SPECIFICATIONS
ASPHALT REPAIR & RESURFACE GENERAL PARAMETERS The intent of these specifications is to provide detailed specifications for contractors to fallow for parking lot repairs. The property manager or construction
More informationSection 600 Incidental Construction
Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...
More informationSECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES
SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES 611-1 Description. This Section sets forth Contract acceptance procedures for installations of traffic control signals and devices
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationCivil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationGuidelines for Fiber Optic Cable Permits
Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway
More information