1 FTA s Small Starts Program Denver, Colorado September 27, 2007

2 Small Starts Program Overview Program funding at $200m/yr Simplified Process Alternatives Analysis Project Development Construction Simplified Project Construction Grant Agreement Scope Cost Schedule Federal Funding Maximum Amount and Schedule Local Funding Sources 2

3 Eligibility - Costs Total cost < $250 million Small Starts share < $75 million Exempt projects (<$25 million New Starts share) may: Remain exempt until Final Rule then be evaluated and rated if construction not started, or Be evaluated and rated now as Small Starts 3

4 Program Goal Fund meritorious projects Develop reliable information on project benefits and costs Ensure projects treated equitably nationally Facilitate communication between FTA, transit industry and Congress 4

5 Guiding Principles for Development of Small Starts Interim Guidance Evaluation process should not change dramatically from existing process to minimize rating changes given those anticipated in the NPRM Requirements should ensure level playing field for all projects Requirements should be mode-neutral Costs, benefits and impacts should be developed using established methodologies 5

6 Eligibility Project Definition Project a fixed guideway for 50% or more of its length during peak, or Project a corridor bus project including at least: Transit stations Traffic signal priority or pre-emption Low floor buses or level boarding Premium service branding 10 min peak/15 min off-peak headways at least 14 hrs/day 6

7 Eligibility Additional Features for Very Small Starts Simple, low-cost projects that qualify for streamlined process Very Small Starts eligibility criteria: Existing daily riders over 3,000 Total cost under $50 million Under $3 million per mile, excluding rolling stock 7

8 Interim Guidance Evaluation of Small Starts Project Justification Subset of Existing New Starts Criteria: Land-use Cost-effectiveness Other factors, including economic development, congestion and pricing strategies, and the case for the project 8

9 Interim Guidance Evaluation of Local Financial Commitment Projects receive medium for local financial commitment if: Reasonable plan to secure local share (all non-new Starts funding committed for PCGA) Project O&M under 5 percent of agency operating budget Agency in solid financial condition Projects that cannot meet the conditions above submit a financial plan According to FTA guidance Covering period up to and including opening year Evaluated based on criteria used for New Starts 9

10 Simplification of Small Starts Program Requirements Compared to New Starts Very Small Starts AA could contain two alternatives and require no more information than developed for a project funded only with local funds Project justification evaluation requires meeting easily developed information on costs and existing ridership Local financial commitment evaluation could require meeting 3 easily demonstrated conditions; otherwise financial plan extends only to opening year No final design approval Simplified PMP and cost reviews Simplified PCGA 10

11 Simplification of Small Starts Program Requirements Compared to New Starts Small Starts AA could contain few alternatives, use forecasts of transportation benefits with simplified methods and address project opening, not 20-year forecasts Land use submission reduced for project justification Local financial commitment evaluation could require meeting 3 easily demonstrated conditions; otherwise financial plan extends only to opening year No final design approval Simplified PMP and cost reviews Simplified PCGA 11

12 Projects in Project Development Los Angeles Metro Rapid Bus Closure Kansas City Troost Corridor BRT Springfield (OR) Pioneer Parkway BRT King Co (WA) Pacific Highway South BRT Portland Streetcar Loop 12

13 Pending Project Development Requests Projects Mason (CO) Transportation Corridor BRT Fitchburg (MA) Commuter Rail South Corridor BRT in Grand Rapids, MI Perris Valley (CA) Metrolink Commuter Rail Extension Others in St. Petersburg, Sarasota, Tucson, San Diego, San Francisco, Oakland, Reno, Des Moines, and Aspen Common Issues AA not completed Finances not identified Project not in metro plan 13

14 Planned Schedule for Rulemaking August 2007: Publication of the Notice of Proposed Rulemaking for New and Small Starts August 2007: Publication of Measures document for NPRM Summer 2008: Publication of the Final Rule for New and Small Starts Summer 2008: Publication of Weights and Measures document for Final Rule 14

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

REINVENTING TRANSIT FROM A SOCIAL SERVICE TO A CRITICAL PUBLIC UTILITY

REINVENTING TRANSIT FROM A SOCIAL SERVICE TO A CRITICAL PUBLIC UTILITY REINVENTING TRANSIT FROM A SOCIAL SERVICE TO A CRITICAL PUBLIC UTILITY THE PRE 1950 PAST. Extensive networks for streetcars, trams and buses. Operated by the private sector through a system of franchises

More information

VRE SYSTEM PLAN SUMMARY

VRE SYSTEM PLAN SUMMARY VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial

More information

Executive Summary. Does a Streetcar Make Sense in Anaheim

Executive Summary. Does a Streetcar Make Sense in Anaheim Does a Streetcar Make Sense in Anaheim Streetcar in Portland s Pearl District Anaheim s proposed streetcar compares well with national best practice in Portland, Seattle and Tampa where new streetcars

More information

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by

Evergreen Line Rapid Transit Project Business Case Executive Summary. February 2008. Reviewed by Evergreen Line Rapid Transit Project Business Case Executive Summary February 2008 Reviewed by Recommendation and Executive Summary The business case for the Evergreen Line Rapid Transit Project (the Project)

More information

Proposed New Starts/Small Starts Policy Guidance

Proposed New Starts/Small Starts Policy Guidance Proposed New Starts/Small Starts Policy Guidance Table of Contents I. INTRODUCTION... 1 II. PROJECT JUSTIFICATION CRITERIA... 4 MOBILITY IMPROVEMENTS... 4 OPERATING EFFICIENCIES... 5 Measure:... 5 Calculation:...

More information

California State Transportation Agency Call for Projects for the. 2016 Transit and Intercity Rail Capital Program

California State Transportation Agency Call for Projects for the. 2016 Transit and Intercity Rail Capital Program California State Transportation Agency Call for Projects for the 2016 Transit and Intercity Rail Capital Program Summary: This call for projects details the application requirements and procedures for

More information

When is BRT the Best Option? 1:30 2:40 p.m.

When is BRT the Best Option? 1:30 2:40 p.m. TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session

More information

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida

National Bus Rapid Transit Institute (NBRTI) At the University of South Florida National Bus Rapid Transit Institute (NBRTI) At the University of South Florida History of the NBRTI In January 2001, the National BRT Institute was created at USF s Center for Urban Transportation Research

More information

California High Speed Rail Ridership and Revenue Forecast Model Run Summary

California High Speed Rail Ridership and Revenue Forecast Model Run Summary California High Speed Rail Ridership and Revenue Forecast Model Run Summary Scenario: 11-035 Scenario Description: High Speed Rail (HSR) between San Francisco and LA Basin (DRAFT) Phase: Year: HSR Fare

More information

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation

More information

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010)

Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Eagle Commuter Rail Denver, Colorado Final Design (Based upon information received by FTA in November 2010) Summary Description Proposed Project: Electrified Commuter Rail 30.2 Miles, 13 Stations Total

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination 2035. Attachment A ORANGE COUNTY TRANSPORTATION AUTHORITY Final Long-Range Transportation Plan - Destination 2035 Attachment A DESTINATION 2035 DESTINATION 2035 EXECUTIVE SUMMARY ATTACHMENT A Moving Toward a Greener Tomorrow

More information

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP This chapter

More information

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015)

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015) Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015) Summary Description Proposed Project: Streetcar 1.3 Miles, 4 Stations otal Capital

More information

Ethernet Access (Formerly Converged Ethernet Access) Operations Manual

Ethernet Access (Formerly Converged Ethernet Access) Operations Manual Ethernet Access (Formerly Converged Ethernet Access) Operations Manual 1. Service Description. Ethernet Access (formerly known as Converged Ethernet Access or Multi-Service Ethernet Access) provides dedicated

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

Welcome to the LRT Overview Open House

Welcome to the LRT Overview Open House Welcome to the LRT Overview Open House Please sign-in so that we may provide you with updates on future events. TORONTO LRT OVERVIEW Importance of Transit to Cities Increase City s competitiveness (World

More information

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4

Figure 4-21. L3: Level 2 SR 99 Elevated Light Rail Alternative Detail - 1 of 4 4-34 SEE FIGURE 4-22 N 14TH ST ROOSEVELT WAY N 130th Street N 130TH ST NE NORTHGATE WAY N 0 1/4 Miles Elevated Light Rail At-Grade Light Rail Elevated Light Rail Station At-Grade Light Rail Station Figure

More information

IMPLICATIONS AND LESSONS LEARNED

IMPLICATIONS AND LESSONS LEARNED 26 CHAPTER 3 IMPLICATIONS AND LESSONS LEARNED The last several decades have seen a transition from bus lanes and prioritization treatments to full-featured BRT. Thirty years ago the emphasis was on curb

More information

2014 SFMTA Transit Fleet Management Plan March 2014

2014 SFMTA Transit Fleet Management Plan March 2014 2014 SFMTA Transit Fleet Management Plan March 2014 Financial Services 1. Introduction 1-1 Introduction to the SFMTA The San Francisco Municipal Transportation Agency (SFMTA) is the principal multi-modal

More information

Chronology of Application of Land Use and Economic Development in New Starts Criteria

Chronology of Application of Land Use and Economic Development in New Starts Criteria Chronology of Application of Land Use and Economic Development in New Starts Criteria Transit Supportive Land Use Policies 1991 ISTEA included additional consideration of transit supportive land use policies

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects C2012-0684 ATTACHMENT 2 The RouteAhead draft 30-year rapid transit plan was developed in coordination with the Investing in

More information

Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development

Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development Who is implementing managed lanes with pricing strategies? Operational Under Construction/ Development Managed Lane Facilities in the U.S. Operational Under Construction Under Development I-10 (Katy Freeway),

More information

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012

South Florida East Coast Corridor (SFECC) Projects. February 7, 2012 Project Update to City of Ft. Lauderdale Central lbroward deast West ttransit it& South Florida East Coast Corridor (SFECC) Projects February 7, 2012 Transit Studies Building a network of premium transit.

More information

Growth of Addis Ababa

Growth of Addis Ababa Growth of Addis Ababa Founded in 1887, and has expanded rapidly Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would reach to eight million.

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Cost Reduction Opportunities

Cost Reduction Opportunities Cost Reduction Opportunities 9 December 2015 Presentation to MassDOT Board of Directors & MBTA Fiscal and Management Control Board Arup 2 A global, integrated, multidisciplinary firm of professionals 13,000

More information

Bus Rapid Transit Service Design

Bus Rapid Transit Service Design APTA STANDARDS DEVELOPMENT PROGRAM RECOMMENDED PRACTICE American Public Transportation Association 1666 K Street, NW, Washington, DC, 20006-1215 APTA BTS-BRT-RP-004-10 Approved October, 2010 APTA Bus Rapid

More information

Financial Plan Status Report

Financial Plan Status Report Financial Plan Status Report Broward MPO Board March 13, 2014 Financial Sub-Committee Membership SFRTA (lead agency) Broward MPO FDOT Miami-Dade MPO Palm Beach MPO South Florida Regional Planning Council

More information

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE MONITORING IMPLEMENTATION AND PERFORMANCE 12MAP-21, a funding and authorization bill to govern U.S. federal surface transportation spending, creates a data-driven, performance-based multimodal program

More information

Smart Cities & Integrated Corridors: from Automation to Optimization

Smart Cities & Integrated Corridors: from Automation to Optimization Smart Cities & Integrated Corridors: from Automation to Optimization Presentation to the National Rural ITS Conference August 28, 2013 Cary Vick, Director of Business Development; Smart Mobility for Smart

More information

Overarching Benefits of Public Transportation:

Overarching Benefits of Public Transportation: Senate Committee on Banking, Housing and Urban Affairs Field Hearing on Transportation A 21 st Century Transportation System: Reducing Gridlock, Tackling Climate Change, Growing Connecticut s Economy Thursday

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

WWW.IMMIGRANTJUSTICE.ORG/KIDS

WWW.IMMIGRANTJUSTICE.ORG/KIDS On the following pages you will find addresses for: Dept. of Justice Immigration Courts AND Dept. of Homeland Security Offices of Chief Counsel (OCC) DISCLAIMER: The most current addresses for DOJ Immigration

More information

Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project

Associated Students of the University of California, Merced 2014-2015. Resolution #14. Resolution in Support of the California High-Speed Rail Project Introduced By: Isaias Rumayor III, ASUCM Senator At-Large Authored By: Michael Lomio, ASUCM Senator At-Large Isaias Rumayor III, ASUCM Senator At-Large Sponsored By: Background: The California High-Speed

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

MANAGEMENT PLAN. Fiscal Year 2015-2016

MANAGEMENT PLAN. Fiscal Year 2015-2016 MANAGEMENT PLAN Fiscal Year 2015-2016 May 6, 2015 Table of Contents I. Executive Summary... 2 Omnitrans Vision... 5 Omnitrans Mission Statement... 5 II. Strategic Initiatives... 5 Implementation... 6 Strategic

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool

TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations. Part 2: Station Typology and Mode of Access Planning Tool TCRP Report 153: Guidelines for Providing Access to Public Transportation Stations Part 2: Station Typology and Mode of Access Planning Tool Jamie Parks, AICP Kittelson & Associates, Inc. Acknowledgements

More information

ANGELOUECONOMICS 2012 INDUSTRY HOTSPOTS

ANGELOUECONOMICS 2012 INDUSTRY HOTSPOTS ANGELOUECONOMICS 2012 INDUSTRY HOTSPOTS INDUSTRY SPECIALIZATION OF AMERICA'S 100 LARGEST METROPOLITAN AREAS INDUSTRY CLUSTERS 19-24 (of 36) ABOUT THE RANKINGS In the 21 st Century, the engines that drive

More information

APPLICATION FORM MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA

APPLICATION FORM MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA Received by: Date: OFFICIAL USE: MASS TRANSIT PROGRAM GRANT APPLICATION PROJECT NAME LEAD AGENCY PROJECT TYPE GENERAL PROJECT AREA APPLICATION FORM Planning/ Project Development Capital/Equipment Amenities/

More information

The Right Direction for Transit: Invest Wisely and Manage Well

The Right Direction for Transit: Invest Wisely and Manage Well The Right Direction for Transit: Invest Wisely and Manage Well The United States have experienced a rapid growth of investment in transit since the beginning of federal transit assistance landmarked by

More information

R-06: Innovation and Technology Fund

R-06: Innovation and Technology Fund Project Number R-06 Subarea Systemwide Primary Mode Facility Type Length Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION This

More information

Downtown Los Angeles Streetcar Economic Analysis

Downtown Los Angeles Streetcar Economic Analysis Downtown Los Angeles Streetcar Economic Analysis Executive Briefing Prepared for: Los Angeles Streetcar, Inc. 550 S. Hope Street, Ste. 2300 Los Angeles, CA 90071 Prepared by: AECOM 515 S. Flower Street,

More information

Metro. Board Report. File #:2015-1088, File Type:Informational Report

Metro. Board Report. File #:2015-1088, File Type:Informational Report Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #:2015-1088, File Type:Informational Report SUBJECT: EXECUTIVE MANAGEMENT

More information

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL

APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL DRAFT APPENDIX G OPERATIONS AND MAINTENANCE COST ESTIMATION MODEL Operations and Maintenance Cost Methodology and Results The Colorado Department of Transportation is conducting an Advanced Guideway System

More information

Title VI Analysis of FY 2015 & FY 2016 Proposed Fare Changes

Title VI Analysis of FY 2015 & FY 2016 Proposed Fare Changes Title VI Analysis of FY 2015 & FY 2016 Changes 1 2 I. Background Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color or national origin in programs and activities

More information

2012 King County Metro Transit Peer Agency Comparison on Performance Measures

2012 King County Metro Transit Peer Agency Comparison on Performance Measures 2012 Peer Agency Comparison on Performance Measures Department of Transportation Metro Transit Division King Street Center, KSC-TR-0415 201 S. Jackson St Seattle, WA 98104 206-553-3000 TTY Relay: 711 www.kingcounty.gov/metro

More information

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects

MAKING TRACKS. A Primer for Implementing Transit Fixed Guideway Projects MAKING TRACKS A Primer for Implementing Transit Fixed Guideway Projects Introduction Demand for new fixed guideway projects is strong nationwide. Each year hundreds of new fixed guideway projects across

More information

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone Abstract. As California cities move into the second decade of the 21st

More information

GTA Cordon Count Program

GTA Cordon Count Program Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends

More information

Transportation Funding Overview SAMCo. Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006

Transportation Funding Overview SAMCo. Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006 Transportation Funding Overview SAMCo Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006 San Antonio Mobility Coalition, Inc: Non profit, public/private partnership

More information

Update on the Development of MAP 21 Performance Measures

Update on the Development of MAP 21 Performance Measures Update on the Development of MAP 21 Performance Measures TPB Technical Committee February 6, 2015 Eric Randall Department of Transportation Planning Item 9 MAP 21 Rulemaking National Goals Rulemaking Overview

More information

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix E Transportation System and Demand Management Programs, and Emerging Technologies Appendix Contents Transportation System Management Program Transportation Demand Management Program Regional Parking

More information

a GAO-01-984 GAO MASS TRANSIT Bus Rapid Transit Shows Promise Report to Congressional Requesters United States General Accounting Office

a GAO-01-984 GAO MASS TRANSIT Bus Rapid Transit Shows Promise Report to Congressional Requesters United States General Accounting Office GAO United States General Accounting Office Report to Congressional Requesters September 2001 MASS TRANSIT Bus Rapid Transit Shows Promise a GAO-01-984 Contents Letter 1 Results in Brief 2 Background

More information

OFFICE OF THE CHIEF ARCHITECT PUBLIC BUILDINGS SERVICE U.S. GENERAL SERVICES ADMINISTRATION THE GREENING OF GSA CASE STUDIES

OFFICE OF THE CHIEF ARCHITECT PUBLIC BUILDINGS SERVICE U.S. GENERAL SERVICES ADMINISTRATION THE GREENING OF GSA CASE STUDIES OFFICE OF THE CHIEF ARCHITECT PUBLIC BUILDINGS SERVICE U.S. GENERAL SERVICES ADMINISTRATION THE GREENING OF GSA CASE STUDIES APT Symposium, Los Angeles, APT SYMPOSIUM, California DENVER, COLORADO November

More information

Miami-Dade Transit Service Standards

Miami-Dade Transit Service Standards Miami-Dade Transit Service Standards Presentation to RTC November 10, 2005 Roosevelt Bradley 1 MDT Service Standards Primer Background Standards: Old & New Best Practices: Comparison Denver RTD ChicagoCTA

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

Conceptual Engineering Study for the Hempstead Corridor Commuter Rail

Conceptual Engineering Study for the Hempstead Corridor Commuter Rail Conceptual Engineering Study for the Hempstead Corridor Commuter Rail VOLUME I OF II Prepared by In association with Conceptual Engineering Study for the Hempstead Corridor Commuter Rail FOR REVIEW ONLY

More information

Q1 2011 Utility Rebate Report. Fort Worth, TX

Q1 2011 Utility Rebate Report. Fort Worth, TX Q1 2011 Utility Rebate Report A service of the Sustainable Corporate Real Estate Roundtable Fort Worth, TX April 7, 2011 (Captures regulations through March 31, 2011) This Report is one of a series of

More information

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013

City of Rockville Regional Development Impacts: Transportation Capacity Analysis. June, 2013 City of Rockville Regional Development Impacts: Transportation Capacity Analysis June, 2013 Purpose and Need Response to Council and Public Evaluate use of more advanced traffic analysis methodology and

More information

IN THEOR Y, PUBLIC INVESTMENTS IN MASS TRANSIT CAN MAKE URBAN

IN THEOR Y, PUBLIC INVESTMENTS IN MASS TRANSIT CAN MAKE URBAN Can Public Transportation Increase Economic Efficiency? M AT T H E W D R E N N A N A N D C H A R L E S B R E C H E R IN THEOR Y, PUBLIC INVESTMENTS IN MASS TRANSIT CAN MAKE URBAN economies more efficient

More information

What will the Christchurch Mayor and CEO learn about light rail in the US?

What will the Christchurch Mayor and CEO learn about light rail in the US? CRMS Special Digest. What will the Christchurch Mayor and CEO learn about light rail in the US? The Costs of Fruitless Tours. The public and media commentators are currently somewhat excited about the

More information

Municipal Transportation Quality Review

Municipal Transportation Quality Review Municipal Transportation Quality Review SFMTA Response June 2015 San Francisco, California Overview The Agency s response to recommended modifications in the Transportation Quality Review An update on

More information

Research Results Digest 352

Research Results Digest 352 April 2011 NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM Responsible Senior Program Officer: Gwen Chisholm-Smith Research Results Digest 352 COST/BENEFIT ANALYSIS OF CONVERTING A LANE FOR BUS RAPID TRANSIT

More information

Presented by: New Haven Electric Streetcar A Catalyst for Development

Presented by: New Haven Electric Streetcar A Catalyst for Development Presented by: New Haven Electric Streetcar A Catalyst for Development Our Team Has Been on Virtually Every Streetcar Project Constructed in U.S. in Last 10 Years Sedro Woolley Portland St. Paul Minneapolis

More information

Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives

Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives INFORMATION Subject: Presentation - TTC/Transportation Services Joint Surface Transit Initiatives Date: May 27, 2015 Stephen Buckley, General Manager, Transportation Services has been invited by the Chair

More information

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions

More information

ExpressLanes CAG Summit. March 2, 2010

ExpressLanes CAG Summit. March 2, 2010 ExpressLanes CAG Summit March 2, 2010 1 Project Goals Move More People, Not More Vehicles > Increase Throughput of HOT lanes > Effectiveness (Mode Shift) > Efficiency (Cost of Project Relative to Benefits)

More information

Department of Veterans Affairs Quarterly Notice to Congress on Data Breaches Third Quarter of Fiscal Year 2015 April 1, 2015 through June 30, 2015

Department of Veterans Affairs Quarterly Notice to Congress on Data Breaches Third Quarter of Fiscal Year 2015 April 1, 2015 through June 30, 2015 VHA 4/1/15 VISN 01 Boston, MA 1 0 4/15/15 VISN 01 Boston, MA 1 0 4/22/15 VISN 01 Boston, MA 10 0 4/24/15 VISN 01 Boston, MA 1 0 4/27/15 VISN 01 Boston, MA 0 1 4/29/15 VISN 01 Boston, MA 0 1 4/30/15 VISN

More information

Risk Management in the Development of a Penta-P Project

Risk Management in the Development of a Penta-P Project Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don

More information

Jan 2015 - Dec 2016 Training Schedule

Jan 2015 - Dec 2016 Training Schedule Alabama Birmingham, AL Aug 31Sep 1 '15 Sep 23 '15 Aug 31Sep 3 '15 Sep 2122 '15 Sep 2324 '15 Arc Flash Electrical Safety NFPA 70E Sep 2325 '15 Dec 1415 '15 Dec 78 '15 Nov 1819 '15 Nov 1617 '15 Dec 910 '15

More information

Q1 2011 Utility Rebate Report. Houston, TX

Q1 2011 Utility Rebate Report. Houston, TX Q1 2011 Utility Rebate Report A service of the Sustainable Corporate Real Estate Roundtable Houston, TX April 7, 2011 (Captures regulations through March 31, 2011) This Report is one of a series of reports

More information

Transitways and the RouteAhead for Calgary Transit

Transitways and the RouteAhead for Calgary Transit Transitways and the RouteAhead for Calgary Transit Chris Jordan, P.Eng., M.Sc., Manager, Strategic Planning, Calgary Transit, Transportation, City of Calgary Jen Malzer, P.Eng., M.Sc., Senior Transit Planner,

More information

30 Years of Smart Growth

30 Years of Smart Growth 30 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor A Presentation by the Arlington County Department of Community Planning,

More information

ASSESSING RISK OF SENIOR LIVING OVER-SUPPLY A LONG-TERM PERSPECTIVE

ASSESSING RISK OF SENIOR LIVING OVER-SUPPLY A LONG-TERM PERSPECTIVE TOPICS ASSESSING RISK OF SENIOR LIVING OVER-SUPPLY A LONG-TERM PERSPECTIVE The ratio of new openings to existing inventory ratio (the new openings ratio ) in combination with the ratio of units currently

More information

Moving Ahead for Progress in the 21 st Century (MAP-21)

Moving Ahead for Progress in the 21 st Century (MAP-21) Streets and Freeways Subcommittee Meeting Moving Ahead for Progress in the 21 st Century (MAP-21) September 20, 2012 Metro s America Fast Forward Proposal Included in MAP-21 Act Enhances Transportation

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

Chapter 8 Funding Considerations

Chapter 8 Funding Considerations Chapter 8 Funding Considerations Expanding transit services into El Dorado Hills under any of the service alternatives has associated operating and capital costs. This chapter considers the funding sources

More information

Passenger Rail Service

Passenger Rail Service Passenger Rail Service Bill Sproule Michigan Tech University REES Module #5 - Transit, Commuter and Intercity Passenger Rail 1 Passenger Rail Service Intercity Passenger Rail trains that move passengers

More information

Expo Light Rail Line. Expo Board Presentation Monthly Project Status Update May 7, 2015

Expo Light Rail Line. Expo Board Presentation Monthly Project Status Update May 7, 2015 Expo Board Presentation Monthly Project Status Update May 7, 2015 Expo Phase 1 Phase 1 Project Status Closeout Status Completing Closeout of Remaining Elements of Work Final As-Builts nearing completion

More information

Strategic Regional Transit Plan

Strategic Regional Transit Plan Strategic Regional Transit Plan December 2008 Chapter 6: Run Time nalysis (Chapter 6 originally prepared October 2007) RUN TIME NLYSIS TLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 SCREEN TWO LTERNTIVES...

More information

Project Management Oversight Services

Project Management Oversight Services Solicitation Number: Reference-Number-FTA-08-PMOC Project Management Oversight Services Federal Transit Administration Our fundamental business strategy is forging strong, long-term relationships with

More information

The Most Affordable Cities For Individuals to Buy Health Insurance

The Most Affordable Cities For Individuals to Buy Health Insurance The Most Affordable Cities For Individuals to Buy Health Insurance Focusing on Health Insurance Solutions for Millions of Americans Copyright 2005, ehealthinsurance. All rights reserved. Introduction:

More information

Geary Corridor Bus Rapid Transit Conceptual Engineering and Environmental Analysis

Geary Corridor Bus Rapid Transit Conceptual Engineering and Environmental Analysis Geary Corridor Bus Rapid Transit Conceptual Engineering and Environmental Analysis SFMTA Fleet Issues SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Citizens Advisory Committee September 12, 2013 The Pathway

More information

L E G I S L A T I V E A N A L Y S T S O F F I C E

L E G I S L A T I V E A N A L Y S T S O F F I C E November 29, 2011 High-Speed Rail Authority: The Draft 2012 Business Plan and Funding Plan L E G I S L A T I V E A N A L Y S T S O F F I C E Presented to: Assembly Transportation Committee Hon. Bonnie

More information

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch

More information

Bus rapid transit (BRT) can deliver highquality

Bus rapid transit (BRT) can deliver highquality Bus rapid transit (BRT) can deliver highquality service if operated on exclusive busways, where there is no congestion. But building such guideways has two major drawbacks. First, they are expensive, comparable

More information

Progress Report Capital Programs Support

Progress Report Capital Programs Support Progress Report Capital Programs Support March 2015 Prepared by Project Control l Design, Engineering & Construction Management March 2015 Page 141 of 150 This page intentionally left blank. March 2015

More information

Transit Technology Alternatives

Transit Technology Alternatives Transit Technology Alternatives Fixed Guideway Systems (see http://www.apta.com/research/info/define/index.cfm) Heavy rail - HR Heavy Rail is a system that is totally separated from its surroundings and

More information

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat Sustainable urban mobility: visions beyond Europe 2 nd October 2013 Brest Udo Mbeche, UN-Habitat The Global Report for Human Settlements Published every two years under a UN General Assembly mandate. Aims

More information

QMobility Management. A New Role for Public Transportation

QMobility Management. A New Role for Public Transportation QMobility Management A New Role for Public Transportation A Message from Bill Millar Several years ago a series of studies were undertaken through the Transit Cooperative Research Program (TCRP) to identify

More information

Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016

Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016 Final NPS Alternative Transportation Program Strategic Action Plan, 2012 2016 FY 2012 Executive summary This plan is an action oriented, performance based update to the 2002 2006 Alternative Transportation

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information