1 Mechanical Biological Treatment Facility Former Britannia Zinc Site, Avonmouth Environmental Statement Non Technical Summary Non Technical Summary July 09

2 New Earth Solutions Group Ltd Mechanical Biological Treatment Facility Former Britannia Zinc Site, Avonmouth Environmental Statement Non Technical Summary July 2009 A planning application for the development of a Mechanical Biological Treatment facility at the former Britannia Zinc Site in Avonmouth has been submitted. An Environmental Statement has been prepared in accordance with the requirements of the Town and Country Planning (Environmental Impact Assessment) (England and Wales) Regulations Schedule 4 of those regulations requires that a summary of the Environmental Statement is provided in non technical language. This document forms the Non Technical Summary to satisfy these requirements. This report was produced by Atkins Limited for New Earth Solutions Group Ltd (NES) for the specific purpose supporting the planning application. It may not be used by any person other than NES without NES s express permission. In any event, Atkins accepts no liability for any costs, liabilities or losses arising as a result of the use of, or reliance upon, the contents of this report by any person other than NES. Atkins Limited Document History JOB NUMBER: DOCUMENT REF: Britannia Zinc MBT Non Technical Summary 1 Final LS EH AJ JAS July 09 0 Draft for client review LS EH AJ JAS July 09 Revision Purpose Description Originated Checked Reviewed Authorised Date July 2009

3 Introduction New Earth Solutions Group Ltd (NES) is proposing to develop a Mechanical Biological Treatment (MBT) facility on the former Britannia Zinc site in Avonmouth. The proposed facility will have the capacity to treat 200,000 tonnes per annum (tpa) of residual waste (non-hazardous household and commercial black bag/wheely bin waste) through a combination of sorting, segregating and composting processes. New Earth Solutions Group Ltd (NES) employ advanced waste separation and composting technologies to process household, commercial and industrial waste. They specialise in designing bespoke processing systems that assist local authorities in meeting their landfill diversion and recycling targets. NES has recently been selected as preferred bidder for the West of England Contract to treat 120,000 tpa of household waste from the Partnership area (Bath & North East Somerset Council, Bristol City Council, North Somerset Council and South Gloucestershire Council) starting April Phase 1 of the proposed MBT is being designed and constructed specifically to meet the needs of this contract with a second phase providing an additional 80,000 tpa of merchant capacity. Once the facility is fully operational it will reduce the amount of municipal biodegradable waste going to landfill (within the partnership area) by 75%. Figure 1 shows the location of the application site. It is anticipated that site remediation and construction will commence in February 2010 and take approximately 14 months up to the completion of the Phase 1 build. Phase 1 is planned to be operational by 1 st April The Need for the Development European and UK legislation sets targets for local authorities to reduce the amount of biodegradable waste they send to landfill. By 2020, the Council must have reduced the amount of such waste from current levels of approximately 227,371 tonnes to just 98,223 or they will face very heavy fines. The West of England Partnership have chosen the MBT technology employed by NES to meet these targets. The Alternatives Considered NES have undertaken an exhaustive search for a suitable site to accommodate the MBT facility in the West of England sub-region. This has been combined with the sites identified as suitable for waste treatment facilities in a report produced for the Partnership area. 1 Both searches have identified the land at the former Britannia Zinc site as suitable for a waste treatment facility. The application site is currently a derelict industrial site with good transport links to the Partnership area from which the waste will be coming. It is located within an area which is being redeveloped for commercial and industrial use and there are no residential properties within 800m of the site. The West of England Partnership have selected the MBT technology used by NES over alternative technologies through a tendering process and using a life cycle assessment tool which assesses the environmental impacts associated with various waste management scenarios. 1 Environmental Resource Management. June 2009, Revised Detailed Site Assessment. An assessment of sites for the location of strategic facilities to treat residual waste. Final Report. July

4 The Site and Its Setting The application site is situated within the Avonmouth Industrial Area approximately 9.5km north west of Bristol City Centre. It is located on the former Britannia Zinc works site which is now referred to as the Access 18 commercial development. The site is approximately 5.5ha of brownfield land, all previous buildings have been demolished to ground level leaving a generally flat surface of various forms of concrete. The surrounding land use is dominated by past and present industrial and commercial activities. The former zinc smelting works that were located on the site have contaminated the underlying ground with heavy metals associated with the smelting processes. These contaminants are largely contained in the underlying Made Ground (ground constructed by man) which comprises residues of the former smelter processes. The Made Ground is underlain by the Tidal Flat deposits of clay, silt and sand which in turn is underlain by the solid geology of the Mercia Mudstone Group. environment. There is an extensive rhine (ditch) system in the local area. The northern boundary of the site is formed by Kings Western Rhine (west) which is an artificially lined channel which flows into the larger rhine network and ultimately the River Severn Estuary. The closest Greenfield area to the site is approximately 800m to the east. The nearest residential receptor is approximately 800m to the south east of the A4034/A4 roundabout. The River Severn Estuary is located approximately 800m to the north west of the site at its closest point and is designated as a Site of Special Scientific Interest (SSSI), a Special Protection Area (SPA), a Special Area of Conservation (SAC), and as an important wetland under the Ramsar Convention. These designations relate to the important habitats that the estuary provides and the species that the habitats support. Other watercourses in the area include the River Avon, approximately 1.8km to the south of the site and the extensive rhine network which ultimately flows into the Severn Estuary. Three groundwater regimes exist at the site associated with each of the above geological strata. Shallow groundwater is present within the Made Ground, this groundwater is contaminated. Groundwater is also present within the Tidal Flat deposits and the Mercia Mudstone Group which is classified as a non-aquifer (a formation regarded as containing insignificant quantities of groundwater). The contamination at the site has had an adverse impact on the water quality of the surrounding View from Zinc Road showing eastern site area July

5 Description of the Proposals The proposed layout of the MBT Facility is illustrated in Figure 2. With the key identifying the proposed use of the different buildings. Mechanical Biological Treatment is split into two distinct processes. Waste reception and mechanical sorting Biostabilisation of the organic fraction In the first process waste is tipped from waste delivery vehicles through doors into a bunkering area in the waste reception hall. The doors are kept closed except when a waste delivery is taking place. From the reception area the waste is loaded by mobile plant into a shredder and subsequently passed through a series of industrial machines to remove certain materials such as metals and plastics for recycling and sorts different sized fractions of the biodegradable portion. The reception building also provides buffering capacity to temporarily store waste materials during peak delivery periods or in the event of plant breakdown. The second process is biostabilisation of the organic fraction to both reduce the biodegradable content and ensure that the waste is treated to meet the requirements of the Animal Bi-Products Regulations (ABPR) This fraction of the waste includes any green and food waste within the residual waste stream as well as paper, card and natural fibres. The biodegradable fraction is transferred from the mechanical treatment hall to the biostabilisation halls via covered links or conveyors and is subsequently built into 4m wide long piles called windrows. The windrows are built over aeration channels in the floor which pull a steady supply of air through the windrow. This in addition to irrigation of the windrows, ensures that optimum conditions are in place for biodegradation. The temperature of the windrows is monitored continuously and they are turned regularly using a bespoke compost turner to ensure that all of the windrowed material has reached the temperatures required by the ABP Regulations. The output from the biostabilisation process is a compost like output (CLO). Before the CLO is ready for dispatch it is subjected to a further mechanical treatment involving screening to ensure that any oversized material or contamination such as plastics and metals, that were not removed in the initial mechanical sorting process, are removed before use in land restoration or non-food crop agricultural land. Schematic diagram of processes July

6 The Assessment of the Potential Environmental Effects The MBT facility will operate under an Environmental Permit from the Environment Agency. The Permit will provide limits on discharges to air, land and water associated with the operation of the facility. An application for an Environmental Permit will be submitted shortly after the planning application. The potential environmental impacts during the construction and operation of the MBT facility have been assessed. While several measures to minimise these impacts are incorporated into the design of the facility, the assessment identified additional measures which are detailed in this summary. With these measures in place, there will be some long term beneficial effects on the environment once the facility is operational. These benefits are largely due to the improvements in surface water and shallow groundwater quality, the development of a derelict site and ecological enhancement. Traffic and Transport Vehicles accessing the site will travel northbound on the A403 St Andrews Rd and turn right onto Kings Weston Lane at a signal controlled junction. They will then turn right onto Boundary Road which leads onto Zinc Road and into the site. The majority of waste deliveries to the MBT facility will occur between 0700 and 1700 Monday to Friday, and 0800 to 1200 on Saturdays (and all day Saturday following a bank holiday). The facility will only receive waste on Saturdays during the months of April to June, when higher levels of household garden waste is generated. The existing capacity of the highway network has been assessed following the identification of two junctions for assessment. These junctions were identified in scoping discussions with Bristol City Council. They are: Kings Weston Lane / St Andrews Road Signal Junction; Kings Weston Road / Boundary Road (Site Access) Priority Junction The capacity of both junctions have been assessed with 2009 base traffic flows, and show both junctions to operate within capacity during the weekday peak hours. The injury accident records have been obtained for the same junctions for which capacity assessments have been undertaken, and show local roads to have no safety shortcomings. The Kings Weston Lane / St Andrews Road signal junction is shown to operate at capacity with base and committed development traffic flows in This is a direct result of a significant amount of committed development traffic travelling through the junction during peak hours. With the addition of proposed development traffic, the results are largely unchanged, and the proposals shown to have minimal impact. Sustainable transport links have been identified in the local area to the site. The site is connected to footways and cycle routes and adequate public transport provision is provided in the local area. There are a number of bus and train services operating in Avonmouth, providing links to wider areas of Bristol and beyond. Air Quality The facility will operate under an Environmental Permit, which will provide limits on discharges to air associated with the operation of the facility. Operation of the proposed facility has the potential to result in releases of dust, odour, and bioaerosols as a result of the waste processing activities. The assessment provides: an examination of information on existing pollutant sources and measures ambient concentrations in the vicinity of the site and surrounding area, comparing these with air quality criteria. consideration of air quality impacts during the remediation and construction phases, inparticular potential dust impacts and effects. estimations of ambient local air pollutant concentrations due to additional traffic emissions associated with the operation of the proposed facility. consideration of the potential impacts and effects of the operation of the facility in terms July

7 of potential dust, bioaerosols, odour and other gaseous emissions. recommendations for mitigation to prevent or reasonably minimise potentially significant effects identified by the assessment. The operation of the facility would have an insignificant effect on odour and bioaerosol emissions in the area. Wind rose diagram for Bristol Airport Consultation with Bristol City Council identified that : there are few relevant sensitive receptors in the vicinity for any of the potential air quality impacts (air, dust, odour, bioaerosols), and the proposed facility uses proven technology to control releases to air. As such, the following potential issues were excluded from further consideration in the Environmental Impact Assessment (EIA): Dust from construction vehicle movements on local road network. Construction dust effects from site workings at sensitive human health receptors. Operational traffic adversely affecting local air quality (human health), subject to confirmation of traffic flow changes from the transport assessment. This is confirmed within the EIA. The assessment has therefore been limited to: Consideration of construction dust effects on the Severn Estuary designated ecological site Qualitative assessment of operational phase bioaerosol emissions Qualitative comments on any design changes since the scoping position on the effect of odour on relevant receptors. The assessment concludes that: The site is located within an area with relatively good ambient local air quality, with the relevant pollutant concentrations below the air quality objectives. For the Severn Estuary designated site, dust from construction would have a negligible impact with no significance with proposed mitigation. Operational road traffic changes from the proposed facility are small, and below the Design Manual for Roads and Bridges change criteria that require calculations of local air quality human health effects. Noise and Vibration An impact assessment has been carried out following the British Standards BS 5228 and BS 4142 for construction and operational noise. The nearest residential property is approximately 800m from the site. This residential property was considered throughout the assessment but no impacts were found. The nearest commercial properties are offices located approximately 370m and 420m from the eastern site boundary and approximately 200m from the western site boundary. Sampled baseline noise surveys were carried out during the day (07:00-19:00), evening (19:00-23:00) and night (23:00-07:00) periods, to establish ambient noise conditions in the area potentially at risk of exposure to noise from the new facility, and which represented nearby noisesensitive properties. The noise climate of the area was revealed to be industrial in nature, dominated by road traffic noise (a large proportion HGVs) and surrounding industrial activity. Measured noise levels were subsequently used in the assessment of the impact from the proposed development and the setting of an operational plant (machinery) noise emission limit. July

8 Assumptions on the type and number of plant required were used to predict the noise and vibration levels. Unmitigated impact from all stages of development were assessed that may cause minor adverse impacts. However, with the use of appropriate mitigation measures it is practicable to off-set these impacts. Vibration impact is unlikely to be perceptible at any off-site receptor locations. Driven piling is likely to be required as part of the construction phase. The noise and vibration generated by the piling activities will not affect the nearest residential or commercial premises. Operational noise impact was assessed with reference to British Standard 4142 and the Local Authority target noise criterion. This states that a Rating Level of any noise from any fixed plant should not exceed the pre-existing background noise level by 0 db(a) at any time at residential properties and +6 db(a) at any sensitive industrial use. An existing New Earth Solutions MBT and composting facility at Canford, Poole (which the proposal resembles closely) was considered appropriate for comparison and measured noise levels from this site were applied in this assessment. During the daytime operational noise levels were predicted to achieve the Local Authority s noise standard, but for the quietest period of the night the predicted plant noise level was calculated to exceed the adopted plant noise emission limit by up to 4 db(a). However, the office locations of the adjacent industries are very unlikely to be occupied during the night-time to cause complaint. It is recommended that with careful attention paid to plant selection, installation and noise attenuation, the requirements of the Local Authority will be achieved, and that, at worst, adverse residual effects of negligible significance would remain. The Calculation of Road Traffic Noise (CRTN) memorandum and the procedures described within were used to determine noise generated by the extra vehicle movements that would result from the proposed development. The flows associated with the proposed development are relatively low and are not predicted to be large enough to cause any discernible adverse impacts. Landscape An assessment of the impact of the proposed development on landscape character and visual amenity within a study area of approximately 2 km radius was carried out. The proposed development will be located in an area of intense industry. It will create a visual extension to this area but will not be an uncharacteristic addition to it. The existing site is derelict and contaminated; having previously been the location of a zinc smelting facility. The site currently has planning permission to become a landfill site. The proposed development will use materials sympathetic to the immediate townscape character and will introduce a positive alteration to the existing site. Overall there will be a slight beneficial effect on the Avonmouth Industrial Shoreline townscape character area. However there will be a slight adverse effect on one visual amenity receptor in close proximity to the proposed development. Due to the screening qualities of the enclosed industrial urban fabric, large landfill site and network of major transport corridors, the proposed development will result in a neutral effect on more distant visual amenity receptors and landscape/townscape character areas. Ecology An ecological assessment of the receptors that may be affected by the proposed development was undertaken, focusing on protected or notable species, habitats and designated sites. A combination of desk studies and field surveys (Extended Phase I Habitat survey, water vole survey and little ringed plover/black redstart surveys) were undertaken. No protected or notable species were recorded during the surveys. The habitats and species assemblage on site are of negligible value and so were not included in the impact assessment. Designated sites are located within the vicinity of the development site, including the internationally designated Severn Estuary. Impacts on the designated sites were assessed in line with best practice guidelines. Strict adherence to pollution prevention guidelines will result in a negligible July

9 residual impact on the designated sites during both the construction and operational phase of the development. Enhancement of: flood compensation ponds and creation of rubble log piles as refuge hibernacula for amphibians and reptiles will result in an overall net gain in biodiversity. Water and Drainage An assessment has been undertaken to determine the potential effects of the proposed development on flood risk, drainage, water quality and water resources. Measures to prevent or minimise negative impacts have been determined and the subsequent residual effects after these measures are implemented assessed. The potential effects can be summarised as: Temporary construction phase impacts including contamination of surface water resources and increase in localised flood risk. Permanent operational phase impacts including positive impact on water resources. Alteration of the surface water drainage regime (and associated effects, including discharge rates and flood risk). The local rhine network is not monitored by the Environment Agency for water quality but has been assessed as part of this report. The proposed development is located within the tidal flood extent of the Severn Estuary and the floodplain for the local rhines. The risks of flooding on the site and on the surrounding area have been calculated and an appropriately sized flood compensation pond has been designed to mitigate against these risks. This includes any increased surface water runoff associated with new hardstanding and ensures there is no significant residual flood risk. The implementation of mitigation measures will ensure that there are no significant residual or cumulative effects on water quality or any important and sensitive water resources during the construction or operational phase. Following the implementation of the recommended mitigation measures no significant residual effects in terms of flooding, drainage, surface water quality and surface water resources are anticipated during construction or operation. Once the site is operational there will be some beneficial effects to the local surface water network as the surface water and groundwater recharge of the Kings Weston Rhine (west) will be much cleaner. To mitigate against altering the drainage regime and possible contamination of surface water during construction a Construction Environmental Management Plan (CEMP) will be developed, to manage and control all the construction activities. Contaminated Land Geo-environmental investigations have been undertaken across the whole Access 18 development area and outline remedial strategies have been agreed with the Environment Agency and Bristol City Council for the various areas of the whole development. A further geo-environmental investigation has been undertaken on the application site to further inform both the environmental impact assessment and a remedial strategy specific to the site. The current concentrations of contaminants present within the Made Ground were found to present risks to the human health of site users, surface waters and shallow groundwater. A remediation strategy has been developed to ensure that once the site is operational it will no longer present significant risks to human health or the water environment. This will involve some remediation works being carried out during the construction phase. The Construction Environmental Management Plan will include measures to avoid accidental spillages of potentially polluting substances. The Environmental Permit that the MBT will operate under requires that the quality of the land does not deteriorate due to the operation of the facility. July

10 Summary and Conclusions The impact assessment has sought to understand both the direct and indirect effects of the MBT facility during construction and operation and has considered their duration. Generally, the environmental impact assessment has determined that the during the construction phase there will be some minor adverse impacts relating to noise, dust, landscape and surface water. These are all short term impacts typical of activities on construction sites. Once the site is operational the overall environmental assessment has determined that there should be long term minor beneficial effects on the surrounding environment when all mitigation measures are taken into account. The benefits to the surrounding environment are borne through improvements to: the local surface water within the rhine network. the biodiversity of the site. the improved visual effect on the local area by bringing a derelict site into use. July

11 Figures July 2009

12

13

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects

Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects Chapter 12: Impacts, Mitigation, Cumulative Impacts and Residual Effects REnescience Northwich Quality Management Prepared by: Tom Dearing Senior Environmental Consultant 02/10/15 Reviewed & checked by:

More information

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES

2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.0 NEED FOR THE DEVELOPMENT & CONSIDERATION OF ALTERNATIVES 2.1 This chapter outlines how the need for this proposed development has been established, where planning policy supports it, the alternative

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Recycling & Energy Recovery Facility

Recycling & Energy Recovery Facility Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES Integra Consulting Engineers Limited NS / 2543 Fountain House

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

Application for Planning Permission. Town and Country Planning Act 1990

Application for Planning Permission. Town and Country Planning Act 1990 Application for Planning Permission. Town and Country Planning Act 1990 Publication of applications on planning authority websites. Please note that the information provided on this application form and

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

Carmarthenshire LDP Site Assessment Proforma

Carmarthenshire LDP Site Assessment Proforma Carmarthenshire LDP Site Assessment Proforma 1. Site Details Ref: SC1/h1 Site Ref (where applicable): Location: Parc Puw, Drefach Felindre Site Area (Ha): Eisting Use* *if candidate site as proposed by

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS

ENVIRONMENTAL IMPACT ASSESSMENTS AND ENVIRONMENTAL IMPACT STATEMENTS GOVERNMENT OF BERMUDA Department of Planning ENVIRONMENTAL IMPACT ASSESSMENTS AND Section 1: Introduction... 2 Section 2: What are Environmental Impact Assessments and Environmental Impact Statements and

More information

It s hard to avoid the word green these days.

It s hard to avoid the word green these days. Going green : Environmental jobs for scientists and engineers Alice Ramey Alice Ramey is an economist in the Office of Occupational Statistics and Employment Projections, BLS. She is available at (202)

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment

Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment Item No. Area/ Building Pathway to 1 Identified areas of / (redevelopment Ingestion Inhalation Severe Likely High SKM Enviros desk study highlights several known areas of significant historical. Areas

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Creating the environment for business

Creating the environment for business 1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of

More information

Living & Working Managing Natural Resources and Waste

Living & Working Managing Natural Resources and Waste Living & Working Managing Natural Resources and Waste 5.13 Managing Natural Resources and Waste Background 5.13.1 This chapter focuses on how we manage resources within the AONB. It includes renewable

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

The River Ribble is one of the longest rivers in the North West of England

The River Ribble is one of the longest rivers in the North West of England River Ribble The River Ribble is one of the longest rivers in the North West of England Did you know? The tidal limit of the Ribble is 11 miles inland (above Preston); The River Ribble is home to a variety

More information

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At

M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Alternatives and Design Evolution: Planning Application 1 - RBKC

Alternatives and Design Evolution: Planning Application 1 - RBKC 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan

More information

New environmental liabilities for EU companies

New environmental liabilities for EU companies New environmental liabilities for EU companies The ELD applies to all businesses that operate within the EU, even if the parent company is located outside of the EU. The ELD applies to all businesses,

More information

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012 Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of

More information

part 9 waste management

part 9 waste management part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE

More information

South London Energy Recovery Facility. Planning Application Summary

South London Energy Recovery Facility. Planning Application Summary South London Planning Application Summary July 2012 South London Planning Application Summary July 2012 Terence O Rourke Ltd 2012. All rights reserved. No part of this document may be reproduced in any

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange

East Midlands Intermodal Park, South Derbyshire Proposals for a Strategic Rail Freight Interchange Newsletter: Issue 1 (May 2014) Welcome + This newsletter announces the start of Goodman Shepherd s consultation on its proposals for the East Midlands Intermodal Park (EMIP) in South Derbyshire. Goodman

More information

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.

TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles. TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment

KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT. Appendix E. Environmental Noise Impact Assessment KRUGER ENERGY CHATHAM WIND PROJECT ENVIRONMENTAL SCREENING REPORT / ENVIRONMENTAL IMPACT STATEMENT Appendix E Environmental Noise Impact Assessment Executive Summary The purpose of this environmental

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass

More information

Planning Policy Statement (PPS 11) Planning & Waste Management

Planning Policy Statement (PPS 11) Planning & Waste Management Planning Policy Statement (PPS 11) Planning & Waste Management Planning Policy Statement 11 (PPS 11) Planning and Waste Management Planning Policy Statements (PPSs) set out the policies of the Department

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment

Proposed Residential Development Land off Cody Road Waterbeach Cambridgeshire. Flood Risk Assessment Land off Cody Road Waterbeach Cambridgeshire Cedar Barn, White Lodge, Walgrave, Northampton, NN6 9PY T: F: E: W: 01604 781811 01604 781999 mail@jppuk.net jppuk.net Proposed Residential Development Land

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048

White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048 White Rose Carbon Capture and Storage (CCS) Project Document Ref: 8.5 - Rev. 2 PINS Ref: EN10048 The White Rose CCS (Generating Station) Order Land adjacent to and within the Drax Power Station, Drax,

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM

MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM MINERALS AND ASSOCIATED WASTE APPLICATIONS APPLICATION FORM 1. Applicant Details (See guidance note 1) 2. Agent Details Please complete if the applicant has an agent (See guidance note 2) * Title: * Forename:

More information

Making the polluter pay Environmental Damage Regulations March 2009

Making the polluter pay Environmental Damage Regulations March 2009 Making the polluter pay Environmental Damage Regulations March 2009 Introduction... 1 When do the Regulations apply?... 2 Type of damage... 2 Cause of damage... 3 When did the incident or damage occur?...

More information

Council, Municipal Building, Kingsway, Widnes, Cheshire, WA8 7QF. Greenspace. DEVELOPMENT PLAN ALLOCATION:

Council, Municipal Building, Kingsway, Widnes, Cheshire, WA8 7QF. Greenspace. DEVELOPMENT PLAN ALLOCATION: APPLICATION NO: LOCATION: PROPOSAL: WARD: PARISH: CASE OFFICER: AGENT(S) / APPLICANT(S): DEVELOPMENT PLAN ALLOCATION: 13/00397/HBCOUT Land at Widnes Recreation Ground, Liverpool Road, Widnes, Cheshire.

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

ROSTHERNE TO MANCHESTER PICCADILLY

ROSTHERNE TO MANCHESTER PICCADILLY ROSTHERNE TO MANCHESTER PICCADILLY In your area July 2013 High Speed Two (HS2) is the planned new high speed rail network connecting London with the West Midlands and running lines on to Manchester and

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information