Objective Evidence Record (OER)
|
|
|
- Beverley Flynn
- 9 years ago
- Views:
Transcription
1 APPENDIX A OBJECTIVE EVIDENCE RECORD (OER) 1 Auditing Company Name Objective Evidence Record (OER) 2 Auditing Company Logo 3 Organization: 4 Audit Number: 5 Site/OIN: 6 Issue Date: 7 Standard: 9100 /9110 / Objective Evidence/Comments Item# Quality Management System Requirements C NCR (e.g., observations, OFIs) 4. QUALITY MANAGEMENT SYSTEM 4.1 General requirements 01 A QMS has been established, documented, implemented and maintained with evidence of continual effectiveness improvement 02 Approvals, certificates, ratings, licenses, and permits are in place (9110 only) 03 The QMS addresses customer, statutory, and regulatory requirements 04 a. QMS processes have been determined and applied 05 b. Sequence and interaction determined for QMS processes 06 c. Criteria and methods determined to for effectively operate and control QMS processes 07 d. Availability of resources and information necessary to support the operation and monitoring available for QMS processes 08 e. QMS processes are monitored, measured, and analyzed 09 f. Actions implemented to continually improve planned results 10 Processes are managed in accordance with applicable Aerospace Quality Management Systems (AQMS) standards Ref.: Examples ref.: Main process formally identified (e.g., list, flow diagram) 11 Outsourced processes are defined and controlled List outsourced processes Page 1
2 4.2 Documentation requirements General 12 a. Documented statement of a quality policy Quality policy ref.: 13 Documented quality objectives Quality objectives ref.: 14 b. Documented quality manual Quality manual ref.: 15 c. Documented procedures required by 9100-series List of procedures ref.: standards 16 Documented records required by 9100-series List of records ref.: standards 17 d. Necessary documents and records as per clause d 18 Documented safety policy and safety objectives (9110 Safety policy/safety objectives ref: only) 19 Accessibility and awareness of personnel of relevant QMS documentation and changes Quality manual 20 Quality manual established, maintained and 21 a. Includes the scope of the QMS 22 Includes justification of exclusions List excluded clauses: 23 b. Includes QMS documented procedures or reference to them 24 c. Includes a description of the QMS processes and interactions d. Includes a description of the processes and procedures used for: (9110 only) 25 proficiency of personnel 26 rosters of certifying staff and personnel 27 training program 28 current approved or accepted technical data 29 performing preliminary inspection 30 acceptance of incoming articles 31 inspecting articles involved in an accident for hidden damage before maintenance activities (9110 only) 32 conducting maintenance in compliance with customer, statutory and regulatory requirements 33 performing final inspection and 'return to service' of maintained articles 34 governing work performed at another location Page 2
3 4.2.3 Control of documents 35 Documents required by the QMS are controlled 36 Records are controlled in accordance with clause Documented PROCEDURE exist and includes: 37 a. approval process 38 b. review, update, and re-approval process 39 c. identification of changes and current revision status 40 d. documents are available where needed 41 e. documents are legible and identifiable 42 f. external documents are identified and controlled 43 g. obsolete documents are identified and controlled 44 h. incomplete and ambiguous technical data are reported to the customer and/or the author (9110 only) Procedure ref.: Control of records 45 Records (as required in 4.2.4) are established and controlled A documented PROCEDURE exists that includes controls for: Procedure ref.: 46 identification 47 storage 48 protection 49 retrieval 50 retention 51 disposition 52 supplier created and/or retained records 53 Records are legible, identifiable and retrievable Samples of records reviewed 54 Records of product origin, conformity and shipment are Samples of records reviewed maintained (9120 only) 55 Back-up procedures are defined for records stored in Procedure ref.: an electronic form (9120 only) 56 Electronic records are secured and cannot be corrupted due to software or system changes (9120 only) Page 3
4 5. MANAGEMENT RESPONSIBILITY 5.1 Management commitment Evidence of top management commitment includes: 57 a. communicating importance of meeting customer, statutory, and regulatory requirements 58 b. establishing a quality policy 59 c. establishing quality objectives 60 d. conducting management reviews 61 e. ensuring availability of resources 62 f. establishing the safety policy (9110 only) 63 g. ensuring safety objectives are established (9110 only) Evidence ref.: 5.2 Customer focus Top management ensures: 64 customer requirements are determined and met 65 product conformity is measured 66 on-time delivery (OTD) performance is measured 67 actions are taken, if planned results are not orwill not be achieved 5.3 Quality policy Top management ensures that the quality policy: 68 a. is appropriate 69 b. includes a commitment to comply with requirements and continually improve the effectiveness of the QMS 70 c. provides a framework to establish and review its quality objectives 71 d. is communicated and understood 72 e. is reviewed for suitability Commitment ref.: Page 4
5 5.4 Planning Quality objectives Top management ensures that quality objectives are: 73 established 74 measurable 75 consistent with the quality policy Quality management system planning Top management ensures: 76 a. QMS planning is carried out to meet the requirements defined in clause 4.1 and the quality objectives 77 b. QMS integrity is maintained when changes occur Safety objectives (9110 only) Top management ensures safety objectives are: 78 established 79 measurable 80 consistent with the safety policy 5.5 Responsibility, authority and communication Responsibility and authority Top management ensures that responsibilities and authorities: 81 are defined 82 communicated Accountable manager (9110 only) 83 A manager has been appointed by top management with authority to ensure that all necessary resources are obtained Maintenance manager(s) (9110 only) 84 Top management appointed a manager(s) responsible for assuring that all maintenance required is performed in accordance with all requirements Page 5
6 5.5.2 Management representative 85 Top management appointed Management Representative exists Management Representative s responsibility and authority include: 86 a. ensuring QMS processes are established, implemented, and maintained 87 b. reporting QMS performance 88 c. promoting customer requirements awareness 89 d. organizational freedom and unrestricted access to top management for resolution of quality management issues 90 d. organizational freedom and unrestricted access to top management to resolve safety issues (9110 only) Job description ref.: Internal communication 91 Top management ensures communication processes are established and takes place on the effectiveness of the QMS 5.6 Management review General 92 Top management reviews the QMS for suitability, adequacy, and effectiveness at planned intervals 93 Management Review records are maintained Management Review record(s) ref.: 94 Management Review includes assessing opportunities for improvement and the need for changes to the safety policy and safety objectives (9110 only) Review input Inputs to Management Reviews include: 95 a. audit results 96 b. customer feedback 97 c. process performance and product conformity 98 d. preventive and corrective actions 99 e. follow-up actions from previous reviews 100 f. changes that could possibly effect the QMS 101 g. improvement recommendations 102 h. product safety (9110 only) 103 i. achievement, adequacy, and effectiveness of the personnel training program (9110 only) 104 j. changes to requirements that could impact the organization (9110 only) Page 6
7 5.6.3 Review output Management Review outputs include: 105 a. QMS process improvements 106 b. customer requirement related product improvements 107 c. identification of resource needs 5.7 Safety policy (9110 only) Top management ensures the safety policy: 108 a. is appropriate 109 b. includes a commitment to comply with requirements and continually improve safety 110 c. provides a framework for establishing and reviewing safety objectives 111 d. is communicated and understood 112 e. is reviewed for continuing suitability Page 7
8 6. RESOURCE MANAGEMENT 6.1 Provision of resources Resources determined and provided to: 113 a. implement and maintain the QMS and improve its effectiveness 114 b. enhance customer satisfaction 115 A system is in place to continually assess the availability of tools, technical data, facilities, materials and qualified personnel (9110 only) 6.2 Human resources General 116 Personnel competency is based on education, training, skills, and experience 117 Certified personnel meet and maintain applicable eligibility authority requirements (9110 only) 118 Process exists for the qualification/surveillance of non-certified personnel who perform maintenance activities (9110 only) 119 Non-certified personnel shall be assessed on their ability to satisfactory carry out maintenance operations, prior to performing the work (9110 only) Competence, training and awareness 120 a. Competence for personnel affecting product quality is determined 121 b. Training to achieve competence is provided 122 c. Evaluates effectiveness of actions taken 123 d. Ensures personnel are aware of the relevance and importance of their activities and contribution to realizing of quality objectives 124 e. Maintains appropriate records per clause requirements 125 f. Personnel performing maintenance activities and release of articles are qualified and certified (9110 only) 126 g. A training program (initial and recurrent) exists that ensures personnel performing maintenance tasks remain compliant to procedures, human factors, technical knowledge, and requirements (9110 only) Training record(s) ref.: Training program ref.: Page 8
9 6.3 Infrastructure Determine, provide, and maintain an infrastructure needed to achieve product conformity including: 127 a. buildings, workspace, and associated utilities 128 b. process equipment 129 c. supporting services 130 d. suitable facilities, compliant with customer and authority requirements, for performing maintenance activities away from its' fixed location (9110 only) 6.4 Work environment 131 Determine and manage the work environment needed to achieve product conformity 132 Work environment shall give consideration to human factors and human performance, and ensure that effectiveness of personnel is not unduly impaired (9110 only) Page 9
10 7. PRODUCT REALIZATION 7.1 Planning of product realization 133 Plan and develop consistent product realization processes Product realization planning reflect the following: 134 a. quality objectives and product requirements 135 b. processes, documents, and resources 136 c. verification, validation, monitoring, measurement, inspection, and test activities 137 d. records Planned product realization record(s) ref.: 138 e. product configuration 139 f. resources to support the use and maintenance of the product 140 f. resources to support the maintenance of the product; to ensure it is airworthy (9110 only) 141 g. safety objectives and product requirements (9110 only) 142 Planning is in a suitable form for the organization's operations Project management (not applicable to 9120) 143 Product realization is planned and managed in a structured and controlled manner to meet requirements at acceptable risk (as in 9120) Configuration management (9120 only) see listing below Risk management (not applicable to 9120) 144 Establish, implement, and maintain a process for managing risk Risk management includes, as appropriate: 145 a. responsibilities for risk management 146 b. definition of risk criteria 147 c. identification, assessment, and communication of risks 148 d. identification, implementation, and management of actions to mitigate risks that exceed defined risk acceptance 149 e. acceptance of remaining risks after implementation of mitigating actions Page 10
11 7.1.2 (as in 9120) Control of work transfers (9120 only) - see below Configuration management 150 Establish, implement, and maintain a configuration management process that includes, as appropriate: 151 a. configuration management planning 152 b. configuration identification 153 c. change controls 154 d. configuration status accounting 155 e. configuration audits Control of work transfers 156 Establish, implement, and maintain a process to plan and control work transfers including: 157 temporary or permanent transfers 158 verification of work conformity to requirements 159 Organization shall only transfer work in a manner acceptable to the relevant customers and authorities (9110 only) 7.2 Customer-related processes Determination of requirements related to the product 160 a. Determine customer requirements, including delivery and post-delivery activities 161 b. Determine requirements not stated by the customer, but necessary for specified or intended use 162 c. Determine applicable statutory and regulatory requirements 163 d. Determine any additional necessary requirements Page 11
12 7.2.2 Review of requirements related to the product 164 Reviews product requirements prior to commitment to supply a product Reviews conducted to the customer documentation to ensure: 165 a. product requirements are defined 166 b. differing contract requirements are resolved 167 c. organization has the ability to meet the requirements 168 d. contractual requirements are being reviewed for special product requirements (9110 only) 169 d. special product requirements are determined 170 e. risks have been identified 171 Shall use technical data at contractually specified revision or at latest revision, if not specified (9110 only) 172 Records of reviews and actions are maintained Review record(s) ref.: 173 Where the customer provides no documented requirements, they are confirmed before acceptance 174 Documents are amended and personnel made aware when product requirements are changed 175 Contract processes include provisions for disposition of out-of-scope defects discovered during maintenance (9110 only) Customer communication Implements effective customer communications for: 176 a. product information 177 b. enquiries, contracts, or order handling 178 c. customer feedback 7.3 Design and development (D&D) Design and development planning (not applicable to 9120) 179 Plans and controls the product D&D process D&D planning includes: 180 a. defined stages 181 b. reviews, verifications, and validations for each stage 182 c. responsibilities and authorities 183 Where appropriate, the organization divides the D&D effort into distinct activities and defines the tasks, resources, responsibilities, design content, input/output data, and design constraints 184 D&D tasks are based on the safety and functional objectives of the product to customer, statutory, and regulatory requirements 185 D&D planning considers the ability to produce, inspect, test, and maintain the product 186 Interfaces between groups involved are managed to ensure effective communication and clear assignment of responsibility 187 Planning output is updated as the D&D progresses Page 12
13 7.3.2 Design and development inputs (not applicable to 9120) 188 Product input requirements are determined and records maintained D&D inputs include: 189 a. functional and performance requirements 190 b. applicable statutory and regulatory requirements 191 c. information derived from previous designs 192 d. other essential D&D requirements 193 Inputs are reviewed for adequacy Product input requirement record ref.: Design and development outputs (not applicable to 9120) 194 Outputs are in a suitable form for verification against the inputs and are approved prior to release D&D outputs: 195 a. meet the input requirements 196 b. provide appropriate information for purchasing, production, and service 197 c. contain or reference product acceptance criteria 198 d. specify product characteristics 199 e. specify critical items, including any key characteristics and specific actions to be taken 200 Outputs define the data required for identification, manufacturing and inspecting including: drawings, part lists, and specifications material, process, manufacturing, and assembly data Design and development review (not applicable to 9120) D&D reviews are performed to: 203 a. evaluate the ability of the results to meet requirements 204 b. identify any problems and propose actions 205 c. authorize progression to the next stage 206 Participants in reviews include representatives from all functions concerned with the D&D stage(s) being reviewed 207 Records of reviews and actions are maintained Review record(s) ref.: Page 13
14 7.3.5 Design and development verification (not applicable to 9120) 208 Verifications performed in accordance with planned arrangements 209 Records of verifications and actions are maintained Verification record(s) ref Design and development validation (not applicable to 9120) 210 Validations performed in accordance with planned arrangements 211 Records of validations and actions are maintained Validation record(s) ref.: Design and development verification and validation testing (not applicable to 9120) 212 Verification and validation tests are planned, controlled, reviewed, and documented to ensure and/or prove the following: 213 a. test plans identify the tested product, resources used, define test objectives and conditions, parameters recorded, and acceptance criteria 214 b. test procedures describe the method of operation, test performance, and record of the results 215 c. correct configuration of the product for test 216 d. requirements of the test plan/procedures followed 217 e. acceptance criteria are met Design and development verification and validation documentation (not applicable to 9120) 218 Reports, calculations, test results, etc. demonstrate product definition meets the specified requirements for all operational conditions Control of design and development changes (not applicable to 9120) 219 D&D changes are identified and records maintained D&D change record(s) ref.: 220 Changes are reviewed, verified, validated, and approved before implementation 221 Records of the change reviews and any actions are Change review record(s) ref.: maintained 222 D&D changes are controlled in accordance with the configuration management process Page 14
15 7.4 Purchasing Purchasing process 223 Purchased product conforms to specified requirements 224 Responsibility evident for product conformity for all purchased products (including product from customer directed suppliers) 225 Suppliers hold required approvals and certificates (9110 only) 226 Purchasing process satisfy applicable requirements for the use of non-certified suppliers (9110 only) 227 Criteria for selection, evaluation, and re-evaluation are established 228 Records of evaluations and actions arising from the evaluations are maintained 229 a. Register of approved suppliers including scope of approval is available 230 b. Supplier performance is periodically reviewed 231 c. Process for dealing with suppliers that do not meet requirements is defined 232 d. The organization and all suppliers use customerapproved special process sources 233 e. The process, responsibilities, and authority for the approval status decision, changes, and conditions for controlled use determined 234 f. The risk when selecting and using suppliers is determined and being managed 235 g. Appropriate measures are in place to prevent the purchase of counterfeit and suspect unapproved parts (9110 only) 236 g. Controls exist to prevent the purchase of counterfeit and suspected unapproved parts (9120 only) Supplier evaluation record(s) ref.: Approved supplier register ref.: Page 15
16 7.4.2 Purchasing information Purchasing information includes (where appropriate): 237 a. product, procedures, processes, and equipment approvals 238 b. personnel qualifications 239 c. QMS requirements 240 d. revision status relevant technical data 241 e. requirements for design, test, inspection, verification, use of statistical techniques, and related instructions for acceptance (including critical items and key characteristics) 242 f. requirements for test specimens 243 g. requirements for the suppliers to notify of nonconforming product receive nonconforming product disposition approvals notify of changes to product, processes, suppliers, and facilities flow down requirements 244 h. records retention requirements 245 i. right of access 246 j. specific authority approval requirements (9110 only) 247 j. requirements for certificate of conformity, test reports, and/or airworthiness certificate (9120 only) 248 k. format and content of the supplier s delivery documentation package (9110 only) 249 l. conditions where product malfunctions, defects, and un-airworthy conditions must be reported and dispositioned (9110 only) 250 Adequacy of purchase requirements prior to issuance Reviewed supplier contract(s) ref.: Verification of purchased product 251 Activities to ensure purchased product meets purchase requirements have been established and implemented 252 A process of product recall is implemented when product released for use prior to completion of required incoming verification 253 Requirements for supplier delegations defined and a register of delegations maintained 254 Purchasing information defines information about the verification activities at the supplier's premises Samples of purchased product(s) reviewed including contract ref.: Reviewed supplier contract(s) ref.: 7.5 Production and service provision Control of production and service provision 255 Production and service provisions are planned and achieved under controlled conditions including: 256 a. availability of product characteristics 257 b. availability of necessary work instructions Revieved work instruction(s) ref.: 258 c. use of suitable equipment 259 d. availability and use of monitoring and measurement (M&M) equipment Page 16
17 260 e. implementation of M&M 261 f. implementation of product release, delivery, and post-delivery activities 262 g. accountability for all product during production 263 h. evidence that all operations have been completed as planned 264 h. evidence that all maintenance and inspection / verification operations have been completed as planned / instructed (9110 only) 265 i. provisions for a Foreign Object Damage and Debris (FOD) program 266 j. monitoring and control of utilities and supplies 267 k. criteria for workmanship 268 l. compliance with stds, quality plans, manufacturing recommendations, customer specifications, and/or documented procedures (9110 only) 269 m. maintaining a list of approved maintenance/repair process capabilities and/or current ratings (9110 only) 270 n. assuring that maintenance operations do not adversely affect areas outside the scope of the planned maintenance (9110 only) 271 o. equipment, tools, and materials recommended (or equivalent) by the technical data and acceptable to the authority (9110 only) Planning appropriately considers: 272 managing critical items and key characteristics 273 measurement tooling 274 identifying in-process verification points 275 special processes Reviewed job cards, routers, etc. ref.: List ref.: Production process verification (not applicable to 9110) 276 A representative item from the first production run is used to verify production processes, documentation, and tooling and is capable of producing parts and assemblies that meet requirements Sample of First Article Inspection (FAI) record: Page 17
18 Maintenance process verification (9110 only) 277 First application of maintenance processes are evaluated, verified, documented, and approved by the customer and/or authority Control of production (maintenance ) process changes 278 Personnel authorized to approve changes are defined Record ref.: 279 Changes affecting processes, equipment, tools, or software are controlled and documented 280 Changes are assessed to confirm that product conformity has not been adversely effected Control of production (maintenance ) equipment, tools and software programs 281 Production equipment, tools, and software used to Sample(s) of validation record(s): automate, control, or monitor processes are validated prior to release for production and are maintained (not applicable to 9110) 282 Maintenance equipment, tools, and programs used to automate and control/monitor processes are defined by technical data prior to use (9110 only) 283 Maintenance equipment, tools, and programs are maintained and inspected periodically (9110 only) 284 Storage requirements are defined for production (maintenance ) equipment or tooling Post-delivery support Post-delivery support includes applicable: 285 a. collection and analysis of in-service data 286 b. actions to be taken, including investigation and reporting, when problems (related to the maintenance performed ) are detected after delivery 287 c. control and updating technical documentation (data) 288 d. approval, control, and use of repair schemes 289 e. controls required for off-site work Page 18
19 7.5.2 Validation of processes for production and service provision (not applicable to 9120) 290 Special processes are validated prior to use 291 Special processes shall comply with applicable technical data (9110 only) 292 Special process validations demonstrate the ability to achieve planned results Established arrangements including, as applicable, 293 a. criteria for review and approval 294 b. approval of equipment and qualification of personnel 295 c. use of specific methods and procedures 296 d. requirements for records 297 e. revalidation Identification and traceability 298 Products identified throughout product realization 299 Product configuration maintained 300 Product configuration maintained in order to identify any differences between actual and approved configuration (9110 only) 301 Product status is identified throughout product realization 302 Controls in place for media used for acceptance 303 When required, traceability is controlled through unique product identifications and records are maintained 304 Product identification and traceability is maintained by suitable means from receipt; during splitting, storage, packaging, and preservation; and until delivery (9120 only) Traceability record(s) ref.: Samples of product reviewed (identification ref.): Customer property 305 Customer property is adequately controlled through the identification, verification, protection, and safeguarding 306 Lost, damaged, or product unsuitable for use is reported to the customer and records maintain 307 Verifications include review of the applicable release certificate (9110 only) Customer property record(s) ref.: Page 19
20 7.5.5 Preservation of product 308 Products are preserved during internal processing and delivery 309 Preservation includes identification, handling, packaging, storage, and protection 310 Preservation controls are applied to the constituent parts 311 Maintenance items are segregated (9110 only) Preservation of product includes where applicable: 312 a. cleaning 313 b. foreign object controls 314 c. special handling for sensitive products 315 d. marking and labeling 316 e. shelf life control and stock rotation 317 f. special handling for hazardous materials 318 Serviceable parts are physically segregated from unserviceable parts (9120 only) 7.6 Control of monitoring and measuring (M&M) equipment 319 Product M&M and appropriate M&M equipment have been determined 320 Selection of M&M equipment and the method of calibration/verification shall comply with applicable technical data or be demonstrated as equivalent (9110 only) 321 A register of the M&M equipment is maintained Register ref.: 322 Processes are defined for M&M equipment calibration Process definition ref.: (and/or verification), including equipment type, identification, location, frequency, check method, and acceptance criteria 323 M&M can and are carried out consistent with the M&M requirements 324 Environmental conditions are suitable for the calibrations, inspections, measurements, and testing 325 a. M&M equipment are calibrated (and/or verified) at specified intervals against traceable standards 326 b. M&M equipment are adjusted, when necessary 327 c. M&M equipment have unique identifiers Equipment reviewed ref.: 328 d. M&M equipment are safeguarded from adjustments 329 e. M&M equipment are adequately protected 330 A M&M equipment calibration (and/or verification) recall process exists 331 Previous results are assessed, recorded, and acted upon when M&M equipment is found out-of-conformance 332 Calibration (and/or verification) records are retained Calibration record(s) ref.: 333 Software used for M&M equipment is confirmed before initial use and reconfirmed, as necessary Page 20
21 8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 8.1 General 334 Monitoring, measurement, analysis, and improvement processes planned and implemented to: 335 a. Demonstrate product conformity 336 b. Ensure QMS conformity 337 c. Improve QMS effectiveness 338 Applicable methods (including statistical techniques) have been determined and are being used Samples of method(s): 8.2 Monitoring and measurement (M&M) Customer satisfaction (CS) 339 Methods for obtaining/using customer perception data are in place 340 CS information includes product conformity, on-time delivery (OTD), customer complaints, and corrective action requests 341 Improvement plans to address CS deficiencies are in place 342 Responds to issues raised by the customers, has a plan to address noted areas of improvement and monitor progress 343 Improvement plans shall be consitent with the organization s safety policy and safety objectives Method(s) ref.: Improvement plan(s) ref.: Internal audit 344 Internal audits conducted at planned intervals 345 a. Audits ensure conformity to planned arrangements, requirementsof the applicable 9100-series standard and organization s QMS requirements 346 b. Audits ensure the QMS is effectively implemented and maintained 347 Audits based on status and importance of processes and previous audit results to defined criteria, scope, frequency, and methods 348 Auditors do not audit their own work 349 A documented internal audit PROCEDURE exists Procedure ref.: 350 Audit records are maintained Audit record(s) ref.: 351 Timely corrective actions are taken by management in audited areas 352 Follow-up activities verify and report actions taken Page 21
22 8.2.3 Monitoring and measurement (M&M) of processes 353 Methods for M&M of QMS processes are in place and demonstrate that processes achieve planned results 354 Correction and corrective actions are taken when results are not achieved Process nonconformities result in: 355 a. action(s) to correct the nonconforming process 356 b. evaluation of the process nonconformity and its affect on product conformity 357 b. evaluation of the process nonconformity and its affect on product safety or reliability (9110 only) 358 c. determination of the affect on other processes or products 359 d. identification and control of nonconforming product (NCP) Monitoring and measurement (M&M) of product 360 M&M of product characteristics are performed and maintained 361 Maintenance operations are completed (9110 only) 362 Acceptance measurement requirements are Revision level documented and include: 363 a. acceptance and/or rejection criteria 364 b. the sequence where measurement and testing operations are planned (including customer and/or authority inspections only) 365 c. records of measurement results Revision level 366 d. specific measurement instruments required 367 e. the inspection/testing operations that are to be verified and/or witnessed (9110 only) 368 Critical items are controlled and monitored 369 Sampling plan are justified on the basis of recognized statistical principles and appropriate for use 370 Sampling inspection shall only be used if compatible with the technical dat/instructions (9110 only) 371 Defects are identified during maintenance (that are outside the scope of the contract or order) are processed per customer and/or authority requirements (9110 only) 372 Product released for use prior to the completion of planned activities is controlled to allow for recall 373 Records reflect person(s) authorizing release of product for Revision level delivery 374 Records show that products meet defined requirements Revision level 375 Release of product and/or delivery of services are not performed until all planned activities are accomplished or without Authority/customer approval 376 Certifying staff signs the release certificate after verification of all maintenance and inspection / verification operations in accordance with customer contract or order requirements, and applicable technical data with no known nonconformities that would endanger flight safety (9110 only) 377 Documents required to accompany the product are present at delivery 378 Documents required to accompany the product are being provided and procedures are implemented for the preparation and completion of authority documentation (9110 only) Page 22
23 8.2.5 Evidence of conformity (9120 only) 379 Product conformity evidence is provided to customers, when required 380 For split product, the quantity delivered, purchase order number, and both customer and supplier's names are annotated on copies of original documents 381 Certifying statements reference the original manufaturer's traceable documents and applicable requirements that are retained by the organization (applicable where a formal customer agreement is in place) 8.3 Control of nonconforming product (NCP) 382 NCP is identified and controlled 383 A documented PROCEDURE exist for handling of NCP Procedure ref: 384 The responsibility and authority for the review and disposition of nonconforming product are defined 385 The process for approving personnel making these decisions is defined NCP controls include: 386 a. actions to eliminate the nonconformity 387 b. use, release, or acceptance by customer concession 388 c. actions to preclude its intended use or application 389 d. actions on the effects of NCP, when detected after delivery or use, including timely reporting 390 NCP process shall provide for timely reporting of delivered product (including product safety and reliability 9110 only) 391 e. actions to contain the nonconformity effect on other processes or products (9110 only) 392 Dispositions of use-as-is (UAI) or repair is used only after approval from design responsible organizations 393 Dispositions of UAI or repair are not used without customer authorization 394 Customer property shall not be scraped unless specifically authorized by the customer (9110 only) 395 Scrap product is marked or positively controlled 396 Corrected NCP is subjected to re-verification 397 NCP records are maintained NCP record(s) ref.: 8.4 Analysis of data 398 Data to demonstrate the suitability and effectiveness of the QMS is determined, collected, and analyzed Analysis of data includes: 399 customer satisfaction 400 conformity to product requirements 401 characteristics and trends of processes and products 402 supplier performance 403 human factors events (9110 only) Page 23
24 8.5 Improvement Continual improvement 404 The QMS is continually improved through the quality policy, quality objectives, audit results, analysis of data, corrective/preventive actions, and management reviews 405 Improvements and the evaluation of effectiveness are monitored Corrective action (CA) 406 Actions are taken to eliminate the causes of nonconformities 407 A documented PROCEDURE exist that includes: Procedure ref.: 408 a. reviewing of nonconformities 409 b. determining the causes of nonconformities 410 c. evaluating action to prevent recurrence 411 d. determining and implementing actions 412 e. record of actions taken CA record(s) ref.: 413 f. reviewing the effectiveness of corrective actions 414 g. flowing down CA requirements to suppliers 415 h. actions where timely and/or effective CAs are not achieved 416 i. determining if additional NCP exists 417 j. evaluating action based on human factors (9110 only) Preventive action (PA) 418 Actions taken to eliminate the causes of potential nonconformities 419 A documented PROCEDURE exist that includes: Procedure ref.: 420 a. determining potential nonconformities and their causes 421 b. evaluating action to prevent occurrence 422 c. determining and implementing action 423 d. record of actions taken PA record(s) ref.: 424 e. reviewing the effectiveness of PA 425 f. evaluating action based on human factors (9110 only) Auditor Name(s) Signature: Page 24
25 9101:2009 FORM INSTRUCTIONS APPENDIX A OBJECTIVE EVIDENCE RECORD (OER) This form should be used during the on-site quality management system audits for recording the objective evidence that is used to determine conformity with the related QMS requirements. It can also be used to record auditor notes/comments and opportunities for improvement (OFI). NOTE: This OER summarizes the requirements and is not intended to add or take away from the stated requirements. Where a conflict exists, the stated requirement in the applicable standard takes precedence. 1 Include the name of the organization conducting the audit. 2 Include the logo of the organization conducting the audit (optional). 3 Identify name of organization audited as noted, or to be noted, on the certificate or approval. 4 Identify associated audit/audit report number 5 Identify site, OASIS Identification Number (OIN), and location of the audited organization as noted, or to be noted, on the certificate or approval. 6 Indicate date the OER was completed 7 Tick box(es) ( ) of the applicable standard(s) (i.e., 9100, 9110, 9120). 8 Summarized requirement description. The description of the additonal aviation, space and defense requirements are shown as bold/italic text. All descriptions without bracketed standard reference are applicable for all standards : 9100, 9110, and Descriptions with a bracketed standard reference are applicable for the indicated standard only, e.g.,item 18 Documented safety policy and safety objectives (9110 only) is applcable top 9110 QMS only. 9 Conforming (C): Enter a mark: (X, S,, etc.) to indicate that the requirement was audited and found to be conforming. N/E to indicate not evaluated. N/A to indicate not applicable. EX to indicate an acceptable exclusion. In case of non conformity leave conforming box blank to indicate a NCR and enter the NCR number in box Nonconformity Report (NCR): Record reference the applicable NCR number. 11 Objective Evidence/Comments/OFI s: Record objective evidence reviewed during the assessment and any applicable comments. The prefilled text in this column is for guidance and the objectice evidence to be recorded should not be limited to this. Typical examples of objective evidence are reviewed documents including records, e.g., procedures, shop orders/travellers, job descriptions, process sheets, training records, products, verification records. It is also possible to include observed concerns or improvement opportunities NOTE 1: The completion of this information could start during the Stage 1 phase (record of the quality manual and procedures), then be carried over to the onsite audit to record what was observed. NOTE 2: If the clauses of chapter 7 are associated with processes that are addressed on a PEAR, the objective evidence can be mentioned in the PEAR. In such case, the PEAR number should be referenced in this column.
ISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
ISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
Quality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
ISO 9001:2008 Audit Checklist
g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
Cartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
Quality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
ISO-9001:2000 Quality Management Systems
ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT
DNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION
INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
ISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
Row Manufacturing Inc. Quality Manual ISO 9001:2008
Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of
AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE
AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised
QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents
Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
QUALITY MANAGEMENT SYSTEM Corporate
Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality
Turbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
QUALITY MANUAL ISO 9001. Quality Management System
Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context
Quality Management System Manual QM-QUA-001
Quality Management System Manual QM-QUA-001 Nelson-Miller Inc. 2800 Casitas Avenue Los Angeles, Ca 90039 P a g e 2 Revision Date Description of the Change N/C 10/10/79 Initial release of documented inspection
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171
Camar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
ED FAGAN INC. QUALITY SYSTEM MANUAL
ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
Quality Management System Manual
Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:
CENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval
Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer
Eagle Machining, Inc. Quality Management System
Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A
FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision
AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626
AS 9100 Rev C Quality Management System Manual B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 Doc. No. AS9100C Rev E Effective Date: 01 JAN 2013 Page 2 of 45 CONTROLLED
Contents. Management Policy Manual SEM USA Page 2 of 12
SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...
ISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
QUALITY MANUAL ISO 9001:2015
Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
ISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
Micro Plastics, Inc. Quality Manual
ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368
Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Uncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
ALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page
Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have
The President of Inductors Inc. is the senior executive responsible for operations.
Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom
Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22
ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)
Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
Quality Management System Manual
Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years
The Prophotonix (UK) Ltd Quality manual
The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: [email protected] Page
Quality Management System Policy Manual
Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
FMC Technologies Measurement Solutions Inc.
Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...
ISO 9001:2008 QUALITY MANUAL. Revision B
ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
Quality Management Systems Manual
Washington Division Quality Management Systems Manual ISO 13485:2003 DOCUMENT NUMBER 01-QM-MED REVISION LEVEL 01 PAGE 1 of 40 This manual describes the quality management systems structure at GM Nameplate
Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended
QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL
PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS
Disclosure to Promote the Right To Information
इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013
UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd
G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration
G & R Labs Light Meters and Calibration Quality Assurance Manual G&R Labs 2996 Scott Boulevard Santa Clara CA 95054 QM01 QUALITY MANUAL ISO9001:2008 Manual Contents QM 01 Manual Contents 2 QM 02 Copy Holder
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
ISO 9001:2008 Quality Manual Clause 3.7.4
ISO 9001:2008 Quality Manual Clause 3.7.4 Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this Quality Manual has been reviewed and accepted, and demonstrates
Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com
RCGLOBAL.COM Free Download ISO/TS 16949:2009 Requirements Checklist 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL(Canada), for internal use only. Page 1 of 57 Review performed
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
ISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
Quality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02
QUALITY MANAGEMENT SYSTEM
2507 WEST GENEVA DRIVE TEMPE, ARIZONA 85282 TEL: 602.231.8616 FAX: 602.273.9135 QUALITY MANAGEMENT SYSTEM TABLE OF CONTENTS TABLE OF CONTENTS... 2 Phoenix Logistics Vision Statement... 3 1.0 SCOPE... 4
Quality Management System Manual ISO9001:2008
Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1
QUALITY MANAGEMENT SYSTEMS
QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 7 Page: 1 of 57 This document contains proprietary information and is not lo be distributed to or copted for a third party without the express written permission
ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL
Page 1 of 25 ABC COMPANY INC QUALITY MANUAL Page 2 of 25 DOCUMENT INTRODUCTION PURPOSE OF THIS MANUAL This describes the quality management system at ABC Company Ltd, Buffalo, USA described as the Organization,
This page intentionally left blank
This page intentionally left blank Page 2 of 28 . TABLE OF CONTENTS 1.0 Forward... 5 2.0 Introduction... 5 3.0 Mission Statement... 6 4.0 Quality Management Systems... 6 4.1 General Requirements... 6 4.2
ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL
8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic
Quality Management Plan Procedure
Quality Management Plan Procedure Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Quality Management Plan Overview... 1 Introduction... 1 Objectives...
Quality Management System
LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority
Quality Assurance System Manual
The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street
Quality Management System and Procedures
Commercial HVAC/R Coils & Protective Coatings Quality Management System and Procedures Rahn Industries, Inc. Quality Assurance Manual Version 3.0 www.rahnindustries.com 1-800-421-7070 Commitment to Quality
QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O
IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 Introduction Value Plastics, Inc., dba Nordson MEDICAL created a Quality Management System (QMS) to document the company s best business
Vigilant Security Services UK Ltd Quality Manual
Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security
CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014
Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September
SUPPLIER QUALITY SYSTEM AUDIT
Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company
Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents
Contents of the ISO 9001:2000 Quality System Checklist
Contents of the ISO 9001:2000 Quality System Checklist Page Hyperlinks (click underlines) This SAMPLE document includes 4 clauses of the standard. You receive the Windows.doc file (with hyperlinks). You
Quality Systems Manual
Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management