12. Inventory - Receiving & Shipping

Size: px
Start display at page:

Download "12. Inventory - Receiving & Shipping"

Transcription

1 1.0 PURPOSE 1.1 To establish a procedure for dealing with Warehouse issues including: i ii iii iv Receiving Shipping Handling and storage including ESD RMA & Quarantine 2.0 RESPONSIBILITY 2.1 The Warehouse Manager is responsible for managing this process. 3.0 CRITIERIA 3.1 Ensure prompt and accurate processing of all receiving and shipping 3.2 Ensure parts are stored and handled so as to maintain confidence in their integrity 4.0 PROCESS 4.1 Receiving (AS9120: 7.4.3, 7.5.3, 7.5.5(e))(AS9120: 8.1, , 8.2.5, 8.3, 8.5.3) (AS5553: 4.1) The WM ensures that all parts received into the warehouse are recorded on a Receiving Report The receiving person shall stamp the incoming packing list with the date of arrival on the dock at MCI so that the true receiving date is traceable C of C documents are to be kept on file for 10 years All parts received into the warehouse are checked for: i Quantity, part number marking and item description match both the shipper s packing slip and matches MCI PO description on MCI system, make sure the product config didn t change. ii Parts should be handled and stored to avoid electrical damage and product degradation. iii Any damaged items or differences in quantities are noted; ensure items are well packaged, clean and undamaged to prevent FOD. iv Packing slip and Certificate of Conformance is enclosed showing order #, date, item & quantity (and serial # information if relevant); the WM adds the MCI PO # to the Packing Slip and C of C. Revision: 26 Date: January 14, 2014 Page 1 of 8

2 v vi A photocopy of a part bag will be placed with the Mfg C of C to provide traceability as the part bag will contain the date code and / or lot numbers that is often missing from the C of C. If the inspection date is later than the received date on the packing list, then the received date shall take precedence As we are a franchised distributor and purchase direct with the manufacturers, we perform visual inspections only thus we do not expect to receive any counterfeit parts. Receiving makes sure that incoming product is identifiable and comes from the manufacturer. If there is any doubt, then the parts are treated as a non-conformity until they can be validated by QA and the MFG. If the parts are found to be counterfeit, then the parts are reported to the supplier and GIDEP. The product is then disposed of to prevent re-entering into the supply chain If a package is received which contains incorrect parts or the parts are damaged, these parts are placed in a separate location on a shelf entitled 'Vendor Quarantine' until those issues can be resolved and the parts are returned to the manufacturer. Either the warehouse manager or the QAM shall place a note with the parts stating the issue concerning said part. A copy of the MFG C of C shall accompany the parts. Parts shall be returned in their original packaging. Paperwork associated with the return shall accompany the return. If the value of the damaged or incomplete parts is below ten dollars, or the manufacturer does not want them returned, then the QAM shall scrap these parts in accordance with paragraph There is no need for product recall as a result of incomplete verification. Product cannot be shipped until received and cannot be received before being counted and inspected. Parts being returned on Stock Rotation should be clearly identified. Parts received from the Tape and Reel service shall be checked against the customer purchase order to ensure that the parts information is correct Any test data sent with the shipment is annotated with the MCI PO # and then filed in the warehouse file. Test data shall be retained for minimum seven years Parts are recorded in the Receiving Report to indicate acceptance. The receiving person splits the quantities into groups of ten and moves the parts into the warehouse where they are stored on the shelves in boxes by part number sequence. Parts are stored in each box in date order with the oldest to the front (FiFo). Product is pulled for shipment in the same manner unless the customer requests specific lot and date codes If the parts are due for immediate shipment the WM is notified of their arrival the sales order is pulled and the parts are placed in shipping. Revision: 26 Date: January 14, 2014 Page 2 of 8

3 If the parts received are required by an order with an or before ship schedule, then the order is pulled and placed in the bin at the receiver s desk labeled: Or Before Orders The WM distributes the Receiving Report daily as follows: i The original is kept in the Warehouse folder; ii One copy is given to the PMA to enter the details into the MCI system and to release the parts to inventory; iii One copy is given to the Accounts Manager along with the packing slips / C of C for accounting purposes and to file with the purchase order. iv If there are any discrepancies with the received order (e.g. wrong quantity), a copy of the Receiving Report is given to the Purchasing Manager to review and follow up with the Vendors. The Purchasing Manager will: issue RMA s and CPAR s as necessary for discrepancies, late deliveries, etc; and coordinate with the Accounts Manager on whether outstanding parts are to be expedited or adjust payment for short order The PMA s an Expedite report to each vendor on a weekly basis to follow-up on all outstanding purchase orders. 4.2 Shipping The Order Entry Assistant prints a regular Past Due Order Report (on Monday through Friday of each week) for all orders due for shipping. The Past Due Order Report also identifies those orders that cannot be shipped due to: i credit hold; ii still awaiting parts to come in For all other outstanding orders, the Order Entry Assistant will pull the Sales Orders from the Sales Order file. The Order Entry Assistant will also provide any sales order issued that day and requiring immediate delivery Warehouse personnel shall also check the Or before bin for any available orders and pull those for preparation Warehouse Personnel shall check the customer s credit information to see if it exceeds the limit. If it does, then the order is brought to Accounting for approval The Warehouse Personnel will pull the required parts, measuring the required quantity and following any packaging instructions. Packing instructions are per customer request noted on the purchase order. For example, DSCC Revision: 26 Date: January 14, 2014 Page 3 of 8

4 orders are packaged I/A/W MIL-STD-129. ESD protection will be used if required When parts are pulled, Warehouse Personnel must perform a count back. Under each line item on the Shipment Sign Off Sheet, Warehouse Personnel note the quantity in stock, the quantity being shipped and the quantity remaining. If the parts contain assembly procedures, the Warehouse Personnel must copy those procedures and include them with the package The Warehouse Personnel prints the shipping delivery label, adds a C of C along with a Manufacturer s C of C, if requested and completes shipping information on the Sales Order. If the order specifies a MFG C of C, Warehouse Personnel shall also include an MCI C of C, as the MFG C of C does not always contain information such as date codes and / or lot numbers. When complete, the parts on the order are placed on the delivery bench with the paperwork for QA to inspect. A copy of the C of Cs shall be kept with the parts and / or placed inside the parts bag to ensure that they accompany the shipment. The Original C of C is returned to the parts bin for the next shipment If a line item is a Cable Assembly manufactured by MCI, the Warehouse Personnel shall stamp the product C of C by its line item stating that the cable assembly is NOT covered under the AS9120A standard Two personnel, one QA manager (primary) or representative and one secondary are to review every completed line item, on each sales order, for quantity, correct item, (C of C or Manufacturer s C of C if required) and shipping details; and resolve any issues with the WM. The secondary shall be the first to inspect and sign off on the shipment. Only when correct, the QA personnel shall initial the Shipment Sign-off Sheet attached to the order. There are three sign off sections on the sheet for up to three initials each to verify the Shipping Label, the actual Shipment Information and the C of C if present. They must also ensure that the packaging is clean and parts are properly packaged with no loose items to prevent FOD. A list of qualified QA and Secondary sign off persons are posted in the shipping area. Warehouse manager shall assign one person to act as the initial sign off. Before continuing to the next step, shipping personnel shall ensure that at least one of the two signatures are from a QA manager or representative and that the parts indeed match the order. A signature set must be present on every line item prepared for shipment with the exception of the shipping label area which only needs to be signed on the tracking number line. Revision: 26 Date: January 14, 2014 Page 4 of 8

5 4.2.9 The Warehouse Personnel packs the parts, and leaves the shipping box open with shipping delivery label waiting for packing slip to be added after the multi-copy invoice is printed in next step Order Entry Assistant will: i Check sales order is correctly filled in and add any details such as Sales Order # from the MCI system ii Calculate and process final invoice; if there is any problem with processing final invoice, such as credit card refused, then contact relevant CSE to resolve issue. iii Release order on MCI system and print multi-copy invoice; iv attach multi-copy invoice to sales order and return to WM Warehouse Personnel pulls the packing list from the multi-copy invoice and adds to shipment box, seals box and adds UPS label and stacks for collection Warehouse Personnel returns remaining documents to Order Entry Assistant for processing as follows: i White invoice sent to customer; ii Yellow invoice: iii If order is complete, yellow invoice is attached to sales order and all filed in closed order file ; If shipment is only partial, then yellow invoice only is filed in closed order file and the sales order is filed in open order file Green copy is filed by State; if there is a tax payment, then green copy is sent to Accounting and a copy filed by State. 4.3 Cable Assemblies / Tape & Reel Microwave Components makes custom cable assemblies for customers as requested. These parts are taken from stock per the assembly s BOM and shipped out to our assembler. QA or their designated inspector shall inspect those parts to ensure they match the BOM requirements prior to shipment. These cables are not offered under AS9120A Customers also request parts to be placed on a reel. In these situations, the parts needed are pulled from stock and prepared for shipment to the tape and reel service. QA or their designated inspector shall inspect those parts to ensure they match the BOM requirements prior to shipment. A copy of the purchase order for the Tape and Reel service shall be available to warehouse / inspection personnel along with the customer sales order to ensure that all the information is accurate and matches the parts that are being sent out / requested. Parts are verified as correct during receiving inspection. Tape and reeled parts are not altered or manipulated in any way. Revision: 26 Date: January 14, 2014 Page 5 of 8

6 4.4 Storage, Handling and ESD (AS9120: 6.4, 7.5.5(c, d)) Parts requiring ESD protection are: i Stored in anti-static bags ii Are always packed and counted at the ESD table in accordance with the ESD documentation procedure # All other parts are handled with care but do not require ESD protection. 4.5 RMA and Quarantine (AS9120: 8.3) All parts returned on an RMA are to be placed in the quarantine area until the material review board (MRB) has determined its designation The MRB shall consist of both the QAM or his representative and the MR or his representative All parts of the same date and/or lot code shall be subject to the same findings as any parts returned on an RMA and shall also be placed in quarantine but shall be also marked and kept separate from the original returned parts. Stock parts found to be non-conforming shall be placed in Vendor Quarantine per paragraph of this document If the MRB determines that the questionable parts are the result of a physical or manufacturing or design defect, then the manufacturer shall be contacted and an RMA requested. In the event that the manufacturer does not want the damaged product returned, the items will be clearly marked as scrap until rendered unusable and disposed of. NOTE: MCI has no authority to rework or repair product If the MRB determines that the questionable parts are the result of a customer error then the parts may be returned to stock and a restocking fee may be applied depending on the total circumstances If the MRB determines that the questionable parts are the result of an internal Microwave Components error then the questionable parts may be returned to stock with no restocking fee applied and a CPAR shall be generated to rectify the internal mistake that was made The remaining stock of the questionable parts shall be inspected for similar defects and / or damage. 5.0 Quality Records Record Name Responsible Person Location Index method Minimum Retention Revision: 26 Date: January 14, 2014 Page 6 of 8

7 Daily Receiving Report WM Warehouse folder By date 7-yr Packing slip / C of C Accounts Accounts Office By PO # 7-yr Manager Test records WM Warehouse file By PO # 7-yr Expedite report Accounts Ongoing report Not filed N/a Manager Outstanding Orders WM Ongoing report Not filed N/a White Invoice Order Entry Asst To customer Not filed N/a Yellow Invoice Order Entry Asst Closed Order file By customer 7-yr Green Invoice Order Entry Asst Tax file By state 5-yr ESD Log WM ESD Table By date 3-yr Shipment Sign Off Sheet QAM With each order By Sales Order On-going Shipment Sign off training QAM Shipping Area N/A On-going 6.0 Change History Revision Date Description of Change Level /04 Initial release 2 04/22/05 Added note /14/05 Corrected Para & /25/06 Corrected Para /29/06 Corrected Section 4.2 (Changed WM to Warehouse Personal various Para s) 6 06/21/06 Updated Section & (added QA signoff for Cert. Of Comps.) 7 04/26/07 Corrected Para &4.2.6 (CPAR # 15) 8 08/26/08 Added item iv to Para (Receiving) (CPAR #26) / Specified retention of 7 years for test data 9 09/05/08 Added References to AS9120 standard /10/08 Added Para referring to MCI cable assy s not AS9120 certified 11 10/02/08 Added Para (re-number) performing a parts count back 12 11/20/08 Revised Para to cover what to do with incomplete parts. Revised Para to include rendering scrap parts unusable /11/2009 Revised Para to cover adding assy procedures to the order. Revised Para to address CPAR #28 last check for signatures / correct parts 14 05/20/2009 Added paragraph to cover the addition of the Or Before order bin. Added paragraph to instruct the Warehouse personnel to check said bin /25/2009 Modified Paragraph to cover using the new Shipment Sign Off Sheet 16 08/04/2009 Modified Paragraph to cover new method of count backs 17 10/07/2009 Modified Paragraph to clarify the sign off procedure and cover qualified sign off personnel. Created Shipment training / sign off document /05/2010 Modified Paragraph to ensure that Warehouse Personnel include an MCI C of Revision: 26 Date: January 14, 2014 Page 7 of 8

8 C with an order which calls for a MFG C of C /03/2011 Modified Paragraph changing Order Entry Assistant to PMA. Modified Paragraph changing Warehouse Manager to Order Entry Assistant. Modified Paragraph changing Warehouse personnel to Order Entry Assistant Changed Paragraph to reflect the changes brought forth by CPAR #44. Changed Paragraph to clarify the vendor quarantine procedure 20 09/20/2011 Modified Paragraph 4.1.2, , 4.1.4, for the AS9120 Rev A upgrade 21 10/24/2011 Modified Paragraph to refer to the ESD documentation /30/2011 Added new section 4.3 to cover cable assemblies / Tape & Reel 23 09/13/2012 Modified: 4.1.2, , 4.1.4, to conform to the JEDEC standard. Added new section 4.4 describing packaging processes IAW the JEDEC standard 24 11/14/2012 Added a section describing the Packaging procedure per JEDEC standards 25 11/19/2013 Added a section describing counterfeit parts prevention /14/2014 Modified 4.1.4, to add more detail to the Shipping Tape and Reel procedure /14/2014 Removed reference to JEDEC standard and the section on packaging as it was no longer required. Clarification of outsourced processes: 4.3.1, Revision: 26 Date: January 14, 2014 Page 8 of 8

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.

Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers. QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 1/19/15 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

Quality Assurance Provisions

Quality Assurance Provisions Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

Facilities Planning & Management Maintenance Repair Parts Policies & Procedures

Facilities Planning & Management Maintenance Repair Parts Policies & Procedures Facilities Planning & Management Policies & Procedures Revised 10/2013 Facilities Planning & Management Policies & Procedures PURCHASE REQUESTS cspolicy1.wpd 1-4 ISSUES FROM STOCK cspolicy2.wpd 5-7 MONTHLY

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

RMA Procedure. 2.0 SCOPE This covers all material returned to your company s manufacturing facility.

RMA Procedure. 2.0 SCOPE This covers all material returned to your company s manufacturing facility. RMA Procedure Document Number: OP-00027 Revision History: Rev. Description Author Eff. Date Eng. Fin. Mfg. Mktg. Sales QA 1 Release. 07/18/95 N/A N.B. B.W. E.K. E.K. G.T. 2 Update QA027 (RMA) Form 12/15/95

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

Vendor Requirements and Compliances

Vendor Requirements and Compliances Vendor Requirements and Compliances As a valued supplier to Ottens Flavors there are implied customer requirements and there are requirements that are established as specifications. To assist you and Ottens

More information

NASH ROCKY MOUNT PUBLIC SCHOOLS PURCHASING PROCEDURES

NASH ROCKY MOUNT PUBLIC SCHOOLS PURCHASING PROCEDURES 1 NASH ROCKY MOUNT PUBLIC SCHOOLS PURCHASING PROCEDURES INTRODUCTION The authority to purchase goods and services and to enter into contracts is given to Boards of Education by action of the North Carolina

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

This page intentionally left blank

This page intentionally left blank This page intentionally left blank Page 2 of 28 . TABLE OF CONTENTS 1.0 Forward... 5 2.0 Introduction... 5 3.0 Mission Statement... 6 4.0 Quality Management Systems... 6 4.1 General Requirements... 6 4.2

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection

Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection Table of Contents Receiving, Inspection, Acceptance Testing and Acceptance or Rejection...1 Chapter 10...3 Receiving, Inspection,

More information

Quality Manual PA3-01-001

Quality Manual PA3-01-001 Rev 01C February 2008 2008, PhaseLink Corporation PhaseLink is the trademark of PhaseLink Corporation, www.phaselink.com CONTENTS 1. Purpose and scope:...3 1.1. Purpose:...3 1.2. Scope:...3 2. Introduction

More information

PERFORMANCE EXCELLENCE Procurement Standards

PERFORMANCE EXCELLENCE Procurement Standards PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through

More information

Supplier Quality Requirements F16 Program

Supplier Quality Requirements F16 Program ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY

More information

Counterfeit Parts Prevention

Counterfeit Parts Prevention Counterfeit Parts Prevention 1 Introduction / Objectives Counterfeiting is an age-old issue, but is growing in exponential proportions with respect to the types of: Products being counterfeited Industries

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record

More information

Procedure for Procurement and Receipt

Procedure for Procurement and Receipt Procedure for Procurement and Receipt 1.0 Purpose - To ensure that all supplies, equipment and services purchased by the State Crime Laboratory (Laboratory) are properly procured and received. 2.0 Scope

More information

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Supplier Requirements for Beckwith Electric Co., Inc. Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

6A. RMA Processing. How does an RMA work?

6A. RMA Processing. How does an RMA work? 6A. RMA Processing 6A. RMA Processing RMA (Returned Merchandise Authorization) processing is a common requirement among manufacturing companies. An RMA system should be able to do the following: RMA entry

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015

More information

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.

More information

IEC Electronics Terms and Conditions

IEC Electronics Terms and Conditions IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in

More information

SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING, AND DISPENSING MATERIALS.

SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING, AND DISPENSING MATERIALS. MIAMI-DADE AVIATION DEPARTMENT STANDARD OPERATING PROCEDURES PROCUREMENT AND COMMODITIES DIVISION SOP No. 03-01 Effective: July 25, 2003 SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING,

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

SUGGESTED CONTROLS TO MITIGATE THE POTENTIAL RISK (Internal Audit)

SUGGESTED CONTROLS TO MITIGATE THE POTENTIAL RISK (Internal Audit) Unit: Subject: Sarbanes-Oxley Act Review - Inventory Management Title: Risk & Control Identification Year end: MILL RAW MATERIALS Receiving of Raw Materials Raw materials are received and accepted only

More information

8.0.0.0.0 Accounts Receivable. I. Overview Definitions and Abbreviations. Equipment and Supplies Required

8.0.0.0.0 Accounts Receivable. I. Overview Definitions and Abbreviations. Equipment and Supplies Required 8.0.0.0.0 Accounts Receivable I. Overview Definitions and Abbreviations Equipment and Supplies Required Page 1 of 36 Revised October 2015 Version 4 II. Job Position(s) Accounts Receivable Clerk Page 2

More information

Workflow Process: Receiving Items

Workflow Process: Receiving Items Workflow Process: Receiving Items This process actually starts outside of QuickBooks when the truck pulls up to the dock. At dockside, follow these steps: Obtain documentation from the driver, such as

More information

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE 1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior

More information

Implementing a Purchase Order System

Implementing a Purchase Order System 10 Maintaining the Inventory System Implementing a Purchase Order System Introduction The following section explains why and how to use purchase orders in your business. This topic assumes that you are

More information

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

Best Practices: Inventory Management for the Small to Medium-Sized Business

Best Practices: Inventory Management for the Small to Medium-Sized Business Best Practices: Inventory Management for the Small to Medium-Sized Business You don t have to be a big business to use technology to improve your inventory management processes. In fact, if you are a smaller

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision - New Program Quality Requirements for Suppliers Rev.

More information

ADVANCED EXCHANGE PROGRAM AND CREDIT POLICY TERMS AND CONDITIONS

ADVANCED EXCHANGE PROGRAM AND CREDIT POLICY TERMS AND CONDITIONS ADVANCED EXCHANGE PROGRAM AND CREDIT POLICY TERMS AND CONDITIONS 2014/2015 Section 1: The Advanced Exchange Program and product return requirements Section 2: Account terms and conditions This policy is

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

How to Deliver to Dunstable DC. WH Smith High Street & Travel

How to Deliver to Dunstable DC. WH Smith High Street & Travel How to Deliver to Dunstable DC WH Smith High Street & Travel Last updated 25 th Feb 2016 Introduction This booklet is intended to provide you with the information you require to ensure that your deliveries

More information

4.0 Receiving Process

4.0 Receiving Process 4.0 Receiving Process Delivery of requested products or services marks a transition in the Purchase-to-Pay process from a purchasing activity to a payables activity. All purchases must be received to release

More information

Issue Date: 22/10/12 Page 1 of 1 TABLE OF CONTENTS

Issue Date: 22/10/12 Page 1 of 1 TABLE OF CONTENTS P R O C E D U R E S M A N U A L Title: CONTENTS AND ISSUE STATUS Issue Date: 22/10/12 Page 1 of 1 TABLE OF CONTENTS PROCEDURE NO DESCRIPTION ISSUE QP01 Control of documents 1 QP02 Control of records 1

More information

AMETEK Airtechnology Group Ltd

AMETEK Airtechnology Group Ltd Page 1 of 16 AMETEK Airtechnology Group Ltd Locations: Airscrew Muirhead Aerospace Traxsys Input Products 111 Windmill Road, Sunbury on Thames, Middlesex, TW16 7EF Oakfield Road, Penge London SE20 8EW

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

Purchase Order Clauses and Conditions

Purchase Order Clauses and Conditions Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:

More information

Physical Inventory Guidelines

Physical Inventory Guidelines Purpose This document provides guidelines for conducting annual physical inventories, and is applicable to all units that hold inventory for resale to external or internal customers. Annual physical inventories

More information

GE Power Electronics Business Total Quality Management for Suppliers

GE Power Electronics Business Total Quality Management for Suppliers GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler

More information

Camar Aircraft Parts Co. Procedures Manual

Camar Aircraft Parts Co. Procedures Manual QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign

More information

MOUSER ELECTRONICS QUALITYMANUAL

MOUSER ELECTRONICS QUALITYMANUAL MOUSER ELECTRONICS QUALITYMANUAL QS-QM-001 REV L9/25/09 This page intentionally left blank. Page 2 of 27 TABLE OF CONTENTS 1.0 Forward...5 2.0 Introduction...5 3.0 Mission Statement...5 4.0 Quality Management

More information

Bogue Machine Company, Inc. Business Instruction

Bogue Machine Company, Inc. Business Instruction Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008

More information

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008 WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,

More information

Handling customer returns in Microsoft Dynamics AX 2009

Handling customer returns in Microsoft Dynamics AX 2009 Microsoft Dynamics AX 2009 Handling customer returns in Microsoft Dynamics AX 2009 White Paper This paper describes the dedicated module for handling customer returns that was introduced in Microsoft Dynamics

More information

Exemplar for Internal Achievement Standard. Accounting Level 2

Exemplar for Internal Achievement Standard. Accounting Level 2 Exemplar for internal assessment resource Accounting for Achievement Standard 9386 Exemplar for Internal Achievement Standard Accounting Level This exemplar supports assessment against: Achievement Standard

More information

EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS

EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS EXHIBIT MATERIALS MANAGEMENT REQUIREMENTS FOR CONTRACTED STORAGE PROVIDERS TABLE OF CONTENTS 1. General 1.1. Purpose 1.2. Scope 1.3. Target groups and responsibility 1.3.1. Target groups 1.3.2. Roles and

More information

Accounts Payable and Inventory Management

Accounts Payable and Inventory Management Accounts Payable and Inventory Management 2013 SedonaOffice Users Conference Presented by: Lisa Gambatese & Laurie Goodrich Table of Contents Accounts Payable G/L Account Defaults (AP) 4 A/P Setup Processing

More information

INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE

INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE 1.0 SCOPE: The purpose of this procedure is to document mandatory to ensure compliance to Project Requirements. inspection points and 2.0 REFERENCE DOCUMENTS:

More information

SUPPLIER QUESTIONNAIRE

SUPPLIER QUESTIONNAIRE SUPPLIER QUESTIONNAIRE January 17, 2014 Dear Valued Customer, It is Summit Aerospace Inc., policy to respond in a timely fashion to every regulatory and quality inquiry as presented by our current and

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

Article 6 To monitor type-certified products, the type certification body shall assign professionals to perform the

Article 6 To monitor type-certified products, the type certification body shall assign professionals to perform the ::: 103.12.22 Regulations Governing the Surveillance of Machinery, Equipment and Appliances [Chinese] Download:Regulations Governing the Surveillance of Machinery Equipment and Appliances.docx Chapter

More information

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum Release 4.0 4.2.3 4.2.3.C.1 Control of Customer- Supplied Documents and Data The organization shall establish and maintain a documented procedure(s) to control all customer-supplied documents and data

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL EASTERN STONE COMPANY QUALITY ASSURANCE MANUAL TAC-2000 / FAA AC 00-56 8042 NW 109 Lane Parkland, FL 33076 USA Section: I Page: 1 of 1 List of Effective Pages Section Page Revision # Date I 1 1 03/11/08

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

Packaging Guidelines Version Date: 11/6/12. ABB Inc. Packaging Guidelines. Version 1.0. Page 1. 3.04.P08.W03 Rev 0

Packaging Guidelines Version Date: 11/6/12. ABB Inc. Packaging Guidelines. Version 1.0. Page 1. 3.04.P08.W03 Rev 0 ABB Inc. Packaging Guidelines Version 1.0 Page 1 Contents Master Carton:... 3 Data Requirements... 3 Barcodes... 5 Label Placement... 6 Packing List... 7 Page 1 Contents... 7 Page 2 Contents... 9 International

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

Quality Control Procedures QCP 5.4 Page 1 of 5

Quality Control Procedures QCP 5.4 Page 1 of 5 Quality Control Procedures QCP 5.4 Page 1 of 5 1.0 PURPOSE 2.0 SCOPE SOURCE INSPECTION To establish a system for Source Inspection of material supplied to Eaton Corporation, FSD, Euclid. This procedure

More information

PREVIEW DISCRETE MANUFACTURING SCOTT HAMILTON

PREVIEW DISCRETE MANUFACTURING SCOTT HAMILTON PREVIEW Chapter 9: Serial and Batch Tracking Chapter 18: Quality Management DISCRETE MANUFACTURING USING MICROSOFT DYNAMICS AX 2012 SCOTT HAMILTON Contents Preface xi Chapter 1 Introduction 1 1.1 Suggestions

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the

More information

OPERATING PROCEDURES MANUAL

OPERATING PROCEDURES MANUAL LINDSTROM METRIC, INC 6-C SHELTER DRIVE a GREER SOUTH CAROLINA 29650 Phone (864) 877-3120 (800) 572-5550 Fax (864) 877-3121 SALES DISTRIBUTION CENTERS MINNESOTA CHICAGO YORK GREENVILLE OPERATING PROCEDURES

More information

Standard Operating Procedure Title: Manufacturing Rework Procedure

Standard Operating Procedure Title: Manufacturing Rework Procedure DR BPN RBPN WIP Deviation Report Batch Production Number Reworked Batch Production Number Work in Progress Area PS1 Production Staging Area 1 PS2 Production Staging Area 2 IP Interim Production Staging

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

Panini Maintenance Program My Vision X STANDARD WARRANTY-

Panini Maintenance Program My Vision X STANDARD WARRANTY- Panini Maintenance Program My Vision X STANDARD WARRANTY- Panini warrants, to its customers, its authorized Resellers customers, and no others, that all My Vision X Branch Image Scanners ( My Vision X

More information

QP-740. Supplier Management Handbook

QP-740. Supplier Management Handbook QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,

More information

Apple Juice Concentrate (AJC) Manual

Apple Juice Concentrate (AJC) Manual Apple Juice Concentrate (AJC) Manual Minneapolis Grain Exchange, Inc. 400 South 4 th Street Minneapolis, MN 55415 www.mgex.com AJC Manual Table of Contents The below table of contents is being supplied

More information

Transferring Government Records

Transferring Government Records Government Records Procedure GRO 2 Transferring Government Records Government Records Office Archives of Manitoba 2 PROCEDURE GRO 2: Transferring Government Records Updated: February 2014 CONTENTS PURPOSE

More information

QLT.DF1130.R04 Signature Authority Coversheet This coversheet shall accompany all controlled documents at all

QLT.DF1130.R04 Signature Authority Coversheet This coversheet shall accompany all controlled documents at all Document No: R62003.R03 Page 1 of 19 Process Owner: Kacy Williams Effective Date: 2-15-08 Originating Dept.: Shipping / Receiving No. Copies Distributed: Title/Subject: Bar Code Label Guidelines Panasonic

More information

Freight Claim Submission Process

Freight Claim Submission Process TSG Claims 770-995-3036 x260 Claims@shiptsg.com Freight Claim Submission Process All of the following documents must be submitted in support of the freight claim: Fully completed Standard Form for Presentation

More information

Lot: a group of product that is unique to time, date and location of manufacture.

Lot: a group of product that is unique to time, date and location of manufacture. Supplier ar Code Labeling Requirements E-43002 1 Scope and Purpose This document establishes requirements for package labeling and date or lot code segregation for suppliers providing material to enchmark

More information

Guide to Quality System for General Sale Wholesale Distributors

Guide to Quality System for General Sale Wholesale Distributors Guide to Quality System for General Sale Wholesale Distributors IA-G0038-2 1 NOVEMBER 2013 This guide does not purport to be an interpretation of law and/or regulations and is for guidance purposes only.

More information

B Resource Guide: Implementing Financial Controls

B Resource Guide: Implementing Financial Controls What s in this Guide: I. Definition: What are Financial Controls? II. Why Do You Need Financial Controls? III. Best Practices: Financial Controls to Consider I. Definition: What are Financial Controls?

More information

Order Processing and Logistics Guidelines

Order Processing and Logistics Guidelines Order Processing and Logistics Guidelines Effective Date: 02-01-2009 Revised: 08-13-2010 Revised: 01-24-2014 In order to offer our customers Perfect Service, C&H Service LLC and its related entities (C&H

More information

Shipping, Receiving, and Mail Services Procedure

Shipping, Receiving, and Mail Services Procedure Shipping, Receiving, and Mail Services Procedure Procedure Number Effective Date 5.1.3P TBD 1.0 PURPOSE The functions of Mail Services include receiving, processing, and delivering incoming, outgoing,

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

Supplier Handbook Terms and Conditions

Supplier Handbook Terms and Conditions * 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality

More information

Central Receiving Policies & Procedures Manual North Carolina Central University Central Receiving

Central Receiving Policies & Procedures Manual North Carolina Central University Central Receiving Central Receiving Policies & Procedures Manual North Carolina Central University Central Receiving 625 George Street Durham NC 27707 Phone: (919) 530-6441 Fax: (919) 530-6152 Hours of Operation: Monday

More information