Edmonton s Risk Based Infrastructure Management System CNAM Bradley Leeman, P.Eng.
|
|
|
- Lee Bennett
- 9 years ago
- Views:
Transcription
1 Edmonton s Risk Based Infrastructure Management System CNAM 2010 Bradley Leeman, P.Eng.
2 Agenda Risk Analysis Methodology (The Past) Risk Model (RIMS) (The Present) Strategic Integration with Operational Planning (The Future)
3 What Are the Challenges? Funding is insufficient to preserve existing infrastructure or to support continued growth Funding shortfalls will continue to grow as infrastructure ages, growth continues and inflation increases construction costs Lack of action now will limit options and cost more in the future
4 What Does Our Office Do? Office of Infrastructure & Funding Strategy Mandates: Implement Edmonton City Council s Infrastructure Strategy Develop tools and processes to improve infrastructure asset management and facilitate long term infrastructure planning Coordinate the City s infrastructure grant programs from federal and provincial governments Research and develop alternative sources of funding
5 SMA Consulting Ltd. Established in 1995 History with Office goes back to 2003 Involved in providing services in the areas of value engineering/analysis, risk analysis, uncertainty modeling, production planning, project controls, simulation modeling, construction staging, quality assurance and infrastructure management. Develop new production planning tools based on computer simulation, created technologies for project control and deployed artificial intelligence techniques for optimizing infrastructure planning. Principle Simaan AbouRizk, Ph.D., P.Eng.
6 Risk Analysis Methodology Advantages of Risk Analysis Include: 1 Uniformity in dealing with different types of assets. Comprehensive models of all assets that enable development of various funding scenarios and experimentation with the impacts on infrastructure. Prioritization of funding to deal first with critical assets, and An integrated approach to asset management. 1) Allouche, AbouRizk, and Siu; Risk Analysis of the Physical Condition of Infrastructure Assets
7 What Is The Risk? KM A B C D F Condition Year 2001 Year 2011 Year 2021 Year 2031 KM Expected Failure Pipes in D +F Now 10 years 20 years 30 years Condition Projections and Expected Failure N (new) P AB P BC P CD P DF (new) A B C D F PFO P O (out) Impacts of Failure P DB P FA Determine Future Condition Negligible Acceptable Reasonable Important Severity of the Asset Serious Acute
8 Condition Assessment Classifications Physical Condition condition of the physical infrastructure that allows it to meet the intended service level Demand/Capacity the ability of the physical infrastructure to meet service needs Functionality the ability of the physical infrastructure to meet program delivery needs Very Good Good Fair Fair Poor Poor Very Poor Poor These ratings are applied to each classification AA BB CC DD FF
9 Status of Our Infrastructure $20.0 $18.0 $16.0 $7.7 40% $14.0 $12.0 $ % $ % $ billions $10.0 $8.0 Good and Very Good Fair Poor and Very Poor $6.0 $4.0 $6.3 33% $ % $4.0 21% $2.0 $2.7 14% $3.1 16% $1.3 7% $0.0 Physical Condition Functionality Demand/ Capacity Assessment Classification
10 Deterioration & Renewal A B C D F Start of the Assets Life (Condition A) Deterioration after one year Deterioration after 15 years (Condition C) Deterioration after 25 years (Condition D) Age (Year) Deterioration 41 years A B C Condition B Renewal ($) New Life Cycle D F Age (Year) Condition D Extending Asset Life
11 Calculating Condition Over Time Transition from one stage to the other is computed using a deterioration curve. Curves are derived using historical data points and other relevant data. P AB P BC P CD P DF P FO N A B C D F O (out) P BD P AF
12 Renewal Strategy: Replace, Rehab and Maintenance Each type of asset has its own practical rehabilitation and maintenance actions Example: Local Sanitary Sewer 1- Open Cut and Replace $3.7 Million/km (F A) 2- Spot Open Cut and Reline (F B) $0.32 Million/km 3- Reline F A F B F C F D A B C D B A C B C A D C D B D A (D B) $0.26 Million/km F
13 Renewal Strategy - Roads Reconstruction D:F A Rehabilitation (Grind and overlay, Structural & overlay, etc.) C:D A Preventive maintenance Crack/Joint Seal Microsurfacing B A
14 Risk & Severity Risk: The possibility of suffering loss (or harm) and the impact that loss has on the involved party. Risk can be characterized in terms of its Severity where: Severity = Likelihood of Occurrence x Magnitude of the Impact Five Areas of Impact 1. Safety and Public Health (33%) 2. Growth (11%) 3. Environment (20%) 4. Preservation of the infrastructure (20%) 5. Services to People (16%)
15 Risk & Severity Severity = Likelihood of Occurrence x Magnitude of the Impact
16 RIMS Model Risk-Based Inventory Management System
17 Questions We All Ask What are the critical assets and how much investment is required to deal with them? How much money is required to keep all assets to the current average condition they are in today? What investment is required to minimize exposure, maintain a reasonable level of service, or achieve specific goals established by the Corporation?
18 Background Our Vision Based on work with SMA Consulting going back to 2003 Previous Models based in Excel and housed at SMA Senior Management Team Resolution: That the City undertake development of a user-friendly risk-based decision model in a software application to allocate revenues for infrastructure.
19 Objective of Project Development of a user friendly software application to optimize investment, based on risk and condition, at the strategic level (product not intended to prioritize individual projects)
20 Benefits of a Resources Allocation Model A quantitative approach for use in strategic planning and macro life cycle analysis Identify infrastructure areas with emerging issues and the need to increase inspection and assessment programs in those areas Identify areas that involve significant exposure to the City
21 RIMS Model - Inputs In General, the Following Inputs are Needed: Asset Hierarchy Asset Deterioration Curves/Models Asset Inventory (Quantity/Age/Condition) Impact of Failure Renewal Strategies (Applicability, Impact, $) Reconstruction Rehabilitation Maintenance Asset Importance Level
22 RIMS Model Levels of Performance An acceptable level of performance was developed based on the following four parameters: Condition Index Percentage of assets in condition F& D Percentage of assets in condition F Severity Sensitivity Analysis performed to analyze link between investment and these parameters
23 Sensitivity Analysis High Importance Assets
24 RIMS Model Levels of Performance Importance Level Minimum Condition Index Maximum % of Assets in D & F Maximum % of Assets in F Severity High % 0% 200 Medium-High % 2% 200 Medium % 5% 200 Medium-Low % 7% 200 Low % 10% 200
25 RIMS Model Genetic Algorithm Based on Research by Dr Hussien AL-Battaineh Consider codifying a solution into a string of information Based on Darwin s Theory of Natural Selection Genes propagate thru generations more readily if they contribute to more fit organisms. Fit organisms will breed more than unfit organisms thus passing more of their genes to the next generation The genes of a successive generation receive their genes as a result of a combination of the genes from their parents Mutation allows for divergence from the established gene pool. Mutations are random and may or may not increase the fitness of the organism. Fitness is defined based on the problem being solved
26 RIMS Model Optimization We can optimize investment under two assumptions
27 RIMS Model Levels of Analysis Single Asset Collectors Small Storm Sewers LRT Line Collection of Assets Different assets bounded by neighbourhood Assets enclosed in hierarchical classes
28 RIMS Model - Output Asset distribution over the different conditions A, B, C, D, and F Asset conditions at each year of the analysis, including condition index %F+D, %F, and Severity Proposed rehabilitation and replacement actions Proposed investment level each year
29 Output: Road - Condition Index
30 Output: Road - % in F&D
31 Output: Road- Severity
32 Output: Impact on Condition Index
33 Strategic Integration DECISION MAKING PROCESS & TOOLS Determine NEEDS Infrastructure Renewal Infrastructure Growth Service Renewal Service Growth Determine Financial CAPACITY Population Projection Debt Supply Tax Structure Establish DECISION- MAKING Process Goals & Criteria Setting Balance between Service & Infrastructure Balance between Renewal & Growth Renewal Prioritization Growth Prioritization Infrastructure Projection Model (Growth) Life Cycle Cost Model (Renewal) Revenue Projection Model Risk-based Resources Allocation Model (Renewal) Goal-based Prioritization Model (Growth) Service Projection Model Service / Infrastructure Impact Model Services Prioritization Model PRODUCT 10 Year Resource Plan
STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON
STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON Theresa Cloake, P.Eng. Infrastructure Analyst and K.L. Siu, P.Eng. Senior Infrastructure Officer Office
Visa Smart Debit/Credit Certificate Authority Public Keys
CHIP AND NEW TECHNOLOGIES Visa Smart Debit/Credit Certificate Authority Public Keys Overview The EMV standard calls for the use of Public Key technology for offline authentication, for aspects of online
The City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
Risk Analysis and Quantification
Risk Analysis and Quantification 1 What is Risk Analysis? 2. Risk Analysis Methods 3. The Monte Carlo Method 4. Risk Model 5. What steps must be taken for the development of a Risk Model? 1.What is Risk
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN
TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located
ASSET MANAGEMENT PLAN
ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account
Probabilistic Risk Assessment Studies in Yemen
Probabilistic Risk Assessment Studies in Yemen The catastrophic risk analysis quantifies the risks of hazard, exposure, vulnerability, and loss, thus providing the decision maker with the necessary information
Asset Management Plan Final Report
AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our
Using Risk-Based GIS Modeling Software to Optimize Sewer Renewal Planning
Close Using Risk-Based GIS Modeling Software to Optimize Sewer Renewal Planning By Paul F. Boulos Rapid population growth and the deterioration of aging infrastructures are overtaxing sewer systems worldwide.
RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.
HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended
0242-1. HSR TRAINING COURSE REQUIREMENTS HSR Training Course Guidance Booklet 2
0242-1 HSR TRAINING COURSE REQUIREMENTS HSR Training Course Guidance Booklet 2 SafeWork SA 2 Contents Introduction... 4 Learning resources... 4 PART 1 UNDERPINNING PRINCIPLES FOR THE DEVELOPMENT OF A SAFEWORK
I Have...Who Has... Multiplication Game
How to play the game: Distribute the cards randomly to your students. Some students may get more than one card. Select a student to begin by reading their card aloud. (example: 35. who has 4x4?) 35 4 x
SERVER CERTIFICATES OF THE VETUMA SERVICE
Page 1 Version: 3.4, 19.12.2014 SERVER CERTIFICATES OF THE VETUMA SERVICE 1 (18) Page 2 Version: 3.4, 19.12.2014 Table of Contents 1. Introduction... 3 2. Test Environment... 3 2.1 Vetuma test environment...
EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction
EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure
Township of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
cugog TOWNSHIP OF Ian
TOWNSHIP OF cugog EDUCATION AND TRAINING SESSION AGENDA MONDAY, OCTOBER 28, 2013 AT 9:00 A.M. IN COUNCIL CHAMBERS Road and Bridge Asset Management Plan The What and the How 9:00 a.m. The What Ian Roger
City of Cambridge and IBM Build a Smarter City
City of Cambridge and IBM Build a Smarter City September 8, 2010 Presented by Mike Hausser, P.Eng Director of Asset Management and Support Services City of Cambridge Infrastructure Asset Life Cycle Install
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level
Implementing Pavement Management Systems, Do's and Don ts at the Local Agency Level Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Do Understand Basic Pavement
Asset Management Plan
Asset Management Plan Final Report May 2014 EXECUTIVE SUMMARY Adequate municipal infrastructure such as roads, bridges, and underground water and sewage pipes are essential to economic development, citizen
Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email:
Rehabilitation Scenarios for Sustainable Water Mains Khaled Shahata 1 ; Tarek Zayed 2 ; and Saad Al-Jibouri 3 1 Graduate Student, Department of Building, Civil, and Environmental Engineering, Concordia
SERVER CERTIFICATES OF THE VETUMA SERVICE
Page 1 Version: 3.5, 4.11.2015 SERVER CERTIFICATES OF THE VETUMA SERVICE 1 (18) Page 2 Version: 3.5, 4.11.2015 Table of Contents 1. Introduction... 3 2. Test Environment... 3 2.1 Vetuma test environment...
Risk - Based Inspection Frequencies
Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection
Bridges & Culverts Condition by Quantity
3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received
Use of the Chi-Square Statistic. Marie Diener-West, PhD Johns Hopkins University
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike License. Your use of this material constitutes acceptance of that license and the conditions of use of materials on this
SL-8800 HDCP 2.2 and HDCP 1.x Protocol Analyzer for HDMI User Guide
SL-8800 HDCP 2.2 and HDCP 1.x Protocol Analyzer for HDMI Simplay-UG-02003-A July 2015 Contents 1. Overview... 4 1.1. SL-8800 HDCP Protocol Analyzer Test Equipment... 4 1.2. HDCP 2.2/HDCP 1.x Protocol Analyzer
1. What Is Risk? 3. Perspectives on Risk. Risk Management. 6. Characteristics of Risk Management 7. Advantages of Risk Management
Risk Management 1. What Is Risk? 2. Why Do We Accept or Assume Risks? 3. Perspectives on Risk 4. What is Risk Management? 5. The Risk Management Process 6. Characteristics of Risk Management 7. Advantages
Town of Mattawa Asset Management Plan. December 2013
Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,
USB HID to PS/2 Scan Code Translation Table
Key Name HID Usage Page HID Usage ID PS/2 Set 1 Make* PS/2 Set 1 Break* PS/2 Set 2 Make PS/2 Set 2 Break System Power 01 81 E0 5E E0 DE E0 37 E0 F0 37 System Sleep 01 82 E0 5F E0 DF E0 3F E0 F0 3F System
NEOSHO COUNTY COMMUNITY COLLEGE MASTER COURSE SYLLABUS. Medical Professional Issues
NEOSHO COUNTY COMMUNITY COLLEGE MASTER COURSE SYLLABUS COURSE IDENTIFICATION Course Code/Number: ALMA 110 Course Title: Medical Professional Issues Division: Applied Science (AS) Liberal Arts (LA) Workforce
Town of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
Asset Management Plan
Example Transportation Asset Management Plan Outline This outline was created using the Transportation Asset Management Plan (TAMP) Builder ( www.tamptemplate.org ), a product of NCHRP Project 8-36/116.
How To Manage The County Of Simcoe'S Infrastructure
Asset Management Plan Asset Management Plan Table of Contents 1.0 Executive Summary... 2 2.0 Introduction... 4 3.0 State of County of Simcoe s Infrastructure... 7 4.0 Levels of Service... 14 5.0 Asset
Phased Assessment Strategy for Sewers
Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure
Asset Management B.C.
Asset Management BC Roadmap Project Guide for using the Asset Management BC Roadmap Asset Management B.C. ROADMAP MAY 2011 Asset Management BC ROADMAP PROJECT Guide for using the Asset Management BC Roadmap
Asset Management: A Best Practice
Asset Management: A Best Practice Purpose Introduction This guide will help you understand: The definition of Asset Management. Why asset management is important to your utility. The best practices in
TACKLING MANAGEMENT TASKS
TACKLING MANAGEMENT TASKS Asset Soundness Results of Processing Non-Performing Loans in FY2005 We have calculated write-offs and reserve amounts for non-performing loans based on results from selfassessment
Randomized Block Analysis of Variance
Chapter 565 Randomized Block Analysis of Variance Introduction This module analyzes a randomized block analysis of variance with up to two treatment factors and their interaction. It provides tables of
Guidance for Industry: Quality Risk Management
Guidance for Industry: Quality Risk Management Version 1.0 Drug Office Department of Health Contents 1. Introduction... 3 2. Purpose of this document... 3 3. Scope... 3 4. What is risk?... 4 5. Integrating
ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD
ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers
Prepared by. Tamer E. El-Diraby, PhD., PEng. Associate Professor, Sherif N. Kinawy, MSc., EP, Research Assistant. Department of Civil Engineering,
Analyzing Approaches Used by Ontario Municipalities to Develop Road Asset Management Plans: Initial Insights Report Prepared by Tamer E. El-Diraby, PhD., PEng. Associate Professor, Sherif N. Kinawy, MSc.,
ASSET MANAGEMENT PLAN
Tof Proud Heritage, Exciting Future ASSET MANAGEMENT PLAN 1 TABLE OF CONTENTS PAGE 3 OVERVIEW 8 FACILITIES 12 FLEET 16 PLAYGROUND EQUIPMENT 19 ROADWAYS 23 BRIDGES 26 WATER RELATED ASSETS 2 One of the goals
Stormwater Infrastructure Asset Management Plan
District of West Vancouver May 18, 2010 FINAL REPORT Prepared by: AECOM Canada Ltd. 1901 Rosser Avenue, Floor 6, Burnaby, BC, Canada V5C 6S3 T 604.298.6181 F 604.294.8597 www.aecom.com Project Number:
Welcome! First Steps to Achieving Effective Inventory Management
Welcome! First Steps to Achieving Effective Inventory Management Tuesday, January 25, 2011 10 a.m. 11 a.m. EST Housekeeping Items This meeting will run for approximately one hour. Submit all questions
How to create OpenDocument URL s with SAP BusinessObjects BI 4.0
How to create OpenDocument URL s with SAP BusinessObjects BI 4.0 Creator: Twitter: Blog: Pieter Verstraeten http://www.twitter.com/pverstraeten http://www.pieterverstraeten.com/blog Hi, Thanks for downloading
Session 4. System Engineering Management. Session Speaker : Dr. Govind R. Kadambi. M S Ramaiah School of Advanced Studies 1
Session 4 System Engineering Management Session Speaker : Dr. Govind R. Kadambi M S Ramaiah School of Advanced Studies 1 Session Objectives To learn and understand the tasks involved in system engineering
THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH
THE ASSET MANAGEMENT PLAN FOR THE TOWNSHIP OF ASHFIELD-COLBORNE-WAWANOSH 2013 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET, SUITE 1410 LONDON, ONTARIO, N6A 5P3 State of the Infrastructure
Inspection Data for Bridge Asset Management
Inspection Data for Bridge Asset Management New York State DOT approach and Practice George A. Christian, P.E. New York State Department of Transportation Vermont AOT Bridge Maintenance and Preservation
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation
2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels
OPAL platform Goal-based financial planning for private investors Retail banking - Private banking - Wealth management
OPAL platform Goal-based financial planning for private investors Retail banking - Private banking - Wealth management CONTENT Improve investment decision making For Private investors Take your financial
Space project management
ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards
Optimal Replacement of Underground Distribution Cables
1 Optimal Replacement of Underground Distribution Cables Jeremy A. Bloom, Member, IEEE, Charles Feinstein, and Peter Morris Abstract This paper presents a general decision model that enables utilities
A Risk Based Thinking Model for ISO 9001:2015
A Risk Based Thinking Model for ISO 9001:2015 Bob Deysher Senior Consultant 2014 QSG, Inc. Agenda Why implement Risk Based Thinking? What does ISO 9001:2015 require? What is Risk Based Thinking? What is
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49
Chapter 5 RISK MANAGEMENT ANALYSIS CHAPTER 5 RISK MANAGEMENT ANALYSIS PAGE 49 This page intentionally left blank. PAGE 50 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN RISK MANAGEMENT ANALYSIS
10.0 ASSET MANAGEMENT PRACTICES
10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal
Professional Level Skills Module, Paper P4
Answers Professional Level Skills Module, Paper P4 Advanced Financial Management December 2011 Answers 1 Up to 4 professional marks are available for the presentation of the answer, which should be in
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
Pavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
Advanced Encryption Standard by Example. 1.0 Preface. 2.0 Terminology. Written By: Adam Berent V.1.7
Written By: Adam Berent Advanced Encryption Standard by Example V.1.7 1.0 Preface The following document provides a detailed and easy to understand explanation of the implementation of the AES (RIJNDAEL)
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan
Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data
Fault Analysis in Software with the Data Interaction of Classes
, pp.189-196 http://dx.doi.org/10.14257/ijsia.2015.9.9.17 Fault Analysis in Software with the Data Interaction of Classes Yan Xiaobo 1 and Wang Yichen 2 1 Science & Technology on Reliability & Environmental
Capital Asset Management Plan
2015 Capital Asset Management Plan City of Peterborough 12/15/2015 Executive Summary Asset management planning supports evidence based decisions regarding the building, operating, maintaining, renewing,
Advanced Encryption Standard by Example. 1.0 Preface. 2.0 Terminology. Written By: Adam Berent V.1.5
Written By: Adam Berent Advanced Encryption Standard by Example V.1.5 1.0 Preface The following document provides a detailed and easy to understand explanation of the implementation of the AES (RIJNDAEL)
FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry)
FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry) 1 Contents Executive Summary... 3 Background and Scope... 3 Company Background and Highlights... 3 Sample Risk Register...
Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
Our Challenging Future
Protecting Our Future by Making Advanced Asset Management Decisions < All stories in this section Gregory M. Baird Dec 23, 2011 America s economic dominance as a world power over the past several decades
Township of Terrace Bay Drinking Water System Financial Plan
Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance
Proposed New Starts/Small Starts Policy Guidance
Proposed New Starts/Small Starts Policy Guidance Table of Contents I. INTRODUCTION... 1 II. PROJECT JUSTIFICATION CRITERIA... 4 MOBILITY IMPROVEMENTS... 4 OPERATING EFFICIENCIES... 5 Measure:... 5 Calculation:...
The current version of this document can always be found at http://www.nic.cz/csirt.
1 RFC 2350 1.1 1. Document Information This document contains a description of CZ.NIC-CSIRT according to RFC 2350. It provides basic information about the CSIRT team, the ways it can be contacted, describes
Optimization of Preventive Maintenance Scheduling in Processing Plants
18 th European Symposium on Computer Aided Process Engineering ESCAPE 18 Bertrand Braunschweig and Xavier Joulia (Editors) 2008 Elsevier B.V./Ltd. All rights reserved. Optimization of Preventive Maintenance
EXECUTIVE SAFETY POLICY
EXECUTIVE SAFETY POLICY SAFETY AT VIRGINIA FLIGHT SCHOOL The concept or word safety when used at Virginia Flight School, written, spoken or implied shall mean: The freedom from, or minimal exposure to,
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
The ASCII Character Set
The ASCII Character Set The American Standard Code for Information Interchange or ASCII assigns values between 0 and 255 for upper and lower case letters, numeric digits, punctuation marks and other symbols.
A Robust Method for Solving Transcendental Equations
www.ijcsi.org 413 A Robust Method for Solving Transcendental Equations Md. Golam Moazzam, Amita Chakraborty and Md. Al-Amin Bhuiyan Department of Computer Science and Engineering, Jahangirnagar University,
EIOPA Risk Dashboard March 2015 Q4 2014 data PUBLIC. EIOPA-FS-15/209 Frankfurt, 20th March 2015
EIOPA Risk Dashboard March 2015 Q4 2014 data PUBLIC EIOPA-FS-15/209 Frankfurt, 20th March 2015 Summary The release of this EIOPA Risk Dashboard is based on 2014- Q4 indicators submitted on a best effort
STRUCTURED FINANCE RATING CRITERIA 2015
STRUCTURED FINANCE RATING CRITERIA 2015 1. Introduction 3 1.1 Credit quality of the collateral 3 1.2 The structure designed 3 1.3 Qualitative risks on the Securitization Fund 4 1.4 Sensitivity 4 1.5 Definition
ethekwini Metropolitan Municipality s
ethekwini Metropolitan Municipality s integrated approach to pavement asset management INTRODUCTION Recent asset management legislation has holistically incorporated a host of previously stand-alone principles
Taking Target Date Fund Evaluation to the Next Level
Taking Target Date Fund Evaluation to the Next Level Lori Lucas Defined Contribution Practice Leader Callan Associates Chicago, Illinois The opinions expressed in this presentation are those of the speaker.
