1 Review of Exam Wastewater Math Problems (Grades 2-4) 1. A pump runs continuously for 8 hrs at full speed and delivers 9,350 gallons, what is the capacity (pumping rate) of the pump in gallons per minute? Pumping Rate, gpm = Volume, gals Time, mins a. Change hrs to mins: 8 hrs x 60 mins = 480 mins hr b. Solve for gpm discharging pumping rate using the above formula: Pumping Rate, gpm = 9350 gal 480 mins Pumping Rate, gpm = 19.5 gpm 2. Approximately how many gallons of wastewater would 800 feet of 8-inch pipe hold? a. x (the unknown) = number of gallons pipe will hold The pipe s volume in ft 3 must be calculated first and then the ft 3 of pipe is converted to gallons using the capacity formula: b. Solve for volume of pipe in ft 3 : Gallons = Number of calculated ft 3 x 7.48 gal/ft 3 Convert 8 in to ft: 8 inches = 0.67 ft 12 inches/ft Volume, ft 3 = x (D, ft) 2 x length of pipe, ft = x (0.67 ft) 2 x 800 ft = [0.785 x (0.67 ft x 0.67 ft)] x 800 ft = [0.785 x 0.45 ft 2 ] x 800 ft = 0.35 ft 2 x 800 ft = 280 ft 3 Gallons = # of ft 3 x 7.48 gal/ft 3 Gallons = 280 ft 3 x 7.48 gal/ft 3 Gallons = gals! 1

2 3. A sewer pipe is 265 feet long and has a diameter of 10-inches. The pipe is to be treated with a root-killing chemical containing a 250-mg/L concentration. How many pounds of chemical are needed? a. x (unknown) = lbs. of chemical needed to kill the roots in the pipe The lbs formula is the main formula needed to solve this problem Lbs. Chemical = (pipe capacity, MG) x (Chemical conc. mg/l) x 8.43 lbs/gal b. First the ft 3 volume of pipe and then convert the ft 3 to gallons and then to MG capacity. Convert 10 inch-diameter pipe to ft diameter: 10 inches = 0.83 ft 12 inches/ft Volume, ft 3 = x (D, ft) 2 x length of pipe, ft = [0.785 x (0.83 ft) 2 ] x 265 ft = [0.785 x (0.83 ft x 0.83 ft)] x 265 ft = [0.785 x 0.69 ft 2 ] x 265 ft = 0.54 ft 2 x 265 ft = ft 3 Capacity, gals = # of ft 3 x 7.48 gal/ft 3 Capacity, gals = ft 3 x 7.48 gal/ft 3 Capacity, gals = gals MG = gals = MG 1,000,000 gals/mg c. Solve for lbs of chemical using the lbs. formula: lbs. Chemical = MG x 250 mg/l x 8.34 lbs/gal lbs. Chemical = 2.24 lbs of chemical d. There is another formula that can be used to solve for lbs of chemical Lbs. Chemical = gallons treated x chemical concentration, mg/l 120,000! 2

3 = gals x 250 mg/l 120,000 = = 2.24 lbs of chemical 120, Find the gallon capacity of a secondary (also can be called the final clarifier) that has a diameter of 30 feet, a water depth of 12 feet. The cone portion of the tank is 4.5 feet deep. a. x(unknown) = gallon capacity of tank b. Find the volumes of both the cylinder part and cone part of clarifier in ft 3 and add ft 3 together then convert total ft 3 to gallons. Find Cylinder Volume: 1. Find Cylinder depth, ft = 12.5 ft 4.5 ft = 7.5 ft 2. Volume, ft 3 = x (D, ft. 2 x depth of cylinder, ft = x (30 ft) 2 x 7.5 ft = [0.785 x (30 ft x 30 ft)] x 7.5 ft = [0.785 x 900 ft 2 ] x 7.5 ft = ft 2 x 7.5 ft = 5299 ft 3 Find Cone Volume: 1. Volume, ft 3 = 1/3 x [0.785 x (D, ft) 2 ] x Cone depth, ft = 1/3 x [706.5 ft 2 x 4.5 ft] = 1/3 x ( ft 3 ) = or 1060 ft 3 Add Ft 3 Volumes of cylinder and cone: 5299 ft ft 3 = 6359 ft 3 Find Gallon Capacity of Clarifier Capacity, gals = Total # of ft 3 in clarifier x 7.48 gal/ft 3 = 6359 ft 3 x 7.48 gal/ft 3 = 47,565 gals 5. How many pounds of chlorine gas are necessary to treat 8,000,000 gallons of wastewater at a dosage of 4 mg/l?! 3

4 a. x = lbs. of Chlorine needed to treat wastewater The lbs formula is the main formula needed to solve this problem Lbs. Chlorine = (Vol. of wastewater, MG) x (Chlorine dose, mg/l) x 8.43 lbs/gal Convert gallons of wastewater to MG: 8,000,000 gals = 8.0 MG 1,000,000 gal/mg Continued on next page: b. Find lbs of chlorine needed Lbs. Chlorine = (Vol. of wastewater, MG) x (Chlorine dose, mg/l) x 8.43 lbs/gal = 8.0 MG x 4 mg/l x 8.34 lbs/gal = or 267 lbs of chlorine 6. A WWTP uses 1-ton cylinders of chlorine for disinfection. The average daily chlorine demand is 8 mg/l requiring an average daily dosage of 11 mg/l. How many cylinders will the plant need for the month of May? The average plant flow for the month of May is 12 MGD. Data needed to solve this problem: ADF in May = 12 MGD Cl dose = 11 mg/l Days in May = 31 days Ton cylinder = 2,000 lbs a. x(unknown) = Number of ton chlorine cylinders used in May b. Find lbs Cl/day used = 12 MGD x 11 mg/l x 8.34 lbs/gal = c. Find lbs. Chlorine used in May = lbs Cl/day x 31 days/may = 34, lbs used/may d. #Ton Cl cylinders/may = 34, lbs used/may 2000 lbs/cylinder = or 18 cylinders used in May 7. How may pound of chlorine has to be added per day to maintain a chlorine residual of 0.5 mg/l with a chlorine demand of 19.5 mg/l and a plant flow of 5 MGD? a. X(unknown) = Cl dose, lbs/day! 4

5 b. Find Cl dose in mg/l: Cl dose, mg/l = Cl demand, mg/l + Cl residual, mg/l = 19.5 mg/l mg/l = 20.0 mg/l c. Find lbs/day of Chlorine dose Lbs. Cl dose/day = Flow (MGD) x Chlorine Dose (mg/l) x 8.34 lbs/gal = 5 MGD x 20.0 mg/l x 8.34 lbs/gal = 834 lbs Cl dose/day 8. Calculate the weir-loading rate for a primary clarifier that has a total weir length of 520 feet and receives a flow of 5 MGD. a. x(unknown) = Weir Loading rate also called weir overflow rate in gpd/ft First, Convert 5 MGD to gpd: 5 MGD x 1,000,000 gal/day = 5,000,000 gpd MGD b. Formula: WLR, gpd/ft = Flow, gpd Weir Length, ft. WLR, gpd/ft = 5,000,000 gpd 520 ft = gpd/ft 9. A primary clarifier has a diameter of 75 ft with a depth of 15 ft and a daily flow of 5.0 MGD that passes through the tank. What is the detention time (in hours) of the tank? a. x(unknown) = Detention time, hrs b. Formula: DT, hrs = Clarifier Vol., gals x 24 hr/day Flow, gal/day c. First, find clarifier volume in ft 3 then convert to gals Volume, ft 3 = x (D, ft.) 2 x depth of clarifier, ft = (75 ft.) 2 x 15 ft = [0.785 x (75 ft x 75 ft)] x 15 ft = [0.785 x 5625 ft 2 ] x 15 ft! 5

6 = ft 2 x 15 ft = 66, ft 3 Capacity, gals = 66, ft 3 x 7.48 gal/ft 3 = 495, gals d. Convert 5 MGD to gal/day: 5 MGD x 1,000,000 gal/day = 5,000,000 gpd MGD e. Find detention time of clarifier: DT, hrs = 495, gals x 24 hr/day 5,000,000 gal/day =.099 day x 24 hr/day = 2.4 hrs 10. A pump delivers 250,000 gallons per day at a static head of 310 feet. Calculate the pressure equivalent to this head expressed as pounds per square inch (psi)? a. x(unknown) = psi of static head b. Conversion Formula: #psi = Number of feet 2.31 ft/psi c. Solve for number of psi # psi = 310 ft 2.31 ft/psi = psi 11. Given the following information calculate the BOD value of this sample. Initial Sample DO = 8.2 mg/l Final Sample DO = 4.9 mg/l Total Sample Volume = 300 ml Amt. of Sample Used = 10 ml a. x(unknown) = BOD, mg/l of sample b. Formula: BOD, mg/l = Initial BOD, mg/l Final BOD, mg/l Amt. of Sample, ml 300 ml! 6

7 BOD, mg/l = 8.2 mg/l 4.9 mg/l 10 ml_ 300 ml = 3.3 mg/l 0.03 = 110 mg/l BOD 12. Given the following information determine the percent volatile suspended solids of this sample. Wt. of dish = grams Wt. of dish + wet sample = grams Wt. of dish + dry sample = grams Wt. of dish + ash = grams a. x (unknown) = % Volatile Solids b. Formulas: Dry Solids wt. grams = (Wt. of dish, g + Dry sample, g) Wt. of Dish, g Ash wt. = (wt. of dish + ash wt.) Wt. of Dish, g Volatile Solids, % = Dry solids wt. g Ash wt. g x 100 Dry solids wt. g Volatile Solids, % = (22.60 g g) (21.75 g g) x g g = x = 0.85 x = 0.54 x 100 = 54%! 7

8 13. A drying bed dimensions are 50 feet in length and 20 feet in width. A bed of sludge has been drawn to a depth of 18 inches. The sludge contains 3.8% solids. How many pounds of solids are in the bed? a. x(unknown) = lbs of solids in drying bed b. Formula to solve for lbs of solids: Lbs of solids = MG (capacity of drying bed) x mg/l (conc. of solids in sludge) x 8.34 lbs/gal c. Find Volume of sludge in drying bed in ft 3 converts to gallons and then convert to MG Convert the 18 inch depth of sludge to feet of sludge: 18 inches = 1.5 ft 12 in/ft Volume of sludge, ft 3 = Length, ft x Width, ft x Depth, ft = 50 ft x 20 ft x 1.5 ft = 1500 ft 3 Capacity, gals = # ft 3 x 7.48 gal/ft 3 = 1500 ft 3 x 7.48 gal/ft 3 = gals MG = gals = MG 1,000,000 gals/mg d. Convert 3.8% solids to mg/l Conversion factor: 1% = 10,000 mg/l 3.8% x 10,000 mg/l = 38,000 mg/l 1% c. Calculate lbs of solids in drying bed: Lbs of solids = MG (capacity of drying bed) x mg/l (conc. of solids in sludge) x 8.34 lbs/gal Lbs of Solids = MG x 38,000 mg/l x 8.34 lbs/gal Lbs of Solids = ! 8

9 14. Given the following information, determine the excess solids in pounds that should be wasted from the aerated sludge system. Target F:M = 0.6 MLVSS = 3250 mg/l BOD loading = 20,500 lb/day Vol. of aeration basin = 2.0 MG a. X(unknown) = Lbs of solids (MLSS) must be wasted to achieve the target F:M ratio. b. Formulas Needed to Solve this Problem: 1. Lbs. MLVSS to waste = lbs MLVSS in Aerator lbs. MLVSS required in basin to meet target F:M 2. Lbs. MLVSS in Aerator = Aerator Vol. (MG) x MLVSS conc. mg/l x 8.34 lbs/gal 3. Rearrange F:M formula to calculate the lbs of MLVSS required in basin to meet the target F:M. F:M = lbs. BOD/day can be rearranged to the following formula: lbs MLVSS Lbs. MLVSS = lbs. BOD/day F:M (lbs BOD/day/lb MLVSS) c. Find lbs MLVSS already in basin: lbs MLVSS = 2.0 MG x 3250 mg/l x 8.34 lbs/gal = 54,210 lbs MLVSS d. Calculate lbs of MLVSS required in basin to meet target F:M using the rearranged F:M formula: lbs MLVSS = 20,500 lbs BOD/day 0.6 lbs BOD/day/lb MLVSS Lbs. MLVSS = 34, lbs MLVSS e. Calculate the lbs MLVSS to be wasted to meet target F:M lbs MLVSS to waste = 54,210 lbs MLVSS 34,167 lbs MLVSS = 20,043 This type of problem is on a Grade 4 and possibly on a Grade 3 exam! 9

10 15. A primary clarifier has a diameter of 80 feet with an incoming flow of 1440 gpm. Calculate the surface-settling rate (hydraulic loading) on the clarifier. a. X(unknown) = SSR, gpd/ft 2 b. Formula needed to solve problem: SSR, gpd/ft 2 = Flow, gal/day Area, ft 2 c. Calculate area of clarifier: A, ft 2 = x (D, ft) 2 d. Convert 1440 gpm to gal/day gal/day = 1440 gal/min x 1440 min/day gal/day = 2,073,600 gal/day e. Solve for SSR, gpd/ft 2 SSR, gpd/ft 2 = 2,073,600 gal/day 5024 ft 2 = x (80 ft x 80 ft) = x 6400 ft 2 = 5024 ft 2 SSR, gpd/ft 2 = gpd/ft Determine the water horsepower delivered by a pump if the flow is 600 gpm and the TDH is 65 feet and the pump s efficiency is 80%. a. x(unknown) = whp delivered by pump b. Formula to solve problem: Whp = Flow, gpm x head, ft x 0.0% 3960 Convert pump efficiency of 80% to its mathematical equivalent: 80% = 80/100 = 0.80 c. Solve for whp Whp = 600 gpm x 65 ft 3960 Whp = 39, Whp = 9.85! 10

11 17. A water tank needs to be painted. The tank is 15 feet tall and has a diameter of 50 feet. The bottom and top of the tank must also be painted. A gallon of paint will cover 200 sq. ft./gal. How many gallons of paint must be bought to paint the tank? a. x(unknown) = Number of gallons of paint needed to paint the tank b. Formula to solve problem: # of gallons paint = Total Tank Area, ft 2 c. First find total area, ft 2 of tank: 200 ft 2 /gal of paint 1. Find top & bottom area, ft 2 of tank: Area, ft 2 = x (D, ft) 2 Total Area, ft 2 (top & bottom) = ft 2 x 2 = 3925 ft 2 2. Find wall area, ft 2 of tank: Circumference of tank, ft 2 = Length, ft 2 Height of tank, ft 2 = Width, ft 2 C, ft = 3.14 x Diameter, ft C, ft = 3.14 x 50 ft C, ft = 157 ft Area, ft 2 = L, ft (C) x W, ft (Ht) Area, ft 2 = 157 ft x 15 ft Area, ft 2 = 2,355 ft 2 3. Total Tank Area, ft 2 = 3925 ft 2 + 2,355 ft 2 = 6280 ft 2 d. Solve for number of gallons of paint: # of gallons of paint = 6280 ft ft 2 /gal = 31.4 gals or 32 gals of paint = x (50 ft x 50 ft) = x 2500 ft 2 = ft 2! 11

12 18. A channel has the dimensions of 24 inches in width and 17 inches in depth. 13,500 gallons of sludge is wasted through this channel at a velocity of 1.6 ft/sec to maintain the desired mean cell residence time. The waste activated sludge flow meter is out of service, how long does it take to waste this amount of sludge? a. X(unknown) = Time, minutes it takes to waste 13,500 gallons of sludge b. Convert all inch dimensions in problem to feet: Width: ft = 24 inches Depth: ft = 17 inches 12-in/ft 12-in/ft = 2 ft = 1.42 ft c. Overall formula to use to solve problem is detention time: DT = Volume Flow DT, sec = Volume of sludge, ft 3 Flow, ft 3 /sec d. Convert 13,500 gals of sludge to ft 3 to cubic feet of sludge: Ft 3 = 13,500 gals = ft gals/ft 3 e. Find flow rate of sludge through channel: Q, ft 3 /sec = Area, ft 2 x Velocity, ft/sec 1. Find area, ft 2 of channel: Area, ft 2 = Depth, ft x Width, ft = 1.42 ft x 2 ft = 2.84 ft 2 Q, ft 3 /sec = Area, ft 2 x Velocity, ft/sec = 2.84 ft 2 x 1.6 ft/sec = 4.54 ft 3 /sec d. Calculate the time it takes to move sludge through channel: Time, sec = Volume, ft 3 Sludge Flow, ft 3 /sec of Sludge Time, sec = ft ft 3 /sec! 12

13 Time, sec = sec Time, min = sec = 6.6 minutes to waste 13,500 gals of sludge 60 sec/min 19. A plant has 5 grit channels. They are 20 ft long, 4 ft wide and 42 inches deep. The plant flow is 16 MGD. How many grit channels are needed; 2, 3, 4 or 5? a. x(unknown) = # of grit channels needed To find the number of grit channels needed, the velocity of the wastewater entering the plant must be calculated, then based on the information that grit settles out at an average velocity of 1.0 ft/sec the number of grit channels can be chosen. b. Formula to solve for velocity of wastewater entering the plant: Velocity, ft/sec = Q, ft 3 /sec Area, ft 2 c. Convert Q, flow rate of 16 MGD to ft 3 /sec: 16 MGD = 16,000,000 gals/day Gal/min = 16,000,000 gal = gal/min 1440 min/day Ft 3 /min = gal/min = ft 3 /min 7.48 gal/ft 3 Ft3/sec = ft 3 /min = ft 3 /sec 60 sec/min Or you can use the conversion factor: 1.0 MGD = 1.55 ft 3 /sec Ft 3 /sec = 16 MGD x 1.55 ft 3 /sec = 24.8 ft 3 /sec d. Find area, ft 2 of channel: Area, ft 2 = Width, ft x Depth, ft = 4 ft x 3.5 ft = 14 ft 2 e. Solve for velocity of wastewater in channel:! 13

14 Velocity, ft/sec = Q, ft 3 /sec Area, ft 2 Velocity, ft/sec = 24.8 ft 3 /sec = 1.77 ft/sec 14 ft 2 Operator would choose 2 grit channels based on average grit channel velocity of 1.0 ft/sec 20. A WWTP has an average daily flow of 2.6 MGD with a daily dosage rate of 4 mg/l and a chlorine residual of 0.5 mg/l. The plant has 9 full cylinders. When the plant is down to 3 full cylinders, chlorine is reordered. How many days will the chlorine last before it has to be reordered? Assume a one-day delivery time. a. x(unknown) = Number of days before Chlorine has to be reordered Have to reorder chlorine when 3 full cylinders are left. 9 cylinders 3 cylinders = 6 cylinders are only used for chlorine dose b. Formula to solve problem: # of days of Chlorine feed = Total lbs of Cl in 6 cylinders Lbs. Cl used/day 1. Calculate lbs Cl/day feed Lbs Cl used/day = 2.6 MGD x 4.0 mg/l x 8.34 lbs/gal = Calculate total amount of Chlorine in 6 one-ton cylinders 6 cylinders x 2000 lbs/cylinder = 12,000 lbs of chlorine c. Calculate the number of days of Chlorine will last before reorder # of days = 12,000 lbs Chlorine = days (137 days with a one day delivery) lbs Cl used/day 21. Estimate the velocity of wastewater flowing through a grit channel if a float travels 45 feet in one minute and 10 seconds. a. x(unknown) = Velocity of flow, ft/sec b. Formula to solve problem: Velocity, ft/sec = Distance traveled, ft! 14

15 Total Travel Time, sec 1. Convert time from minutes to seconds: 1 minute = 60 seconds 60 seconds + 10 seconds = 70 seconds Velocity, ft/sec = 45 ft_ = 0.64 ft/sec 70 sec 22. A tank is 15 feet in height and has a 30 ft diameter. What is the force at the bottom of the tank in psi? a. x(unknown) = PSI at bottom of tank b. Formula to solve problem: Conversion factor: 1.0 psi = 2.31 ft # of psi = 15 ft 2.31 ft/psi = 6.49 psi 23. How many pounds of chlorine are added to a 4 MGD plant flow with a chlorine demand of 19.5 mg/l is needed to maintain a chlorine residual of 0.3 mg/l? a. x(unknown) = lbs Cl used/day b. Formulas to use to solve problem: Lbs Cl dose/day = Flow (MGD) x Cl dose (mg/l) x 8.34 lbs/gal Cl dose, mg/l = Cl demand, mg/l + Cl residual, mg/l c. First, calculate mg/l of Chlorine dose: Cl dose, mg/l = Cl demand, mg/l + Cl residual, mg/l = 19.5 mg/l mg/l = 19.8 mg/l d. Calculate lbs Cl dose/day Lbs Cl dose/day = Flow (MGD) x Cl dose (mg/l) x 8.34 lbs/gal! 15

16 Lbs Cl dose/day = 4 MGD x 19.8 mg/l x 8.34 lbs/gal = Digested sludge is being drawn from the secondary digester at a rate of 1000 gal/day with 3% solids content. How many gallons would have to be drawn at 6% solids to remain the same + 30 gallons either way? 1000 gals, 500 gals, 750 gals, or 1500 gals. a. x(unknown) = gallons of 6% sludge withdrawn from digester b. Formula to solve problem: Volume1 x Concentration1 = Volume2 x Concentration2 Volume1 = 1,000 gals Concentration1 = 3% Volume2 = X (the unknown) Concentration2 = 6% Rearrange above formula to solve for Volume2 (X): V2 = V1 x C1 C2 V2 = 1,000 gals x 3% 6% V2 = 3,000 gals = 500 gals A wet well has a width of 20 ft, a length of 20 ft and a depth of 25 ft. The pump kicks on at 20 ft and stops when the water level reaches 10 ft. The pump ran for 5 minutes. How many gallons were pumped out of the well? a. x(unknown) = gallons of wastewater pumped from well b. Find ft of water pumped from well in 5 minutes: 20 ft 10 ft = 10 ft of water pumped c. Calculate Volume of wastewater pumped from well: Volume Wastewater, ft 3 = L, ft x W, ft, x Water Drop, ft =20 ft x 20 ft x 10 ft = 4000 ft 3! 16

17 d. Calculate gallons of wastewater pumped: Capacity, gals = # ft 3 x 7.48 gal/ft 3 = 4000 ft 3 x 7.48 gal/ft 3 = 29,920 gals 26. A secondary clarifier 85 feet in diameter receives a primary effluent flow of 2.8 MGD and a RAS flow of 0.75 MGD. If the MLSS concentration is 3510 mg/l, what is the solids loading rate on the clarifier? a. x(unknown) = Solids loading rate on clarifier expressed as lbs SS added/day/ft 2 b. Formula to solve problem: lbs SS added/day/ft 2 = lbs SS added/day Area, ft 2 Note: SLR is only calculated on secondary clarifiers. The plant flow and the RAS flow must be added together when calculation lbs SS added/day. NOTE: If the plant flow is only given in the problem, it is assumed that the RAS flow is part of the given total flow entering the secondary clarifier. When the flows are separated out in the problem, they must be added together 1. Add the two flows that enter the sec. clarifier: 2.8 MGD MGD = 3.55 MGD flow into sec. clarifier 2. Calculate lbs SS added /day Lbs SS added/day = 3.55 MGD x 3510 mg/l x 8.34 lbs/gal = 103,920.6 c. Calculate area of sec. clarifier: Area, ft 2 = x (D, ft) 2 = x (85 ft) 2 = x (85 ft x 85 ft) = x 7225 ft 2 = ft 2 d. Calculate SLR lbs SS added/day/ft 2 = lbs SS added /day ft 2! 17

18 lbs SS added/day/ft 2 = 18.3 lbs SS added/day/ft A single-piston reciprocating pump has a 6-inch diameter piston with an 8-inch length of stroke. If it makes 20 discharges strokes per minute, calculate the pumping rate in gallons per minute. a. x(unknown) = pumping rate, gpm b. Formula to solve problem: gal/min = # of gals x 20 strokes/minute 1.0 stroke c. Calculate volume of water discharge from cylinder per stroke from cylinder in ft 3 and then convert to gallons. 1. Convert all inch measurements to feet. Depth of stroke = 8 inches/stroke = 0.67 ft/stroke 12 in/ft Diameter of cylinder = 6 inches = 0.5 ft 12 in/ft 2. Calculate volume of water discharged from cylinder per stroke in ft 3. Volume of stroke, ft 3 = [0.785 x (D, ft) 2 ] x Depth of stroke, ft = [0.785 x (0.5 ft) 2 ] x 0.76 ft = [0.785 x (0.5 ft x 0.5 ft)] x 0.67 ft = [0.785 x 0.25 ft 2 ] x 0.67 ft = ft 2 x 0.67 ft = ft 3 3. Convert ft 3 of water to gallons Capacity, gals = # ft 3 x 7.48 gal/ft 3 = ft 3 x 7.48 gal/ft 3 = gals d. Calculate gpm pumping rate: gal/min = # of gals x 20 strokes/minute 1.0 stroke! 18

19 Pumping Rate, gpm = gals x 20 strokes/min 1.0 stroke Pumping Rate, gpm = 19.6 gpm 28. A plant permit requires that all plant effluent be dechlorinated to 0 mg/l using sulfur dioxide. Given the following current operating conditions, what is the minimum amount of sulfur required to dechlorinate the effluent? (Grade 4) Effluent Flow 10 MGD Chlorine Demand 4.5 mg/l Chlorine Dosage 6.0 mg/l Sulfur dioxide-to-chlorine ratio required 1.0:1.0 a. x = Lbs. SO2 required to dechlorinate b. Calculate the chlorine residual. Cl Residual, mg/l = Chlorine Dose, mg/l Chlorine Demand, mg/l Cl Residual, mg/l = 6.0 mg/l 4.5 mg/l Cl Residual, mg/l = 1.5 mg/l c. Calculate the lbs./day of Chlorine residual Lbs./day chlorine residual = 10 mg/l x 1.5 mg/l x 8.34 lbs./gal Lbs./day chlorine residual = lb. of SO2 per 1 lb. Chlorine Residual Lbs. of SO2 needed = 125.1! 19

20 29. A rectangular clarifier is 20 ft wide, 60 ft long, 10 ft deep; it was designed for a surface-loading rate of 800 gpd/ft 2. The average daily flow is 0.8 MGD. The following is data from a typical flow chart; 7 am 450 gpm 1pm 1050 gpm 8 am 550 gpm 2 pm 950 gpm 9 am 650 gpm 3 pm 750 gpm 10 am 750 gpm 4 pm 650 gpm 11 am 850 gpm 5 pm 550 gpm 12 pm 950 gpm 6 pm 450 gpm Based on the above daily surface-loading rate, the design capacity was exceeded by approximately how many hours each day? Answer 6 hrs a. x(unknown) = How many hours was the designed SLR on clarifier exceeded that day. b. Formula to solve problem: Rearrange hydraulic loading formula to find designed flow in gpd then convert flow to gpm. HL, gpd/ft 2 = Flow, gpd rearranged to find flow, gpd; Area, ft 2 Flow, gpd = HL, gpd/ft 2 x ft 2 = 800 gpd/ft 2 x 1200 ft 2 = 960,000 gpd c. Convert 960,000 gpd to gpm: 960,000 gal/day = or 667 gpm 1440 min/day! 20

21 d. Go back to gpm data in problem and determine how many hours 667 gpm were exceeded during the time period given. There are two time periods when the 667 gpm was in between the flows; 9 am 10:00 am and 3 pm 4 pm, you must take an average to come up with the last 6th hour. 9 am 10 am: = 17 gpm 3 pm 4 pm: = 83 gpm 17 gpm + 83 gpm = 100 gpm/2 = 50 gpm Since flows increase by 100 gpm per hour there is an average 50 gpm between the two time periods then there is a half an hour in morning 667 is exceeded and an half an hour in the afternoon that is exceeded and they must be added together to make the 6 hour. 30. A wastewater treatment plant used a polymer for solids dewatering centrifuges. The current polymer inventory is 3100 lbs. Standard procedure requires the polymer to be reordered when 1,000 lbs remain in inventory. Given the following data, when would the polymer have to be reordered? Feed Solids to centrifuges at 1400 lbs/day Polymer dosage = 15 lbs/ton of solids a. x(unknown) = Number of days polymer will last before reordering b lbs 1,000 lbs = 2100 lbs of polymer used before reordering c. Calculate the polymer usage in lbs/day (set-up as a proportion) 15 lbs polymer = X, lbs/day polymer used 2000 lbs solids 1400 lbs solids/day 2000X = 15 x X = 21,000 X = 21, X = 10.5 lbs/day of polymer used d. Calculate number of days polymer will last before reordering! 21

22 # days = 2100 lbs of polymer 10.5 lbs/day polymer used # days = 200 days 31. The cost of chlorine is $0.08 per pound, the average Chlorine dose is 5 mg/l with a chlorine residual of 1.5 mg/l with an average flow of 2.0 MGD and the effluent BOD concentration is 10 mg/l. How many pounds of chlorine are required per year? a. X(unknown) = lbs/year of chlorine used b. Formulas to solve problem: Lbs. Cl/day = Flow (MGD) x Cl concentration (mg/l) x 8.34 lbs/gal Lbs. Cl/day = lbs Cl/day x 365 days/yr c. First calculate lbs Cl/day and lbs Cl/year used: 1. Lbs. Cl/day = 2.0 MGD x 5 mg/l x 8.34 lbs/gal = Lbs. Cl/year = 83.4 lbs. Cl x 365 days day year Lbs. Cl used/year = 30, A WWTP has two 1-ton cylinders of chlorine on hand. One cylinder contains 450 lbs and the other is full. The chlorine demand is 2.9 mg/l and the chlorine residual is 0.65 mg/l with an average flow of 2.6 MGD. How many days until the chlorine has to be reordered? a. x(unknown) = Number of days left until Chlorine has to be reordered. b. Calculate Chlorine on hand: 2000 lbs lbs = 2450 lbs of Chlorine! 22

23 c. Calculate Chlorine dose, mg/l; lbs Cl used/day; Number of days of Cl on hand before reordering 1. Cl dose, mg/l = Cl Demand, mg/l + CL Residual, mg/l = 2.9 mg/l mg/l = 3.55 mg/l 2. lbs. Cl used/day = 2.6 MGD x 3.55 mg/l x 8.34 lbs/gal = # of days of Cl on = 2450 lbs of Cl hand before reorder lbs Cl used/day = or 32 days 33. Given the following data, how much MLVSS must be wasted to achieve the desired F/M ratio? Desired F/M ratio = 0.33 lb BOD/D/lb MLVSS Primary Effluent Flow = 3.6 MGD Current F/M ratio = 0.27 lb BOD/D/lb MLVSS Aeration Tank Volume = 0.65 MG Primary Effl. BOD conc. = 138 mg/l MLVSS conc. = 2840 mg/l a. X (unknown) = Lbs of solids (MLSS) must be wasted to achieve the target F:M ratio. b. Formulas Needed to Solve this Problem: 1. Lbs. MLVSS to waste = lbs MLVSS in Aerator lbs. MLVSS required in basin to meet desired F:M 2. Lbs. MLVSS in Aerator = Aerator Vol. (MG) x MLVSS conc. mg/l x 8.34 lbs/gal 3. Rearrange F:M formula to calculate the lbs of MLVSS required in basin to meet the target F:M. F:M = lbs. BOD/day can be rearranged to the following formula: lbs MLVSS Lbs. MLVSS = lbs BOD/day F:M (lbs BOD/day/lb MLVSS) c. Find lbs MLVSS already in basin: Lbs. MLVSS = 0.65 MG x 2840 mg/l x 8.34 lbs/gal = 15, lbs MLVSS! 23

24 d. Calculate lbs BOD/day entering the aeration basin: Lbs. BOD/day = 3.6 MGD x 138 mg/l x 8.34 = e. Calculate lbs of MLVSS required in basin to meet desired F:M Lbs. MLVSS = lbs BOD/day 0.33 lbs BOD/day/lb MLVSS (use desired F:M value) Lbs. MLVSS = 12, lbs MLVSS f. Calculate the lbs MLVSS to be wasted to meet desired F:M Lbs. MLVSS to waste = 15, lbs MLVSS 12, lbs MLVSS = Convert 20 o C to o F. a. X (unknown) = o F temperature b. Formula to solve problem: o F = [ o C x 9 ] o F = [20 x 9 ] o F = o F = 68 o F Convert 75 o F to o C. a. X (unknown) = o C temperature b. Formula to solve problem: o C = ( o F 32) x 5/9 o C = (75 32) x 5/9 o C = 43 x 5/9 o C = 23.8 o C 35. What is the organic loading rate applied to a trickling filter in lbs. BOD/ day/1000 ft 3 units for a filter with a diameter of 50 ft, a depth of 5 ft., a flow of 0.2 MGD, and a filter influent BOD of 90 mg/l?! 24

25 a. x(unknown) = Organic Loading, BOD/day/1000 ft 3 unit or Tft 3 Note: 1000 ft 3 unit contains 1000 ft 3. This is similar to 1 MGD contains 1,000,000 gallons. I use Tft 3 (T stands for 1000) instead of 1000 ft 3 in the formula. b. Formula to solve problem: OL, lbs BOD/day/Tft 3 = lbs BOD/day Tft 3 c. Calculate lbs BOD/day and Tft 3 volume of trickling filter. 1. lbs BOD/day = 0.2 MGD x 90 mg/l x 8.34 lbs/gal = Volume, ft 3 = [0.785 x (D, ft) 2 ] x Depth, ft = [0.785 x (50 ft) 2 ] x 5 ft = [0.785 x (50 ft x 50 ft)] x 5 ft = [0.785 x 2500 ft 2 ] x 5 ft = ft 2 x 5 ft = ft 3 3. Convert ft 3 to Tft 3 units: Tft 3 = ft ft 3 /Tft 3 Tft 3 = 9.8 Tft 3 d. Calculate Organic Loading on trickling filter OL, lbs BOD/day/Tft 3 = lbs BOD/day 9.8 Tft 3 OL, lbs BOD/day/Tft 3 = lbs BOD/day/1000 ft 3 unit! 25

26 36. Calculate the reduction in volatile solids if the percent volatile solids entering the digester are 70% and the percent leaving is 45%. a. x(unknown) = % reduction of solids in the digester b. Formula to solve problem: % Reduction VS = In Out x 100 In (In x Out) Note: Decimal form of the percentages must be used with this formula. If you use the whole numbers given in the problem, the answer will be a very tiny negative number! c. Calculate for % Reduction of Volatile Solids % Reduction VS = x (0.70 x 0.45) = 0.25 x ! 26

27 = 0.25 x = x 100 = 64.9 or 65% reduction in VS ,000 gal/day of sludge from a primary clarifier is pumped to a gravity thickener. If the solids content of the sludge is 4% and the surface area of the thickener is 850 ft 2, what is the solids loading rate into the thickener (lbs. solids/day/ft 2 )? a. X (unknown) = SRL, lbs solids/day/ft 2 b. Formula to solve problem; lbs SS/day/ft 2 = lbs SS/day Area of Thickener, ft 2 c. Convert 65,000 gal/day sludge to lbs/day of sludge (note: if sludge weight per gallon is not given in the problem use 8.43 lbs/gal) lbs/day of sludge = 65,000 gal/day x 8.34 lbs/gal = 542,100 lbs/day sludge d. Calculate solids portion in the sludge:! 27

28 Part (solids) = Whole (sludge) x O.O%(decimal percent of solids in sludge) = 542,100 lbs/day sludge x 0.04 = 21,684 lbs solids/day Note: 4% = = e. Calculate Solids loading rate on thickener: Lbs. SS/day/ft 2 = 21,684 lbs SS/day 850 ft 2 Lbs. SS/day/ft 2 = 25.5 lbs SS/day/ft Calculate the RAS flow back into the aeration basin based on the MLSS to RAS ratio. Influent flow = 5.0 MGD MLSS conc. = 2500 mg/l RAS conc. = 8,000 mg/l Primary Clarif. Effl. SS conc. = 100 mg/l a. X (unknown) = RAS flow (mgd or gpm) needed to maintain 2500 mg/l solids in basin NOTE: Most pumping rates are given in the unit gpm instead of MGD. Look at the answers units to see what flow unit is given with the four choices given. b. Formula to solve problem: You must first find the flow in MGD (with this ratio formula) before it can be converted to gpm.! 28

29 R, MGD = (MLSS mg/l) x (Q, MGD) (RAS SS, mg/l) (MLSS, mg/l) Note: Plant Flow = Q R, MGD = 2500 mg/l x 5 MGD 8,000 mg/l 2500 mg/l = 12,500 mg/l. MGD 5500 mg/l (The dot means the mg/l and MGD units have been joined together as one unit, thus the mg/l unit can be cancelled out in the next step) = 12,500 MGD (mg/l unit is cancelled out, leaving only the flow unit, MGD) 5,500 = 2.27 MGD RAS Flow c. Convert 5 MGD to gpm: 2.27 MGD = 2,270,000 gal/day Gal/min = 2,270,000 gal/day 1440 min./day Gal/min = 1, gpm 39. Find the total volume in gallons of the final clarifiers. 2 rectangular clarifiers dimensions = 60 ft x 15 ft x 10 ft 2 round shape clarifiers: Diameters = 30 ft Clarifiers Ht = 12 ft Cone-shaped bottoms Ht = 3.5 ft a. Find the 2 rectangular clarifiers volumes in cubic feet and then convert cubic feet to gallons. Volume, Ft 3 = 60 ft x 15 ft x 10 ft = 9,000 ft 3 Total Volume in Ft 3 of both clarifiers = 9,000 ft 3 x 2! 29

30 = 18,000ft 3 Total gallons capacity for both clarifiers = 18,000 ft 3 x 7.48 gals/ft 3 = 134,640 gals b. Find the 2 circular clarifiers volumes in cubic feet and then convert cubic feet to gallons. The clarifiers have two shapes: the cylinder part and the cone-shape bottom part. The volumes of each of these shapes must be calculated separately and then added together to obtain the total volume of the round clarifier in cubic feet. Since the overall height of the clarifier (including the cone-shaped bottom) is 12 ft, the cone shaped height must be subtracted from the overall height of 12 ft to obtain the height of the cylinder shape part of the clarifier. 12 ft 3.5 ft = 8.5 ft (This is the height of the cylinder portion of the clarifier) c. Find the Volume of the cylinder part of clarifier: Volume, ft 3 = [0.785 x (30 ft) 2 ] x 8.5 ft = [0.785 x (30 ft x 30 ft)] x 8.5 ft = [0.785 x 900 ft 2 ] x 8.5 ft = ft 2 x 8.5 ft = ft 3 d. Find the volume of the cone-shaped portion of the clarifier: Volume, ft 3 = 1 [(0.785 x (D, ft) 2 ) x Ht. of cone-shape, ft] 3 Volume, ft 3 = 1 [706.5 ft 2 x 3.5 ft] (706.5 ft 2 is the area of the clarifier found in part c) 3 = 1 ( ft 3 ) 3 = ft 3 e. Find the total volume in cubic feet of the one round clarifier:! 30

31 Total Volume, ft 3 = ft ft 3 = ft 3 f. Find the total volume in cubic feet for the 2 round clarifiers: Total Volume for both clarifiers, ft 3 = ft 3 x 2 = 13,659 ft 3 g. Find the total volume in gallons for the 2 round clarifiers: Total Volume, gals for 2 round clarifiers = 13,659 ft 3 x 7.48 gals/ft 3 = 102, gals h. Add the total gallons from the rectangular clarifiers with the total gallons of the round clarifiers: Total gals for all final clarifiers = 134,640 gals + 102, gals = 236, gals NOTE: If the problem gives you dimensions for primary clarifier/s (also called primary sedimentation basins), they must not be used in the calculation. The problem asks for the total volume in gallons for the final clarifier/s (final sedimentation basins). The catch in this problem is to recognize that the total round clarifier height must be divided into two heights; the cylinder portion height and the cone-shaped height to obtain the total volume (cubic feet) of the round clarifier. 40. A pump pulls 3 amps on a 15-amp circuit breaker, what size fuse is used? Rule: Only pull 80% of the size of the circuit breaker. a. Calculate the number of amps #amps = 15 amps x.80 # amps = 12 amps! 31

32 41. If the velocity in a 24-inch pipe flowing half-full is 2.5 fps, what is the flow rate in gpm? (Grade 3) a. X = Flow, gpm b. The formula needed to solve the problem: Q, ft 3 /sec = Area, ft 2 x Velocity, ft./sec Once the flow rate is found in ft 3 /sec then the flow must be converted to gpm. Since the area of the pipe is flowing half full, the area in the formula must be divided by 2: Q, ft 3 /sec = Area, ft 2 x Velocity, ft./sec 2 c. Solve for the Area, ft 2 of the pipe: Area, ft 2 = x (Diameter, ft.) 2 = x (2 ft.) 2 = x 4 ft 2 = 3.14 ft 2 d. Solve for Q, ft 3 /sec: Q, ft 3 /sec = 3.14 ft 2 x 4 ft 2 2 Q, ft 3 /sec = 1.57 ft 2 x 2.5 ft./sec Q, ft 3 /sec = ft 3 /sec e. Convert ft 3 /sec -> ft 3 /min -> gpm Ft 3 /min = ft 3 /sec x 60 sec/min Ft 3 /min = ft 3 /min gpm = ft 3 /min x 7.48 gal/ft 3 gpm = gpm 42. EPA defines metals as the sum of the concentrations of copper, nickel, total chromium, and lead. An analysis of industrial wastewater for an electroplating facility produced the following results: (Grade 4) Pollutant Concentration Cadmium (T) 0.6 mg/l! 32

33 *Chromium (T) 2.1 mg/l *Copper (T) 0.9 mg/l *Lead (T) 0.3 mg/l *Nickel (T) 1.2 mg/l Zinc (T) 1.4 mg/l Cyanide (T) 0.4 mg/l The total metal concentration is: a. 3.9 mg/l b. 4.5 mg/l c. 6.5 mg/l d. 6.9 mg/l x = Sum of metals, mg/l a. Calculate the sum of the concentrations of chromium, copper, lead, and nickel in mg/ L. Total metal, mg/l = (Cu), 0.9 mg/l + (Ni), 1.2 mg/l + (Cr), 2.1 mg/l + (Pb), 0.3 mg/l Total metal concentrations, mg/l = 4.5 mg/l 43. Determine the MCRT for an activated sludge treatment plant in days using the following information: Plant flow 4,000,000 gallons MLVSS 1,600 mg/l Aeration tank volume 0.8 MG Plant effluent SS 16 mg/l WAS 7,600 mg/l WAS flow 0.03 MGD a. 9.2 days b. 8.1 days c. 5.3 days d. 4.3 days a. x = MCRT, days b. MCRT, days = Aeration Tank, TSS, lbs. TSS Wasted, lbs./day + Effluent TSS, Lbs./day c. Convert 4,000,000 gpd -> MGD MGD = 4,000,000 gal/day 1,000,000 gal/mg MGD = 4.0 MGD! 33

34 d. Aer. Tank TSS, lbs. = 0.8 MG x 1600 mg/l x 8.34 lbs./gal Aer. Tank TSS, lbs. = 10,675.2 e. Wasted Solids, lbs./day = 0.03 MGD x 7,600 mg/l x 8.34 lbs./gal Wasted Solids, lbs./day = 1, f. Effluent Lost TSS, lbs./day = 4 MGD x 16 mg/l x 8.34 lbs./gal Effluent Lost TSS, lbs./day = g. Calculate MCRT, days: MCRT, days = 10,675.2 lbs. 1, lbs./day lbs./day MCRT, days = 10,675.2 lbs. 2, lbs./day MCRT, days = 4.4 days 44. An activated sludge treatment plant produces 23,000 pounds of solids per year and the cost of hauling the solids is $120 per dry ton. What is the hauling cost per year? a. $1380 b. $1440 c. $1520 d. $1660 a. x = Hauling cost per year b. Formula to use to solve problem: 1. Tons/year = Total lbs. of solids/year 2000 lbs. solids/ton 2. Hauling Cost = Tons solids/year x $120.00/ton of solids c. Solve for Tons of solids produced during the year: Tons/year = 23,000 lbs. solids/year 2000 lbs/ton Tons/year = 11.5 Tons Solids/year! 34

35 d. Solve for hauling cost: Hauling Cost = 11.5 Tons Solids/year x $120.00/Ton Hauling Cost = $1,380/year 45. The flow through a 78-inch diameter mag-meter is 70 MGD. What is the flow velocity? a. 2.1 ft/sec b. 3.3 ft/sec c ft/sec d ft/sec a. x = Velocity, ft/sec b. Solve for the velocity of water through the pipe in ft/sec using the following formula: Velocity, Ft./sec = Q, ft 3 /sec A, ft 2 c. Convert 70 MGD to FT 3 /sec using this conversion formula: Use this conversion factor: 1.0 MGD = 1.55 ft 3 /sec Ft 3 /sec = 70 MGD x 1.55 ft 3 /sec/mgd Ft 3 /sec = ft 3 /sec d. Solve for Area of pipe, ft 2 : Convert 78-inch diameter to feet: Ft. = 78 inch 12 inch/ft. Ft. = 6.5 ft. Area, ft 2 = x (D, ft.) 2 Area, ft 2 = x 6.5 ft. Area, ft 2 = ft 2 d. Solve for velocity, ft./sec:! 35

36 Velocity, ft./sec = ft 3 /sec ft 2 Velocity, ft./sec = 3.27 ft./sec 46. Math question gave annual cost of chlorine, gave chlorine dose, and average daily flow. Determine how much it cost to treat with chlorine for one week. 52 weeks/year 47. What is the solids loading on a sedimentation basin 60 ft. in diameter if the flow is 0.55 MGD and the solids concentration is 200 mg/l? a. X (unknown) = Solids Loading, lbs. SS/day/ft 2 b. The solids loading formula is used to solve for X. Solids Loading, lbs. SS/day/ft 2 = Lbs. SS/day Area, ft 2 c. Solve for lbs. SS/day: Lbs. SS/day = 0.55 MGD x 200 mg/l x 8.34 lbs./gal = d. Solve for the area of the basin: Area, ft 2 = x (Diameter, ft.) 2 = x (60 ft.) 2 = x 3600 ft 2 = 2,826 ft 2 e. Solve for Solids Loading: SL, lbs./day/ft 2 = lbs. SS/day 2,826 ft 2 = lbs. SS/day/ft Determine the flow through a length of 50 ft. pipe with an inner diameter of 8-inches and a velocity of 2.5 ft./sec. in liters/min. a. X (unknown) = Flow (Q), Liters/mins b. The flow rate formula is used to solve for X! 36

37 Q, ft 3 /sec = A, ft 2 x V, ft./sec c. Solve for the area of pipe. Convert 8 inches to ft.: 8 inches = 0.67 ft. 12 inches/ft. Area, ft 2 = x (0.67 ft.) 2 = x 0.45 ft 2 = 0.35 ft 2 d. Q, ft. 3 /sec = Area, ft 2 x V, ft./sec = 0.35 ft 2 x 2.5 ft./sec = 0.88 ft 3 /sec e. Convert 0.88 ft 3 /sec to liters/min. Use the conversion factor of 1 gal. = 3.79 liters First convert 0.88 ft 3 /sec to ft 3 /min to gal/min to liters/min. Ft 3 /min = 0.88 ft 3 /sec x 60 sec./min = 52.8 ft 3 /min Gal/min = 52.8 ft 3 /min x 7.48 gal/ft 3 = gal/min Liters/min = gal/min x 3.79 liters/gal = 1, L/min 49. Determine the volume of an anaerobic digester in cubic feet. The digester has a diameter of 110 ft. with a total height of 50 ft. The cone portion of the digester s height is 15 ft. a. X (unknown) = Volume of digester, ft 3 b. The digester contains two shapes; a cylinder and a cone. The volumes for each shape must be calculated and then added together to determine the total volume of the digester. c. Calculate the volume of the cylinder portion: Find the height of the cylinder portion: Ht. of cylinder, ft. = 50 ft. 15 ft.! 37

38 = 35 ft. Vol. ft 3 = [0.785 x (110 ft.) 2 ] x 35 ft. = [0.785 x 12,100 ft 2 ] x 35 ft. = 9,498.5 ft 2 x 35 ft. = 332,447.5 ft 3 d. Calculate the volume of the cone portion: Vol. ft 3 = 1 [0.785 x (110 ft.) 2 ] x 15 ft. 3 = 1 [9,498.5 ft 2 x 15 ft.] 3 = 1 [142,477.5 ft 3 ] 3 = 47,492.5 ft 3 e. Add the cubic foot volumes of the cylinder and cone portions. Total Volume, Ft 3 = 332,447.5 ft ,492.5 ft 3 = 379,940 ft If an activated sludge plant s MLSS had a concentration of 1,200 mg/l and settled out at 600 ml/l, what would the sludge volume index (SVI) be? Grade 3 a. X (unknown) = SVI, ml/gram b. Use the SVI formula: SVI, ml/g = (SSV30, ml/l) x (1,000 mg/g) MLSS, mg/l SVI, ml/g = 600 ml/l x 1,000 mg/g 1,200 mg/l SVI, ml/g = 600,000 ml/g 1,200 SVI, ml/g = 500 ml/g! 38

39 51. One side of the grounds for a lift station is 325 ft. long. How many trees will be required if the trees are to be 25 ft. apart with a tree at each end? Hint; draw a diagram of the spacing of the trees. *------*------*------*------*------*------*------*------*------*------*------*------*------* * Represents a tree Spaces between trees = 325 ft. = 13 spaces 25 ft. 14 trees are needed! 39

BASIC MATH FORMULAS - CLASS I. A. Rectangle [clarifiers, ponds] I = length; w = width; A = area; area in square ft [sq ft]

BASIC MATH FORMULAS - CLASS I. A. Rectangle [clarifiers, ponds] I = length; w = width; A = area; area in square ft [sq ft] WASTEWATER MATH CONVERSION FACTORS 1. 1 acre =43,560 sq ft 2. 1 acre =2.47 hectares 3. 1 cu ft [of water] = 7.48 gallons 4. 1 cu ft [of water] = 62.4 Ibs/ft 3 5. Diameter =radius plus radius, D =r + r

More information

ABC & C 2 EP Formula/Conversion Table for Wastewater Treatment, Industrial, Collection, & Laboratory Exams

ABC & C 2 EP Formula/Conversion Table for Wastewater Treatment, Industrial, Collection, & Laboratory Exams ABC & C EP Formula/Conversion Table for Wastewater Treatment, Industrial, Collection, & Laboratory Exams Alkalinity, as mg CaCO /L (Titrant, ml) (Acid Normality)(50,000) Sample, ml Volts Amps Ohms * of

More information

( ) ABC Formula/Conversion Table for Wastewater Treatment, Industrial, Collection and Laboratory Exams. Alkalinity, as mg CaCO 3 /L =

( ) ABC Formula/Conversion Table for Wastewater Treatment, Industrial, Collection and Laboratory Exams. Alkalinity, as mg CaCO 3 /L = ABC Formula/Conversion Table for Wastewater Treatment, Industrial, Collection and Laboratory Exams Alkalinity, as mg CaCO 3 /L = (Titrant Volume, ml) (Acid Normality)(50,000) Volts Amps = Ohms Area of

More information

ABC & C 2 EP Formula/Conversion Table for Water Treatment, Distribution, & Laboratory Exams

ABC & C 2 EP Formula/Conversion Table for Water Treatment, Distribution, & Laboratory Exams ABC & C EP Formula/Conversion Table for Water Treatment, Distribution, & Laboratory Exams Alkalinity, as mg CaCO 3 /L = (Titrant, ml) (Acid Normality)(50,000) Sample, ml Volts Amps = Ohms * of Circle =

More information

MATHEMATICS FOR WATER OPERATORS

MATHEMATICS FOR WATER OPERATORS MATHEMATICS FOR WATER OPERATORS Chapter 16: Mathematics The understanding of the mathematics of water hydraulics (flows, pressures, volumes, horsepower, velocities) and water treatment (detention time,

More information

Practice Tests Answer Keys

Practice Tests Answer Keys Practice Tests Answer Keys COURSE OUTLINE: Module # Name Practice Test included Module 1: Basic Math Refresher Module 2: Fractions, Decimals and Percents Module 3: Measurement Conversions Module 4: Linear,

More information

Math. The top number (numerator) represents how many parts you have and the bottom number (denominator) represents the number in the whole.

Math. The top number (numerator) represents how many parts you have and the bottom number (denominator) represents the number in the whole. Math This chapter is intended to be an aid to the operator in solving everyday operating problems in the operation of a water system. It deals with basic math that would be required for an operator to

More information

SECTION 3 - SUMMARY OF KEY WATER PLANT OPERATOR MATH FORMULAS

SECTION 3 - SUMMARY OF KEY WATER PLANT OPERATOR MATH FORMULAS MATH FORMULAS Most mathematics problems found on Grade I - IV level examinations are process control problems that are responsive to a host of math formulas that have been developed over a period of time

More information

Module 9: Basics of Pumps and Hydraulics Instructor Guide

Module 9: Basics of Pumps and Hydraulics Instructor Guide Module 9: Basics of Pumps and Hydraulics Instructor Guide Activities for Unit 1 Basic Hydraulics Activity 1.1: Convert 45 psi to feet of head. 45 psis x 1 ft. = 103.8 ft 0.433 psi Activity 1.2: Determine

More information

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification

Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification Illinois Environmental Protection Agency Division of Water Pollution Control Class K Study Guide Industrial Wastewater Operator Certification Revised March 2003 The purpose of this study guide is to help

More information

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key Unit 1 Process Control Strategies Exercise Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key 1. What are the six key monitoring points within the activated sludge process? Ans:

More information

Wastewater Collection Practice Test #3 Page 1 of 26

Wastewater Collection Practice Test #3 Page 1 of 26 Wastewater Collection Practice Test #3 Page 1 of 26 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? a) 13.85 MGD b) 10.73 MGD

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

Formula/Conversion Table for Water Treatment and Water Distribution

Formula/Conversion Table for Water Treatment and Water Distribution Formula/Conversion Table for Water Treatment and Water Distribution Measurement Conversion Measurement Conversion Measurement Conversion Measurement Conversion 1 ft. = 12 in. 1 MGD = 1.55 cfs 1 grain /

More information

Example Calculations Evaluation for Fine Bubble Aeration System. Red Valve Company, Inc. 700 NORTH BELL AVENUE CARNEGIE, PA 15106-0548

Example Calculations Evaluation for Fine Bubble Aeration System. Red Valve Company, Inc. 700 NORTH BELL AVENUE CARNEGIE, PA 15106-0548 Revision Date 6/10/02 9:52 Red Valve Company, Inc. 700 NORTH BELL AVENUE CARNEGIE, PA 15106-0548 PHONE (412) 279-0044 FAX (412) 279-5410 Red Valve Representative Sample Air Diffuser Calcs.xls Input Data

More information

Conversions between the common units of length used in the Imperial system are listed below 12 in = 1 ft 3 ft = 1 yard 1760 yards = 1 mile

Conversions between the common units of length used in the Imperial system are listed below 12 in = 1 ft 3 ft = 1 yard 1760 yards = 1 mile THE METRIC SYSTEM The metric system or SI (International System) is the most common system of measurements in the world, and the easiest to use. The base units for the metric system are the units of: length,

More information

Cambridge Wastewater Treatment Facility

Cambridge Wastewater Treatment Facility Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working

More information

ADVANCED MATH HANDBOOK. For Class III & IV Water Operators

ADVANCED MATH HANDBOOK. For Class III & IV Water Operators ADVANCED MATH HANDBOOK For Class III & IV Water Operators 2009 ADVANCED MATH HANDBOOK Overview This handbook is designed for operators taking the Class III or Class IV water operator certification exam.

More information

Best Practice Guide NO. BPGCS002. Wastewater Treatment Activated Sludge Process

Best Practice Guide NO. BPGCS002. Wastewater Treatment Activated Sludge Process Best Practice Guide NO. BPGCS002 Wastewater Treatment Activated Sludge Process The following is intended to provide a first check for those involved in the operation, management and monitoring of the activated

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

Illinois Environmental Protection Agency Bureau of Water Class 4 Study Guide Wastewater Operator Certification

Illinois Environmental Protection Agency Bureau of Water Class 4 Study Guide Wastewater Operator Certification Revised March 2003 Illinois Environmental Protection Agency Bureau of Water Class 4 Study Guide Wastewater Operator Certification The purpose of this study guide is to explain the testing process and to

More information

WASTEWATER TREATMENT OBJECTIVES

WASTEWATER TREATMENT OBJECTIVES WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater

More information

WATER DISTRIBUTION SYSTEM OPERATOR CERTIFICATION COURSE MANUAL

WATER DISTRIBUTION SYSTEM OPERATOR CERTIFICATION COURSE MANUAL WATER DISTRIBUTION SYSTEM OPERATOR CERTIFICATION COURSE MANUAL NOVEMBER 2008 1 WATER DISTRIBUTION SYSTEM OPERATOR CERTIFICATION COURSE MANUAL Overview/Preface This manual is designed for operators taking

More information

Perimeter, Area, and Volume

Perimeter, Area, and Volume Perimeter, Area, and Volume Perimeter of Common Geometric Figures The perimeter of a geometric figure is defined as the distance around the outside of the figure. Perimeter is calculated by adding all

More information

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM OTCO Water Workshop March, 2011 Frank Woyma Plant Manager Nick Pizzi Vice-President EE&T ENVIRONMENTAL ENGINEERING & TECHNOLOGY, INC. Objectives Review the

More information

How To Calculate An Average Daily Flow

How To Calculate An Average Daily Flow DESIGN GUIDELINES FOR WASTEWATER FACILITIES MARYLAND DEPARTMENT OF THE ENVIRONMENT ENGINEERING AND CAPITAL PROJECTS PROGRAM 2013 Purpose: Recommended Standards for Wastewater Facilities (as revised) for

More information

Basic Math for the Small Public Water Systems Operator

Basic Math for the Small Public Water Systems Operator Basic Math for the Small Public Water Systems Operator Small Public Water Systems Technology Assistance Center Penn State Harrisburg Introduction Area In this module we will learn how to calculate the

More information

VOLUME AND SURFACE AREAS OF SOLIDS

VOLUME AND SURFACE AREAS OF SOLIDS VOLUME AND SURFACE AREAS OF SOLIDS Q.1. Find the total surface area and volume of a rectangular solid (cuboid) measuring 1 m by 50 cm by 0.5 m. 50 1 Ans. Length of cuboid l = 1 m, Breadth of cuboid, b

More information

MUNICIPAL WASTEWATER TREATMENT PLANT ENERGY EVALUATION FOR ITHACA AREA WASTEWATER TREATMENT FACILITY

MUNICIPAL WASTEWATER TREATMENT PLANT ENERGY EVALUATION FOR ITHACA AREA WASTEWATER TREATMENT FACILITY MUNICIPAL WASTEWATER TREATMENT PLANT ENERGY EVALUATION FOR ITHACA AREA WASTEWATER TREATMENT FACILITY Agreement No. 7185 Prepared for THE NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY Albany,

More information

Expanded Treatment Facilities within the City of Detroit

Expanded Treatment Facilities within the City of Detroit Wastewater Master Plan DWSD Project No. CS-1314 Expanded Treatment Facilities within the City of Detroit Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: Tetra Tech

More information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park

More information

This example of a completed sampling plan worksheet has been included to illustrate the information

This example of a completed sampling plan worksheet has been included to illustrate the information APPENDIX B EXAMPLE OF A COMPLETED SAMPLING PLAN WORKSHEET This example of a completed sampling plan worksheet has been included to illustrate the information necessary to document a sampling program for

More information

WASTE WATER TREATMENT SYSTEM (OPERATING MANUALS )

WASTE WATER TREATMENT SYSTEM (OPERATING MANUALS ) Page 1 of 76 1.0 PURPOSE The purpose of the Wastewater Treatment System is to remove contaminates from plant wastewater so that it may be sent to the Final Plant Effluent Tank and eventually discharged

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City

More information

SECONDARY TREATMENT ACTIVATED SLUDGE

SECONDARY TREATMENT ACTIVATED SLUDGE SECONDARY TREATMENT ACTIVATED SLUDGE Activated sludge is another biological process used to remove organics from wastewater. Like the trickling filter, activated sludge processes are used to grow a biomass

More information

1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005

1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005 1.85 WATER AND WASTEWATER TREATMENT ENGINEERING FINAL EXAM DECEMBER 20, 2005 This is an open-book exam. You are free to use your textbook, lecture notes, homework, and other sources other than the internet.

More information

Removing Heavy Metals from Wastewater

Removing Heavy Metals from Wastewater Removing Heavy Metals from Wastewater Engineering Research Center Report David M. Ayres Allen P. Davis Paul M. Gietka August 1994 1 2 Removing Heavy Metals From Wastewater Introduction This manual provides

More information

Technical Feasibility of a Wet Weather Flow Treatment Facility

Technical Feasibility of a Wet Weather Flow Treatment Facility Wastewater Master Plan DWSD Project No. CS-1314 Technical Feasibility of a Wet Weather Flow Treatment Facility Technical Memorandum Original Date: August 9, 2001 Revision Date: September 2003 Author: Tetra

More information

2. A painted 2 x 2 x 2 cube is cut into 8 unit cubes. What fraction of the total surface area of the 8 small cubes is painted?

2. A painted 2 x 2 x 2 cube is cut into 8 unit cubes. What fraction of the total surface area of the 8 small cubes is painted? Black Surface Area and Volume (Note: when converting between length, volume, and mass, 1 cm 3 equals 1 ml 3, and 1 ml 3 equals 1 gram) 1. A rectangular container, 25 cm long, 18 cm wide, and 10 cm high,

More information

Sewerage Management System for Reduction of River Pollution

Sewerage Management System for Reduction of River Pollution Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from

More information

Area is a measure of how much space is occupied by a figure. 1cm 1cm

Area is a measure of how much space is occupied by a figure. 1cm 1cm Area Area is a measure of how much space is occupied by a figure. Area is measured in square units. For example, one square centimeter (cm ) is 1cm wide and 1cm tall. 1cm 1cm A figure s area is the number

More information

Cylinder Volume Lesson Plan

Cylinder Volume Lesson Plan Cylinder Volume Lesson Plan Concept/principle to be demonstrated: This lesson will demonstrate the relationship between the diameter of a circle and its circumference, and impact on area. The simplest

More information

William E. Dunn Water Reclamation Facility. Facility Overview & Information

William E. Dunn Water Reclamation Facility. Facility Overview & Information William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa

More information

Appendix B: Water Treatment Scenarios from AMD Treat

Appendix B: Water Treatment Scenarios from AMD Treat Appendix B: Water Treatment Scenarios from AMD Treat 103 of 104 Jeddo Tunnel Abandoned Mine Drainage Passive vs. Active Treatment Cost Estimates Provided by Office of Surface Mining AMD Treat Software

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City.

More information

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East

High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East High-Rate Retention Treatment Facility for CSO Control in Windsor Riverfront East Jian Li, Ph.D., P.Eng., PE Senior Environmental Engineer Stantec Consulting Ltd. Water & Wastewater Treatment BMP Forum

More information

Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system.

Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system. II. PROCESS OVERVIEW Provided below is a description of the processes generating wastewater in a poultry plant and a typical pretreatment and full treatment system. II.1. Wastewater Generation A typical

More information

Minnesota. BMI Project No. M21.037315

Minnesota. BMI Project No. M21.037315 Wastewater Treatment Facility Plan City of Paynesville Minnesota BMI Project No. M21.037315 March 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. GENERAL... 1 B. DESIGN PARAMETERS... 1 C. COST ESTIMATES...

More information

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 APPLICATION FOR ADDITION OF TRANSPORTED WASTES IN WASTEWATER TREATMENT FACILITIES Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 This application is to be

More information

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL ABSTRACT Timur Deniz, Ph.D., Thomas W. Friedrich, P.E.

More information

MEASUREMENTS. U.S. CUSTOMARY SYSTEM OF MEASUREMENT LENGTH The standard U.S. Customary System units of length are inch, foot, yard, and mile.

MEASUREMENTS. U.S. CUSTOMARY SYSTEM OF MEASUREMENT LENGTH The standard U.S. Customary System units of length are inch, foot, yard, and mile. MEASUREMENTS A measurement includes a number and a unit. 3 feet 7 minutes 12 gallons Standard units of measurement have been established to simplify trade and commerce. TIME Equivalences between units

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES,

More information

CHAPTER 5 - WASTEWATER TREATMENT FACILITIES

CHAPTER 5 - WASTEWATER TREATMENT FACILITIES CHAPTER 5 - WASTEWATER TREATMENT FACILITIES 5.1 Introduction The purpose of this chapter is to summarize the evaluation of the existing wastewater facilities infrastructure and performance. The results

More information

Environmental Technology March/April 1998

Environmental Technology March/April 1998 Treating Metal Finishing Wastewater Sultan I. Amer, Ph.D. AQUACHEM INC. Environmental Technology March/April 1998 Wastewater from metal finishing industries contains high concentrations of contaminants

More information

Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service

Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service Experts Review of Aerobic Treatment Unit Operation and Maintenance Bruce Lesikar Texas AgriLife Extension Service Overview Overview of Aerobic Treatment Units Installing for accessibility to system components

More information

IMPACT OF CHEMICALS ADDITION IN WATER/WASTEWATER TREATMENT ON TDS CONCENTRATION AND SLUDGE GENERATION Jurek Patoczka, PhD, PE Hatch Mott MacDonald 27 Bleeker Str., Millburn, NJ 07041 (973) 912 2541 jurek.patoczka@hatchmott.com

More information

Area of Parallelograms, Triangles, and Trapezoids (pages 314 318)

Area of Parallelograms, Triangles, and Trapezoids (pages 314 318) Area of Parallelograms, Triangles, and Trapezoids (pages 34 38) Any side of a parallelogram or triangle can be used as a base. The altitude of a parallelogram is a line segment perpendicular to the base

More information

The South Central Regional Wastewater

The South Central Regional Wastewater FWRJ Successful Clarifier Rehabilitation: Using Computational Fluid Dynamics Modeling, Performance Specifications, and Compliance to Save Money Alonso Griborio, Felipe Martinez, Eric Stanley, John Koroshec,

More information

POTW PHOSPHORUS REMOVAL PROCESSES

POTW PHOSPHORUS REMOVAL PROCESSES POTW PHOSPHORUS REMOVAL PROCESSES Ohio Lake Erie Phosphorus Task Force - December 20, 2007 ROBERT M. BONNETT, PE Northeast Ohio Regional Sewer District OUTLINE SOURCES AND FORMS IN WASTEWATER TYPICAL POTW

More information

Open Channel Diffusers

Open Channel Diffusers Open Channel Diffusers Application Information: Open channel diffusers are used to increase mixing and absorbance efficiency of a chemical solution into the process water. Specifically designed penetrations

More information

5. TREATMENT FACILITIES

5. TREATMENT FACILITIES 5. TREATMENT FACILITIES 5.1. Background... 1 5.2. Nine Springs Wastewater Treatment Plant... 1 5.2.1. Liquid Treatment Facilities... 3 5.2.2. Biosolids Disposal Facilities... 6 5.2.3. Operation and Maintenance

More information

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan 26th Ward Wastewater Treatment Plant Prepared by: New York City Department of Environmental Protection Bureau of Wastewater Treatment July 2010 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1-1 1.1 BACKGROUND...

More information

RAINWATER HARVESTING FOR DRYLANDS - VOLUME 1. By Brad Lancaster, 2006. Appendix 3. Water-Harvesting Calculations

RAINWATER HARVESTING FOR DRYLANDS - VOLUME 1. By Brad Lancaster, 2006. Appendix 3. Water-Harvesting Calculations RAINWATER HARVESTING FOR DRYLANDS - VOLUME 1 By Brad Lancaster, 2006 Appendix 3 Water-Harvesting Calculations List of Equations and Other Information Box A3.1. Abbreviations, Conversions, and Constants

More information

Area & Volume. 1. Surface Area to Volume Ratio

Area & Volume. 1. Surface Area to Volume Ratio 1 1. Surface Area to Volume Ratio Area & Volume For most cells, passage of all materials gases, food molecules, water, waste products, etc. in and out of the cell must occur through the plasma membrane.

More information

ENGINEERING REPORT Sewage Treatment System

ENGINEERING REPORT Sewage Treatment System CIVIL & STRUCTURAL ENGINEERING CONSULTANTS 7A Barbados Avenue, Kingston 5, Jamaica, Tele: (876) 754-2154/5 Fax: (876) 754-2156 E-mail: mail@fcsconsultants.com GORE FLORENCE HALL DEVELOPMENT FCS # 0827/76/C

More information

Computer Assisted Procedure for the Design and Evaluation of Wastewater Treatment Systems

Computer Assisted Procedure for the Design and Evaluation of Wastewater Treatment Systems Anexos Sistema Lagunar. Computer Assisted Procedure for the Design and Evaluation of Wastewater Treatment Systems CCCCC AAAAA PPPPPP DDDDD EEEEEE TTTTTTTT PPPPPP CCCCC CC CC AA AA PP PP DD DD EE TT PP

More information

1. Metric system- developed in Europe (France) in 1700's, offered as an alternative to the British or English system of measurement.

1. Metric system- developed in Europe (France) in 1700's, offered as an alternative to the British or English system of measurement. GS104 Basics Review of Math I. MATHEMATICS REVIEW A. Decimal Fractions, basics and definitions 1. Decimal Fractions - a fraction whose deonominator is 10 or some multiple of 10 such as 100, 1000, 10000,

More information

CHAPTER 1 - EXECUTIVE SUMMARY

CHAPTER 1 - EXECUTIVE SUMMARY Chapter Page CHAPTER 1 - EXECUTIVE SUMMARY 1.1 Background 1-1 1.2 Purpose/ Objectives 1-1 1.3 Flow, Condition and Operation Assessment 1-3 1.4 Class A Biosolids 1-4 1.5 Summary of Recommendations 1-4 CHAPTER

More information

Calculating Area and Volume of Ponds and Tanks

Calculating Area and Volume of Ponds and Tanks SRAC Publication No. 103 Southern Regional Aquaculture Center August 1991 Calculating Area and Volume of Ponds and Tanks Michael P. Masser and John W. Jensen* Good fish farm managers must know the area

More information

Area of Parallelograms (pages 546 549)

Area of Parallelograms (pages 546 549) A Area of Parallelograms (pages 546 549) A parallelogram is a quadrilateral with two pairs of parallel sides. The base is any one of the sides and the height is the shortest distance (the length of a perpendicular

More information

Measurement. Customary Units of Measure

Measurement. Customary Units of Measure Chapter 7 Measurement There are two main systems for measuring distance, weight, and liquid capacity. The United States and parts of the former British Empire use customary, or standard, units of measure.

More information

April 30, 2013 E M. Environmental Management. www.em.doe.gov. safety performance cleanup closure

April 30, 2013 E M. Environmental Management. www.em.doe.gov. safety performance cleanup closure April 30, 2013 1 Facility Stabilization and Deactivation C.1.3 - (Period 3) After facilities are turned over by USEC and accepted by DOE: Perform minimal stabilization and deactivation activities for facilities

More information

VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region.

VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region. Math 6 NOTES 7.5 Name VOLUME of Rectangular Prisms Volume is the measure of occupied by a solid region. **The formula for the volume of a rectangular prism is:** l = length w = width h = height Study Tip:

More information

Geometry Notes VOLUME AND SURFACE AREA

Geometry Notes VOLUME AND SURFACE AREA Volume and Surface Area Page 1 of 19 VOLUME AND SURFACE AREA Objectives: After completing this section, you should be able to do the following: Calculate the volume of given geometric figures. Calculate

More information

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

Section 7 Existing Treatment Facilities

Section 7 Existing Treatment Facilities Section 7 7.1 Introduction An essential tool for the IRP is the wastewater treatment and effluent discharge facility capacities. There are six wastewater treatment facilities within the City s service

More information

Solids. Objective A: Volume of a Solids

Solids. Objective A: Volume of a Solids Solids Math00 Objective A: Volume of a Solids Geometric solids are figures in space. Five common geometric solids are the rectangular solid, the sphere, the cylinder, the cone and the pyramid. A rectangular

More information

Pump ED 101. Positive Displacement Pumps. Part I Reciprocating Pumps

Pump ED 101. Positive Displacement Pumps. Part I Reciprocating Pumps Pump ED 101 Positive Displacement Pumps Part I Reciprocating Pumps Joe Evans, Ph.D http://www.pumped101.com There are many pump designs that fall into the positive displacement category but, for the most

More information

I Gotta Know What? A Math Tutorial For Prospective CPO Students. FR = FA times FMR or FR = FA x FMR Volume (V)gallons = Volume (V)cubic feet x 7.

I Gotta Know What? A Math Tutorial For Prospective CPO Students. FR = FA times FMR or FR = FA x FMR Volume (V)gallons = Volume (V)cubic feet x 7. olume (V) = Area (A) x Average Depth (AD) I Gotta Know What? FR = FA times FMR or FR = FA x FMR Volume (V)gallons = Volume (V)cubic feet x 7.5 A = L x W A Math Tutorial For Prospective CPO Students AD

More information

CFD Modeling as a Tool for Clarifier Design

CFD Modeling as a Tool for Clarifier Design WEF Webcast: Optimizing Clarifier Design and Performance CFD Modeling as a Tool for Clarifier Design Outline of Presentation What is CFD? Typical Applications Activated Sludge Example Projects Benefits

More information

Enhancing Nitrification in an Oil Refinery WWTP with IFAS

Enhancing Nitrification in an Oil Refinery WWTP with IFAS Enhancing Nitrification in an Oil Refinery WWTP with IFAS Wayne J. Flournoy (2), Russ Grillo (1), *Sarah B. Hubbell (2), Ramesh Kalluri (3), Casey Mueller (1) (1) Frontier Refining, Inc. (2) Entex Technologies

More information

MODELING WASTEWATER AERATION SYSTEMS TO DISCOVER ENERGY SAVINGS OPPORTUNITIES By Steven A. Bolles Process Energy Services, LLC

MODELING WASTEWATER AERATION SYSTEMS TO DISCOVER ENERGY SAVINGS OPPORTUNITIES By Steven A. Bolles Process Energy Services, LLC Introduction MODELING WASTEWATER AERATION SYSTEMS TO DISCOVER ENERGY SAVINGS OPPORTUNITIES By Steven A. Bolles Process Energy Services, LLC Aeration systems for conventional wastewater activated sludge

More information

MEASUREMENT. Historical records indicate that the first units of length were based on people s hands, feet and arms. The measurements were:

MEASUREMENT. Historical records indicate that the first units of length were based on people s hands, feet and arms. The measurements were: MEASUREMENT Introduction: People created systems of measurement to address practical problems such as finding the distance between two places, finding the length, width or height of a building, finding

More information

Equivalents & Conversion Factors 406 Capacity Formulas for Steam Loads 407 Formulas for Control Valve Sizing 408-409

Equivalents & Conversion Factors 406 Capacity Formulas for Steam Loads 407 Formulas for Control Valve Sizing 408-409 Engineering Data Table of Contents Page No. I II Formulas, Conversions & Guidelines Equivalents & Conversion Factors 406 Capacity Formulas for Steam Loads 407 Formulas for Control Sizing 408-409 Steam

More information

SMALL COMMUNITY TREATMENT PLANT EXPANSION WHILE IN OPERATION USING ADVANCED TECHNOLOGY

SMALL COMMUNITY TREATMENT PLANT EXPANSION WHILE IN OPERATION USING ADVANCED TECHNOLOGY SMALL COMMUNITY TREATMENT PLANT EXPANSION WHILE IN OPERATION USING ADVANCED TECHNOLOGY Adel Bassyouni, HDR Engineering, Guillermo Garcia, HDR Engineering, Don Mc Dermott, Viejas Public Works Department

More information

How To Water System

How To Water System Mid-Monroe Water System: Soluble Iron and Manganese Removal via Oxidation & Filtration Daniel Rickard, P.E. Engineering Project Manager Pennsylvania-American Water Company Who Is American Water We are

More information

Phosphorus Removal. Wastewater Treatment

Phosphorus Removal. Wastewater Treatment Phosphorus Removal In Wastewater Treatment by Derek Shires (512) 940-2393 Derek.Shires@ett-inc.com Why do we care? Eutrophication of surface water - Especially reservoirs Maximum agronomic uptake - Limiting

More information

Small Wastewater Treatment Systems

Small Wastewater Treatment Systems Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems

More information

Aeration Efficiency Guide

Aeration Efficiency Guide Aeration Efficiency Guide Environmental Dynamics InTernational EDI specializes in the research, development, and application of advanced technology aeration and biological treatment solutions for municipal

More information

Revision Notes Adult Numeracy Level 2

Revision Notes Adult Numeracy Level 2 Revision Notes Adult Numeracy Level 2 Place Value The use of place value from earlier levels applies but is extended to all sizes of numbers. The values of columns are: Millions Hundred thousands Ten thousands

More information

Area of a triangle: The area of a triangle can be found with the following formula: 1. 2. 3. 12in

Area of a triangle: The area of a triangle can be found with the following formula: 1. 2. 3. 12in Area Review Area of a triangle: The area of a triangle can be found with the following formula: 1 A 2 bh or A bh 2 Solve: Find the area of each triangle. 1. 2. 3. 5in4in 11in 12in 9in 21in 14in 19in 13in

More information

FCAT FLORIDA COMPREHENSIVE ASSESSMENT TEST. Mathematics Reference Sheets. Copyright Statement for this Assessment and Evaluation Services Publication

FCAT FLORIDA COMPREHENSIVE ASSESSMENT TEST. Mathematics Reference Sheets. Copyright Statement for this Assessment and Evaluation Services Publication FCAT FLORIDA COMPREHENSIVE ASSESSMENT TEST Mathematics Reference Sheets Copyright Statement for this Assessment and Evaluation Services Publication Authorization for reproduction of this document is hereby

More information

Engineers Edge, LLC PDH & Professional Training

Engineers Edge, LLC PDH & Professional Training 510 N. Crosslane Rd. Monroe, Georgia 30656 (770) 266-6915 fax (678) 643-1758 Engineers Edge, LLC PDH & Professional Training Copyright, All Rights Reserved Engineers Edge, LLC An Introduction to Advanced

More information

OHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT

OHIO ENGINEERING JOB APPROVAL AUTHORITY ETHICS STATEMENT Sheet 1 of 9 NAME TITLE GRADE LOCATION DELEGATED BY (Responsible Engineer) TITLE DATE 210-NEM-501-A, Third Ed., Amend. OH1, February 2015 CONCURRED BY (Line Supervisor) (non-nrcs) TITLE DATE TITLE ETHICS

More information

Module 17: The Activated Sludge Process Part III

Module 17: The Activated Sludge Process Part III Wastewater Treatment Plant Operator Certification Training Module 17: The Activated Sludge Process Part III Revised October 2014 This course includes content developed by the Pennsylvania Department of

More information

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES 8-1. General. Upgrading of wastewater treatment plants may be required to handle increased hydraulic and organic loadings to meet existing effluent quality

More information

Appendix C: Conversions and Calculations

Appendix C: Conversions and Calculations Appendix C: Conversions and Calculations Effective application of pesticides depends on many factors. One of the more important is to correctly calculate the amount of material needed. Unless you have

More information

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1

More information

Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD

Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD Trevor Ghylin, PE PhD Outline Background Case Study: Sterno, Sweden (~1.8 MGD) 65% Aeration Energy Reduction Case Study:

More information