Approval of Software & Specification of Software Presentation at Banekonferencen
|
|
- Bryan Harrison
- 8 years ago
- Views:
Transcription
1 Approval of Software & Specification of Software Presentation at Banekonferencen
2 Background of the speaker Troels Winther, TÜV-SÜD Danmark, Software CV Year Company Program Role SW language Bombardier Sternol Programmør C Bombardier Ebilock 850 Test Integrator Assembler Chartec up, Motorola Project Manager C / embedded KMS VisIT Programmør Pascal/C++ Windows Det Norske Veritas -- Assessor Member WG EN50128: Atkins/DSB Safety Departm. SW-approvals Current TÜV-SÜD Danmark -- Assessor SW-approvals
3 CMS assessor Software error SIL2 in TCMS Hardware SIL3 Emergency fail (pushbutton) AND Hazard Train can not brake Collision Software SW-assessor, Report about SIL2 fullfilment Train computer CMS assessor - SVR 5/7/2015 3
4 EN50126-suiten EN50126 (Safety Management) EN50129 (Safety case, SIL-determination) EN50128 (Software) EN50155 (Equipment) EN50121 (EMC and noise) Safety concerns functions: The two most important? Rolling stock: Emergency brake Fire Detection Equipment Pass. Information System Infrastructure: Driving permit Allowed track speed Train Dispatching (TMS)
5 About TÜV-SÜD - European capacity 1/2 Mail-answer from Dr. Jan Richard, Zurich, concerning EN50128 and TSI: To my understanding, the TSI CCS itself do not have any requirement to SW The TSI CCS contains requirements to so called Interoperability Constituents. Such an IC can be a SW module or SW application The interoperability relevant requirements are given on a functional and system level, refer to Annex A TSI CCS is referring to mandatory EN norms as well This EN norms then contain requirements regarding the development and manufacturing of SW (especially EN50128) Chapter of TSI CCS is stating some requirements regarding the assessment of ICs
6 About TÜV-SÜD - European capacity 2/ : Uanset hvilket modul der er valgt, gælder bestemmelserne i bilag A, indeks 47, indeks A1, indeks A2..der er underlagt kravene i grundparameteren sikkerhed
7 Software 1/6 As media About software: Software is a physical file with billions of 0- og 1-numbers Software is help- and useless without hardware to execute the software Software is made by many people, who don t know each other => Not suited for approval EN50128 definition software intellectual creation comprising the programs, procedures, rules, data and any associated documentation pertaining to the operation of a system software baseline complete and consistent set of source code, executable files, configuration files, installation scripts and documentation that are needed for a software release. Information about compilers, operating systems, preexisting software and dependent tools is stored as part of the baseline. This will enable the organisation to reproduce defined versions and be the input for future releases at enhancements or at upgrade in the maintenance phase
8 Software 2/6 Function IF Button = 001 AND Data = 011 THEN Colour on screen = 101 ELSE Relay pulls = 111 Push button IF Colour on screen Detect smoke AND THEN Gate opens Data-file ELSE Relay pulls 111..
9 Software 3/6 Input/outputs Push button Detect smoke Colour on screen Gate opens Data-file 00 el. 01 Relay pulls 111..
10 Software 5/6 Component testing Push button 0, Colour on screen Detect smoke Gate opens Data-file 00, 01, 10, 11 Data Button 0 Component test Relay pulls Is it a software change, when data is changed?
11 Software 6/6 - Arkitecture Push button 0, 1 Detect smoke Data-file 00, 01, 10, 11 Tool 2 Datagenerering Compon Compon. 4 Library 1 Component 5 COTS-code from industry 1 Component 2 Newly developed code Component 3 Old code from mother company Component 6 Hardware micro code Tool 1 Linker det hele sammen til en fil Colour on screen Gate opens Relay pulls Install-fil
12 Pandoras box for infra structure Set train route 0, 1 Train detection Comp TMS Train drives Global Stop Data-file 00, 01, 10, 11 Balise ERTMS GSM-R Radio block Tool 2 Datagenerering Tool 1 Transmission chanels ERTMS. Level
13 CSM Where is the system? Push button Smoke detection C1 C4 C2 C3 C5 Colour on screen Gate opens Cause Hazard Consequence Risk Change is red dot SW failure - in green path, Gate is not opening Smoke poisoning => safety requirement: EN50128, SIL2
14 Difficult arguments The supplier sent two very competent guys. We where sitting all weekend together, fixing the bugs, testing the software, and now I am very confident that it works It is old software, the supplier say they can not fulfill EN50128 The changes are very small and does not concern the safety functions It is only data changes, the software has not been changed 5/7/
15 Approval & Specifying Independency Software requirements Tracability ISO9001 is basis Natural Language & Decision Tables 5/7/
16 Example from EN50128 om issue Test coverage Specification: The supplier is recommended to state test coverage Approval: The number gives confidence in approval the supplier knows what they are doing l 5/7/
17 Summary ISO9001 is basis Tracability Architecture Independency Validator Releases Natural Language & Decision Tables Configuration Management 5/7/
18 Final last words Var CSM_System: THandle; // Global variabel // This function decides whether Software in CSM-System is approved Function Software_Approved Boolean; Var Test_done, Proces_done: Boolean; Begin Result := False; If ((EN50128_followed = True) OR (Test_done = True AND Proces_done = True)) Then Begin If ISA_Report = SIL_Fulfilled Then Begin Result := True; end Else.To be done end; 5/7/
19 Q + A, Discussion 5/7/
BOMBARDIER INTERFLO*550 for ERTMS Regional
BOMBARDIER INTERFLO*550 for ERTMS Regional An application of ERTMS technology for Regional lines *Trademark of Bombardier Inc. and its subsidiaries What is Regional ERTMS? A UIC initiative, originally
More informationHS line TSI Conformity Certification and Safety Assessment
Roma-Napoli HS line TSI Conformity Certification and Safety Assessment Roma, 16 December 2004 Carlo Carganico Rome Naples Certification: contents EU and Italian railway legislation RFI: role and responsibility
More informationDirective 2001/16 - Interoperability of the trans- European conventional rail system
01/16-ST02 part 2 version EN07 TSI-TAF origin EN Status NA Directive 2001/16 - Interoperability of the trans- European conventional rail system Draft Technical Specification for Interoperability "Telematic
More informationSignaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel
Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel 1 Agenda F-Banen signaling programme and migration strategy Simple solution overview of signaling programme and scope
More information3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND
RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades
More informationControl and Indicating Equipment
VdS Guidelines for Fire Detection and Fire Alarm Systems VdS 2540en Control and Indicating Equipment Requirements and Test Methods VdS 2540en : 2010-12 (02) Publishing house: VdS Schadenverhütung GmbH
More informationApplication Functional Safety IEC 61511
Application Functional Safety IEC 61511 Introduction Functional safety must be an integral part of the project execution if we shall succeed to make safe application program We can t test and audit safety
More informationSoftware in safety critical systems
Software in safety critical systems Software safety requirements Software safety integrity Budapest University of Technology and Economics Department of Measurement and Information Systems Definitions
More informationChapter 12. Development Tools for Microcontroller Applications
Chapter 12 Development Tools for Microcontroller Applications Lesson 01 Software Development Process and Development Tools Step 1: Development Phases Analysis Design Implementation Phase 1 Phase 2 Phase
More informationEfficient Verification for Avionic Product Development
YAVE Test Systems Efficient Verification for Avionic Product Development With YAVE FTI offers the full range of test systems from compact budget units up to complex systems configured to customers individual
More informationELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL
61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable
More informationITIL A guide to release and deployment management
ITIL A guide to release and deployment management The goal of release and deployment management Release and deployment management aims to build, test and deliver services to the customers specified by
More informationERTMS - National implementation plan
ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release 09.07.2013 KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation
More informationWe drive Aurix to success Aurix Services for Automotive & Industrial
Building a safe and secure embedded world We drive Aurix to success Aurix Services for Automotive & Industrial > Services HITEX: An Preferred Design House (PDH) Questions about? Ask us Aurix Services for
More informationVÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.
VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is
More informationComplementary Tests: the key of the successful ERTMS deployment in Spain.
Complementary Tests: the key of the successful ERTMS deployment in Spain. M. Cambronero 1, A.. Arranz 1,, C. de la Roza 1, B. Domingo 1, J. Gómez 1 ; J. Iglesias 1, J. Santiago 2, C. Arias 3 1 ADIF. Spanish
More informationAn Introduction to MPLAB Integrated Development Environment
An Introduction to MPLAB Integrated Development Environment 2004 Microchip Technology Incorporated An introduction to MPLAB Integrated Development Environment Slide 1 This seminar is an introduction to
More informationCertification of a Scade 6 compiler
Certification of a Scade 6 compiler F-X Fornari Esterel Technologies 1 Introduction Topic : What does mean developping a certified software? In particular, using embedded sofware development rules! What
More informationService Transition. ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1
Service Transition ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1 Lesson Objectives Service Transition - Introduction - Purpose and Objectives
More informationHow to Upgrade SPICE-Compliant Processes for Functional Safety
How to Upgrade SPICE-Compliant Processes for Functional Safety Dr. Erwin Petry KUGLER MAAG CIE GmbH Leibnizstraße 11 70806 Kornwestheim Germany Mobile: +49 173 67 87 337 Tel: +49 7154-1796-222 Fax: +49
More informationOver-the-top Upgrade Guide for Snare Server v7
Over-the-top Upgrade Guide for Snare Server v7 Intersect Alliance International Pty Ltd. All rights reserved worldwide. Intersect Alliance Pty Ltd shall not be liable for errors contained herein or for
More informationApplicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC)
Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC) Click here to enter text. ERA 1.0 Page 1/13 Standards or other documents referred to in the rolling stock- freight wagons TSI
More informationImpact of Safety Standards to Processes and Methodologies. Dr. Herbert Eichfeld
Impact of Safety Standards to Processes and Methodologies Dr. Herbert Eichfeld Impact to Processes, Methodologies, Products Processes + New/changed role descriptions (e.g. safety manager) + Assignments
More informationHow to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe
How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe Alfred Beer Unit Manager Rolling Stock (TÜV SÜD Rail GmbH, Germany) Lighthouse Event, Copenhagen, Denmark 20 th November
More informationAvaya Brugergruppe dage
13.03.2015 1 Avaya Brugergruppe dage ODENSE 13.03.2015 2 BRUGERGRUPPEDAGE 2015 ODENSE Rigets tilstand på Blå Avaya Skal jeg gå SIP vejen? Hvad er Avaya Software Investment Protection Policy (ASIPP) SIP
More informationNetwork Certification Body
Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative
More informationAn Introduction to the ECSS Software Standards
An Introduction to the ECSS Software Standards Abstract This introduces the background, context, and rationale for the creation of the ECSS standards system presented in this course. Addresses the concept
More informationChange Management Best Practices
General Change Management Best Practices Practice Area Best Practice Criteria Organization Change management policy, procedures, and standards are integrated with and communicated to IT and business management
More informationERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges
ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges J. Iglesias 1, A. Arranz 1, M. Cambronero 1,C. de la Roza 1, B. Domingo 1, J. Tamarit 2, J. Bueno 2, C. Arias
More informationSUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL
SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We
More informationService Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0
Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations
More informationAmlib Library Software: Equipment & Asset Tracking Management System
Amlib Library Software: Equipment & Asset Tracking Management System Included in the Amlib Library System is a comprehensive Equipment & Asset Tracking Management System. This is implemented by a wide
More informationProject Development & Software Design
Project Development & Software Design Lecturer: Sri Parameswaran Notes by Annie Guo. S1, 2006 COMP9032 Week12 1 Lecture Overview Basic project development steps Some software design techniques S1, 2006
More informationRATP safety approach for railway signalling systems
RATP safety approach for railway signalling systems ReSIST summer School 007 Pierre CHARTIER Summary. Introduction. Hardware fault detection. 6 Introduction Global railway system Rolling stock Environment
More informationShmeisani: Al-Hussary Street Anshasi Sq P.O. Box 940314 Amman 11194 Jordan Telephone: +962-65007335
itil.org Service Management Essentials ITIL V3 Study Guide v1.0.0 Shmeisani: Al-Hussary Street Anshasi Sq P.O. Box 940314 Amman 11194 Jordan Telephone: +962-65007335 Fax: +962-65007300 Email: info@saadehgroup.com
More informationReliable, Affordable Peace of Mind. Protect your Vehicle with Cloud GPS
Reliable, Affordable Peace of Mind Protect your Vehicle with Cloud GPS Benefits of Cloud GPS Peace of mind always know where your vehicle is and recover it quickly if it gets stolen. Parents Keep an eye
More informationYour Power. Traction energy
Your Power Traction energy Table of content 1. What is traction energy? 3 1.1 From producer to train 1.2 Advantages 1.3 Energy, voltage or current 1.4 Transport and distribution 1.5 Supply of traction
More informationInformationsteknologi Serviceledelse Del 3: Vejledning i definition af emne og brug af ISO/IEC 20000-1
DS-information DS/ISO/IEC TR 20000-3 1. udgave 2009-10-21 Informationsteknologi Serviceledelse Del 3: Vejledning i definition af emne og brug af ISO/IEC 20000-1 Information technology Service management
More informationAgenda. Michele Taliercio, Il circuito Integrato, Novembre 2001
Agenda Introduzione Il mercato Dal circuito integrato al System on a Chip (SoC) La progettazione di un SoC La tecnologia Una fabbrica di circuiti integrati 28 How to handle complexity G The engineering
More informationInformationsteknologi Serviceledelse Del 4: Procesreferencemodel
DS-information DS/ISO/IEC TR 20000-4 1. udgave 2010-12-14 Informationsteknologi Serviceledelse Del 4: Procesreferencemodel Information technology Service management Part 4: Process reference model DS/ISO/IEC
More informationEE289 Lab Fall 2009. LAB 4. Ambient Noise Reduction. 1 Introduction. 2 Simulation in Matlab Simulink
EE289 Lab Fall 2009 LAB 4. Ambient Noise Reduction 1 Introduction Noise canceling devices reduce unwanted ambient noise (acoustic noise) by means of active noise control. Among these devices are noise-canceling
More informationTITLE: Control of Software
Page 1 of 8 TITLE: Control of Software WARNING This document is the property of United Technologies Corporation (UTC). You may not possess, use, copy or disclose this document or any information in it,
More informationCONSOLIDATED VERSION IEC 62304. Medical device software Software life cycle processes. colour inside. Edition 1.1 2015-06
IEC 62304 CONSOLIDATED VERSION Edition 1.1 2015-06 colour inside Medical device software life cycle processes INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS 11.040 ISBN 978-2-8322-2765-7 Warning! Make sure
More informationIs your current safety system compliant to today's safety standard?
Is your current safety system compliant to today's safety standard? Abstract It is estimated that about 66% of the Programmable Electronic Systems (PES) running in the process industry were installed before
More informationWO Sandnes - Stavanger Request for quotation (RFQ) Norwegian Frame Contract Signaling System
Request for quotation (RFQ) Norwegian Frame Contract Signaling System 00B BL 3.0 09.11.1011 XSMISIL XDATR ESL Revision Reason for issue Date Created by Contr. by Appr. by Title: Pages: Sørlandsbanen, (Egersund)
More informationIEC 61508 Functional Safety Assessment. Project: K-TEK Corporation AT100, AT100S, AT200 Magnetostrictive Level Transmitter.
61508 SIL 3 CAPABLE IEC 61508 Functional Safety Assessment Project: K-TEK Corporation AT100, AT100S, AT200 Magnetostrictive Level Transmitter Customer: K-TEK Corporation Prairieville, LA USA Contract No.:
More informationDynamics AX. Microsoft Dynamics AX 4.0. Microsoft Dynamics ISV Software Solution Test Guidelines
Dynamics AX Microsoft Dynamics AX 4.0 Microsoft Dynamics ISV Software Solution Test Guidelines May 23, 2007 The information contained in this document represents the current view of Microsoft Corporation
More informationAnwendung von Polyspace im Software Entwicklungsprozess nach IEC 60880. München, 19.05.2011, Dr.-Ing. Jörg Barrho
Anwendung von Polyspace im Software Entwicklungsprozess nach IEC 60880 München, 19.05.2011, Dr.-Ing. Jörg Barrho Agenda 01 Tognum and MTU Friedrichshafen 02 Background and project 03 Overview IEC 60880
More informationSoftware Asset Management (SAM) and ITIL Service Management - together driving efficiency
Software Asset Management (SAM) and ITIL Service Management - together driving efficiency Ian Preskett MIET C.Eng. MBCS CITP Software Asset Management Consultant ian.preskett@ipassociatesltd.co.uk Agenda
More informationAgile SPL-SCM: Agile Software Product Line Configuration and Release Management
Agile SPL-SCM: Agile Software Product Line Configuration and Release Management APLE 2006 Workshop SPLC 2006, Baltimore, MD Reto.Kurmann@phonak.com Phonak Hearing Systems Presentation Roadmap 1. Introduction
More informationHow To Integrate Software And Systems
September 25, 2014 EFFECTIVE METHODS FOR SOFTWARE AND SYSTEMS INTEGRATION P R E S E N T E D B Y: D R. B O Y D L. S U M M E R S 1 Software Engineer (Quality) Defense and Space The Boeing Company - Seattle,
More informationNetComm Wireless NP920 Dual Band WiFi USB Adapter. User Guide
NetComm Wireless NP920 Dual Band WiFi USB Adapter User Guide Contents Preface... 3 Important Safety Instructions... 3 Introduction... 4 Overview... 4 Features... 4 Package Contents... 5 Minimum System
More informationERTMS/ETCS Configuration Management
ERTMS/ETCS Configuration Management Bernhard Stamm Siemens Transportation Systems Nick Cory Bombardier Transportation 1 Configuration Management What is it? What to? Why? How? When? Who does it? 2 Configuration
More informationINTEROPERABILITY UNIT
INTEROPERABILITY UNIT MODULES FOR THE PROCEDURES FOR ASSESSMENT OF CONFORMITY, SUITABILITY FOR USE AND EC VERIFICATION TO BE USED IN THE TECHNICAL SPECIFICATIONS FOR INTEROPERABILITY Reference: Version
More informationTYPE CERTIFICATION OF WIND TURBINES
TYPE CERTIFICATION OF WIND TURBINES March 2003, rev. 9 DET NORSKE VERITAS, DANMARK A/S Building 114 Frederiksborgvej 399 P. O. Box 49 DK-4000 Roskilde Denmark Email: Wind.Turbine.Certification@dnv.com
More informationINTERNAL SERVICES GROUP PMO
Ownership & Awareness Program 1 Program 3 Program 4 Program 5 Program 6 Program 7 Program 2 Cap ability Development Infra structure Program n INTERNAL SERVICES GROUP ESSENTIAL FUNCTIONS Act as an interface
More informationA P P L I C A T I O N. Nutricia Polska. Control system for jar-packed baby-foods manufacturing department
A P P L I C A T I O N N O T E FOOD PRZEMYSŁ INDUSTRY SPOŻYWCZY Nutricia Polska Control system for jar-packed baby-foods manufacturing department R E L I A B L E S O L U T I O N O F A U T O M A T I O N
More informationEin einheitliches Risikoakzeptanzkriterium für Technische Systeme
ETCS Prüfcenter Wildenrath Interoperabilität auf dem Korridor A Ein einheitliches Risikoakzeptanzkriterium für Technische Systeme Siemens Braunschweig, Oktober 2007 Prof. Dr. Jens Braband Page 1 2007 TS
More informationHow To Use A Pkn10 (Powerline) With A Microsd Card (Powerkit) On A Powerline (Powergen) Or Powerline 2 (Powerbee) (Powerbmi) (Pk10) (Operating
GB PKN10 serial node with colour LCD display User s manual Bač 49a, 6253 Knežak, SLOVENIA tel: ++ 386 5 753 2006 fax: ++ 386 5 753 2007 email: sec.electronics@siol.net http://www.secelectro.com SEC Electronics
More informationA304a: Understanding User Needs for Field Management Stations Part 1 Object Definitions for Signal System Masters (SSM) Based on NTCIP 1210 Standard
A304a: Understanding User Needs for Field Management Stations Part 1 Object Definitions for Signal System Masters (SSM) Based on NTCIP 1210 Standard Table of Contents Introduction/Purpose... 2 SSM User
More informationCertification Case: Locomotives for Corridor A (and more)
Certification Case: Locomotives for Corridor A (and more) Dr.ir. L. (Lieuwe) Zigterman MIRSE Inhoud Lieuwe Zigterman DoorZigt B.V. Casus: certificering ES64F4: Gebaseerd op ervaringen opgedaan bij KEMA
More informationERTMS UNIT ERTMS CHANGE CONTROL MANAGEMENT EUROPEAN RAILWAY AGENCY. Reference: ERA_ERTMS_0001 Document type: Version : 1.2.
EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA_ERTMS_0001 Document type: Version : 1.2 Date : 11/05/06 Name Edited by Quality review Approved by A. HOUGARDY E. LEPAILLEUR A. CHIAPPINI P. GUIDO Position
More informationOpen EMS Suite. O&M Agent. Functional Overview Version 1.2. Nokia Siemens Networks 1 (18)
Open EMS Suite O&M Agent Functional Overview Version 1.2 Nokia Siemens Networks 1 (18) O&M Agent The information in this document is subject to change without notice and describes only the product defined
More informationAXIS 5810 A Bluetooth Print Plug. Quick Start
AXIS 5810 AXIS 5810 A Bluetooth Print Plug Quick Start BLUETOOTH is a trademark owned by its proprietor and used by Axis Communications AB under license 1 AXIS 5810 Regulatory Information Regulatory Information
More informationGeneral Description of The CMC- Services
STANDARD FOR CERTIFICATION No.1.1 General Description of The CMC- Services JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The
More informationTESTING FRAMEWORKS. Gayatri Ghanakota
TESTING FRAMEWORKS Gayatri Ghanakota OUTLINE Introduction to Software Test Automation. What is Test Automation. Where does Test Automation fit in the software life cycle. Why do we need test automation.
More informationSECTION I: INTRODUCTION
SECTION I: INTRODUCTION It s been a busy year. Marine Magnet, Inc. dispatchers are constantly looking for new ways to integrate external data to give DoD the best tools for tracking their fleets. Marine
More informationCable Trays and Ducts (Metallic)
p pproval roramms for U rcos orasato Mutual coto (M)No. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Type Approval Programmes for EU recognised organisation Mutual Recognition (MR) No. MR-P009 Cable
More informationADAPTABLE TO CHANGE PICKING THE RIGHT SOFTWARE
S O F T W A R E F O R E V O L V I N G B U S I N E S S E S Today it is more apparent than ever that in order to keep pace with the rapid changes in the way that business is carried out and to take full
More informationVHDL programmering H2
VHDL programmering H2 VHDL (Very high speed Integrated circuits) Hardware Description Language IEEE standard 1076-1993 Den benytter vi!! Hvornår blev den frigivet som standard første gang?? Ca. 1980!!
More informationQuality Guide. CJC Quality Guide Vol. 7 April 2015 1
Quality Guide CJC Quality Guide Vol. 7 April 2015 1 CJC Quality Guide An introduction to C.C.JENSEN A/S Quality Guide It is important that our customers know what C.C.JENSEN A/S stands for when talking
More informationMeasure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
More informationGuidelines for filling in the Excel Template for Monitoring INSPIRE by the contributing authorities
Guidelines for filling in the Excel Template for Monitoring INSPIRE by the contributing authorities WARNING: in order to allow for an automated upload into the data base it is necessary that strict formatting
More informationHandicap regulations for lift. Points related to the remote alarm on passenger and goods passenger lifts
Handicap regulations for lift Points related to the remote alarm on passenger and goods passenger lifts What are the regulations in Europe? For news lifts: Directive 95/16/CE Annex 1: Essential safety
More informationINTERMEDIATE QUALIFICATION
PROFESSIONAL QUALIFICATION SCHEME INTERMEDIATE QUALIFICATION SERVICE CAPABILITY RELEASE, CONTROL AND VALIDATION CERTIFICATE SYLLABUS Page 2 of 23 Contents RELEASE, CONTROL AND VALIDATION CERTIFICATE 4
More informationIFS-8000 V2.0 INFORMATION FUSION SYSTEM
IFS-8000 V2.0 INFORMATION FUSION SYSTEM IFS-8000 V2.0 Overview IFS-8000 v2.0 is a flexible, scalable and modular IT system to support the processes of aggregation of information from intercepts to intelligence
More informationMiTraC Train ConTrol and ManaGeMenT system. Propulsion & Controls. This is a running title
MiTraC Train ConTrol and ManaGeMenT system 1 Propulsion & Controls The Brain of the Train A train speeding across the landscape at over 350 km/h is an impressive sight. So impressive it is, easy to forget
More informationHow To Improve Card Payment Protocol In Europe
Corporate Launch Event October 27, Brussels Driving Interoperability in Card Payments 2 1 Terms of Reference Payment - the action of paying or the process of being paid - a set of rules governing the exchange
More informationEmbedded Systems. introduction. Jan Madsen
Embedded Systems introduction Jan Madsen Informatics and Mathematical Modeling Technical University of Denmark Richard Petersens Plads, Building 321 DK2800 Lyngby, Denmark jan@imm.dtu.dk Wireless Sensor
More informationOcé TCS500. No time to waste. Wide format colour. print, copy and scan. system
Océ TCS500 No time to waste Wide format colour print, copy and scan system Ready for any job: highly productive Excellent throughput in colour and monochrome The right results every time Performance you
More informationChoose certainty. Add value.
TÜV SÜD Group Choose certainty. Add value. TÜV SÜD creates increased safety and added economic value. As process partners with comprehensive industry knowledge, our teams of specialists provide early consultation
More informationTrends in Machinery/ Automation Safety
Trends in Machinery/ Automation Safety by Roberta Nelson Shea Director, Safety & Compliance Symbotic LLC and C&S Wholesale Grocers 2013 SES - The Society for Standards Professionals Why Machinery Safety
More informationCentral Commissioning Facility Research Management Systems (RMS): User Guidance
Central Commissioning Facility Research Management Systems (RMS): User Guidance Contents 1. How to login and register a new account... 2 2. How to accept an invitation to review... 8 3. How to submit a
More informationARIZONA CTE CAREER PREPARATION STANDARDS & MEASUREMENT CRITERIA SOFTWARE DEVELOPMENT, 15.1200.40
SOFTWARE DEVELOPMENT, 15.1200.40 STANDARD 1.0 APPLY PROBLEM-SOLVING AND CRITICAL THINKING SKILLS TO INFORMATION 1.1 Describe methods of establishing priorities 1.2 Prepare a plan of work and schedule information
More informationThe Easy and Cost Effective Way to AS9100 Certification
The Easy and Cost Effective Way to AS9100 Certification Presented by John Graham June 26, 2007 1 Seminar Sponsors Fulcrum Associates John Graham 425.885.4175 jagraham@fulcrumassociates.com Det Norske Veritas
More informationSetting Up the Cisco Unified IP Phone
CHAPTER 3 This chapter includes the following topics, which help you install the Cisco Unified IP Phone on an IP telephony network: Before You Begin, page 3-1 Understanding the Cisco Unified IP Phone 7962G
More informationA Project Document of the Advanced Transportation Controller Joint Committee. APIVS CONOPS v02.04
A Project Document of the Advanced Transportation Controller Joint Committee APIVS CONOPS v02.04 Advanced Transportation Controller (ATC) Application Programming Interface (API) Validation Suite (APIVS)
More informationEnhanced Project Management for Embedded C/C++ Programming using Software Components
Enhanced Project Management for Embedded C/C++ Programming using Software Components Evgueni Driouk Principal Software Engineer MCU Development Tools 1 Outline Introduction Challenges of embedded software
More informationJD Edwards World. Database Audit Manager Release A9.3 E21957-02
JD Edwards World Database Audit Manager Release A9.3 E21957-02 April 2013 JD Edwards World Database Audit Manager, Release A9.3 E21957-02 Copyright 2013, Oracle and/or its affiliates. All rights reserved.
More informationFree ITIL v.3. Foundation. Exam Sample Paper 1. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass
Free ITIL v.3. Foundation Exam Sample Paper 1 You have 1 hour to complete all 40 Questions You must get 26 or more correct to pass Compliments of Advance ITSM www.advanceitsm.com 1. What is the main reason
More informationCloud computing for maintenance of railway signalling systems
Cloud computing for maintenance of railway signalling systems Amparo Morant, Diego Galar Division of Operation and Maintenance Engineering Luleå University of technology Luleå, 97 817, Sweden Amparo.morant@1tu.se
More informationChange Impact analysis
1 Change Impact analysis and the safety standard IEC 61508:2010 series Author and presenter: Thor Myklebust SINTEF ICT Authors: Tor Stålhane, IDI NTNU Geir Hanssen, SINTEF ICT Børge Haugset, SINTEF ICT
More informationNeue Konzepte in der Betriebsführung und Information
www.thalesgroup.com/germany Neue Konzepte in der Betriebsführung und Information 17-19 Januar 2013 Zürich, Schweiz Volkmar Heuer, Produktstrategie Leittechnik Thales Transportation Systems 2 / New Concepts
More informationRS Components HKUST ECESS Career Talk. Eric K.H. Lee Head of APAC Technical Marketing 26 th November, 2013
RS Components HKUST ECESS Career Talk Eric K.H. Lee Head of APAC Technical Marketing 26 th November, 2013 20 minutes to cover About my background About my current company Career Opportunities 2 My Background
More informationOver the past several years, the Missoula Technology
Watershed, Soil, and Air United States Department of Agriculture Forest Service Technology & Development Program November 2002 2500 0225-2329 MTDC Remote Telemetry System for Particulate Monitoring Andy
More informationAURIX Preferred Design House. Hitex Development Tools GmbH Hitex (UK) Ltd.
AURIX Preferred Design House Hitex Development Tools GmbH Hitex (UK) Ltd. Company Profile Founded in 1976 38 years of experience in microcontroller technology Part of the Infineon Group since 2003 Leading
More informationModule 1 - Hardware Acquisition and Installation TABLE OF CONTENTS. Version 3.0
1 Module 1 - Hardware Acquisition and Installation TABLE OF CONTENTS Version 3.0 1. AGREED TERMS AND INTERPRETATION... 2 2. SUPPLY OF HARDWARE... 2 3. ACQUISITION THROUGH A RESELLER... 4 4. AVAILABILITY
More informationQuality assurance in an Agile delivery method
Quality assurance in an Agile delivery method Guy Nelson (Quality Manager, Fidelity International) Barbara Roberts (Accredited DSDM Consultant) April 2006 Agenda The Challenges to Quality Assurance CMMi
More information12/6/2006. European Railway Agency
12/6/2006 European Railway Agency How it started : Legal Basis A first proposal by the Commission from 23 January 2002 in the framework of the Second Railway Package and on 29 April 2004 adoption of Regulation
More information