1 SUB-FRAME Accoya is the worl s leaing high technology woo. It is prouce from sustainably source, fast growing softwoo using a non-toxic moification process, resulting in a urable, stable an beautiful material with excellent performance characteristics an proviing for a minimum 0 year above groun life. Like all claing materials, Accoya claing performs best when installe properly on a suitable frame an in a ventilate façae system - characterise by continuous ventilation behin the claing boars, through ventilation in- an outlets situate at the top an bottom of the façae. This ensures rain water an conensation behin the claing to be remove an for the insulation to retain its effectiveness. The sub-frame the claing is fastene to shoul have a maximum spacing of 00 mm on center an shoul consist of timber battens of at least x mm when fully supporte by a substrate. Horizontal battens an counter battens shoul be at least 0 x mm. Support battens use with Accoya soul be of a urability class or. In case of a iscouloration risk of the claing boars because of leaching of extractives from the timber subframe, apply a barrier between the sub-frame battens an the boars. Timber support battens shoul not be use above m builing height. In case of claing, best practice is a ouble sub-frame where horizontal support battens are fastene on counter battens. The horizontal battens shoul be chamfere at the top sie, sheing water into the cavity. The lowest batten shoul slant inwar at the bottom, creating a rip lip at the intersection with the counter battens. If only horizontal support battens are use, aitional measures nee to be taken to ensure sufficient ventilation (00 mm per m horizontal length), e.g. by making cut-outs in the battens or interrupting the battens at regular intervals, staggere relative to each other. In this case it is preferable if the horizontal battens are chamfere on the top ege to she any water outwars. Water penetration at the en grain of battens shoul be avoie by applying a suitable sealer. CAVITY ACCOYA CLADDING ON A TIMBER FRAME Accoya is suitable for stanar claing types, an in general the installer shoul follow the same recommenations for fitting as with traitional woo claing, requiring no special etailing or tools, an performs best when installe properly on a suitable frame. Accoya woo can be cut, profile an routere to specifie esigns without encountering restrictions or issues associate with the instability of traitional woo claing while maintaining its urability. FASTENERS Accoya can be face fixe onto the timber sub-frame with ring shank (or other improve) nails or screws (raise or roun hea). As Accoya is slightly aciic, like most urable woos, it is recommene to use stainless steel grae.0 (general applications) or grae.0 (for coastal or inustrial sites). Stapling is not recommene, nor to rive the nail or screw heas into the woo. T-nails shoul not be use for external claing as they offer little resistance to axial withrawal. Lost hea nails shoul also be avoie as they offer little resistance to pull-through. To ensure a urable an lasting fixation, the boars shoul be fixe with at least 0 mm clearance to the en of the boar (pre-rill holes to mm less than the screw shank iameter or 0% of the nail iameter). The minimum istance to the top an bottom ege of the boars is mm. The recommene point sie penetration of nails into the sub-frame is at least x for ring shank or x for smooth nails. If the nail hea is larger than twice the shank iameter, assumely pull-through will not occur, as the pull-through resistance excees the withrawal resistance. Point sie penetration x (ring shank) / x (smooth) x mm COATINGS mm UK Coatings are applie to Accoya for largely aesthetic reasons. Please refer to the general guiance given in the brochures provie through accoya.com an the applicable avice from coating manufacturers. UK Accoya Claing V. these guielines have been written for pro-fessionals wishing to use Accoya to create beautiful, reliable an highly u-rable en proucts. Shoul you require further information, please contact Accsys through

2 Accoya claing James Latham profiles vert + hor : / HWI Because of the improve stability of the Accoya woo, the gap neee between the height of the boars is very limite, an can be as little as mm. This permits spacing to be built into the profile rather than use of a spacer on site. The spee of installing Accoya claing boars can be increase significantly by the crusher bea mille into the James Latham tongue an groove profile. This bea will insure the necessary spacing when installing the boars without aitional measures. If an when the boars move relative to each other, this small triangle of material will be easily presse together, releasing the necessary istance. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for. When this free space is left open, a vermin mesh might be require at certain joint withs. Please check local builing coes to verify requirements. mm mm mm / mm mm / mm James Latham LT AC 0 tongue an groove profile for claing mm mm James Latham LT AC 0 tongue an groove profile for horizontal claing

3 Horizontal claing LT AC 0 Base :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). 0 Wooen structural frame. Soleplate. DPC. Wall an floor structure, etails to be esigne in line with strength an insulation requirements. 0 Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Vertical timber battens of at least x mm of urability class or. Vermin mesh of corrosion resistant metal, hole with mm. Voi area in line with ventilation requirements. > mm mm 0 mm continuous ventilation Preforme corrosion resistant metal flashing. x Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm It is recommene to position the claing above the splash zone, between groun level an a height of 00 to 0 mm. This will avoi rain water splashing onto the boars, which can cause staining an reuce the service life of coatings. Applying a gravel section below the claing is recommene. with the written instructions an guielines of Accsys Technologies an/or its agents (available upon request). Accsys Technologies accepts no liability for any efect, amage or loss that may occur where such written instructions an guielines are not ahere to. No ACCSYS T E C H N O L O G I E S

4 Vertical claing LT AC 0 Brick claing junction :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Brick base or claing. 0 continuous ventilation 0 00 micron polyethylene flashing. Vertical timber counter battens of urability class or. Horizontal timber battens of at least 0 x mm, of urability class or. Vermin mesh of corrosion resistant metal, hole with mm. Voi area in line with ventilation requirements. mm / mm x boar thickn. mm 0 mm Coe lea flashing. Accoya LT AC 0 claing boar, available from James Latham in x mm an x mm. Ring shank or improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm x mm

5 Horizontal claing LT AC 0 Horizontal joint :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Vertical timber battens of at least x mm of urability class or. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm x mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for. continuous ventilation

6 Vertical claing LT AC 0 Vertical joint horizontal :..0.0 / HWI 0 Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Vertical timber counter battens of urability class or. Horizontal timber battens of at least 0 x mm, of urability class or. Accoya LT AC 0 claing boar, available from James Latham in x mm an x mm. 0 x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

7 Horizontal claing LT AC 0 Sash winow sill :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber battens of at least x mm of urability class or. Vermin mesh of corrosion resistant metal, hole with mm. Voi area in line with ventilation requirements. 0 x Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm mm 0 mm 0 continuous ventilation

8 Horizontal claing LT AC 0 Sash winow hea :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. continuous ventilation Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber battens of at least x mm of urability class or. Vermin mesh of corrosion resistant metal, hole with mm. Voi area in line with ventilation requirements. 0 Preforme corrosion resistant metal flashing. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm > mm 0 mm mm 0 x mm

9 Horizontal claing LT AC 0 Sash winow jamb horizontal :..0.0 / HWI 0 0 mm 0mm -0 mm Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber battens of at least x mm of urability class or. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. 0 x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

10 Vertical claing LT AC 0 Sash winow jamb horizontal :..0.0 / HWI 0-0 mm Room lining (such as plaster boar). Service voi (optional, may also be fille with 0 Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber counter battens of urability class or. Horizontal timber battens of at least 0 x mm, of urability class or. Accoya LT AC 0 claing boar, available from James Latham in x mm an x mm. x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

11 Horizontal claing LT AC 0 Winow sill :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber battens of at least x mm of urability class or. Vermin mesh of corrosion resistant metal, hole with mm. Voi area in line with ventilation requirements. 0 mm mm 0 Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. 0 Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm continuous ventilation x mm OFFICIAL DISTRIBUTOR lathams-accoya.co.uk

12 Horizontal claing LT AC 0 Winow hea :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. continuous ventilation Framing. Vertical timber battens of at least x mm of urability class or. Vermin mesh of corrosion resistant metal, max hole with mm. Voi area in line with ventilation requirements. 0 Preforme corrosion resistant metal flashing. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm -0 mm 0 x mm

13 Horizontal claing LT AC 0 Winow jamb horizontal :..0.0 / HWI 0 0 mm 0mm -0 mm Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber battens of at least x mm of urability class or. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. 0 x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

14 Vertical claing LT AC 0 Winow jamb horizontal :..0.0 / HWI 0-0 mm Room lining (such as plaster boar). Service voi (optional, may also be fille with 0 Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Framing. Vertical timber counter battens of urability class or. Horizontal timber battens of at least 0 x mm, of urability class or. Accoya LT AC 0 claing boar, available from James Latham in x mm an x mm. x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm Joints The crusher bea mille into the LT AC 0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

15 Horizontal claing LT AC 0 Roof trim :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Vertical timber battens of at least x mm of urability class or. Roofing material to specification. 0 0 Roof trim (corrosion resistant), etails to project requirements; a minimum gap of mm shoul be kept between the surface of the panel an the trim to ensure ventilation. Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. x Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm mm continuous ventilation

16 Horizontal claing LT AC 0 Overhang :..0.0 / HWI Room lining (such as plaster boar). Service voi (optional, may also be fille with Wall structure (wooen structural frame fille with a suitable insulation material of sufficient thickness to achieve require values). Structural sheathing boar. Water repellent breather membrane - UV resistant in case of open joints. Vertical timber battens of at least x mm of urability class or. -0 mm 0 Accoya frieze boar Accoya LT AC 0 horizontal claing boar, available from James Latham in x an x mm. continuous ventilation 0 Ring shank or other improve nails: grae.0 (general applications) or grae.0 (coastal or inustrial sites) Holes pre-rille: - mm less than nail Ø - to 0% of screw shank Ø Point sie penetration x (ring shank) / x (smooth) mm x mm 0

17 Horizontal claing - UK Interior corners horizontal : / HWI 0 mm mm 0 mm mm mm 0 mm Joints The crusher bea mille into the LT AC 0/0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

18 Horizontal claing - UK Exterior corners : / HWI 0 mm mm mm 0 mm mmmm 0 mm mm 0 mm mm 0 mm Joints The crusher bea mille into the LT AC 0/0 Accoya claing boar insures sufficient mutual istance between the boars, with an increase installing spee. When meeting other construction elements an/or between the length of two boars, a free space of - 0 mm shoul be allowe for.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

MEDITE TRICOYA CLADDING BOARD AND PANEL APPLICATIONS

MEDITE TRICOYA CLADDING BOARD AND PANEL APPLICATIONS MEDITE TRICOYA CLADDING BOARD AND PANEL APPLICATIONS CONTENTS About the panel 3 Features and benefits 4 Properties 6 Boarding 8 horizontal 8 vertical/diagonal 9 grooved panels 10 ventilation and joints

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated) (Fixed Lite Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Awning Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Casement Window Illustrated) BRICK VENEER CONSTRUCTION (Horizontal

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Product Data Sheet ROCKPANEL Rockclad

Product Data Sheet ROCKPANEL Rockclad Product Data Sheet ROCKPANEL Rockclad Durable - Xtreme - FS-Xtra United Kingdom 1 Product description ROCKPANEL boards are prefabricated compressed mineral wool boards with synthetic binders. The surface

More information

Galvanized Roofing Attachment

Galvanized Roofing Attachment GALVANIZE ROOFING ATTAHMENT APPENIX K Appendix K Galvanized Roofing Attachment This appendix presents guidelines for the attachment of galvanized metal roofing in Guam, the U.S. Virgin Islands, and other

More information

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013]

FLASHMAN WINDOW AND DOOR FLASHING SYSTEM. Product. Scope. Appraisal No. 573 [2013] FLASHMAN WINDOW AND DOOR FLASHING SYSTEM This Appraisal replaces BRANZ Appraisal No. 573 (2007). Amended 05 February 2016. BRANZ Appraisals Technical Assessments of products for building and construction.

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

How-To-build guide timber windows

How-To-build guide timber windows How-To-build guide timber windows What you can build using this guide This guide shows you how to install a factory-made timber casement window into a house with a weatherboard cladding. Casement windows

More information

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

WINDOW INSTALLATION GUIDE

WINDOW INSTALLATION GUIDE WINDOW INSTALLATION GUIDE is not responsible for or liable for any use or misuse of the information contained in this window installation guide. Window Installation Guide This guide provides basic information

More information

K2 STONE NATURAL VENEER

K2 STONE NATURAL VENEER INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin

More information

1.2.1 1.1.8 PRODUCTBLADEN GT ROCKPANEL STRUCTURE

1.2.1 1.1.8 PRODUCTBLADEN GT ROCKPANEL STRUCTURE 1..1 1.1.8 PRODUCTBLADEN SHEETS GT page 1 to 6 Rockpanel Structure is a very durable panel with a lightly textured finish, specially developed for use in cladding, fascia, soffit applications. The basic

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO

300mm. 2mm MIN GAP. PLACE 100mm X 100mm. SO THAT IT IS 38mm INTO INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 2mm MIN GAP IN SHEATHING STEP 1 PLACE 100mm X 100mm PIECE OF P&S IN CORNER SO THAT IT IS 38mm INTO THE OPENING EACH WAY

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description

More information

3. Geberit Pluvia Roof Drainage Systems

3. Geberit Pluvia Roof Drainage Systems 3. Geberit Pluvia Roof Drainage Systems Assortment overview: Pluvia Outlets...52 3.1 Roof outlets... 53 3.1.1 Roof outlets up to 25 l/s...53 3.1.2 Roof outlets up to 100 l/s...55 3.2 Roof outlets for gutters...

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

FLASHCLAD VERTICAL WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 829 [2013] Appraisal No. 829 (2013) Amended 05 February 2016

FLASHCLAD VERTICAL WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 829 [2013] Appraisal No. 829 (2013) Amended 05 February 2016 WEATHERBOARD CAVITY SYSTEM Amended 05 February 2016 BRANZ Appraisals Technical Assessments of products for building and construction. Flashclad Limited PO Box 346 Kaiapoi 7633 North Canterbury Tel: 0800

More information

Steel-framed Walls. Insulation

Steel-framed Walls. Insulation Insulation A4/8 SF AW1192 Issue 4 Nov 2012 Steel-framed Walls Insulation guide Helps achieve a 6-star house energy rating Rigid and flexible Kingspan AIR-CELL solutions available Vapour barrier or vapourpermeable

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

EcoTouch Insulation with PureFiber Technology

EcoTouch Insulation with PureFiber Technology PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri

The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri Determination 2009/103 The compliance of a roof to part of a new house at 28D Rata Street, Oxford, Waimakariri 1. The matters to be determined 1.1 This is a determination under Part 3 Subpart 1 of the

More information

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150 SECTION ONE A. Objective The objective of this guide is to provide Owners and General Contractors/Construction

More information

AMERICAN GOTHIC PLAYHOUSE

AMERICAN GOTHIC PLAYHOUSE AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

LEGACY REPORT. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council RETAINED ON U.S.

LEGACY REPORT. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council RETAINED ON U.S. ICC-ES Legacy Report ER-5043* Reissued March 2004 www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council Legacy report on the 1997 Uniform Building Code DIVISION: 09

More information

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No. Report on Sanctuary/Chancel Crawl Space Inspection St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove Project No. E112056 1. Background St. John in the Wilderness (SJITW) is considering

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength. INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

Description. Outlets Page 62. Contact foil Page 65. Accessories Page 65. Outlets Page 68. Accessories Page 69. Brackets Page 73.

Description. Outlets Page 62. Contact foil Page 65. Accessories Page 65. Outlets Page 68. Accessories Page 69. Brackets Page 73. Pluvia Syphonic roof rainage system Description Outlets Page 62 Pluvia outlets 12 l Contact foil Page 65 Accessories Page 65 Pluvia outlets 25 l Outlets Page 68 Accessories Page 69 Pluvia outlets 45/60/100

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs

INSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions

More information

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame

More information

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS 2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

SINTEF Building and Infrastructure. Contents

SINTEF Building and Infrastructure. Contents Contents Contents... 2 1. Introduction... 3 2. Test Object... 3 3. Test Method... 4 4. Testing... 5 4.1 Hunton Asfalt Vindtett 12 mm... 5 4.2 Hunton Bitroc 15 mm... 5 4.3 Hunton Asfalt Vindtett 25 mm...

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Tunnels & Arches OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 5 Tunnels & Arches V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V Create dry usable space with the original X pattern

More information

RB271 06/07 R807.1 RB272 06/07 R807.1. Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

RB271 06/07 R807.1 RB272 06/07 R807.1. Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN 3. The use of asphalt shingles and other roof coverings has been successful over these composite insulation panels, so the extra details about vapor retarders, etc. can be eliminated. RB271 06/07 R807.1

More information

Installation Instructions

Installation Instructions Installation Instructions Issued: March 10, 2004 GeoDeck Deck and Railing System (ICC-ES Legacy Report No. 21 71, former BOCA Report No. 21 71) Design and Installation Manual Congratulations! You have

More information

December 2013. J-Ply Roofing, Flooring and Decking

December 2013. J-Ply Roofing, Flooring and Decking December 2013 J-Ply Roofing, Flooring and Decking Introduction J-Ply plywood is manufactured in New Zealand by Juken New Zealand Limited (JNL) and marketed by New Zealand Wood Products Limited. The J-Ply

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining Section Timber Frame Walls Single layer between studs Product: Earthwool FrameTherm Rolls and Slabs Tf01 Single layer between studs with service void Product: Earthwool FrameTherm Rolls and Slabs Tf02

More information

Geberit Pluvia. Syphonic roof drainage system. Overview Page 42. Geberit Pluvia outlets 6 l. Geberit Pluvia outlets 14 l

Geberit Pluvia. Syphonic roof drainage system. Overview Page 42. Geberit Pluvia outlets 6 l. Geberit Pluvia outlets 14 l Geberit Pluvia Syphonic roof rainage system Description Overview Page 42 Geberit Pluvia outlets 6 l Outlets Page 43 Contact foil Page 43 Outlets Page 44 Geberit Pluvia outlets 14 l eating element Page

More information

Residential Inspection Guidelines

Residential Inspection Guidelines Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against

More information

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS Introduction This inspection guide is organized to follow the EIF System's Installation Guide.

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM

Interior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer

More information

How to Install Hardwood Flooring Over a Sub Floor

How to Install Hardwood Flooring Over a Sub Floor How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nail fin. Not all window types may be installed into every wall

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

application instructions

application instructions application instructions ARCHITECTURAL COLLECTION PRIMED BOLD PROFILE 120 SERIES LAP SIDING (D5, T4, D8, T5, Q4) General At the time of manufacture, siding meets or exceeds the performance standards set

More information

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >> 12 x 8 Basic Shed This 8 12-ft. shed features a simple

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

L mm. 12 100 M12x1 163.120.11 14 100 M12x1 163.140.11 16 100 M12x1 163.160.11 TECHNICAL DETAILS: - Super strength steel. L mm

L mm. 12 100 M12x1 163.120.11 14 100 M12x1 163.140.11 16 100 M12x1 163.160.11 TECHNICAL DETAILS: - Super strength steel. L mm aw blaes lot an mortise boring bits 163 12 100 M12x1 163.120.11 14 100 M12x1 163.140.11 16 100 M12x1 163.160.11 TECHNCA ETA: - uper strength steel. - 2 HW precision groun cutting eges [Z2]. HW Z2 RH APPCATON:

More information

Detached accessory structures that contain no conditioned floor area are exempt.

Detached accessory structures that contain no conditioned floor area are exempt. RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of

More information

Important Information for Installer & Homeowner

Important Information for Installer & Homeowner Important Information for Installer & Homeowner Homeowner: Please keep this information for your records, do not discard! Installation Instructions for Wood Frame Construction Replacement (See other side

More information

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.

DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board installation guide Substrate and ceramic tile installation for walls, floors, countertops and wall shields. DUROCK Brand Cement Board... Strength beneath the surface A ceramic

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

Module 3.7. Thermal bridging

Module 3.7. Thermal bridging Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems

Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology Modern Efficient Performance Cost Effective Flat Roofing Systems Introduction A complete range of Memtec Roofing and Waterproofing Single

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar

DuPont Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar Tyvek ThermaWrap R5.0 Installation Guidelines for New Construction Using Stone Veneer or Lap Siding, e.g. Fiber Cement and Wood/Cedar VERSION 1/16 FOR SINGLE FAMILY HOMES AND LOW-RISE MULTI-FAMILY BUILDINGS

More information

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006)

INSTALLATION INSTRUCTIONS for Vinyl Patio Doors with Integral Nailing Fin (JII006) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl Patio Doors with nailing fin. Any local building code requirements supersede the recommended

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information