1 Scheme: Enterprise Architect Prepared by: SSEPD Approved by: SSEPD Issue Date: 30/07/2012 Review Date: N/A 1 of 36

2 Contents 1 Introduction Purpose Orkney Active Network Management (ANM) Use Case Model Orkney ANM Use Case Model High Level Apply for new Connection Connect to Network Monitor Network & Control Generation Maintain ANM System Orkney ANM Application Use Cases Request Budget Estimate/Feasibility Study Request Formal Quotation Prepare Constraint Analysis Accept Formal Offer Orkney ANM Connection Use Cases Plan Work Procure Hardware Undertake Distribution Work Orkney ANM Monitor and Control Use Cases Assess Network Power Flow Monitor NNFGs Monitor Current and Voltage Control NNFG Output Maintain Set Point Signals Raise Alarm Trip NNFG Turn NNFG On/Off Turn ANM On/Off Orkney ANM Maintenance Use Cases Manage Customer Pay Annual Subscription Configure ANM System Update SCADA Screens Undertake Network Maintenance Upgrade ANM Software Orkney ANM Business Process Model Apply for New Connection Connect to Network Monitor Network & Control Generation Assess Network State and Update NNFG Constraints Maintain ANM System Orkney ANM Class Model Orkney ANM State Machine Diagrams Orkney Generator Control Orkney Zone Boundary Control Orkney RPZ ANM Sequence Diagrams Orkney RPZ ANM Curtailment/Release Cycle Orkney ANM Component Model Orkney ANM Deployment Model of 36

3 1 Introduction The ability of the distribution network in the Orkney Islands to accept new renewable generation connections above 50kW became restricted by the capacity of the twin 33kV submarine cable circuits connecting to the Scottish mainland. At times of minimum demand on Orkney, the rated output of the existing Orkney generators accounted for all available export capacity. Under conventional network planning practice, the connection of further generation on Orkney would have required reinforcement of the submarine cables to the mainland grid by providing a third circuit. Additional generation connection capacity, beyond the firm limit (Firm Generation - FG) has previously been made available under non-firm (Non Firm Generation - NFG) arrangements utilising inter-tripping arrangements to disconnect these generators in the event of loss of either of the 33kV submarine cables from Orkney to the UK mainland if the total Orkney export exceeds the capacity of lowest-rated cable. This method enabled 21MW of additional generation capacity to be realised, but this has also been fully taken up by contracted generators. The development and deployment of an Active Network Management (ANM) scheme by Scottish Hydro Electric Power Distribution plc (SHEPD) working with the University of Strathclyde and Smarter Grid Solutions Ltd (SGS) has delivered an innovative means of facilitating further generator connections without expensive reinforcement of the network. Under this scheme, new generators (New Non Firm Generation NNFG) are instructed by automated controls to limit their power output to avoid breaching constraint limits on the electrical distribution network. The capacity available to these generators is derived from real-time network measurements, and depends on the level of the local electricity demand on Orkney and the output from generation. Existing generators are unaffected by the introduction of the ANM scheme. The Future Networks and Policy Department of Scottish & Southern Energy Power Distribution plc (SSEPD) recognised the potential benefits of introducing business and systems analysis modelling techniques to capture an understanding of the project scope and to clearly communicate business requirements and technical solutions. SSE reviewed the marketplace and selected Enterprise Architect from Sparx Systems to facilitate the creation, storage and dissemination of the models. Enterprise Architect supports Unified Modelling Language 1 (UML) and Business Process Modelling Notation 2 (BPMN) and is widely used in the software development industry. UML is used to specify, visualise, construct and document features of a business system. BPMN diagrams articulate the internal business procedures and provide a step-by-step workflow that can be readily understood and communicated to interested parties. 2 Purpose The purpose of this document is to provide the details of the models that have been prepared for the Orkney ANM solution and were used to support the Britain s First Smart Grid: Sharing the Knowledge event held in London on the 18 th May The aim of the event was to provide an opportunity for participants to learn interactively from the experience of developing the Orkney Active Network Management scheme. The material is intended to provide information on the commercial and technical aspects of setting up and operating an ANM scheme. Further information on Enterprise Architect and tutorials on the models within this document can be found on the Sparx website ( 1 Ref for more information 2 Ref for more information 3 of 36

4 3 Orkney Active Network Management (ANM) Use Case Model 3.1 Orkney ANM Use Case Model High Level Use case diagrams are used to model user/system interactions. They define behaviour, requirements and constraints in the form of scripts or scenarios. Further information can be obtained from the Sparx EA website ( The ANM scheme starts with the Customer requiring a new connection. The Major Connections Contracts Department process this application and ask the Distribution and Generation Network Planning Team to provide costs and SGS to provide estimated levels of power generation constraint. If a connection offer is accepted the Distribution Major Projects Team will contact the Customer and schedule the required distribution works. Once the required works and generators are in place the ANM system will be configured by SGS to include the new generation. Once operational the new generation will be constantly sent messages to control the generation output levels in accordance with rules of the ANM system. The network control engineers receive real time information on the ANM system through the SCADA system. They can override the ANM system if required. The ANM system is supported and maintained by the ANM provider SGS. 4 of 36

5 3.1.1 Apply for new Connection The Major Connections Contracts (MCC) Department of SHEPD manages the contractual arrangements for new connections to the network. New generation connections to the Orkney network above 50kW can only be added as New Non Firm Generation (NNFG). This is because the Firm Generation group (FG) and Non Firm Generation (NFG) group have been fully allocated. Before applying for connection the NNFG Customer must already have planning permission. A nonbinding, constraint analysis report is created and issued as part of a connection offer, which estimates the constraint level that the Customer might experience. For further information about the current connection process please visit Connect to Network Once an offer for connection has been accepted the Customer will be contacted and a project manager will be appointed in SHEPD to coordinate activities within SHEPD and with the Customer. The Customer has a responsibility to comply with the progression clauses of the contract; otherwise the contract can be terminated. All associated distribution and communications works are undertaken to enable the new generation to be connected and integrated into the ANM scheme. It is the responsibility of the Customer to provide the communications link from the NNFG site to the ANM scheme in Kirkwall. Use Case Pre-Condition: Customer has successfully passed through the application process. An application has been received and accepted Monitor Network & Control Generation The Orkney ANM scheme is divided into zones and the boundary of a zone is defined when the total output of the generation within the zone less the minimum electricity demand of the supply customers within the zone is capable of exceeding the rated thermal capacity of the distribution network at that location. The boundaries of each zone are thermal constraint points which are monitored so that the ANM scheme receives real-time measurements of current (and voltage) from these locations. The ANM scheme is not required to know the separate values of demand and supply on the network, but obtains real time measurements of the power flow at these constraints points and monitors the output from the NNFGs. NNFG generators are constrained in accordance with the priority stack which defines the order in which they will be curtailed whenever the level of power flow in a zone breaches a threshold level in that zone or in an associated zone Maintain ANM System The ANM scheme is maintained which includes the addition of further NNFG generation, changes to the supporting software and hardware and any network maintenance. 5 of 36

6 3.2 Orkney ANM Application Use Cases Request Budget Estimate/Feasibility Study The Customer makes a request for a budget estimate or feasibility study. For further information about the current connection process please visit Request Formal Quotation Customers can request a formal quotation for connection to the network providing they have planning consent. As part of the formal quotation process, an estimated constraint analysis report is created by SGS and forms part of the offer. This supersedes any constraint analysis reports that may have been created previously. Use Case Pre-Condition: The Customer must have planning permission before applying for connection Prepare Constraint Analysis An analysis of the present network configuration, typical power flow levels and proposed generator capacity is conducted and the results are summarised into an estimate of the typical level of constraint that a Customer might experience at that location and at that point in time Accept Formal Offer Following application and SHEPD processing, the Customer will be provided with a formal offer for the connection. The Customer must formally accept the offer before any works can go-ahead. Use Case Pre-Condition: The Customer must accept a formal quotation within 30 days. 6 of 36

7 3.3 Orkney ANM Connection Use Cases Plan Work All work orders are added to the planning schedule in the project management system (PROMIS). If any work order does not go ahead it is cancelled. For further information about the current connection process please visit Use Case Pre-Condition: The application must have been accepted before Distribution Major Projects can contact the Customer to arrange planning for connection. Use Case Post-Conditions: Following this planning work, the Customer and Distribution Major Projects will have an arranged date for connection Procure Hardware For the connection of a new NNFG all the required hardware components are procured ready for installation on the network and at the Customer site Undertake Distribution Work A project manager will coordinate activities between the various SHEPD departments and the Customer and ensure progress in accordance with the contract. Once the Customer and SHEPD installations are complete the system can be jointed, tested and commissioned for 7 of 36

8 operational use. This includes physical connection, commissioning and integration into the SHEPD SCADA system. Use Case Pre-Condition: This work is scheduled in the PROMIS system by Distribution Major Projects in an initial planning session with the Customer, following acceptance of an application. 8 of 36

9 3.4 Orkney ANM Monitor and Control Use Cases Assess Network Power Flow The ANM system continuously reads the latest information on the network power flow at the monitoring points and determines the correct set point (maximum permitted output level) for each NNFG associated with that zone. Various 'alarms' (information messages) are raised and sent to the SCADA System for the attention of the network control engineer Monitor NNFGs The ANM scheme monitors the status of all NNFGs. If a communication failure from the NNFG is detected, the NNFG reverts itself to a predetermined 'out of service' set point. 9 of 36

10 3.4.3 Monitor Current and Voltage The ANM system monitors current and voltage levels at the monitoring points. Each monitoring point has a number of thresholds designed to ensure the safety of the network. If the communications is lost to the measurement point, the ANM scheme has no information about the power flow in that zone. Therefore, all NNFGs in the zone and associated zones must be instructed to run at their 'out of service' set point Control NNFG Output Monitoring point information is assessed against its threshold values and the generation levels (set point) for all associated NNFGs are calculated and continuously sent to each NNFG. Each NNFG can have different rates at which their generation levels can be increased or decreased and over different time intervals. Various 'alarms' (information messages) are raised and sent to the SCADA system for the attention of the network control engineer Maintain Set Point Signals The ANM system constantly sends set points to all NNFG. The set point consists of a numerical value, measured in pu (per unit). For example, a set point of 0.8 pu instructs an NNFG to limit its output to 80% of its maximum. Each installation can have different set points Raise Alarm Various 'alarms' (information messages) are raised and sent to the SCADA system for the attention of the network control engineer. The following situations are flagged as alarms and action may be required: 1. Generation not responding 2. Generation trim in progress 3. Generation forced trim 4. System emergency Overload Trip 5. DAR in progress 6. Generation holds off 7. Communications fail 8. PLC fault 9. Stabilised (Ready for set point) Trip NNFG A trip instruction is used to ensure network safety and stops a NNFG generating power onto the local distribution network. Any loss of communications between the ANM system and the NNFG is detected by the ANM equipment at the NNFG site and it reduces the output of the NNFG to a pre-defined 'out of service' level. If the power flows on the network rise at a level where it cannot respond adequately by issuing reduced set points then the NNFG in that zone or all associated zones will be tripped. Furthermore, if an NNFG fails to reduce output to its set point level within a predefined time the ANM system will issue a trip instruction to the NNFG Turn NNFG On/Off The DNO have a facility to turn-on or off an NNFG from the SCADA system. This may be required for emergency or network maintenance purposes. When turning off an NNFG in this manner, the circuit breaker at the substation is opened and the NNFG is no longer connected to the network. 10 of 36

11 3.4.9 Turn ANM On/Off The DNO have a facility to turn the whole ANM system on or off from the SCADA system. 11 of 36

12 3.5 Orkney ANM Maintenance Use Cases Manage Customer The Major Connections Contracts department will inform the Customer of any planned, unplanned or emergency interruptions to their service. They will also request the annual subscription Pay Annual Subscription The NNFG Customers are required to pay an annual subscription fee. This is paid at the start of the first year of commissioning and annually thereafter Configure ANM System The Orkney ANM scheme will facilitate the addition of NNFGs. The Orkney Isles power network is divided into zones defined by the constraint points. As new generation sources are connected to the Orkney power network, new constraint points (new zones) may emerge in places where there were no previous issues. 12 of 36

13 3.5.4 Update SCADA Screens The interface to the SCADA system will be modified when required Undertake Network Maintenance There will be periods when the electricity distribution network will undergo repair and maintenance works. This could be for emergency, planned or unplanned purposes. Planned network maintenance requires 5 days notice Upgrade ANM Software The software components may require changing or upgrading; therefore there will need to be a change configuration and management process system to enable component and software upgrades. 13 of 36

14 4 Orkney ANM Business Process Model The Customer applies for a new connection and following receipt of an offer can decide to continue and request the connection or stop. Once connected through the NNFG process the Customer will be monitored and their generation will be controlled. The Customer may be further impacted by the addition of new NNFG, network maintenance and maintenance of the ANM system. 4.1 Apply for New Connection Apply for New Connection New generation connections to the Orkney network above 50kW can only be added as New Non Firm Generation (NNFG). This is because the Firm Generation group (FG) and Non Firm Generation (NFG) group have been fully allocated. As new generation Customers are connected as NNFG, they can only connect following their agreement with the ANM contract and constraint policy (Principles of Access (PoA)). 14 of 36

15 15 of 36

16 The above diagram broadly describes the business process for New Non Firm Generation (NNFG) connections to the Orkney network. For further information about the current connection process please visit Connect to Network Connect to Network Connecting an NNFG to the network involves distribution works, communications, electrical protection equipment, commissioning and safety sign off. 16 of 36

17 17 of 36

18 The above diagram broadly describes the business process for New Non Firm Generation (NNFG) connections to the Orkney network. For further information about the current connection process please visit Monitor Network & Control Generation Monitor Network & Control Generation The monitoring point data is constantly assessed to determine NNFG output in accordance with the operation of the ANM scheme. The Network Management Centre of SHEPD is responsible for network safety and any faults in the ANM system will be investigated and resolved. 18 of 36

19 19 of 36

20 Read Measurement Point Data The ANM system polls the monitoring points at regular pre-defined intervals. Store Measurement Point Data The ANM system stores the data received from the monitoring points. This data is used by the ANM control algorithms to determine the appropriate control of the generation output levels (set points) of the associated generators. If there is a communications failure or the data is not within reasonable bounds to be relied upon then this will trigger a safety response and the associated NNFG will be tripped. Read NNFG Generation Data The ANM system polls the NNFG at regular pre-defined intervals. Store NNFG Generation Data The ANM system stores the data received from the NNFG. Perform Controlled Ramp Down When the ANM scheme instructs an NNFG to trip, the NNFG undergoes an immediate controlled ramp down and stops the export of power onto the network. Restrict Output as per Set Point The ANM scheme maintains a current set point level for each NNFG which is conveyed as an analogue signal between 0 and 20 ma. The set point consists of a numerical value, measured in pu (per unit). For example, a set point of 0.8 pu instructs an NNFG to limit its output to 80% of its maximum. Each installation can have different set points. When reducing the output from an NNFG, the set point is calculated and reduced to the precise level required. Store ANM Data Data from the ANM system is sent to the SCADA system and subsequently to reporting data repository, PI North. This data is subsequently used in analyse to support reporting requirements and governance to ensure the NNFG operators are operating within the terms of their contractual agreements and to ensure the ANM system is operating appropriately. Inform DNO Shift Leader of Alarm Signals are sent to the SCADA system as follows: 1. Generation not responding 2. Generation trim in progress 3. Generation forced trim 4. System emergency Overload Trip 5. DAR in progress 6. Generation holds off 7. Communications fail 8. PLC fault 9. Stabilised (Ready for set point) These may require operator attention. 20 of 36

21 Process Alarm Appropriate action will be undertaken in response to the alarms raised by the ANM system Assess Network State and Update NNFG Constraints Assess Network State and Update NNFG Constraints The ANM scheme requires active data from the monitoring points. These points are organised in zones according to 'pinch' points on the network. The ANM scheme will have a configurable set of threshold levels for each zone and uses the power flow data to actively control the NNFG units as and when the power flow breaches these threshold levels. The priority stack defines the order in which the NNFG will have their generation capacity constrained (trimmed). The thresholds at the network monitoring points are constrained (trim signal), sequentially tripped (turned-off one by one in a zone) and globally tripped (all NNFG in the zone turned-off). When power levels breach the trim threshold the lowest NNFG in the priority stack is constrained first. If power levels at the monitoring points rise too rapidly then the NNFG will be sequentially or globally tripped to ensure network safety. Read Monitoring Point data Real time data from the monitoring points is accessed. If no data is available then this will trigger an error. The state of the network cannot be confirmed and all NNFG in that zone will be tripped; this will be a Global Trip in that zone and associated zones. Assess Monitoring Point data against Threshold Reference data for the monitoring point is accessed and whether the real time data has breached a threshold. An assessment will be made as to the scale of the breach. If the lower threshold has been met then any existing constraint will be lifted. There will be either a breach of an upper threshold, lower threshold, no breach, or no current data. Identify NNFG & Power level instructions This will identify all the associated NNFG in the affected zones and their order in the priority stack. It will then send 21 of 36

22 a message to all the NNFG. If it is a breach of a 'trim' threshold then there will need to be a calculation of the required power outputs for the associated NNFG. Calculate Power level In the case of a breach of a trim threshold the NNFG will be constrained to meet the safe levels of the network and in accordance with their respective position on the priority stack. Issue Trim instruction Constraint instructions are sent according to priority stack. This will be between 0 and 1. Issue Sequential Trip instruction Where power levels are rising too rapidly to allow constraints to be issued and actioned then the NNFG will be sequentially tripped in that zone in accordance with priority stack (LIFO) position. Issue Global Trip instruction If power levels are rising too rapidly to allow constraints or sequential trips to be actioned then a global trip will be issued that will immediately constrain all NNFG to ensure network safety. Issue Reset instruction Following constraint or trip instructions the affected NNFG in that zone will be unconstrained once the network safety levels have been restored. 4.4 Maintain ANM System Maintain ANM System Maintenance of the ANM system involves updating the software configuration of the ANM system, upgrading the software version, and planning and undertaking network maintenance that impacts the ANM system. 22 of 36

23 23 of 36

24 Request Subscription Customers will be contacted annually for their subscription payments. Subscriptions are collected on the first and subsequent anniversaries of the connection date. Make Payment The NNFG Customer will make payment in accordance with the terms and conditions of the contractual agreement. Process Payment The payment will be received and cleared in accordance with internal processes and procedures. Undertake Network Maintenance There will be periods when the electricity distribution network will undergo maintenance. This could be for emergency, planned or unplanned purposes. Planned network maintenance requires a notice period. Contact Customer The Major Connections Contracts department will contact the Customer in the event of any planned or unplanned maintenance work that affects their installation. A notice period is required for any planned maintenance work. Emergency work requires no notice period. SHEPD will endeavour to minimise the impact on Customers as much as possible and give as much notice as practical. When a new NNFG is being added to the scheme then the existing NNFG will be put into an 'out of service' state temporarily to enable them to be added. Analyse Issue There will be a change release process that will manage requests for change (RFC) to the system. In the case of emergency maintenance a temporary solution may be put in place to allow a longer term solution to be applied at a later date. Issues and RFCs will be prioritised and will require some initial analysis to identify their respective impact and importance. Request System Access There will be no direct access to the ANM system for the 3rd party supplier (SGS). This must be pre-arranged and agreed with SHEPD. Process System Access Request A request for access to the ANM system is received from the 3rd party supplier (SGS) and processed in accordance with internal procedures and security protocols. Undertake Maintenance/Changes The 3rd party supplier (SGS) will undertake the required changes in an appropriate manner in accordance with the change release process. Remove System Access Once the changes have been successfully implemented then system access to the 3rd party supplier will be removed in accordance with internal procedures and security protocols. Document & Request Changes Changes to the network may result in changes to the SCADA system, in which case a switching schedule will be 24 of 36

25 required. Undertake SCADA Changes Changes will be made in accordance with internal procedures and documentation. Decommission Unit In the event that a NNFG is decommissioned then it will be removed from the ANM scheme and the system will continue to operate in accordance with the rules and principles of access (PoA) for the remaining NNFG. Test, Commission and Deploy Changes System changes are tested and applied to the production environment in accordance with internal change release process. 25 of 36

26 5 Orkney ANM Class Model Class or Structural diagrams define the basic building blocks of a model: the types, classes and general materials used to construct a full model. Further information can be obtained from the Sparx EA website Generator Configuration is part of a Generator that allows it to operate within the ANM system. A Generator is associated to one to twenty Measurement Points by a Zone Boundary Link. A Generator and Measurement Point has one or many Generator Releases. A Measurement Point Status, Threshold Persistence, Post Action Response and Measurement Point Configuration are part of a Measurement Point. Generator The class represents data associated with the real time operation of NNFGs. It includes status data and the position of the NNFG in the priority stack. Generator Configuration The class acts as a container for configuration data associated with a Generator. 26 of 36

27 Generator Release The class acts as a container for data relating to the release of a curtailed generator. Measurement Point The class represents parameters related to the real time operation of a Measurement Point. Measurement Point Configuration The class represents the configuration data relating to a Measurement Point. Measurement Point Status The class acts as a container for the data related the status of a measurement point. Post Action Response The class represents configuration data associated with the response of the ANM scheme after action to mitigate conditions at the Measurement Point. Threshold Persistence The class acts as a container for threshold configuration data for a Measurement Point. Zone Boundary Link The class acts as a container for the position in the Priority Stack for a given generator with respect to a given zone. 27 of 36

28 6 Orkney ANM State Machine Diagrams State Machine diagrams are essential to understanding the instant to instant condition, or "run state" of a model when it executes. Further information can be obtained from the Sparx EA website The Generator Control undergoes the following states. At the start the Generator is out of service and can go to initialising then idling and connecting to the network. Once stabilised the Generator will start generating. It will receive output control levels and can be constrained (Unloading). The Generator can have the circuit breaker tripped whilst connecting or during constraint. Once the circuit breaker is tripped it can have the circuit breaker reclosed to connect to the network again. The Generator can also be put into and out of service state during initialising, idling, constrained or unconstrained generation e.g. communications failure at the site. 6.1 Orkney Generator Control 28 of 36

29 CIRCUIT BREAKER RECLOSING This state represents the reclosing of the metering circuit breaker after a trip due during Connecting or Unloading. GENERATING This state represents the NNFG being normal generating mode of operation. GOING OUT OF SERVICE This state represents the NNFG going Out of Service. INITIALISING This state represents the initialisation of the NNFG controller. OUT OF SERVICE This state represents the NNFG being Out of Service. STABILISING This is an intermediate state between connecting and generating. The NNFG controller remains in this state until the stabilising timer has expired. TRIPPING CIRCUIT BREAKER This state represents the tripping of the local metering breaker due to the generator output being above 2% whilst in the Connecting state or the Unloading state after the unloading timer has expired. UNLOADING The Unloading state represents the NNFG reducing its output to a predefined level. Final Final State Initial Initial State 29 of 36

30 6.2 Orkney Zone Boundary Control The Zone Boundary Control (Monitoring Points) undergoes the following states. At the start it is initialised and at a normal state. It will go into a trim state if the power flow is greater than the trim threshold. If the power flow is then less than the reset threshold it will move to reset and then back to normal. It can also move from a trim state to a sequential trip state if the power flow is greater than the sequential trip threshold; or a global trip state if the power flow is greater than the global trip threshold. It can then be reset and back to normal from both states if the power flow is less than the reset threshold. It can also move straight to sequential trip or global trip from normal if the power levels are greater than the respective thresholds. Global Trip This state represents the highest severity action in the ANM Scheme's escalating actions. All participating generators in the zone are immediately tripped. 30 of 36

31 Normal This state represents normal operating conditions. Flows at the measurement points are below the "Trim", "Sequential Trip" and "Global Trip" limits. All generation participating in the scheme is not curtailed. Reset This state represents the release of the curtailment for all curtailed/tripped generators within the zone after the zone export has dropped below the reset limit. Sequential Trip The Sequential Trip state represents the scheme entering the second highest set of actions in the ANM Scheme's set of escalating actions. Zone generation is tripped based on the priority stack (LIFO) sequence. Trim This state represents the first action in a set of potentially escalating actions. In this state the ANM scheme curtails generators in the zone based on the priority stack and priority stack (LIFO) principles of access after export from the zone has breached the "Trim" limit. 31 of 36

32 7 Orkney RPZ ANM Sequence Diagrams Sequence diagrams are closely related to communication diagrams and show the sequence of messages passed between objects using a vertical timeline. Further information can be obtained from the Sparx EA website Orkney RPZ ANM Curtailment/Release Cycle This Sequence Diagram details the interactions between scheme components for a normal curtailment/release cycle. 32 of 36

33 8 Orkney ANM Component Model Component diagrams are used to model higher level or more complex structures, usually built up from one or more classes, and providing a well defined interface. Further information can be obtained from the Sparx EA website The ANM system comprises of SG Core and a Communications Hub that receives signals from Measuring Devices and the NNFG controller. A Programmable Logic Controller is a type of NNFG controller. The ANM system sends alarms to the SCADA system in Perth; PI North records the history of the network status. The Measuring Device is associated with a substation where an RTU is installed that sends signals to FEP in Aberdeen and onto the SCADA system in Perth. 33 of 36

34 Measurement Device Network Measurement Units (NMUs) located at critical measurement points on the Orkney network providing power flow information. NNFG Controller PLC units located at each NNFG site. The NNFG PLC receives the signals from the ANM NNFG control system located at Kirkwall and monitors the response of the renewable generator via the generator RTU. SG Core SG Core is the real-time power flow management application and contains the algorithms which are run by this PLC (or server) unit to manage devices in the ANM Scheme. Comms Hub Comms Hub acts as the field data aggregator, protocol converter and gateway for subscribing systems and subsystems. The Hub provides the interface to and from the ANM system and enables the integration with the ANM controlled devices and the SHEPD, SCADA system. FEP FEP connects an outstation piece of equipment such as a RTU unit to the centralised SCADA components. FEP typically runs on Windows and runs OPC server. The FEP time stamps each piece of data when it arrives at the FEP. PI North PI North is a data historian system that stores SCADA transactions and monitoring data for the northern distribution and transmission networks ENMAC North ENMAC is a Supervisory Control and Data Acquisition (SCADA) system manufactured by General Electric (GE). ENMAC North is the deployment of the system used to support the NMC in Perth to manage and monitor the SHEPD distribution networks in the North of Scotland. 34 of 36

35 9 Orkney ANM Deployment Model Deployment diagrams show the physical disposition of significant artifacts within a real-world setting. Further information can be obtained from the Sparx EA website 35 of 36

36 CB Control Circuit Breaker Control. Data Mapping Data Mapping between CommsHub and Generator Controller HMI Control Control for the HMI on site. In and Out of Service In and Out of Service control logic. NNFG Control NNFG control logic, as described in the Generator Control state machine. NNFG Watchdog Timer Watchdog timer for monitoring the health of NNFG controllers. CommsHub Watchdog Monitors the CommsHub Watchdog timer to monitor health of communications with CommsHub. Data Mapping Data mapping between CommsHub and Measurement Point. Measurement Point Scaling Scales and processes Measurement Point data. Measurement Point Watchdog Timer Measurement Point Watchdog timer. This is used to check the health of communications between the Measurement Point and CommsHub. 36 of 36

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution

More information

Substation Automation based on IEC 61850

Substation Automation based on IEC 61850 Substation Automation based on IEC 61850 Ivan De Mesmaeker 1, Peter Rietmann, Klaus-Peter Brand, Petra Reinhardt ABB Switzerland Ltd. (Switzerland) Introduction The more than 4000 Substation Automation

More information

UML TUTORIALS THE COMPONENT MODEL

UML TUTORIALS THE COMPONENT MODEL UML TUTORIALS THE COMPONENT MODEL www.sparxsystems.com.au Sparx Systems 2004 Page 1/5 The component model illustrates the software components that will be used to build the system. These may be built up

More information

Monitoring & Control of Small-scale Renewable Energy Sources

Monitoring & Control of Small-scale Renewable Energy Sources Small Scale Renewable Energy Sources and Energy Saving: 6-17 th July 2009 Monitoring & Control of Small-scale Renewable Energy Sources Dr G A Taylor Brunel Institute of Power Systems Brunel University,

More information

NEW CABLE? - Understanding the cost to connect renewable generation in Orkney

NEW CABLE? - Understanding the cost to connect renewable generation in Orkney New Holland, Holm 500kW Partner of Choice in Mid-Size Wind NEW CABLE? - Understanding the cost to connect renewable generation in Orkney Hammer, Westray 500kW Colin Risbridger Windflow UK Development Manager

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2

More information

Flexible Urban Networks Low Voltage Integration of IT systems to facilitate the planning and operation of LV networks (SDRC 9.3)

Flexible Urban Networks Low Voltage Integration of IT systems to facilitate the planning and operation of LV networks (SDRC 9.3) Flexible Urban Networks Low Voltage Integration of IT systems to facilitate the planning and operation of LV networks (SDRC 9.3) Contents Executive Summary... 5 1. Introduction... 7 1.1 Background... 7

More information

SCADA Systems Automate Electrical Distribution

SCADA Systems Automate Electrical Distribution SCADA Systems Automate Electrical Distribution PC-based supervisory control and data acquisition systems increase uptime, cut costs and improve utilization. A White Paper from InduSoft Fabio Terezinho

More information

New Supervisory Control and Data Acquisition (SCADA) Based Fault Isolation System for Low Voltage Distribution Systems

New Supervisory Control and Data Acquisition (SCADA) Based Fault Isolation System for Low Voltage Distribution Systems International Conference on Computer and Communication Engineering (ICCCE 2010), 11-13 May 2010, Kuala Lumpur, Malaysia New Supervisory Control and Data Acquisition (SCADA) Based Fault Isolation System

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories: Filed: September 0, 00 EB-00-0 Tab Schedule Page of OPERATIONS CAPITAL.0 INTRODUCTION Operations Capital funds enhancements and replacements to the facilities required to operate the Hydro One Transmission

More information

Active Network Management Good Practice Guide

Active Network Management Good Practice Guide Active Management Good Practice Guide Active Management Good Practice Guide ENA Members Copyright Baringa Partners LLP 2015. All rights reserved. Confidentiality and Limitation Statement This document:

More information

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist SCADA The Heart of an Energy Management System Presented by: Doug Van Slyke SCADA Specialist What is SCADA/EMS? SCADA: Supervisory Control and Data Acquisition Retrieves data and alarms from remote sites

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

ATTACHMENT G. Network Operating Agreement

ATTACHMENT G. Network Operating Agreement ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service

More information

Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System)

Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System) Design and Implementation of SCADA System Based Power Distribution for Primary Substation ( Monitoring System) Aye Min Zaw 1, Hla Myo Tun 2 Department of Electronic Engineering, Mandalay Technological

More information

Monitor electricity supply power network system

Monitor electricity supply power network system Page 1 of 5 Monitor electricity supply power network system Level 4 Credits 10 Purpose People credited with this unit standard are able to: continuously monitor power supply trends, communication, and

More information

Industrial IT for Substation Automation & Protection

Industrial IT for Substation Automation & Protection Industrial IT for Substation Automation & Protection Exploit the potential of ABB substation automation Improve your performance In view of the increasingly competitive arena where power providers are

More information

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission

More information

ACTIVE NETWORK MANAGEMENT (ANM) TECHNOLOGY Current Technology Issues and Identification of Technical Opportunities for Active Network Management

ACTIVE NETWORK MANAGEMENT (ANM) TECHNOLOGY Current Technology Issues and Identification of Technical Opportunities for Active Network Management ACTIVE NETWORK MANAGEMENT (ANM) TECHNOLOGY Current Technology Issues and Identification of Technical Opportunities for Active Network Management CONTRACT NUMBER: DG/CG/00104/00/00 CURRENT TECHNOLOGY ISSUES

More information

Customer Engagement Plan Underground Cable Overlay Cost Reduction Project NIA_SSEPD_0014

Customer Engagement Plan Underground Cable Overlay Cost Reduction Project NIA_SSEPD_0014 Customer Engagement Plan Underground Cable Overlay Cost Reduction Project NIA_SSEPD_0014 Version and Change Control Document Owner(s) Timoleon Manolopoulos Avril Vera-Leon Project/Organisation Role Project

More information

Low Carbon Networks Fund Screening Submission Pro-forma

Low Carbon Networks Fund Screening Submission Pro-forma Notes on completion Before completing this form, please refer to the LCN Fund Governance Document. Please use Verdana font size 10 in your submission, the text entry areas are predetermined and should

More information

NETWORK MONITORING. Network Monitoring. Product brief. NETWORK MONITORING Logger Only

NETWORK MONITORING. Network Monitoring. Product brief. NETWORK MONITORING Logger Only Network Monitoring 1 Network Monitoring Product brief Logger Only CONTENTS 1 Page 1. Introduction 2-3 2. Network Structure 4 3. Data Collection 5 4. Data Visualisation 6 5. Dashboard 7 6. Alarm Management

More information

UML TUTORIALS THE USE CASE MODEL

UML TUTORIALS THE USE CASE MODEL UML TUTORIALS THE USE CASE MODEL www.sparxsystems.com.au Sparx Systems 2004 Page 1/5 describes the proposed functionality of the new system. A Use Case represents a discrete unit of interaction between

More information

16 West Coast Regional Plan

16 West Coast Regional Plan 16 West Coast Regional Plan 16.1 Regional overview 16.2 West Coast transmission system 16.3 West Coast demand 16.4 West Coast generation 16.5 West Coast significant maintenance work 16.6 Future West Coast

More information

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks

SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks SCADA Controlled Multi-Step Automatic Controlled Capacitor Banks & Filter Banks Introduction SCADA (Supervisory Controlled and Data Acquisition) controlled multi-step metalenclosed automatic capacitor

More information

Implementation of a New Substation Restoration System Using Protective Relays and a Logic Processor

Implementation of a New Substation Restoration System Using Protective Relays and a Logic Processor Implementation of a New Substation Restoration System Using Protective s and a Logic Processor BERNARD S. TATERA, JR. Pacific Gas & Electric Company San Francisco, California Bst1@pge.com LAWRENCE C. GROSS,

More information

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0

More information

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers

More information

NIA Project Registration and PEA Document

NIA Project Registration and PEA Document Date of Submission April 2015 NIA Project Registration and PEA Document Notes on Completion: Please refer to the appropriate NIA Governance Document to assist in the completion of this form. The full completed

More information

of The New England Water Works Association

of The New England Water Works Association Journal Our 132nd Year of The New England Water Works Association Volume 127 No. 2 June 2013 PUTNAM WATER TREATMENT PLANT AQUARION WATER COMPANY OF CONNECTICUT GREENWICH, CONNECTICUT New England Water

More information

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT

PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT PATTERN MATCHING OF LIVE DATA TO IMPLEMENT PROACTIVE NETWORK MANAGEMENT Eur Ing Steve Mustard, Product Manager, LogicaCMG Dr Mark Thornton, Solutions Director, Helveta Abstract Supervisory Control And

More information

Clarity Assurance allows operators to monitor and manage the availability and quality of their network and services

Clarity Assurance allows operators to monitor and manage the availability and quality of their network and services Clarity Assurance allows operators to monitor and manage the availability and quality of their network and services clarity.com The only way we can offer World Class Infocomm service is through total automation

More information

CLASS Voltage Regulation Scheme. 27 February 2014

CLASS Voltage Regulation Scheme. 27 February 2014 CLASS Voltage Regulation Scheme 27 February 2014 Functional Specifications and Voltage Regulation Scheme for the Autonomous Substation Controllers (ASCs) Date: 27 February 2014 Page 2 of 26 Table of Contents

More information

ADMS(Advanced Distribution Management System ) in Smart Grid

ADMS(Advanced Distribution Management System ) in Smart Grid ADMS(Advanced Distribution Management System ) in Smart Grid 柯 佾 寬 博 士 Yi-Kuan Ke, Ph.D. 2014/03/28 Smart Grid Solution Smart Grid Solution Overview Smart Grid Solutions Smart Network Operation - Distribution

More information

Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948

Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948 SMARTER GRID AND SMARTER STORAGE HOW DO BUSINESS AND TECHNOLOGY MEET? Anthony Price Swanbarton Limited, Dairy Farm, Pinkney, Malmesbury, Wiltshire, SN16 0NX Telephone +44 1666 840948 Introduction The technical

More information

Executive summary 2. 1 Introduction 4

Executive summary 2. 1 Introduction 4 Flexible Networks for a Low Carbon Future Future Network Monitoring Strategy September 2015 Contents Executive summary 2 Glossary 3 1 Introduction 4 2 Fundamental principles of monitoring 5 2.1 LCT monitoring

More information

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy GE Energy Digital Energy GENe Software Suite Today s utilities have complex requirements that need sophisticated solutions. GE Energy s GENe provides these solutions. Using the latest advances in technology,

More information

Performance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals

Performance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals traffic systems and signing TR 2503 Issue B February 2006 Performance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals Crown Copyright 2005 First published 2005 Printed and

More information

Testing Intelligent Device Communications in a Distributed System

Testing Intelligent Device Communications in a Distributed System Testing Intelligent Device Communications in a Distributed System David Goughnour (Triangle MicroWorks), Joe Stevens (Triangle MicroWorks) dgoughnour@trianglemicroworks.com United States Smart Grid systems

More information

HyperAccess Access Control System

HyperAccess Access Control System Control System We manufacture, an advanced PC based access control solution that will give you control over who has access to your building. With you can control access on hundreds of doors for up to 10,000

More information

ICT SUPPORT SERVICES

ICT SUPPORT SERVICES ICT SUPPORT SERVICES SERVICE LEVEL AGREEMENT 2008 2009 Period of agreement: This document will run from 1st April 2008 to 31 st March 2009 and remains valid until superseded by a revised document. The

More information

Demand Response Market Overview. Glossary of Demand Response Services

Demand Response Market Overview. Glossary of Demand Response Services Demand Response Market Overview Glossary of Demand Response Services Open Energi has partnered with Tarmac to provide Demand Response What s inside... Market Overview Balancing Electricity Supply and Demand

More information

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12 Document Details Title: Author: 247Time Backup & Disaster Recovery Plan Document Tracking Page 1 of 12 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 OVERVIEW... 3 1.2 DEFINED REQUIREMENT... 3 2 DISASTER OVERVIEW...

More information

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014 1 Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables Bob Yinger Southern California Edison April 15, 2014 Southern California Edison SCE provides power to: Nearly

More information

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives DOCUMENT: ECSEQ6-0 EFFECTIVE: 09/23/10 SUPERSEDES: Operational Overview and Controls Guide Two or Three Pump IronHeart Lite with Variable Frequency Drives 6700 Best Friend Road. Norcross, GA 30071. (770)

More information

G8 - Contracts for Difference Metering

G8 - Contracts for Difference Metering PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical

More information

BT Assure DoS Mitigation UK

BT Assure DoS Mitigation UK BT Assure DoS Mitigation UK Annex to the Internet Connect UK Schedule Contents A note on we and you... 2 1. Service Summary... 2 2. Service Standard Components... 2 3. Service Options... 2 4. Service Management

More information

DIGITAL CONTROL SYSTEM PRODUCT SOLUTIONS

DIGITAL CONTROL SYSTEM PRODUCT SOLUTIONS Multi-function substation server Unlock the value of your substation data with Alstom s multi-function substation server Enabling the Smart Grid with Alstom's DAP server The is a multi-function substation

More information

METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES

METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES Sebnem RUSITSCHKA 1(1), Stephan MERK (1), Dr. Heinrich KIRCHAUER (2), Dr. Monika STURM (2) (1) Siemens AG Germany Corporate

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

Low Cost Automatic Transmission Line Sectionalizing

Low Cost Automatic Transmission Line Sectionalizing Low Cost Automatic Transmission Line Sectionalizing The Ohio State University Distinction Project Autumn 2009 Andrew Dulmage EXECUTIVE SUMMARY This report contains detailed information about the design,

More information

Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions

Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions Operational Control of the UKPN Low Voltage Distribution Network for EPN and LPN Regions Owner Name Title Signature Steve White Head of Network Control and Operations Date 16 February 2016 Authoriser Name

More information

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version CONFORMED COPY Method Statement Revision History Revision Date Reviewer Status 23 March 2007 Project Co Final Version Table of Contents 1 Objectives... 3 2 Management Supervision and Organisation Structure...

More information

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering

More information

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive

More information

RIIO-ED1 Business Plan Smart Metering Strategy

RIIO-ED1 Business Plan Smart Metering Strategy Paper Reference Code File Reference: Output Paper Reference: References RIIO-ED1_SSEPD_BP2_Mar14_smart_meter_strategy.pdf \\RIIO-ED1\_BP2 Final\Ofgem Uploaded Mar2014\ Issue Number Issue 2 Issue Date 17/03/2014

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator

More information

Information Crib Sheet Internet Access Service Agreement

Information Crib Sheet Internet Access Service Agreement Information Crib Sheet Internet Access Service Agreement 1. Definitions and Interpretation This Service Agreement is to be read in conjunction with the Conditions for Communications Services (the Conditions

More information

About Southern California Edison

About Southern California Edison About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly

More information

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid

Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy

More information

fdsfdsfdsfdsfsdfdsfsdfdsfsdfsd Square Box Systems Technical Support Agreement

fdsfdsfdsfdsfsdfdsfsdfdsfsdfsd Square Box Systems Technical Support Agreement fdsfdsfdsfdsfsdfdsfsdfdsfsdfsd Square Box Systems Technical Support Agreement Last updated 4 th January 2016 Technical Support Agreement This Technical support agreement is made up of these terms and conditions

More information

Chapter 7 System Operations and Physical Markets

Chapter 7 System Operations and Physical Markets MDP_RUL_0002_07 Market Rules Chapter 7 System Operations and Physical Markets Public Issue Date: June 3, 2015 Library Record No. MDP_RUL_0002_07 Document Name Market Rules for the Ontario Electricity Market

More information

Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems

Audit Report Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems ABN 20 009 454 111 Rottnest Island 2015 Network Quality and Reliability of Supply Performance Audit - Operation of Compliance Monitoring Systems Telephone: +61 8 9260 0003 Fax: +61 8 9225 7447 E-Mail:

More information

Permissible ambient temperature Operation Storage, transport

Permissible ambient temperature Operation Storage, transport The Sitras PRO combined DC protective unit and controller is used in the power supply for DC railways in mass transit and main-line systems up 3,000 V DC. It protects DC switch gear and contact line systems

More information

Project Management Manual

Project Management Manual Project Management Manual PM01 Introduction to the Project Management Manual Ref: PM01 (V7.01) - Uncontrolled once Printed Issued on 20 th December 2006 Manual Owner: James Couper Head of Project Management

More information

OFGEM CONSULTATION: NON-TRADITIONAL BUSINESS MODELS

OFGEM CONSULTATION: NON-TRADITIONAL BUSINESS MODELS Highlands and Islands Enterprise Fraser House Friars Lane Inverness IV1 1BA Scotland Sustainable.energy@ofgem.gov.uk OFGEM CONSULTATION: NON-TRADITIONAL BUSINESS MODELS Dear Dr Hardy, Introduction Thank

More information

Flexible Plug & Play Smart grid cyber security design and framework. Tim Manandhar

Flexible Plug & Play Smart grid cyber security design and framework. Tim Manandhar Flexible Plug & Play Smart grid cyber security design and framework Tim Manandhar Agenda Cyber security for smart grids Smart Grid cyber security framework FPP project approach on Cyber security Conclusions

More information

Flexible Plug and Play Implementation of active voltage and active power flow management within FPP Trial area - SDRC 9.6

Flexible Plug and Play Implementation of active voltage and active power flow management within FPP Trial area - SDRC 9.6 1 Flexible Plug and Play Implementation of active voltage and active power flow management - SDRC 9.6 By UK Power Networks December 2014 ukpowernetworks.co.uk/innovation Acknowledgement The authors gratefully

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

ENTSO-E Network Code on Emergency and Restoration

ENTSO-E Network Code on Emergency and Restoration ENTSO-E Network Code on Emergency and Restoration Notice 25 March 2015 This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation

More information

IT06 - Information Technology (IT) Hardware and Software Policy

IT06 - Information Technology (IT) Hardware and Software Policy IT06 - Information Technology (IT) Hardware and Software Policy Introduction 1 This policy sets out the general rules for the use of Southampton Solent University IT hardware and software. Southampton

More information

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach

Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach Integration Capacity Analysis Workshop 11/10/15 California IOU s Approach READ AND DELETE For best results with this template, use PowerPoint 2003 10 November 2015 Background and Importance of ICA Definition:

More information

1 Descriptions of Function

1 Descriptions of Function Utility Use Case #3 (residential and commercial) implements system and responds to signals from the utility (using ) 1 Descriptions of Function 1.1 Function Name Date 12-15-2009, Version 1.11 implements

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

CONDIS. IT Service Management and CMDB

CONDIS. IT Service Management and CMDB CONDIS IT Service and CMDB 2/17 Table of contents 1. Executive Summary... 3 2. ITIL Overview... 4 2.1 How CONDIS supports ITIL processes... 5 2.1.1 Incident... 5 2.1.2 Problem... 5 2.1.3 Configuration...

More information

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB

More information

Protection and Substation Automation. Training Programmes

Protection and Substation Automation. Training Programmes Protection and Substation Automation Training Programmes Protection and Substation Automation Training Programme Overview The objective of the Training Program is to provide education and training to make

More information

KPI, OEE AND DOWNTIME ANALYTICS. An ICONICS Whitepaper

KPI, OEE AND DOWNTIME ANALYTICS. An ICONICS Whitepaper 2010 KPI, OEE AND DOWNTIME ANALYTICS An ICONICS Whitepaper CONTENTS 1 ABOUT THIS DOCUMENT 1 1.1 SCOPE OF THE DOCUMENT... 1 2 INTRODUCTION 2 2.1 ICONICS TOOLS PROVIDE DOWNTIME ANALYTICS... 2 3 DETERMINING

More information

CYBER SECURITY POLICY For Managers of Drinking Water Systems

CYBER SECURITY POLICY For Managers of Drinking Water Systems CYBER SECURITY POLICY For Managers of Drinking Water Systems Excerpt from Cyber Security Assessment and Recommended Approach, Final Report STATE OF DELAWARE DRINKING WATER SYSTEMS February 206 Kash Srinivasan

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

AMI Use Case: B3 - Utility detects tampering or theft at customer site 03/16/06

AMI Use Case: B3 - Utility detects tampering or theft at customer site 03/16/06 AMI Use Case: 03/16/06 Author: James McGrath Author: James Mcgrath Page 1 of 23 Document History Revision History Revision Number Revision Date Revision / Reviewed By Summary of Changes Changes marked

More information

schedule 2f additional terms for internet services

schedule 2f additional terms for internet services 1. SERVICE DESCRIPTION Interoute Internet Services comprises of the provision and supply of connectivity to the Internet via the Interoute IP Network. 2. DEFINITIONS ADSL refers to Asymmetric Digital Subscriber

More information

Innovation in Electricity Networks

Innovation in Electricity Networks OPPORTUNITIES IN ENERGY SG2 Innovation in Electricity Networks physical & digital network security Contents Introduction... 1 Innovation in electricity networks... 1 The smart grid opportunity... 2 Physical

More information

Does function point analysis change with new approaches to software development? January 2013

Does function point analysis change with new approaches to software development? January 2013 Does function point analysis change with new approaches to software development? January 2013 Scope of this Report The information technology world is constantly changing with newer products, process models

More information

Wind Farm Power Station (WFPS) Performance Monitoring Process Effective 1 st October 2015

Wind Farm Power Station (WFPS) Performance Monitoring Process Effective 1 st October 2015 Wind Farm Power Station (WFPS) Performance Monitoring Process Effective 1 st October 2015 MAIN CHANGES from previous version published 1 st February 2013 1. Changing the standard for APC in performance

More information

Adlib Hosting - Service Level Agreement

Adlib Hosting - Service Level Agreement Adlib Hosting - Service Level Agreement June 2014 This service level agreement (SLA) applies to the Adlib Hosting services provided by Axiell ALM Netherlands BV, and includes the activities and facilities

More information

Technical Training Module ( 30 Days)

Technical Training Module ( 30 Days) Annexure - I Technical Training Module ( 30 Days) Section 1 : Programmable Logic Controller (PLC) 1. Introduction to Programmable Logic Controller - A Brief History, Need and advantages of PLC, PLC configuration,

More information

SP Energy Networks 2015 2023 Business Plan

SP Energy Networks 2015 2023 Business Plan Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from

More information

ESPA 4.4.4 Nov 1984 PROPOSAL FOR SERIAL DATA INTERFACE FOR PAGING EQUIPMENT CONTENTS 1. INTRODUCTION 2. CHARACTER DESCRIPTION

ESPA 4.4.4 Nov 1984 PROPOSAL FOR SERIAL DATA INTERFACE FOR PAGING EQUIPMENT CONTENTS 1. INTRODUCTION 2. CHARACTER DESCRIPTION PROPOSAL FOR SERIAL DATA INTERFACE FOR PAGING EQUIPMENT CONTENTS 1. INTRODUCTION 2. CHARACTER DESCRIPTION 2.1 CHARACTER STRUCTURE 2.2 THE CHARACTER SET 2.3 CONTROL CHARACTERS 2.3.1 Transmission control

More information

Mladen Kezunovic Texas A&M University

Mladen Kezunovic Texas A&M University INTEGRATING DATA AND SHARING INFORMATION FROM VARIOUS IEDs TO IMPROVE MONITORING, CONDITION-BASED DIAGNOSTIC, MAINTENANCE, ASSET MANAGEMENT AND OPERATION TASKS Introduction Mladen Kezunovic Texas A&M University

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

NETWORK MANAGEMENT SYTEMS FOR ACTIVE DISTRIBUTION NETWORKS. A Feasibility Study CONTRACT NUMBER:K/EL/00310/REP URN NUMBER: 04/1361

NETWORK MANAGEMENT SYTEMS FOR ACTIVE DISTRIBUTION NETWORKS. A Feasibility Study CONTRACT NUMBER:K/EL/00310/REP URN NUMBER: 04/1361 NETWORK MANAGEMENT SYTEMS FOR ACTIVE DISTRIBUTION NETWORKS A Feasibility Study CONTRACT NUMBER:K/EL/00310/REP URN NUMBER: 04/1361 The DTI drives our ambition of prosperity for all by working to create

More information

Why Can t We Be Friends?

Why Can t We Be Friends? Why Can t We Be Friends? Monitoring the Server Room by Introducing Modbus to SNMP Stanley Liu Product Manager, Data Acquisition & Control Division Overview IA devices are very useful for monitoring server

More information

PIPELINE ENGINEERING - Pipeline System Automation and Control - C. Bruce Warren and Mike S. Yoon PIPELINE SYSTEM AUTOMATION AND CONTROL

PIPELINE ENGINEERING - Pipeline System Automation and Control - C. Bruce Warren and Mike S. Yoon PIPELINE SYSTEM AUTOMATION AND CONTROL PIPELINE SYSTEM AUTOMATION AND CONTROL C. Bruce Warren and Mike S. Yoon BCT Group and Yoon Consulting Keywords: SCADA, RTU, Communications, Data Management, HMI, Alarm, Security, Measurement, Flow Meters,

More information

Applying Use Cases to Microcontroller Code Development. Chris Gilbert Cypress Semiconductor

Applying Use Cases to Microcontroller Code Development. Chris Gilbert Cypress Semiconductor Applying Use Cases to Microcontroller Code Development Chris Gilbert Cypress Semiconductor Agenda Why Use Cases Microcontroller Project Development Use Cases Defined Use Cases Composition General Example

More information

Manage Utility IEDs Remotely while Complying with NERC CIP

Manage Utility IEDs Remotely while Complying with NERC CIP Manage Utility IEDs Remotely while Complying with NERC CIP Disclaimer and Copyright The information regarding the products and solutions in this document are subject to change without notice. All statements,

More information

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters Specification Number: HPC-9FJ-12-0001-2012 CONTENTS 1 Introduction... 6 1.1 Context... 6 1.2

More information

EQF CODE EQF. European Competence Profiles in e-content Professions. http://www.ubique.org/eqfcode

EQF CODE EQF. European Competence Profiles in e-content Professions. http://www.ubique.org/eqfcode EQF CODE EQF European Competence Profiles in e-content Professions http://www.ubique.org/eqfcode European Competence Profiles in e-content Professions This project has been funded with support from the

More information

obems - open source Building energy Management System T4 Sustainability Ltd

obems - open source Building energy Management System T4 Sustainability Ltd obems - open source Building energy Management System T4 Sustainability Ltd AMR and BMS What are the problems? Cost - hardware, rental or purchase, and software licenses, upgrades etc. Lack of open standards.

More information