1 CORROSION UNDER INSULATION Donna Fruge Principal Production Engineer Westlake Chemical Corporation Karl Bishop Area Reliability Engineer Westlake Chemical Corporation Corrosion Under Insulation (CUI) is one of the predominant mechanical integrity issues affecting the ethylene industry. Occurrence can be erratic and sometimes undetectable based on visual examination. Traditional methods of addressing this issue involve selective removal of insulation for visual inspection in carbon steel services that operate from freezing to 300F. In addition to this recognized range, it is also important to look for areas that are susceptible to CUI due to swing conditions or non-flow areas, even though the design and observed operating condition of the line are outside of this range. This presentation will outline experiences with CUI resulting in leaks in lines listed as operating below 0 F. 53

2 Introduction Corrosion under insulation (CUI) has become one of the most important mechanical integrity issues within the ethylene industry. Traditional methods of addressing this issue include removal of insulation for visual inspection for operating temperatures from 25 ºF to 300 ºF. However, this does not address piping that was designed for cold service but was not identified as intermittent flow and/or a deadleg and remains at ambient conditions for most of its operating life. Background Thursday, October 11, 2007, a Shift Supervisor was investigating the operation of the pressure control valve off of the ethylene splitter to the flare when he discovered a pinhole leak in a 1 ½ inch impact tested carbon steel line, upstream of the pressure control valve. Maintenance stripped the insulation in the immediate area of the pinhole leak. The piping in the area was severely corroded, Figure 1. Due to the condition of the pipe upstream of the pressure control valve, maintenance stripped the rest of the insulation back to a 14 inch branch. Severe corrosion also existed at the branch connection, Figures 2 and 3. The installation of the impact tested carbon steel line was designed based on a design temperature of -50 F, pressure of 370 psig and an operating temperature of -12 F, per the original line list. The impact tested carbon steel piping was original installation (1991) and has not been modified. Based on the parameters listed on the original line list, this line was never identified to be inspected for corrosion under insulation. Westlake s corrosion under insulation inspection strategy inspects lines that have operating temperatures between 0 F 300 F, which goes beyond the recommended temperature range set by API standards of 25 F 250 F. The corrosion under insulation was caused by the line being at ambient conditions a majority of the time versus the -12 ºF designation on the line list and water ingression through the insulation. This line has many insulation transition and termination places, any one of which could have formed a breach where moisture entered between the pipe and the foam insulation. Based on the insulators comments, the initial stripped area at the leak location appeared to have been insulated correctly, with the foam insulation and the vapor barrier. However the through wall failure was located in an area that was susceptible to trapping moisture. 54

3 A t-clamp was installed at the 14in to 1 ½ inch branch to enclose the corrosion area until replacement during the next turnaround. The corroded portion of the 1 ½ inch impact tested carbon steel line was isolated and replaced with 304 stainless steel. After this event, the Reliability department began working with Operations to identify and inspect all stagnant, ambient pieces of pipe in the cold section of the unit. Additionally, due to the quantity of pipe and timing of the next major turnaround, an outside engineering firm was also enlisted for assistance. Two more areas of corrosion have since been discovered and replaced. 120 feet of 1 ½ inch impact tested carbon steel was replaced with 304 stainless steel. This is an ethylene refrigeration make-up line that is used once per week for approximately 3 hours at a time. When in service, and according to the original line list, the design pressure is 370 psig and the operating temperature is -11 F. However, it is typically at ambient conditions. Finally, a minor leak was discovered in a portion of carbon steel line to a moisture analyzer from the ethylene guard dryer, Figure 10. This piping was also isolated and replaced. This line is always in service; however the operating temperature is 33 F. The corrosion under insulation for this particular piece of pipe was initiated by visual inspection which found a breach in insulation, coating failure and insulation holding water. The areas of corrosion have been either isolated and replaced or clamped and pumped with no safety or environmental issues. Although the corrosion under insulation discussion has been centered around cold service piping that is either stagnant or a dead leg, piping in the process gas dryer and DeMethanizer bottoms areas are being inspected for metallurgy upgrades, specifically vents and bleeders. In addition, condensate and steam piping issues are being addressed. Corrosion Mechanism Corrosion under insulation of carbon steel is essentially an electrochemical reaction that consists of an oxidation reaction and a reduction reaction and is the combined result. Most metals and alloys prefer the ionic state rather than remain in an elemental state. An oxidation reaction is where the metal atoms give up electrons and enter an ionic state. The site at which an oxidation reaction occurs is the anode. The two common iron oxidation reactions are: Fe = Fe e - and Fe = Fe e - 55

4 The electrons are then transferred and become apart of another chemical species as part of a reduction reaction. When the steel surface is in contact with water containing dissolved oxygen and the presence of the free electrons this results in the reduction reaction: O 2 + H 2 O + 4e - = 4OH - The site at which the reduction reaction occurs is the cathode. The OH- reacts with the Fe2+ and Fe3+ to form Fe(OH) 2 and Fe(OH) 3. The final reaction is the reformation of the H2O and the precipitation of the Fe 2 O 3 oxide. The total chemical reaction is 4Fe + 6H 2 O +3O 2 = 4Fe(OH) 3 = 6H 2 O + 2Fe 2 O 3 (precipitation). Carbon steel that is insulated corrodes due to being in contact with aerated water. The role of insulation provides a crevice that retains the water and corrosive media, the material may wick and absorb water, and the material may contribute contaminants that increase or accelerate the corrosion rate. The primary water sources are infiltration from external sources and condensation. Contaminants in water can increase the conductivity of the water environment. Standard CUI Identification (25 F 250 F) Industry standards that are derived from NACE and API identify the piping systems that operate between 25 F to 250 F as having the greatest risk for developing corrosion under insulation (CUI). CUI can be broken into two categories, the first being corrosion of carbon steel due to contact with aerated water and forming corrosion cells. Carbon steel piping operating at temperatures greater than 250 F is warm enough that the piping surface stays free of moisture. When operating below 25 F any water that is present at the surface is frozen and does not provide a wet environment for a corrosion cell to develop. The second main category deals with stainless steels and their susceptibility to external stress corrosion cracking and pitting; however this paper will discuss experiences with the corrosion of carbon steel piping. Currently all piping that is identified as operating from 0 F to 300 F and insulated are part of a CUI inspection strategy that involves identifying breaches in insulation and removing insulation in suspect areas. Systems that have the greatest potential for issues with CUI have been the steam utility stations, low pressure steam and condensate piping, and regeneration piping that are insulated for heat conservation and personal protection purposes. Since the external corrosion rates are relatively the same for small bore and large bore piping, the smaller nominal wall thicknesses of line sizes 1-1/2 inch and smaller are more prone to developing through wall failures. 56

5 Steam utility stations have shown the highest potential for CUI. These piping systems are constructed of carbon steel, insulated for heat conservation, and for the most part are dead legs that stay at ambient conditions, as these sections of piping are not equipped with a steam trap and are usually 20 feet from the header. The typical orientation of the piping is a vertical leg that drops down to grade level from a main header. The piping is insulated to help prevent heat lose and condensate formation. The typical design of the steam utility station is to put a u-bolt support and valve near grade level, however, the main issue with this orientation is that it leaves a high potential for water ingression due to the number of insulation penetrations. Although properly sealed at installation, which is caulking, over time the caulk has the potential to break the seal and allow moisture ingression and eventual coating failure and corrosion cells to form. Here the areas that pose the greatest potential to develop a leak have been at the u-bolt to pipe interface and on the topside of the valve, Figure 6. Inspection for CUI starts with a visual inspection of the insulation for defects that could allow moisture to enter the system. Based on the orientation of the piping, areas of insulation are selected for removal to examine the base metal. The above case of the ethylene guard drier moisture analyzer was caught on a CUI inspection. The initial insulation inspection showed that there were several breaches in the insulation and that the insulation appeared to holding water. After removing the insulation around the valve assemble and support, a very small leak was found in the form of bubbles coming from underneath the corrosion scale at the u-bolt support location, Figure 10. The section of u-bolt in direct contact with the pipe was completely corroded away. The insulation was stripped further back to the main header to where the frost rings were present. This was approximately an 8 foot deadleg section of piping. The section of piping that was still frozen near the header showed no significant signs of corrosion and the coating was still in good condition. During a maintenance unit outage, an operator was in the process of purging the process gas dryers, when the valve he was attempting to open snapped off at the 3/4 inch nipple between the valve and header. The valve was located on the dryer effluent filter bypass line. The system operates at 60 F and is insulated. After investigating the process gas dryer system, a majority of the bleed valves were subject to CUI. The valves and nipples were replaced with stainless steel to prevent future instances of CUI at these locations. This is an example of piping that continuously operates at or near ambient conditions and is insulated to minimize ambient temperature swings, Figures 12, 13 and

6 Unexpected CUI Identification The cold section of the unit operates at varying temperatures below freezing, depending on the stage of the process. Impact tested carbon steel piping was utilized for the majority of the piping that had a design temperature greater than -50 F. The original construction specifications did not require any coating for piping designed to continuously operate below 20 F. It was found that this criteria is acceptable, provided that the line is continuously operated below freezing. This is based on visual inspection of lines that were frozen, as they did not exhibit any significant signs of corrosion. The unexpected piping that was found with corrosion problems was not correctly identified based on operating temperatures specified. The original line list identified the operating temperature for the flowing case and did not consider normal operating temperatures based on stagnate flow. The cases presented below should have been originally identified as having a CUI potential. However based on the listed operating conditions, these piping systems were not identified to have a CUI potential and were not included in the inspection strategy. The first two cases represent intermittent flow conditions while the third case represents a deadleg condition. In the below cases, none of the piping was originally coated due to being identified as normally operating below 20 F. The first case was identified in the background section which resulted in a through wall failure of an ethylene vapor line. The original specifications of the plant identified the line as operating at 12 F. At this temperature, the line was not flagged to be included in the CUI inspection strategy. After investigation, it was found that the operating temperature was correct, when the pressure control valve was open and flowing. The normal operation of the valve was to be in the closed position, creating a stagnate leg with no flow. Under these conditions the typical temperature of the line was only slightly below ambient. After removing the insulation at the location of the leak, it was found that the corrosion extended beyond the area of the leak and traveled further down the pipe back to the 14 inch line. The insulation was removed to the 14 inch line, where a severe area of corrosion was found on the branch connection, Figures 2 and 3. The 14 inch line was also identified as having an operating temperature of 12 F. The 14 inch line was the supply line to the system relief devices and under normal conditions was completely stagnate, Figure 4. It is only under a pressure relieving event that the actual operating temperature reaches the specified 12 F. The insulation on the entire length of the 14 inch line was removed for inspection. It was found that the first signs of frost rings, indicating that the temperature was below freezing did not occur until within 7 feet of the 24 inch main header. The leak location was approximately 20 feet from the where the piping was normally operating at or below freezing conditions. Based on the nominal wall thicknesses of the piping, the corrosion rates are estimated to be in the range of 0.004in/yr to 0.011in/yr. The corrosion rates are roughly 58

7 the same for the 14 inch line and the 1-1/2 inch line. With the 1-1/2 inch line requiring a smaller wall thickness, it was more susceptible to developing a through wall failure. The second case of CUI deals with a 1-1/2 inch carbon steel makeup line to the ethylene refrigeration system. The line branches off of the suction to the ethylene product pumps and runs to the ethylene refrigeration accumulator. This line was originally identified as operating at -11 F. This line is in operation once per week, for approximately 3 hours, it is stagnate the remainder of the time. The piping orientation is shown in Figure 9. The original specification for this line was to utilize impact carbon steel to a manual globe valve where a specification break to stainless steel occurs. The intent was to minimize the carbon steel piping while keeping the globe valve within sight of the accumulator; however due to the location of the vessel, this required approximately 140 feet of carbon steel piping before the specification break to stainless. The initial visual inspection of this line found several areas of damaged/missing insulation. After removing most of the insulation, the piping was assessed by profile radiography to determine the remaining wall thickness without having to disturb the scale, Figures 7 and 8. There were several areas that were identified as having less than 1/32 inch remaining wall thickness. The worst section of piping was located the furthest from the main header and within approximately 30 feet of the specification break. The line was found to be frozen and free of corrosion within 20 feet of the main header. The third case of CUI deals with a ¾ inch carbon steel bleeder off of a 12 inch acetylene converter feed main header. The bleeder piping and valve were located within 1 foot of the main header. The main header was originally identified as operating at 21 F and normally is at this temperature. The CUI was caught on a visual inspection of the line, were the stem of the bleed valve that protruded through the insulation showed noticeable corrosion and was observed to be sweating. After removal of the insulation, it was found that the main header was frozen and free of corrosion. The ¾ inch piping was frozen next to the main header and showed signs of sweating back to the valve. The piping was assessed by profile radiography, where it was determined that the remaining wall thickness was approximately 1/16 inch localized in areas, Figure 11. It was determined that the piping was acceptable to be in service up to the next scheduled outage. This line was hand cleaned and coated to arrest the corrosion and is scheduled for replacement with stainless steel. 59

8 Prevention Proper prevention of CUI on existing equipment is a very intensive task. The inspection strategy has been modified to include piping that was originally designed for temperatures outside the normal CUI range, less than 0 F, but actually has intermittent flow conditions and/or deadlegs that could be operating within the CUI range. As corrosion is found, it is addressed either through reapplication of coating or replacement. The Reliability department is currently working with Operations to inspect all stagnant, ambient pieces of pipe in the cold section of the unit. Additionally, an outside engineering firm is working with Reliability to review the entire unit so piping that needs to be replaced can be identified for the next turnaround. Since original construction, the plant coating specifications have been revised so that all insulated pipe is coated prior to being put in service. The listed operating temperature now only determines the type and application of the coating system to be used. A proper coating along with a CUI inspection strategy will provide greater protection against developing corrosion cells. Finally, all carbon and impact tested carbon steel piping is being evaluated not only for operating, but ambient conditions to better access and rank potential corrosion issues. References 1. NACE Standard RP , The Control of Corrosion Under Thermal Insulation, and Fireproofing A Systems Approach, NACE International, Houston TX 2. API Publication 570, Piping Inspection Code Inspection, Repair, Alteration, and Rerating of In-Service Piping Systems, American Petroleum Institute, Washington D.C. 3. API Publication RP571, Damage Mechanisms Affecting Fixed Equipment in the Refining Industry, American Petroleum Institute, Washington D.C. 4. API Publication Guide for Inspection of Refinery Equipment, Chapter II Conditions Causing Deterioration or Failures, American Petroleum Institute, Washington D.C. 5. William D. Callister, Jr., Materials Science and Engineering An Introduction, 4 th edition 1997, John Wiley & Sons, Inc. 60

9 Acknowledgements The authors would like to thank the owners and management of Westlake Chemical Corporation for allowing the publishing of this paper and participation in the Ethylene Producers Subcommittee. 61

10 Figures Leak Location Figure 1 Location of the Ethylene leak on the vent line Figure 2 Corrosion of vent line at 14 inch Branch Connection Figure 3 Corrosion of vent line at 14 inch Branch Connection 62

11 Figure 4 Piping layout of the vent line failure Leak Location Figure 5 Cross section of the vent line failure Figure 6 Steam Utility Station 63

12 Localized Corrosion Area Localized Corrosion Area Figure 7 Profile X-Ray of ethylene makeup line Figure 8 Profile X-Ray of ethylene makeup line Figure 9 Piping layout of makeup line 64

13 Leak Location Corroded Areas Figure 10 Moisture Analyzer Line Figure 11 Bleed Valve Corrosion Figure 12 Drier Bleed Valve Failure Location 65

14 Figure 13 Close up of Failed Drier Bleed Valve Figure 14 Corroded Drier Bleed Valve 66

Steam System Best Practices Condensate System Piping

Steam System Best Practices Condensate System Piping Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. Anode Rods, Cathodic Protection and the Porcelain (glass) Lining

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin 1-800-432-8373. Anode Rods, Cathodic Protection and the Porcelain (glass) Lining Corrosion can be defined as the destructive attack of a metal by an electrochemical reaction with its environment. Steel exposed to moisture and oxygen will rust and corrode. Corrosion is defined as the

More information

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. Richard L. Dornfeld, BSME, P.E. Staff Engineer September 25, 2014 Moisture can be a problem

More information

CATHODIC PROTECTION SYSTEM DESIGN

CATHODIC PROTECTION SYSTEM DESIGN CATHODIC PROTECTION SYSTEM DESIGN Presented By DENIS L ROSSI P.E. CORROSION ENGINEER New England C P Inc. Corrosion Fundamentals What is corrosion? It is defined as the degradation or deterioration of

More information

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm. Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water

More information

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2015 (Replaces July 2013) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance, inspection,

More information

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 gpm@gpmhydraulic.com www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS

More information

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound. Steam Tables What They Are How to Use Them The heat quantities and temperature/ pressure relationships referred to in this Handbook are taken from the Properties of Saturated Steam table. Definitions of

More information

Best Practice in Boiler Water Treatment

Best Practice in Boiler Water Treatment Best Practice in Boiler Water Treatment Boiler Water Treatment Part 2 Internal Treatment Objectives of Internal Water Treatment 1 To control the level of total dissolved solids (TDS) within the boiler

More information

Dissimilar Metal Corrosion

Dissimilar Metal Corrosion PDHonline Course S118 (1 PDH) Dissimilar Metal Corrosion Instructor: D. Matthew Stuart, P.E., S.E., F.ASCE, F.SEI, SECB, MgtEng 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658

More information

ROOF CONDENSATION: A COSTLY PROBLEM

ROOF CONDENSATION: A COSTLY PROBLEM ROOF CONDENSATION: A COSTLY PROBLEM CONTENTS 1. What is it? 2. How does it form? 3. What to look for 4. Repair options 5. Owner responsibilities and proactive measures 1. WHAT IS IT? Roof condensation

More information

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters

Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters Guidance Notes For Provision Of Water Expansion For 10 & 15 Litre Unvented Hot Water Heaters When water is heated, it naturally expands and allowance has to be made for this. Vented water heaters usually

More information

A SHORT INTRODUCTION TO CORROSION AND ITS CONTROL

A SHORT INTRODUCTION TO CORROSION AND ITS CONTROL A SHORT INTRODUCTION TO CORROSION AND ITS CONTROL CORROSION OF METALS AND ITS PREVENTION WHAT IS CORROSION Corrosion is the deterioration of materials by chemical interaction with their environment. The

More information

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS BULLETIN 240-10-3 June 2004 Supersedes June 1983 Many centrifugal systems get little maintenance. As a result they operate with the refrigerant highly contaminated

More information

Refrigeration Installation 101

Refrigeration Installation 101 Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly

More information

Geothermal Alliance of Illinois. TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls

Geothermal Alliance of Illinois. TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls Geothermal Alliance of Illinois TXVs Theory and Fundamentals John Haug Senior Application Engineer Emerson Climate Technologies - Flow Controls Thermal Expansion Valve Topics Anatomy Operation Terms &

More information

HVAC Super Pro FAQ. Can HVAC SUPER PRO be used on both hard and soft copper and aluminum tubing?

HVAC Super Pro FAQ. Can HVAC SUPER PRO be used on both hard and soft copper and aluminum tubing? HVAC Super Pro FAQ Application What is the working time for HVAC SUPER PRO? HVAC SUPER PRO can be left on the tubing and connector for several minutes, but when the tubing is inserted into the connector

More information

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS

RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;

More information

Vacuum. How It Relates to Refrigeration And Air Conditioning Service

Vacuum. How It Relates to Refrigeration And Air Conditioning Service Vacuum How It Relates to Refrigeration And Air Conditioning Service Moisture In A Refrigeration System Visible Moisture Water Droplets Uncommon, but it can occur Invisible Moisture Water Vapor Found in

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Steam Coil Installation, Operation and Maintenance

Steam Coil Installation, Operation and Maintenance Steam Coil Installation, Operation and Maintenance Guidelines for the installation, operation and maintenance of the Heatcraft brand of steam heating coils manufactured by Luvata in Grenada, MS have been

More information

Home inspectors are not mold inspectors, however they do inspect for defects that

Home inspectors are not mold inspectors, however they do inspect for defects that CONDENSATION IN THE WALLS Home inspectors are not mold inspectors, however they do inspect for defects that can result in mold. Mold grows in wet or damp environments. Defects that result in a wet or damp

More information

Why is my air conditioner dripping on my customers?

Why is my air conditioner dripping on my customers? De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These

More information

DVD-15C Soldering Iron Tip Care

DVD-15C Soldering Iron Tip Care DVD-15C Soldering Iron Tip Care Below is a copy of the narration for DVD-15C. The contents for this script were developed by a review group of industry experts and were based on the best available knowledge

More information

CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS

CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME

More information

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE 1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.

More information

This chapter is devided into two sections:

This chapter is devided into two sections: This chapter is devided into two sections: Page Installation requirements........................................................................ 127 The installation process..........................................................................

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15062 STEAM AND CONDENSATE PIPING PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. Comply with the provisions of the following: 1.2 DESIGN CRITERIA 1. ASME B 31.9 Building Services Piping : for

More information

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. Exelon Generation 200 Exelo11 Way Kennett Square. PA 19348 www.pxeloncoroi.c cm 10 CFR 50.55a August 13, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach

More information

POLICY BULLETIN Tecumseh Compressor Company Compressor Group

POLICY BULLETIN Tecumseh Compressor Company Compressor Group to Bulk Milk Coolers and Other System Page 1 of 5 Overall reliability can be enhanced if there exists a complete understanding of the features, system design, installation requirements, processing, charging

More information

P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l.

P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. c o m Determining Code Compliance and Pipe System Leak ing by William M.

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

Corrosion Inhibition of Dry and Pre-Action Fire Suppression Systems Using Nitrogen Gas

Corrosion Inhibition of Dry and Pre-Action Fire Suppression Systems Using Nitrogen Gas Corrosion Inhibition of Dry and Pre-Action Fire Suppression Systems Using Nitrogen Gas Josh Tihen Corrosion Product Manager Potter Electric Signal Company, LLC 1609 Park 370 Place St. Louis, MO 63042 (800)

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 10 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia PIPING FLEXIBILITY ANALYSIS TABLE

More information

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors

More information

List of Frequently Utilized Storage Tank Standards and Practices

List of Frequently Utilized Storage Tank Standards and Practices List of Frequently Utilized Storage Tank Standards and Practices Below is a list of frequently used storage tank standards and practices from organizations that are referenced in 25 PA Code, Chapter 245.

More information

DESIGN STANDARDS SECTION 23 60 00

DESIGN STANDARDS SECTION 23 60 00 PART 1 - GENERAL 1.01 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.02 General requirements: A.

More information

VACUUM REFRIGERATION SYSTEMS

VACUUM REFRIGERATION SYSTEMS VACUUM REFRIGERATION SYSTEMS CHILL VACTOR The Croll-Reynolds CHILL-VACTOR is a chiller that uses a vapor flashing process. Water has a pressure-temperature relationship which is its boiling point. If its

More information

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations

Overview. Introduction Cooling Tower Basics Principles of Operation Types of Cooling Towers Common Applications Design Considerations Stephen Lowe ASHRAE Hampton Roads Chapter Past President AECOM Design Mechanical Engineering Discipline Manager, Virginia Beach Division Professional Engineer Commonwealth of Virginia, NCEES BSME University

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

PBX Series Quick Fit Connector Bimetallic Steam Traps

PBX Series Quick Fit Connector Bimetallic Steam Traps 6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM

CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM Lee Siang Hua Titan Petrochemicals (M) Sdn Bhd Cheah Phaik Sim Titan Petrochemicals (M) sdn Bhd piximmink@yahhoo.com Karl Kolmetz Westlake Group, Lake Charles,

More information

Heat Trace Fundamentals. Monte Vander Velde, P.E. President, Interstates Instrumentation

Heat Trace Fundamentals. Monte Vander Velde, P.E. President, Interstates Instrumentation Heat Trace Fundamentals Monte Vander Velde, P.E. President, Interstates Instrumentation Contents Introduction... 3 Purpose of Heat Trace... 3 Types of Heat Trace... 4 Steam Trace vs. Electric Trace...

More information

COMPUTERISED CORROSION MONITORING STEPS TOWARDS PREVENTING UNEXPECTED CORROSION FAILURES.

COMPUTERISED CORROSION MONITORING STEPS TOWARDS PREVENTING UNEXPECTED CORROSION FAILURES. R. W. Gregory" COMPUTERISED CORROSION MONITORING STEPS TOWARDS PREVENTING UNEXPECTED CORROSION FAILURES. Traditionally the consequences of corrosion on process plants have been assessed on the basis of

More information

9707 Key West Avenue, Suite 100 Rockville, MD 20850 Phone: 301-740-1421 Fax: 301-990-9771 E-Mail: awt@awt.org

9707 Key West Avenue, Suite 100 Rockville, MD 20850 Phone: 301-740-1421 Fax: 301-990-9771 E-Mail: awt@awt.org 9707 Key West Avenue, Suite 100 Rockville, MD 20850 Phone: 301-740-1421 Fax: 301-990-9771 E-Mail: awt@awt.org Part of the recertification process is to obtain Continuing Education Units (CEUs). One way

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 38 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia CAUSTIC AND CHEMICAL TABLE OF CONTENT

More information

A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE

A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE The following article was published in ASHRAE Journal, December 2002. Copyright 2002 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE No. 9195 REGISTRATION EXAMINATION, NOVEMBER 2013 CERTIFYING PLUMBER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2013. All rights reserved. No part of this publication may be reproduced

More information

The First Line of Safety

The First Line of Safety Pilot Operated Pressure Relief Valves The First Line of Safety Pilot Operated Pressure Relief Valves 597C Farris Engineering Pressure Relief Valves Process Pressure Relief Valves Series 2600 ASME NB Certified:

More information

TECHNIQUES FOR NATURAL GAS SAMPLING A DISCUSSION OF FIELD METHODS FOR OBTAINING SPOT SAMPLES. Randall Messman SW Regional Sales Manager

TECHNIQUES FOR NATURAL GAS SAMPLING A DISCUSSION OF FIELD METHODS FOR OBTAINING SPOT SAMPLES. Randall Messman SW Regional Sales Manager TECHNIQUES FOR NATURAL GAS SAMPLING A DISCUSSION OF FIELD METHODS FOR OBTAINING SPOT SAMPLES Randall Messman SW Regional Sales Manager PGI International 16101 Vallen Drive Houston, TX 77041 Purpose Natural

More information

Nitrogen Blanketing for Methanol Storage and Transportation

Nitrogen Blanketing for Methanol Storage and Transportation Nitrogen Blanketing for Methanol Storage and Transportation Overview Air is the enemy of many materials. Not only can oxygen cause safety concerns and product degradation, but moisture, dirt, hydrocarbons

More information

Atomic Structure. Atoms consist of: Nucleus: Electrons Atom is electrically balanced equal electrons and protons. Protons Neutrons

Atomic Structure. Atoms consist of: Nucleus: Electrons Atom is electrically balanced equal electrons and protons. Protons Neutrons Basics of Corrosion Performance Metals Sacrificial anode manufacturer Specialize in aluminum alloy anodes All products made in the USA (Berks county, PA) ISO9001/2001 Certified Quality System Also traditional

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

Dry-out Design Considerations and Practices for Cryogenic Gas Plants

Dry-out Design Considerations and Practices for Cryogenic Gas Plants Dry-out Design Considerations and Practices for Cryogenic Gas Plants Presented at the 93 rd Annual Convention of the Gas Processors Association April 14, 2014 Dallas, Texas Joe T. Lynch, P.E., David A.

More information

Installation of Underground LP-Gas Systems

Installation of Underground LP-Gas Systems NPGA #412-94 Installation of Underground LP-Gas Systems SCOPE This bulletin provides guidelines for the installation and inspection of underground LP-Gas systems and outlines song of the unique problems

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

ASME B31.3 Process Piping. Scope of B31.3 Course

ASME B31.3 Process Piping. Scope of B31.3 Course ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Introduction -1 Scope of B31.3 Course This course covers piping as typically used in process

More information

Heating Water by Direct Steam Injection

Heating Water by Direct Steam Injection Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space

More information

PPB Dissolved Oxygen Measurement - Calibration and Sampling Techniques

PPB Dissolved Oxygen Measurement - Calibration and Sampling Techniques PPB Dissolved Oxygen Measurement - Calibration and Sampling Techniques Introduction The amount of dissolved oxygen in process water is continually gaining importance in many industries as a critical parameter

More information

PROBLEM SOLVING FORUM

PROBLEM SOLVING FORUM 4 Dealing with Water Tank Blisters Amy Forsgren Swedish Corrosion Institute Stockholm, Sweden: Blistering of the paint system used in a steel water tank indicates that the steel surface was not cleaned

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Leak Detection Systems in Urea Plants

Leak Detection Systems in Urea Plants Leak Detection Systems in Urea Plants Content Summary 1. Introduction 2. Failure mechanism of loose liners i. Weld defects ii. Crevice corrosion at stainless steel and duplex liners iii. Corrosion in the

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

The Engineering Science of Oil Pipelines

The Engineering Science of Oil Pipelines The Engineering Science of Oil Pipelines From the Keystone XL pipeline project to spills and leaks in existing lines, pipelines are in the news. The SMCC has prepared this backgrounder on crude oil and

More information

Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m.

Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m. Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m. Safety First! How to Specify Emergency Showers and Eyewashes Presented by Mike Adkins, Guardian Equipment. ASPE

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

LASER CUTTING OF STAINLESS STEEL

LASER CUTTING OF STAINLESS STEEL LASER CUTTING OF STAINLESS STEEL Laser inert gas cutting is the most applicable process type used for cutting of stainless steel. Laser oxygen cutting is also applied in cases where the cut face oxidation

More information

MODEL 9020 & 9020-OEM CORRATER TRANSMITTER USER MANUAL

MODEL 9020 & 9020-OEM CORRATER TRANSMITTER USER MANUAL Serial Number MODEL 9020 & 9020-OEM CORRATER TRANSMITTER USER MANUAL ROHRBACK COSASCO SYSTEMS, INC. 11841 East Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065

More information

Boiling Water Reactor Systems

Boiling Water Reactor Systems Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical

More information

Rajesh Swaminathan. March 13, 2005

Rajesh Swaminathan. March 13, 2005 Chemistry 12 IB Corrosion of Iron Rajesh Swaminathan March 13, 2005 1 Planning A 1.1 Aim The aim of the experiment is to investigate factors that affect the rate of corrosion of iron. More specifically,

More information

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX

INSTALLATION INSTRUCTIONS Fan Coil Replacement Coil Kit EBX & EBXX Fan Coil Replacement Coil Kit EBX & EBXX These instructions must be read and understood completely before attempting installation. These instructions covers the installation of replacement coil kit into

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

Table Z. Troubleshooting Chart for Air Conditioners. Cause

Table Z. Troubleshooting Chart for Air Conditioners. Cause Troubleshooting Chart for Air Conditioners Type of Unit Complaint Cause With open-type compressor Electric motor will not start Power failure Check circuit for power source Compressor stuck Locate cause

More information

IGEMA BOILER LEVEL & TDS CONTROLS

IGEMA BOILER LEVEL & TDS CONTROLS IGEMA BOILER LEVEL & TDS CONTROLS IGEMA offers boiler level and TDS control products of the highest quality standard, being certified to ISO 9001. Made in Germany, IGEMA products are manufactured in compliance

More information

RMF Engineering 23 05 23

RMF Engineering 23 05 23 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

CPX/HT Series. REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM. High-performance products. Designed for you!

CPX/HT Series. REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM. High-performance products. Designed for you! CPX/HT Series REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM High-performance products. Designed for you! COMPRESSED AIR WATER CONTAMINATION Atmospheric air contains water in vapor form in different

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

The National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320

The National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320 TheNationalBoardofBoilerandPressureVesselInspectors 1055CrupperAvenue Columbus,Ohio43229 614.888.8320 NB-410, Revision 3 Sept, 2015 1 1.0 GENERAL The purpose of this document is to provide basic guidelines

More information

Ethanol-Water Phase Separation White Paper

Ethanol-Water Phase Separation White Paper Ethanol-Water Phase Separation White Paper Samir Jain Background The use of ethanol as a fuel in the United States has significantly increased over the past decade. Today, greater than 80% of all retail

More information

Energy Saving Fact Sheet Boilers

Energy Saving Fact Sheet Boilers Energy Saving Fact Sheet Boilers Turn a burning issue into real energy savings You need a boiler to heat your premises and provide hot water or to generate steam for use in industrial processes. Unfortunately,

More information

Oil and Gas Pipeline Design, Maintenance and Repair

Oil and Gas Pipeline Design, Maintenance and Repair Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University aelsayed@mail.eng.cu.edu.eg

More information

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program Guidance Concerning Remediation and Prevention of Mold Growth and Water Damage in Public Schools/Buildings to Maintain Air

More information

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping

CODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping BUILDING TECHNOLOGIES PROGRAM Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping The intent of the pipe insulation requirements is to reduce temperature changes

More information

Filtering Samples to On-Line Process Analyzers. Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers

Filtering Samples to On-Line Process Analyzers. Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers Filtering Samples to On-Line Process Analyzers Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers Filtering samples to on-line analyzers Use these guidelines to ensure

More information

CONDENSATION IN REFRIDGERATED BUILDINGS

CONDENSATION IN REFRIDGERATED BUILDINGS CONDENSATION IN REFRIDGERATED BUILDINGS By: Steve Salisbury Nov. 10, 2010 (revised Nov. 14, 2013) Introduction The following discussion reviews the basic causes of condensation in refrigerated buildings

More information

REPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE

REPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE REPORT OF A COATING FAILURE ON A 16-INCH OIL PIPELINE UNDER WET CO2 SERVICE Klaus E. Kueter InterCorr International, Inc. 14503 Bammel-N. Houston, Suite 300 Houston, TX 77014 David E. Hendrix The Hendrix

More information

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap

BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap 1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

ON-VEHICLE INSPECTION

ON-VEHICLE INSPECTION Sight Glass I11244 ONVEHICLE INSPECTION 1. INSPECT REFRIGERANT VOLUME Observe the sight glass on the liquid tube. AC3 AC22F05 Test conditions: Running engine at 1,500 rpm Blower speed control switch: HI

More information

EXPERIMENT #9 CORROSION OF METALS

EXPERIMENT #9 CORROSION OF METALS EXPERIMENT #9 CORROSION OF METALS Objective The objective of this experiment is to measure the corrosion rate of two different metals and to show the effectiveness of the use of inhibitors to protect metals

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS

More information

Some Criteria for Choosing a Steam Boiler for a Microbrewery

Some Criteria for Choosing a Steam Boiler for a Microbrewery Some Criteria for Choosing a Steam Boiler for a Microbrewery Jack Coe Rite Engineering and Manufacturing Corporation Breweries rely on steam heating for a number of functions, primarily to heat the brew

More information

G-704-0 SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

G-704-0 SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years LAST REVIEW DATE: REVIEW CYCLE: 1/15/14 5 Years SPECIFICATION: TITLE: VOLUME: G-704-0 3 and Gas Yellow Book REVISIONS: (See ) 1) This specification is being issued for the first time. G-704-0 Gas Operations

More information

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide

Treatment options for hydrogen sulfide. Testing for hydrogen sulfide Sometimes hot water will have a sour smell, similar to that of an old damp rag. This smell often develops when the thermostat has been lowered to save energy or reduce the potential for scalding. Odor-causing

More information

This will also provide you with the knowledge to insure long life for your Investment

This will also provide you with the knowledge to insure long life for your Investment CONDUIT PIPE DRYING This Presentation will guide you to why systems fail! This will also provide you with the knowledge to insure long life for your Investment Drainable and Dryable System Design Trough

More information