AGOM EXPANSION JOINTS INSTALLATION PROCEDURE
|
|
- Linette Oliver
- 7 years ago
- Views:
Transcription
1 AGOM EXPANSION JOINTS INSTALLATION PROCEDURE
2 HOW TO REALIZE A JOINT LINE When you have to realize a joint line, workers have to install many units jointed together with a groove-and-tongue junction welded with special glue. Actually the AGOM expansion joints type AGWJ and AGFLEXJ are supplied in two meters long elements with the exception of the AGFLEXJ 330 that is one meter long. The joint fixing is obtained by chemical anchors. The nuts are locked using a dynamometric key so that a permanent compression strength is given to the joint. In that way the horizontal forces, due to braking of vehicles and to the reaction that rubber oppose to the joint deformation (shrinkage, flu age, thermal variations etc.) are transmitted by friction between the rubber and the concrete. AGOM expansion joint can be installed also on a metallic infrastructure. AGOM EXPANSION JOINT JOINT MOVEMENT DIMENSION A x H x L DISTANCE P WEIGHT [Kg/m] AGWJ 50 ± x35x AGWJ 70 ± x35x AGFLEXJ 30 ± x32x AGFLEXJ 50 ± x42x AGFLEXJ 80 ± x46x AGFLEXJ 100 ± x53x AGFLEXJ 140 ± x78x AGFLEXJ 160 ± x82x AGFLEXJ 200 ± X70X AGFLEXJ 250 ± x78x AGFLEXJ 330 ± x100x Pag 2
3 EXPANSION JOINT TYPE AGWJ EXPANSION JOINT TYPE AGFLEXJ AGFLEXJ AGFLEXJ INSTALLATION PROCESS FOR AGOM EXPANSION JOINTS Before installing an expansion joint is very important to make sure of the bridge movements (see general rules to calculate bridge movement pag. 7) and to check the asphalt thickness in order to verify if the chosen type of joint can be correctly installed and what is the better type of installation. There are mainly two type of installation, one of which suitable for little expansion joint and the other for bigger one. Layout a ground plan for the joint and mark the cut width at both side of the axis. Using a diamond disc cutting machine, cut and remove the asphalt to obtain the recess of the enquired width and depth for each respective AGOM expansion joint type. Pag 3
4 TYPE 1 - INSTALLATION FOR LITTLE EXPANSION JOINTS For little expansion joints like AGOM AGWJ and AGFLEXJ the installation type 1 is suggested. W 1 A H S If S>30 mm use levelling mortar If S < 30 mm use levelling epoxy resin G I 1. After demolition and leaning of the slab, the steel reinforces will be prepared and the levels verified. 2. The gap will be protected with a polystyrene piece and the modules of expansion joint will be centred on the structural joint applying polyurethane sealant or the epoxy bedding at the tongue & grove interface before installing the adjoining element in order to achieve a waterproof connection. 3. The points where the anchoring are to be placed will be marked and drilled. The holes will be flushed thoroughly with compressed air and will be filled with a fast curing pour able epoxy grout before to insert the anchor bolts vertically down. After that Workers will start the casting of the mortar. 4. Once the mortar is set and the protection removed, washers and nuts will be located on the bolts. Nuts will be adjusted with the appropriate tightening torque using a dynamometric key. Epoxy sealant product will be used to fill all the bolt hole cavities. Pag 4
5 TYPE 2 - INSTALLATION FOR AGOM EXPANSION JOINTS For all type of expansion joints and particularly for bigger expansion joints, the installation type 2 is suggested. W2 A H S G if S > 30mm use levelling mortar if S < 30mm use levelling epoxy resin I SEAT JOINT HEIGHT [H] WIDTH [W 1 ] [W 2 ] GAP [G] DISTANCE [I] AGWJ AGWJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ AGFLEXJ Pag 5
6 1. After demolition and leaning of the slab, the gap will be protected with a polystyrene piece and the levelling mortar will be applied to form a layer of level bedding for the expansion joint. 2. Once the mortar is set, the modules of expansion joint will be centred on the structural joint and the points where the anchoring are to be placed will be marked. Then the modules will be removed and the holes will be flushed thoroughly with compressed air. JOINT ANCHOR material: C40 zinc plated [M x B] HOLE Ø DEPTHT AGWJ 50 M12 x 190 ø AGWJ 70 M12 x 190 ø AGFLEXJ 30 M12 x 190 ø AGFLEXJ 50 M12 x 190 ø AGFLEXJ 80 M14 x 200 ø AGFLEXJ 100 M16 x 200 ø AGFLEXJ 140 M16 x 200 ø AGFLEXJ 160 M16 x 200 ø AGFLEXJ 200 M20 x 230 ø AGFLEXJ 250 M20 x 230 ø AGFLEXJ 330 M24 x 300 ø The holes will be filled with a fast curing pour able epoxy grout before to insert the anchor bolts vertically down. 4. When the anchoring is hardened, Workers will start laying the first AGOM expansion joint element applying polyurethane sealant on the epoxy bedding at the tongue & grove interface before installing the adjoining element in order to achieve a waterproof connection. Pag 6
7 5. Modules will be aligned and washers and nuts will be located on the bolts. Nuts will be adjusted with the appropriate tightening torque using a dynamometric key. Epoxy sealant product will be used to fill all the bolt hole cavities. 6. Transition strips: Be sure that the asphalt walls and the module walls are completely clean and dry. After that workers will prime carefully the asphalt walls, the module walls and the bottom surfaces of the two side gaps by using a brush or a roller. Before the priming will be cured, they will prepare and apply the epoxy based product by mixing properly the epoxy resin with siliceous arid. The epoxy resin will be applied by using a shovel (previously wet in solvent) in order to make easier the application. The resin must be very well levelled in relation to the module and the asphalt. 7. Once the mortar cured, transition strips will be painted with pure resin. In order to accomplish a clean finish, a paper tape should be placed along the edges of the joint and all along the asphalt before painting the transitions. Those tapes will be removed once this task is finished. GENERAL RULES TO CALCOLATE THE BRIDGE MOVEMENT The movements to be considered for the expansion joints, arise from the following causes : Thermal expansion and contraction of the superstructure and in certain cases even of substructure Shrinkage of concrete Creep in the concrete Elastic shortening under prestress Displacement of the structure under load, temperature variations or any other action. Because expansion joints are installed at a late stage in construction, therefore, some of these movements will already at least partly have been taken place. Hence less total movement has to be considered for the expansion joints than for the bearings at the same location. It s possible to calculate the maximum opening movement of the expansion joint by adding all the irreversible and reversible movements due to concrete retraction and creep, thermal movements and elastomeric bridge bearings deformation. At the same way it s possible calculate the maximum closing movement of the expansion joint by adding the thermal movement and the displacement of the structure under load or any other action. Pag 7
8 A) Irreversible movements Concrete retraction: Regardless of the factors that should be taken into account, such as degree of ambient humidity, piece thickness, concrete composition, typical strength, number of reinforcements and diameters, etc, an approximate value of 0,25 mm. per metre is taken, with the correction corresponding to the elapsed time since the piece concreting and joint installation (100% in 2.5 years). Concrete creep: Regardless of the factors that should be taken into account, such as degree of ambient humidity, piece thickness, concrete composition, typical strength, number of reinforcements and diameters, etc, an approximate average value of 0,20 mm. per metre is taken, with the corresponding correction (100% in 10 years). B) Reversible movements Thermal expansion and contraction: Maximum and minimum temperatures of the structure location area have to be considered, as well as the assembling temperature and its structure and thickness. The approximate average value o thermal expansion/contraction is 0.01 mm. per metre and degree of centesimal temperature. Pag 8
9 where the correction factor K H is related with the thickness and the type of structure SOLID SLABS VOILED SLABS CAISSON SLABS THICKNESS K H THICKNESS K H THICKNESS K H 0,30m 1,15 0,60m 1,09 1,67m 1,06 0,60m 1,00 0,90m 1,05 2,22m 1,00 0,90m 0,97 1,20m 1,02 2,78m 0,97 1,20m 0,95 1,50m 1,00 3,33m 0,95 The displacement of the structure under load or any other action. For this example let's consider only the movement due to elastomeric bridge bearings under a maximum horizontal force of 18,000 kg, which deforms all the elastomeric bearings upon which the structure rests, and instantaneous deflection factor G = 14 Kg/cm2 Pag 9
Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION
Sikadur-Combiflex REVISED JULY 2002 Sealing system for cracks and problem joints with large movements Construction DESCRIPTION USES ADVANTAGES The Sikadur-Combiflex joint sealing system consists of two
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationEcoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
More informationCORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
More informationSERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
More informationJames M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
More informationDubai Municipality Standard DMS 1: Part 5: 2004
Specification for precast concrete blocks Part 5: Normal-weight concrete-polystyrene sandwich masonry blocks Issue Date Revision Revision Description Prepared by Approved by Authorized by 19/12/2004 Issue
More informationChapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationMounting Instructions for SP4 Power Modules
Mounting Instructions for SP4 Power Modules Pierre-Laurent Doumergue R&D Engineer Microsemi Power Module Products 26 rue de Campilleau 33 520 Bruges, France Introduction: This application note gives the
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationIf stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
More informationGuidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
More informationSaferand easierinstallation
EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More informationMILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS
MILMAN & ASSOCIATES STRUCTURAL CONSULTING ENGINEERS/ PROJECT MANAGERS May 29, 2013 Revision B Structural Guideline for Design and Installation Holes in Composite Floor Slab Terminal 3, Departure Level
More informationCONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
More informationELECTRIC PERISTALTIC MORTAR POINTING PUMP
ELECTRIC PERISTALTIC MORTAR POINTING PUMP pointing gun & control valve ACF405 PERISTALTIC PuMP hopper feed roller & tube pump for refurbishment & repair trades heritage & conservation bridge & underground
More informationTECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
More informationField Damage Inspection and Static Load Test Analysis of Jiamusi Highway Prestressed Concrete Bridge in China
Advanced Materials Research Vols. 163-167 (2011) pp 1147-1156 Online available since 2010/Dec/06 at www.scientific.net (2011) Trans Tech Publications, Switzerland doi:10.4028/www.scientific.net/amr.163-167.1147
More informationINSTALLATION INSTRUCTIONS for Bifold Doors (JII103)
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast
More information2.9 WINDOW & DOOR BUCKS
2.9 WINDOW & DOOR BUCKS Bucks provide attachment surfaces for windows and doors while holding back concrete from these openings during concrete placement. Mark the center and edges of openings as you place
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationGuidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
More informationChapter. Restoration of Damaged Structures
5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.
More informationHow to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
More informationPTFE Slide Bearings 04/10 149
04/10 149 1.0 GENERAL INFORMATION In a wide range of applications, PTFE Slide bearings are superior to conventional expansion plates, rollers and rocker arm type supports. They support petrochemical plant,
More informationIPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring
International Progress Report IPR-02-64 Äspö Hard Rock Laboratory Temperature Buffer Test Report for retaining plug and anchoring Richard Bäck Äspö HRL September 2002 Svensk Kärnbränslehantering AB Swedish
More informationCAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.
CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT
More informationInstallation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationBeautifully Traditional
Arcade 800mm Single Sliding Door Quadrant - nickel Arcade 900mm Single Sliding Door Quadrant - nickel ARC48 ARC49 INSTALLATION INSTRUCTIONS A www.arcadebathrooms.com IMPORTANT - Please read before installation
More informationTwo most common lock nut groups: 1-Prevailing Torque Type Lock Nuts:
Two most common lock nut groups: 1. PREVAILING TORQUE a design feature of the lock nut produces friction between threads of mated components thereby increasing the force needed to tighten as well as loosen
More information7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
More informationHS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version
ANLAGENTECHNIK HS-Steel-Classic Curing chambers for the concrete block industry in a proven steel version + special galvanising + simple assembly due to snap-in connections and building kit system We build
More informationCLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
More informationCavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
More informationREDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationWecryl Waterproofing System under surfacing supplied by others
Brief description The Wecryl waterproofing system allows a high-quality, seamless and crack-bridging waterproofing layer to be installed under loose-laid or bonded surfacing supplied by others (stone slabs,
More informationWATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
More informationSERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
More informationAlways. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+
Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+ The wall sleeve The wall sleeve a largely unnoticed but very important sealing part. Wall sleeves
More informationAluminium systems profile selection
Aluminium systems profile selection The purpose of this document is to summarise the way that aluminium profile selection should be made, based on the strength requirements for each application. Curtain
More information1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.
MINI BIKE PLANS Page 1 INTRODUCTION Before starting to build your Mini-Bike, be sure that you have all the parts shown on the material list. You will note that tubing has been used in the construction.
More informationLay blocks with mortar
Student Lay blocks with mortar What you will learn When you have fi nished this section, you should be able to: Mix mortar Lay blocks with correct mortar joints. How do I mix mortar? Mortar is a wet paste
More informationDIVISION: 04 00 00 MASONRY SECTION: 04 05 19.16 MASONRY ANCHORS REPORT HOLDER: HILTI, INC. 7250 DALLAS PARKWAY, SUITE 1000 PLANO, TEXAS 75024
0 ICC-ES Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 Most Widely Accepted and Trusted ESR-3342 Reissued 08/2015 This report is subject to renewal 08/2017. DIVISION: 04 00 00 MASONRY
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More information39HQ Airovision Air Handling Units
39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport
More informationSlab Track Austria. System ÖBB-PORR elastically supported slab
Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.
More informationHow To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
More informationElo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
More informationWHI 90-Minute Rated Veneered Door Frame Installation Instructions
No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,
More informationnecessary for years of satisfactory service. SmartBlock insulating form concrete walls share the
Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final
More informationCONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS
CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS 1.0 DESIGN 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Isolation Bearings and installing Isolation Bearing Assemblies at the locations
More informationPipe Clamps and Accessories
Products 4.0 Products 4.1 Connection options to pipe clamps with Triple-Thread Connector NT 3G (M16, M10, M8) 4.2 Connection options to pipe clamps with Triple-Thread Connector NT 3G (3/8", M12, M10) 4.3
More informationK. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11
K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins
More informationInjection System VMU. Injection System for non-cracked concrete and brickwork. Threaded Stud VMU-A for concrete and brickwork
Injection System for noncracked and brickwork Injection System VMU Threaded Stud VMUA for and brickwork VMUIG for and brickwork Threaded Stud VMA meter length, to be cut to the required length Threaded
More informationConstruction. 3-part thixotropic epoxy patching mortar. Product Description. Tests
Product Data Sheet Edition 05/12/2014 Identification no: 020204030010000044 Sikadur -41 CF Rapid 3-part thixotropic epoxy patching mortar Construction Product Description Uses Characteristics / Advantages
More informationTechnical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
More informationAMF112 Instruction Manual
AMF112 Instruction Manual Scan here to view product demo and install videos or visit san.us/103 Milestone AV Technologies 6436 City West Parkway Eden Prairie, MN 55344 USA Customer Service Americas: 800-359-5520
More informationFLOORS REINFORCEMENT Shear Stud Connector for steel- concrete composite structures cold applied by pins
www.tecnaria.com FLOORS REINFORCEMENT Shear Stud Connector for steel concrete composite structures cold applied by pins HIGHPERFORMANCE FLOORS COMPOSITE STEEL AND CONCRETE STRUCTURES: STATIC AND ECONOMIC
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationPermanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions
ABS-Lock X / X - SR Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions The ABS-Lock X system was developed to provide both a secure single anchorage point for
More informationInstallation Manual. Toilet Partitions, Dressing Compartments & Shower Stalls
Installation Manual Toilet Partitions, Dressing Compartments & Shower Stalls Metpar Corp 95 State Street, Westbury, New York, USA, 11590 Tel: 516-333-2600 Fax: 516-333-2618 Internet: http://www.metpar.com
More informationSITEMA PowerStroke. Technical Information TI-P11. 1 Function. 2 Applications. Mould Closing Devices series FSK. Contents
English translation of German original Technical Information TI-P11 SITEMA PowerStroke Mould Closing Devices series FS drive system for powerful forces on a short stroke hydraulic actuation closing force
More informationHow to build a Pizza Oven in 4 days
How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY
More informationRudder Repair and refinish
Rudder Repair and refinish Montgomery 23 Dauntless The before photograph A receipt found inside the boat showed a previous owner had enlisted a boat yard to perform maintenance on the rudder by shortening
More informationSPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY
BS 40 M6 MuCis mono SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY LE CE LE type: "expansive binder which allows the production of extremely fluid concrete
More informationDiameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
More informationCOMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
More informationAssembly and Usage Instructions
Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free
More informationNEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY
1 of 10 10/1/2015 Revised note #3 to: Joint (behind backwall, brush Expansion joint opening shall be adjusted to curb) temperature anticipated just prior to pouring deck blockout. Final setting in the
More informationInstallation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
More informationHigh-performance, 2-part epoxy anchoring adhesive
Product Data Sheet Edition 27/04/2009 Revision no: 0 Identification no: 01 04 02 06 001 0 000030-3+ -3+ High-performance, 2-part epoxy anchoring adhesive Construction Product Description Uses Solvent-free,
More informationWall installation for Samsung Galaxy
1 Scope of delivery... 02 2 Mounting... 03 2.1 Mounting preparation table of contents 2.2 Mounting on cavity walls / lightweight walls... 04 2.2.1 Wall notch 2.2.2 Angles 2.2.3 Insert the lower case 2.2.4
More informationHIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationSAN25 (6904-002001 <00>)
SAN25 () Wood 002752.eps Concrete 13mm (1/2 in.) 5mm (3/16 in.) Sanus Systems 2221 Hwy 36 West Saint Paul, MN 55113 USA Customer Service Americas: 800-359-5520 651-484-7988 info@sanus.com Europe, Middle
More informationLathe Milling Attachment
Lathe Milling Attachment By L C. MASON BY CLEVERLY stacking cold-rolled flat stock together, T-slots and slide for this lathe milling attachment are made without costly machinery. In fact, only two tools,
More informationAttachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits
Attachment G-1: Pit Latrine Diagram Fig E.1a: Pit Latrine Fig E.1b: Plan View of Twin Pits Fig E.1c: Section of a water-sealed pan Fig E.1d: 3D view of Overflow Pipe Fig E.1e: 2D view of Overflow Pipe
More informationTHE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS
THE COMPOSITE DISC - A NEW JOINT FOR HIGH POWER DRIVESHAFTS Dr Andrew Pollard Principal Engineer GKN Technology UK INTRODUCTION There is a wide choice of flexible couplings for power transmission applications,
More informationAMF112 (6904-002010 <00>) 13mm (1/2 in.)
AMF112 () Concrete Wood 13mm (1/2 in.) 5.5mm (7/32 in.) 10mm (3/8 in.) Sanus Systems 2221 Hwy 36 West Saint Paul, MN 55113 USA Customer Service Americas: 800-359-5520 651-484-7988 info@sanus.com Europe,
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationwww.pitchmasticpmb.com PmB Expansion Joints World leaders in expansion joint technology
www.pitchmasticpmb.com Expansion Joints World leaders in expansion joint technology High performance expansion joint solutions Pitchmastic offers a comprehensive range of specialist services to the civil
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationProfiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa
Profiles in stock Standard catalogue Discover the possibilities with aluminium from Sapa You can create your own profile or you can choose from a wide selection of standard. Delivery: 1 2 weeks for standard
More informationwww.cornholesupplies.com
www.cornholesupplies.com How To Build Regulation Cornhole Boards Home of the Original Cornhole Bags and Boards Supply List: 1-4' X 8' Piece of Plywood (pre sanded) 4-2" X 4" X 8' Studs (2 by 4s make sure
More informationmajestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base
majestic install ation guide barcelona three sided enclosure 24mm surface mounted wall channels and underframe to base These Instructions are for a left and right handed unit. The diagrams show a left
More informationRebuild Instructions for 70001 and 70010 Transmission
Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before
More informationConstruction Specifications for Keyhole Pavement Coring and Reinstatement
F I N A L Construction Specifications for Keyhole Pavement Coring and Reinstatement Gas Technology Institute 1700 S. Mount Prospect Rd. Des Plaines, Illinois 60018 www.gastechnology.org Version 13 October
More informationEmbedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
More informationFORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
More informationBUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS
BUTTERFLY SHOWER DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,
More informationSliding Door Hardware Installation Instructions
Sliding Door Hardware Installation Instructions Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview ff All Krown Lab sliding
More informationNational Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination
Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)
More informationHoles & Selective Laser Sintering
SLS is one of the most accurate 3D printing processes. The process has a layer thickness of 0.1mm. This is the thickness with which a new layer is added to each part. In any direction therefore the maximum
More informationPRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
More informationChar-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors
Char-Lynn Spool Valve Hydraulic Motors Repair Information W Series Geroler Motors with Parking Brake 004 Nut Key Ring, Retaining Bearing Ring, Retaining Ring, Retaining Washer (Thick), Pressure Washer,
More informationSTORAGE, INSTALLATION AND MAINTENANCE PROCEDURES
GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the
More information