1 Annexure 4 Site Inspection Forms and Checklists Annexure 4.1 Site and Surrounds Inspection Checklist Standard Inspection Checklist (Site and Surrounds) The Site Inspection Checklist is to be completed by Site Management during a site walk-around each month. Other checklists may be utilised depending on their relevance to the particular location. At the conclusion of a Site Inspection where there is immediate attention required to action a hazard, a copy of the Site Inspection Checklist should be forwarded to the Site Manager. SECTION 1: To be completed for every Monthly Site Inspection Conducted Audit Location: Date: / / Audit Start Time: Audit Finish Time: Name of Auditor: Position/Title: Signature: SECTIO N 2: Mark No for items that require attention and/ or remedial action (list comments in the box below) Mark Yes for items that are correct, present, satisfactory, etc. Item # Checklist Item Status 1 Are all relevant train inspections being completed as applicable and are records available on file? 2 Have all contractors and visitors signed the visitors book and been formally inducted? Are contractors working in agreed areas and providing site protection? 3 Are all personnel, contractors and visitors adhering to site speed limits, no smoking policy, requirements to wear high visibility safety vests? 4 Are safety glasses and hearing protection being worn by personnel, contractors and visitors where appropriate? 5 Are all fire extinguisher maintenance stamps current and has a fire evacuation / drill been conducted within the last 12 months? 6 Are all defendable spaces and access road corridors being maintained to reduce the impact from bushfire? 7 Is Emergency Response Equipment easily identifiable, accessible and adequately stocked i.e.: are items listed on the master contents list available? 8 Have all spills (major and minor) been adequately cleaned up? If absorbent particulate has been used to absorb a spill has it been appropriately disposed of? 9 Is site housekeeping adequate? Are oil / grease stocks stored appropriately? Are drains clear of rubbish? Is the site free of tripping hazards brake blocks, etc.? 10 Is site maintenance adequate? Check roadways, lighting, perimeter fences, etc. 11 Are the maintenance workshops clean of oil/grease build up? Is the site free of rubbish and tripping hazards? Is the oil/water separator Page 104 of 149

2 appropriately maintained? 12 Is appropriate radio protocol being used? Are operators complying with relevant radio protocol procedures? 13 Are personnel complying with the correct procedures for piloting shunting movements? 14 Are there a sufficient number of qualified First Aid people on site? 15 Check contents of the first aid cabinet / box. Is it adequately stocked and accessible? 16 Is there a qualified Health and Safety Representative on the Site SHE Committee representing each workgroup on site? 17 Are Site SHE Committee meetings conducted on a monthly basis? 18 Are SHE Committee meeting records maintained and accessible? 19 Are SHE Committee minutes of meetings distributed? 20 Are Site Inspections conducted on a quarterly basis and are identified hazards transferred appropriately to the Safety, Health and Environment Management Event (SHEM Event) management system? 21 Are hazards identified on Hazard Report Form(s) transferred appropriately to SHEM Event? 22 Are action items on in-gauge being completed in a timely manner? 23 Are employees trained in the use of SHEM Event for reporting hazards, incidents and events? 24 Observe work practices on site. Is there anyone not working according to procedure or working in an unsafe manner? 25 Observe work place conditions. Can you identify any other hazards not previously listed? 26 Has all stormwater monitoring been conducted and reviewed against compliance conditions? 27 Has the site undertaken daily visual dust observations during periods of high risk (hot, dry and windy)? 28 Has the site undertaken the necessary noise and vibration compliance monitoring? 29 Are all complaints recorded, investigated where required and closed out? 30 Is the site operating in accordance within the approved operation times? 31 Is there evidence of plant and equipment being maintained and operated in an efficient manner? 32 Are train operators trained in the entry and exit of trains into the Hexham TSF in order to minimise noise impacts? 33 Is all fencing (EEC, Offset area, boundary) in satisfactory condition? Commen ts: Item # (Detail any items that require attention and/or remedial action) Actions listed below are to be written up on in-gauge. Comment Page 105 of 149

3 Annexure 4.2 Provisioning Facility Inspection Checklist Provisioning Facility Inspection Checklist Actions arising from the inspection are to be listed on SHEM Event and progressed by the Site Manager. SECTION 1: To be completed for every [insert period/frequency] Site Inspection Conducted Audit Location: Date: / / Audit Start Time: Audit Finish Time: Name of Auditor: Position/Title: Signature: SECTION 2: Mark No for items that require attention and/ or remedial action (list comments in the box below) Mark Yes for items that are correct, present, satisfactory, etc. Item # Checklist Item Status 1 Bulk Fuel Bund & Pumps Is the floor of the bunding clean with no evidence of leaks? Is pump area clean with no evidence of leaks? Are all bund valves locked? 2 Fuel Discharge Area Is the area clean with no evidence of spills? Are the pumps, pipes etc. functioning with no evidence of leaks. Are all valves locked (when facility is closed)? 3 Provisioning Shed Is the area kept clean with no evidence of spills? Are drains and/or pits free from sand/ silt? Are all substances and dangerous goods appropriately stored? 4 Oily Wash Down Areas Are spill kits in place and fully stocked for any spills or emergency incidents? 5 External Are stormwater discharge areas clean with no evidence of hydrocarbons or excess silt? Is external concrete area clean with no excess rubbish on site? 6 Waste Disposal Is all waste generated on site appropriately classified and handled? Are waste reuse/recycling practices maximised on site where practicable? Are records of waste tracking available/ kept for all waste materials removed from site? 7 Environmental Management Are all substances/ dangerous good used/ stored on site approved? Are SDS available for all substances/ dangerous goods? Have all modifications been recorded and appropriate plans/procedures updated? 8 Emergency Procedures Are Incident Report forms available? Have all incidents been recorded Page 106 of 149

4 and reported? Are all new/ existing operators trained on Environmental Management Plan and Emergency Procedures? Are records of all training available? Is adequate stocks of booms, absorbent materials etc. available and accessible on site? Has a test/ trial of emergency procedures been conducted with all operators in last 6 months? Is all fire protection equipment in date and/or accessible? Are safety showers and eye wash stations fully operational and accessible? 9 Liquid trade-waste Are the trade-waste tanks at or above 50% capacity? 10 Do the trade-waste tanks require emptying? 11 Is there any evidence of deterioration of the trade-waste systems including sumps, pumps, pipework, tanks and bunds? 12 Do the trade-waste sumps require cleaning? Comments: (Detail any items that require attention and/or remedial action) Actions listed below are to be written up on in-gauge. Item # Comment Page 107 of 149

5 Annexure 4.3 Combined Maintenance Facility Inspection Checklist Combined Maintenance Facility Inspection Checklist Actions arising from the inspection are to be listed on SHEM Event and progressed by the Site Manager. SECTION 1: To be completed for every [insert period/frequency] Site Inspection Conducted Audit Location: Date: / / Audit Start Time: Audit Finish Time: Name of Auditor: Position/Title: Signature: SECTION 2: Mark No for items that require attention and/ or remedial action (list comments in the box below) Mark Yes for items that are correct, present, satisfactory, etc. Item # Checklist Item Status 1 Coolant Replacement, Storage and Disposal Is the area clean with no evidence of spills? Are all pumps, pipes etc. functioning with no evidence of leaks? Are all valves locked (when facility is closed)? Is storage container bund fully intact and emptied as required? 2 Oil Replacement, Storage and Disposal Is the area clean with no evidence of spills? Are the pumps, pipes etc. functioning with no evidence of leaks. Are all valves locked (when facility is closed)? Is storage tank bund fully intact and emptied as required? 3 Oily Wash Down Area Is the area kept clean with no evidence of spills? Are spill kits in place and fully stocked for any spills or emergency incidents? Are all substances and dangerous goods appropriately stored? 4 Locomotive Wash Down Areas Are spill kits in place and fully stocked for any spills or emergency incidents? Has the wash down bay been left in a clean state following use? 5 External Are stormwater discharge areas clean with no evidence of hydrocarbons or excess silt? Is external concrete area clean with no excess rubbish on site? 6 Waste Disposal Is all waste generated on site appropriately classified and handled? Are waste reuse/recycling practices maximised on site where practicable? Are records of waste tracking available/ kept for all waste materials removed from site? 7 Environmental Management Are all substances/ dangerous good used/ stored on site approved? Are SDS available for all substances/ dangerous goods? Have all modifications been recorded and appropriate plans/procedures updated? 8 Emergency Procedures Are Incident Report forms available? Have all incidents been recorded and reported? Are all new/ existing operators trained on Environmental Management Plan and Emergency Procedures? Are records of all training available? Is adequate stocks of booms, absorbent materials etc. available and accessible on site? Page 108 of 149

6 Has a test/ trial of emergency procedures been conducted with all operators in last 6 months? Is all fire protection equipment in date and/or accessible? Are safety showers and eye wash stations fully operational and accessible? 9 Amenities Are all wash troughs and toilet amenities clean and fully operational? Are all water drinking fountains clean and fully operational? 10 Trade Waste Water Recycling System (DAF System) Is there sufficient chemicals to operate the treatment plant? Are they appropriately stored? Have all treatment plant alarms been addressed? Have all treatment plant prestart checks been completed? Is the Oil-Water Separator system fully operational? Are records of inspection and maintenance up to date and available (i.e. Clearmake Daily/ Weekly/ Monthly/ Annual/ Bi-annual Maintenance Record Sheet)? 11 Comments: (Detail any items that require attention and/or remedial action) Actions listed below are to be written up on in-gauge. Item # Comment Page 109 of 149

7 Annexure 4.4 Service Vehicle Garage Inspection Checklist Actions arising from the inspection are to be listed on SHEM Event and progressed by the Site Manager. SECTION 1: To be completed for every [insert period/frequency] Site Inspection Conducted Audit Location: Date: / / Audit Start Time: Audit Finish Time: Name of Auditor: Position/Title: Signature: SECTION 2: Mark No for items that require attention and/ or remedial action (list comments in the box below) Mark Yes for items that are correct, present, satisfactory, etc. Item # Checklist Item Status 1 Is appropriate housekeeping being maintained in the service garage areas? 2 Are all substances/ dangerous good used/ stored on site approved? 3 Are SDS available for all substances/ dangerous goods? 4 Is all waste generated on site appropriately classified and handled? 5 Are waste reuse/recycling practices maximised on site where practicable? 6 Are records of waste tracking available/ kept for all waste materials removed from site? 7 Are stormwater discharge areas clean with no evidence of hydrocarbons or excess silt? 8 Is external concrete area clean with no excess rubbish on site? 9 Are vehicle spills (i.e. oil, fuel, coolant) throughout the garage appropriately cleaned up? 10 Are spill kits in place and fully stocked for any spills or emergency incidents? 11 Are all contractors (providing mobile light vehicle services) fully inducted and holding appropriate SDS and emergency spill management controls? 12 Comments: (Detail any items that require attention and/or remedial action) Actions listed below are to be written up on in-gauge. Item # Comment Page 110 of 149

8 Page 111 of 149

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply

More information

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003 Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

Safety and Health Office WORKPLACE SAFETY CHECKLIST

Safety and Health Office WORKPLACE SAFETY CHECKLIST Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting

More information

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008

BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park

More information

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Good Housekeeping Practices for DPW/Fleet Maintenance Facilities Kevin P. Walker C&S Engineers, Inc. Best Management Practices Best Management Practices (BMPs) are measures and/or controls used to prevent

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014

Safety Manual Title: Spill Prevention & Response Review Date: 6/1/2014 Operation s Purpose The purpose of this plan is to document spill prevention and response requirements. Each Elkhorn Construction, Inc. jobsite will develop a spill prevention and response plan based on

More information

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,

More information

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services. Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9

More information

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas

ACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas ACTIVITY NAME Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas CY 2014 BOTTOM LINE UP FRONT To prevent oil discharges

More information

History of the SPCC Rule

History of the SPCC Rule 2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally

More information

R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN

R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN LEND LEASE BUILDING PTY LIMITED ABN 97 000 098 162 R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN 3/12/2015 Revision

More information

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry AURV471482A Plan and manage compliance with environmental regulations in the body repair industry Release: 1 AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS

GUIDANCE FOR DEVELOPMENT OF SPILL AND SLUG PREVENTION CONTROL PLANS AND FACILITIES FOR THE CITY OF ATTLEBORO SEWER USERS Company Name: Address: The City of Attleboro s Rules and Regulations for the use of Wastewater Facilities require each user to provide protection from accidental discharge of prohibited materials and substances

More information

Spill Control Prevention Plan (SCPP)

Spill Control Prevention Plan (SCPP) Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Ingredion ANZ Pty Ltd

Ingredion ANZ Pty Ltd Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)

More information

CONTRACTOR INDUCTION HANDBOOK

CONTRACTOR INDUCTION HANDBOOK CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with

More information

Monthly Warehouse Inspection Checklist

Monthly Warehouse Inspection Checklist Monthly Warehouse Inspection Checklist This timetable will assist you in the timely completion of various protocols in order to obtain certification. Specific Warehouse Inspections 3 PROTOCOL DESCRIPTION

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed

More information

Environmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department

Environmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department Environmental Standard Operating Procedure Originating Office: MCAS Miramar Environmental Management Department Revision: Original Prepared By: Environmental Management Department Approved By: William

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

Safety Inspection Checklist

Safety Inspection Checklist Inspector(s): Building: Room Number (s): Department/Unit: Date Inspected: Supervisor: To customize your local inspection checklist, delete or add as required. Inspection Headings: 1. Administrative 8.

More information

Example risk assessment for a motor vehicle mechanical repair workshop

Example risk assessment for a motor vehicle mechanical repair workshop Example risk assessment for a motor vehicle mechanical repair workshop Setting the scene The garage manager did the risk assessment. The business employed 12 mechanics, including two apprentices who carried

More information

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations

Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,

More information

WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1

WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1 WORKPLACE INDUCTION FOR CONSTRUCTION WORKPLACES INFORMATION SHEET 1 Overview This Information Sheet provides advice for persons conducting a business or undertaking (PCBUs) including builders and principal

More information

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES

SOP 4: Spill Response and Cleanup Procedures SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES SOP 4: SPILL RESPONSE AND CLEANUP PROCEDURES Municipalities are responsible for any contaminant spill or release that occurs on property they own or operate. Particular areas of concern include any facilities

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

UNIVERSITY OF WISCONSIN MADISON

UNIVERSITY OF WISCONSIN MADISON UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common

More information

Restaurant & café guide

Restaurant & café guide 'Helping our customers stay in business by reducing risk' NZI Risk Solutions TM About NZI Risk Solutions NZI has extensive experience in providing expert risk management advice to help our commercial customers

More information

Site Induction Presentation

Site Induction Presentation ABC Contracting Site Induction Presentation This presentation provides a mock site induction and serves to help those people in the process of preparing and delivering site inductions It is essential that

More information

Good Housekeeping BMP

Good Housekeeping BMP E.1. Good Housekeeping BMP Sweep or vacuum shops floor frequently. Use mopping as an alternative to hosing down work areas. Spot clean any spilled oil or fluids using absorbents or rags. Use dry cleanup

More information

Environment Information Sheet 8 Spill Response

Environment Information Sheet 8 Spill Response Environment Information Sheet 8 Spill Response Prevention is better than spill response What s the issue with spills? Spills of fuel, oil and / or chemicals pose a significant risk to groundwater at the

More information

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS

WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks

More information

SBR FIRE RISK ASSESSMENT

SBR FIRE RISK ASSESSMENT SBR FIRE RISK ASSESSMENT Report of audit and inspection Premises Details Occupier Premises Address Premises Description Times premises are in use Use and maximum no. people present The British School of

More information

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE 1 of 12 DOCUMENT REVISION HISTORY Revision No. Date DESCRIPTION OF CHANGES Pages Affected By 00 01/07/2003 Draft Issued For Comment All HSEQ Dept. 01 01/09/2003 Total Change First Approved Issue All HSEQ

More information

Stormwater BMPs: Secondary Containment and Spill Control. September 2012

Stormwater BMPs: Secondary Containment and Spill Control. September 2012 Stormwater BMPs: Secondary Containment and Spill Control September 2012 Secondary Containment Secondary Containment Helps to minimize the potential for pollution by: Keeping spills in a confined area Preventing

More information

Title: Aircraft Parking

Title: Aircraft Parking Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department

More information

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

Spill Prevention, Control and Countermeasure (SPCC) Training

Spill Prevention, Control and Countermeasure (SPCC) Training Spill Prevention, Control and Countermeasure (SPCC) Training Fort Jackson 2015 Origins of SPCC Regulatory History 1972 Clean Water Act Oil Pollution Act of 1990 Spill Prevention Control and Countermeasures

More information

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency;

1.1. EMERGENCY PROCEDURE On discovering a fire or being informed of an emergency; Fire Action Plan FIRE ACTION PLAN SEStran aims to provide and maintain safe & healthy working conditions, equipment and systems of work for all our employees, and to provide such information, training

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park

More information

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No General Inspection FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS 1. All Floors (inspect from top floor to basement): Yes are fire exits and directional signs properly illuminated? is the emergency

More information

Outdoor Storage of Raw Materials SC-33

Outdoor Storage of Raw Materials SC-33 Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

Environmental Management System Procedures

Environmental Management System Procedures Environmental Management System s Plan Title Oils and Oil Contaminated Items Delivery, Storage, Use and Disposal Ref No Op-Proc-71 Related Documents EMS-Plan-7 Op-Proc-72 EMS-F-71 EMS-F-72 Record of Revisions

More information

FLAMMABLE LIQUIDS COMPLIANCE NOTE

FLAMMABLE LIQUIDS COMPLIANCE NOTE Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL

COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL COLUMBUS STATE COMMUNITY COLLEGE EMPLOYEE SAFETY MANUAL HAZARDOUS MATERIAL MANAGEMENT Effective October 15, 1995 Page 1 of 4 Updated August, 2008 Revised August, 2009 A. Columbus State Community College

More information

ecognition of Prior Learning (RPL)

ecognition of Prior Learning (RPL) ecognition of Prior Learning (RPL) ASSESSMENT GUIDE FOR INSPECT AND LUBRICATE AN AUTOMOTIVE SYSTEM Assessment Guide inspect and lubricate an automotive system Page 1 of 9 National Certificate in Professional

More information

Safety and Environmental Information for External Companies Koehler Oberkirch

Safety and Environmental Information for External Companies Koehler Oberkirch and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13

More information

TOWN OF MANSFIELD STORMWATER POLLUTION PREVENTION PLAN. for the TOWN GARAGE (230 CLOVER MILL ROAD) REVISED JANUARY, 1997 REVISED SEPTEMBER, 2003

TOWN OF MANSFIELD STORMWATER POLLUTION PREVENTION PLAN. for the TOWN GARAGE (230 CLOVER MILL ROAD) REVISED JANUARY, 1997 REVISED SEPTEMBER, 2003 TOWN OF MANSFIELD STORMWATER POLLUTION PREVENTION PLAN for the TOWN GARAGE (230 CLOVER MILL ROAD) REVISED JANUARY, 1997 REVISED SEPTEMBER, 2003 REVISED JANUARY, 2005 REVISED MARCH, 2007 REVISED MAY, 2011

More information

Contractor Name: Foremen/Superintendent on-site: email: phone: 24 Hr Phone# Email: Project Address: Floor(s)

Contractor Name: Foremen/Superintendent on-site: email: phone: 24 Hr Phone# Email: Project Address: Floor(s) FACILITIES & CONSTRUCTION MANAGEMENT SAFE WORK PLAN This document must be submitted with typed responses. Hand written forms will not be acceptable. All responses must be completed or filled in with N/A

More information

Company Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000

Company Name Chemical Spill Prevention & Clean-up Procedures Program. Last Revised On 00/00/0000 Company Name Chemical Spill Prevention & Clean-up Procedures Program Last Revised On 00/00/0000 PURPOSE The following program will discuss how prevent chemical spills from occurring and setting forth procedures

More information

Course of Construction Questionnaire

Course of Construction Questionnaire Course of Construction Questionnaire CLIENT DETAILS Broker: Contact: Insured s name: Policy number: Address undergoing works: Insured s contact phone number: 1) Name and address of Contractor: 2) Contractor

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

Housekeeping Audit Check Sheet for Warehouse (Refer SOP QMS-105)

Housekeeping Audit Check Sheet for Warehouse (Refer SOP QMS-105) Area Audited Audit Date Week Wk1 Wk2 Wk3 Wk4 Office Documentation stored appropriately Contact lists near phones are clearly displayed, current and easily accessible. All personal items are stored in lockers.

More information

Risk Assessment / Safety Checklist

Risk Assessment / Safety Checklist Risk Assessment / Safety Checklist For Events USC has a duty to provide a safe and healthy environment for those visiting USC to the extent that it is reasonably practical. To ensure USC provides a safe

More information

National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards

National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards Version 1.0 February 2014 Maintenance Management standards Maintenance Management Systems 1.

More information

OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001

OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001 OIL CONTAINMENT AND SPILL MITIGATION Page: 1 of 8 OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001 Prepared and Maintained by: J Versluys Maintenance Manager Authorised and Approved by:

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

APPENDIX 7-B. Hazardous Materials Management Plan

APPENDIX 7-B. Hazardous Materials Management Plan S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction

More information

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control & Cleanup SC-11 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to

More information

Notes. Material 1. Appropriate Flammable Liquids

Notes. Material 1. Appropriate Flammable Liquids 29 CFR 1910.106 Flammable Materials Flammable Liquids Preparation 1. Read Applicable Background information and related Company Policy Chapter. 2. Make Copies of this Lesson Plan for Personnel 3. Make

More information

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS The attached self-inspection form is intended for staff use at regular, frequent intervals. It should not take the place of two other vital measures

More information

CHAPTER 62-740 PETROLEUM CONTACT WATER

CHAPTER 62-740 PETROLEUM CONTACT WATER CHAPTER 62-740 PETROLEUM CONTACT WATER 62-740.010 Declaration of Intent (Repealed) 62-740.020 Applicability 62-740.030 Definitions 62-740.040 General 62-740.100 Management Practices for Producers of PCW

More information

Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry

Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry Company Name: Safety Meeting ID: 16 Date: Grainger Safety Services Inc. 2012 Safety Meeting Topic: Chemical Spills and Emergency Action Plans for General Industry UPDATED: This safety meeting has been

More information

15GAL STEEL OIL DRAIN WITH 110V PUMP

15GAL STEEL OIL DRAIN WITH 110V PUMP 15GAL STEEL OIL DRAIN WITH 110V PUMP OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety

More information

RHODE ISLAND. Downloaded 01.15.11

RHODE ISLAND. Downloaded 01.15.11 Housekeeping/Laundry/Maintenance Section 35.0 Housekeeping RHODE ISLAND Downloaded 01.15.11 35.1 A full time employee of the facility shall be designated responsible for housekeeping services, supervision

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Kidd Mine Barricade Standards

Kidd Mine Barricade Standards Kidd Mine Barricade Standards Wednesday, February 13, 2013 Why Upgrade Our Barricade Standard? Eliminate any confusion with fences, signs and their purpose in our operation by applying an easily recognizable

More information

Standard Operating Procedure Title: Housekeeping Audit Procedure

Standard Operating Procedure Title: Housekeeping Audit Procedure Standard Operating Procedure Title: Housekeeping Audit Procedure Department Quality Management Document no QMS-105 Prepared by: Date: Supersedes: Checked by: Date: Date Issued: Approved by: Date: Review

More information

Action required (Please tick) If you answered YES, record Action Points at STEP 4

Action required (Please tick) If you answered YES, record Action Points at STEP 4 RECORD OF FIRE SAFETY RISK ASSESSMENT Building Name & Use: Address: Postcode: Name of person(s) with fire safety duties: Name and contact details of assessor: Date of Assessment: 6 th February 2011 Laurel

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Workshop Self Inspection Checklist WORK01

Workshop Self Inspection Checklist WORK01 Workshop Self Inspection Checklist WORK01 General Mechanical Workshops Location Assessor Date This core checklist is provided by the Health and Safety Department as a template, which provides a basic framework

More information

EMERGENCY PLANS FACT SHEET

EMERGENCY PLANS FACT SHEET EMERGENCY PLANS FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on preparing and maintaining general emergency plans for

More information

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING

FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE

More information

Managing Floor Drains and Flammable Traps

Managing Floor Drains and Flammable Traps Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended

More information

For an Incidental Oil Spill:

For an Incidental Oil Spill: Table 2 Oil Spill Procedural Checklist In the event of a spill or accidental release of fuel oil or other combustible material on premises, WWU personnel follow the procedural checklist outlined below.

More information

An inventory of hazardous materials used in your workplace will prove useful.

An inventory of hazardous materials used in your workplace will prove useful. Introduction Fire Protection is an organized approach designed to prevent fires. In the event of a fire, a fire protection program will help prevent or minimize personal injuries, losses, and harm to the

More information

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT

SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT SELF-INSPECTION PROGRAM FOR FIRE PROTECTION EQUIPMENT INTRODUCTION No matter how reliable fire protection equipment may seem, periodic maintenance is needed to ensure proper operation. Fire protection

More information

Health and Safety at Work Policy

Health and Safety at Work Policy Health and Safety at Work Policy Introduction Management of health and safety issues is an integral part of our business and is given the highest priority. Compliance with Health and Safety legislation

More information

BUSINESS INSPECTION PROGRAM

BUSINESS INSPECTION PROGRAM RESOURCES FOR ENVIRONMENTAL HELP BUSINESS INSPECTION PROGRAM How can I help keep our waters clean and healthy? Educate your staff about common surface water pollution sources (spills, leaky containers

More information

Routine Maintenance and Inspection

Routine Maintenance and Inspection THE CORPORATION OF THE VILLAGE OF WARFIELD POLICY TITLE: Sanitary Sewer Operations POLICY: #5435 PURPOSE: This policy is to provide the Village of Warfield s procedures for maintaining its sanitary sewer

More information

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act

More information

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident Response Management Plan (PIRMP) Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:

More information

Managing the Risk of Legionnaires Disease in Vehicle Wash Systems

Managing the Risk of Legionnaires Disease in Vehicle Wash Systems Managing the Risk of Legionnaires Disease in Vehicle Wash Systems Guidance produced by a Water Management Society Working Party First published June 2008 Working Party members: John Alvey, David Bebbington,

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH

FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH FACILITY SAFETY SIGNAGE GUIDE: 10 SIGNS TO SPOT DURING A PLANT WALKTHROUGH Safety signs are the primary way to communicate important warnings and messages to your employees, on-site contractors and other

More information

WORKING IN CONFINED SPACES GUIDELINES

WORKING IN CONFINED SPACES GUIDELINES WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...

More information

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012 DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines