1 LEND LEASE BUILDING PTY LIMITED ABN R8000 NEW AIR COMBAT CAPABILITY (NACC) FACILITIES PROJECT, RAAF BASE WILLIAMTOWN HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN 3/12/2015 Revision No: 7
2 Plan Revision Status Date Revision (in numbers) 19/09/ Initial Draft Purpose and Summary of Amendments Reviewed by Approved by 15/10/ For Construction 14/11/ Updated to include SEM s and additional internal QA comments 16/03/ Updated chemical storage and labelling requirements 22/06/ Quarterly review. Included responsibilities coloum. 22/09/ Quarterly review and update 3/12/ Quarterly review and update *Note that all printed paper/hard copies of this document and related procedures are uncontrolled. The controlled copy of this document is found either in Project Web, within the Project Management Plan section, or other project specific database/server approved by the Regional EHS Manager. HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 2 of 11
3 HAZARDOUS SUBSTANCES/DANGEROUS GOODS MANAGEMENT PLAN Scope: This Hazardous Substances / Dangerous Goods Management Plan details management measures for Hazardous Substances / Dangerous Goods during construction at the NACC Facilities Project Williamtown. It defines mitigation measures to be implemented, storage and handling protocols that enables control of the impacts of construction activities on potentially affected areas, and contingency measures that may be implemented if unforseen release or exposures are experienced. Objective: To receive, store, utilise, handle and dispose of chemical and hazardous materials in an environmentally appropriate manner. To prevent any contamination of site work areas and adjoining properties including all aquatic ecosystems by chemicals and fuels etc. utilised on the construction site. To ensure proper treatment / disposed of substances as needed. Typically Hazardous Substances / Dangerous Goods exist in three (3) forms on a construction sites, being a solid, liquid or a gas. These substances are usually recognisable as bulk fuels; products containing asbestos, lead based paints as well as chemicals (both used and stored) such as PCBs. On a typical project site there are five (5) classes of Hazardous Substances and Dangerous Goods (HS&DG), which are most commonly utilised. 1. Dangerous Goods Class 2.1(Flammable gases): propane, LPG, acetylene 2. Dangerous Goods Class 2.2(Non-flammable non-toxic gases): argon 3. Dangerous Goods Class 3 (Flammable liquids): diesel fuels, petrol, lubricating oil etc. 4. Dangerous Goods Class 5.1 (Oxidizing substances): oxygen, hydrogen peroxide. 5. Dangerous Goods Class 8 (Corrosive substances): cleaning acids, chloride Risks: Hazardous Materials may also be encountered during demolition of existing structures and buildings, management of this risk is addressed in the Asbestos & Hazardous Building Materials Management Plan There is potential to encounter contaminated soil or groundwater during excavation work, this risk will be addressed in the Contaminated Soil & Water Management Plan. Sensitive receptors include: construction teams, RAAF Base personnel, Newcastle Airport staff and visitors, Fighter World Tomago Sand beds Aquifer. Neighbouring Properties An escape of hazardous substances may have a potentially significant environmental and human health consequence. Appropriate management measures must be established to prevent any environmental incidents from occurring. The implementation of the Hazardous Substances & Dangerous Goods Management Plan is intended as mitigation measures to prevent the following risks from occurring. HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 3 of 11
4 Leaks or spill from site storage, or use of dangerous / hazardous goods such as fuels. Exposure of site workers or base personnel or the public to dangerous goods or hazardous substances Inappropriate disposal of dangerous goods or hazardous substances Commonwealth: Environment Protection and Biodiversity Conservation Act 1999 State: While state legislation does not apply to Defence activities, Defence aims to be good environmental stewards and comply with State government legislation and policies to the extent that these do not conflict with Commonwealth legislative obligations or compromise operational objectives or capability. NOTE: State Legislation does apply to activities carried out outside of Defence land. Key Legislation / Standards / Guidance Protection of the Environment Operations Act (POEO) 1997; Protection of the Environment Operations (General) Regulation 1998; Contaminated Land Management Amendment Act 2008; Explosives Act 2003 and Regulation 2005; Occupational Health and Safety Act (OHS) 2000 and Regulation 2001; OHS Amendment Act (Dangerous Goods) 2003; Road and Rail Transport Act (Dangerous Goods) 1997; Pesticides Act 1999; Environmentally Hazardous Chemicals Act Guidelines and Standards: Waste Classification Guidelines 2014 (NSW EPA Publication); NSW Rural Fire Service publication Equipment and Machinery Use in Bush Fire Prone Areas ; and Acid Sulphate Soil Manual (ASSMAC 1998) Australian Standard AS 1940: 2004 Storage and Handling of Flammable and Combustible Liquids Australian Standard AS 4452B1997: The Storage and Handling of Toxic Substances National Code of Practice for the Labelling of Workplace Substances. National Code of Practice for the Preparation of Material Safety Data Sheets (Check Safe Work Australia) Work Health and Safety Act & Regulation 2011 Construction teams will aim to minimise the need bulk for storage on site of HS&DG. Site Controls: Hazardous substances/ dangerous goods (HS&DG) storage and handling impacts shall be minimised by incorporation of appropriate control measures in the specification and contract HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 4 of 11
5 arrangements, and quality assurance inspection and monitoring during construction. The installation and maintenance of HS&DG controls during the construction phase shall be accordance with the following table. All controls are to comply will the Lendlease GMRs Storage of HS&DG Site Control Measures Timing Methodology Responsibility Monitoring and Reporting Performance Measure A HS&DG stores location will be planned and recorded for the site. These plans will be updated as the site changes or work progresses Prior to works commencing Detail the designated storage locations for all dangerous goods on the site will be included in the Erosion and Sediment Control Plans (ESCP). CM/SM Review of ESCP prior works commencing. Diagram to be reviewed as required. ESCP prepared & containing all relevant details. HS&DG Stores located away from sensitive receptors. Dangerous goods storage locations must be positioned away from high traffic areas, pedestrian zones and environmentally sensitive areas such as waterways or natural habitats. CM Review prior to designation as a HS&DG Store. Review at quarterly EHS Audit Not within vicinity of sensitive receptor. Appropriate HS&DG stores constructed on site in designated areas. All chemicals to be stored in secure covered bundled areas with capacity to hold 110% of the volume of the largest container. SM Weekly inspection. Appropriate structures i.e. sealed floors & bund, cover/roof, signage, designated drainage & sump collection, security. Sump will be provided for pumping out the bund No uncontrolled spills/ leakages. Chemicals will be appropriately segregated and spill kits and firefighting appliances will be available at all chemical stores. Design and construct HS&DG stores prior to commencing works. Maintain bunds to preserve clean storage capacity Bunds to be maintained empty of accumulated chemicals or rainwater. SM Weekly inspection. All bunds maintained clean and with full capacity. All dewatering of chemical bunds tested and disposed of to an appropriately licenced liquid waste disposal facility (see Waste Management Plan) Ensure Storage and handling procedures are reviewed and made available. Chemicals, fuels and oil containers must be clearly labelled. Reference to these procedures should be included in the site induction. Prior to works commencing Covered in the site induction training. All storage containers are labelled in compliance with National Code of Practice for the Labelling of Workplace Substances SM Review effectiveness at 3 monthly EHS audit. Inspections No employee without site induction. No unlabled chemicals, fuels and oil containers are on site. Safety Data Sheet (SDS) register and Prior to Contractors to supply SDS and for inclusion in SM SDS supplied required prior to use SDS centrally located (first aid). HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 5 of 11
6 Site Control Measures Timing Methodology Responsibility Monitoring and Reporting Performance Measure HS&DG Register to be maintained on site. SDS should not be more than 5 years old from the issue date. substance being used on site. the Hazardous Substances/Dangerous Goods Register. Hazardous Substances/Dangerous Goods Register No substance being used without SDS. No substance being stored on-site without inclusion in HS&DG Register. Security measures in place for all HS&DG Stores. Install security prior to works commencing. Induct and train all staff and site personnel. SM Weekly inspection. No theft, vandalism or misuse. No HS&DG Stores left open or unlocked without supervision. Provide appropriate spill kits at any permanent fuel / chemical storage bunds and areas. Appropriate spill kits adjacent to all HS/DG Storage areas. Hydrocarbon Spill Kits to be provided where fuel and oils are being stored. Sub-Contractor/ SM Weekly inspection. Risk assessments Fully stocked and appropriate spill kit available at storage areas. General Spill Kits to be provided where water based products are being stored. Where risk assessments indicate, specialist chemical spill kits may be required for products such as acids or corrosive chemicals Emergency procedures regarding spillage containment, control and clean up shall be displayed in a prominent position within the site Implement the spill ranagement procedures described below in the event of a land-based or water based fuel, oil or chemical spill. SM Monitoring of activities and condition of spill kits including re-stock.. Drills to be undertaken every 6 months No spill or handling incidents with the potential to cause environmental degradation or human health impact. Use of HS&DG Refuelling of plant will take place in designated areas, 20m away from any water course or drain, on hard stand and with spill kits on hand to contain and clean up any spills. Light vehicles will be refuelled and maintained off site. Maintenance and cleaning of plant done in appropriately designed and controlled areas Refuelling to follow the Refuelling Procedure (Appendix A) SWMS to be provided Spill kit available at fuelling point. Containment controls must be in place prior to operations commencing. Major maintenance should be completed off site where possible. As a minimum maintenance activities should be carried out 20m away from any water course or drain, on hard stand and with spill kits on hand to contain and clean up any spills. Where emergency maintenance necessitates Sub-Contractor/SM Sub-Contractor./SM HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 6 of 11 Refuelling activities supervised at all times. Auditt of Work Method Statement Random inspection Work Method Statement No refuelling by other means No maintenance outside designated areas. Designated areas shown on ESCP.
7 Site Control Measures Timing Methodology Responsibility Monitoring and Reporting Performance Measure Plant and equipment checklists to be completed.. Provide appropriate spill kits in areas where fuels or chemicals are being used. Personnel to be trained in the use of the provided spill kits to control, contain and clean up spills exception to this requirement, all practical measures such as portable bunds, ground sheets and good housekeeping must be employed to prevent chemical, fuel or oil spills. As necessary Using developed checklists Plant operators/ SM Daily (documented) inspections by operators/subcontractors Prior to commencing work involving use of fuels or chemicals Appropriate spill kits to be readily available where fuel and chemicals are being used. Hydrocarbon Spill Kits to be provided where fuel and oils are being used. General Spill Kits to be provided where water based products are being used Where risk assessments indicate, specialist chemical spill kits may be required for products such as acids or corrosive chemicals Spill response procedure to be covered in Site Induction and trained in specific training / toolbox sessions as required Drills to be undertaken every 6 months All spills to be recorded and reported All spills to be reported to the Managing Contractor. Respond to spills to minimise environmental harm In the event of a spill The Managing Contractor will report to the Client as required, in accordance with the documented environmental incident reporting detailed within the Site Management Plan. Ensure all personnel are away from danger. Notify the site supervisor. Stop the leak or source of spill if possible Contain and absorb spill and all potential runoff from affected area On hardstand surfaces - Form a barrier around spill using booms. For large spills a temporary bund may be required to be installed. Sub-Contractor/SM Sub-Contractor/SM HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 7 of 11 Random checks EHS Weekly Checklist. ESCP Weekly inspection. Quarterly GMR Audit Periodic spill kit inspections /audits Induction and training records Spill Drill records Spill reports / investigations Daily log books filled out. No preventable spills. Fully stocked and appropriate spill kit available where chemicals and fuels are used. Appropriate level of understanding of spill response as demonstrated in response to spill incidents and during spill drills. SM Spill reports All spills reported in accordance with the EHS Management Plan and Site Management Plan SM / Sub-contractor /EM Spill reports All spill s manged appropriately to minimise environmental harm.
8 Site Control Measures Timing Methodology Responsibility Monitoring and Reporting Performance Measure Adequate Fire Fighting Equipment to be kept in designated areas. Concrete waste and wash water to be contained and managed Management of HS&DG Waste Waste substances (oil/ diesel/solvents) to be collected and stored in designated liquid waste containers within bundled area until Use absorbent material and pads to absorb the spill. Work from the perimeter of the spill towards the center. On soil and sand as soon as possible stop the source of the spill and/or prevent further spill onto the ground and excavate spill contaminated material to minimize potentntial for the spill soaking down into the aquifer. Place contaminated material on a bunded impervious surface. For spills on water ensure that absorbent materials from marine spill kit are used. Collect and dispose of absorbent materials appropriately. Waste absorbent materials are to be disposed of at a suitably licensed disposal facility and transported by a licensed contractor. Report spill and restock used spill response materials As per the site risk assessment. Contractor/SM Random / through weekly EHS walk. Sufficient firefighting equipment and suitable types based on Hazardous Substances/Dangerous Goods Register. As required Concrete washout will be to lined and bundled concrete wash out bays only. Site inductions and signage on site will direct concrete Agi s and pumps to the washout bays. Blow out lines and waste concrete will be to designated washouts or onto plastic sheeting or similar for collection and disposal. Sufficient capacity allowed in design of HS/DG storage facilities. See also Waste Management Plan HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 8 of 11 Contractor/SM Weekly inspection No pollution of soil or waterways/drains due to concrete waste or wash water Contractor/SM Inspection weekly Waste Register Waste receipts/dockets All liquid waste placed in appropriate containers. No uncontrolled spills or leakages.
9 Site Control Measures Timing Methodology Responsibility Monitoring and Reporting Performance Measure disposal can be arranged. Waste substances (oil/ diesel/solvents) to be removed/disposed to an appropriately licenced waste facility. As required As per approved contractors list. In accordance with contractor SWMS. Waste to be transported by a licenced contractor and/or tracked where required by NSW Waste legislation / guidelines. See also Waste Management Plan Contractor/SM Waste Register Waste receipts/dockets Waste tracking documentation (where required) Reports from waste contractor Liquid Waste collection/disposal dockets provided for every load. Waste disposal documentation available in site files, and provided to Managing Contractor as required. Verification through EHS Audits. Waste substances (oil/diesel/solvents) to be recycled, where possible. As required Designated area for storage of recyclable substances. Contractor/SM Verification through EHS Audits. Site inspections Waste dockets from recycling contractors. Toilet waste to be disposed to an appropriately licenced waste facility As required Via the HWC sewerage system, or collected by an appropriately licenced contractor. In accordance with the NSW EPA Waste Guidelines. SM As required Waste disposal receipts No uncontrolled discharges and/or spills HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 9 of 11
10 Appendix A Onsite Refuelling Protocol 1. Introduction This on site refueling protocol has been developed to manage all refueling of vehicles / plant during construction for NACC Facilities Project at RAAF Williamtown. The protocol is to be implemented by all sub-contractors and Lendlease personel responsible for refueling of plant, vehicles or machinery. The includes: i. a decision-making flowchart to determine whether on-site or off-site refueling is appropriate in a given situation; ii. iii. procedures for refueling to address the potential for spills, collisions with refueling vehicles or other hazardous incidents; and procedures to be followed in the event of a diesel spill, including containment and clean-up measures. 2. Refuelling Decision Flowchart The following decision making process diagram will be used to determine appropriate refueling locations. Are the vehicles / machinery to be refuelled able to reasonably travel to dedicated Project or external refueling locations? YES NO Refuelling must be undertaken in dedicated facilities either: 1. in external refueling locations or 2. in hardstand / compound / workshop locations to minimise construction-site refueling. See Section 3a Ensure all management measures and checks are completed as detailed in Section 3b of this Protocol. Refuelling may then commence Are vehicles / machinery positioned on level ground and at least 20m from a waterway? YES NO Are vehicles / machinery able to be reasonably repositioned to meet above criteria? (If Yes, do so) YES NO Ensure Environmental Officer is notified of works, Section 3b is complied with and any additional spill response material directed by the Environmental Coordinator is available. Refuelling may then commence HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 10 of 11
11 3a. Refuelling in Dedicated Areas Refuelling externally from the Project site or within dedicated hardstand / compound / workshop areas on the site is preferred. When refuelling in workshop or compound areas, the following standard safeguards must be followed: 1. refuelling areas must be on hardstand areas and able to capture and contain any spills in oil / water separators; 2. where practical, refuelling areas should be undercover to prevent interaction with rainwater; and 3. regular maintenance of refuelling areas and associated containment / treatment devices should be undertaken. 3b. On-Site Refuelling Requirements Where refuelling cannot be undertaken externally or in dedicated compound / workshop locations, the following control measures must be implemented: 1. refuelling must be undertaken on relatively level ground at least 20m from waterways, drainage lines and sensitive areas. Where this is not possible, notify the Environmental Officer and implement additional spill controls measures; 2. never refuel in vegetated areas; 3. never leave the refueling activity unattended; 4. know where your spill kit is kept and ensure you know how to use it. Keep a spill kit on the refueling truck; 5. ensure the machine operator shutdowns the machine and make safe according to the manufacturers specifications before refuelling; 6. where possible drip trays to be placed under standing machinery i.e. generators, compressors etc.; 7. handling, storage and disposal of fuel, oil, and other chemicals will be undertaken in accordance with the Waste Guidelines (DECCW 2008) and AS , the Storage and Handling of Flammable and Combustible Liquids; 8. control measures in this Protocol will be followed and all relevant personnel trained in the requirements; 9. emergency response procedures outlined in the HS&DGMP shall be implemented in the event of a spill or other environmental incident; and 10. spill incidents will be reported to the site supervisor, who will report this to the environment team for action. 3c. Fuel Transportation Requirements The following fuel transport controls will be implemented: 1. on site transportation of fuel will only be carried out on established access haul roads; 2. vehicles/trucks used to transport fuels and chemicals must be maintained to prevent spillage of loads; 3. fuel trucks entering site will be fitted with standard site safety gear including UHF radios, reversing beepers and flashing lights to ensure visibility on site and reduces the risk of vehicular collisions; and 4. any container used to transport fuel must be secured on the vehicle carrying the container. HAZARDOUS SUBSTANCES DANGEROUS GOODS MANAGEMENT PLAN Page 11 of 11
Chemical Storage and Spill Response Guidelines
Chemical Storage and Spill Response Guidelines 9TP-SD-066/3.0 Supporting Document Applicable to Transport Projects Delivery Office Quality Management System Status: Approved Version: 3.0 Branch: Business
More informationHYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003
Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved
More informationPollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
More informationANNEX 2 Emergency / Pollution Incident Response Plan
ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...
More informationPollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
More informationIngredion ANZ Pty Ltd
Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
FUCHS LUBRICANTS (AUSTRALASIA) PTY LTD 2 HOLLAND STREET WICKHAM NSW POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN ENVIRONMENTAL PROTECTION LICENCE No.10181 Pubic Version DOC REF:ENV228 ISSUE:1 DATE:21.11.13
More informationPollution Incident Response Management Plan
Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes
More informationEnvironmental Management Plan
Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply
More informationUDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES
UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,
More informationAppendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public
Appendix J3 - Outline Fuel Spill Contingency Response Plan Control room receives call on fuel spill from staff or public Initial Actions to be taken after Fuel Spill reported Identification of the source
More informationSPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA
SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed
More informationCompany Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]
Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]
More informationWaste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
More informationCivil Engineering Sector Labour-Management Health and Safety Committee
PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION
More informationALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
More informationBEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008
BEHANS LAND RESTORATION LIMITED RESTORATION OF FORMER QUARRY BLACKHALL, CO. KILDARE OUTLINE CONTINGENCY PLAN MAY 2008 JBA Prepared by : John Barnett and Associates / SLR Consulting 7 Dundrum Business Park
More informationEnvironmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
More informationSILICON VALLEY CLEAN WATER. May 2015
SILICON VALLEY CLEAN WATER May 2015 Slug Discharge Control and Spill Containment Guidelines This document was revised and used with the permission of the Los Angeles County Sanitation District, Industrial
More informationSAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
More informationAPPENDIX 7-B. Hazardous Materials Management Plan
S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction
More informationImproper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
More informationChapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
More informationConstruction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
More informationMAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident
More informationAPPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O
APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND
More informationENVIRONMENTAL ASPECTS REGISTER (ISO 14001)
ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region
More informationHistory of the SPCC Rule
2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally
More informationACTIVITY NAME. Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas
ACTIVITY NAME Training Requirements for Spill Prevention Control and Countermeasures (SPCC) 40 CFR Part 112 Naval Air Station Corpus Christi Texas CY 2014 BOTTOM LINE UP FRONT To prevent oil discharges
More informationNarellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.
Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9
More informationGuide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationDisposal of chemical waste must be regarded as an integral part of all research projects and teaching programs involving chemical use.
1. Purpose and Objectives This procedure provides information on the generation, collection, storage and disposal of chemical waste to ensure: that the collection, storage and disposal of chemical waste
More informationDIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012
DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY August 2012 SECTION 2 The storage requirements in Directive 055 apply to upstream petroleum facilities, well sites, and pipelines
More informationPollution Incident Response Management
For Notification Procedure, please turn to Section 5 for Pollution Incident Response Management Document Table of Contents 1 Introduction... 3 1.1 Background and Scope... 3 1.2 Regulatory Requirements...
More informationFLAMMABLE LIQUIDS COMPLIANCE NOTE
Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic
More informationExtraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan
Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Pentarch PTY LTD Answerth Drive Oaklands, NSW Table of Contents 1. Description and Intended Use... 4 1.1. Overview... 4 1.2. Objectives... 4 1.3. Criteria...
More informationCHEMICAL SPILL MANAGEMENT GUIDELINES
WHS Unit CHEMICAL SPILL MANAGEMENT GUIDELINES Contents 1 Purpose... 2 2 Scope... 2 3 Definitions... 2 4 Roles and Responsibilities... 2 5 General... 2 6 Defining Major or Minor Spill... 3 7 Major Spill
More informationSydney Port Botany Terminal 3 Project Water Resource Management Plan
Civil Works Construction Contract Phase 1 1/8 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP
More informationEnvironmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024
Environmental Incident Response Procedure Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Document Number: NGSF-PSV-NAS-EN-PLN-0024 Version:
More informationAppendix J Spill Prevention and Response Plan
Appendix J Spill Prevention and Response Plan This page intentionally left blank SPILL PREVENTION AND RESPONSE PLAN THE LUCERNE SOLAR PROJECT SAN BERNARDINO COUNTY, CALIFORNIA Revision 1 dated: January
More informationWASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE
SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.
More informationSpill Prevention, Control and Countermeasure (SPCC) Rule
Spill Prevention, Control and Countermeasure (SPCC) Rule Code of Federal Regulations Title 40 CFR Part 112 Training Guide for Oil and Fuel handlers on Farms 1 Purpose of SPCC Rule To prevent oil discharges
More informationAppendix A1. Register of legal and other requirements
Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure
More informationContractor Environment, Health and Safety Management Plan
EHSMS10 Contractor and Supplier EHS Management Contractor Environment, Health and Safety Management Plan Purpose Guidelines Record Keeping This template provides an example to Santos Contractors of the
More informationSpill Prevention, Control & Cleanup SC-11
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to
More informationWHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
More informationAURV471482A Plan and manage compliance with environmental regulations in the body repair industry
AURV471482A Plan and manage compliance with environmental regulations in the body repair industry Release: 1 AURV471482A Plan and manage compliance with environmental regulations in the body repair industry
More informationAppendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
More informationEPA PRIMP Pollution Incident Response Management Plan
EPA PRIMP Pollution Incident Response Management Plan QA Department: QA Documents\EPA\Pollution Incident Response Management Plan Page 1 AMENDMENT REGISTER Version Number Page Numbers Subject Date QA Department:
More informationWHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
More informationSpill Control Prevention Plan (SCPP)
Spill Control Prevention Plan (SCPP) FACILITY INFORMATION PLEASE PRINT Facility Name: Mailing Address: Physical address if different: Owner Name: Owner Address: Primary Contact Name: Work Phone Number:
More informationEnvironmental Management System Procedures
Environmental Management System s Plan Title Oils and Oil Contaminated Items Delivery, Storage, Use and Disposal Ref No Op-Proc-71 Related Documents EMS-Plan-7 Op-Proc-72 EMS-F-71 EMS-F-72 Record of Revisions
More informationTHE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986
THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182 A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 The Council of the Corporation of the City of Courtenay in open meeting assembled enacts as follows:
More informationEnvironment Information Sheet 8 Spill Response
Environment Information Sheet 8 Spill Response Prevention is better than spill response What s the issue with spills? Spills of fuel, oil and / or chemicals pose a significant risk to groundwater at the
More informationOutdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
More informationOCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5
GUIDANCE NOTE OCCUPATIONAL SAFETY AND HEALTH MANAGEMENT AND CONTAMINATED SITES WORK 2 0 0 5 Guidance for employers, employees, site owners, consultants, self-employed people and contractors C O M M I S
More informationNatural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground
Natural Resources Conservation Authority Guidelines for Secondary Containment of Hazardous Liquids stored Above-ground December 2011 Table of Contents Definition of Terms... 2 Requirements for Secondary
More informationEnvironmental Compliance Report Liquid Chemical Storage, Handling and Spill Management
Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management Part B Review of Best Practice and Regulation The Liquid Chemical Storage, Handling and Spill Management Environmental
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationOIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001
OIL CONTAINMENT AND SPILL MITIGATION Page: 1 of 8 OIL CONTAINMENT AND SPILL MITIGATION M-04 ISSUE: F SEPTEMBER 2001 Prepared and Maintained by: J Versluys Maintenance Manager Authorised and Approved by:
More informationSTORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders
STORE HAZARDOUS SUBSTANCES SAFELY Suitable containers incompatibles gas cylinders Oxy-Acetylene welding flammable substances 35 36 STORE HAZARDOUS SUBSTANCES SAFELY STORE HAZARDOUS SUBSTANCES SAFELY Storing
More informationPLANNING & ENVIRONMENT COMMITTEE 8 JULY 2009 REGULATION OF CHARITY CAR WASHING ON ROADWAYS RECOMMENDATION:
341 PLANNING & ENVIRONMENT COMMITTEE 8 JULY 2009 19 REGULATION OF CHARITY CAR WASHING ON ROADWAYS Jacinta Oliver: 18/46/2-104: #2017806 RECOMMENDATION: That Council promote healthy waterways and water
More informationUCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS
Fire Safety Technical Guide UCL FIRE RISK ASSESSMENT POLICY& ARRANGEMENTS 1.0. BACKGROUND 1.1. The Regulatory Reform (Fire Safety) Order (known Fire Safety Order) applies to England and Wales (Northern
More informationSPILL RESPONSE PLAN. What is the Issue? Regulatory Requirements. General Information
An equal opportunity university SPILL RESPONSE PLAN What is the Issue? Accidental spills of petroleum products, common household cleaning products, hazardous materials or hazardous waste, can have negative
More informationHow To Safely Handle A Spill
WD DWGB 22 6 2010 Best Management Practices for Fueling and Maintenance of Excavation and Earthmoving Equipment Env Wq 401, Best Management Practices for Groundwater Protection, applies to a variety of
More informationSafety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
More informationRockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
More informationFlorida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
More informationWORKING IN ISOLATION PROCEDURE
Document uncontrolled when printed Procedure ID no 0479/05 WORKING IN ISOLATION PROCEDURE This procedure is applicable to: All Department of Education and Children's Services employees. DOCUMENT CONTROL
More informationAPPENDIX G Materials Storage and Handling Guidelines
APPENDIX G Materials Storage and Handling Guidelines 1.0 INTRODUCTION Operations at Austin-Bergstrom International Airport (ABIA) comprise several different industrial activities including aircraft, ground
More informationCritical Regulations SUMMARY OF. Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.
SUMMARY OF Critical Regulations Stormwater Management Regulations (National Pollutant Discharge Elimination System or "NPDES ) 40 CFR 122.26 Spill Prevention, Control, and Countermeasures Rule (SPCC) 40
More informationSpill Plan Reviewer s Guidance
Spill Plan Reviewer s Guidance WSDOT Hazardous Materials Program May 2013 2 Overview Purpose: Spill prevention planning is a key element for protecting the environment during construction. The Spill Plan
More informationManaging Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
More informationLIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
More informationSHENZHEN ENVIRONMENTAL PRINTED CIRCUIT BOARD COMPANY. Environmental Procedure
SHENZHEN ENVIRONMENTAL PRINTED CIRCUIT BOARD COMPANY Environmental Procedure Environmental Emergency Preparedness and Response (EP-05) Revision No. : 1 Prepared by : Jiang Ho (EMR) Approved by : Ma Hung
More informationWORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
More informationStormwater BMPs: Secondary Containment and Spill Control. September 2012
Stormwater BMPs: Secondary Containment and Spill Control September 2012 Secondary Containment Secondary Containment Helps to minimize the potential for pollution by: Keeping spills in a confined area Preventing
More informationGuide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools
APPENDIX II Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools (Prepared by Environmental Protection Department) 1. Introduction The Waste Disposal (Chemical
More informationDRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer
Only RAIN down the Storm Drain... DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer This publication applies to you if: You generate wastewater outdoors, and The wastewater
More informationSpill Containment control it before it controls you!
Spill Containment control it before it controls you! CIVILQUIP LTD is a family owned and operated company providing innovative solutions for the total control of hazardous liquids for a wide range of applications
More informationABOVE-GROUND STORAGE TANKS
ABOVE-GROUND STORAGE TANKS Above-ground storage tanks in Georgia are regulated by the State Fire Marshall and by the EPA. Above-ground tanks containing 1,100 gallons or less do not require any secondary
More informationThe Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview
The Federal Spill Prevention, Control & Countermeasures (SPCC) Rule Overview January 2012 Presented by: Annie Macmillan, Stephanie Congo The purpose of the SPCC rule is to prepare and implement a plan
More informationPROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan
PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client
More informationManagement of Contractors and Suppliers Procedure
Management of Contractors and HSE P1101 Table of Content 1 DOCUMENT CONTROL... 2 2 PURPOSE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 ROLES AND RESPONSIBILITIES... 5 6 PROCESS DETAILS... 9 6.1 Confirm Need
More informationJemalong Irrigation Limited. Pollution Incident Response Management Plan
Jemalong Irrigation Limited Pollution Incident Response Management Plan Pollution incidents must be reported immediately A pollution incident can be any of the following: An accident which involves any
More informationSpill Kits and Incidental Spill Response
Spill Kits and Incidental Spill Response June 2012 This training is intended to be educational and should not be construed as legal guidance. It is provided as a courtesy to our customers and others who
More informationTemporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationManagement of Environmental Risks and Emergencies. Compliance Audit Program
Management of Environmental Risks and Emergencies Compliance Audit Program 2012 State of NSW and Environment Protection Authority The State of NSW and the Environment Protection Authority (EPA) are pleased
More informationUNIVERSITY OF WISCONSIN MADISON
UNIVERSITY OF WISCONSIN MADISON Contractor Spill Contingency Plan (while working on campus) Departments of: Environment, Health & Safety Physical Plant Table of Contents Spill Contingency Plan Most Common
More informationEvent Planning Guidance Notes EVENT PLANNING GUIDANCE NOTES
EVENT PLANNING GUIDANCE NOTES 1 Event Planning Guidance Notes Important issues This documentation is not a full and authoritative statement of the law, statutory guidance or best practice in planning,
More informationINFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
More informationWORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
More informationa guide for wastewater producers and wastewater treatment plant operators
Contingency plans April 2007 Contingency Plans a guide for wastewater producers and wastewater treatment plant operators Updated May 2009 * EPA 696/09: This guideline has been provided to help licensees
More informationSPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN
SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the
More informationAPPENDIX 2A. Shah Deniz Production Sharing Agreement Extract
APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall
More informationPOLLUTION INCIDENT RESPONSE MANAGEMENT PLAN
POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Southern Oil Refining Pty Ltd 42 Lewington St. Bomen. NSW. 2650 Table of Contents 1 INTRODUCTION 1.1 Facility details 1.2 Overview of Operations 1.3 Plan Objectives
More informationPOLLUTION PREVENTION GUIDE: Storage and Handling. Report: R08/28 ISBN: 978-1-86937-811-0 Date: June 2008 PPG: Storage and Handling Module
POLLUTION PREVENTION GUIDE: Storage and Handling Report: R08/28 ISBN: 978-1-86937-811-0 Date: June 2008 PPG: Storage and Handling Module If the daily activities on your site involve storage and handling
More informationOutdoor Liquid Container Storage
Outdoor Liquid Container Storage SC-31 Objectives Cover Contain Educate Reduce/Minimize Description Accidental releases of materials from above ground liquid storage tanks, drums, and dumpsters present
More information