Infrastructure Asset Data Dictionary for the UK. Asset Data Dictionary Definition Document Generic Attributes
|
|
- Anastasia George
- 7 years ago
- Views:
Transcription
1 Asset Data Dictionary Definition Document Generic Attributes
2 Contents Introduction... 3 Attributes... 3 Approvals... 5
3 Introduction This document describes the generic attributes that all assets within the Infrastructure Asset Data Dictionary require in addition to the specific attributes listed in their respective AD4. Attributes This is the minimum level of information required to make decisions in relation to requirements, surveys and constraints. Attribute Measure/Enumeration Description Status of the physical asset. See BS1192 for status of the virtual asset Asset Status Design Manufactured Logistics On Site Construction Test And Commissioning Commissioned Operational Spare Temporary Decommissioned Removed Asset being designed, but not yet approved for construction Asset has been manufactured/ Fabricated but has not entered the logistics supply chain Asset is in transit from its place of manufacture but has not arrived in the site depot Asset is in the depot/store and is ready for use in construction Asset being procured, built and installed but not yet under formal testing or commissioning Asset under formal test and commissioning programme, but not commissioned Asset that has passed testing and commissioning but is not under control of the Infrastructure Manager Asset that has been commissioned and is under control of Infrastructure Manager Equipment that is available for use, but is not installed Asset which supports a programme of works but will not be handed over to an Infrastructure Manager Asset decommissioned, but remaining on site Asset decommissioned and removed from site
4 Attribute Measure/Enumeration Description Criticality The criticality of the asset to the Owner/ Operator. Note: BS8544 may provide a more descriptive scale:. And current best practice may separate criticality into compliance criticality, operational criticality, environmental criticality and others. High High criticality for compliance, operational or environmental reasons Medium Standard criticality Facility Region Location Low Low criticality with low compliance, operational or environmental significance Location of the asset according to the top level of COBie spatial structure Location of the asset according to the middle level of COBie spatial structure Location of the asset defined by its AD4 (Linear, area, point etc.) ie lowest level of COBie spatial structure Notes Any further notes as required RFID Number RFID Tag Required Tag Nameplate Required Commissioning Numerical Yes/No/Unknown Yes/No/Unknown The Radio Frequency Identification Tag Number Radio Frequency Identification Tag is required Tag Nameplate is required The date (year) the asset was commissioned Expected economic life of the Asset Expected Life Expected Life Expiry Duration (see IFC Pset_ServiceLife and COBie Type.ExpectedLife ) Expected economic life expiry date (year) based on the commissioning date and the expected economic Life
5 Note: Properties and Enumeration names should be defined in CamelCase for acceptability to the majority of authoring and database environments. Suggestion. The properties should be grouped by topic to aid legibility and comparisons with other work and to aid the implementation in BIM authoring packages: XXX AssetStatus_UK xxxassetlocation_uk (for use when no spatial model available) Each individual class of assets has class specific attributes that are associated to that individual class. These class specific assets are listed within each AD4 Class document. Approvals Industry sector Representative Comments Road Rail Power Water Government
ABSTRACT List of tables List of figures List of abbreviations CHAPTER 1 INTRODUCTION 1.1 Background 1.2 Problem Statement 1.3 Objective 1.4 Scope 1.5 Thesis Organization Chapter 2 2.1 Automatic Identification
More informationAsset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data
More informationBuilding the Asset Information Model
Building the Asset Information Model BIM: Let s Get Started Contractors Survey https://www.surveymonkey.com/s/nfbbim Hypothesis: Government as a client can derive significant improvements in cost, value
More informationMeasuring Benefits from BIM across Whole-of-life Asset Management
Measuring Benefits from BIM across Whole-of-life Asset Management 1 Research Team Adriana Sanchez Research Associate Sustainable Built Environment National Research Centre (SBEnrc)/ Curtin University Keith
More informationCEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN
CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-09-16 Version: Draft #7 Page: 1 EXECUTIVE SUMMARY Business Environment [to
More informationHow To Manage Assets
INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS OF KENYA ASSET MANAGEMENT SEMINAR SEPTEMBER 9 TH -11 TH, 2015 Asset Information Credibility. Professionalism. AccountAbility 1 Asset Information 2 Content 1. Stakeholders
More informationPapua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV-000018-025
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 21: Procurement and Supply Management Plan PGGP-EH-SPENV-000018-025 LNG Project Page i of ii CONTENTS
More informationTechnology Trends in MRO Inventory Management
June 2012 Technology Trends in MRO Inventory Management Technological Advances Technological advances are changing the dynamics in level of MRO inventory management and data management has a distinct focus
More informationManaged Smart Pallet Services: Improving Supply Chain Efficiency While Driving Down Costs
Managed Smart Pallet Services: Improving Supply Chain Efficiency While Driving Down Costs CHALLENGE Logistics networks across the world depend on millions of returnable transport items (RTIs) to keep goods
More informationREPORT Meeting Date: March 7,201 3 Waste Management Committee
J Wohkiq foh y OIL REPORT Meeting Date: March 7,201 3 Waste Management Committee DATE: February 22, 201 3 REPORT TITLE: PROFESSIONAL SERVICES TO SUPPLY, INSTALL AND INTEGRATE RADIO FREQUENCY IDENTIFICATION
More informationEmployer s Information Requirements Version 07 28.02.13. Core Content and Guidance Notes
Employer s Information Requirements Version 07 28.02.13 Core Content and Guidance Notes Employer s Information Requirements - Guidance notes version 07: 28.02.13 Contents 1.0 Employer s Information Requirements
More informationWhat s New in Autodesk Revit 2014
Building Design Suite 2014 What s New in Revit 2014 * Revit 2014 software is only available as part of the Building Design Suite 2014 Premium and Ultimate Editions. New & Enhanced Features Platform & For
More informationHow To Understand The Value Of Building Information Modelling
Delivering Value with BIM A Whole-of-life Approach BIM4clients breakfast, Melbourne, Australia 12 August 2016 1 The Team Slide title Adriana Sanchez Research Associate Sustainable Built Environment National
More informationIS-TG501MS IS-TG100MS L-TG700 XS-PLINTH01
The Aspects ARTS system is a wireless tracking, audit and security system for works of art and people. The system operates 24/7, which from a security perspective is very important as perimeter or intruder
More informationEndeavour Dynamics Offering
Endeavour Dynamics Offering Microsoft Dynamics AX 2012 is recognised as a global leading ERP system that supports a single instance strategy for medium to large enterprise companies. Endeavour is proud
More informationBIM: Transitioning the Industry through Education. Adam Matthews Education Lead UK Government BIM Task Group
BIM: Transitioning the Industry through Education Adam Matthews Education Lead UK Government BIM Task Group 2.32 Government will require fully collaborative 3D BIM (with all project and asset information,
More informationINCIDENT COMMAND SYSTEM MULTI-CASUALTY POSITION MANUAL AIR AMBULANCE COORDINATOR ICS-MC-222-9. December, 1991
INCIDENT COMMAND SYSTEM MULTI-CASUALTY POSITION MANUAL AIR AMBULANCE COORDINATOR December, 1991 Revised March, 1993 CONTENTS 1.1 CHECKLIST USE...1 1.2 AIR AMBULANCE COORDINATOR S CHECKLIST...1 2.1 RESPONSIBILITIES...2
More informationLIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister
LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE A presentation on the UK experience By Karen Gough, Barrister 1 1 BUILDING INFORMATION What is BIM? MODELLING essentially value
More informationCPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:
CPIx on Line Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: April 2013 Revision: v2.0 Status: For review
More informationINCIDENT COMMAND SYSTEM MULTI-CASUALTY POSITION MANUAL GROUND AMBULANCE COORDINATOR ICS-MC-222-8 DECEMBER, 1991
INCIDENT COMMAND SYSTEM MULTI-CASUALTY POSITION MANUAL GROUND AMBULANCE COORDINATOR DECEMBER, 1991 Revised March, 1993 CONTENTS 1.1 CHECKLIST USE...1 1.2 GROUND AMBULANCE COORDINATOR'S CHECKLIST...1 2.1
More informationREQUEST FOR QUOTATION FOR RFID ASSET TRACKING MANAGEMENT SYSTEM REF: SAHRA/IT/12/2013
REQUEST FOR QUOTATION FOR RFID ASSET TRACKING MANAGEMENT SYSTEM REF: SAHRA/IT/12/2013 1. PURPOSE The South African Heritage Resources Agency (SAHRA) invites suitably qualified service providers to submit
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationBIM: The Legal and Contractual Risks and How to Deal With Them. May Winfield Kennedys LLP
BIM: The Legal and Contractual Risks and How to Deal With Them May Winfield Kennedys LLP Risks and Opportunities of BIM 61.7% of respondents: Do believe that BIM will help support the delivery of Facilities
More informationThe Drug Quality & Security Act
The Drug Quality & Security Act Drug Traceability & Interoperable Exchange of Transaction Information, History & Statement Mujadala Abdul-Majid 3E Company February 20, 2014 About 3E Company About 3E Supply
More informationHow to Design and Build a RFID Network Infrastructure in Nationwide Buildings?
Carmel Clifford Nationwide Building Society Current Challenges and Novel Solutions in Workspace Management at Nationwide Building Society BIFM ANNUAL CONFERENCE Oxford 2007 Background of Nationwide Largest
More informationSupply Chain Management
Supply Chain Management อาจารย ดร.อ ศว ณ ปส ธรรม Email: win@riped.utcc.ac.th 11-1 Supply Chain the sequence of organizations (their facilities, functions, and activities) that are involved in producing
More informationFINAL WORKSHOP Wildau
INtegration in the intermodal goods Transport of non EU states: Rail, Inland/coastal waterway Modes INTERREG IIIB CADSES Neighbourhood Programme 4 th Call FINAL WORKSHOP Wildau Introduction of the INTERIM
More informationList of Tables. Table No Title Page No 2.1 Market Segments in Indian retail 25
List of Tables Table No Title Page No 2.1 Market Segments in Indian retail 25 2.2 Organized retail penetration levels 25 3.1 Pattern of control in ABC analysis 58 3.2 Various selective inventory control
More informationTHE CITY OF NORTH LAS VEGAS REQUEST FOR INFORMATION FOR ASSET TRACKING & INVENTORY MANAGEMENT RFI# 06-30-09-01 RELEASE DATE: JUNE 30, 2009
THE CITY OF NORTH LAS VEGAS REQUEST FOR INFORMATION FOR ASSET TRACKING & INVENTORY MANAGEMENT RFI# 06-30-09-01 RELEASE DATE: JUNE 30, 2009 RESPONSES TO BE RECEIVED BY JULY 21, 2009 2:00 P.M. RETURN TO
More informationSimplifying IT Management and Data Security with RFID
Simplifying IT Management and Data Security with RFID IT asset management is a fundamental discipline to contribute to the growth and sustainability of the enterprise. Chief information officers have to
More informationmobile data collection technology Supply Chain Logistic Mobile Workforce RFID
mobile data collection technology Supply Chain Logistic Mobile Workforce RFID mobile data collection technology Supply Chain Logistic Mobile Workforce RFID Gamma Solutions Pty Ltd t +61 1300 555 563 f
More informationIntroduction to project management and concepts
37E01500 Project Management and Consulting Practice Introduction to project management and concepts Matti Rossi, Professor Dept. of Information and Service Economy Lecture 1, Mon 26.10.2015 Learning objectives
More informationModeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC
Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC 2013 Many building owners and facility managers lack good documentation for their automation control
More informationMSc(Eng)-1. All modules are assessed through examination (0%-100%) and/or coursework assessment (0%-100%). Concurrent engineering
MSc(Eng)-1 MSC(ENG) IN INDUSTRIAL ENGINEERING AND LOGISTICS MANAGEMENT [This syllabus is applicable to students admitted to the curriculum in the academic year 2014-2015 and thereafter.] The curriculum
More informationContents. List of figures List of tables. Abbreviations
Contents List of figures List of tables Preface Abbreviations xv xxi xxiii xxix PART 1 CONCEPTS OF LOGISTICS AND DISTRIBUTION 1 Introduction to logistics and distribution 3 Introduction 3 Definitions 4
More informationBuilding Information Modelling Principles for Building envelopes
Technical Note No 93 Building Information Modelling Principles for Building envelopes Building Information Modelling (BIM) is being adopted by the construction industry led in part by some s and driven
More informationOFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 6/ 12 MARCH 2013, PRISTINA. LAW No. 04/L-159 ON ECONOMIC ZONES LAW ON ECONOMIC ZONES
LAW No. 04/L-159 ON ECONOMIC ZONES Assembly of Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic of Kosovo; Approves LAW ON ECONOMIC ZONES Article 1 Purpose of Law This Law
More informationCollaborative Project Management Made Simple
Collaborative Project Management Made Simple Construction businesses in the building, energy, and infrastructure sectors find Viewpoint For Projects to be an ideal fit. That s because all team members
More informationEfficient Asset Tracking: From Manual to Automated
White Paper Efficient Asset Tracking: From Manual to Automated Asset Tracking Overview: Asset Tracking Basics: The Fixed Asset Register Managing a Fixed Asset Register Asset Identification Technologies
More informationNow that you have a fleet management system, what should you do with it?
Now that you have a fleet management system, what should you do with it? By Brad Kelley Overview Typical fleet system use Understanding where your data lives Reporting Key Performance Indicators (KPI)
More informationImproving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions
Improving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions Aberdeen, 28 November 2013 Agenda: Asset Management as the front office of the offshore supply chain Impact
More informationSecuring, Monitoring & Tracking Documents and Flow of Goods. Real Time Supply Chain Visibility
Securing, Monitoring & Tracking Documents and Flow of Goods Real Time Supply Chain Visibility Pivot88TM All4R : All & All Rights 4RTM reserved : All Rights October reserve 2013 March 2013 Pivot88TM All4R
More informationGlossary of Inventory Management Terms
Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate
More informationLinac Coherent Light Source (LCLS)
Linac Coherent Light Source (LCLS) An X Ray Free Electron Laser LLNL Quality Implementation Plan PMD 003 r0 May 2004 Prepared for the US Department of Energy under contract numbers: SLAC DE AC03 76SF00515
More informationDROPS FORUM 17 th September
DROPS FORUM 17 th September Name Role Name Role Paul Walker Assessor / Internal Verifier Tom Wetton RigCentral Specialist DSL Company Profile DSL specialises in range of products, construction, inspection
More informationRFID Based 3D Indoor Navigation System Integrated with Smart Phones
RFID Based 3D Indoor Navigation System Integrated with Smart Phones Y. Ortakci*, E. Demiral*, I. R. Karas* * Karabuk University, Computer Engineering Department, Demir Celik Kampusu, 78050, Karabuk, Turkey
More informationThe Airline IT Trends Survey 2004 - Executive Summary - Brijdeep Sahi Vice-President, Marketing SITA SC
- Executive Summary - Brijdeep Sahi Vice-President, Marketing SITA SC SITA & the Air Transport Industry SITA s unique position as a neutral customer-driven cooperative, necessitates our constant assessment
More informationDATA REQUIREMENTS DESCRIPTION (DRD)
DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/EDAL 3. DATA TYPE: 3 4. DATE REVISED: 5. PAGE: 1/3 6. TITLE: Engineering Drawings and Associated Lists 7. DESCRIPTION/USE:
More informationABBVIE C-TPAT SUPPLY CHAIN SECURITY QUESTIONNAIRE
AbbVie is a participant in the U.S. Customs supply chain security program called the Customs-Trade Partnership Against Terrorism (C-TPAT). Participation in C-TPAT requires AbbVie to ensure that its overseas
More informationConstruction Clients Forum (CCF) Overview. Feb 10 th 2016
Construction Clients Forum (CCF) Overview Feb 10 th 2016 1 CCF Goal & Mission Goal Provide Leadership to the Irish construction industry to ensure Clients and Partners implement Lean on all capital programmes
More informationeseals RFID Internet of things «Technical experiences, innovative projects and EU pilots» for a smart supply chain digitalization
eseals RFID Internet of things «Technical experiences, innovative projects and EU pilots» for a smart supply chain digitalization Luca Abatello Technical Manager for Innovative Projects and EU Pilots July,
More informationSecurity+ Guide to Network Security Fundamentals, Third Edition. Chapter 7 Access Control Fundamentals
Security+ Guide to Network Security Fundamentals, Third Edition Chapter 7 Access Control Fundamentals Objectives Define access control and list the four access control models Describe logical access control
More informationMicrotronics technologies Mobile: 99707 90092
For more Project details visit: http://www.projectsof8051.com/rfid-based-attendance-management-system/ Code Project Title 1500 RFid Based Attendance System Synopsis for RFid Based Attendance System 1.
More informationBUILDING A STRATEGY FOR BIM
BUILDING A STRATEGY FOR BIM A Roadmap for Clients Graham Jones Chair, Davis Langdon BIM Steering Group Building a Strategy for BIM: A roadmap for Clients Introduction Conditions for Success Why? What How?
More informationChapter 2 INDUSTRIAL BUYING BEHAVIOUR: DECISION MAKING IN PURCHASING
Chapter 1 THE ROLE OF PURCHASING IN THE VALUE CHAIN The role and importance of the purchasing and supply function in the value chain. The difference between concepts such as ordering, buying, purchasing,
More informationAPEC s evolving supply chain
2012 APEC CEO Summit: PwC issues spotlight APEC s evolving supply chain Leading up to this year s Asia-Pacific Economic Cooperation CEO Summit in Vladivostok, Russia on September 7 8, PwC is sharing a
More informationHow to create value with urban freight transport solutions?
How to create value with urban freight transport solutions? A comparison of consolidation solutions Susanne Balm Consultant Logistics Sustainable Transport and Logistics TNO Delft, The Netherlands susanne.balm@tno.nl
More informationIBM Global Services RFID tags an intelligent bar code replacement
IBM Global Services RFID tags an intelligent John A Wolff Programme Director e-commerce Page 2 Key topics Describes how the use of Radio Frequency ID (RFID) wireless technology significantly enhances supply
More informationBIM Strategy for NHSScotland
BIM Strategy for NHSScotland Professor Bimal Kumar and Graham Hayne GCU BIM Partnership School of Engineering and Built Environment Glasgow Caledonian University Agenda Introduction to BIM GCU BIM Partnership
More informationThe State of Maryland s Coverage and Data Collection for the Nationwide Public Safety Broadband Network
The State of Maryland s Coverage and Data Collection for the Nationwide Public Safety Broadband Network Objective: The Nationwide Public Safety Broadband Network (NPSBN) promises to provide critical broadband
More informationEstimation Model for Integrated Logistics Support Cost and Annual Recurrent Expenditure in C3 Projects
Estimation Model for Integrated Logistics Support Cost and Annual Recurrent Expenditure in C3 Projects ABSTRACT In defence acquisition and development projects, the costs of Integrated Logistics Support
More informationCross-discipline design deliverables for BIM Phase 1 report Strategy Document
Phase 1 report Strategy Document David Churcher, Hitherwood Consulting Mervyn Richards, MR1 Consulting Page 1 of 49 Contents 1 Introduction... 3 1.1 BIS BIM Strategy Paper... 3 1.2 Purpose of this document
More informationA. Background. In this Communication we can read:
On RFID The Next Step to THE INTERNET OF THINGS Information of the Presidency 2832nd Council meeting, Competitiveness (Internal Market, Industry and Research), Brussels, 22-23 November 2007 A. Background
More informationMaximising supply chain throughput with existing infrastructure
Maximising supply chain throughput with existing infrastructure Improve customer service without capital outlay 1 the CHALLENGE SUPPLY CHAIN AND LOGISTICS Increasing global complexity and uncertainty is
More informationFrom COBie to Asset Management
BIM Prospects Conference: From COBie to Asset Management 27 th March 2015 - RIBA, London Jeff Stephens, Head of BIM jeff.stephens@vinciconstruction.co.uk 1 Experiences creating COBie data for Asset Management
More informationRACK AND CONTAINER TRACKING SOLUTION
RACK AND CONTAINER TRACKING SOLUTION Rack and Container Tracking Solution Overview Zebra Technologies is the market leader in providing solutions for tracking and managing assets, people and events through
More informationICM Project Station Infrastructure and Equipment
EB 0 00 Schedule B. ( pages) ICM Project Station Infrastructure and Equipment (THESL) EB 0 00 Schedule B. I EXECUTIVE SUMMARY 0. Project Description Many Municipal Substations (MS) located outside of downtown
More informationA Practical Approach to BIM April 23 rd 2015
A Practical Approach to BIM April 23 rd 2015 House Keeping Your Hosts Nick Harris Darren Cox Stuart Tanfield Simon Brown Mike O Brien Ben McGovern Agenda for Today 10:00 10:15 Welcome and Introductions
More informationPractitioner Certificate Software Asset Management Syllabus. Version 2.0
Practitioner Certificate Software Asset Management Syllabus Version 2.0 June 2010 Practitioner Certificate in Software Asset Management The ISEB Practitioner Certificate in Software Asset Management (SAM)
More informationLook around any workplace and you see Information Technology (IT) assets. If you are working in an average office environment, you probably have a
1 Look around any workplace and you see Information Technology (IT) assets. If you are working in an average office environment, you probably have a computer monitor with a CPU at your desk along with
More informationwww.pwc.com/oracle Next presentation starting soon Oracle Asset Tracking in Datacenter Environment
www.pwc.com/oracle Next presentation starting soon Oracle Asset Tracking in Datacenter Environment Agenda Business Goal and Benefits Business value of Oracle Asset Tracking System Architecture & Key Solution
More informationA Systems Engineering Approach to Risk-based Asset Management
A Systems Engineering Approach to Risk-based Asset Management Michael Salvato, Executive Program Manager NYCT Enterprise Asset Management Program Office Office of the President Email: michael.salvato@nyct.com
More informationOVERCOMING FIELD SERVICE & REVERSE LOGISTICS CHALLENGES WITH AN INTEGRATED, BEST OF BREED ENTERPRISE SERVICE MANAGEMENT SYSTEM
OVERCOMING FIELD SERVICE & REVERSE LOGISTICS CHALLENGES WITH AN INTEGRATED, BEST OF BREED ENTERPRISE SERVICE MANAGEMENT SYSTEM A WHITE PAPER BY: Michael R. Blumberg, CMC PRESIDENT, Blumberg Advisory Group
More informationCertificate in Construction Project Management
Certificate in Construction Project Management Duration: 6 Months Distance Learning Programme Language: English RICS Member: 895.00 + VAT Non RICS Member 995.00 + VAT Course Summary As a result of the
More informationComplex engineering objects construction using Multi-D innovative technology
Complex engineering objects construction using Multi-D innovative technology Interregional Knowledge Management Workshop on Life Cycle Management of Design Basis Information Issues, Challenges, Approaches
More informationNon-Stop Manufacturing Excellence. Automotive. Answers for industry.
Non-Stop Manufacturing Excellence. Automotive Answers for industry. Answers to your challenges How can the potential of emerging markets be best economically tapped? What possibilities are there of reducing
More informationTHE ROAD TO PRODUCTIVITY
THE ROAD TO PRODUCTIVITY Lessons Learned by the Structural Steel Industry Tom Faraone, PE Senior Regional Engineer October 31, 2006 It started with the mills TODAY 1980 PRODUCTIVITY Today.5 man-hours/ton
More informationAdvanced Project Management Incl. MS Projects 5 DAYS
Imsimbi Training proudly presents Advanced Project Management Incl. MS Projects 5 DAYS Imsimbi Training is a fully accredited training provider with the Services Seta, number 2147, as well as a Level 2
More informationElectronic Commerce Management for Business Activities and Global Enterprises:
Electronic Commerce Management for Business Activities and Global Enterprises: Competitive Advantages In Lee Western Illinois University, USA IIS SCIENCE Keference/ Table of Contents Preface Acknowledgment
More informationSKIERLEK INFORMAL SETTLEMENT PRE-FEASIBILITY STUDY THABAZIMBI LOCAL MUNICIPALITY
P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6- Riviera Road, Riviera R E Q U E S T F O R P R O P O S A L S SKIERLEK INFORMAL SETTLEMENT PRE-FEASIBILITY STUDY THABAZIMBI LOCAL MUNICIPALITY
More informationTechnology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs
Technology Lifecycle Management A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs Even as technology improves, government s fundamental IT challenge remains
More informationWorld Class Windturbine Maintenance Project
World Class Windturbine Maintenance Project Ir. Johan Prinsloo, Technical Director A presentation by IMS International Your partner in Integrated Maintenance & Asset Management Solutions Copyright 2014
More informationNOT ALL CODES ARE CREATED EQUAL
NOT ALL CODES ARE CREATED EQUAL Why some serial numbers are better than others. Verify Brand 3033 Campus Drive, Minneapolis MN 55441 info@verifybrand.com (763) 235-1400 EXECUTIVE SUMMARY Serial numbers
More informationSUPPLY CHAIN AND CHANNEL MANAGEMENT
C H A P T E R SUPPLY CHAIN AND CHANNEL MANAGEMENT 15 McGraw-Hill/Irwin Copyright 2012 by The McGraw-Hill Companies, Inc. All rights reserved. Supply Chain and Channel Management L E A R N I N G O B J E
More informationA DECISION SUPPORT SYSTEM FOR THE LEVEL OF REPAIR ANALYSIS PROBLEM. Carlos M. Ituarte-Villarreal and Jose F. Espiritu
A DECISION SUPPORT SYSTEM FOR THE LEVEL OF REPAIR ANALYSIS PROBLEM Carlos M. Ituarte-Villarreal and Jose F. Espiritu Department of Industrial, Manufacturing & Systems Engineering. The University of Texas
More informationBIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE
Division BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE Mark Sawyer General Manager, Division Trimble Navigation Limited, Inc. Lifecycle Strategy PROJECT TEAM s Engineers General Contractor Subcontractors
More informationLOGISTICS & SUPPLY CHAIN MANAGEMENT
LOGISTICS & SUPPLY CHAIN MANAGEMENT 1. Concepts of Logistics management The role of Logistics information systems and technology Logistics relevance to an organization and the economy Channels of distribution
More informationPharmacy Supply Chain
Pharmacy Supply Chain A Structured Approach to Managing Pharmacy Inventory David Stead Chief Pharmacist Royal Bournemouth & Christchurch Hospitals David Owens Supply Chain Development Manager NHS Logistics
More informationBP Southern Africa (Pty) Ltd. Storage Facility Allocation Mechanism 2013/14. Version 1.2013
BP Southern Africa (Pty) Ltd Storage Facility Allocation Mechanism 2013/14 Version 1.2013 1 Table of Contents 1. Executive Summary... 3 2. Tariff schedule... 4 3. Spare capacity determination mechanism...
More informationDemystifying the PMBOK: Project Planning Made Simple" By" Bill Carswell, Ph.D., PMP" Adjunct Professor" Embry Riddle Aeronautical University" "
Demystifying the PMBOK: Project Planning Made Simple" By" Bill Carswell, Ph.D., PMP" Adjunct Professor" Embry Riddle Aeronautical University" " How Complicated Is PM?" walks the reader through the new
More information763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule
763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule Description: This work shall reflect a Contractor s anticipated work plan for constructing the project using a Critical Path Method Project
More informationProcurement. Supply chain management. Inventory. IT Modern management. Medical treatment. Optimize. Hospital. model of medical services
Current Situation and Prospects of Supply Chain in Chinese Healthcare industry Prof. Gao Yanjie Ministry of Health, P.R. China 1 Necessity Hospital Supply chain management IT Modern management Optimize
More information(Big?) Data Driven Research. Vinayak Deshpande Kenan-Flagler Business School University of North Carolina
(Big?) Data Driven Research Vinayak Deshpande Kenan-Flagler Business School University of North Carolina Three Research Projects Linking Airline flight delays to flight schedules - Joint work with Mazhar
More informationRIBA Plan of Work 2013 Overview
RIBA Plan of Work 2013 Overview Foreword First developed in 1963, for half a century the RIBA Plan of Work has been the definitive UK model for the building design and construction process, also exercising
More informationHow to Make RAM Part of the Business Process
How to Make RAM Part of the Business Process 14th Transport Sector Coordinating Committee (TSCC) Meeting of the Central Asia Regional Economic Cooperation Program 27-30 April 2015 Ulaanbaatar, Mongolia
More informationJOURNAL OF INFORMATION, KNOWLEDGE AND RESEARCH IN MECHANICAL ENGINEERING
Automated Spares and Inventory Management System For Upstream Oil and Gas Producing Facilities Using RFID Based Item Tracking Integrated With Enterprise Resource Planning Through Centralized Onshore Sourcing
More informationBIM based Schedule Control for Precast Concrete Supply Chain
BIM based Schedule Control for Precast Concrete Supply Chain J. Nissilä a, R. Heikkilä b, I. Romo a, M. Malaska b and T. Aho b a Skanska Oy, Helsinki, Finland b Construction Technology Research Center,
More informationCPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.
CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published
More informationOptimization of patient transport dispatching in hospitals
Optimization of patient transport dispatching in hospitals Cyrille Lefèvre and Sophie Marquet Supervisors: Yves Deville and Gildas Avoine 1500 minutes Thesis motivation MedSoc NPO asked us to conduct a
More informationAvenir Telecom Consolidates Its Activity in Romania Using Microsoft Dynamics NAV
Avenir Telecom Consolidates Its Activity in Romania Using Microsoft Dynamics NAV About the Organization Avenir Telecom has more than 3000 employees and activates is six countries (France, Great Britain,
More information