ENVIRONMENTAL ASSESSMENT REPORT

Size: px
Start display at page:

Download "ENVIRONMENTAL ASSESSMENT REPORT"

Transcription

1 ENVIRONMENTAL ASSESSMENT REPORT Biodiesel Processing Plant 32 The Avenue, New Norfolk Peter Johnson Earthmoving Pty Ltd Report and recommendations of the Environment Division Department of Environment, Parks, Heritage and the Arts to the Director, Environment Protection Authority August 2008

2 Applicant Proposal Environmental Assessment Report Peter Johnson Earthmoving Pty Ltd Biodiesel Processing Plant Location 32 The Avenue, New Norfolk, TAS, 7140 NELMS 7646 DA number DA 87/2007 File Document \\w2k3lndsfp\environment\eeo_enviro_ops\eas_assessments\eas _Projects\Peter Johnson biodiesel\assessment Report\Assessment Report Final Peter Johnson biodiesel plant.doc Assessment process milestones 28 April 2008 Permit application submitted to Council 30 April 2008 Application received by Board 18 June 2008 Environmental Effects Report submitted to Board 5 July 2008 Start of public consultation period 18 July 2008 End of public consultation period Acronyms Board Board of the Environment Protection Authority DEPHA Department of Environment, Parks, Heritage and the Arts Division Environment Division of the DEPHA EER Environmental Effects Report EIA Environmental impact assessment EMPC Act Environmental Management and Pollution Control Act 1994 EPA Environment Protection Authority EPBC Act Environment Protection and Biodiversity Conservation Act 1999 (Cth) LUPA Act Land Use Planning and Approvals Act 1993 SD Sustainable development TSP Act Threatened Species Protection Act 1995 Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page i

3

4 Contents 1 APPROVALS PROCESS SD OBJECTIVES AND EIA PRINCIPLES THE PROPOSAL PUBLIC AND AGENCY CONSULTATION EVALUATION OF ISSUES CONCLUSIONS SUMMARY OF APPENDICES APPENDIX 1 - PROPOSED PERMIT CONDITIONS Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page iii

5 1 Approvals process An application for a permit under the Land Use Planning and Approvals Act 1993 (LUPA Act) in relation to the proposal was submitted to Derwent Valley Council on 28 April The proposal is defined as a level 2 activity under Schedule 2 Subsection (1)(a)(i) of the Environmental Management and Pollution Control Act 1994 (EMPC Act), being manufacture (through chemical reaction) of an inorganic chemical. Section 25(1) of the EMPC Act required Council to refer the application to the Board of the Environment Protection Authority (the Board) for assessment under the Act. The application was received by the Board on 30 April The assessment has been undertaken by the Director, Environment Protection Authority under delegation from the Board. The Director required that additional information to support the application be provided in the form of an Environmental Effects Report (EER). The EER was received by the Director on 18 June The permit application and EER were released for public inspection for a 14-day period commencing on 5 July An advertisement was placed in The Mercury newspaper. The EER was also referred to relevant government agencies for comment. No public representations were received. 2 SD objectives and EIA principles The proposal must be considered by the Director, under delegation from the Board, in the context of the sustainable development objectives of the Resource Management and Planning System of Tasmania (RMPS), and in the context of the objectives of the Environmental Management and Pollution Control System (EMPCS) established by the EMPC Act. The functions of the Board are to administer and enforce the provisions of the Act, and in particular to use its best endeavours to protect the environment of Tasmania, and to further the RMPS and EMPCS objectives. The Director, under delegation from the Board, must undertake the assessment of the proposal in accordance with the Environmental Impact Assessment Principles defined in Section 74 of the EMPC Act. Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 1

6 3 The proposal Peter Johnson Earthmoving Pty Ltd proposes to install and operate a biodiesel processing plant at 32 The Avenue, New Norfolk, Tasmania The property is located within a light industrial area, with some private residences located nearby. Figure 1 shows the general location of the property. The applicant proposes to install a pre-constructed biodiesel processing plant which is constructed on a transportable frame and located fully within a converted shipping container. The biodiesel is processed in the plant by mixing used cooking oil with methanol and potassium hydroxide, and heating the mixture to 50 degrees Celsius for approximately 1.5 hours. This process produces two products biodiesel and glycerol. Both products are drained into 205 litre drums and once cooled, are ready for transport to market. Figure 2 shows a proposed plan of the site. The maximum annual production of biodiesel is estimated to be 3,600 x 205 litre drums (total 738,000 litres; estimated to be approximately 738 tonnes of product produced). The main characteristics of the proposal are summarised in Table 1. A detailed description of the proposal is provided in the Environmental Effects Report. Table 1. Summary of key proposal characteristics Characteristic Description/quantities Activity description Installation and operation of a biodiesel processing plant, to produce up to 738 tonnes of product per annum. Location 32 The Avenue, New Norfolk, Tasmania Land zoning The property is zoned Special Development under the New Norfolk Planning Scheme Planning approval was granted by Derwent Valley Council in August 2007 for use and development of the site for the purposes of Limited Impact Industry Salvage Premises and Equipment Sales and Hire Premises. The current application is for an amendment to the existing planning permit DA 87/2007. Land tenure The property is privately owned by Peter Johnson Earthmoving Pty Ltd (certificate of title /1). Site overview The property is located at 32 The Avenue, within the township of New Norfolk, on the corner of The Avenue and Ring Road. The property is the site of the former Boiler House which served the Royal Derwent Hospital. The Boiler House was decommissioned more than a decade ago at the time of site closure, and remained vacant until purchased by the current owner in There is no known soil or ground contamination of the site. A notice has been issued by Workplace Standards in relation to decontamination of asbestos at the site. The property is currently used for delivery, processing (by cold filtering) and temporary storage of cooking oil (canola) and cardboard recycling. Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 2

7 Surrounding area overview Major equipment Other infrastructure Inputs Water Energy Other raw materials Wastes Liquid Atmospheric Solid Noise Operating hours Project timetable The property is located within an area of light industry (including the Lachlan Park Enterprise Park, Mountain Engineering, mechanical workshop and tyre company, antique retailer, self storage, and earthmoving equipment hire). Private residences are located across The Avenue, at a distance of approximately 50 to 75 metres from the property. Adjacent properties are privately owned. The Lachlan River is approximately 200 metres from the site. The biodiesel processing plant is an Ageratec Biodiesel Processor and is to be located within the existing building on site. No construction is required as the plant is pre-fabricated and housed within a shipping container. Equipment for loading and unloading drums on transport vehicles. Nil. No water is required in the process. The biodiesel processing plant is powered by three phase electric power. Used cooking oil (canola) is the main raw input to the plant. Methanol is required in the biodiesel manufacture process. A maximum of 8 x 200 litre drums of methanol will be stored on site at a time. Potassium hydroxide is also required in the biodiesel manufacture process. A maximum of 12 x 25 litre bags will be stored on site at a time. In addition to the biodiesel, glycerol is the only by-product of the process and is decanted into 205 litre drums as is the biodiesel product. The glycerol is to be shipped interstate for further processing. The biodiesel processing plant is a sealed unit and there are no atmospheric emissions from the operation of this plant. There are no solid wastes produced from the operation of this plant. Other solid wastes generated on site may include empty containers and other general waste. The plant has low noise emissions with no noise emissions expected to extend beyond the property s boundaries. The plant is housed within a shipping container in an existing building which will provide noise attenuation. Proposed operating hours are the same as under the existing planning permit: 0800 to 1630 hours Monday to Friday. The biodiesel processing plant would be installed and operational within four weeks of project approval. Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 3

8 Figure 1. Location map, 32 The Avenue, New Norfolk (corner of Ring Road) (adapted from Attachment 7, Environmental Effects Report) Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 4

9 Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 5 Figure 2. Site plan (Attachment 2, Environmental Effects Report)

10 4 Public and agency consultation The development application and Environmental Effects Report were made publicly available for a 14 day period following advertising in The Mercury newspaper on Saturday, 5 July No public representations were received. The development application was referred to the Department of Health and Human Services (Population Health). No public health concerns were raised by the Department in regards to the proposal. 5 Evaluation of issues The environmental issues considered relevant to the proposal have been evaluated in Table 2 below. A summary of proposed permit conditions is provided in Appendix 1. Table 2. Assessment of environmental issues Issue Hazardous substances Description of potential impacts The proposed activity will involve the storage and use of used cooking oil (canola), methanol, and potassium hydroxide. Biodiesel and glycerol are the products of the process and will also be stored and handled on site. The used cooking oil and biodiesel are biodegradable and with the glycerol are not considered to be hazardous materials. Methanol is flammable and potassium hydroxide is corrosive. Accidental spillage or release of these substances may contaminate soils, groundwater, and/or waterways. Management measures proposed in EER The following commitments are made in Part D of the EER: o The biodiesel processor will be contained in a bunded area with the capacity to contain 110% of the volume of oil of the processor. o Working areas will be bunded. o Oil and biodiesel transfer operations will occur in bunded areas to ensure any spills are contained. o No discharge of liquids to sewer or stormwater. o Use of portable bunded stands for storage of oil and biodiesel to ensure all spills are contained. o Provision of oil spill kits in working areas. o Storage and handling of methanol and potassium hydroxide in accordance with manufacturer s recommendations and material safety data sheet. o Maintenance and operation of biodiesel processor in accordance with manufacturer s specifications. o Staff training on maintenance and operation of biodiesel processor in accordance Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 6

11 with manufacturer s specifications. o Development of emergency response procedures in event of a biodiesel processor malfunction and/or oil or bio-diesel spill. A maximum of 8 x 200 litre drums of methanol will be stored on site at a time. A maximum of 12 x 25 litre bags of potassium hydroxide will be stored on site at a time. Public and agency comment Nil. Evaluation The site is located at a sufficient distance from the nearest waterway (Lachlan River 200 metres) to ensure a minimal risk of any uncontained spill reaching the waterway. No water is used in the process and no discharge of liquids occurs as the biodiesel processing plant is self-contained with no connection to plumbing required. The two products created by the process, biodiesel and glycerol, are drained directly into drums ready for transport. The commitments made by the applicant in the EER in relation to bunding and appropriate containment of areas of use and storage of these materials, combined with proposed permit conditions, are considered appropriate to manage the potential risk of soil, and surface and groundwater contamination. Recommendation It is recommended that the applicant be required to comply with the commitments listed above (also listed in Attachment 2 of the permit conditions). It is also recommended that the applicant be required to comply with standard permit conditions H1 (Storage and handling of hazardous materials), H2 (Hazardous materials < 250 L), H3 (Spill kits) and H4 (Inventory of hazardous materials). Issue Noise Description of potential impacts Noise created by transport of materials to and from site, and by operation of the biodiesel processing plant, may result in nuisance for nearby residents. Management measures proposed in EER The biodiesel processing plant has low noise emissions and is contained within a shipping container, which will be located within the existing building on site. No noise emissions are expected beyond the boundary of the property. Drums containing biodiesel and glycerol products will be transported on a 3 tonne truck with an estimated number of truck movements of 2 per day. No increase to existing operating hours for the site has been requested by the applicant. Public and agency comment Nil. Evaluation The nearest residences are located approximately 50 metres from the building in which the biodiesel processing plant is to be located. Noise was raised by neighbours as a potential concern during the application for the existing planning permit, however, no representations were received during the advertising of this particular Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 7

12 application, and no complaints have been received by Council in relation to the property. The location of the biodiesel processing plant within a shipping container and within an existing building, are considered to provide adequate noise attenuation. The biodiesel processing plant is powered by three-phase power so no noise is expected to occur from generation of electricity to power the plant. The operating hours requested by the proponent are the same as in the existing planning permit (0800 to 1630 hours, Monday to Friday). Operation within these hours (including deliveries and truck movements) is considered acceptable. Recommendation It is recommended that the applicant be required to comply with permit condition N1 (Hours of operation). Issue Air emissions Description of potential impacts Dust and odours may create nuisance for nearby residents. Management measures proposed in EER The biodiesel processing plant is a sealed unit which emits no odour, dust or particulates to the air. Public and agency comment Nil. Evaluation Based on information provided in the EER, it is considered unlikely that the biodiesel processing plant will produce odours or air pollutants sufficient to create environmental harm or nuisance. Recommendation Nil. Issue Waste management Description of potential impacts By-products of the biodiesel production process may create wastes that are inappropriate for storage on site or disposal to sewer or landfill and may contaminate soils, groundwater, and/or waterways. Management measures proposed in EER The biodiesel processing plant produces only two products, biodiesel and glycerol. No solid waste or waste water is created by the process. Public and agency comment Nil. Evaluation Based on information provided in the EER, it is considered unlikely that the biodiesel processing plant will produce solid or liquid wastes that may contaminate soils, groundwater, and/or waterways. Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 8

13 Management of other waste generated on site (such as empty containers, and other general waste) is not covered in the EER. This may be adequately managed through use of the standard permit condition relating to waste management (WM1 Waste management hierarchy). Recommendation It is recommended that the applicant be required to comply with the standard permit condition WM1 (Waste management hierarchy). Issue Previous site contamination Description of potential impacts The site is part of the decommissioned Royal Derwent Hospital complex. Asbestos has been identified on the site and may have negative health impacts if disturbed. Management measures proposed in EER There is no known soil and ground contamination present on the site. Asbestos is known to be present within the former Boiler House building and Workplace Standards Tasmania issued a notice on 2 May 2008 pursuant to s38 of the Workplace Health and Safety Act 1995 requiring decontamination of asbestos at the site. Work is currently being undertaken to comply with the notice. Public and agency comment Nil. Evaluation The management measures being carried out are considered adequate to remove the asbestos risk, providing the material is wrapped and disposed of at a facility approved to accept the waste. Recommendation Nil. Issue Cultural heritage Description of potential impacts Installation and operation of the biodiesel processing plant may disturb sites of cultural heritage importance. Management measures proposed in EER The site is not on or near a place listed on the Tasmanian Aboriginal Site Index, Tasmanian Heritage Register, or Tasmanian Historic Places Inventory. The Royal Derwent Hospital Complex, listed on the Tasmania Heritage Register, the Willow Court Asylum Precinct and the Willow Court Barracks Building both listed on the Register of the National Estate, are all located within one kilometre of the site. The site itself is the former Boiler House serving the decommissioned Royal Derwent Hospital. A heritage assessment has been undertaken (provided in Attachment 5 of the EER) which concluded that the Boiler House is of low heritage significance. Public and agency comment Nil. Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 9

14 Evaluation The evaluation provided by the applicant in the EER is considered adequate. The biodiesel processing plant is pre-fabricated and no construction works are required on site. Recommendation Nil. Issue Decommissioning and site rehabilitation Description of potential impacts Inappropriate decommissioning procedures at the end of the biodiesel processing plant s life may contribute to future degradation of the site. Management measures proposed in EER According to the EER the proposal involves no activity that will require future rehabilitation. Public and agency comment Nil. Evaluation Appropriate ongoing machinery and site maintenance, combined with use of standard permit conditions relating to operation of plant, and decommissioning and rehabilitation, are considered adequate for this site. Recommendation It is recommended that the applicant be required to comply with standard permit conditions DC1 (Notification of cessation), DC2 (DRP requirements) and DC3 (Rehabilitation following cessation), and OP1 (Plant and equipment). Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 10

15 6 Conclusions The Division is of the view that: (i) (ii) (iii) the RMPS and EMPCS objectives have been duly and properly pursued in the assessment of the proposal; and the assessment of the proposal has been undertaken in accordance with the Environmental Impact Assessment Principles; and the recommendations set out in this report accord with the Board s responsibilities in relation to these objectives and principles. This assessment has been based upon the information provided by the applicant in the permit application and EER. It is concluded that the proposal is capable of being managed in an environmentally acceptable manner such that it is unlikely that the RMPS and EMPCS objectives would be compromised, provided that the recommendations made in this report are satisfactorily implemented, including the commitments made by the applicant in the EER. 7 Summary of Appendices Appendix 1 Proposed permit conditions Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Page 11

16 Appendix 1 - Proposed permit conditions Summary of proposed conditions The following conditions are recommended. Q1 Maximum quantities regulatory limits Non standard G1 Compliance with EMP and BPEM Standard G2 Access to and awareness of conditions Standard G3 Incident response Standard G4 No changes without approval Standard G5 Change of responsibility Standard G6 Change of ownership Standard G7 Commitments Non standard A1 Odorous gases Standard DC1 Notification of cessation Standard DC2 DRP requirements Standard DC3 Rehabilitation following cessation Standard H1 Storage and handling of hazardous materials Standard H2 Hazardous materials (< 250 litres) Standard H3 Spill kits Standard H4 Inventory of hazardous materials Standard N1 Hours of operation Non standard OP1 Plant and equipment Standard WM1 Waste management hierarchy Standard Environmental Assessment Report Biodiesel Plant, Peter Johnson Earthmoving Pty Ltd Appendix 1

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Ingredion ANZ Pty Ltd

Ingredion ANZ Pty Ltd Ingredion ANZ Pty Ltd 170 Epping Road, Lane Cove, NSW 2066 EPL: 518 Page 1 of 8 1. Purpose and Background POLLUTION INCIDENT RESPONSE The purpose of this Pollution Incident Response Management Plan (PIRMP)

More information

Pollution Incident Response Plan

Pollution Incident Response Plan Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply

More information

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services.

Narellan Field Service Centre. Pollution Incident Response Management Plan. Prepared by Endeavour Energy Safety and Environmental Services. Narellan Field Service Centre Pollution Incident Response Management Plan Prepared by Endeavour Energy Safety and Environmental Services Version 3 Version Date 1 30 August 2012 2 30 September 2013 3 9

More information

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number]

Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN. For [site name] [EPL number] Company Header POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN For [site name] [EPL number] Pollution Incident Response Management Plan for [insert site name] Contents [need to check correct page numbers]

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information

Appendix A1. Register of legal and other requirements

Appendix A1. Register of legal and other requirements Appendix A1 Register of legal and other requirements 1 Table 1 Legal register Act Activity / General Environmental Planning and Assessment Act 1979 All Comply with the terms Minister for Planning and Infrastructure

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

LICENCE NUMBER: L8272/2008/2 FILE NUMBER: 2013/000545

LICENCE NUMBER: L8272/2008/2 FILE NUMBER: 2013/000545 WESTERN AUSTRALIA DEPARTMENT OF ENVIRONMENT REGULATION Environmental Protection Act 1986 Licensee: Nationwide Oil Pty Ltd Registered Office: Level 4, 441 St Kilda Road MELBOURNE VIC 3004 ACN: 066 383 364

More information

ANNEX 2 Emergency / Pollution Incident Response Plan

ANNEX 2 Emergency / Pollution Incident Response Plan ANNEX 2 Emergency / Pollution Incident Response Plan Volume 5 of 5 Appendix 21.1 Annex 2 EPIRP Page 1 of 9 1 WIND FARM CONSTRUCTION ENVIRONMENTAL EMERGENCY / POLLUTION RESPONSE PLAN... 3 1.1 Policy...

More information

Works Approval Conditions 1 General

Works Approval Conditions 1 General Works Approval Conditions 1 General 1.1 Interpretation 1.1.1 In the Works Approval, definitions from the Environmental Protection Act 1986 apply unless the contrary intention appears. 1.1.2 In the Works

More information

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001)

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed

More information

Environment Information Sheet 8 Spill Response

Environment Information Sheet 8 Spill Response Environment Information Sheet 8 Spill Response Prevention is better than spill response What s the issue with spills? Spills of fuel, oil and / or chemicals pose a significant risk to groundwater at the

More information

Paragraph 9 Exemption The reclamation or improvement of land

Paragraph 9 Exemption The reclamation or improvement of land The reclamation or improvement of land 1 INTRODUCTION This document provides guidance, definitions, operational policy and strategy with regard registering a paragraph 9 exemption under Schedule 1 of the

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

History of the SPCC Rule

History of the SPCC Rule 2010 SPCC Training SPCC Rule History of the SPCC Rule The SPCC plan is a document required under the clean water act (CWA) It became effective in 1972 and has changed little in 32 years. The rule was formally

More information

Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act

Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills

More information

ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN

ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN ENVIRONMENTAL HEALTH AND SAFETY HAZARDOUS MATERIALS MANAGEMENT PLAN November 2011 University of Northern Colorado Hazardous Materials Management Plan I. General II. III. IV. Responsibilities Definition

More information

Environmental Management System Procedures

Environmental Management System Procedures Environmental Management System s Plan Title Oils and Oil Contaminated Items Delivery, Storage, Use and Disposal Ref No Op-Proc-71 Related Documents EMS-Plan-7 Op-Proc-72 EMS-F-71 EMS-F-72 Record of Revisions

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Introduction to Waste Treatment Technologies. Contents. Household waste

Introduction to Waste Treatment Technologies. Contents. Household waste Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting

More information

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE

WASTE Application Form - Dublin Waste to Energy SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE SECTION J ACCIDENT PREVENTION & EMERGENCY RESPONSE Describe the existing or proposed measures, including emergency procedures, to minimise the impact on the environment of an accidental emission or spillage.

More information

Management of Environmental Risks and Emergencies. Compliance Audit Program

Management of Environmental Risks and Emergencies. Compliance Audit Program Management of Environmental Risks and Emergencies Compliance Audit Program 2012 State of NSW and Environment Protection Authority The State of NSW and the Environment Protection Authority (EPA) are pleased

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

ENVIRONMENTAL ENFORCEMENT: WHAT THE OWNER REALLY NEEDS TO KNOW

ENVIRONMENTAL ENFORCEMENT: WHAT THE OWNER REALLY NEEDS TO KNOW Page 1 of 5 ENVIRONMENTAL ENFORCEMENT: WHAT THE OWNER REALLY NEEDS TO KNOW The Metropolitan Corporate Counsel, August 2000, p. 21, authored by John E. Osborn, Esq. Our law firm s practice concentrates

More information

LPG, Flammable Liquids, Toxic and Corrosive Substances

LPG, Flammable Liquids, Toxic and Corrosive Substances LPG, Flammable Liquids, Toxic and Corrosive Substances LPG, Flammable Liquids, Toxic and Corrosive Substances Safe Storage and Handling Today s focus is Dangerous substances under the Dangerous Substances

More information

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing

On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation

More information

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses

New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov. Environmental Self Audit For Small Businesses New York State Department of Environmental Conservation 625 Broadway, Albany, NY 12233 www.dec.ny.gov Environmental Self Audit For Small Businesses Disclaimer The materials in this document are intended

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Environmental Site Inspection Checklist

Environmental Site Inspection Checklist Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated

More information

Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools

Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools APPENDIX II Guide on the Segregation, Packaging, Labelling and Storage of Laboratory Chemical Wastes for Schools (Prepared by Environmental Protection Department) 1. Introduction The Waste Disposal (Chemical

More information

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES

UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES UDOT SPILL PREVENTION and RESPONSE PLAN for CONSTRUCTION SITES February 2014 The plan contained in the following pages was developed in part from UDOT Construction Division s Safety and Health Manual,

More information

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986

THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182. A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 THE CORPORATION OF THE CITY OF COURTENAY BYLAW NO. 2182 A bylaw to amend Storm Sewer Bylaw No. 1402, 1986 The Council of the Corporation of the City of Courtenay in open meeting assembled enacts as follows:

More information

EPA Guidelines for Environmental management of on-site remediation

EPA Guidelines for Environmental management of on-site remediation E N V I R O N M E N T P R O T E C T I O N A U T H O R I T Y EPA Guidelines for Environmental management of on-site remediation Environment Protection Authority GPO Box 2607, Adelaide, SA 5001 Telephone

More information

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102

CHAPTER 9 PERMITTING. 9.2 Scotland 102 9.2.1 Exemption 102 9.2.2 Waste management licence 102 9.2.3 PPC permit 102 CHAPTER 9 PERMITTING 9.1 England and Wales 100 9.1.1 T24 exemption for on-farm AD 100 9.1.2 T25 exemption for off-farm AD 100 9.1.3 Standard rules environmental permits 100 9.1.4 Standard rules for on-farm

More information

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders

STORE HAZARDOUS SUBSTANCES SAFELY. incompatibles gas cylinders STORE HAZARDOUS SUBSTANCES SAFELY Suitable containers incompatibles gas cylinders Oxy-Acetylene welding flammable substances 35 36 STORE HAZARDOUS SUBSTANCES SAFELY STORE HAZARDOUS SUBSTANCES SAFELY Storing

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry AURV471482A Plan and manage compliance with environmental regulations in the body repair industry Release: 1 AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

More information

6. Principles of effective plumbing systems

6. Principles of effective plumbing systems 6. Principles of effective plumbing systems This chapter summarizes the aims and objectives of a good local plumbing system that is, the drinking-water supply that serves a building and the system for

More information

Works Approval Conditions 1 General

Works Approval Conditions 1 General Works Approval Conditions 1 General 1.1 Interpretation 1.1.1 In the Works Approval, definitions from the Protection Act 1986 apply unless the contrary intention appears. 1.1.2 In the Works Approval, unless

More information

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN

MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa Environmental Law Enforcement in Zimbabwe By Farai Michael Nyahwa Presentation Breakdown Institutional Arrangement for Environmental Law Enforcement in Zimbabwe Major Environmental Issues of Concern In

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County

Pollution Prevention And Best Management Practices For Dry Cleaners Operating In Broward County FORWARD In 1991, the Broward County Environmental Protection and Growth Management Department, who was then known as the Department of Natural Resource Protection (DNRP), initiated the development of Pollution

More information

GENERAL SPECIFICATION

GENERAL SPECIFICATION R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT

More information

FLAMMABLE LIQUIDS COMPLIANCE NOTE

FLAMMABLE LIQUIDS COMPLIANCE NOTE Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic

More information

Laws Requiring Pollution Prevention Practices

Laws Requiring Pollution Prevention Practices Laws Requiring Pollution Prevention Practices Stormwater/urban runoff is being addressed as a result of the 1987 amendments to the Federal Clean Water Act [Section 402(p)], which established requirements

More information

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA

SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA SPILL PREVENTION AND RESPONSE PLAN TEMPLATE FOR BUSINESSES IN DAYTON S SOURCE WATER PROTECTION AREA Regulated Substance Management: All Regulated Substances, including chemical wastes, are to be managed

More information

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL

More information

How To Safely Handle A Spill

How To Safely Handle A Spill WD DWGB 22 6 2010 Best Management Practices for Fueling and Maintenance of Excavation and Earthmoving Equipment Env Wq 401, Best Management Practices for Groundwater Protection, applies to a variety of

More information

Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management

Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management Environmental Compliance Report Liquid Chemical Storage, Handling and Spill Management Part B Review of Best Practice and Regulation The Liquid Chemical Storage, Handling and Spill Management Environmental

More information

Slide 1. Enviros Consulting Ltd

Slide 1. Enviros Consulting Ltd Slide 1 Regulation of Waste Management Activities Past, Present and Future! Steve Bell Technical Manager Waste Management Thursday, 26 July 2007 Presentation Aims An insight of where we have come from

More information

How to comply with your environmental permit

How to comply with your environmental permit How to comply with your environmental permit 1 How to comply with your environmental permit We are the Environment Agency. We protect and improve the environment and make it a better place for people and

More information

How To Get A Stormwater Discharge Permit In A City Of Scottsdale

How To Get A Stormwater Discharge Permit In A City Of Scottsdale Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through

More information

Guide Document for Development of WHS Management Plans

Guide Document for Development of WHS Management Plans DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS

More information

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT

EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT EXPLOSIVE ATMOSPHERES - CLASSIFICATION OF HAZARDOUS AREAS (ZONING) AND SELECTION OF EQUIPMENT OVERVIEW ASSESSING THE RISK RELATIONSHIP BETWEEN FIRES AND EXPLOSIONS CLASSIFYING HAZARDOUS AREAS INTO ZONES

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN. CLEARING AND CIVIL WORKS EPBC 2009/4796 and EPBC 2013/7032. July 2015

CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN. CLEARING AND CIVIL WORKS EPBC 2009/4796 and EPBC 2013/7032. July 2015 CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN CLEARING AND CIVIL WORKS EPBC 2009/4796 and EPBC 2013/7032 July 2015 Jandakot Airport Holdings Pty Ltd 16 Eagle Drive Jandakot WA 6164 Ref: Construction Environment

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 February 2016 Revision 1.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

Environmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024

Environmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Document Number: NGSF-PSV-NAS-EN-PLN-0024 Version:

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

HINTS AND TIPS FOR IMPROVING RESOURCE EFFICIENCY IN YOUR BUSINESS

HINTS AND TIPS FOR IMPROVING RESOURCE EFFICIENCY IN YOUR BUSINESS HINTS AND TIPS FOR IMPROVING RESOURCE EFFICIENCY IN YOUR BUSINESS Publication 1255 October 2008 EPA Victoria has assembled a range of hints and tips aimed at assisting you to improve the resource efficiency

More information

Disposal of chemical waste must be regarded as an integral part of all research projects and teaching programs involving chemical use.

Disposal of chemical waste must be regarded as an integral part of all research projects and teaching programs involving chemical use. 1. Purpose and Objectives This procedure provides information on the generation, collection, storage and disposal of chemical waste to ensure: that the collection, storage and disposal of chemical waste

More information

: Sharpie King Size Permanent Markers. 3500 Lacey Road, 10th Floor Downers Grove, IL 60515 USA 800-323-0749 or 630-829-2500

: Sharpie King Size Permanent Markers. 3500 Lacey Road, 10th Floor Downers Grove, IL 60515 USA 800-323-0749 or 630-829-2500 PRODUCT DATA SHEET Section 1. Identification Product name : Sharpie King Size Permanent Markers Material uses : Writing instruments Manufacturer : Newell Brands 3500 Lacey Road, 10th Floor Downers Grove,

More information

CHEMICAL SPILL MANAGEMENT GUIDELINES

CHEMICAL SPILL MANAGEMENT GUIDELINES WHS Unit CHEMICAL SPILL MANAGEMENT GUIDELINES Contents 1 Purpose... 2 2 Scope... 2 3 Definitions... 2 4 Roles and Responsibilities... 2 5 General... 2 6 Defining Major or Minor Spill... 3 7 Major Spill

More information

Syston Dry Cleaners and Laundry Schedule 1 CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999

Syston Dry Cleaners and Laundry Schedule 1 CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999 CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999 ENVIRONMENTAL PERMITTING (ENGLAND AND WALES) REGULATIONS 2010 (As Amended) PERMIT REF. NO. 123 Charnwood Borough Council hereby permits,

More information

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction

PPG21. Pollution Prevention Guidelines. pollution incident response planning: PPG 21. 1. Introduction PPG21 February 2004 Environmental Alliance working together Pollution Prevention Guidelines pollution incident response planning: PPG 21 These guidance notes have been drawn up to assist those developing

More information

CHAPTER 62-740 PETROLEUM CONTACT WATER

CHAPTER 62-740 PETROLEUM CONTACT WATER CHAPTER 62-740 PETROLEUM CONTACT WATER 62-740.010 Declaration of Intent (Repealed) 62-740.020 Applicability 62-740.030 Definitions 62-740.040 General 62-740.100 Management Practices for Producers of PCW

More information

Management Toolkit for Small and Medium Sized Businesses

Management Toolkit for Small and Medium Sized Businesses Management Toolkit for Small and Medium Sized Businesses What is it? A pack of information, with helpful simple templates, specifically aimed to assist small and medium sized businesses in Scotland manage

More information

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION

MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION MARSHALL UNIVERSITY HAZARDOUS WASTE DISPOSAL SECTION TABLE OF CONTENTS POLICY STATEMENT.2 REFERENCE PROCEDURE 3 l.0 Purpose.3 2.0 Scope 3 3.0 Definitions 4 4.0 Responsibilities 5 5.0 Procedure.7 11/16/2005

More information

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011)

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011) NEBOSH National Diploma in Environmental Management Unit ED1 MANAGement of Environmental Risk element 6: Environmental Legislative Framework and Methods of Enforcement Sample material (Material correct

More information

CONTRACTOR ENVIRONMENTAL LIABILITY 101. Violation of environmental laws may result in fine or imprisonment or both.

CONTRACTOR ENVIRONMENTAL LIABILITY 101. Violation of environmental laws may result in fine or imprisonment or both. CONTRACTOR ENVIRONMENTAL LIABILITY 101 Violation of environmental laws may result in fine or imprisonment or both. To avoid potential liability, contractors must be aware of the requirements of the various

More information

Disposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets

Disposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets Disposal of Fats, Oils, Grease and Food Waste Best Management Practice for Catering Outlets Working in partnership with: Blank inside front cover page Best Management Practice for Catering Outlets Fat,

More information

APPENDIX 7-B. Hazardous Materials Management Plan

APPENDIX 7-B. Hazardous Materials Management Plan S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT A SSESSMENT APPENDIX 7-B Hazardous Materials Management Plan SX03733 Section 6.0 1.1.1 Hazardous Materials Management Plan 1.1.1.1 Introduction

More information

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)

More information

HAZARDOUS WASTE MANAGEMENT PROGRAM

HAZARDOUS WASTE MANAGEMENT PROGRAM HAZARDOUS WASTE MANAGEMENT PROGRAM UNIVERSITY RISK MANAGEMENT Occupational Safety and Health Programs 19 Hagood Avenue, Suite 908 Charleston, SC 29425 843-792-3604 Revised: January 2015 TABLE OF CONTENTS

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Pollution Incident Response Management

Pollution Incident Response Management For Notification Procedure, please turn to Section 5 for Pollution Incident Response Management Document Table of Contents 1 Introduction... 3 1.1 Background and Scope... 3 1.2 Regulatory Requirements...

More information

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident Response Management Plan (PIRMP) Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Southern Oil Refining Pty Ltd 42 Lewington St. Bomen. NSW. 2650 Table of Contents 1 INTRODUCTION 1.1 Facility details 1.2 Overview of Operations 1.3 Plan Objectives

More information

ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM

ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM ENVIRONMENTAL MANAGEMENT SYSTEMS QUOTE REQUEST FORM Please provide the following information to enable us to confirm the costs of registration. To which standard are you requiring registration? (please

More information

Management Toolkit for Small and Medium Sized Businesses

Management Toolkit for Small and Medium Sized Businesses Management Toolkit for Small and Medium Sized Businesses What is it? A pack of information, with helpful simple templates, specifically aimed to assist small and medium sized businesses in Northern Ireland

More information

Uncontrolled if Printed

Uncontrolled if Printed Hazard Table Hazard Types Any Hazard Kinetic / Mechanical Gravitational Thermal and/or Explosive Electrical Pressurised Chemicals / Substances Radiation Biological Manual Handling / Postural Noise and/or

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN

SOUTH COOGEE TRANSPORT MANAGEMENT PLAN SOUTH COOGEE TRANSPORT MANAGEMENT PLAN On behalf of : DEPARTMENT FOR PLANNING & INFRASTRUCTURE Prepared by: ENV Australia A.C.N. 091 839 520 Mezzanine Level, Central Park 152-158 St Georges Terrace Perth

More information