1 Presentation for MWEA Process Committee Seminar November 6, 2013 SCREENING AND CONSEQUENCES Tom Grant, Hubbell Roth and Clark Sandra Diorka, Delhi Charter Township

2 Need for Project Class A Sludge Anaerobic Digestion System Heat Exchangers Plugging

3 Plugging Heat Exchangers All raw sludge is macerated such that fibers, plastics, etc. are relatively small, about ¼ wide x 3 to 6 long During sludge recirculation and pumping through 1 1/4 and 3 diameter heat exchanger tubes, small pieces become entwined and form ropes that plug the heat exchangers Heat exchangers required cleaning every other day

4 Plugging Heat Exchangers

5 Existing Not Effective Existing headworks grinding with capture was not effectively removing screenable materials from wastewater Requires seasonal cleaning of primary clarifiers and disposal of wet settlings to drying beds Causing early wear on POTW equipment Excessive labor spent removing rags from all process equipment Wasting pumps Telescopic valves Decant valves Digester heat exchangers

6 Existing Not Effective

7 Existing Not Effective Removal of about 40 pounds wet material per day

8 Traditional bar screens New Screen Selection: Site Visits, Round 1 Visited Michigan WWTPs to view their headworks screens: South Lyon, ¼ bar Grand Rapids, ¼ bar

9 Bar Screen Observations During site visits noticed: Bar screens had excessive pass through Equipment had grease balls and strings hanging Resulting screenings were very dirty Bar screen room and environment was gross Primaries, aeration tanks, and secondaries had floaters Conclusion: Bar screens are not so good. What else can we get?

10 Pilot Testing at POTW How do we pick between round holes and slots (bar screen)? How big should the holes be? Devised an in house experiment Fabricated a slide gate with four different screens built in 1/8 inch round hole (perforated plate) 1/4 inch round hole 1/4 inch bar hole Window screen (around 1mm hole size)

11 Pilot Testing at POTW Placed each gate in the influent channel for a specified time Weighed the material collected Window screen was considered 100% capture Roughly 8000 pounds per day Round holes collected roughly 4 times the amount of material as the bar or slot shaped openings Conclusion: We want round holes!!

12 North Kent, 1 to 3 mm drum screen New Screen Selection: Site Visits, Round 2

13 New Screen Selection: Site Visits, Round 2 Kalamazoo, 6 mm bandscreen Screen entrance is sealed to channel Flow In Flow Out

14 Discovered and Purchased U.K. Study Purchased National Screen Evaluation Facility, Inlet Screen Comparative Report performed between 1999 and 2011 by the UK Water Industry Research Installed and compared the performance of 27 different headworks treatment products Finescreen Stepscreen Combined screen (bar or round with processing) Bandscreen Reported % capture of material Maintenance frequency

15 Finescreen Screen rotates around to carry stuff to the top Can have round or bar openings

16 Stepscreen Like a fine screen Steps move and transport stuff to the top body of the screen holds still

17 Discovered and Purchased U.K. Study Bandscreens showed the best performance Highest screen capture rate Lowest risk of pass through or carry over because of seal between opening and the channel Study showed two brands had the highest screen capture rate Screens incorporating slots or bar spacing showed the lowest performance Conclusion: We want one of the bandscreens with the highest capture rate!

18 Site Visits Round 3 Made a three day trip to visit four additional screens Ishpeming, MI Jones and Atwood band, 6 mm holes Sheboygan, WI Brackett Green band, 6 mm holes Madison, WI Brackett Green band, 6 mm holes Fond du Lac, WI JWC Fine Screen, 3 mm holes

19 Ishpeming Site Visits

20 Sheboygan Site Visits

21 The Final Decision How did we decide? The cleanest end product 3mm because Madison had 6mm hole size with the same type of heat exchanger Heat exchangers still plugged Fond du Lac had 3mm hole size with the same type of heat exchanger Heat exchangers did NOT plug!!

22 What Happened After? Heat exchangers no longer routinely cleaned Primaries have no rags or floating salad Grease hauled less often (contains only grease) Aeration tanks do not have to be skimmed No more condoms Wasting pumps no longer need to be routinely cleaned Sludge storage decant valves have remained clean Telescopic valves no longer have to be cleaned

23 1200 Screenings Production

24 88.0 Raw Sludge % Volatile Before After

25 500 Grit Production

26 Before NOT Gritty

27 After Actually Grit

28 Design Engineering Engineering and Construction 2 screens, each handle 6 mgd, bypass/overflow manually cleaned channel 5 mgd Tight site fit between existing influent screw pumps, grit tank and primary clarifiers Existing hydraulic grade line is fixed Poor soils for building & channels foundation

29 Tight Site

30 Helical Screw Piles Foundation Poor Soils

31 Construction Extended schedule due to piles, originally June 2012 completion, first screen started in October 2012 Alternate bypass

32 Gravity Bypass Construction

33 Construction

34 Construction

35 Construction

36 Construction

37 Results

38 Results

39 Questions??

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and

Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

Small Wastewater Treatment Systems

Small Wastewater Treatment Systems Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems

More information

GRIT CHARACTERIZATION IN FLORIDA WASTEWATER PLANTS

GRIT CHARACTERIZATION IN FLORIDA WASTEWATER PLANTS GRIT CHARACTERIZATION IN FLORIDA WASTEWATER PLANTS INTRODUCTION Over the years Moss-Kelley, Inc. has pilot tested the Eutek TEACUP, and most recently the HEADCELL and SLURRYCUP to characterize grit entering

More information

WASTEWATER TREATMENT OBJECTIVES

WASTEWATER TREATMENT OBJECTIVES WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater

More information

Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance

Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance LAKESIDE Water Purification Since 1928 Bulletin #1603 April 2005 Grit Removal Systems Simple, low cost, effective grit removal to enhance plant performance Aeroductor Model L Grit Classifier SpiraGrit

More information

Raptor Septage Acceptance Plant. For Municipal Wastewater, Septage and Grease Trap Applications

Raptor Septage Acceptance Plant. For Municipal Wastewater, Septage and Grease Trap Applications Raptor Septage Acceptance Plant For Municipal Wastewater, Septage and Grease Trap Applications The Lakeside Raptor Septage Acceptance Plant Many wastewater treatment plants process municipal, industrial,

More information

ANAEROBIC/ANOXIC TANKS

ANAEROBIC/ANOXIC TANKS PROCESS DESCRIPTION In the anaerobic/anoxic tanks, wastewater is prepared for further treatment in the biological reactors. Denitrification and luxury uptake of phosphorus take place by mixing a food source

More information

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach

Fundamentals of Asset Management. Step 10. Build Asset Management Plan A Hands-On Approach Fundamentals of Asset Management Step 10. Build Asset Management Plan A Hands-On Approach Tom s bad day Fundamentals of Asset Management 2 AM plan 10-step process Develop Asset Registry Assess Performance,

More information

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the

More information

aquateam Aquateam - Norwegian Water Technology Centre A/S Report no: 02-051 Project no: O-02033 Project manager: Dr. Bjørn Rusten.

aquateam Aquateam - Norwegian Water Technology Centre A/S Report no: 02-051 Project no: O-02033 Project manager: Dr. Bjørn Rusten. Feasibility study of biological wastewater treatment plants with Salsnes Filter fine mesh sieve primary treatment compared to plants without primary treatment Aquateam - Norwegian Water Technology Centre

More information

The City of Boulder 75 th Street Wastewater Treatment Facility

The City of Boulder 75 th Street Wastewater Treatment Facility The City of Boulder 75 th Street Wastewater Treatment Facility Wastewater Collection and Treatment The Foundation of Public Health Wastewater Collection Boulder s wastewater collection system, also known

More information

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan

26th Ward Wastewater Treatment Plant Wet Weather Operating Plan 26th Ward Wastewater Treatment Plant Prepared by: New York City Department of Environmental Protection Bureau of Wastewater Treatment July 2010 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1-1 1.1 BACKGROUND...

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project September 2015 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN

FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN FAYETTEVILLE PUBLIC UTILITIES WATER AND SEWER DEPARTMENT SANITARY SEWER OVERFLOW CORRECTIVE ACTION PLAN ENGINEERING REPORT 408 College Street, West Fayetteville, TN 37334 (931)433-1522 CONSOLIDATED TECHNOLOGIES,

More information

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM

CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM CWD BALDWIN PLANT NEW RESIDUALS HANDLING SYSTEM OTCO Water Workshop March, 2011 Frank Woyma Plant Manager Nick Pizzi Vice-President EE&T ENVIRONMENTAL ENGINEERING & TECHNOLOGY, INC. Objectives Review the

More information

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS

SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS SYNERGISTIC APPLICATION OF ADVANCED PRIMARY AND SECONDARY WASTEWATER TREATMENT SYSTEMS Published in Water and Waste Digest membrane issue, November 2008 Miroslav Colic; Chief Scientist, Clean Water Technology

More information

Grease Trap Maintenance, Procedures and Cleaning Logs

Grease Trap Maintenance, Procedures and Cleaning Logs SAWS Grease Reduction Program Grease Trap Maintenance, Procedures and Cleaning Logs Don t Feed the Grease Monster Best Management Practices for Commercial Food and Restaurant Facilities Train kitchen staff

More information

lforrnation Requir C -INF lucture & OPER eraf - Drawing No. 5270-2910 - Drawing No. 5270-2911

lforrnation Requir C -INF lucture & OPER eraf - Drawing No. 5270-2910 - Drawing No. 5270-2911 C -INF eraf - lucture & OPER lforrnation Requir Outline Description of the Treatment Process at Kiicioon WWTP 8 Agglomeration - Drawing No. 5270-2910 Co n se nt o f c Fo op r i yr ns ig pe ht ct ow ion

More information

Best Management Practices Fats, Oils, & Grease

Best Management Practices Fats, Oils, & Grease Best Management Practices Fats, Oils, & Grease for Food Service Facilities Public Works Department Environmental Division Table of Contents A. Introduction B. Purpose of the Manual 1 C. Frequently Asked

More information

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems

Homeowners and Home Buyers Guide to Wells and Private Sewage Systems Homeowners and Home Buyers Guide to Wells and Private Sewage Systems What every homeowner should know about living with a well and a private sewage system. YOUR ENVIRONMENTAL SYSTEMS Out of sight out of

More information

Grit Removal Identification and Removal Methods

Grit Removal Identification and Removal Methods Grit Removal Identification and Removal Methods ERIN FLANAGAN, P.E. Northeast Biennial WEAT Conference May 7, 2014 Presentation Outline True Grit Particle Size Grit Material Comparison Settling Characteristics

More information

Minnesota. BMI Project No. M21.037315

Minnesota. BMI Project No. M21.037315 Wastewater Treatment Facility Plan City of Paynesville Minnesota BMI Project No. M21.037315 March 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 A. GENERAL... 1 B. DESIGN PARAMETERS... 1 C. COST ESTIMATES...

More information

Cambridge Wastewater Treatment Facility

Cambridge Wastewater Treatment Facility Cambridge Wastewater Treatment Facility Emergency Situations If you have a water or sewer emergency that relates to the City s utility system call the Public Works office at 763-689-1800 on normal working

More information

Wastewater Technology Fact Sheet Screening and Grit Removal

Wastewater Technology Fact Sheet Screening and Grit Removal United States Environmental Protection Agency Wastewater Technology Fact Sheet and DESCRIPTION Wastewater contains large solids and grit that can interfere with treatment processes or cause undue mechanical

More information

VX Series Pumps Rotary Lobe Pumps designed for abrasive and viscous liquids. HIGH PERFORMANCE PUMPS DESIGNED FOR TOUGH APPLICATIONS ENGINEERED TO WORK

VX Series Pumps Rotary Lobe Pumps designed for abrasive and viscous liquids. HIGH PERFORMANCE PUMPS DESIGNED FOR TOUGH APPLICATIONS ENGINEERED TO WORK ENGINEERED TO WORK HIGH PERFORMANCE PUMPS DESIGNED FOR TOUGH APPLICATIONS VX Series Pumps Rotary Lobe Pumps designed for abrasive and viscous liquids. Industry Agriculture Mining Biogas Agriculture Wastewater

More information

BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES

BHS CANDLE FILTER APPLICATIONS FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES FOR CLARIFICATION / RECOVERY OF SOLIDS FROM CHEMICAL SLURRIES TABLE OF CONTENTS 1. FINE CATALYST RECOVERY AT A REFINERY Pages 2 4 2. FINE SOLIDS REMOVAL & CLARIFICATION OF A SPECIALIZED ACIDIC SOLVENT

More information

Current Trends in Digester Mixing Technologies Becky Daugherty Brian Hemphill

Current Trends in Digester Mixing Technologies Becky Daugherty Brian Hemphill Current Trends in Digester Mixing Technologies Becky Daugherty Brian Hemphill rc0406sfbs.ppt Outline Importance of Digester Mixing Digester Mixing Technologies Current Trends Case Studies Design Considerations

More information

Final Report On the Effect of Macerating Toilets on Septic Tank Performance

Final Report On the Effect of Macerating Toilets on Septic Tank Performance Final Report On the Effect of Toilets on Septic Tank Performance Submitted to SFA Saniflo Inc. Submitted by Angela Mason, BSc (Eng) and Douglas Joy, PhD Ontario Rural Wastewater Centre University of Guelph

More information

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering

Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson

More information

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company) Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company) The following describes operations at the National Steel Pellet Company, an iron ore mining and processing facility

More information

E nv i ro n m e nta l. Biotec 5-7. Sustainable, Reliable, Affordable

E nv i ro n m e nta l. Biotec 5-7. Sustainable, Reliable, Affordable E nv i ro n m e nta l Biotec 5-7 Package Sewage Treatment for Residential, Business & Leisure Applications Sustainable, Reliable, Affordable ENTEC BIOTEC 5-7 FROM KINGSPAN ENVIRONMENTAL Package Sewage

More information

Environmental Science 101 Waste. Fall 2012. Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated.

Environmental Science 101 Waste. Fall 2012. Lecture Outline: Terms You Should Know: Learning Objectives: Reading Assignment: Chlorinated. Environmental Science 101 Waste Fall 2012 1 Lecture Outline: 17. SEWAGE DISPOSAL A. Sewage Handling B. Raw Sewage C. Wastewater Treatment Steps D. Individual Septic Systems E. Taking Stock Learning Objectives:

More information

SunMaxx Solar Filling Station Operating Instructions

SunMaxx Solar Filling Station Operating Instructions SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...

More information

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS

San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS San Luis Obispo County Los Osos Wastewater Project Development TECHNICAL MEMORANDUM SEPTAGE RECEIVING STATION OPTION TABLE OF CONTENTS Page No. 1.0 BACKGROUND...1 2.0 INTRODUCTION - SEPTAGE RECEIVING STATION...1

More information

Drain to Drinking Water

Drain to Drinking Water Drain to Drinking Water Adapted from Project WET Curriculum and Activity Guide Subject: Science, Social Studies Target Grades: 6-8 Duration: one class period Materials Per group (2-3 students) 1 set of

More information

Aeration Efficiency Guide

Aeration Efficiency Guide Aeration Efficiency Guide Environmental Dynamics InTernational EDI specializes in the research, development, and application of advanced technology aeration and biological treatment solutions for municipal

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 1.0 DESCRIPTION OF EXISTING CONDITIONS... 1-1. 1.1 Population... 1-1. 1.2 Wastewater Flows...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 1.0 DESCRIPTION OF EXISTING CONDITIONS... 1-1. 1.1 Population... 1-1. 1.2 Wastewater Flows... TABLE OF CONTENTS EXECUTIVE SUMMARY...1 1.0 DESCRIPTION OF EXISTING CONDITIONS... 1-1 1.1 Population... 1-1 1.2 Wastewater Flows... 1-1 1.3 Existing Wastewater Facilities... 1-2 1.3.1 City of Celina...

More information

A copy of Worksheet 1 at the appropriate level for each pupil. Ask pupils to answer the question 'What is sewerage?'

A copy of Worksheet 1 at the appropriate level for each pupil. Ask pupils to answer the question 'What is sewerage?' Waste Water Treatment 1. Fascinating Facts Aim: To introduce pupils to key facts about waste water Materials: A copy of Worksheet 1 at the appropriate level for each pupil String Method: Ask pupils to

More information

5. TREATMENT FACILITIES

5. TREATMENT FACILITIES 5. TREATMENT FACILITIES 5.1. Background... 1 5.2. Nine Springs Wastewater Treatment Plant... 1 5.2.1. Liquid Treatment Facilities... 3 5.2.2. Biosolids Disposal Facilities... 6 5.2.3. Operation and Maintenance

More information

Winnipeg Sewage Treatment Program Integrated Management System

Winnipeg Sewage Treatment Program Integrated Management System Winnipeg Sewage Treatment Program Integrated Management System SEWPCC Facility s. DOCUMENT NUMBER: CD-RC-RF-02 Rev Prepared by Reviewed by Date Approved by Date 2014/04/02 Philippe Biesse Bruno Valla 2014/04/02

More information

CNG Fueling Developments and Renewable Conversion to RNG Technology and Update on a RNG Fleet

CNG Fueling Developments and Renewable Conversion to RNG Technology and Update on a RNG Fleet CNG Fueling Developments and Renewable Conversion to RNG Technology and Update on a RNG Fleet NY State Chapter of SWANA, Albany. NY. June 13, 2013 Bernard Sheff, PE, Vice President Anaergia Inc. Agenda

More information

Procedures for Correcting a Sludge / Grease Clogged Elevated Sandmound Sewage Disposal System.

Procedures for Correcting a Sludge / Grease Clogged Elevated Sandmound Sewage Disposal System. This pamphlet is intended to assist Dingman Township residents in understanding the most common procedure for repairing an elevated sandmound sewage disposal system. Dingman Township property owners may

More information

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk 1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance

More information

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009

Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 APPLICATION FOR ADDITION OF TRANSPORTED WASTES IN WASTEWATER TREATMENT FACILITIES Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 This application is to be

More information

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE

RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN PERCHLOROETHYLENE (Adopted January 6, 1978)(Amended August 3, 1979)(Amended July 11, 1980) (Amended August 3, 1990)(Amended December 7, 1990) (Amended November 17, 2000) RULE 1102. DRY CLEANERS USING SOLVENT OTHER THAN

More information

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery County of Nassau Department of Public Works Bay Park Sewage Treatment Plant Super Storm Sandy Recovery Edward P. Mangano County Executive Shila Shah-Gavnoudias, P.E. Commissioner of Public Works Bay Park

More information

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan

Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan Chapter 8: Common Treatment Facilities, Programs, Operational Improvements and Policies for the Recommended Plan 8.1 Introduction The purpose of this chapter is to document the variety of treatment-related

More information

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems

Texas Commission on Environmental Quality Page 1 Chapter 217 - Design Criteria for Domestic Wastewater Systems Texas Commission on Environmental Quality Page 1 217.31. Applicability. SUBCHAPTER B: TREATMENT FACILITY DESIGN REQUIREMENTS 217.31-217.39 Effective August 28, 2008 This subchapter details the design values

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method. PERMEABILITY TEST A. CONSTANT HEAD OBJECTIVE To determine the coefficient of permeability of a soil using constant head method. need and Scope The knowledge of this property is much useful in solving problems

More information

COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens

COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens COD/BOD 5 Reduction with ROTAMAT Fine and Micro Screens Removal of particulate material from wastewater Eco-efficient use of capital Water pollution control through maximum COD/BOD 5 reduction Service

More information

Guidelines for Precast Concrete Grease Interceptors

Guidelines for Precast Concrete Grease Interceptors Guidelines for Precast Concrete Grease Interceptors Purpose Provide an overview of the basic design principals that govern why gravity grease interceptors work Provide a forum for discussion of common

More information

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS

Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined

More information

Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD

Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD. Trevor Ghylin, PE PhD Holistic Aeration and Chemical Optimization Saves Big Money from 1 MGD to 600 MGD Trevor Ghylin, PE PhD Outline Background Case Study: Sterno, Sweden (~1.8 MGD) 65% Aeration Energy Reduction Case Study:

More information

Filter Aid Filtration

Filter Aid Filtration Filter Aid Filtration Filtration is the separation of solids from liquids by forcing the liquid to flow through a porous medium and depositing the solids on the medium. A filter aid (finely divided material

More information

Double-Headed Screw 1. 3/4" FIP x 3/4" MIP x 1/4" hole 2. 3/4" Fip x 3/4" MIP. Feed Water Connector 1. 1/2" FIP x 1/2" MIP x 1/4" OD 2. 3.

Double-Headed Screw 1. 3/4 FIP x 3/4 MIP x 1/4 hole 2. 3/4 Fip x 3/4 MIP. Feed Water Connector 1. 1/2 FIP x 1/2 MIP x 1/4 OD 2. 3. Picture Item No. Description RO- 0010 Brass Water Feed 1. 3/4" FIP with 1/4" hole 2. Using on R.O. tank RO- O020 Double-Headed Screw 1. 3/4" FIP x 3/4" MIP x 1/4" hole 2. 3/4" Fip x 3/4" MIP RO- 0030 Brass

More information

EXISTING WASTEWATER TREATMENT FACILITIES

EXISTING WASTEWATER TREATMENT FACILITIES Chapter 5 EXISTING WASTEWATER TREATMENT FACILITIES 5.1 THERESA STREET WWTF 5.1.1 Overview The Theresa Street WWTF is the larger of the two wastewater treatment facilities owned and operated by the City.

More information

Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service

Experts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service Experts Review of Aerobic Treatment Unit Operation and Maintenance Bruce Lesikar Texas AgriLife Extension Service Overview Overview of Aerobic Treatment Units Installing for accessibility to system components

More information

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL

THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL THE MARSHALL STREET ADVANCED POLLUTION CONTROL FACILITY (CLEARWATER, FLORIDA) CONVERSION TO 4-STAGE BARDENPHO TO IMPROVE BIOLOGICAL NITROGEN REMOVAL ABSTRACT Timur Deniz, Ph.D., Thomas W. Friedrich, P.E.

More information

MICHAEL BRYAN-BROWN, GREEN MOUNTAIN TECHNOLOGIES, BAINBRIDGE ISLAND, WA JEFF GAGE, COMPOST DESIGN SERVICES, OLYMPIA, WA

MICHAEL BRYAN-BROWN, GREEN MOUNTAIN TECHNOLOGIES, BAINBRIDGE ISLAND, WA JEFF GAGE, COMPOST DESIGN SERVICES, OLYMPIA, WA Lessons Learned in Aerated Static Pile (ASP) Composting MICHAEL BRYAN-BROWN, GREEN MOUNTAIN TECHNOLOGIES, BAINBRIDGE ISLAND, WA JEFF GAGE, COMPOST DESIGN SERVICES, OLYMPIA, WA ASP Lessons Learned Overview

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions

POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS. Water & Wastewater Treatment Solutions POSITIVE DISPLACEMENT BLOWERS & VACUUM PUMPS Water & Wastewater Treatment Solutions Water & Wastewater Treatment Solutions Gardner Denver understands the complex needs and challenges of the water and wastewater

More information

FLASH TANK ECONOMIZER PRODUCT GUIDE

FLASH TANK ECONOMIZER PRODUCT GUIDE FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.

More information

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key

Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key Unit 1 Process Control Strategies Exercise Module 16: The Activated Sludge Process - Part II Instructor Guide Answer Key 1. What are the six key monitoring points within the activated sludge process? Ans:

More information

DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement

DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement DIY Poly Digester What is Supplied in the Kit 4 m of clear polyethylene layflat tube Inlet tube (100mm PVC pipe, 40 cm long) 0.4 m of 19mm dia PVC pipe 0.4 m of 13mm dia black poly tube 2 m of 12 mm dia

More information

POTW PHOSPHORUS REMOVAL PROCESSES

POTW PHOSPHORUS REMOVAL PROCESSES POTW PHOSPHORUS REMOVAL PROCESSES Ohio Lake Erie Phosphorus Task Force - December 20, 2007 ROBERT M. BONNETT, PE Northeast Ohio Regional Sewer District OUTLINE SOURCES AND FORMS IN WASTEWATER TYPICAL POTW

More information

Installation & Operating Instructions

Installation & Operating Instructions MANEP08082011 Installation & Operating Instructions Note: Please read this manual thoroughly before installation and operation Thank you for purchasing your new EazyPod filter. We are sure you will be

More information

ALL YOU NEED TO KNOW...

ALL YOU NEED TO KNOW... ALL YOU NEED TO KNOW... What do you know about your septic tank system? For the purposes of this booklet, a septic tank system refers to any kind of on-site sewage management system including traditional

More information

OPERATIONS AND MAINTENANCE INFORMATION FOR: THE CANPLAS BACKWATER VALVE THE CHEMTROL BALL SHUT OFF VALVE SUMP PUMPS AND WASTEWATER EJECTOR PUMPS

OPERATIONS AND MAINTENANCE INFORMATION FOR: THE CANPLAS BACKWATER VALVE THE CHEMTROL BALL SHUT OFF VALVE SUMP PUMPS AND WASTEWATER EJECTOR PUMPS OPERATIONS AND MAINTENANCE INFORMATION FOR: THE CANPLAS BACKWATER VALVE THE CHEMTROL BALL SHUT OFF VALVE SUMP PUMPS AND WASTEWATER EJECTOR PUMPS THE LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT

More information

AerobicSepticSystems.com

AerobicSepticSystems.com WHITEWATER AEROBIC WASTWATER TREATMENT UNITS DF SERIES Distributed in Oregon by: For information on sales or service: Randy Arts (541) 580-4100 or Mike Arts (541) 580-4102 AerobicSepticSystems.com Principle

More information

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES

CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES CHAPTER 8 UPGRADING EXISTING TREATMENT FACILITIES 8-1. General. Upgrading of wastewater treatment plants may be required to handle increased hydraulic and organic loadings to meet existing effluent quality

More information

Spill Containment Manholes

Spill Containment Manholes Spill Containment Manholes 1-2100 Series OPW and Pomeco Spill Containment Manholes are designed to prevent spilled product from entering the soil near the fill and vapor return riser connections on underground

More information

Industrial Strength Rocket Launcher

Industrial Strength Rocket Launcher Industrial Strength Rocket Launcher Description: Instructions for the construction of an industrial strength rocket launcher for use with paper rockets. Materials: Schedule 40 PVC piping and bushings from

More information

Enhancing Nitrification in an Oil Refinery WWTP with IFAS

Enhancing Nitrification in an Oil Refinery WWTP with IFAS Enhancing Nitrification in an Oil Refinery WWTP with IFAS Wayne J. Flournoy (2), Russ Grillo (1), *Sarah B. Hubbell (2), Ramesh Kalluri (3), Casey Mueller (1) (1) Frontier Refining, Inc. (2) Entex Technologies

More information

Removing Moisture within Large Double Glazed Windows

Removing Moisture within Large Double Glazed Windows Removing Moisture within Large Double Glazed Windows Copyright: Max Cottrell www.mcottrell.co.uk This article gives the reasons and a method of removing accumulated moisture from double glazed windows,

More information

SEPTIC SYSTEM. Taking care of your. ... what you need to know

SEPTIC SYSTEM. Taking care of your. ... what you need to know Taking care of your SEPTIC SYSTEM... what you need to know For more information, please call: WATER & WASTE MANAGEMENT PROGRAM (909) 387-4666 Visit our web site: www.sbcounty.gov/dehs A:\Septic System

More information

Control ball valves for severe services. Author: Michele Ferrante, PARCOL S.p.A., Italy

Control ball valves for severe services. Author: Michele Ferrante, PARCOL S.p.A., Italy Control ball valves for severe services Author: Michele Ferrante, PARCOL S.p.A., Italy Control valves are primarily classified according to the type of their obturator motion which can be linear or rotary.

More information

NAYADIC TROUBLE-SHOOTING CHECKLIST

NAYADIC TROUBLE-SHOOTING CHECKLIST (IMPORTANT: Disconnect power to compressor or alarm before attempting repairs.) I. COMPRESSOR A. New compressor will not start but 1. Rotary assembly is locked up due 1. Remove internal filters, muffler

More information

Managing Floor Drains and Flammable Traps

Managing Floor Drains and Flammable Traps Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

SECTION 10 WATER WELL SUPPLY 10.01 SCOPE OF WORK

SECTION 10 WATER WELL SUPPLY 10.01 SCOPE OF WORK 10.01 SCOPE OF WORK The work covered by this section of the specifications consists in furnishing all labor, equipment and material necessary to perform the installation of a Type I water supply well per

More information

TAMPERS. 9949 Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A.

TAMPERS. 9949 Tabor Place, Santa Fe Springs, California, CA 90670, U.S.A. TAMPERS Website: www.apt-tools.com e-mail: info@apt-tools.com TDS-1064 Rev A S TOOL MAINTENANCE & REPAIR INFORMATION FIELD OPERATION: Before use: 1. Check the tamping butt lock screw, it must be tightened

More information

Installation Manual Gravity Solar Water Heater Evacuated Tube Integrated (Direct) System, unpressurized

Installation Manual Gravity Solar Water Heater Evacuated Tube Integrated (Direct) System, unpressurized Installation Manual Gravity Solar Water Heater Evacuated Tube Integrated (Direct) System, unpressurized Gravity Solar System Installation Manual: This manual explains how to install a system of evacuated

More information

RMF TANDEM 900 OFF-LINE FILTER SYSTEMS

RMF TANDEM 900 OFF-LINE FILTER SYSTEMS RMF TANDEM 900 OFF-LINE FILTER SYSTEMS RMF Tandem 900 Off-line filter Systems can be applied to every imaginable industrial application where hydraulic or lubrication systems are present. An integrated

More information

Top 10+ Mistakes of DWV plumbing design

Top 10+ Mistakes of DWV plumbing design Top 10+ Mistakes of DWV plumbing design Listed below are the some of the most frequently missed items, noticed by our inspectors, at plumbing rough-in when non-plumbers attempt plumbing design. Most of

More information

IMPORTANT SAFETY RULES TO FOLLOW

IMPORTANT SAFETY RULES TO FOLLOW WARNING FLOOR & CARPET CLEANER Any piece of equipment can be dangerous if not operated properly. YOU are responsible for the safe operation of this equipment. The operator must carefully read and follow

More information

PLUMBING CARE AND REPAIR

PLUMBING CARE AND REPAIR PLUMBING CARE AND REPAIR No special skills are required for any of the repairs described in this section. Plumbing repairs are seldom dangerous unless leaking water is soaking areas where there are electrical

More information

Round Housing with Side Ports

Round Housing with Side Ports Power Steering Steering Control Unit (SCU) Parts and Repair Information 5 Series Steering Control Units 001 Square Housing with Side Ports Round Housing with Side Ports T E L RP Round Housing with End

More information

Solids, Volatile Dissolved and Fixed Dissolved

Solids, Volatile Dissolved and Fixed Dissolved , 8277 Solids, Volatile Dissolved and Fixed Dissolved Gravimetric Method 1 Scope and Application: For wastewater. 1 Adapted from Standard Methods for the Examination of Water and Wastewater DOC316.53.001206

More information

Looking after your Septic Tank System

Looking after your Septic Tank System Looking after your Septic Tank System Name: Bought to you by Address: File this in your property file. 0800 TO FLUSH Call 0800 TO FLUSH 1 What do you know about your septic tank system? Just like your

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

Septic Systems Maintenance:

Septic Systems Maintenance: Septic Systems Maintenance: A typical septic system consists of two basic components: a septic tank and an underground disposal field. Wastewater flows from the house to the septic tank. Effluent, after

More information

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE 4 3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE A. Changing the Control Board B. Replacing a Heating Element C. Thermistor Replacement D. High Limit Switch Replacement E. Level Detector Replacement

More information

Fleck 4650. Service Manual INSTALLATION AND START-UP PROCEDURE TABLE OF CONTENTS JOB SPECIFICATION SHEET

Fleck 4650. Service Manual INSTALLATION AND START-UP PROCEDURE TABLE OF CONTENTS JOB SPECIFICATION SHEET Fleck 4650 Service Manual TABLE OF CONTENTS JOB SPECIFICATION SHEET...1 INSTALLATION AND START-UP PROCEDURE...1 CONTROL VALVE DRIVE ASSEMBLY...2 CONTROL DRIVE ASSEMBLY FOR CLOCK...3 BYPASS VALVE ASSEMBLY...4

More information

Calcite PH Nutralizer System

Calcite PH Nutralizer System Calcite PH Nutralizer System Installation, Operation & Maintenance Manual Facts About Calcite Ph Neutralizers Calcite is a crushed and screened white marble media which can inexpensively be used to neutralize

More information

WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY

WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY Schneider Electric Three Levels of Redundancy January 2008 WATER/WASTEWATER: ACHIEVING THE THREE LEVELS OF REDUNDANCY by Grant Van Hemert, P.E., application engineer, Water and Wastewater Competency Center,

More information

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations

Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations Green Seal Best Practices Guide for Fleet Vehicle Maintenance Operations June 4, 1996 Green Seal, Inc. 1001 Connecticut Ave. NW, Ste 872 Washington, DC USA 20036-5525 (202) 872-6400 FAX (202) 872-4324

More information

Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units

Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units SECTION: C3.10.120 CL0052 0911 Supersedes New Fusion Series Treatment Systems Small Scale Residential & Commercial Treatment Units Clarus Environmental 3649 Cane Run Rd. Louisville, KY 40211 877-244-9340

More information

Revised April (May) 2015

Revised April (May) 2015 Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as

More information