1 Edwards Blasche Group Pty Ltd ABN Environmental & Engineering Geoscience Occupational Hygiene Consultants HAZARDOUS MATERIAL AUDIT (HMA) King George Park Amenities King George Park Rozelle NSW 2039 Prepared for: Leichhardt Municipal Council (Report ID : EBG.HMA rpt) October 2015 This document has been prepared by EBG for the specific use at the above address. This document or any part thereof shall not be used at any other site, works or by any company or party not associated with the above works. ALL RIGHTS RESERVED BY THE AUTHOR UNAUTHORISED REPRODUCTION OR COPYING STRICTLY PROHIBITED EBG Environmental Geoscience (Edwards Blasche Group Pty Ltd) 85 Rose St, PO Box 284, Annandale 2038 Ph: Fax:

2 ebgroup.com.au CONTENTS 1.0 Hazardous Materials Audit 1.1 Asbestos Materials 1.2 Synthetic Mineral Fibre 1.3 PCB Capacitors in Fluorescent Light Fittings 1.4 Ceiling Space Dust with Elevated Lead Levels 1.5 Lead Based Paint 2.0 Photographs 3.0 Limitations of the Audit Appendix A: Asbestos Analysis Report Appendix B: Hazardous Materials Removal Specifications Appendix C: Envirolab Services Analysis Report EBG PCBs SMF NEHF Pb AS EDBs OH&S EPA (NSW) ANZECC HBSIL NOHSC HMA ABBREVIATIONS Edwards Blasche Group Poly Cyclic Biphenyls Synthetic Mineral Fibre National Environment Health Forum Lead Australian Standards Electrical Distribution Boards Occupational Health & Safety Environmental Protection Agency (NSW) Australian and New Zealand Environment Conservation Council Health Based Soil Investigation Levels National Occupational Health and Safety Hazardous Materials Audit Distribution: PDF Copies to: Julian Oon - Leichhardt Council Investigation & Reporting conducted by: Michael Edwards MAppSc, MAIG, RPGeo No Registered Professional Geoscientist Env. & Eng. Geoscientist / Occup. Hygiene Signed: Issued 29 October 2015 Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 2

3 1.0 Hazardous Materials Audit 1.1 Asbestos Materials # Location Material Sample ID / Suspect Result Type/ Visual Area m/sq* Friable or Bonded Recommendations 1 Electrical Box Rear wall facing road: Bituminous fibrous Zelminite style electrical board. (Larger board is timber, smaller black board has an asbestos content) Bituminous Elect. Dist. Board 02491/1 Chrysotile Envirolab # Bonded Remove all as Bonded Asbestos prior to demolition or refurbishment (see Appendix B: 1. Specification for the Removal of Bonded Asbestos) * NOTE TO CONTRACTORS: Area in Square Metres: The area of asbestos material is given here as an approximate quantity. Asbestos removal contractors should only rely on this figure as an indication of the scale of the amount to be removed, and should individually assess and measure the areas themselves to provide a fee proposal for the removal procedures. NON-DETECTS: NA. INSPECTION NOTES: The building is constructed of concrete blocks with a concrete roof. IMPORTANT REFURBISHMENT/DEMOLITION NOTES: If removing any concrete floor slabs, the builder/demolisher should check the sides and underneath for possible pieces of asbestos cement sheeting. These may have been used as formwork in some instances, and have been buried as waste product in other situations. Asbestos removal shall proceed as per Specifications attached. Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 3

4 1.2 Synthetic Mineral Fibre (SMF) Synthetic mineral fibre (SMF) insulation was NOT located during the inspection. Contingency Measure: Any synthetic mineral fibre (SMF) located during demolition or refurbishment shall be removed if the material is to be disturbed during the works, as per Appendix B: 2. Specification for the Removal of Synthetic Mineral Fibre (SMF) 1.3 PCBs in Fluorescent Light Fittings A number of older style light fittings were located throughout the building. The fittings were connected to mains power. The internal components could not be inspected. It is suspected that these fittings may contain internal capacitors or components with an internal PCB dielectric oil. Contingency Measure: Any light fittings located during demolition or refurbishment, with metal capacitors or older plastic capacitors, should be checked in the Identification of PCB - Containing Capacitors PCB (ANZECC, 1997) and if identified, removed as per Appendix B: 3. Specification for the Removal of Fluorescent Light Capacitors containing PCB Oil. Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 4

5 1.4 Ceiling Space Dust with Elevated Lead Levels Findings: Ceiling space dust was not located during the inspection. Health based investigation levels for lead in soil currently accepted by EPA NSW are documented in EPA NSW Guidelines for the NSW Site Auditor Scheme (June 1998). The HBSILs are: Column 1: residential (including schools) level for lead in soil of 300mg/kg. Column 2: parks and residential open space level for lead in soil of 600mg/kg. 1.5 Lead Based Paint 1. A sample of paint was taken from the external wall paint and analysed for lead content. The sample contained <0.05% of lead. (See sample 02491/2 in Envirolab report #136262). The paint IS NOT defined as lead paint according to Australian Standard: Guide to Lead Paint Management, Part 2: Residential and Commercial Buildings (AS ). In general lead paint is identified in the Australian Standard as paint having a lead content in excess of 1% by weight ( kg-1). Findings: Paint containing significant levels of lead was not detected with the sample analysis. It is suspected that lead paint shall not be an issue on the external or internal walls. NOTE: In most cases external enamel paint used from the 1800s to 1970s have levels of lead above 1%. Paint samples above this figure may become a hazard if allowed to flake, peel or deteriorate in any way that allows it to come in contact with humans. Generally external enamel paint on timber in older buildings may be regarded as containing lead (i.e. >1%). In general lead paint is identified in the Australian Standard as paint having a lead content in excess of 1% by weight ( kg-1). Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 5

6 2.0 Photographs 1. Toilet cubicle walls are brick. 2. Electrical switchbox no internal asbestos suspected. 3. Bituminous asbestos board in electrical box. 4. Old fluorescent light fittings - suspected old internal capacitors with a PCB content. 5. Electrical switchbox no internal asbestos suspected. 6. Timber verandah. Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 6

7 3.0 LIMITATIONS OF THE AUDIT This report must be read in total. No part should be extracted from the whole report to be used during the demolition or refurbishment procedures. Every effort has been made to locate and identify any hazardous materials within the buildings, however hazardous materials may be located in inaccessible areas. The survey was conducted within occupied buildings. In accordance with OH&S procedures, sampling was therefore restricted and/or difficult due to the risk of exposure to asbestos fibres when this material is broken. The scope of works for this inspection did not include demolition of suspect areas. It should be noted that without substantial demolition of the buildings it is not possible to guarantee that all (or any) hazardous materials have been located. Where sampling was possible, generally one sample of the material was analysed. One sample as a part of the whole is generally deemed adequate and common practice for the assessment of asbestos. The status of the material in regard to the asbestos content has been made from analysing this one sample. If during demolition and/or refurbishment the identified materials are found not to be homogeneous, further samples should be taken and analysed. Access to confined spaces, shallow sub floors, some ceiling spaces, and within the internal confines of any plant equipment was not possible in certain circumstances. Certain assumptions were made during the inspection taking into consideration the age of the building. This document should be used as a starting point in the identification of hazardous materials, and care should be taken if refurbishment or demolition occurs. Where suspect materials are encountered, work should cease until any unidentified material has been analysed. EBG and the author take no responsibility for the hazardous nature of any asbestos or other contamination found in the buildings, within the soil or the sub surface areas of the buildings and associated facilities. EBG and the author take no responsibility for any hazardous material that may cause risk, or is causing risk, to human health. Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 7

8 APPENDIX A: ASBESTOS ANALYSIS REPORT DATE: 21 October 2015 CLIENT: Leichhardt Council JOB No: SAMPLES FROM: King George Park Amenities NSW COLLECTED BY: Michael Edwards Sample # Location of Sample Material Analysis Result 02491/2 Electrical box distribution board Bituminous fibrous board Chrysotile asbestos was detected by stereobinocular and polarising light microscopy (PLM) including Dispersion Staining 02491/2 External paint on walls analysed for lead content (Results: <0.05% lead) Crocidolite - Blue asbestos, Chrysotile - White asbestos, Amosite - Brown asbestos, SMF - Synthetic Mineral Fibre TEST METHOD: Samples have been examined in accordance with the 1991 NATA Guidance Notes on Asbestos Identification and the EBG Identification of Asbestos in Bulk Materials IDENTIFICATION TECHNIQUE: Sample has been analysed using stereobinocular and polarising light microscopy (PLM) including Dispersion Staining, except where stated. Analysed By: Michael Edwards (BSc MAppSc) Env. Science / Occup. Hygiene Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 8

9 APPENDIX B: HAZARDOUS MATERIALS REMOVAL SPECIFICATIONS (NOTE: TO BE USED WHERE APPLICABLE) Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 9

10 1. Specification for the Removal of Bonded Asbestos Material Asbestos containing materials were located during the inspection. Bonded Asbestos Materials: Removal required if material is to be disturbed during refurbishment or demolition or it poses a health risk. In accordance with the Work Health and Safety Act 2011 (WHS Act) and Work Health and Safety Regulation 2011 (WHS Regulation) removal shall be by a Asbestos Removalist who holds a Bonded (Class B) Asbestos Removal Licence. Note: A licence is required where the surface area of bonded asbestos removed, is greater than 10m 2 (as of January ). Where practicable, plastic barriers should be constructed at the entrance to the removal area. The removalist shall wear disposable overalls of 100% synthetic material or a mixed natural/synthetic fabric capable of providing adequate protection against fibre penetration. Goggles and a head covering shall be used in the event of overhead work. A half face respirator fitted with a P1 filter shall be used. Following this removal process, the asbestos material is to be wrapped in plastic sheeting and taped. Smaller pieces of asbestos debris when removed shall be placed in heavy-duty polythene bags approximately 0.2mm thick, or other approved containers. It is recommended that a maximum bag size of 1200mm (length) x 900mm (width) be observed. Bags should be filled to no more than 50% capacity. The bags shall be marked, Caution - Asbestos: Do Not Inhale Dust, Do Not Open Bag. The top of the bag when full shall be twisted, folded down and taped. The bag shall then be placed in the plastic lined skip bin. The work shall be in accordance with WorkCover NSW, How to Safely Remove Asbestos Code of Practice. Asbestos is classified as a special waste and shall be tipped at approved sites. Copies of the tipping receipts should be provided to the project manager. All work carried out shall be in accordance with: WorkCover NSW, How to Safely Remove Asbestos Code of Practice, Work Health and Safety Act 2011 (WHS Act) Work Health and Safety Regulation 2011 (WHS Regulation) National Occupational Health and Safety (NOHSC:2002, 1998) Code of practice for the safe removal of asbestos; EPA NSW (1999) Environmental Guidelines: Assessment, Classification & Management of Liquid & Non-liquid Wastes; Protection of the Environment Operations (Waste) Regulations 1996; Protection of the Environment Operations Act 1997; Occupational Health and Safety Act, 2000; and Occupational Health and Safety Regulation, Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 10

11 2. Specification for the Removal of Synthetic Mineral Fibre (SMF) SMF containing materials were not located during the inspection. Contingency Measures (if located during development works): If any synthetic mineral fibre (SMF) is located during demolition it is recommended that it be removed prior to refurbishment or demolition where there is a possibility that the material may be disturbed. Workers shall wear long sleeved, loose fitting clothing and gloves to prevent fibre penetration. Disposable overalls may be worn if desired. Washable clothing should be laundered separately to avoid cross contamination and skin irritation of other workers. Goggles and a head covering shall be used in the event of overhead work. A half face respirator fitted with a P1 filter shall be used. All work carried out shall be in accordance with:! National Occupational Health and Safety (NOHSC:2002, 1990) Code of Practice for the Safe Use of Synthetic Mineral Fibres;! EPA NSW (1999) Environmental Guidelines: Assessment, Classification & Management of Liquid & Non-liquid Wastes;! Protection of the Environment Operations (Waste) Regulations 1996(updated 1/12/00);! Protection of the Environment Operations Act 1997; and! Occupational Health and Safety Act, 2000; and! Occupational Health and Safety Regulation, Specification for the Removal of Fluorescent Light Capacitors containing PCB Oil Older style fluorescent light fittings suspected of containing PCB components were located during the inspection. Contingency Measures: It is recommended that all fluorescent light fittings removed during demolition or refurbishment be dismantled. Lights with identified PCB capacitors as per PCB - Containing Capacitors PCB (ANZECC, 1997), or any old aluminium capacitors, shall be removed from the light fittings and placed in an appropriate sealed drum. Appropriate PPE shall be employed. The containers containing the PCBs shall be approved for the transport of dangerous goods and labelled with words to the effect: ENVIRONMENTAL CONTAMINANT - CLASS 6.1(A) CAUTION - CONTAINS POLYCHLORINATED BIPHENYL (PCB) A TOXIC ENVIRONMENTAL CONTAMINANT UN NUMBER 2315 All work carried out shall be in accordance with:! Polychlorinated Biphenyl (PCB) Wastes Chemical Control Order June 1997 (PCB CCO 1997);! National Strategy for the Management of Scheduled Waste, Polychlorinated Biphenyls Management Plan - November 1996;! NSW Waste Disposal Act;! NSW Occupational Health and Safety Act and Regulations! NSW Construction Safety Act and Regulations 84a-84j. Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 11

12 APPENDIX C: ENVIROLAB SERVICES ANALYSIS REPORT Hazardous Materials Audit : King George Park Amenities, Rozelle NSW (EBG.HMA rpt) Page 12

13 Client: Edwards Blasche Group PO Box 284 Annandale NSW 2038 CERTIFICATE OF ANALYSIS Attention: Michael Edwards Sample log in details: Your Reference: No. of samples: 1 material, 1 paint Date samples received / completed instructions received 22/10/15 / 22/10/15 Analysis Details: Please refer to the following pages for results, methodology summary and quality control data. Samples were analysed as received from the client. Results relate specifically to the samples as received. Results are reported on a dry weight basis for solids and on an as received basis for other matrices. Please refer to the last page of this report for any comments relating to the results. Report Details: Date results requested by: / Issue Date: 29/10/15 / 28/10/15 Date of Preliminary Report: Not Issued NATA accreditation number This document shall not be reproduced except in full. Accredited for compliance with ISO/IEC Tests not covered by NATA are denoted with *. Results Approved By: Envirolab Reference: Revision No: R 00 Page 1 of 7

14 Client Reference: Asbestos ID - materials Our Reference: UNITS Your Reference /1 Type of sample material Date analysed - 28/10/2015 Mass / Dimension of Sample - 10x5x1mm Sample Description - Brown fibrous bituminous material Asbestos ID in materials - Chrysotile asbestos detected Envirolab Reference: Revision No: R 00 Page 2 of 7

15 Client Reference: Lead in Paint Our Reference: UNITS Your Reference /2 Type of sample paint Date prepared - 23/10/2015 Date analysed - 23/10/2015 Lead in paint %w/w <0.05 Envirolab Reference: Revision No: R 00 Page 3 of 7

16 Client Reference: Method ID ASB-001 Metals-004 Methodology Summary Asbestos ID - Qualitative identification of asbestos in bulk samples using Polarised Light Microscopy and Dispersion Staining Techniques including Synthetic Mineral Fibre and Organic Fibre as per Australian Standard Digestion of Paint chips/scrapings/liquids for Metals determination by ICP-AES/MS and or CV/AAS. Envirolab Reference: Revision No: R 00 Page 4 of 7

17 Client Reference: QUALITY CONTROL UNITS PQL METHOD Blank Duplicate Sm# Lead in Paint Duplicate results Spike Sm# Spike % Recovery Base ll Duplicate ll %RPD Date prepared - 23/10/2 015 Date analysed - 23/10/ /10/ /10/2015 LCS-2 23/10/ /10/ /10/2015 LCS-2 23/10/2015 Lead in paint %w/w 0.05 Metals-004 < <0.05 <0.05 LCS-2 99% Envirolab Reference: Revision No: R 00 Page 5 of 7

18 Client Reference: Report Comments: Asbestos ID was analysed by Approved Identifier: Asbestos ID was authorised by Approved Signatory: Lulu Scott Lulu Scott INS: Insufficient sample for this test PQL: Practical Quantitation Limit NT: Not tested NR: Test not required RPD: Relative Percent Difference NA: Test not required <: Less than >: Greater than LCS: Laboratory Control Sample Envirolab Reference: Revision No: R 00 Page 6 of 7

19 Client Reference: Quality Control Definitions Blank: This is the component of the analytical signal which is not derived from the sample but from reagents, glassware etc, can be determined by processing solvents and reagents in exactly the same manner as for samples. Duplicate: This is the complete duplicate analysis of a sample from the process batch. If possible, the sample selected should be one where the analyte concentration is easily measurable. Matrix Spike : A portion of the sample is spiked with a known concentration of target analyte. The purpose of the matrix spike is to monitor the performance of the analytical method used and to determine whether matrix interferences exist. LCS (Laboratory Control Sample) : This comprises either a standard reference material or a control matrix (such as a blank sand or water) fortified with analytes representative of the analyte class. It is simply a check sample. Surrogate Spike: Surrogates are known additions to each sample, blank, matrix spike and LCS in a batch, of compounds which are similar to the analyte of interest, however are not expected to be found in real samples. Laboratory Acceptance Criteria Duplicate sample and matrix spike recoveries may not be reported on smaller jobs, however, were analysed at a frequency to meet or exceed NEPM requirements. All samples are tested in batches of 20. The duplicate sample RPD and matrix spike recoveries for the batch were within the laboratory acceptance criteria. Filters, swabs, wipes, tubes and badges will not have duplicate data as the whole sample is generally extracted during sample extraction. Spikes for Physical and Aggregate Tests are not applicable. For VOCs in water samples, three vials are required for duplicate or spike analysis. Duplicates: <5xPQL - any RPD is acceptable; >5xPQL % RPD is acceptable. Matrix Spikes, LCS and Surrogate recoveries: Generally % for inorganics/metals; % for organics (+/-50% surrogates) and % for labile SVOCs (including labile surrogates), ultra trace organics and speciated phenols is acceptable. In circumstances where no duplicate and/or sample spike has been reported at 1 in 10 and/or 1 in 20 samples respectively, the sample volume submitted was insufficient in order to satisfy laboratory QA/QC protocols. When samples are received where certain analytes are outside of recommended technical holding times (THTs), the analysis has proceeded. Where analytes are on the verge of breaching THTs, every effort will be made to analyse within the THT or as soon as practicable. Where sampling dates are not provided, Envirolab are not in a position to comment on the validity of the analysis where recommended technical holding times may have been breached. Envirolab Reference: Revision No: R 00 Page 7 of 7

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials. The Administration of Norfolk Island SAFE DISPOSAL OF ASBESTOS AT THE WASTE MANAGEMENT CENTRE The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing

More information

Asbestos frequently asked questions

Asbestos frequently asked questions Asbestos frequently asked questions Asbestos is the name given to a group of fibrous silicate minerals which were mined in Australia and overseas and used for a range of products. All forms of asbestos

More information

Asbestos in your home

Asbestos in your home Asbestos in your home How to dispose of Asbestos safely Telephone Number: 01372 732000 contactus@epsom-ewell.gov.uk www.epsom-ewell.gov.uk If you would like a copy of this document in large print, on tape

More information

Asbestos Containing Materials Survey And Register Moil Shopping Centre

Asbestos Containing Materials Survey And Register Moil Shopping Centre Asbestos Survey and Register Asbestos Containing Materials Survey And Register Moil Shopping Centre Property Name: Moil Shopping Centre Property Address: 8 Moil Cres. Darwin, NT Prepared for: John Nicolakis

More information

Asbestos Inspection Project Procedure

Asbestos Inspection Project Procedure EOSMS 402 Date: 01/13/2014 Page 1 of 6 1) Purpose This document is intended to specify the scope of services required of Asbestos Contractor in asbestos inspection projects at Kennesaw State University

More information

Asbestos Disposal in the Northern Territory

Asbestos Disposal in the Northern Territory Information on the requirements for the disposal of Asbestos in the Northern Territory Scope These guidance notes have been developed to assist industry, local government, consultants and other relevant

More information

How To Manage Asbestos At A University

How To Manage Asbestos At A University DIVISION OF FACILITIES MANAGEMENT Locked Bag 588 Boorooma Street Wagga Wagga NSW 2678 Australia Tel: +61 2 6933 2286 Fax: +61 2 6933 2180 www.csu.edu.au/division/facilitiesm ABN: 83 878 708 551 Asbestos

More information

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons

More information

Management of asbestos in recycled construction and demolition waste

Management of asbestos in recycled construction and demolition waste Management of asbestos in recycled construction and demolition waste Guide November 2010 Disclaimer This publication may contain occupational health and safety and workers compensation information. It

More information

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos

ASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos ASBESTOS AND THE HOME RENOVATOR A basic guide on what you need to know about asbestos DISCLAIMER This publication contains information regarding occupational health and safety. It includes some of your

More information

Environmental Protection Information Sheet: 2. Advice on Asbestos

Environmental Protection Information Sheet: 2. Advice on Asbestos Environmental Protection Information Sheet: 2 Advice on Asbestos A s b e s t o s Asbestos is a natural mineral, which has been widely used in construction materials and in articles within the home for

More information

HOW TO SAFELY REMOVE ASBESTOS

HOW TO SAFELY REMOVE ASBESTOS HOW TO SAFELY REMOVE ASBESTOS Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of representatives of the

More information

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS

SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS SAFE REMOVAL AND DISPOSAL OF ASBESTOS CEMENT BUILDING PRODUCTS Within the City of Mandurah many dwellings exist with asbestos cement building products. When removing the asbestos, concerns may be raised

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

Analysis of Asbestos in Soil. Hazel Davidson Technical Marketing Manager

Analysis of Asbestos in Soil. Hazel Davidson Technical Marketing Manager Analysis of Asbestos in Soil Hazel Davidson Technical Marketing Manager Diversity of asbestos materials Methods of analysis Problems and issues The way forward Types of asbestos: Chrysotile (white), Amosite

More information

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406.

Asbestos Survey. for. Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington. May 1, 2014. Project #A2014/0406. Asbestos Survey for Commercial Building TCA Building T-187, Pasco Airport Pasco, Washington May 1, 2014 Project #A2014/0406 prepared for: Port of Pasco PO Box 769 Pasco, WA 99301 prepared by: Blue Mountain

More information

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk

More information

H2 Opening Statement Asbestos

H2 Opening Statement Asbestos H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of

More information

How to Safely Remove Asbestos

How to Safely Remove Asbestos How to Safely Remove Asbestos Code of Practice December 2012 CP113 Workplace Standards Department of Justice This code of practice has been approved by the Tasmanian Minister for Workplace Relations under

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL

PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0

More information

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos STANDARDS Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos 1. INTRODUCTION IWU has a responsibility to provide a safe environment for students,

More information

ASBESTOS MANAGEMENT SURVEY REPORT

ASBESTOS MANAGEMENT SURVEY REPORT ASBESTOS MANAGEMENT SURVEY REPORT for THE MORAY COUNCIL of B3239-1140002 Produced by ESG Asbestos Ltd, a wholly owned subsidiary of ESG Bretby Business Park, Ashby Road, Bretby, Burton upon Trent, Staffordshire

More information

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION 1389 Pursuant to Article 104 paragraph 1 item 4 of the Waste Act (Official Gazette 178/04, 111/06), the Minister of Environmental

More information

Asbestos at work guide

Asbestos at work guide Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets. All About Asbestos Read this booklet to learn more about: identifying asbestos-containing material in your home the health risks of asbestos what you can do about asbestos. What is Asbestos? Asbestos is

More information

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos Asbestos Information available on managing and removing asbestos-containing materials has been updated to reflect the changes to legislation effective from 1 January 2006. What law applies Responsibilities

More information

Policy. Asbestos Management Version 1.0. Adopted by Council at its meeting on 15 June 2010 Minute No: 390

Policy. Asbestos Management Version 1.0. Adopted by Council at its meeting on 15 June 2010 Minute No: 390 Policy Asbestos Management Version 1.0 Adopted by Council at its meeting on 15 June 2010 Minute No: 390 Division: Planning and Regulation Section: Building and Health File Reference: Council Policies/Protocols/Procedures

More information

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace

More information

ASBESTOS CONTROL PLAN

ASBESTOS CONTROL PLAN ASBESTOS CONTROL PLAN POLICY It is the long term plan of Emily Carr University to have an asbestos free workplace. In the interim, The University plans to manage asbestos hazards based on prioritization

More information

ASBESTOS IN THE HOME

ASBESTOS IN THE HOME J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What

More information

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards Part 2. Overview Risk management Workplace health and safety legislation How should asbestos exposure be managed? identify hazards assess risk decide on control measures implement control measures monitor

More information

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include - Page 1 of 5 Version No. 2 Date of issue: HAZARDOUS WASTE REGULATIONS (NI) 2005 HAZARDOUS WASTE GUIDANCE DOCUMENT Introduction WASTE ASBESTOS Hazardous waste is subject to the requirements of the European

More information

Saxe Middle School Auditorium Renovation February 4, 2015

Saxe Middle School Auditorium Renovation February 4, 2015 Saxe Middle School Auditorium Renovation February 4, 2015 OVERVIEW OF PRESENTATION Renovation of Saxe Auditorium State & Federal Testing requirements Town Hires Tighe & Bond to perform testing Summary

More information

WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT

WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT IMPORTANT PLEASE ENSURE THAT YOU READ AND UNDERSTAND THE GUIDANCE

More information

All You Need to Know About Asbestos

All You Need to Know About Asbestos All About Asbestos Read this booklet to learn more about: identifying asbestos-containing material in you home the health risks of asbestos what you can do about asbestos. What Is Asbestos? Asbestos is

More information

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO

LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO LIMITED ASBESTOS INSPECTION POLICE DEPARTMENT - ROOFING 434 SOUTH 1 ST STREET MONTROSE, COLORADO Inspected by Grande River Environmental, LLC CDPHE CONSULTING FIRM #18631 October 15, 2014 LIMITED ASBESTOS

More information

How To Manage Asbestos At A Recycling Facility

How To Manage Asbestos At A Recycling Facility Guidelines for managing asbestos at construction and demolition waste recycling facilities Lead Author: Location/Dept: Industry Regulation Licensing Branch (IRLB) Waste Industries, IRLB Issued Date: 18/12/2012

More information

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012 Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People

More information

Restoration Specific Asbestos and Lead Based Paint Survey Report. 2503 Logan Ave Colorado Springs, CO 80909

Restoration Specific Asbestos and Lead Based Paint Survey Report. 2503 Logan Ave Colorado Springs, CO 80909 Restoration Specific Asbestos and Lead Based Paint Survey Report Property Information: 2503 Logan Ave Colorado Springs, CO 80909 Inspection Conducted By: Shannon Anderson Colorado Cert #14225 Ted Anderson

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.

More information

www.suttonhousingpartnership.org.uk Asbestos

www.suttonhousingpartnership.org.uk Asbestos www.suttonhousingpartnership.org.uk Asbestos images courtesy of www.sxc.hu and/or www.morguefile.com Asbestos Asbestos was widely used until the 1980 s to improve the performance of materials and to provide

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for Michigan State University Engineering and Architectural Services Physical Plant Building, Room 101 East Lansing, Michigan 48824-1326 at Michigan

More information

What is Asbestos Cement and how is it identified?

What is Asbestos Cement and how is it identified? Regulatory Services Dealing with Asbestos Cement Every year the Council's Environmental Protection team receives a large number of enquiries about garden sheds, garages and house soffits made of asbestos.

More information

Asbestos: Common Questions and Answers

Asbestos: Common Questions and Answers Asbestos: Common Questions and Answers 1. What is asbestos? Asbestos is the name given to a group of minerals that occur naturally as masses of strong, flexible fibres that can be separated into thin threads

More information

Policy for the Management of Asbestos

Policy for the Management of Asbestos CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A R FRO Policy for the Management of Asbestos Author Keith Jones Estate Controls Assurance Officer / Environmental Management Co-ordinator Policy

More information

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT

OGS LIMITED ASBESTOS & LEAD SURVEY REPORT our people and our passion in every project OGS LIMITED ASBESTOS & LEAD SURVEY REPORT Building 44 Willard Drug Treatment Center 7116 County Road 132 Willard, NY Prepared for: NYSOGS 33 rd Floor, Corning

More information

CWM Technical Guideline

CWM Technical Guideline CWM Technical Guideline MANAGEMENT OF ASBESTOS / ASBESTOS CONTAINING MATERIAL (ACM) IN THE EMIRATE OF ABU DHABI This Document is the property of Center of Waste Management Abu Dhabi, and cannot be used

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

CODE OF PRACTICE FOR THE MANAGEMENT AND CONTROL OF ASBESTOS IN WORKPLACES [NOHSC: 2018 (2005)]

CODE OF PRACTICE FOR THE MANAGEMENT AND CONTROL OF ASBESTOS IN WORKPLACES [NOHSC: 2018 (2005)] CODE OF PRACTICE FOR THE MANAGEMENT AND CONTROL OF ASBESTOS IN WORKPLACES [NOHSC: 2018 (2005)] CANBERRA APRIL 2005 NATIONAL OCCUPATIONAL HEALTH AND SAFETY COMMISSION CODE OF PRACTICE FOR THE MANAGEMENT

More information

INTRODUCTION. Alastair Hunter Deputy Director-General, Finance and Infrastructure

INTRODUCTION. Alastair Hunter Deputy Director-General, Finance and Infrastructure INTRODUCTION The health, safety and well-being of students and staff is the highest priority of the NSW Department of Education and Training (DET). This commitment includes ensuring that any asbestos-containing

More information

United Federation of Teachers A Union of Professionals. Polychlorinated Biphenyls (PCBs) in Fluorescent Light Fixtures March 2012

United Federation of Teachers A Union of Professionals. Polychlorinated Biphenyls (PCBs) in Fluorescent Light Fixtures March 2012 United Federation of Teachers A Union of Professionals Polychlorinated Biphenyls (PCBs) in Fluorescent Light Fixtures March 2012 What are polychlorinated biphenyls (PCBs)? Polychlorinated biphenyls are

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

1. Purpose of Policy. 2. Introduction

1. Purpose of Policy. 2. Introduction POLICY ON THE HANDLING AND DISPOSAL OF ASBESTOS AND ASBESTOS CONTAINING WASTE IN TERMS OF SECTION 20 OF THE ENVIRONMENT CONSERVATION ACT, 1989 (ACT 73 OF 1989) 1. Purpose of Policy The purpose of this

More information

Tenants` Asbestos Handbook Guide

Tenants` Asbestos Handbook Guide Tenants` Asbestos Handbook Guide Tenants` advice for asbestos in the home What is Asbestos? Asbestos is a naturally occurring mineral which can be found in rocks all over the word, including Scotland.

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

How to Manage and Control Asbestos in the Workplace

How to Manage and Control Asbestos in the Workplace How to Manage and Control Asbestos in the Workplace Code of Practice December 2012 CP111 Workplace Standards Department of Justice This code of practice has been approved by the Tasmanian Minister for

More information

The British Occupational Hygiene Society Faculty of Occupational Hygiene INTERNATIONAL MODULE SYLLABUS W504 ASBESTOS AND OTHER FIBRES

The British Occupational Hygiene Society Faculty of Occupational Hygiene INTERNATIONAL MODULE SYLLABUS W504 ASBESTOS AND OTHER FIBRES The British Occupational Hygiene Society Faculty of Occupational Hygiene INTERNATIONAL MODULE SYLLABUS W504 ASBESTOS AND OTHER FIBRES Aim: Learning Outcomes: This module enhances the student s knowledge

More information

FACT SHEET: Asbestos Insulating Boards (AIB) (Accompanies Asbestos NSCA leaflet.)

FACT SHEET: Asbestos Insulating Boards (AIB) (Accompanies Asbestos NSCA leaflet.) FACT SHEET: Asbestos Insulating Boards (AIB) (Accompanies Asbestos NSCA leaflet.) Please Note This Fact Sheet gives advice on how to recognise asbestos insulating boarding. It is not a substitute for professional

More information

UBC Plant Operations Asbestos Work Procedures April 2004

UBC Plant Operations Asbestos Work Procedures April 2004 UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other

More information

Asbestos Management and Control Policy for Government Buildings

Asbestos Management and Control Policy for Government Buildings Asbestos Management and Control Policy for Government Buildings The Queensland Government s policy for the management and control of asbestos containing material in government buildings is one of proactive

More information

Guideline for the Management of Waste Asbestos. 1 Introduction. 2 Roles and Responsibilities. 3 Waste Management. 4 Conclusion

Guideline for the Management of Waste Asbestos. 1 Introduction. 2 Roles and Responsibilities. 3 Waste Management. 4 Conclusion Guideline for the Management of Waste Asbestos 1 Introduction 1.1 Definitions 1.2 haracteristics 1.3 Potential Effects 2 Roles and Responsibilities 2.1 Environmental Protection Service 2.2 Occupational

More information

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL ASBESTOS SAMPLING REPORT Urban Design Louisa Ryland House Sampling to Ceiling in Room 01 44 Newhall Street Birmingham B PL TECHNICAL REPORT: 09H/56 150 Phoenix House Valepits Road Garretts Green Birmingham

More information

the risks of removing asbestos containing drywall October 29, 2011

the risks of removing asbestos containing drywall October 29, 2011 Summary of recent research about the risks of removing asbestos containing drywall joint compound during residential renovation Presented by David Redmond October 9, 011 Some background information about

More information

Asbestos in the home. Health and safety in the home. Asbestos in the home A

Asbestos in the home. Health and safety in the home. Asbestos in the home A Asbestos in the home Health and safety in the home Asbestos in the home A Did you know? Asbestos is the name given to a group of fibrous silicate minerals that can potentially cause lung disease if inhaled.

More information

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of: Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos

More information

Asbestos Survey Report

Asbestos Survey Report 0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ

More information

ASBESTOS REGULATIONS 2001. Government Notice No 155 Gazette No 23108 dated 10 February 2002

ASBESTOS REGULATIONS 2001. Government Notice No 155 Gazette No 23108 dated 10 February 2002 ASBESTOS REGULATIONS 2001 Government Notice No 155 Gazette No 23108 dated 10 February 2002 SUMMARY OF THE NEW PROVISIONS: More detailed and streamlined Method of assessment changed (A) INTRODUCTION Exposure

More information

Asbestos. from the Home. Removing. Read this booklet for:

Asbestos. from the Home. Removing. Read this booklet for: Removing Asbestos from the Home Read this booklet for: steps and care you should take if your home has asbestos-containing material (ACM) advice about protective gear. How to get ACM removed from your

More information

Asbestos - Frequently Asked Questions

Asbestos - Frequently Asked Questions Asbestos - Frequently Asked Questions 1. What is asbestos? Asbestos is the name given to a group of fibrous minerals which occur naturally in the earth. These are grouped into two mineral types known as

More information

Asbestos in Your Home - How to Test It

Asbestos in Your Home - How to Test It Asbestos in your Home Asbestos can be very hazardous if it's not treated with respect. A majority of homes built between 1950s and late 1970s, were built using products / finishes containing asbestos.

More information

Asbestos Common Questions & Answers

Asbestos Common Questions & Answers sbestos Common uestions & nswers This section contains a list of some of the questions on sbestos and Man Made Fibres, which may commonly be asked by members of the public. Suggested answers to these questions

More information

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of

More information

Asbestos Awareness at the University of Toronto

Asbestos Awareness at the University of Toronto Asbestos Awareness at the University of Toronto What is Asbestos? Asbestos is a general term given to a group of naturally occurring mineral silicates that are made up of long thin fibres. These fibrous

More information

ASTCCR2 - SQA Unit Code H548 04 Carry out and complete clean-room cleaning operations

ASTCCR2 - SQA Unit Code H548 04 Carry out and complete clean-room cleaning operations Carry out and complete clean-room cleaning Overview 1 Carry out clean-room 2 Remove and store equipment, tools and materials after clean-room 3 Remove and dispose of contaminated material after clean-room

More information

Removing asbestos in workplaces

Removing asbestos in workplaces Edition No. 1 September 2008 Compliance Code Removing asbestos in workplaces Contents Preface 2 Introduction 3 Purpose 3 Scope 3 Application 3 Consultation 4 General requirements of the Occupational Health

More information

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW January 2013 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 27, Ernst & Young Centre

More information

Hazardous Building Materials Management During Facility Demolition IOL CAB Demo Project Learning's RemTech - October 17, 2012

Hazardous Building Materials Management During Facility Demolition IOL CAB Demo Project Learning's RemTech - October 17, 2012 Hazardous Building Materials Management During Facility Demolition IOL CAB Demo Project Learning's RemTech - October 17, 2012 Presented By: David Wytrykush, CRSP Goals of the Presentation Scope of Presentation

More information

have been provided with information on whether they do or do not contain asbestos before starting work;

have been provided with information on whether they do or do not contain asbestos before starting work; Health Effects of Asbestos If your work involves possible exposure to asbestos, you should: be aware of the risks from asbestos exposure; understand the importance of keeping exposure as low as possible;

More information

Title: Hazardous Building Materials Procedure

Title: Hazardous Building Materials Procedure Issue Date: April 2011 Review Date: April 2013 Page Number: 1 of 5 1. Purpose: The purpose of this procedure is to ensure all risks associated with hazardous building materials within the Department of

More information

Facts about Asbestos. Council policy

Facts about Asbestos. Council policy Facts about Asbestos Winchester City Council has produced this leaflet to give its tenants advice and information about the possible presence of asbestos in and around their homes. Its content gives general

More information

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE

HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE HOW TO MANAGE AND CONTROL ASBESTOS IN THE WORKPLACE Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of

More information

Curriculum Vitae. Personal Details. Academic Record. Membership of Professional Groups. Other Training. Identification: Aaron Baulch

Curriculum Vitae. Personal Details. Academic Record. Membership of Professional Groups. Other Training. Identification: Aaron Baulch Curriculum Vitae Personal Details Full Name: Aaron Baulch Phone: 0404 800 238 (m) E-mail: aaron@controlone.com.au Current Position: Occupational Hygienist Current Employer: Control One Academic Record

More information

How To Perform A Limited Asbestos Survey

How To Perform A Limited Asbestos Survey Limited Asbestos Survey Report Presented To: Barbara Wethington Project Manager Weston Solutions, Inc. 960 West Elliot Road, Suite 201 Tempe, Arizona 85284 Project: Southeast Corner of Arizona Highway

More information

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship

GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS. BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship GUIDELINE TITLE: ASBESTOS DISPOSAL AT WASTE DISPOSAL GROUNDS BRANCH/DIVISION: Environmental Approvals / Environmental Stewardship Effective Date: June 9, 2015 Approved By: EMC Date Reviewed: Date Revised:

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at Bailey Hall Building #315 East Lansing, Michigan 48823

More information

Answering your questions about asbestos in Sunshine North 18 MARCH 2015

Answering your questions about asbestos in Sunshine North 18 MARCH 2015 Answering your questions about asbestos in Sunshine North 18 MARCH 2015 The Victorian Government is aware of community concerns about asbestos in and around the old Wunderlich factory site that was located

More information

Fact Sheet on Asbestos

Fact Sheet on Asbestos Fact Sheet on Asbestos WHAT IS ASBESTOS? Asbestos is a naturally occurring mineral found in certain rock formations, mined from open pit mines. Most of the asbestos used in the United States today comes

More information

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within

More information

Asbestos Management. 2. Introduction. Contents

Asbestos Management. 2. Introduction. Contents Asbestos Management Contents 1. Policy 2. Introduction 3. Scope 4. Definitions 5. Asbestos Inventory and Identification 6. Inspection 7. Access Control 8. Repair and Maintenance of Asbestos-Containing

More information

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks e a sbestos ssentials Non-licensed tasks Some trades likely to disturb asbestos Anyone who works on the fabric of a building, may be at risk of disturbing asbestos. This includes: electricians, joiners,

More information

Guidelines for Cleaning Staff on Managing Mould Growth in State Buildings

Guidelines for Cleaning Staff on Managing Mould Growth in State Buildings Guidelines for Cleaning Staff on Managing Mould Growth in State Buildings Prepared by the State Claims Agency 2 Index 1. Background 2. What are moulds? 3. What are the possible health effects? 4. How do

More information

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations

More information

ASBESTOS MATERIALS IN SCHOOLS

ASBESTOS MATERIALS IN SCHOOLS CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk

More information

Frequently asked questions

Frequently asked questions Frequently asked questions Asbestos investigation An investigation into asbestos-related health concerns has found that there is no evidence of elevated asbestos-related health risk to residents who have

More information

ABClean Frequently Asked Questions (FAQ)

ABClean Frequently Asked Questions (FAQ) ABClean Frequently Asked Questions (FAQ) 1. How can I recognize asbestos containing products during cleaning, renovation, demolition or dismantling task? Considering construction date, which buildings

More information

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT Prepared for: Department of Infrastructure PO Box 61, Palmerston NT 0831 Prepared by: AEC Environmental Pty Ltd Date: May 2013 Register No: NT0545a

More information

Characteristics/Applications

Characteristics/Applications Facilities Operations and Development Environmental Health & Safety 1314 Kinnear Rd. Columbus, Ohio 43212 Phone (614) 292-1284 Fax (614) 292-6404 http://fod.osu.edu The Ohio State University Asbestos Management