1 EXCAVATION PROCEDURE NUMBER: CPL HES-202 Approved December 2011 Version 1.2
2 CONTENTS EXCAVATION HES-202 Section Title Page 1.0 Purpose Scope Prerequisites Process Overview Instructions Preparation for Excavation Job Site Preparation Non-Entry Excavations Excavations Involving Entry Determine Soil Type Determine Protective System Complete Excavation Permit Excavation Work Permit Extension Work Completion Roles and Responsibility Reporting Requirements Documentation and Records Retention Appendices A B C D Glossary Excavation Permit Shoring Requirements To Identifying the Location of Underground Utilities Prior to Excavating Version 1.2. Revised December
3 1.0 Purpose This procedure is written to: describe the methods used to assist in protecting employees, company representatives, and the public from injury during excavation activities; minimize the risk of damage to structures and facilities during excavations; and verify compliance with Occupational Safety and Health Administration (OSHA) requirements contained in 29 CFR through 652; with Department of Transportation (DOT) requirements contained in 49 CFR ; with CAL OSHA 8 CCR (f) and other state regulations regarding excavation. 2.0 Scope 2.1 Personnel and Activities Covered by this Procedure This procedure applies to excavations performed and/or coordinated by all personnel, company or contractor, working in or on Chevron Pipe Line Company (CPL) owned, operated, managed, or maintained pipelines or facilities. This procedure covers activities whenever the ground is broken for open excavations (e.g., trenching, pile driving, ground water wells, soil boring, installation of pipelines, conduit, foundations, etc.). 2.2 Exemptions from this Procedure Excavations performed underwater are exempt from this procedure. If you need assistance in developing work plans for excavations underwater, contact your local Safety Specialist. 3.0 Prerequisites 3.1 Training/Personnel Requirements Persons identified as the Person-In-Charge (PIC) must be trained in this procedure. All excavations involving worker entry require a Competent Person on site. A competent person is an individual who is trained in and knowledgeable about soil analysis, the use of protective systems, and the requirements of the OSHA Construction Standard 29 CFR A Competent Person must be capable of identifying existing and predictable hazards in excavation work and have the authority to take prompt measures to abate these hazards. In California, the Competent Person must know CAL OSHA Standards. The knowledge and understanding of this procedure alone does not make someone a competent Version 1.2. Revised December
4 person. To become a competent person, one must obtain training via a third party Competent Person training course. Contact the Learning and Development Coordinator for further information. Excavations in excess of 20 feet in depth must be designed by a Registered Professional Engineer A Registered Professional Engineer is required to approve the integrity of all excavations beneath the level of an adjacent foundation, retaining wall, or other structure including sidewalks. Standbys must be trained in Cardiopulmonary Resuscitation, first-aid, and bloodborne pathogen safety. 3.2 Additional Documents The Competent Person or registered professional engineer must comprehend and comply with all applicable sections of 29 CFR through California Requirements CPL must have a California Annual Excavation Permit. The Competent Person must know CAL OSHA standards. Contractor(s) performing excavation must have a California Annual Excavation Permit. Version 1.2. Revised December
5 4.0 Process Overview Is the Safe Work Permit completed? No Stop Yes Is the Underground Service Alert completed? No Yes The PIC completes the General Section and the Restrictions Hazards section of the Excavation Permit Is this an Entry Excavation? Yes No PIC and PCW sign the permit and work may safely begin PIC and Competent Person complete the Requirements for Entry Excavation PIC, Person Conducting the Work (PCW), and Competent Person sign the permit and excavation may safely begin Return permit to the PIC PIC file in the appropriate office Upon completion of excavation, PIC fills in dimensions of excavation on permit Work complete Work begins Version 1.2. Revised December
6 Preparation for Excavation 1. Check underground utilities. 2. Remove all surface obstructions. 3. Is there contaminated soil? Will workers be entering excavation? Yes Determine Soil Type No To Determine Protective Systems, review the next three flowcharts. Determine Protective System Complete Excavation Permit (specify all restrictions) Review Permit With All Workers Begin Work Version 1.2. Revised December
7 Determine Excavation Protective Systems (Flowchart 1 of 3) Yes Is the excavation more than 5 feet in depth? No Is the excavation entirely in stable rock? Yes The excavation may be made with vertical sides No Is there a potential for a cave in? No The excavation must be sloped, shored, or shielded Yes For sloping, go to Flowchart 2. For shoring or shielding, go to Flowchart 3 Version 1.2. Revised December
8 Determine Excavation Protective Systems Sloping Requirements (Flowchart 2 of 3) Sloping selected as method of excavation protection Soil classification C is assumed. Slope must be 1½ horizontal to 1 vertical (1½:1 or 34 degrees) No Will soil classification be made? Yes Excavation must comply with one of the two following options: 1. Follow requirements from the maximum allowable slop table listed below. 2. Excavation protection must be designed by registered professional engineer. Soil or Rock Type Maximum Allowable Slope (H:V) (for excavations less than 20 feet deep) Stable Rock Type A Soil Type B Soil Type C Soil Vertical or 90 degrees ¾:1 or 53 degrees 1:1 or 45 degrees 1½:1 or 34 degrees Version 1.2. Revised December
9 Determine Excavation Protective Systems Shoring or Shielding Requirements (Flowchart 3 of 3) Shoring or shielding selected as method of excavation protection Soil classification is required Excavation must comply with one of the three following options: 1. Shoring or shielding must comply with 29 CFR and appendices A, C, and D; 2. Design of support systems, shield systems, or other protective systems that are drawn from manufacturers tabulated data shall be in accordance with all specification, recommendations and limitations issued by the manufacturer. Alternately, follow requirements from the maximum allowable slope table listed below; or 3. Design of support system must be certified by registered professional engineer. Version 1.2. Revised December
10 5.0 Instructions 5.1 Preparation for Excavation The Person-In-Charge (PIC) completes the general section of the Safe Work Permit. The PIC must specify: a) Facility and location of the excavation; b) Date of the excavation; c) Time limits of the excavation; d) Personnel who will be conducting the work; e) Description of the work; f) Equipment to be used; and g) Job boundaries The PIC determines if the excavation will be entry or non-entry and checks the appropriate box on the Excavation Permit. The PIC will then review the area around the proposed excavation site prior to commencing excavation activities to identify and alleviate hazardous conditions including: a) Soil classification b) Surface encumbrances c) Location and identity of utilities d) Amount of surface and subsurface water present e) Traffic and nearby structures f) Depth of excavation g) Length of time the excavation will be open h) Climatic conditions i) Access and egress The PIC specifies the excavation work site hazards by checking all applicable boxes in the Hazard section of the Excavation Permit. The PIC must contact the appropriate state, regional, and/or local One-Call Center to notify other pipeline and utility companies. The PIC will notify the One-Call Center of the proposed work and ask to establish the location of underground installations prior to the start of any actual excavation. See Appendix D for instructions on contacting the One-Call Center. 811 is Version 1.2. Revised December
11 the national call before you dig number and is established for most underground utilities. However, some utilities are exempt from participating in the one-call system and may or may-not be active where you are located. All means must be taken to notify the underground asset owners When other pipeline and/or utility companies cannot respond to a request to locate underground utility installations within 48 hours (unless a longer time period is required by state or local law), or cannot establish the exact location of these installations by attempts to contact these companies directly, the PIC may authorize the excavation to proceed, provided company does so with caution and provided detection equipment or other acceptable means to locate underground installations are employed. In addition, all obstructions, both above and underground, must be identified and marked before excavation work begins. The PIC must review all available maps, plans, and drawings for buried conduits, cables, and piping that may run through or within the vicinity of the proposed excavation and work area The PIC must obtain all applicable state and/or local required permits. Employees in California must notify a CAL OSHA office at least one week prior to commencement of job if excavation will be over five feet deep OR if a Chevron employee will be going in an excavation made by a contractor. Notification by telephone must be followed up in writing on Activity Notification Form for holders of permit. These are available from any CAL OSHA office The PIC must also make arrangements to close the roadway and detour traffic if the excavation will adversely affect a roadway After a review of the excavation site, the PIC will determine which additional safety requirements must be met. The following is a list of safety precautions which may apply to a particular excavation: a) Workers exposed to vehicular traffic must be provided with and wear warning vests or other suitable garments marked with or made of reflective or high visibility material. This reflective or high visibility vest must conform to CPL s FRC policy. b) All surface obstructions (such as piping, posts, etc.) that create a hazard to employees must be removed or supported to safeguard employees. c) Excavations beneath the level of an adjacent foundation, retaining wall, or other structure including sidewalks, are not allowed until a Registered Professional Engineer has determined that the work will not undermine the structures. Version 1.2. Revised December
12 d) Warning systems (such as barricades, stop logs, hand or mechanical signals) must be utilized to warn against mobile equipment operating close to the excavation. e) When personnel crossings over the excavation are required or permitted, OSHA approved crossings will be used including toe boards and guardrails. f) Barricades or barriers must be provided at all excavations. g) Covers placed over open trenches in roadways must be designed by a Registered Professional Engineer and secured against movement. h) A standby with safety and rescue equipment may be required on site. The PIC may specify any other restrictions or approvals as deemed necessary The PIC specifies the required restriction(s) by checking all applicable boxes in the Permit Restriction section of the Excavation Permit. Once the restrictions have been specified, the PIC signs on the Restrictions are specified line of the permit. 5.2 Job Site Preparation The PIC and the Person Conducting the Work (PCW) shall review the work details, job site, and permit conditions to assure the work is defined and can be done safely The PCW satisfies all required precautions and restrictions and obtains any additional approvals. 5.3 Non-Entry Excavations Excavation not involving entry may begin and continue until completed, under the following conditions: a) No personnel are allowed in the excavation unless the entry requirements of section 5.4 Excavations Involving Entry have been met. b) While the excavation is open, underground installations must be protected, supported, or removed. c) No workers are permitted underneath loads handled by lifting or digging equipment. Personnel are required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling material. d) Accumulations of water which could endanger the excavation must be removed and the source of water controlled before allowing further work. e) Any damaged structure(s) or equipment must be evaluated by a Competent Person and removed from service if unsuitable for use. Version 1.2. Revised December
13 f) When excavating within five feet of an underground pipeline or conduit, the location of the pipeline or conduit must be precisely located by hand-digging (or probing) the last two feet (see MIP-206). After pipeline or conduit has been located, power driven equipment may be used under the following conditions: o A representative of the pipeline or conduit owner has been notified and is either present or declines to watch the excavation; o It has been positively determined that any electrical conduit is safely encased in a concrete envelope; or o Person-in-Charge authorizes the work to continue using power driven equipment. 5.4 Excavations Involving Entry If employees will be required to enter the excavation, the PIC must have a Competent Person examine and classify the soil conditions to determine the appropriate protective system to be used. Footing excavations, bell bottom pier holes or other confined excavations require the use of the Confined Space Entry procedure (HES-201) and permit. A harness with lifeline securely attached must be individually attended at all times while the employee wearing the lifeline is in the excavation. 5.5 Determine Soil Type The Competent Person classifies the soil type using both the accepted visual and manual tests per OSHA Standard 29 CFR Appendix A The Competent Person records the type of soil and the soil test method on the appropriate section of the Excavation Permit. 5.6 Determine Protective Systems The Competent Person and the PIC determine the type of protective system to be used, benching, sloping, shielding, timber shoring, or aluminum hydraulic shoring. Sloping, benching, or support systems for an excavation greater than 20 feet deep must be designed by a Registered Professional Engineer The PIC records the type of protective system used at the site on the appropriate section of the Excavation Permit. The excavation dimensions, length, width, and depth are also recorded The Competent Person may exempt the excavation from the requirements for shoring, benching, and sloping if: Version 1.2. Revised December
14 Excavation is less than five feet deep, there is no potential for cave-in (four feet in Washington and Oregon); or Excavation is made entirely in stable rock that has no potential for collapse and decision is documented on form CPL Sloping and benching systems must be selected and constructed conforming to the specifications for slopes as outlined in Table 202.1: Maximum Allowable Slopes, below. TABLE 202.1: Maximum Allowable Slopes Soil or Rock Type Maximum Allowable Slopes (H:V) Stable Rock Vertical (90 ) Type A 3/4:1 (53 ) Type B 1:1 (45 ) Type C 1½:1 (34 ) In general, when soil classification is not conducted, slopes can be no steeper than 1½ horizontal to one vertical (34 measured from the horizontal). For example, a six feet deep excavation in Type C soil would need to be set back nine feet. There are numerous types of sloping and benching techniques. The selection of the type of protective systems will be based on the location; terrain; soil classification; available equipment; and type of work activity. Some examples of the types of sloping and benching techniques are: Simple Slope Simple Bench Multiple Bench Vertically-Sided Lower Portion See figure 202.1: Sloping System for Type B and C Soil for examples of Simple Slope in Type B and C Soils, and figure 202.2: Benching System for Type B Soil for examples of Simple Bench in Type B Soil. In addition, there are OSHA requirements for layered soils. For exact requirements for these types of sloping and benching techniques, refer to your Safety Specialist. Version 1.2. Revised December
15 FIGURE 202.1: Sloping System for Type B and C Soil Sloping System for Type B Soil 1 20 Feet Max Feet 10 Feet Sloping System for Type C Soil 20 Feet Max. 10 Feet 15 Feet / 2 Version 1.2. Revised December
16 FIGURE 202.2: Benching System for Type B Soil Benching System for Type B Soil 1 20 Ft. Max. 4 ft. max Feet 4 ft. max. 10 Feet For sloping/benching, the following requirements must be met: The sides or walls of an excavation or trench may be sloped, in lieu of a shoring/shielding system provided the slope (angle) is not steeper than one and one-half horizontal to one vertical (34 from the horizontal). For slopes steeper than 1-1/2:1 and all benching (stepped) systems, the slope or configuration must conform to the specifications in OSHA Standard 29 CFR Sloped excavations which have vertically sided lower portions must be shielded or supported to a height of at least 18 inches above the vertical sides For protection by mechanical means, the following requirements must be met: Shielding, timber or aluminum shoring and other protective systems (i.e., trench boxes), must meet the specifications in OSHA Standard 29 CFR Workers must be protected from cave-in upon entry or exit from an excavation protected by a shield system. Version 1.2. Revised December
17 Timber Shoring The timber shoring methods are described in Appendix C Shoring Requirements. Timber shoring for trenches deeper than 20 feet (6.1 meters) must be designed by a Registered Professional Engineer. The minimum size of shoring system members is presented in the tables of Appendix C Shoring Requirements. Each table contains the data only for the particular soil type in which the excavation or portion of the excavation is made. The data are arranged to allow the user the flexibility to select from among several acceptable configurations of members based on varying the horizontal spacing of the cross braces. Stable rock is exempt from shoring requirements; therefore, no data are presented for this condition. Use the tables to select the cross braces, the uprights, and the wales, where wales are required. Select the size and spacing of the members from the appropriate table. The selection is based on the soil type and the depth and width of the trench where the members are to be installed and, in most instances, the selection is also based on the horizontal spacing of the cross braces. In instances where a choice of horizontal cross bracing is available, the horizontal spacing of the cross braces must be chosen before the size of any member can be determined. Aluminum Hydraulic Shoring for Trenches Hydraulic cylinders specifications: Use the tables to select the hydraulic cylinders and either the vertical shores or the horizontal wales. When a wales system is used, use the tables to select the vertical timber sheeting. Select the size and spacing of the members from the appropriate table. The selection is based on the soil type and the depth and width of the trench where the members are to be installed. In these tables, the vertical spacing is held constant at four feet on center. The tables show the maximum horizontal spacing of cylinders allowed for each size of wale in the waler system tables, and in the vertical shore tables, the hydraulic cylinder horizontal spacing is the same as the vertical shore spacing. Vertical shoring rails shall have a minimum section modulus of 0.40 inch. When vertical shores are used, there must be a minimum of three shores spaced equally, horizontally, in a group. Plywood must be inches thick softwood or 0.75 inch thick, 14 ply arctic white birch (Finland form). Note that plywood is not intended as a structural member, but only for prevention of local raveling (sloughing of the trench face) between the shores. Version 1.2. Revised December
18 5.6.7 Trench shields Portable trench shields is a means of attempted control of cave-ins in trenches. Unlike shoring, which has to be put up and taken down piece by piece, shields can generally be moved where needed with only a minimal assembly and disassembly. Trench shields can be purchased or rented from numerous sources. The design and installation of portable trench shields must be in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer. Manufacturer's specifications, recommendations, and limitations and manufacturer's approval to deviate from the specifications, recommendations, and limitations must be in written form at the job site during construction of the protective system. 5.7 Complete Excavation Permit Prior to entry into the excavation, the PIC assures that all the required safety, fire, and health equipment is in place and in proper operating working condition. The PIC must verify: a) The excavation has a protective system (sloping/benching or mechanical) unless exempted by the Competent Person as outlined in section b) The excavation has securely fastened ladders, ramps, or stairs for entry and exit at intervals of no more than 25 feet. Ladders must extend at least three feet above the edge of the trench. c) The excavation has been tested for oxygen deficiency (atmospheres containing less than 19.5% oxygen) and for other atmospheric hazards that may exist. Complete the Atmospheric Monitoring section of the Gas Testing Results Form located in HES 209. d) The excavated material (spoil) must be kept at least two feet from the edge of the excavation. e) The workers will not be in the trench (i.e., in the vicinity of where moving the trench shield could affect their safety and the stability of the trench) while a trench shield is being moved. f) The workers will not be permitted to work on the face of a sloped or benched excavation above other employees unless the workers below are protected from falling or rolling material or equipment. g) The appropriate safety and rescue equipment, including a standby, is on site as applicable. Version 1.2. Revised December
19 5.7.2 The PCW reviews the permit and all requirements with all personnel who will be working in the excavation. The PCW informs all of those performing the work of the job boundaries, work precautions, restrictions, and conditions. Person(s) performing the work (or foreman/supervisor for a large crew) review the permit and sign in the approval section of the permit The PIC and the PCW make a final inspection of the job site to assure all permit conditions are satisfied and all signatures have been obtained The PIC assures the work is performed under the immediate supervision of a person experienced in excavation matters, that an on-site person is responsible for the safety of personnel, that necessary safety and rescue equipment is on site, and personnel know how to use it as applicable After the requirements specified by the Competent Person and the PIC are met, personnel may enter the excavation and work may proceed in compliance with all requirements of sections 5.2 Job Site Preparation and 5.4 Entry Excavations as well as the following conditions: In California, the Competent Person must be on job site at all times when employees are exposed to a trench and/or excavation. The Competent Person must make daily inspections completing the appropriate section of the Excavation Permit. Inspections must always be made before the start of the work and as needed throughout the shift. The Competent Person or any other person must stop the job whenever a hazardous condition develops that could endanger workers and remove workers from the excavation or hazardous area until the situation has been corrected and proper precautions have been taken. 5.8 Excavation Work An excavation must be ready for entry when the requirements of the permit have been addressed, all signatures obtained and the Excavation Permit posted at the job site If an adverse condition develops (e.g., a leak, spill, accident, etc.) or the PIC or Competent Person determines the excavation is unsafe, work must be stopped immediately and the permit pulled. Any time the permit is pulled, the excavation must be re-inspected and confirmed safe before work may resume If the soil or material being excavated appears contaminated with hydrocarbons or other chemicals (e.g., unidentified liquid, odor, oily sheen, etc.), work must stop and a HES Specialist must be consulted before work continues. The contaminated soil may have to be sampled to determine if it must be handled as a hazardous waste and/or additional personal protective equipment will be required. Version 1.2. Revised December
20 5.9 Permit Extension An existing Excavation Permit can be extended an additional shift (not to exceed 12 hours) if, at the beginning of each shift, both the PIC and the PCW confirm that conditions remain unchanged, permit restrictions are met, new JSA completed, and it is safe to do the work. They both must date and print name on the permit in the appropriate box. A permit may be extended up to four (4) consecutive shifts at which time it expires and a new permit is required Work Completion Upon job completion, the PIC inspects the site and removes the permit. 6.0 Roles and Responsibilities 6.1 Person-In-Charge The Person-in-Charge is responsible for: verifying that available maps, plot plans, etc., have been reviewed for buried conduits, cables, and piping; verifying that the state/regional/local One-Call Center has been notified to establish the location of underground installations; verifying above ground and underground obstructions have been identified and marked; verifying that those performing the work understand the job boundaries, work precautions, restrictions, and conditions; specifying any precautions, restrictions, and/or approvals that may be required; reviewing the permit to assure the work is defined and can be done safely; reviewing the job site in the field with the PCW; alerting other affected parties if their areas could be affected by the work; verifying that the work in an excavation must be under the immediate supervision of a person experienced in excavation matters; verifying that an on-site person is responsible for the safety of personnel that the necessary safety and rescue equipment is on site as applicable; and arranging for standbys as necessary. Version 1.2. Revised December
21 6.2 Person Conducting the Work The Person Conducting the Work is responsible for: reviewing the permit and conditions; satisfying all precautions and restrictions specified by the PIC; communicating the conditions and restrictions to others on the job; confirming with the PIC notification has been made to the local One-Call Center per applicable state requirements (or the National 811); informing PIC if a hazardous condition develops; and reporting to the PIC before starting work, when leaving the job site, and before resuming work. 6.3 Standby The Standby is responsible for: monitoring the safety of the workers; verifying that motorized equipment does not get so close to the excavation that it effects the stability of the soil; directing traffic around the excavation; Attendant duties for permit required confined space excavations are specified in HES Competent Person The Competent Person is responsible for: inspecting the site prior to work and determine from soil examination or analysis whether a protective system will be required to prevent a cave-in; reviewing the job plan with the PIC to assure the necessary safety precautions have been considered; being in attendance during the job as necessary to assure the job is proceeding in a safe manner; making daily inspections to check for situations that could result in a cave-in, failure of a protective system, a hazardous atmosphere, or condition; stopping the job whenever a hazardous condition develops that could endanger workers, assure workers are removed from the hazardous area until the situation has been corrected and proper precautions have been implemented; and Version 1.2. Revised December
22 taking steps to correct hazardous situations. A CPL employee acting as the Competent Person may also be the PIC. Also, any PIC can also be a Competent Person. 7.0 Reporting Requirements California Only Notify CAL OSHA if situation involves an excavation over five feet deep or a CPL employee will enter a contractor excavation. 8.0 Documentation and Records Retention 8.1 Required Documents An "Excavation Permit" CPL-687 is used to document this procedure. A California Annual Excavation Permit is required to conduct excavations in California. A California Activity Notification Form is used to inform CAL OSHA of excavation activities. 8.2 Document Storage and Retention Time The Excavation Permit will be retained for two (2) years after the job is complete in the appropriate office. California Annual Excavation Permit will be posted in the appropriate office. Version 1.2. Revised December
23 Appendix A Glossary Bell-bottom Pier Hole This is a type of shaft or footing excavation which has a bottom cross section wider than the top cross section, thereby, forming a belled shape. Benching Terracing or stepping the sides of an excavation to prevent a cave-in. Benching is a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Cave-in The separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person. Competent Person A person trained in and knowledgeable about soil analysis, the use of protective systems, and the requirements of the OSHA Construction Standard 29 CFR A Competent Person must be capable of identifying existing and predictable hazards in excavation work and have the authority to take prompt measures to abate these hazards. In California, the Competent Person must know CAL OSHA Standards. Contractor A person who agrees to furnish materials or perform services at a specified price for construction. The person performing the work. Cross Braces The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales. Egress A continuous and unobstructed way of exit travel from any point in an excavation to a safe location outside the excavation. Version 1.2. Revised December
24 Excavation Any man-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal. By definition, excavations include trenches. Gas Testing The use of portable gas testing instruments to determine levels of flammable and toxic vapors or gases present in the atmosphere. Hazardous Atmosphere An atmosphere which, by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury. Person Conducting the Work The person(s) conducting the excavation or working in or around the excavation. This includes all personnel company and contractor. Person-In-Charge The Team Leader responsible for the assets, or their designated CPL employee representative, or a qualified third party contractor, that has overall responsibility for determining acceptable excavation conditions in the area are safe for the excavation work to be performed and for the safety of personnel and equipment until the job is complete. The PIC can be a (Qualified Third Party) inspector who is acting as the company representative. Protective System A method of protecting employees from cave-ins, materials falling or rolling from an excavation face or into an excavation or from the collapse of adjacent structures. Protective systems include, but are not limited to, support systems, benching systems, sloping systems, and shield systems. Qualified Gas Tester Personnel (company and contractor) who have been trained in the use of portable gas testing instruments and have demonstrated their use in the field. Only qualified gas testers may conduct gas tests. Qualified Third Party Contractors A Contractor separate and distinct from the contractor performing the work, who has been trained in CPL applicable procedures, and understands the hazards, risks, exposures, and associated impact to operations from the activities. Version 1.2. Revised December
25 Requestor/Work Owner The person who selects, hires, or oversees the work of a contractor. Shield A structure that is able to withstand the forces imposed on it by a cave-in and thereby protects employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Shields can be either premanufactured or job-built in accordance with the requirements found in this procedure. Shields used in trenches are usually referred to as trench boxes or trench shields. This is also referred to as shield system. Shoring A structure that supports the sides of an excavation and is designed to prevent cave-ins. The structure can be made of metal, wood, or be hydraulic. This is also referred to as a shoring system. Sloping A method of protecting employees from cave-ins by excavating to form sides of an excavation that is inclined away from the excavation so as to prevent cave-ins. The acceptable angle of the incline required to prevent a cave-in is dependant of such factors as the soil type, environmental conditions of exposure, and application of surcharge loads. This is also referred to as a sloping system. Support System A structure, such as an underpinning, bracing or shoring which provides support to an adjacent structure, underground installation or the sides of an excavation. Tabulated Data Tables and charts approved by a Registered Professional Engineer to design and construct a protective system. Trench A narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 meters). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 meters) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench. This is also called a trench excavation. Version 1.2. Revised December
26 Underground Installations Buried utility and production installations such as sewer, telephone, fuel, electric, water lines, or any other underground installations that may be expected to be encountered during excavation work. Version 1.2. Revised December
27 Appendix B Excavation Permit CPL-687 Example shown below. Version 1.2. Revised December
28 Appendix C Shoring Requirements Timber Shoring Tables Minimum Timber Requirements* Soil Type A DEPTH OF TRENCH Horizont al. P a = 25 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S ** CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 6 6 to 8 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 8 8 to 10 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 12 4 X 6 4 X 6 6 X 6 6 X 6 6 X X 8 2 X 6 10 to 15 Up to 6 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 8 6 to 8 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 6 8 to 10 6 X 6 6 X 5 6 X 6 6 X 8 6 X X X 6 10 to 12 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 8 15 to 20 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 Over 20 See Note 1 6 to 8 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 * Mixed oak or equivalent with a bending strength not less than 850 psi. ** Manufactured members of equivalent strength may be substituted for wood. Note 1: Protective systems for excavations deeper than 20 feet (6.1 meters) must be designed by a Registered Professional Engineer. Version 1.2. Revised December C-1
29 Timber Trench Shoring Minimum Timber Requirements* Soil Type B DEPTH OF TRENCH Horiz. P a = 45 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 6 6 to 8 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 8 to 10 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 10 to 12 See Note 1 10 to15 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 See Note 1 15 to 20 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 8 to 10 8 X 10 8 X 10 8 X 10 8 X X X X 6 10 to 12 See Note 1 OVER 20 See Note 1 * Mixed oak or equivalent with a bending strength not less than 850 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-2
30 Timber Trench Shoring Minimum Timber Requirements* Soil Type C DEPTH OF TRENCH Horiz. P a = 80 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Up to 4 4 to 6 6 to 9 9 to to 15 Close Maximum Allowable Horizontal (See Note 2) 5 to 10 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 x 8 8 X 8 8 X 8 8 X x X 6 8 to 10 8 x 10 8 x 10 8 x 10 8 x x x X 6 10 to 12 See Note 1 10 to 15 Up to 6 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 6 to 8 8 X 10 8 X 10 8 X 10 8 X X X X 6 8 to 10 See Note 1 10 to 12 See Note 1 15 to 20 Up to 6 8 x 10 8 x 10 8 x 10 8 x x x X 6 6 to 8 See Note 1 8 to 10 See Note 1 10 to 12 See Note 1 OVER 20 See Note 1 * Mixed oak or equivalent with a bending strength not less than 850 psi. *Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-3
31 Timber Trench Shoring Minimum Timber Requirements * Soil Type A DEPTH OF TRENCH Horiz. P a = 25 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 4 4 X 4 4 X 4 4 X 4 4 X 6 4 Not Req. Not Req. 4 X 6 6 to 8 4 X 4 4 X 4 4 X 4 4 X 6 4 X 6 4 Not Req. Not Req. 4 X 8 8 to 10 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 12 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 15 Up to 6 4 X 4 4 X 4 4 X 4 6 X 6 6 X 6 4 Not Req. Not Req. 4 X 10 6 to 8 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 8 to 10 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 8 10 to 12 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 4 X to 20 Up to 6 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 6 to 8 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 4 X 12 8 to 10 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 10 to 12 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 4 X 12 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-4
32 Timber Trench Shoring Minimum Timber Requirements* Soil Type B DEPTH OF TRENCH Horiz. P a = 45 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 12 4 X 8 6 to 8 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 8 4 X 8 8 to 10 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 8 10 to 12 See Note 1 4 X to 15 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 4 X 10 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 4 X 10 8 to 10 6 X 8 6 X 8 8 X 8 8 X 8 8 X X X 6 4 X to 12 See Note 1 15 to 20 Up to 6 6 X 8 6 X 8 6 X 8 6 X 8 8 X X X 6 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 See Note 1 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-5
33 Timber Trench Shoring Minimum Timber Requirements* Soil Type C DEPTH OF TRENCH Horiz. P a = 80 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Up to 4 4 to 6 6 to 9 9 to to 15 Close Maximum Allowable Horizontal (See Note 2) 5 to 10 Up to 6 6 X 6 6 X 6 6 X 6 6 X 6 8 X X X 6 6 to 8 6 X 6 6 x 6 6 X 6 8 X 8 8 X x X 6 8 to 10 6 X 6 6 X 6 8 x 8 8 x 8 8 x x X 6 10 to 12 See Note 1 10 to 15 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 8 to 10 See Note 1 10 to 12 See Note 1 15 to 20 Up to 6 8 x 8 8 x 8 8 x 8 8 x 10 8 x x X 6 6 to 8 See Note 1 8 to 10 See Note 1 10 to 12 See Note 1 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-6
34 Aluminum Hydraulic Shoring - Vertical Shores for Soil Type A DEPTH OF TRENCH Maximum Horizontal H Y D R A U L I C Maximum Vertical CY L I N D E R S Width of Trench Up to 8 8 to to 15 Over 5 Up to Inch Diameter 2 Inch Diameter (See Note 2) Over 10 Up to Inch Diameter Over 15 Up to 20 7 Over 20 See Note 1 Note 1: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. Aluminum Hydraulic Shoring - Vertical Shores for Soil Type B DEPTH OF TRENCH Maximum Horizontal H Y D R A U L I C Maximum Vertical CY L I N D E R S Width of Trench Up to 8 Over 8 Up to 12 Over 12 Up to 15 Over 5 Up to Inch Diameter 2 Inch Diameter (See Note 2) Over 10 Up to Inch Diameter Over 15 Up to Over 20 See Note 1 Version 1.2. Revised December C-7
35 Aluminum Hydraulic Shoring Vertical Shores for Soil Type C Water Systems for Soil Type B DEPTH OF TRENCH W A L E S H Y D R A U L I C C Y L I N D E R S T I M B E R U P R I G H T S WIDTH OF TRENCH (FEET) CPL HES 202 Excavation MAX. HORIZ. SPACING (ON CENTER) Vertical Section* Modules (Inch 3 ) Horizontal Up to 8 Over 8 Up to 12 Over 12 Up to 15 Solid Sheet 2 FT. 3 FT. Cylinder Diameter Horizontal Cylinder Diameter Horizontal Cylinder Diameter Over 5 Up to Feet 2 Inch 8.0 Feet 2 Inch (See Note 2) Feet 2 Inch 9.0 Feet 2 Inch (See Note 2) 8.0 Feet 3 Inch X Feet 3 Inch Feet 3 Inch 12.0 Feet 3 Inch 12.0 Feet 3 Inch Over 10 Up to Feet 2 Inch 6.0 Feet 2 Inch (See Note 2) 6.0 Feet 3 Inch X Feet 3 Inch 8.0 Feet 3 Inch 8.0 Feet 3 Inch Feet 3 Inch 10.0 Feet 3 Inch 10.0 Feet 8 Inch Over 15 Up to Feet 2 Inch 5.5 Feet 2 Inch (See Note 2) 5.5 Feet 3 Inch 3 X Feet 3 Inch 6.0 Feet 3 Inch 6.0 Feet 3 Inch Feet 3 Inch 9.0 Feet 3 Inch 9.0 Feet 3 Inch Over 20 See Note 1 Notes 1: Refer to Notes for Tables. Notes 2: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. *Consult product manufacturer and/or qualified engineer for Section Modules of available wales. Version 1.2. Revised December C-8
36 Aluminum Hydraulic Shoring DEPTH OF TRENCH W A L E S Waler Systems for Soil Type C H Y D R A U L I C C Y L I N D E R S T I M B E R U P R I G H T S WIDTH OF TRENCH MAX. HORIZ. SPACING (On Center) Vertical Section* Modules (In 3 ) Horizontal Up to 8 Over 8 Up to 12 Over 12 Up to 15 Solid Sheet 2 FT. 3 FT. Cylinder Diameter Horizontal Cylinder Diameter Horizontal Cylinder Diameter Over 5 Up to Feet 2 Inch 6.0 Feet 2 Inch (See Note 2) Feet 2 Inch 6.5 Feet 2 Inch (See Note 2) 6.0 Feet 3 Inch 3 X Feet 3 Inch Feet 3 Inch 10.0 Feet 3 Inch 10.0 Feet 3 Inch Over 10 Up to Feet 2 Inch 4.0 Feet 2 Inch (See Note 2) 4.0 Feet 3 Inch 3 X Feet 3 Inch 5.5 Feet 3 Inch 5.5 Feet 3 Inch Feet 3 Inch 8.0 Feet 3 Inch 8.0 Feet 8 Inch Over 15 Up to Feet 2 Inch 3.5 Feet 2 IN (See Note 2) 3.5 Feet 3 Inch 3 X Feet 3 Inch 5.0 Feet 3 Inch 5.0 Feet 3 Inch Feet 3 Inch 6.0 Feet 3 Inch 6.0 Feet 3 Inch Over 20 See Note 1 Notes 1: Refer to Notes for Tables. Notes 2: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. *Consult product manufacturer and/or qualified engineer for Section Modules of available wales Version 1.2. Revised December C-9
37 Appendix D To Identifying the Location of Underground Utilities Prior to Excavating Call the 811 or Regional One-Call Center 48 hours in advance before digging is scheduled to begin. Wait 48 hours for the site to be marked (unless it is an emergency line repair), and observe the marks and dig with care. If at all possible have the utility owners on site while the excavation is taking place. Plan your work. For larger projects, call in only the work that can be accomplished within a ten-day period. Have the following information available prior to calling the One-Call Center: Name and telephone number of the excavator and name and telephone number of the company Date and time the work is scheduled to begin Specific location address or description of the work site Nearest intersecting roadway to the work site Distance and direction of the work site from the nearest intersection Advise the one-call operator if explosives will be used X and Y or Lat/Long Coordinates of dig site, if available Record the locate request ticket number provided by the one-call operator. It is your proof of the call and may be requested by an enforcement agency. If digging activity comes within 24 inches of a utility line or pipeline, exercise extreme caution. Hand digging is required to expose the buried line. Markings for underground utilities are considered valid as long as they are visible up to ten calendar days from the mark-by time. The mark-by time is provided by the one-call operator but will not holidays and weekends. For larger projects, call in only the work that can be accomplished within a ten-day period. If damage to an underground utility occurs, notify the utility operator or the pipeline company directly. If there is an emergency situation, (i.e., danger to life, health, or property requiring immediate attention), take steps to safeguard health and property. Wherever possible, use white paint, stakes, or flags to mark the proposed excavation area. Remember, not all utilities are members of 811 or the Regional One-Call Center. You should call non-member utility operators directly if there is evidence that other utilities are in the vicinity and they are not on the list of utilities identified by the Regional One-Call Center. Version 1.2. Revised December 2011 D-1
There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.
Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,
More informationExcavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety
Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground
More informationTrenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
More informationTrenching and Shoring Procedures
Trenching and Shoring Procedures Scope & Application This policy sets forth the official practices required for excavations General Requirements Soil Types Testing Methods Aluminum hydraulic shoring Benching
More informationExcavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
More informationSECTION 25. Excavation and Trenching
SECTION 25 Excavation and Trenching 25.A General. The requirements of this Section are applicable to all Government and contractor work forces when their employees are performing excavation or trenching
More informationHERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING
HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING I. Purpose II. III. IV. Definitions Procedures Inspections A. Soil Types V. Testing Methods A. Manual Tests VI. VII. VIII. IX. Spoil
More informationWalking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
More informationUniversity of Tennessee Safety Guidelines
University of Tennessee Safety Guidelines Policy Subject: Trenching and Shoring Guidelines Effective Date: 9/1/12 Area Affected: Any departments who are involved in excavation work and trenching. Reviewed/Revised:
More informationCONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENTS Purpose 2 Scope
More informationCompetent. Person Manual. Course Preview TRENCHSAFETY
Course Preview Competent Person Manual A guide to industry standards, practices, and regulatory requirements for OSHA Construction Industry Regulations 29 CFR 1926, Subpart P - Excavations TRENCHSAFETY
More informationSAFETY AND HEALTH PROGRAM
PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of
More informationSECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
More informationTRENCHING AND SHORING EXCAVATIONS PROGRAM
TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM The purpose of this program is to provide information to our company employees and to interested persons that Northern
More informationBest Practices for Excavation. Best Practices for. Excavation
Best Practices for Excavation Contents Introduction...3 Management commitment...3 Employee involvement... 3 Communication...4 Safety education and training...4 Injury reporting and treatment...6 Return
More informationOne-third of all fatalities in the U.S. construction
Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations
More informationGUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables
Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,
More informationSafety. Vopak Fundamentals on Safety
Safety Vopak Fundamentals on Safety Introduction Every person working at a Vopak location should be able to go home at the end of the working day without having suffered or caused harm in any way. Eliminating
More informationMillersville University - Office Of Environmental Health & Safety Scope & Application
Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and
More information`Fall Protection Guidelines in Construction
`Fall Protection Guidelines in Construction A Publication Provided by: 1681 Campus Delivery Fort Collins, Colorado 80523 (970) 491-6151 email: ohss@lamar.colostate.edu web: http://www.bernardino.colostate.edu/public/
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationLadder, Scaffolding, and Excavation Safety Plan
Ladder, Scaffolding, and Excavation Safety Plan Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Revised: January 2011 LADDERS In reducing
More informationIndependent Contractor Policy
Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor
More informationExcavation, Trenching and Shoring Safety and OSHA s Excavation Standard
Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard AFSCME Training and Education Institute Manual This material was produced under grant number 46C4 DT05 from the Occupational Safety
More informationSECTION 02200 SUPPORT OF EXCAVATION
SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems
More informationGuidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
More informationCONFINED SPACE POLICY
UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 804 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Confined Space Policy CONFINED SPACE POLICY PURPOSE: The purpose of this policy
More informationSITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
More informationExcavation Safe Working Practices
Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to
More informationSCBA Frequently Asked Questions
SCBA Frequently Asked Questions Q. WHEN SHOULD I USE SCBA? A. An SCBA is the choice when dealing with any oxygen deficient atmosphere that is IDLH (Immediately Dangerous to Life or Health), or any environment
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationProcedure for Working in or around Excavations
RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationFall Protection Basics for Construction Activities
Fall Protection Basics for Construction Activities Washington State has revised fall protection rules, effective April 1, 2013. This booklet provides an overview of the requirements. www.lni.wa.gov/safety
More informationConfined Space Plan Prepared by: Environmental Health and Safety Office October, 2014
Confined Space Plan Prepared by: October, 2014 Table of Contents Table of Contents... i Acronyms... ii 1.0 Introduction... 1-1 1.1 Purpose... 1-1 1.2 Scope... 1-1 2.0 Roles and Responsibilities... 2-2
More informationSan Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION
ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More information1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
More informationRZ Guardrail System Installation Manual
TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand
More informationEMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationUNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM
SCOPE AND APPLICATION: The University of Kentucky has developed a written policy for safe entry into confined spaces. The University recognizes that certain environmental conditions within confined spaces
More informationConfined Space Air Monitoring
November 2008 Vol. 26. No. 3 Confined Space Air Monitoring Scott Shinn, C.I.H. Scott Shinn is a Certified Industrial Hygienist with 3M OH&ESD Technical Service and Regulatory Affairs. Summary Over the
More informationFall protection systems and practices Duty to have fall protection Protection at or above 6' level.
Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection
More informationCONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.
CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines
More informationCHECKLIST Fall Protection
Walking/working surfaces can support employees. Employees are protected from falling from elevated surfaces through the use of guardrail systems, safety net systems; personal fall arrest systems, controlled
More information68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
More informationOCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.
1. Authority Orange County Fire Rescue Department Tents & Membrane Structures Office of The Fire Marshall - 109 E. Church Street, Lower Level - Orlando, Florida 32801-3319 Phone: 407-836-0004 Fax: 407-836-8310
More informationTYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
More informationFALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST
OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria
More informationPrevention through Design: Eliminating Confined Spaces and Minimizing Hazards
Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards American Industrial Hygiene Association Developed by the AIHA Confined Spaces Committee Approved by the AIHA Board of Directors
More informationFixed and Portable Ladders- A Guide to OSHA Rules
Fixed and Portable Ladders- A Guide to OSHA Rules Introduction Working on and around stairways and ladders is hazardous. Stairways and ladders are major sources of injuries and fatalities among construction
More informationGoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2
GoM Region Ground Disturbance Safe Work Practice (SWP) Page 1 of 6 GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2 Document Authority: GoM H&S
More informationFixed Access Ladders. Table of Contents. 1. Legislative Requirements
Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms
More informationOSHA 3825-09 2015. Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide
OSHA 3825-09 2015 Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide Occupational Safety and Health Act of 1970 To assure safe and healthful working conditions for working
More informationCompressed Gas Cylinder Safety
Compressed Gas Cylinder Safety I. Background. Due to the nature of gas cylinders, special storage and handling precautions are necessary. The hazards associated with compressed gases include oxygen displacement,
More informationv ations Exca OregonOSHA Safe practices for small business owners and contractors
Exca v ations Safe practices for small business owners and contractors OregonOSHA How to dig your own grave No protective system Spoils too close Excavator bucket over worker No hard hat No means for entering
More informationPressure Vessels (Air Compressors) and LPG Tanks
Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force
More informationTHE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
More informationThe following definitions apply with regard to requirements specified in this document:
GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved
More informationBUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
More informationGas Meter Clearances and Service Installation Requirements
March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction
More informationEXCAVATOR SAFETY TRAINING
EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure
More informationConfined Spaces. Notes
29 CFR 1910.146 - Permit-required confined spaces Standard Number: 1910.146 Standard Title: Permit-required confined spaces SubPart Number: J SubPart Title: General Environmental Controls Confined Spaces
More informationFALL PROTECTION WORK PLAN
FALL PROTECTION WORK PLAN INSTRUCTIONS A written fall protection work plan must be implemented by each employer on a job site where a fall hazard of 10 feet or greater exists, in accordance with OSHA Standards.
More informationCONFINED SPACE PROGRAM
California Institute of Technology CONFINED SPACE PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:
More informationJobsite Safety Inspection Checklist
Jobsite Date Superintendent Inspector Jobsite Safety Inspection Checklist Pass Fail N/A General The company has a written safety program that is site specific where necessary. Emergency telephone numbers
More informationContractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
More informationSection 14. Forklift Safety Contents 14.1 Operator Safety
Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5
More informationFall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.
STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined
More informationPressure Testing (Hydrostatic / Pneumatic) Safety Guidelines
The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)
More informationConfined Space Entry Programs Use with the Confined Spaces book, Chapter 296-809 WAC
Confined Space Entry Programs Use with the Confined Spaces book, Chapter 296-809 WAC This helpful tool gives you examples of confined space entry programs, including a fill-in-the-blank form, for different
More informationCONSTRUCTION SAFETY POLICY
California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSafety and Health Resource Manual. Sample Permit-Required Confined Space Written Program
Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry
More informationCONFINED SPACE ENTRY NON-MARINE FACILITES
CONFINED SPACE SAFETY CONFINED SPACE ENTRY NON-MARINE FACILITES EM-385 Chapter 34 CONFINED SPACE ENTRY NON- MARINE FACILITIES UFGS 013526 OSHA 29 CFR 1910.146 A space that: What is a Confined Space? Is
More informationELEVATED WORK POLICY
ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationHigh Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
More informationSlip, Trip & Fall Program Table of Contents
Slip, Trip & Fall Program Table of Contents I. Introduction... 2 II. Scope... 2 III. Definitions... 2 IV. Responsibilities... 4 V. Practices... 5 VI. Slip-Fall Facility Checklist... 7 VII. References...
More informationOREGON FIRE CODE Interpretations and Technical Advisories
OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application
More informationUniversity of Tennessee Safety Guidelines
University of Tennessee Safety Guidelines Guideline Subject: Compressed Gases and Cryogenics Safety Guidelines Approval Date: 10/1/15 (Rev. 1) Next Scheduled Review: 10/1/19 Date Effective: 1/01/09 Contact
More informationTHE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
THE COMPETENT PERSON & SOIL TESTING This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
More informationCHAPTER 2 GENERAL SAFETY REQUIREMENTS
Bridge Inspection Handbook 2-1 2.1 INTRODUCTION CHAPTER 2 GENERAL SAFETY REQUIREMENTS Safety is everyone's business. As an employer, MassDOT is obligated to promote job safety and furnish safe tools, equipment,
More information1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5
HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University
More informationOSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L
OSHA Scaffold Standard for Construction 29 CFR 1926 Subpart L EH&S Jim Walker What is the revised OSHA scaffold standard for construction? Issued on August 30, 1996 and became effective on November 29,
More informationOSHA Training Guidelines (An Unofficial Summary)
OSHA Training Guidelines (An Unofficial Summary) Many standards promulgated by the Occupational Safety and Health Administration (OSHA) explicitly require the employer to train employees in the safety
More informationDepartment of Transportation Hazardous Material Regulations General Awareness, Safety & Security Training. For: University of Dayton Hazmat Employees
Department of Transportation Hazardous Material Regulations General Awareness, Safety & Security Training For: University of Dayton Hazmat Employees February, 2014 Overview Hazardous materials are substances
More informationHealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?
work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary
More informationCompressed Gas Cylinder Storage and Handling Guide
Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely
More informationGas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
More informationSample Checklist for Permit Required Confined Spaces Program
Sample Checklist for Permit Required Confined Spaces Program 29 CFR 1910.146 - Permit Required Confined Spaces for General Industry Item Description Yes No N/A Section C (General Requirements) 1. (1) -
More informationHOT WORK PERMIT PROCEDURES
COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4
More informationThe following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition:
This guide provides compliance information to help the metal and nonmetal mining industry comply with the requirements of the Mine Safety and Health Administration s (MSHA s) ladder standards. This document
More informationUncovered Decks & Porches
Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed
More informationWORKING AT HEIGHT GUIDELINES. Version II
WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining
More informationProposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
More informationSample Written Program. For. Confined Space OSHCON
Sample Written Program For Confined Space Provided as a public service by OSHCON Occupational Safety and Health Consultation Program Texas Department of Insurance, Division of Workers Compensation Publication
More informationHOT WORK PERMIT PROGRAM TRAINING. John Braun
HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program
More information