1 EXCAVATION PROCEDURE NUMBER: CPL HES-202 Approved December 2011 Version 1.2

2 CONTENTS EXCAVATION HES-202 Section Title Page 1.0 Purpose Scope Prerequisites Process Overview Instructions Preparation for Excavation Job Site Preparation Non-Entry Excavations Excavations Involving Entry Determine Soil Type Determine Protective System Complete Excavation Permit Excavation Work Permit Extension Work Completion Roles and Responsibility Reporting Requirements Documentation and Records Retention Appendices A B C D Glossary Excavation Permit Shoring Requirements To Identifying the Location of Underground Utilities Prior to Excavating Version 1.2. Revised December

3 1.0 Purpose This procedure is written to: describe the methods used to assist in protecting employees, company representatives, and the public from injury during excavation activities; minimize the risk of damage to structures and facilities during excavations; and verify compliance with Occupational Safety and Health Administration (OSHA) requirements contained in 29 CFR through 652; with Department of Transportation (DOT) requirements contained in 49 CFR ; with CAL OSHA 8 CCR (f) and other state regulations regarding excavation. 2.0 Scope 2.1 Personnel and Activities Covered by this Procedure This procedure applies to excavations performed and/or coordinated by all personnel, company or contractor, working in or on Chevron Pipe Line Company (CPL) owned, operated, managed, or maintained pipelines or facilities. This procedure covers activities whenever the ground is broken for open excavations (e.g., trenching, pile driving, ground water wells, soil boring, installation of pipelines, conduit, foundations, etc.). 2.2 Exemptions from this Procedure Excavations performed underwater are exempt from this procedure. If you need assistance in developing work plans for excavations underwater, contact your local Safety Specialist. 3.0 Prerequisites 3.1 Training/Personnel Requirements Persons identified as the Person-In-Charge (PIC) must be trained in this procedure. All excavations involving worker entry require a Competent Person on site. A competent person is an individual who is trained in and knowledgeable about soil analysis, the use of protective systems, and the requirements of the OSHA Construction Standard 29 CFR A Competent Person must be capable of identifying existing and predictable hazards in excavation work and have the authority to take prompt measures to abate these hazards. In California, the Competent Person must know CAL OSHA Standards. The knowledge and understanding of this procedure alone does not make someone a competent Version 1.2. Revised December

4 person. To become a competent person, one must obtain training via a third party Competent Person training course. Contact the Learning and Development Coordinator for further information. Excavations in excess of 20 feet in depth must be designed by a Registered Professional Engineer A Registered Professional Engineer is required to approve the integrity of all excavations beneath the level of an adjacent foundation, retaining wall, or other structure including sidewalks. Standbys must be trained in Cardiopulmonary Resuscitation, first-aid, and bloodborne pathogen safety. 3.2 Additional Documents The Competent Person or registered professional engineer must comprehend and comply with all applicable sections of 29 CFR through California Requirements CPL must have a California Annual Excavation Permit. The Competent Person must know CAL OSHA standards. Contractor(s) performing excavation must have a California Annual Excavation Permit. Version 1.2. Revised December

5 4.0 Process Overview Is the Safe Work Permit completed? No Stop Yes Is the Underground Service Alert completed? No Yes The PIC completes the General Section and the Restrictions Hazards section of the Excavation Permit Is this an Entry Excavation? Yes No PIC and PCW sign the permit and work may safely begin PIC and Competent Person complete the Requirements for Entry Excavation PIC, Person Conducting the Work (PCW), and Competent Person sign the permit and excavation may safely begin Return permit to the PIC PIC file in the appropriate office Upon completion of excavation, PIC fills in dimensions of excavation on permit Work complete Work begins Version 1.2. Revised December

6 Preparation for Excavation 1. Check underground utilities. 2. Remove all surface obstructions. 3. Is there contaminated soil? Will workers be entering excavation? Yes Determine Soil Type No To Determine Protective Systems, review the next three flowcharts. Determine Protective System Complete Excavation Permit (specify all restrictions) Review Permit With All Workers Begin Work Version 1.2. Revised December

7 Determine Excavation Protective Systems (Flowchart 1 of 3) Yes Is the excavation more than 5 feet in depth? No Is the excavation entirely in stable rock? Yes The excavation may be made with vertical sides No Is there a potential for a cave in? No The excavation must be sloped, shored, or shielded Yes For sloping, go to Flowchart 2. For shoring or shielding, go to Flowchart 3 Version 1.2. Revised December

8 Determine Excavation Protective Systems Sloping Requirements (Flowchart 2 of 3) Sloping selected as method of excavation protection Soil classification C is assumed. Slope must be 1½ horizontal to 1 vertical (1½:1 or 34 degrees) No Will soil classification be made? Yes Excavation must comply with one of the two following options: 1. Follow requirements from the maximum allowable slop table listed below. 2. Excavation protection must be designed by registered professional engineer. Soil or Rock Type Maximum Allowable Slope (H:V) (for excavations less than 20 feet deep) Stable Rock Type A Soil Type B Soil Type C Soil Vertical or 90 degrees ¾:1 or 53 degrees 1:1 or 45 degrees 1½:1 or 34 degrees Version 1.2. Revised December

9 Determine Excavation Protective Systems Shoring or Shielding Requirements (Flowchart 3 of 3) Shoring or shielding selected as method of excavation protection Soil classification is required Excavation must comply with one of the three following options: 1. Shoring or shielding must comply with 29 CFR and appendices A, C, and D; 2. Design of support systems, shield systems, or other protective systems that are drawn from manufacturers tabulated data shall be in accordance with all specification, recommendations and limitations issued by the manufacturer. Alternately, follow requirements from the maximum allowable slope table listed below; or 3. Design of support system must be certified by registered professional engineer. Version 1.2. Revised December

10 5.0 Instructions 5.1 Preparation for Excavation The Person-In-Charge (PIC) completes the general section of the Safe Work Permit. The PIC must specify: a) Facility and location of the excavation; b) Date of the excavation; c) Time limits of the excavation; d) Personnel who will be conducting the work; e) Description of the work; f) Equipment to be used; and g) Job boundaries The PIC determines if the excavation will be entry or non-entry and checks the appropriate box on the Excavation Permit. The PIC will then review the area around the proposed excavation site prior to commencing excavation activities to identify and alleviate hazardous conditions including: a) Soil classification b) Surface encumbrances c) Location and identity of utilities d) Amount of surface and subsurface water present e) Traffic and nearby structures f) Depth of excavation g) Length of time the excavation will be open h) Climatic conditions i) Access and egress The PIC specifies the excavation work site hazards by checking all applicable boxes in the Hazard section of the Excavation Permit. The PIC must contact the appropriate state, regional, and/or local One-Call Center to notify other pipeline and utility companies. The PIC will notify the One-Call Center of the proposed work and ask to establish the location of underground installations prior to the start of any actual excavation. See Appendix D for instructions on contacting the One-Call Center. 811 is Version 1.2. Revised December

11 the national call before you dig number and is established for most underground utilities. However, some utilities are exempt from participating in the one-call system and may or may-not be active where you are located. All means must be taken to notify the underground asset owners When other pipeline and/or utility companies cannot respond to a request to locate underground utility installations within 48 hours (unless a longer time period is required by state or local law), or cannot establish the exact location of these installations by attempts to contact these companies directly, the PIC may authorize the excavation to proceed, provided company does so with caution and provided detection equipment or other acceptable means to locate underground installations are employed. In addition, all obstructions, both above and underground, must be identified and marked before excavation work begins. The PIC must review all available maps, plans, and drawings for buried conduits, cables, and piping that may run through or within the vicinity of the proposed excavation and work area The PIC must obtain all applicable state and/or local required permits. Employees in California must notify a CAL OSHA office at least one week prior to commencement of job if excavation will be over five feet deep OR if a Chevron employee will be going in an excavation made by a contractor. Notification by telephone must be followed up in writing on Activity Notification Form for holders of permit. These are available from any CAL OSHA office The PIC must also make arrangements to close the roadway and detour traffic if the excavation will adversely affect a roadway After a review of the excavation site, the PIC will determine which additional safety requirements must be met. The following is a list of safety precautions which may apply to a particular excavation: a) Workers exposed to vehicular traffic must be provided with and wear warning vests or other suitable garments marked with or made of reflective or high visibility material. This reflective or high visibility vest must conform to CPL s FRC policy. b) All surface obstructions (such as piping, posts, etc.) that create a hazard to employees must be removed or supported to safeguard employees. c) Excavations beneath the level of an adjacent foundation, retaining wall, or other structure including sidewalks, are not allowed until a Registered Professional Engineer has determined that the work will not undermine the structures. Version 1.2. Revised December

12 d) Warning systems (such as barricades, stop logs, hand or mechanical signals) must be utilized to warn against mobile equipment operating close to the excavation. e) When personnel crossings over the excavation are required or permitted, OSHA approved crossings will be used including toe boards and guardrails. f) Barricades or barriers must be provided at all excavations. g) Covers placed over open trenches in roadways must be designed by a Registered Professional Engineer and secured against movement. h) A standby with safety and rescue equipment may be required on site. The PIC may specify any other restrictions or approvals as deemed necessary The PIC specifies the required restriction(s) by checking all applicable boxes in the Permit Restriction section of the Excavation Permit. Once the restrictions have been specified, the PIC signs on the Restrictions are specified line of the permit. 5.2 Job Site Preparation The PIC and the Person Conducting the Work (PCW) shall review the work details, job site, and permit conditions to assure the work is defined and can be done safely The PCW satisfies all required precautions and restrictions and obtains any additional approvals. 5.3 Non-Entry Excavations Excavation not involving entry may begin and continue until completed, under the following conditions: a) No personnel are allowed in the excavation unless the entry requirements of section 5.4 Excavations Involving Entry have been met. b) While the excavation is open, underground installations must be protected, supported, or removed. c) No workers are permitted underneath loads handled by lifting or digging equipment. Personnel are required to stand away from any vehicle being loaded or unloaded to avoid being struck by any spillage or falling material. d) Accumulations of water which could endanger the excavation must be removed and the source of water controlled before allowing further work. e) Any damaged structure(s) or equipment must be evaluated by a Competent Person and removed from service if unsuitable for use. Version 1.2. Revised December

13 f) When excavating within five feet of an underground pipeline or conduit, the location of the pipeline or conduit must be precisely located by hand-digging (or probing) the last two feet (see MIP-206). After pipeline or conduit has been located, power driven equipment may be used under the following conditions: o A representative of the pipeline or conduit owner has been notified and is either present or declines to watch the excavation; o It has been positively determined that any electrical conduit is safely encased in a concrete envelope; or o Person-in-Charge authorizes the work to continue using power driven equipment. 5.4 Excavations Involving Entry If employees will be required to enter the excavation, the PIC must have a Competent Person examine and classify the soil conditions to determine the appropriate protective system to be used. Footing excavations, bell bottom pier holes or other confined excavations require the use of the Confined Space Entry procedure (HES-201) and permit. A harness with lifeline securely attached must be individually attended at all times while the employee wearing the lifeline is in the excavation. 5.5 Determine Soil Type The Competent Person classifies the soil type using both the accepted visual and manual tests per OSHA Standard 29 CFR Appendix A The Competent Person records the type of soil and the soil test method on the appropriate section of the Excavation Permit. 5.6 Determine Protective Systems The Competent Person and the PIC determine the type of protective system to be used, benching, sloping, shielding, timber shoring, or aluminum hydraulic shoring. Sloping, benching, or support systems for an excavation greater than 20 feet deep must be designed by a Registered Professional Engineer The PIC records the type of protective system used at the site on the appropriate section of the Excavation Permit. The excavation dimensions, length, width, and depth are also recorded The Competent Person may exempt the excavation from the requirements for shoring, benching, and sloping if: Version 1.2. Revised December

14 Excavation is less than five feet deep, there is no potential for cave-in (four feet in Washington and Oregon); or Excavation is made entirely in stable rock that has no potential for collapse and decision is documented on form CPL Sloping and benching systems must be selected and constructed conforming to the specifications for slopes as outlined in Table 202.1: Maximum Allowable Slopes, below. TABLE 202.1: Maximum Allowable Slopes Soil or Rock Type Maximum Allowable Slopes (H:V) Stable Rock Vertical (90 ) Type A 3/4:1 (53 ) Type B 1:1 (45 ) Type C 1½:1 (34 ) In general, when soil classification is not conducted, slopes can be no steeper than 1½ horizontal to one vertical (34 measured from the horizontal). For example, a six feet deep excavation in Type C soil would need to be set back nine feet. There are numerous types of sloping and benching techniques. The selection of the type of protective systems will be based on the location; terrain; soil classification; available equipment; and type of work activity. Some examples of the types of sloping and benching techniques are: Simple Slope Simple Bench Multiple Bench Vertically-Sided Lower Portion See figure 202.1: Sloping System for Type B and C Soil for examples of Simple Slope in Type B and C Soils, and figure 202.2: Benching System for Type B Soil for examples of Simple Bench in Type B Soil. In addition, there are OSHA requirements for layered soils. For exact requirements for these types of sloping and benching techniques, refer to your Safety Specialist. Version 1.2. Revised December

15 FIGURE 202.1: Sloping System for Type B and C Soil Sloping System for Type B Soil 1 20 Feet Max Feet 10 Feet Sloping System for Type C Soil 20 Feet Max. 10 Feet 15 Feet / 2 Version 1.2. Revised December

16 FIGURE 202.2: Benching System for Type B Soil Benching System for Type B Soil 1 20 Ft. Max. 4 ft. max Feet 4 ft. max. 10 Feet For sloping/benching, the following requirements must be met: The sides or walls of an excavation or trench may be sloped, in lieu of a shoring/shielding system provided the slope (angle) is not steeper than one and one-half horizontal to one vertical (34 from the horizontal). For slopes steeper than 1-1/2:1 and all benching (stepped) systems, the slope or configuration must conform to the specifications in OSHA Standard 29 CFR Sloped excavations which have vertically sided lower portions must be shielded or supported to a height of at least 18 inches above the vertical sides For protection by mechanical means, the following requirements must be met: Shielding, timber or aluminum shoring and other protective systems (i.e., trench boxes), must meet the specifications in OSHA Standard 29 CFR Workers must be protected from cave-in upon entry or exit from an excavation protected by a shield system. Version 1.2. Revised December

17 Timber Shoring The timber shoring methods are described in Appendix C Shoring Requirements. Timber shoring for trenches deeper than 20 feet (6.1 meters) must be designed by a Registered Professional Engineer. The minimum size of shoring system members is presented in the tables of Appendix C Shoring Requirements. Each table contains the data only for the particular soil type in which the excavation or portion of the excavation is made. The data are arranged to allow the user the flexibility to select from among several acceptable configurations of members based on varying the horizontal spacing of the cross braces. Stable rock is exempt from shoring requirements; therefore, no data are presented for this condition. Use the tables to select the cross braces, the uprights, and the wales, where wales are required. Select the size and spacing of the members from the appropriate table. The selection is based on the soil type and the depth and width of the trench where the members are to be installed and, in most instances, the selection is also based on the horizontal spacing of the cross braces. In instances where a choice of horizontal cross bracing is available, the horizontal spacing of the cross braces must be chosen before the size of any member can be determined. Aluminum Hydraulic Shoring for Trenches Hydraulic cylinders specifications: Use the tables to select the hydraulic cylinders and either the vertical shores or the horizontal wales. When a wales system is used, use the tables to select the vertical timber sheeting. Select the size and spacing of the members from the appropriate table. The selection is based on the soil type and the depth and width of the trench where the members are to be installed. In these tables, the vertical spacing is held constant at four feet on center. The tables show the maximum horizontal spacing of cylinders allowed for each size of wale in the waler system tables, and in the vertical shore tables, the hydraulic cylinder horizontal spacing is the same as the vertical shore spacing. Vertical shoring rails shall have a minimum section modulus of 0.40 inch. When vertical shores are used, there must be a minimum of three shores spaced equally, horizontally, in a group. Plywood must be inches thick softwood or 0.75 inch thick, 14 ply arctic white birch (Finland form). Note that plywood is not intended as a structural member, but only for prevention of local raveling (sloughing of the trench face) between the shores. Version 1.2. Revised December

18 5.6.7 Trench shields Portable trench shields is a means of attempted control of cave-ins in trenches. Unlike shoring, which has to be put up and taken down piece by piece, shields can generally be moved where needed with only a minimal assembly and disassembly. Trench shields can be purchased or rented from numerous sources. The design and installation of portable trench shields must be in accordance with all specifications, recommendations, and limitations issued or made by the manufacturer. Manufacturer's specifications, recommendations, and limitations and manufacturer's approval to deviate from the specifications, recommendations, and limitations must be in written form at the job site during construction of the protective system. 5.7 Complete Excavation Permit Prior to entry into the excavation, the PIC assures that all the required safety, fire, and health equipment is in place and in proper operating working condition. The PIC must verify: a) The excavation has a protective system (sloping/benching or mechanical) unless exempted by the Competent Person as outlined in section b) The excavation has securely fastened ladders, ramps, or stairs for entry and exit at intervals of no more than 25 feet. Ladders must extend at least three feet above the edge of the trench. c) The excavation has been tested for oxygen deficiency (atmospheres containing less than 19.5% oxygen) and for other atmospheric hazards that may exist. Complete the Atmospheric Monitoring section of the Gas Testing Results Form located in HES 209. d) The excavated material (spoil) must be kept at least two feet from the edge of the excavation. e) The workers will not be in the trench (i.e., in the vicinity of where moving the trench shield could affect their safety and the stability of the trench) while a trench shield is being moved. f) The workers will not be permitted to work on the face of a sloped or benched excavation above other employees unless the workers below are protected from falling or rolling material or equipment. g) The appropriate safety and rescue equipment, including a standby, is on site as applicable. Version 1.2. Revised December

19 5.7.2 The PCW reviews the permit and all requirements with all personnel who will be working in the excavation. The PCW informs all of those performing the work of the job boundaries, work precautions, restrictions, and conditions. Person(s) performing the work (or foreman/supervisor for a large crew) review the permit and sign in the approval section of the permit The PIC and the PCW make a final inspection of the job site to assure all permit conditions are satisfied and all signatures have been obtained The PIC assures the work is performed under the immediate supervision of a person experienced in excavation matters, that an on-site person is responsible for the safety of personnel, that necessary safety and rescue equipment is on site, and personnel know how to use it as applicable After the requirements specified by the Competent Person and the PIC are met, personnel may enter the excavation and work may proceed in compliance with all requirements of sections 5.2 Job Site Preparation and 5.4 Entry Excavations as well as the following conditions: In California, the Competent Person must be on job site at all times when employees are exposed to a trench and/or excavation. The Competent Person must make daily inspections completing the appropriate section of the Excavation Permit. Inspections must always be made before the start of the work and as needed throughout the shift. The Competent Person or any other person must stop the job whenever a hazardous condition develops that could endanger workers and remove workers from the excavation or hazardous area until the situation has been corrected and proper precautions have been taken. 5.8 Excavation Work An excavation must be ready for entry when the requirements of the permit have been addressed, all signatures obtained and the Excavation Permit posted at the job site If an adverse condition develops (e.g., a leak, spill, accident, etc.) or the PIC or Competent Person determines the excavation is unsafe, work must be stopped immediately and the permit pulled. Any time the permit is pulled, the excavation must be re-inspected and confirmed safe before work may resume If the soil or material being excavated appears contaminated with hydrocarbons or other chemicals (e.g., unidentified liquid, odor, oily sheen, etc.), work must stop and a HES Specialist must be consulted before work continues. The contaminated soil may have to be sampled to determine if it must be handled as a hazardous waste and/or additional personal protective equipment will be required. Version 1.2. Revised December

20 5.9 Permit Extension An existing Excavation Permit can be extended an additional shift (not to exceed 12 hours) if, at the beginning of each shift, both the PIC and the PCW confirm that conditions remain unchanged, permit restrictions are met, new JSA completed, and it is safe to do the work. They both must date and print name on the permit in the appropriate box. A permit may be extended up to four (4) consecutive shifts at which time it expires and a new permit is required Work Completion Upon job completion, the PIC inspects the site and removes the permit. 6.0 Roles and Responsibilities 6.1 Person-In-Charge The Person-in-Charge is responsible for: verifying that available maps, plot plans, etc., have been reviewed for buried conduits, cables, and piping; verifying that the state/regional/local One-Call Center has been notified to establish the location of underground installations; verifying above ground and underground obstructions have been identified and marked; verifying that those performing the work understand the job boundaries, work precautions, restrictions, and conditions; specifying any precautions, restrictions, and/or approvals that may be required; reviewing the permit to assure the work is defined and can be done safely; reviewing the job site in the field with the PCW; alerting other affected parties if their areas could be affected by the work; verifying that the work in an excavation must be under the immediate supervision of a person experienced in excavation matters; verifying that an on-site person is responsible for the safety of personnel that the necessary safety and rescue equipment is on site as applicable; and arranging for standbys as necessary. Version 1.2. Revised December

21 6.2 Person Conducting the Work The Person Conducting the Work is responsible for: reviewing the permit and conditions; satisfying all precautions and restrictions specified by the PIC; communicating the conditions and restrictions to others on the job; confirming with the PIC notification has been made to the local One-Call Center per applicable state requirements (or the National 811); informing PIC if a hazardous condition develops; and reporting to the PIC before starting work, when leaving the job site, and before resuming work. 6.3 Standby The Standby is responsible for: monitoring the safety of the workers; verifying that motorized equipment does not get so close to the excavation that it effects the stability of the soil; directing traffic around the excavation; Attendant duties for permit required confined space excavations are specified in HES Competent Person The Competent Person is responsible for: inspecting the site prior to work and determine from soil examination or analysis whether a protective system will be required to prevent a cave-in; reviewing the job plan with the PIC to assure the necessary safety precautions have been considered; being in attendance during the job as necessary to assure the job is proceeding in a safe manner; making daily inspections to check for situations that could result in a cave-in, failure of a protective system, a hazardous atmosphere, or condition; stopping the job whenever a hazardous condition develops that could endanger workers, assure workers are removed from the hazardous area until the situation has been corrected and proper precautions have been implemented; and Version 1.2. Revised December

22 taking steps to correct hazardous situations. A CPL employee acting as the Competent Person may also be the PIC. Also, any PIC can also be a Competent Person. 7.0 Reporting Requirements California Only Notify CAL OSHA if situation involves an excavation over five feet deep or a CPL employee will enter a contractor excavation. 8.0 Documentation and Records Retention 8.1 Required Documents An "Excavation Permit" CPL-687 is used to document this procedure. A California Annual Excavation Permit is required to conduct excavations in California. A California Activity Notification Form is used to inform CAL OSHA of excavation activities. 8.2 Document Storage and Retention Time The Excavation Permit will be retained for two (2) years after the job is complete in the appropriate office. California Annual Excavation Permit will be posted in the appropriate office. Version 1.2. Revised December

23 Appendix A Glossary Bell-bottom Pier Hole This is a type of shaft or footing excavation which has a bottom cross section wider than the top cross section, thereby, forming a belled shape. Benching Terracing or stepping the sides of an excavation to prevent a cave-in. Benching is a method of protecting employees from cave-ins by excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Cave-in The separation of a mass of soil or rock material from the side of an excavation, or the loss of soil from under a trench shield or support system, and its sudden movement into the excavation, either by falling or sliding, in sufficient quantity so that it could entrap, bury, or otherwise injure and immobilize a person. Competent Person A person trained in and knowledgeable about soil analysis, the use of protective systems, and the requirements of the OSHA Construction Standard 29 CFR A Competent Person must be capable of identifying existing and predictable hazards in excavation work and have the authority to take prompt measures to abate these hazards. In California, the Competent Person must know CAL OSHA Standards. Contractor A person who agrees to furnish materials or perform services at a specified price for construction. The person performing the work. Cross Braces The horizontal members of a shoring system installed perpendicular to the sides of the excavation, the ends of which bear against either uprights or wales. Egress A continuous and unobstructed way of exit travel from any point in an excavation to a safe location outside the excavation. Version 1.2. Revised December

24 Excavation Any man-made cut, cavity, trench, or depression in the earth's surface, formed by earth removal. By definition, excavations include trenches. Gas Testing The use of portable gas testing instruments to determine levels of flammable and toxic vapors or gases present in the atmosphere. Hazardous Atmosphere An atmosphere which, by reason of being explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, toxic, or otherwise harmful, may cause death, illness, or injury. Person Conducting the Work The person(s) conducting the excavation or working in or around the excavation. This includes all personnel company and contractor. Person-In-Charge The Team Leader responsible for the assets, or their designated CPL employee representative, or a qualified third party contractor, that has overall responsibility for determining acceptable excavation conditions in the area are safe for the excavation work to be performed and for the safety of personnel and equipment until the job is complete. The PIC can be a (Qualified Third Party) inspector who is acting as the company representative. Protective System A method of protecting employees from cave-ins, materials falling or rolling from an excavation face or into an excavation or from the collapse of adjacent structures. Protective systems include, but are not limited to, support systems, benching systems, sloping systems, and shield systems. Qualified Gas Tester Personnel (company and contractor) who have been trained in the use of portable gas testing instruments and have demonstrated their use in the field. Only qualified gas testers may conduct gas tests. Qualified Third Party Contractors A Contractor separate and distinct from the contractor performing the work, who has been trained in CPL applicable procedures, and understands the hazards, risks, exposures, and associated impact to operations from the activities. Version 1.2. Revised December

25 Requestor/Work Owner The person who selects, hires, or oversees the work of a contractor. Shield A structure that is able to withstand the forces imposed on it by a cave-in and thereby protects employees within the structure. Shields can be permanent structures or can be designed to be portable and moved along as work progresses. Shields can be either premanufactured or job-built in accordance with the requirements found in this procedure. Shields used in trenches are usually referred to as trench boxes or trench shields. This is also referred to as shield system. Shoring A structure that supports the sides of an excavation and is designed to prevent cave-ins. The structure can be made of metal, wood, or be hydraulic. This is also referred to as a shoring system. Sloping A method of protecting employees from cave-ins by excavating to form sides of an excavation that is inclined away from the excavation so as to prevent cave-ins. The acceptable angle of the incline required to prevent a cave-in is dependant of such factors as the soil type, environmental conditions of exposure, and application of surcharge loads. This is also referred to as a sloping system. Support System A structure, such as an underpinning, bracing or shoring which provides support to an adjacent structure, underground installation or the sides of an excavation. Tabulated Data Tables and charts approved by a Registered Professional Engineer to design and construct a protective system. Trench A narrow excavation (in relation to its length) made below the surface of the ground. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 meters). If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 meters) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench. This is also called a trench excavation. Version 1.2. Revised December

26 Underground Installations Buried utility and production installations such as sewer, telephone, fuel, electric, water lines, or any other underground installations that may be expected to be encountered during excavation work. Version 1.2. Revised December

27 Appendix B Excavation Permit CPL-687 Example shown below. Version 1.2. Revised December

28 Appendix C Shoring Requirements Timber Shoring Tables Minimum Timber Requirements* Soil Type A DEPTH OF TRENCH Horizont al. P a = 25 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S ** CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 6 6 to 8 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 8 8 to 10 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 12 4 X 6 4 X 6 6 X 6 6 X 6 6 X X 8 2 X 6 10 to 15 Up to 6 4 X 4 4 X 4 4 X 6 6 X 6 6 X 6 4 Not Req X 8 6 to 8 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 6 8 to 10 6 X 6 6 X 5 6 X 6 6 X 8 6 X X X 6 10 to 12 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 8 15 to 20 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 Over 20 See Note 1 6 to 8 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 * Mixed oak or equivalent with a bending strength not less than 850 psi. ** Manufactured members of equivalent strength may be substituted for wood. Note 1: Protective systems for excavations deeper than 20 feet (6.1 meters) must be designed by a Registered Professional Engineer. Version 1.2. Revised December C-1

29 Timber Trench Shoring Minimum Timber Requirements* Soil Type B DEPTH OF TRENCH Horiz. P a = 45 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 6 6 to 8 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 8 to 10 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 10 to 12 See Note 1 10 to15 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 See Note 1 15 to 20 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 8 to 10 8 X 10 8 X 10 8 X 10 8 X X X X 6 10 to 12 See Note 1 OVER 20 See Note 1 * Mixed oak or equivalent with a bending strength not less than 850 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-2

30 Timber Trench Shoring Minimum Timber Requirements* Soil Type C DEPTH OF TRENCH Horiz. P a = 80 x H + 72 psf (2 ft Surcharge) S I Z E ( A C T U A L ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Up to 4 4 to 6 6 to 9 9 to to 15 Close Maximum Allowable Horizontal (See Note 2) 5 to 10 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 x 8 8 X 8 8 X 8 8 X x X 6 8 to 10 8 x 10 8 x 10 8 x 10 8 x x x X 6 10 to 12 See Note 1 10 to 15 Up to 6 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 6 to 8 8 X 10 8 X 10 8 X 10 8 X X X X 6 8 to 10 See Note 1 10 to 12 See Note 1 15 to 20 Up to 6 8 x 10 8 x 10 8 x 10 8 x x x X 6 6 to 8 See Note 1 8 to 10 See Note 1 10 to 12 See Note 1 OVER 20 See Note 1 * Mixed oak or equivalent with a bending strength not less than 850 psi. *Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-3

31 Timber Trench Shoring Minimum Timber Requirements * Soil Type A DEPTH OF TRENCH Horiz. P a = 25 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 4 4 X 4 4 X 4 4 X 4 4 X 6 4 Not Req. Not Req. 4 X 6 6 to 8 4 X 4 4 X 4 4 X 4 4 X 6 4 X 6 4 Not Req. Not Req. 4 X 8 8 to 10 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 12 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 10 to 15 Up to 6 4 X 4 4 X 4 4 X 4 6 X 6 6 X 6 4 Not Req. Not Req. 4 X 10 6 to 8 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 6 8 to 10 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 8 10 to 12 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 4 X to 20 Up to 6 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 6 to 8 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 4 X 12 8 to 10 6 X 6 6 X 6 6 X 6 6 X 6 6 X X X 6 10 to 12 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 4 X 12 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-4

32 Timber Trench Shoring Minimum Timber Requirements* Soil Type B DEPTH OF TRENCH Horiz. P a = 45 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Maximum Allowable Horizontal Up to 4 4 to 6 6 to 9 9 to to 15 Close to 10 Up to 6 4 X 6 4 X 6 4 X 6 6 X 6 6 X X X 12 4 X 8 6 to 8 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 8 4 X 8 8 to 10 4 X 6 4 X 6 6 X 6 6 X 6 6 X X X 8 10 to 12 See Note 1 4 X to 15 Up to 6 6 X 6 6 X 6 6 X 6 6 X 8 6 X X X 6 4 X 10 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 4 X 10 8 to 10 6 X 8 6 X 8 8 X 8 8 X 8 8 X X X 6 4 X to 12 See Note 1 15 to 20 Up to 6 6 X 8 6 X 8 6 X 8 6 X 8 8 X X X 6 6 to 8 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 8 to 10 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 10 to 12 See Note 1 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-5

33 Timber Trench Shoring Minimum Timber Requirements* Soil Type C DEPTH OF TRENCH Horiz. P a = 80 x H + 72 psf (2 ft. Surcharge) S I Z E ( S 4 S ) A N D S P A C I N G O F M E M B E R S * * CROSS BRACES WALES UPRIGHTS Width of Trench Vertical Size (Inches) Vertical Up to 4 4 to 6 6 to 9 9 to to 15 Close Maximum Allowable Horizontal (See Note 2) 5 to 10 Up to 6 6 X 6 6 X 6 6 X 6 6 X 6 8 X X X 6 6 to 8 6 X 6 6 x 6 6 X 6 8 X 8 8 X x X 6 8 to 10 6 X 6 6 X 6 8 x 8 8 x 8 8 x x X 6 10 to 12 See Note 1 10 to 15 Up to 6 6 X 8 6 X 8 6 X 8 8 X 8 8 X X X 6 6 to 8 8 X 8 8 X 8 8 X 8 8 X 8 8 X X X 6 8 to 10 See Note 1 10 to 12 See Note 1 15 to 20 Up to 6 8 x 8 8 x 8 8 x 8 8 x 10 8 x x X 6 6 to 8 See Note 1 8 to 10 See Note 1 10 to 12 See Note 1 OVER 20 See Note 1 * Douglas fir or equivalent with a bending strength not less than 1500 psi. ** Manufactured members of equivalent strength may be substituted for wood. Version 1.2. Revised December C-6

34 Aluminum Hydraulic Shoring - Vertical Shores for Soil Type A DEPTH OF TRENCH Maximum Horizontal H Y D R A U L I C Maximum Vertical CY L I N D E R S Width of Trench Up to 8 8 to to 15 Over 5 Up to Inch Diameter 2 Inch Diameter (See Note 2) Over 10 Up to Inch Diameter Over 15 Up to 20 7 Over 20 See Note 1 Note 1: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. Aluminum Hydraulic Shoring - Vertical Shores for Soil Type B DEPTH OF TRENCH Maximum Horizontal H Y D R A U L I C Maximum Vertical CY L I N D E R S Width of Trench Up to 8 Over 8 Up to 12 Over 12 Up to 15 Over 5 Up to Inch Diameter 2 Inch Diameter (See Note 2) Over 10 Up to Inch Diameter Over 15 Up to Over 20 See Note 1 Version 1.2. Revised December C-7

35 Aluminum Hydraulic Shoring Vertical Shores for Soil Type C Water Systems for Soil Type B DEPTH OF TRENCH W A L E S H Y D R A U L I C C Y L I N D E R S T I M B E R U P R I G H T S WIDTH OF TRENCH (FEET) CPL HES 202 Excavation MAX. HORIZ. SPACING (ON CENTER) Vertical Section* Modules (Inch 3 ) Horizontal Up to 8 Over 8 Up to 12 Over 12 Up to 15 Solid Sheet 2 FT. 3 FT. Cylinder Diameter Horizontal Cylinder Diameter Horizontal Cylinder Diameter Over 5 Up to Feet 2 Inch 8.0 Feet 2 Inch (See Note 2) Feet 2 Inch 9.0 Feet 2 Inch (See Note 2) 8.0 Feet 3 Inch X Feet 3 Inch Feet 3 Inch 12.0 Feet 3 Inch 12.0 Feet 3 Inch Over 10 Up to Feet 2 Inch 6.0 Feet 2 Inch (See Note 2) 6.0 Feet 3 Inch X Feet 3 Inch 8.0 Feet 3 Inch 8.0 Feet 3 Inch Feet 3 Inch 10.0 Feet 3 Inch 10.0 Feet 8 Inch Over 15 Up to Feet 2 Inch 5.5 Feet 2 Inch (See Note 2) 5.5 Feet 3 Inch 3 X Feet 3 Inch 6.0 Feet 3 Inch 6.0 Feet 3 Inch Feet 3 Inch 9.0 Feet 3 Inch 9.0 Feet 3 Inch Over 20 See Note 1 Notes 1: Refer to Notes for Tables. Notes 2: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. *Consult product manufacturer and/or qualified engineer for Section Modules of available wales. Version 1.2. Revised December C-8

36 Aluminum Hydraulic Shoring DEPTH OF TRENCH W A L E S Waler Systems for Soil Type C H Y D R A U L I C C Y L I N D E R S T I M B E R U P R I G H T S WIDTH OF TRENCH MAX. HORIZ. SPACING (On Center) Vertical Section* Modules (In 3 ) Horizontal Up to 8 Over 8 Up to 12 Over 12 Up to 15 Solid Sheet 2 FT. 3 FT. Cylinder Diameter Horizontal Cylinder Diameter Horizontal Cylinder Diameter Over 5 Up to Feet 2 Inch 6.0 Feet 2 Inch (See Note 2) Feet 2 Inch 6.5 Feet 2 Inch (See Note 2) 6.0 Feet 3 Inch 3 X Feet 3 Inch Feet 3 Inch 10.0 Feet 3 Inch 10.0 Feet 3 Inch Over 10 Up to Feet 2 Inch 4.0 Feet 2 Inch (See Note 2) 4.0 Feet 3 Inch 3 X Feet 3 Inch 5.5 Feet 3 Inch 5.5 Feet 3 Inch Feet 3 Inch 8.0 Feet 3 Inch 8.0 Feet 8 Inch Over 15 Up to Feet 2 Inch 3.5 Feet 2 IN (See Note 2) 3.5 Feet 3 Inch 3 X Feet 3 Inch 5.0 Feet 3 Inch 5.0 Feet 3 Inch Feet 3 Inch 6.0 Feet 3 Inch 6.0 Feet 3 Inch Over 20 See Note 1 Notes 1: Refer to Notes for Tables. Notes 2: Two-inch diameter cylinders at this width must have structural steel tube over-sleeves of manufacturer's specifications extending the full, collapsed length. *Consult product manufacturer and/or qualified engineer for Section Modules of available wales Version 1.2. Revised December C-9

37 Appendix D To Identifying the Location of Underground Utilities Prior to Excavating Call the 811 or Regional One-Call Center 48 hours in advance before digging is scheduled to begin. Wait 48 hours for the site to be marked (unless it is an emergency line repair), and observe the marks and dig with care. If at all possible have the utility owners on site while the excavation is taking place. Plan your work. For larger projects, call in only the work that can be accomplished within a ten-day period. Have the following information available prior to calling the One-Call Center: Name and telephone number of the excavator and name and telephone number of the company Date and time the work is scheduled to begin Specific location address or description of the work site Nearest intersecting roadway to the work site Distance and direction of the work site from the nearest intersection Advise the one-call operator if explosives will be used X and Y or Lat/Long Coordinates of dig site, if available Record the locate request ticket number provided by the one-call operator. It is your proof of the call and may be requested by an enforcement agency. If digging activity comes within 24 inches of a utility line or pipeline, exercise extreme caution. Hand digging is required to expose the buried line. Markings for underground utilities are considered valid as long as they are visible up to ten calendar days from the mark-by time. The mark-by time is provided by the one-call operator but will not holidays and weekends. For larger projects, call in only the work that can be accomplished within a ten-day period. If damage to an underground utility occurs, notify the utility operator or the pipeline company directly. If there is an emergency situation, (i.e., danger to life, health, or property requiring immediate attention), take steps to safeguard health and property. Wherever possible, use white paint, stakes, or flags to mark the proposed excavation area. Remember, not all utilities are members of 811 or the Regional One-Call Center. You should call non-member utility operators directly if there is evidence that other utilities are in the vicinity and they are not on the list of utilities identified by the Regional One-Call Center. Version 1.2. Revised December 2011 D-1

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation.

There is no water, surface tension cracks, nor other environmental conditions present that reduce the stability of the excavation. Part 1926 Subpart P Introduction The Occupational Safety and Health Administration (OSHA) issued its first Excavation and Trenching Standard in 1971 to protect workers from excavation hazards. Since then,

More information

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety

Excavation Procedure. MIDGA Reviewed: 07/29/14 Effective: 06/20/09 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0203 Page: 1 of 5 Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purposes of this procedure is to ensure safe excavation, reduce the potential of damaging underground

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

Trenching and Shoring Procedures

Trenching and Shoring Procedures Trenching and Shoring Procedures Scope & Application This policy sets forth the official practices required for excavations General Requirements Soil Types Testing Methods Aluminum hydraulic shoring Benching

More information

Excavation & Trenching Procedure

Excavation & Trenching Procedure Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees

More information

SECTION 25. Excavation and Trenching

SECTION 25. Excavation and Trenching SECTION 25 Excavation and Trenching 25.A General. The requirements of this Section are applicable to all Government and contractor work forces when their employees are performing excavation or trenching

More information

HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING

HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING HERSHEY ENTERTAINMENT AND RESORTS COMPANY TRENCHING AND SHORING TRAINING I. Purpose II. III. IV. Definitions Procedures Inspections A. Soil Types V. Testing Methods A. Manual Tests VI. VII. VIII. IX. Spoil

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

University of Tennessee Safety Guidelines

University of Tennessee Safety Guidelines University of Tennessee Safety Guidelines Policy Subject: Trenching and Shoring Guidelines Effective Date: 9/1/12 Area Affected: Any departments who are involved in excavation work and trenching. Reviewed/Revised:

More information

CONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group

CONFINED SPACE ENTRY (PROJECT STANDARDS AND SPECIFICATIONS) KLM Technology Group Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENTS Purpose 2 Scope

More information

Competent. Person Manual. Course Preview TRENCHSAFETY

Competent. Person Manual. Course Preview TRENCHSAFETY Course Preview Competent Person Manual A guide to industry standards, practices, and regulatory requirements for OSHA Construction Industry Regulations 29 CFR 1926, Subpart P - Excavations TRENCHSAFETY

More information

SAFETY AND HEALTH PROGRAM

SAFETY AND HEALTH PROGRAM PROGRAM NUMBER NO. PAGES 05-005 10 REVISION ISSUE DATE Revision 2 11/1/2005 SAFETY AND HEALTH PROGRAM Confined Space Entry 1.0 INTRODUCTION Confined Space Entry is a serious workplace hazard, capable of

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

TRENCHING AND SHORING EXCAVATIONS PROGRAM

TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM TRENCHING AND SHORING EXCAVATIONS PROGRAM The purpose of this program is to provide information to our company employees and to interested persons that Northern

More information

Best Practices for Excavation. Best Practices for. Excavation

Best Practices for Excavation. Best Practices for. Excavation Best Practices for Excavation Contents Introduction...3 Management commitment...3 Employee involvement... 3 Communication...4 Safety education and training...4 Injury reporting and treatment...6 Return

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables Engineering Department SEPTEMBER, 2007 GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables General Requirements This section applies to all public and private utilities,

More information

Safety. Vopak Fundamentals on Safety

Safety. Vopak Fundamentals on Safety Safety Vopak Fundamentals on Safety Introduction Every person working at a Vopak location should be able to go home at the end of the working day without having suffered or caused harm in any way. Eliminating

More information

Millersville University - Office Of Environmental Health & Safety Scope & Application

Millersville University - Office Of Environmental Health & Safety Scope & Application Confined Space Entry Millersville University - Office Of Environmental Health & Safety Scope & Application The Confined Space Entry (CSE) program applies to the safe working practices for entering and

More information

`Fall Protection Guidelines in Construction

`Fall Protection Guidelines in Construction `Fall Protection Guidelines in Construction A Publication Provided by: 1681 Campus Delivery Fort Collins, Colorado 80523 (970) 491-6151 email: ohss@lamar.colostate.edu web: http://www.bernardino.colostate.edu/public/

More information

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600

ALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600 OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done

More information

Ladder, Scaffolding, and Excavation Safety Plan

Ladder, Scaffolding, and Excavation Safety Plan Ladder, Scaffolding, and Excavation Safety Plan Environmental Health, Safety, and Risk Management Department Box 6113, SFA Station Nacogdoches, Texas 75962-6113 Revised: January 2011 LADDERS In reducing

More information

Independent Contractor Policy

Independent Contractor Policy Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor

More information

Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard

Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard Excavation, Trenching and Shoring Safety and OSHA s Excavation Standard AFSCME Training and Education Institute Manual This material was produced under grant number 46C4 DT05 from the Occupational Safety

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

Guidelines for Excavations

Guidelines for Excavations O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines

More information

CONFINED SPACE POLICY

CONFINED SPACE POLICY UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 804 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Confined Space Policy CONFINED SPACE POLICY PURPOSE: The purpose of this policy

More information

SITE SPECIFIC FALL PROTECTION PLAN

SITE SPECIFIC FALL PROTECTION PLAN 1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING

More information

Excavation Safe Working Practices

Excavation Safe Working Practices Excavation Safe Working Practices The Construction (Health, Safety and Welfare) Regulations 1996 under Excavations (Regulation 12) states that:- All practicable steps shall be taken where necessary to

More information

SCBA Frequently Asked Questions

SCBA Frequently Asked Questions SCBA Frequently Asked Questions Q. WHEN SHOULD I USE SCBA? A. An SCBA is the choice when dealing with any oxygen deficient atmosphere that is IDLH (Immediately Dangerous to Life or Health), or any environment

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Procedure for Working in or around Excavations

Procedure for Working in or around Excavations RMS WHS Procedure: PN 066P12 (for Policy No. PN066) Procedure for Working in or around 1 of 15 Contents 1 Purpose... 3 2 Scope... 3 3 General requirements... 4 4 Definitions... 4 5 Responsibilities...

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Fall Protection Basics for Construction Activities

Fall Protection Basics for Construction Activities Fall Protection Basics for Construction Activities Washington State has revised fall protection rules, effective April 1, 2013. This booklet provides an overview of the requirements. www.lni.wa.gov/safety

More information

Confined Space Plan Prepared by: Environmental Health and Safety Office October, 2014

Confined Space Plan Prepared by: Environmental Health and Safety Office October, 2014 Confined Space Plan Prepared by: October, 2014 Table of Contents Table of Contents... i Acronyms... ii 1.0 Introduction... 1-1 1.1 Purpose... 1-1 1.2 Scope... 1-1 2.0 Roles and Responsibilities... 2-2

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

RZ Guardrail System Installation Manual

RZ Guardrail System Installation Manual TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand

More information

EMPLOYEE FALL PROTECTION

EMPLOYEE FALL PROTECTION EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM

UNIVERSITY OF KENTUCKY CONFINED SPACE PROGRAM SCOPE AND APPLICATION: The University of Kentucky has developed a written policy for safe entry into confined spaces. The University recognizes that certain environmental conditions within confined spaces

More information

Confined Space Air Monitoring

Confined Space Air Monitoring November 2008 Vol. 26. No. 3 Confined Space Air Monitoring Scott Shinn, C.I.H. Scott Shinn is a Certified Industrial Hygienist with 3M OH&ESD Technical Service and Regulatory Affairs. Summary Over the

More information

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level. Duty to have fall protection Protection at or above 6' level. Walking/working surfaces inspected before work begins. Employees can only work on surfaces strong enough to support them. Page 1 Protection

More information

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards. CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines

More information

CHECKLIST Fall Protection

CHECKLIST Fall Protection Walking/working surfaces can support employees. Employees are protected from falling from elevated surfaces through the use of guardrail systems, safety net systems; personal fall arrest systems, controlled

More information

68 Metal Industry Guidelines for Safe Work

68 Metal Industry Guidelines for Safe Work 3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been

More information

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes.

OCFRD TENT STANDARD 6000. This Standard operates under the authority of Orange County, Florida Ordinance and State Statutes. 1. Authority Orange County Fire Rescue Department Tents & Membrane Structures Office of The Fire Marshall - 109 E. Church Street, Lower Level - Orlando, Florida 32801-3319 Phone: 407-836-0004 Fax: 407-836-8310

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria

More information

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards

Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards Prevention through Design: Eliminating Confined Spaces and Minimizing Hazards American Industrial Hygiene Association Developed by the AIHA Confined Spaces Committee Approved by the AIHA Board of Directors

More information

Fixed and Portable Ladders- A Guide to OSHA Rules

Fixed and Portable Ladders- A Guide to OSHA Rules Fixed and Portable Ladders- A Guide to OSHA Rules Introduction Working on and around stairways and ladders is hazardous. Stairways and ladders are major sources of injuries and fatalities among construction

More information

GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2

GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2 GoM Region Ground Disturbance Safe Work Practice (SWP) Page 1 of 6 GoM Region Ground Disturbance Safe Work Practice (SWP) Document Number: CD # UPS-US-SW-GOM-HSE-DOC-00083-2 Document Authority: GoM H&S

More information

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements

Fixed Access Ladders. Table of Contents. 1. Legislative Requirements Fixed Access Ladders Engineering Data Sheet 2-04 Revised: January 1997 Table of Contents 1. Legislative Requirements 2. General 3. Rungs 4. Side Rails 5. Safety Cages 6. Attachment & Anchoring 7. Platforms

More information

OSHA 3825-09 2015. Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide

OSHA 3825-09 2015. Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide OSHA 3825-09 2015 Protecting Construction Workers in Confined Spaces: Small Entity Compliance Guide Occupational Safety and Health Act of 1970 To assure safe and healthful working conditions for working

More information

Compressed Gas Cylinder Safety

Compressed Gas Cylinder Safety Compressed Gas Cylinder Safety I. Background. Due to the nature of gas cylinders, special storage and handling precautions are necessary. The hazards associated with compressed gases include oxygen displacement,

More information

v ations Exca OregonOSHA Safe practices for small business owners and contractors

v ations Exca OregonOSHA Safe practices for small business owners and contractors Exca v ations Safe practices for small business owners and contractors OregonOSHA How to dig your own grave No protective system Spoils too close Excavator bucket over worker No hard hat No means for entering

More information

Pressure Vessels (Air Compressors) and LPG Tanks

Pressure Vessels (Air Compressors) and LPG Tanks Pressure Vessels (Air Compressors) and LPG Tanks 1. Identification of Workplace Hazard Any container, tank or vessel that contains pressurized material is a potential hazard to employees due to the force

More information

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY

THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

EXCAVATOR SAFETY TRAINING

EXCAVATOR SAFETY TRAINING EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure

More information

Confined Spaces. Notes

Confined Spaces. Notes 29 CFR 1910.146 - Permit-required confined spaces Standard Number: 1910.146 Standard Title: Permit-required confined spaces SubPart Number: J SubPart Title: General Environmental Controls Confined Spaces

More information

FALL PROTECTION WORK PLAN

FALL PROTECTION WORK PLAN FALL PROTECTION WORK PLAN INSTRUCTIONS A written fall protection work plan must be implemented by each employer on a job site where a fall hazard of 10 feet or greater exists, in accordance with OSHA Standards.

More information

CONFINED SPACE PROGRAM

CONFINED SPACE PROGRAM California Institute of Technology CONFINED SPACE PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028 Email:

More information

Jobsite Safety Inspection Checklist

Jobsite Safety Inspection Checklist Jobsite Date Superintendent Inspector Jobsite Safety Inspection Checklist Pass Fail N/A General The company has a written safety program that is site specific where necessary. Emergency telephone numbers

More information

Contractor s Safe Working Agreement

Contractor s Safe Working Agreement Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND

More information

Section 14. Forklift Safety Contents 14.1 Operator Safety

Section 14. Forklift Safety Contents 14.1 Operator Safety Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5

More information

Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.

Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926. STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined

More information

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines

Pressure Testing (Hydrostatic / Pneumatic) Safety Guidelines The INGAA Foundation, Inc. 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines for the safety of all personnel and the general public during pressure (e.g., hydrostatic, pneumatic)

More information

Confined Space Entry Programs Use with the Confined Spaces book, Chapter 296-809 WAC

Confined Space Entry Programs Use with the Confined Spaces book, Chapter 296-809 WAC Confined Space Entry Programs Use with the Confined Spaces book, Chapter 296-809 WAC This helpful tool gives you examples of confined space entry programs, including a fill-in-the-blank form, for different

More information

CONSTRUCTION SAFETY POLICY

CONSTRUCTION SAFETY POLICY California Institute of Technology CONSTRUCTION SAFETY POLICY Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program

Safety and Health Resource Manual. Sample Permit-Required Confined Space Written Program Sample Permit-Required Confined Space Written Program Purpose The purpose of this document is to communicate Employer s compliance with MIOSHA s requirements for a permit-required confined space entry

More information

CONFINED SPACE ENTRY NON-MARINE FACILITES

CONFINED SPACE ENTRY NON-MARINE FACILITES CONFINED SPACE SAFETY CONFINED SPACE ENTRY NON-MARINE FACILITES EM-385 Chapter 34 CONFINED SPACE ENTRY NON- MARINE FACILITIES UFGS 013526 OSHA 29 CFR 1910.146 A space that: What is a Confined Space? Is

More information

ELEVATED WORK POLICY

ELEVATED WORK POLICY ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Slip, Trip & Fall Program Table of Contents

Slip, Trip & Fall Program Table of Contents Slip, Trip & Fall Program Table of Contents I. Introduction... 2 II. Scope... 2 III. Definitions... 2 IV. Responsibilities... 4 V. Practices... 5 VI. Slip-Fall Facility Checklist... 7 VII. References...

More information

OREGON FIRE CODE Interpretations and Technical Advisories

OREGON FIRE CODE Interpretations and Technical Advisories OREGON FIRE CODE Interpretations and Technical Advisories A collaborative service by local and state fire professionals, along with our stakeholders and customers, to provide consistent and concise application

More information

University of Tennessee Safety Guidelines

University of Tennessee Safety Guidelines University of Tennessee Safety Guidelines Guideline Subject: Compressed Gases and Cryogenics Safety Guidelines Approval Date: 10/1/15 (Rev. 1) Next Scheduled Review: 10/1/19 Date Effective: 1/01/09 Contact

More information

THE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.

THE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. THE COMPETENT PERSON & SOIL TESTING This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the

More information

CHAPTER 2 GENERAL SAFETY REQUIREMENTS

CHAPTER 2 GENERAL SAFETY REQUIREMENTS Bridge Inspection Handbook 2-1 2.1 INTRODUCTION CHAPTER 2 GENERAL SAFETY REQUIREMENTS Safety is everyone's business. As an employer, MassDOT is obligated to promote job safety and furnish safe tools, equipment,

More information

1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5

1.0 Purpose... 4. 2.0 Definitions...4. 3.0 Hot Work Operations. 5 HOT WORK PROGRAM Introduction The University of Kentucky recognizes a potential for fire from hot work operations. For that reason this program should be implemented in all departments at the University

More information

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L

OSHA Scaffold Standard for Construction. 29 CFR 1926 Subpart L OSHA Scaffold Standard for Construction 29 CFR 1926 Subpart L EH&S Jim Walker What is the revised OSHA scaffold standard for construction? Issued on August 30, 1996 and became effective on November 29,

More information

OSHA Training Guidelines (An Unofficial Summary)

OSHA Training Guidelines (An Unofficial Summary) OSHA Training Guidelines (An Unofficial Summary) Many standards promulgated by the Occupational Safety and Health Administration (OSHA) explicitly require the employer to train employees in the safety

More information

Department of Transportation Hazardous Material Regulations General Awareness, Safety & Security Training. For: University of Dayton Hazmat Employees

Department of Transportation Hazardous Material Regulations General Awareness, Safety & Security Training. For: University of Dayton Hazmat Employees Department of Transportation Hazardous Material Regulations General Awareness, Safety & Security Training For: University of Dayton Hazmat Employees February, 2014 Overview Hazardous materials are substances

More information

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed? work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary

More information

Compressed Gas Cylinder Storage and Handling Guide

Compressed Gas Cylinder Storage and Handling Guide Overview Compressed gas cylinders are used in many workplaces to store gases that vary from extremely flammable (acetylene) to extremely inert (helium). Many compressed gas cylinders are stored at extremely

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction

More information

Sample Checklist for Permit Required Confined Spaces Program

Sample Checklist for Permit Required Confined Spaces Program Sample Checklist for Permit Required Confined Spaces Program 29 CFR 1910.146 - Permit Required Confined Spaces for General Industry Item Description Yes No N/A Section C (General Requirements) 1. (1) -

More information

HOT WORK PERMIT PROCEDURES

HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY HOT WORK PERMIT PROCEDURES COLUMBIA UNIVERSITY MEDICAL CENTER February 2010 1 TABLE OF CONTENTS A. PURPOSE 3 B. SCOPE 3 C. POLICIES AND PROCEDURES 3-4

More information

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition:

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition: This guide provides compliance information to help the metal and nonmetal mining industry comply with the requirements of the Mine Safety and Health Administration s (MSHA s) ladder standards. This document

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

WORKING AT HEIGHT GUIDELINES. Version II

WORKING AT HEIGHT GUIDELINES. Version II WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

Sample Written Program. For. Confined Space OSHCON

Sample Written Program. For. Confined Space OSHCON Sample Written Program For Confined Space Provided as a public service by OSHCON Occupational Safety and Health Consultation Program Texas Department of Insurance, Division of Workers Compensation Publication

More information

HOT WORK PERMIT PROGRAM TRAINING. John Braun

HOT WORK PERMIT PROGRAM TRAINING. John Braun HOT WORK PERMIT PROGRAM TRAINING John Braun 1.0 INTRODUCTION 1.2 Purpose The Hot Work Permit Program has been developed for University employees that work on or around hot work activities. This program

More information