DUBLIN CITY COUNCIL WATER SERVICES DIVISION CODE OF PRACTICE FOR THE LAYING OF DISTRIBUTION WATERMAINS

Size: px
Start display at page:

Download "DUBLIN CITY COUNCIL WATER SERVICES DIVISION CODE OF PRACTICE FOR THE LAYING OF DISTRIBUTION WATERMAINS"

Transcription

1 DUBLIN CITY COUNCIL WATER SERVICES DIVISION CODE OF PRACTICE FOR THE LAYING OF DISTRIBUTION WATERMAINS 1. GENERAL June 2009 Contractors have a responsibility to comply with all national legislation and any Code of Practice called up by that legislation, the provisions of which take precedence over this Specification. Contractors and their employees are expected to be competent in the basic elements of designing and constructing water systems such as water main and service pipe laying; service connections; health and safety; understanding materials selection; regulatory requirements; principles of water supply hygiene; customer care and environmental issues. This specification refers to watermains up to and including 300mm in diameter. The Contractor shall submit an as constructed drawing to the Water Services Division, in hard copy and DXF CAD format, within four weeks of completion of the watermain. 2. PLANS The Contractor shall apply for a connection from the existing watermain before construction commences on site. The application shall involve the submission of drawings and other information for approval as specified on the Application Form. Application Forms are available from the Dublin City Council website > Your Drinking Water > Connect a property to the water supply. 3. INSPECTION A Water Services Division representative may inspect works from time to time to ensure that: Watermains have been laid in accordance with this Specification. Pressure, chlorination and bacteriological tests have been carried out and approved. Specific testing requirements may be specified for individual works. 4. MATERIALS No materials shall be used without the prior approval of the Water Services Division. It is the responsibility of the Contractor to ensure that all materials/fittings to be used on the site have been approved for use by the Water Services Division in advance of work commencing. A copy of the Water Services Division Standard Details is available on request. In the event that ground conditions in any part of the site prove to be anything other than inert material, the Contractor shall inform the Water Services Division accordingly and take whatever precautions are deemed necessary by the Water Services Division to deal with the situation. These precautions may include, but not be restricted to, the laying of watermains 1

2 which are specially designed for use in contaminated ground. Such mains shall also be laid in specially designed trenches as approved by the Water Services Division. 5. PIPES & SPECIAL CASTINGS Pipes shall be only MOPVC (up to and including 200mm), CPE/PVC alloys (up to and including 200mm), Ductile Iron, MDPE or HPPE. All plastic water pipes shall be blue in colour. MOPVC pipes shall conform to the UK Water Industry Specification No and manufacturers shall operate a quality system in compliance with BS 5750 Part 2 (EN29002). CPE/PVC alloy pressure pipe shall conform to BS PAS 27. All fittings should conform to this standard also. Ductile iron pipes shall conform to Class K9 of EN 545. Ductile iron fittings shall be Class K9. All ductile iron pipework shall be coated internally with a centrifugally applied cement mortar lining containing a sulphate resistant cement and shall be sealed with an approved bitumen or epoxy resin seal coat in accordance with BS 4722: External protection shall include a zinc coating to EN 545 under bitumen based coating to BS 3416: MDPE pipes should be of type PE-80 and have an SDR rating of 11. They shall conform to IS EN 12201: Part 2: HPPE pipes should be of type PE-100 and have an SDR rating of 17. They shall conform to IS EN 12201: Part 2: Service Pipes & Fittings Service pipes and fittings laid underground should be of blue polyethylene to I.S. EN MDPE and HPPE service pipes and fittings shall conform to: I.S. EN : Plastics piping systems for water supply-polyethylene (PE) part 2: pipes. I.S. EN : Plastics piping systems for water supply-polyethylene (PE) part 3: Fittings. UK WIS : Specification for PE 80 and PE 100 spigot fittings and drawn bends for nominal sizes up to and including Copper service pipes may be laid in the ground in certain circumstances. Copper pipe for use in ground conditions should be type R220 (annealed) or R250 (half hard) and comply with I.S. EN Copper pipe joints for use underground should conform to I.S. EN capillary soldering or I.S. EN : Type B; manipulative compression fittings. Copper alloy fittings for use underground shall be made from gunmetal to I.S. EN 12165, I.S. EN 12163, I.S. EN or I.S. EN material CZ 132 (resistant to dezincification) or be tested for dezincification resistance in accordance with I.S. EN ISO 6509:1995. The sizing of service pipes to any premises and the approval of pipes and fittings for this purpose must be approved in advance by Water Services Plumbing Inspectorate. 5.2 Boundary Box All service pipes shall include the installation of an approved boundary box with integral stopcock (note that the use of the traditional stopcock has been discontinued). The boundary box shall be a telescopic type self contained chamber system with Class C load bearing capacity (capable of supporting a 5 tonne wheel load). Contractors shall consult with the DCC Water Services Division in relation to approved types of boundary box. The only approved types of boundary box at the moment are the Talbot range and the Atplas range. 2

3 5.3 Sluice Valves Sluice valves shall be double flanged with ductile iron resilient seal gate valves and shall comply with the relevant requirements of BS : 2004 Type B and have the BS Kitemark. The number of turns to fully open/close the valve must be n = 2N + 1 where N = the equivalent diameter in inches. All flanges shall be drilled to P.N. 16. The spindle shall be fitted with a cast iron oval false cap (complete with grub screw) of standard Dublin City Council pattern. All sluice valves shall be ANTI-CLOCKWISE CLOSING. 5.4 Hydrants (80mm) Hydrants shall be manufactured in accordance with BS 750: 2006, Type 2 and shall incorporate a screw-down valve, underground, guide in head type, with bayonet lug outlets and false spindle cap of standard Dublin City Council pattern. A contractor may not use hydrants (which are provided for emergency supply) without the written permission of Dublin City Council The hydrant valve shall be ANTI-CLOCKWISE OPENING i.e. the opposite of a sluice valve. Note: Both sluice valves and hydrants shall be coated with an electrostatic epoxy powder spray, or bitumen trichloroethylene solution to U.K. National Water Council and Dublin City Council approval. 5.5 Hydrant and Meter Chambers Chamber floors shall be Grade C25/30 concrete with 215mm thick solid block walls. Alternatively, Polypit Modular Chambers or similar approved may be used. 5.6 Surface Covers Valves and hydrants when installed shall be covered with approved heavy-duty metal surface covers to I.S EN 124: These approved metal covers shall conform to the Dublin City Council Specification for valve and hydrant covers. Where a chamber is located in grass, the cover shall be surrounded by a concrete plinth 200mm all round and 100mm deep. Concrete to be Grade C15/ Hydrant and Valve Indicator Plates Hydrant indicator plates and baseboards shall comply with B.S while sluice valve indicator plates and baseboards shall comply with the Dublin City Council Specification. They shall be mounted at the boundary of the public thoroughfare nearest to the hydrant or valve. Marker posts shall be concrete, comply with IS EN206-1 and be set 450mm deep in a concrete base. 5.8 Storage, Handling and use of Materials All pipes and fittings shall be stored off the ground in a clean environment to prevent any contamination of materials prior to use. All pipes shall be capped at either end until they are used in the Works to prevent vermin entering them and contaminating these materials before their use. All fittings supplied in sealed bags shall remain bagged until immediately prior to installation. Materials and components shall be handled in such a manner as to avoid any damage or contamination and in accordance with all applicable recommendations of the manufacturers. Pipes and fittings, including any lining or coating, shall be examined for damage before laying. Plastic pipes shall be carefully examined for flaws; particular watch shall be kept for 3

4 signs of impact damage and scoring. No polyethylene pipe shall be installed with scores or cuts penetrating more than 10% of the wall section. If, after installation, scores or cuts penetrating more than 10% of the wall section are found, the affected lengths of pipe shall be removed. 6. DEPTH AND POSITION OF PIPES All pipes shall have a minimum depth of cover of 750mm and maximum depth of 900mm measured from the top of the pipe to the finished ground surface. There shall be a minimum clear horizontal distance of 300mm between the distribution watermain and other utilities, cabinets, poles, junction boxes or chambers. No other service shall be laid over the line of the watermain. There shall be a minimum vertical clearance of 100mm where other services cross over the watermain. Pipes/ducts, cabinets, poles, junction boxes or chambers shall not be constructed on top of a watermain. 7. TRENCH WIDTH The trench should be kept as narrow as possible, but must allow adequate room for pipe jointing and placing and compaction of backfill, a width of 300mm greater than the outside diameter of the pipe being laid will normally be found adequate for these purposes. The trench width should normally not exceed the diameter by more than 500mm. A guideline for trench width is shown below. Diameter of main( mm) <80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm Trench Width (mm) 500mm 500mm 600mm 600mm 750mm 750mm 750mm 900mm 900mm Initial lines in bituminous or concrete roads and footpaths shall be cut using a concrete saw or equivalent mechanical means. 8. THRUST BLOCKS Appropriate thrust blocks shall be designed and installed on the main. Except where selfanchoring joints are used, thrusts from bends and branches in mains shall be resisted by concrete thrust blocks cast in contact with undisturbed ground. Concrete support blocks shall be cast to hydrant tees and sluice valves installed in plastic pipelines in order to resist the torque forces imposed on the fittings during operation. Support blocks shall be cast in such a manner so as not to interfere with the operation or maintenance of the apparatus. In general, support blocks should not cover any pipe or fitting joints. Plastics pipes shall be wrapped with a layer of plastic sheeting having a composition in accordance with BS 6076 before being surrounded by concrete (grade C28/35 to IS EN 206-1). Thrust blocks shall be allowed to develop adequate strength before any internal pressure is applied to the pipeline. 4

5 9. WARNING MESH All pipework shall have a 400mm wide water warning mesh, - Plyage HR 40D blue polyethylene warning mesh or similar laid directly over the centreline of the pipeline and tied to valves, at a depth of 350mm below the finished ground surface. Supply pipes shall have a mesh 200mm wide laid at the same depth. 10. PIPE JOINTS Pipe joints shall be one of the following types: Push-in rubber ring joint. Bolted flanged joints. Flexible couplings, e.g. Viking Johnson couplings with Rilsan coating, or similar approved types. Fusion welded joints. Site fusion jointing shall be carried out strictly in accordance with UK WIS using equipment to UK WIS All joints shall be made strictly in accordance with the manufacturer s instructions. 11. CLEANING PIPES All pipes shall be examined internally for dirt, stones, or any foreign matter and shall be thoroughly cleaned before laying in final position. To prevent foreign matter or vermin entering the main as it is being laid, all open ends of laid pipes shall be plugged until the next pipe is ready for insertion. 12. BEDDING MATERIAL All pipes shall be laid on a 150mm bed of rounded single sized pebble of 10mm nominal diameter and haunched and covered to a depth of 150mm with similar material. Pipes shall not be supported by stone or rock at any point. Rock shall be excavated to a depth of 150mm below the actual depth of trench required and backfilled with DOE Clause 805 prior to laying the pebble bed. In ground that contains ashes or chemicals or anything other than inert material, the material to be used and method of laying shall be agreed in writing with the City Council Water Division prior to laying. 13. BACKFILLING MATERIAL IN OR ADJACENT TO ROADWAYS All trenches in or near roadways shall be backfilled with DOE Clause 804, which shall be compacted to City Council requirements in layers not exceeding 225mm compacted by hand vibrators. Mechanical compactors should not be used until the total depth of backfill over the pipe exceeds 450mm. 14. LOCATION OF OTHER UTILITIES Any available records and proprietary cable locators shall be used prior to excavations taking place. Due diligence shall be used when making excavations for watermains and services and care shall be taken to protect and support all existing services (water, gas, telecommunications, drainage and electricity mains) and other works so as not to interfere with the working arrangement of same. 5

6 The Dublin City Council Water Services Division should be contacted before any work which is due to be carried out in the vicinity of an arterial watermain takes place. 15. NETWORK LAYOUT All mains must terminate in a ring or loop of sufficient size to accommodate at least one hydrant (See Dublin City Council Standard Details if necessary). Sluice valves shall always be inserted on branch lines and also as necessary to ensure that no more than 40 properties need be isolated at a time. The minimum size of watermain shall normally be 100mm nominal internal diameter but pipes with a nominal internal diameter of 80mm may be allowed in certain circumstances and only after prior written permission from the Water Services Division had been obtained. Watermains shall be located a minimum of 1m from the boundary of a premises. Watermains shall not be installed under buildings or in areas with either specialist finishes or trees / shrubs / flowers. Surface water attenuation tanks or barriers shall not be installed over watermains. No domestic property shall be more than 46m from a hydrant. Hydrants serving nondomestic properties shall be subject to the approval of the Dublin City Council Fire Officer. The location of hydrants should be such that they can be accessed in an emergency. Hydrants shall only be located in paths or open space or other approved areas. Where a watermain is located in a road, the hydrant shall be legged in to the nearest suitable path or open space. Such legged in hydrants shall include a separate valve on the tee piece off the main where the main is 300mm or greater. The connection to a development shall include the installation of the following at the boundary between the public and private sections of pipe: 1. A boundary box if the pipe is 32mm or less, 2. Two valves with a blank tee in between if the pipe is greater than 32mm and less than 100mm. A suitable chamber(s) plus cover and frame shall be installed. 3. A hydrant with a separate valve downstream of it if the pipe is 100mm or greater. A hydrant chamber plus cover and frame shall be installed. 16. ACCESS Developments shall have unrestricted access at all times. Accesses shall be at least 4m in height and 3m wide to facilitate public service vehicles. 17. TESTS After the pipes have been laid and jointed, the main shall pass the following tests: 18.1 Pressure Test Mains shall be subjected to 5 bar for 24 hours and shall be increased to 9 bar for 1 hour in the presence of a representative of the City Council. Testing shall be carried out between suitably supported blank end pieces. Testing between live shut valves will not be accepted. Polyethylene pipes shall be tested in accordance with the manufacturer s recommendations Chlorination Test All mains shall be swabbed and disinfected before being put in to supply. The pipelines shall be disinfected with water having a minimum concentration of 20mg/l of free available chlorine. This can be achieved using a sodium hypochlorite solution. Many hypochlorite solutions are available on the market, such as Chloros, Eirochlor, Chemchor, Sodium Hypochlorite etc. and 6

7 these contain % of available chlorine by weight. These may be purchased in any good chemical supply company. The recommended dosage of sodium hypochlorite solution is as follows: Main Diameter Vol. of sodium hypochlorite per 100m of main 10% 14% 100mm 150ml 110ml 150mm 350ml 250ml Other dosage figures can be extrapolated from these figures. The chlorinated water shall be left in the main for a period of at least 24 hours. Chlorine residual tests shall be taken at the end of the main furthest from the point of injection. The sterilisation process shall be repeated if the chlorine residual is less than 10mg/l. The chlorinated water shall be discharged into a foul sewer and never into a surface water sewer or watercourse and shall be subject to the prior approval of the DCC Water Pollution Engineer 18.3 Bacteriological Test The main shall then be refilled and a sample of the water shall be taken for bacteriological analysis. Great care shall be taken when obtaining samples for testing and only sterile containers shall be used. This sampling shall be carried out in the presence of the Engineer and/or his/her representative. Samples shall be tested within 6 hours of collection. Water samples may be tested in the following centre or in any approved or accredited laboratory. Public Analyst Laboratory, Sir Patricks Dun s Hospital, Lower Grand Canal Street, Dublin 2. Tel: Note: The Water Services Division will not connect the new main to the existing network until a copy of a satisfactory bacteriological test report has been submitted to the DCC Water Services Division for approval Internal Plumbing All internal plumbing in every development must comply with the Dublin City Council Water Services Division Plumbing Regulations, the Bye-Laws for the Management of Water Services and the Conservation of Drinking Water Arrangements must be made to have the internal plumbing inspected and approved by a representative from the Water Services Division Plumbing Inspectorate. All developments over two storeys must submit details of the pump and break tank arrangement to the Plumbing Inspectorate for approval. It is strongly suggested that Contractors consult with the Water Division Plumbing Inspectorate at an early stage so as to ensure that only approved materials/fittings are used. A water connection approval will not be issued until the internal plumbing has been approved As Constructed Drawings Accurate as constructed drawings shall be submitted to the Water Services Division as soon as possible. The drawings shall be in hard copy and in DXF (Drawing Exchange Format) CAD Format. The DXF shall be geographically referenced to OSI coordinates and all reference files shall be included on the CD. The different utilities shall be on different layers. 7

8 Confirmation shall be provided that delivery media has been scanned and is free of all known computer viruses. 18. CONNECTION TO CITY COUNCIL MAINS Connections to mains, which are the property of the Dublin City Council, may be made by the City Council only. No other person shall interfere in any way with these mains. 19. FLUSHING When mains have been satisfactorily tested and connected to the City Council main, they shall be flushed out with potable water through a standpipe placed on the end hydrant before the main is brought into use. 20. HEALTH AND SAFETY A Safety statement prepared in accordance with the Health Safety and Welfare at Work Act 2005 and subsequent regulations must be kept on site at all times. 21. EU DIRECTIVE ON MATERIALS, PIPES AND FITTINGS Nothing stated in this Specification is to be construed as discriminating against products and materials manufactured in any of the Member States of the European Community. Where items to an Irish Standard Specification, a British Standard Specification, or any other Standard Specification of a Member State of the European Community are called for, this requirement shall be read as including items to a relevant international standard, or the relevant national standard of any Member State of the European Community, which provides an equivalent guarantee of safety and suitability. Where items certified by the National Standards Authority of Ireland as complying with an Irish Standard are called for, the provisions of Circular Letter BM2/97 shall apply, i.e. the requirement shall be read as either certified by the National Standards Authority of Ireland as complying with the Irish Standard, or shall be certified as complying with a relevant international standard, or with the relevant national standard of another Member State of the European Community, which provides an equivalent guarantee of safety and suitability

Specifications for the Laying of Water Mains and Drinking Water Supply

Specifications for the Laying of Water Mains and Drinking Water Supply Water Services and Development Department Water Section Specifications for the Laying of Water Mains and Drinking Water Supply Edition: January 2012 1 INDEX SECTION PAGE 1 General 3 2 Plans 3 3 Regulations/Bye-laws

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

British Standard Underground Hydrant Range

British Standard Underground Hydrant Range British Standard Underground Hydrant Range 2 THE NEW AVK BRITISH STANDARD HYDRANT RANGE AVK are the renowned market leading innovators, manufacturers and suppliers of BS 750 fire hydrants into the UK,

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Section C-1 Pipes and Fittings

Section C-1 Pipes and Fittings Section C-1 Pipes and Fittings C1.00 Work Included The work under this Division of the Specifications shall include all labor, materials, and equipment necessary to furnish and install all piping, pipelines,

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS

SECTION 15105 DUCTILE IRON PIPE AND FITTINGS SECTION 15105 DUCTILE IRON PIPE AND FITTINGS PART 1 GENERAL.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of Owner facilities. Closely coordinate construction work and connections

More information

Standard Specification for the Laying of Sewer Lines and Appurtenances in the Hurunui District

Standard Specification for the Laying of Sewer Lines and Appurtenances in the Hurunui District Standard Specification for the Laying of Sewer Lines and Appurtenances in the Hurunui District 1. SCOPE OF WORK This Specification applies to the laying of sewer pipes and all associated appurtenances

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

Shower and Floor Gullies Channel Drain and Tile Drain SECTION Shower and Floor Gullies Channel Drain and Tile Drain SECTION 2 Shower and Floor Gullies, Channel Drain and Tile Drain 29 General Information Shower and Floor Gullies McAlpine has responded to market conditions

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Appendix A: Acceptable pipe and fitting materials

Appendix A: Acceptable pipe and fitting materials Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS

SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS SECTION 15056 PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. A written request to use Ductile

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage: Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EARTHING AND BONDING AT SECONDARY SUBSTATIONS DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS 2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS Water system improvements proposed for inclusion into Western s service area shall be designed in accordance with all appropriate AWWA standards, include

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

ITS specification Jointing chambers and pull pits (ITS-02-02)

ITS specification Jointing chambers and pull pits (ITS-02-02) ITS specification Jointing chambers and pull pits (ITS-02-02) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Prepare a drainage system layout and specification notes for a low- rise building.

Prepare a drainage system layout and specification notes for a low- rise building. STUDENT MATERIALS Prepare a drainage system layout and specification notes for a low- Outcome 1 - rise building. In this outcome you will study the technology of below and above ground drainage systems.

More information

TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION

TG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION TG 105 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright

More information

SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09

SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 SEWERS FOR ADOPTION 6 PIPE MATERIALS TABLE AND CONDITIONS OF USE VERSION 4 March 09 Foul and Storm Lateral Drains (100 & 150 mm Diameters) Pumped Storage General Exceptions General Exceptions General Exceptions

More information

KILKENNY FIRE and RESCUE SERVICE

KILKENNY FIRE and RESCUE SERVICE Report: GUIDANCE SPECIFICATION FOR FIRE HYDRANTS & FIRE FIGHTING Date: April 2008, Version 17.0 Prepared: Killian John Hennessy Senior Assistant Chief Fire Officer Approved: Adopted: Ciaran Cormican Chief

More information

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21

The Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21 September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SECTION 33 12 19 FIRE HYDRANTS

SECTION 33 12 19 FIRE HYDRANTS SECTION 33 12 19 FIRE HYDRANTS PART 1: GENERAL 1.01 SCOPE A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 - Submittals.

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

4. Combi valves. 7. Fire hydrants. 8. Check valves. 9. Air valves

4. Combi valves. 7. Fire hydrants. 8. Check valves. 9. Air valves 1. General company and product information 2. Flanged gate valves for water 3. Other gate valves for water 4. Combi valves 5. Service connection valves for water 6. Valves and fittings for gas 7. Fire

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable water mains, services, pipe

More information

Water System Disinfection

Water System Disinfection Water System Disinfection Document Number Revision 1 Approved By Ric Morris All 6/2/04 Active Divisions/Departments FEMC Raytheon Polar Services Company HARD COPY NOT CONTROLLED-CONTROLLED COPY AVAILABLE

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1001 SOUTH LEECHBURG HILL LEECHBURG, PA 15656 Phone: 724-845-9355 Fax: 724-845-1186 SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS 1. General

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

SECTION 02732 BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers. SECTION 02732 BUILDING SEWERS PART 1 GENERAL 1.01 SECTION INCLUDES A. Lateral piping, fittings, and accessories. B. Connection of building sanitary drainage system to municipal sewers. 1.02 REGULATORY

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Sewage Compliance Form Instructions

Sewage Compliance Form Instructions CITY OF JOHNSTOWN DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT 401 MAIN STREET ROOM 200 JOHNSTOWN, PA 15901 814-533-2017 FAX 814-539-5816 RENEE K. DALY DIRECTOR Sewage Compliance Form Instructions 1)

More information

Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations

Procedures for Cutting and Handling of Asbestos Cement Pipe. City of Richmond Public Works Operations Procedures for Cutting and Handling of Asbestos Cement Pipe City of Richmond Public Works Operations Version 2.0 Updates to: November 1995 Procedures Prepared by: AMEC Earth & Environmental a division

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,

More information

T.10.928 - NEW WAREHOUSE AND OFFICE INDEX 1. WATER SUPPLY...4 1.1. GENERAL...4 1.1.1. General requirements...4 1.1.2. Macau Codes...4 1.2. GLOSSARY OF TERMS...4 1.2.1. Fitting...4 1.2.2. Flexible joint...4

More information

PART 5 : WASTEWATER DRAINAGE

PART 5 : WASTEWATER DRAINAGE Authorised by : City Waters Unit Manager Page 1 of 15 PART 5 : WASTEWATER DRAINAGE 5.1 INTRODUCTION This Manual sets out the basic design principles for drainage of wastewater. While some construction

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2 FACTORY AUTOMATION Manual Laying loops for Loop detector LC10-1 and LC10-2 With regard to the supply of products, the current issue of the following document is applicable: The General Terms of Delivery

More information

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL 155 E. Front Street (rear) Lititz, PA 17543 Phone (717) 625-1930 Fax (717) 625-1931 Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL CONSTRUCTION SPECIFICATIONS AND DETAILS

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Mechanical Services Standard Specification 5.0 - Compressed Air Systems. May 2010. For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Mechanical Services Standard Specification 5.0 - Compressed Air Systems. May 2010. For ROYAL HOLLOWAY UNIVERSITY OF LONDON Mechanical Services Standard Specification 5.0 - Compressed Air Systems May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd

More information

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water

MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water MS-3/2009 HDPE (High Density Polyethylene) Pipe and Fittings Specification for Buried Potable Water 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org HDPE

More information

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General

SECTION 15 AIR RELEASE VALVE ASSEMBLIES. 15-1 General SECTION 15 AIR RELEASE VALVE ASSEMBLIES 15-1.01 Scope 15-1 General This section describes the requirements for furnishing and installing Air Release Valve Assemblies of the size and type shown on the plans,

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION SECTION 15125 HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION PART 1 GENERAL.01 SECTION INCLUDES Furnishing and installing 4 inch through 16 inch high density

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated

More information

TABLE OF CONTENTS 2.0 RELATED DOCUMENTS... 3.0

TABLE OF CONTENTS 2.0 RELATED DOCUMENTS... 3.0 CHRISTCHURCH CITY COUNCIL CONSTRUCTION STANDARD SPECIFICATION PART 4 WATER SUPPLY CSS: PART 4 2013 TABLE OF CONTENTS 1.0 FOREWORD... 1 2.0 RELATED DOCUMENTS... 3.0 4.0 APPROVAL OF MATERIALS, OPERATORS/CONTRACTORS,

More information

MOBILE HOME LAW. Revised November 2001

MOBILE HOME LAW. Revised November 2001 MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Gas Meter Clearances and Service Installation Requirements

Gas Meter Clearances and Service Installation Requirements March 2016 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE's Customer Construction Services 1 888 321 7779 or visit PSE.com/CustomerConstruction

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

Couplings. Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes

Couplings. Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes Drain Couplings Standard Couplings Large Diameter Couplings Adaptor Couplings Flexible Saddles Bushes Flex-Seal couplings meet a range of UK and international legislation requirements and quality standards

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Uniclass L7315 + L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range

Uniclass L7315 + L2123 EPIC J3413. CI/SfB (52.5) Heavy duty channel drainage system ACO S Range Uniclass L7315 + L2123 EPIC J3413 CI/SfB (52.5) Heavy duty channel drainage system ACO S Range ACO S Range CHANNEL DRAINS Load Class BS EN 1433:2002 Optimum solution The ACO S Range is an interconnecting

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC) APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines

More information

Revised April (May) 2015

Revised April (May) 2015 Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as

More information

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.

More information