Group Procurement Policy. Policy Owner: Executive Director Finance and Resources

Size: px
Start display at page:

Download "Group Procurement Policy. Policy Owner: Executive Director Finance and Resources"

Transcription

1 Group Procurement Policy Policy Owner: Executive Director Finance and Resources 0

2 Control Date Policy level Regulatory / Strategic Policy Reference FR/001/2012 Link to Strategy Procurement Strategy Version Control Effective from January 2013 Effective to January 2016 (This Policy replaces Pre Tender Policy 2007, Tender Policy 2007, Post Tender Policy 2007) Approved by Dominic Lynch Executive Director Finance & Resources Consultation Consulted with Equality lead July 2012 Equality analysis Full Equality Analysis to be undertaken by December 2012 Next review date January

3 Contents 1. Policy Statement Scope, Roles and Responsibilities Procurement principles Procurement application Measurement of procurement success Value for money implications Equality and Diversity implications... 7 Group Financial Regulations: Annex B - Procurement Deviations Pre-tender Authorisation Tendering Thresholds... 2 Table 1: Tendering Thresholds Procurement Processes Procurement Milestone Authorities Submissions and Opening of Tenders Tender Evaluation Bonds, Guarantees and Insurance Contract Form Awarding Contracts Contract Management... 8 Appendix 1 Quick reference guide to minimum requirements

4 1. Policy Statement Curo undertakes to set a framework for the procurement of goods, works and services which reflects the Group s mission, vision and values and supports the strategic objectives. The procurement policy supports the procurement strategy, which links directly to Curo s strategic plan for 2012 to The policy provides for procurement to be undertaken by colleagues throughout the Curo Group in an efficient, common manner with probity, transparency and equality, and ensuring that the standing orders and financial regulations are complied with. Aims The primary aim is to award contracts that reflect our customers aspirations, whilst achieving a target reduction in cost without compromising quality, encouraging competition and delivering value for money. In addition our aims are: To ensure that the procurement process is clear, proportional and focussed on achieving the overall strategy and outcomes for the contract To encourage stakeholder involvement throughout the procurement process through communication and consultation To ensure that the procurement options are chosen on the basis of the degree to which they fulfil Curo s business objectives and customers requirements To ensure that goods, works and services are delivered to the required standard and in a cost effective manner To enable the impact of investing in existing and new stock and the contribution to local neighbourhoods to be maximised To ensure that procurement activities are completed in accordance with current legislation and best practice 2. Scope, Roles and Responsibilities Scope This policy applies to all Curo colleagues and residents who are involved with the procurement of goods, works or services. Roles and responsibilities Procurement Board The Procurement Board will meet every two months to review the progress of procurement activities against the procurement plan and to monitor the outcomes in terms of the procurement performance targets. The Board will be chaired by the Executive Director Finance and Resources and attended by: the Procurement Officer (Administrator), the Executive Director Customer Services, the Director of Neighbourhoods, the Director of Asset Management and Development, the Head of Curo Response and the Head of Procurement & 3

5 Facilities (HoPF) as well as the sponsors undertaking procurement activity at the time. Procurement sponsor Each work package will be sponsored by an Executive or Senior Leadership Team member, who will have primary responsibility for adhering to the policy. The sponsor may delegate to an officer the responsibility for leading the procurement and managing the contract. Procurement lead The officer responsible for day to day contract management will also be responsible for the procurement activity, will own the budget for the expenditure and manage the relationships and performance with the suppliers. Procurement function The procurement team will provide a procurement framework, training and support to enable the sponsor and lead to undertake effective procurement activities. 3. Procurement principles The following procurement principles have been established that support the above aims. Customer focus Specifications of works, goods and services will focus on service delivery and clearly define the goals or outcomes required for customers. Customers will be fully consulted in this process and continue to be involved during the procurement process as appropriate. For this purpose a Resident Procurement Panel will be recruited for which the procurement function will provide advice and training. When planning procurement, due consideration will be given to accommodating innovation and flexibility within the operational and procurement arrangements so that we are able to fulfil our customers aspirations. Forming the strategy for the procurement Curo is committed to ensuring that a thorough pre-tender process is followed to ensure that the optimum strategy is followed. Where appropriate the following apply: Each work package will be sponsored by an Executive or Senior Leadership Team member, who will determine the officer responsible for leading the procurement and managing the contract Where appropriate a cross functional user group will be formed at the outset of the procurement to ensure that individuals representing customers and all departments who will be utilising the works, goods or services under review, are included The budget and objectives will be clearly defined and supported by the business before the market is approached 4

6 The timetable and resources for the procurement will be adequate to ensure adequate consultation before, during and after the tender and a full implementation schedule for the new contract The risks associated with the procurement will be assessed and mitigated accordingly Early and effective market engagement will be included in the process to ensure that the specification and service level requirements are appropriate and clearly communicated Social and environmental considerations Consideration will be given to including social or environmental conditions in contracts, including: Provision for work placements, apprenticeships, employment and skills opportunities for local people including our own residents Environmental issues forming part of the decision making process Measurement of these benefits by key performance indicators Aggregation and packaging of contracts Curo will comply with EU Procurement rules regarding the aggregation of contracts, so that where separate contracts exist for the same works or service, their value is added together to determine the procurement process that will be followed. In addition Curo is committed to the packaging of contracts and procuring them together to encourage the best value to be delivered by our suppliers for our customers. This means that the cost to Curo of our procurement activity is minimised and the number of applications to which suppliers are invited to respond is reduced. Term of contracts, partnering and frameworks Wherever possible and appropriate, Curo will strive to establish longer term contracts and partnering arrangements, in order to give suppliers the opportunity to submit proposals that include efficiencies and added value gained from long term commitment, and that promote continuous improvement by using their initiatives over the life of the contract. The use of consortia or Purchasing Club frameworks and contracts will be considered as an efficient means to procure and to access better value through greater buying power. Advertising requirements Curo will follow the EU Procurement directives that require the public advertising of all tender opportunities above the reigning thresholds. Contract opportunities below this threshold will be advertised sufficiently wide to ensure open and fair competition. To ensure transparency, all opportunities falling into the parameters as stated in the Standing Orders will be advertised on Curo s supplier portal and Contract Finder, the Cabinet Office sponsored national web portal. Approved supplier lists Curo will operate approved supplier lists, whereby key suppliers are pre-qualified to work with Curo. Shortlists of approved suppliers who can fulfil each category of works, goods or services will be maintained and refreshed every two years. Approved suppliers will be guaranteed to be invited to tender for opportunities. 5

7 When the lists are refreshed this will be advertised so that we ensure new suppliers in the market place have the chance to gain access. Evaluation and award criteria Contracts will be awarded on the basis of which tender is the most economically advantageous, taking into account the optimum combination of cost and quality to meet our requirements. When considering our specifications and evaluating proposals, the total cost over the whole life of the works, goods and services will be used. Post tender requirements Curo will document all competitive tendering decisions in a value for money report citing the justifications and authorisations at each stage of the process. The report will include all procurement savings and benefits that have been agreed with the suppliers and will be approved prior to contract award in accordance with the standing orders. In the interests of a well functioning market, feedback to bidders concerning their performance will be offered. Management and monitoring of Contracts Contracts will be adequately managed and monitored using the Curo contract management toolkit with a view to achieving excellent customer service and consistent service delivery to specification and to budget. Curo will work closely with suppliers to ensure that all projected savings and benefits are realised. Regular performance review meetings will be held, with key stakeholders invited to attend. Professional standards and best practice All procurement activities will be operated in a professional manner and Curo will commit appropriate resources to achieve this, thereby ensuring high standards of transparency, probity and accountability. 3. Procurement application This policy applies to all procurement, but the value, nature and risk associated with the contract will determine the procedure undertaken to procure. The standing orders detail the four procurement processes, which vary in respect of the level of consultation, competition, and authorisation required. The procurement lead must comply with the standing orders, financial regulations, and all relevant UK and European Union legislative requirements. The standing orders stipulate the minimum requirements and in some cases a more thorough procedure may be appropriate for a particular contract. Deviations The Executive may waive the requirement of a standing order in exceptional circumstances on receipt of a Deviation Report that details a reasoned request. However, no deviation can be granted if it permits a breach of the EU Procurement Regulations or relevant UK Regulations. 6

8 4. Measurement of procurement success Performance will be monitored in respect of: Compliance with all relevant laws and policies and procedures Appropriate involvement of relevant stakeholders, especially customers, in the development of specifications, service levels and in the selection of suppliers Achievement of target procurement savings and non cashable benefits Contracts that ensure excellent customer care, equality of opportunity, recognise diversity, achieve value for money, improve social well being, increase employment training and opportunities and reduce environmental impact Clear and consistent communication with suppliers before, during and after tendering Timely planning, start and completion of procurement activities Planning, monitoring and review The Head of Procurement and Facilities will be responsible for the co-ordination and maintenance of the rolling 3 year procurement plan. The procurement work packages and targets for next year will be agreed as part of the business planning process and encapsulated within team plans and individual personal development reviews. The implementation of the policy and procedures will be supported, monitored and reported by the procurement function through the e-procurement system. Procurement outcomes and tender initiation and evaluation documents will be reviewed by the Procurement Board to ensure that all procurement activity reflects best practice and serves the changing needs of the business. 5. Value for money implications By applying this policy we will ensure that Curo makes the most of its limited resources by utilising cost effective and best practice procurement processes. The policy and associated standing orders are designed to ensure that we procure contracts that reflect our customers requirements and which secure and sustain optimal value in terms of cost, efficiency and risk. The policy supports the procurement strategy where colleagues are empowered to manage their procurement activities by the most efficient means within a policy framework that provides guidance, support and direction. 6. Equality and Diversity implications By applying this policy and ethical procurement practices we will; ensure that our contracts are compliant with our legal obligations to protected groups under the Equality Act

9 manage competitions fairly and be objective and transparent when making decisions seek evidence about contractors employment practices and their demonstrable ethical way of working embedded within their business strive towards equality and diversity outcomes through our purchasing power and procurement function 8

10 Group Financial Regulations: Annex B - Procurement 1

11 The Group Financial Regulations: Annex B - Procurement stipulates the minimum requirements for the procurement of goods, works and services and are part of the Financial Regulations. This Annex should be used in conjunction with the procurement policy, which provides the framework of principles to be followed 1. Deviations The Executive may waive the requirement of the Group s Financial Regulations: Annex B - Procurement in exceptional circumstances and upon receipt of a Deviation Report that details a reasoned request. Deviations from standing orders or financial regulations are required to be approved by the Head of Procurement and Facilities, the relevant Executive Director and the Executive Director Finance and Resources before they can be implemented. 2. Pre-tender Authorisation Before commencing a procurement activity, it is essential that the nominated Procurement Sponsor ensures that the following steps are completed: appointing the Project Lead responsible for managing the procurement and the ensuing contract defining the need in terms of the scope, value and key stakeholders forming a user group to ensure that customers and other stakeholders are represented (only applicable to Category Review and EU tendering processes) defining the budget and procurement objectives evaluating the market, including an assessment of supply options forming a strategy and/or business case for the procurement summarising the above in a Procurement Stage 1 Report (only applicable to Category Review and EU Tendering) In all cases the availability of an appropriate framework agreement should be considered prior to undertaking a new procurement activity. 3. Tendering Thresholds The Table 1 sets out the contract value and risk parameters used to determine the process that must be followed. 2

12 Table 1: Tendering Thresholds Procurement Process Risk/ impact Band Works Supplies And Services EU Tendering High 4,348,350* 173,934* Category Review High 100,000 to EU threshold 100,000 to EU threshold Localised Purchasing Med 10,000 to 99,999 50,000 to 99,999 Written Quotations from approved Supplier List Low 10,000 to 99,999 10,000 to 49,999 Quotation - minimum 2 written quotes Low 3,000 to 9,999 3,000 to 9,999 Quotation - minimum 2 verbal quotes Low Less than 3,000 Less than 3,000 * These are the current EU thresholds, which are reviewed every 2 years in January. The next review is in January Changes to the Tendering Thresholds to reflect updated EU Financial Thresholds do not require Board approval. Estimating the contract value and risk/impact The procurement process form should be used to arrive at the contract value and risk/impact assessment for each project and this should be signed off by the procurement sponsor. The electronic form automatically determines the correct process based on the user s assessment of contract value and risk/impact. Curo will make best use of its purchasing power and resources by aggregating purchases wherever possible. Contracts should not be split in order to avoid the applicability of the standing orders. The contract value is the aggregate value payable exclusive of VAT over the entire contract period, including possible extensions. Where the contract is being procured to fulfil an on-going requirement, then the term of the contract is deemed to be 4 years. 3

13 Procurements will be regarded as high risk/impact if: the goods, works or services are subject to the European Procurement Directives the goods, works or services are to be recharged via variable service charges and therefore subject to consultation under Section 20 of the Landlord and Tenant Act (this is only applicable to Works exceeding 250 per Leaseholder and Services exceeding 100 per Leaseholder in any one year for an agreement of more than 12 months) the procurement requires consultation with residents throughout the process including the selection and evaluation of potential providers the criticality of the service delivery to Curo is higher than normal due to high business dependency or strategic risk, e.g. IT infrastructure, strategic consultancy the risk involved in the contract delivery is higher than normal, e.g. due to the use of previously untested cutting edge technology, new business ventures or innovative practices in which Curo have no experience Under one or more of the above circumstances the category review process will be deemed most appropriate even if the value if below 100,000. Procurements will be regarded as medium risk/impact if: the goods, works or services are being procured to fulfil part or all of a service contracted to Curo by a third party, e.g. a Curo Choice service the contract requires the provider to possess essential qualifications or accreditations and we do not already have the required approved suppliers or an appropriate framework to fulfil the requirement Under one or more of these circumstances the localised purchasing process will be the minimum process to be used, thereby including requirements for advertising and a full quality evaluation. All other procurements will be regarded as low risk/impact including those which require no consultation or limited consultation with residents pre-tender (e.g. regarding scope and specification). In these cases the procedure to be followed will be determined by the contract value alone. 4. Procurement Processes The minimum requirements for each process are set out in the Appendix. Detailed guidance documents are provided for each procedure and additional support from the procurement function should be sought if required. Verbal and written quotations Where available, Approved Suppliers must be used for these requirements. 2 quotes must be obtained for contracts below 10,000 and these can be obtained orally if the contract value is less than 3,000, provided that it is subsequently confirmed in writing. quotations are acceptable. Written quotations minimum 3 quotes from approved suppliers 4

14 For contracts above 10,000, all eligible suppliers from the relevant approved supplier list should be invited to quote and, as a minimum, quotations from 3 suppliers should be obtained. If it is not possible to obtain 3 written quotations advertising should be considered or a deviation from these standing orders must be obtained. The 3 quotation procedure is a straight forward process for seeking price and delivery times for easily specified goods, works or services. The evaluation may be based on lowest priced bid or the highest scoring bid where quality criteria are used. In general the use of quality assessment is recommended in preference to price only awards. This process is applicable for contracts within the stated value parameters and which are deemed as low risk/impact. Localised purchasing This process is applicable for contracts within the stated value parameters and/or which are deemed as medium risk/impact. The localised purchasing procedure is the process of seeking a price for closely specified works, goods and/or service whilst ensuring value for money through a competitive bidding process, and ensuring quality and capability via reasonable assurance checks. The opportunity will be advertised on the Curo supplier portal and Contract Finder, and all tenders will be subject to the opening procedure. Category review The category review procedure is a rigorous process incorporating all aspects of competitive tendering and designed to ensure that the key principles of probity, transparency and equality are followed. This process is applicable for contracts within the stated value parameters and/or which are deemed as high risk/impact. EU Tendering The EU Directives set out the principles for the procurement of goods, works and services that are above specified financial threshold levels. The rules are mandatory and specify procedures for advertising, tendering and awarding depending on the type of contract. Where the estimated contract value exceeds the EU thresholds the contract must be tendered in accordance with the EU Regulations. The contract will usually be tendered under the open or restricted procedures, but in exceptional circumstances, the accelerated, negotiated or competitive dialogue procedures may be considered. Contracts eligible for this procedure will be guided by procurement to ensure compliance with EU regulations. Call off from a third party framework A framework agreement sets out the terms that will apply if the parties conclude a contract, but does not itself constitute a public contract obliging either party to do anything. The procurement process to be followed will depend on value and risk/impact assessment and the nature of the framework agreement: Initially the pretender process should be followed as determined by the contract value and risk/impact assessment above. This will establish whether a user group and resident consultation is required and whether a suitable framework is available. 5

15 Buying club or consortia framework agreements generally provide a choice of potential providers from which a call off or mini-competition is used to award a contract. The terms of the framework will determine the tender procedure and evaluation process to be followed. The acceptance of the winning tender and award of the contract will be subject to the authorities outlined below. Call off from a framework that has been previously tendered by Curo Where Curo have tendered and awarded a framework that specifies the terms of contracts to be called off without the need for competition, then the procurement procedures do not apply. These contracts may be called off in line with the delegated authorities of the contract manager. 5. Procurement Milestone Authorities Each work package shall be sponsored by an Executive or Senior Leadership Team member. The sponsor may delegate to another colleague the responsibility for leading the procurement. Process and/or value of Contract Less than 10,000 3 written quotations from approved suppliers Up to 100,000 Up to 500,000 Above 500,000 Opening of Tenders Not required Procurement Lead and Sponsor or appointed representative Authorisation of Tender Evaluation report Not required Authorisation of Evaluation Document by sponsor * Authorisation of Evaluation Document by Sponsor and Executive Director Authorisation of Evaluation Document by Chief Executive *Evaluation documents may also be reviewed by the Executive Team and/or the Procurement Review Board on request. Procurement by consultants Where Curo uses Consultants to act on its behalf in relation to any procurement, then the sponsor shall ensure that the Consultants carry out any procurement in accordance with these standing orders. No Consultant shall make any decision on whether to award a contract or whom a contract should be awarded to. 6. Submissions and Opening of Tenders 6

16 All tenders shall be received via the e-procurement system and opened in line with the milestone authorities. In exceptional circumstances (for example in the case of the system not being available) tenders may be received in hard copy format, such exceptions to be approved by procurement. Any tenders submitted in hard copy must be received in accordance with the hard copy tender opening procedure. Late tenders No tenders received after the specified date and time for receipt of tenders should be accepted unless there is sufficient evidence for the tender having been dispatched in sufficient time for it to have arrived on time. 7. Tender Evaluation All tenders should be awarded on the basis of the most economically advantageous offer in terms of the evaluation criteria notified to the tenderers. Evaluation documents In order for the recommended Provider to be appointed Tender Acceptance must be granted in accordance with the milestone authorities. This permission will only be granted upon approval of the required Evaluation Documents, which are as follows: Process Written quotations minimum 3 quotes Localised Purchasing Category Review EU Tendering Evaluation Document Value for Money Report Procurement Stage Report In all cases the evaluation document should state the affordability position, and detail any efficiency savings and/or non-cashable benefits gained from the preferred tender. 8. Bonds, Guarantees and Insurance The sponsor shall consider whether a performance bond and/or parent company guarantee (if applicable) shall be required from the preferred supplier. The procurement lead should ensure that the appropriate type and level of insurance is in place for each contract. If there is any doubt advice should be sought from the Head of Treasury and Revenues. 9. Contract Form As a minimum it is essential that Terms and Conditions are agreed. In the case of contracts with value below 10,000 the Terms and Conditions are contained on the reverse of the Purchase Order. 7

17 With all contracts above 10,000 one of the following contract forms should be used: Curo short form contracts JCT / NEC contracts Appointment letter (in conjunction with a framework agreement containing the terms of the contract) In some cases, the supplier s contract may be used e.g. IT contracts. Advice should be sought from procurement in the first instance. 10. Awarding Contracts With the exception of verbal quotations, current financial checks and other references should be completed to ensure the supplier is suitable for the contract. All contracts over 10,000 must be signed by an authorised signatory of both parties and a scanned copy filed in the Intend contract register. Each procurement lead shall enter the contract details onto the Intend contract register. Authorised Contract signatories Value of Contract Up to 10,000 10,001 to 50,000 50,001 to 100, ,001 to 500,000 Above 500,000 Curo Group Curo Enterprises Curo Places Curo Choices Not required covered by Delegated Authority for Expenditure 2 x Executive Sponsor & 1 x SLT Or 2 x Executive Chief Executive & 1 x Executive or 1 x Board Member Notes 1. In the absence of an available authorised signatory then refer to the Signing and Sealing Procedure for guidance. Contract extensions Contracts may be extended in accordance with their original contract provisions. By exception contracts may be extended by negotiation provided the relevant Executive Director is satisfied that the extension will achieve best value for money, excellent customer service, and does not contravene the rules set out in the EU Procurement Directives. 11. Contract Management 8

18 For each contract the procurement lead should use the Intend Contract management system to store and maintain a contracts file that shall include as a minimum the following: Milestone Approvals and any authorised deviations Evaluation documents Acceptance by successful supplier Signed contract (if contract value is over 10,000) Key performance indicator 9

19 Appendix 1 Quick reference guide to minimum requirements Requirement Verbal quotations (min 2) Written Quotations (min 2) Approved supplier Quotations Localised purchasing Category review Milestone authorities Procurement process form authorised by sponsor x x x x x Sign off strategy, timetable and metrics for the procurement via authorisation of Procurement Stage 1 Report x x Electronic tender opening ceremony x x x Acceptance of tender via authorisation of Procurement Stage 2 Report x x x x Contract signing x x x x Pre tender Consider if suitable framework prior to procuring x x x x x Form an evaluation group with responsibility for evaluating the tenders x x x Form a user group with responsibility for the procurement, including representatives of all the key stakeholders x x Tendering and documentation Use Intend e-procurement system x x x x x Provide a specification for goods, works or services x x x x x Provide a pricing schedule from which the tendered pricing can be calculated x x x x x Provide quality assessment and detailed evaluation criteria x x x Provide Tender return form and declaration, which includes the Bribery Act certification x x x x x Invite all eligible suppliers from the approved supplier list x Advertise on Curo supplier portal and Contract Finder x x x EU tenders 1

20 Requirement Publish OJEU notices, timetable, standstill period and award procedures in accordance with EU regulations Verbal quotations (min 2) Written Quotations (min 2) Approved supplier Quotations Localised purchasing Category review EU tenders x Evaluation and award Qualification required in terms of eligibility, financial standing and technical capacity x x x x Award based on lowest priced bid, or the highest scoring bid where evaluated against price and/or quality criteria x Award based the highest scoring bid evaluated against price and quality criteria x x x Credit check at evaluation stage x x Credit check prior to contract award x x x x Give debriefs to suppliers x x x x Contract management Use Intend Contract Management system x x x x x Purchase Order with Terms and Conditions and specifying the goods, works or services to be issued x x Contract signed by an authorised signatory of all parties x x x x Copy of contract to be scanned and filed in the electronic contracts register x x x x Key - colour indicates the process from which the requirement applies Quotations & above Localised purchasing & above Category review & above EU tenders only 2

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1

CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts

More information

How to do Business with the London. Borough of Sutton

How to do Business with the London. Borough of Sutton How to do Business with the London Borough of Sutton February 2013 1 About this guide This guide has been developed to assist businesses wishing to sell their goods and services to the Borough. Contents

More information

Contract Standing Orders and Procedure - A Guide For Council Employees

Contract Standing Orders and Procedure - A Guide For Council Employees Hampshire County Council Constitution Part 3:F Contract Standing Orders 1. Interpretation 2. Status of, and Compliance with, Contract Standing Orders 3. Approval to Commence Procurement 4. Contract Value

More information

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19 SUFFOLK COUNTY COUNCIL PROCUREMENT RULES 2015 Version 2 Jan 2016. Page 1 of 19 TABLE OF CONTENTS 1. Introduction and Definitions... 3 2. Scope... 4 3. General Principles... 5 4. Responsibilities... 7 5.

More information

Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March 2012 2.0 Robin Hunt

Version Author Revisions Made Date 1.6 David Sharkey Executive Board 27 March 2012 2.0 Robin Hunt Purchasing Policy Originator name: Section / Dept: Implementation date: Date of next review: Related policies: Policy history: Robin Hunt Procurement 1 December 2013 Finance Regulations, Purchase Card

More information

REGISTERS OF SCOTLAND SUPPLIER GUIDE TO PROCUREMENT

REGISTERS OF SCOTLAND SUPPLIER GUIDE TO PROCUREMENT REGISTERS OF SCOTLAND SUPPLIER GUIDE TO PROCUREMENT 1. PURPOSE The purpose of this Guide is to provide suppliers with information and guidance on Purchasing and the Procurement function at Registers of

More information

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES CONSTITUTION PART 4 CONTRACT PROCEDURE RULES (last revised January 2016) A Brief Guide to the Contract Procedure Rules These Contract Procedure Rules promote good purchasing practice, public accountability

More information

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements.

Impartiality must be maintained in selecting suppliers to fulfil Council s requirements. Title: Type: Council Adopted: 17 December 2014 File No: SF/491 TRIM Reference: 14/35410 Attachments: Guidelines (TRIM: 14/38862) 1. Purpose The purpose of this policy is to provide principles, processes

More information

LSB Procurement Framework

LSB Procurement Framework LSB Procurement Framework Introduction Procurement covers the typical purchase of services, supplies and works required to enable project delivery and to manage the infrastructure. The Services Board (LSB)

More information

Date: 7 February 2013

Date: 7 February 2013 Item No. Report title: Classification: Open Ward(s) or groups affected: From: Date: 7 February 2013 Meeting Name: Deputy Leader and Cabinet Member for Housing Management GW2: Leasehold and Ancillary Properties

More information

Audit and Performance Committee Report

Audit and Performance Committee Report Audit and Performance Committee Report Date: 3 February 2016 Classification: Title: Wards Affected: Financial Summary: Report of: Author: General Release Maintaining High Ethical Standards at the City

More information

INTER-PARLIAMENTARY UNION

INTER-PARLIAMENTARY UNION INTER-PARLIAMENTARY UNION 5, CHEMIN DU POMMIER CASE POSTALE 330 1218 LE GRAND-SACONNEX / GENÈVE (SUISSE) TELEPHONE (41.22) 919 41 50 - FAX (41.22) 919 41 60 - E-MAIL postbox@mail.ipu.org TELEGRAPHIC ADDRESS

More information

GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY

GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY GUIDE ON HOW TO DO BUSINESS WITH LIVERPOOL JOHN MOORES UNIVERSITY PRODUCED BY LIVERPOOL JOHN MOORES UNIVERSITY PROCUREMENT SERVICE First Issued - ISSUED 11 th February 2011 VERSION 5.0 updated 13/04/15

More information

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14

Procedures for Tenders and Contracts. October 2014. Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Procedures for Tenders and Contracts October 2014 Huon Valley Council Procedures for Tenders and Contracts October 2014 Page 1 of 14 Huon Valley Council Procedures for Tenders and Contracts October 2014

More information

LGRF. Procurement Probity Plan. July 2012

LGRF. Procurement Probity Plan. July 2012 LGRF July 2012 When to develop a : A probity plan is best used for any procurement of medium complexity and size and above. A probity plan can be implemented without use of a probity advisor/auditor. Description

More information

KIRKLEES COUNCIL CONTRACT PROCEDURE RULES

KIRKLEES COUNCIL CONTRACT PROCEDURE RULES KIRKLEES COUNCIL CONTRACT PROCEDURE RULES JUNE 2012 CONTRACT PROCEDURE RULES DEFINITIONS Assets CPRs Director Disposal EU Procurement Rules EU Threshold/ (*) FPRs Framework Agreement All property of whatever

More information

Wales Procurement Policy Statement

Wales Procurement Policy Statement Wales Procurement Policy Statement In December 2012 I launched the Wales Procurement Policy Statement (WPPS) setting out the principles by which I expect public sector procurement to be delivered in Wales.

More information

Procurement of Goods, Services and Works Policy

Procurement of Goods, Services and Works Policy Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March

More information

Procurement and contract management strategy

Procurement and contract management strategy Procurement and contract management strategy Approved 2015 by Contents 1 Introduction...3 1.1 Purpose of procurement and contract management strategy 1.2 What is procurement? 1.3 What is contract management?

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

How to Do Business. With. Cheshire Constabulary

How to Do Business. With. Cheshire Constabulary How to Do Business With Cheshire Constabulary A guide for suppliers January 2010 1 Contents INTRODUCTION 3 PROCUREMENT RULES AND REGULATIONS 3 European Regulations 3 National Rules 4 Local Rules 4 HOW

More information

BEST PRACTICE GUIDE 3: TENDER PROCESSES AND TENDER DOCUMENTS. RDTL MINISTRY OF FINANCE Procurement Service

BEST PRACTICE GUIDE 3: TENDER PROCESSES AND TENDER DOCUMENTS. RDTL MINISTRY OF FINANCE Procurement Service RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 3: TENDER PROCESSES AND TENDER DOCUMENTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement

More information

Procurement Strategy 2013-2017 Delivering Social Value for our Community

Procurement Strategy 2013-2017 Delivering Social Value for our Community Procurement Strategy 2013-2017 Delivering Social Value for our Community Making Bath & North East Somerset an even better place to live, work and visit 1 Picture courtesy of Bath & News Media Group Our

More information

The Newcastle Upon Tyne Hospitals NHS Foundation Trust. Medical Devices Procurement Procedure

The Newcastle Upon Tyne Hospitals NHS Foundation Trust. Medical Devices Procurement Procedure The Newcastle Upon Tyne Hospitals NHS Foundation Trust Medical Devices Procurement Procedure Version No : 4.1 Effective From 4 December 2012 Expiry Date: 30 November 2013 Date Ratified: 3 December 2012

More information

THE FUN PROCUREMENT QUIZ!!!!!

THE FUN PROCUREMENT QUIZ!!!!! THE FUN PROCUREMENT QUIZ!!!!! Which of the answers to the following questions is correct? There may be more than one correct answer. Part one 1. WHY DO WE HAVE CONTRACT STANDING ORDERS? o To irritate Council

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET. 21 st April 2015. Social Care Case Management System

EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET. 21 st April 2015. Social Care Case Management System EXEMPT INFORMATION REPORT NO: 83/2015 Appendix 1 (See Paragraph 11) CABINET 21 st April 2015 Social Care Case Management System Report of the Director for People STRATEGIC AIM: Creating a Safer Community

More information

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health Page 5 Agenda Item 5 Report to: The Adult Social Services and Health Committee Date: 20 th November 2012 Report of: The Strategic Director of Adult Social Services, Housing and Health Ward Location: All

More information

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should

More information

DRAFT PROCUREMENT AND TENDERING PROCEDURES. (Revised October 2006)

DRAFT PROCUREMENT AND TENDERING PROCEDURES. (Revised October 2006) DRAFT PROCUREMENT AND TENDERING PROCEDURES (Revised October 2006) Contents Page 1. Purpose of Document 2 2. Objectives of Procedures 2 3. Procurement of Supplies and Services 2 4. Invoice Processing 4

More information

CABINET. 18 December 2013

CABINET. 18 December 2013 CABINET 18 December 2013 Title: Procurement of Various Supplies and Service Contracts Report of the Cabinet Member for Finance Open Report Wards Affected: None Report Author: Martin Storrs, Head of Procurement

More information

Procurement & Supply Chain Team. Purpose of the Role

Procurement & Supply Chain Team. Purpose of the Role Role: Responsible To: Responsible For: Location: Procurement & Supply Chain Manager Assistant Director of Finance Procurement & Supply Chain Team Liverpool Purpose of the Role Oversee the group s procurement

More information

Doing business with the Council

Doing business with the Council Doing business with the Council Contents INTRODUCTION 1 POLICIES AND PROCEDURES 2 BUSINESS OPPORTUNITIES 3 TENDERING 4 WHAT THE COUNCIL LOOKS FOR 5 CONTRACTS 7 SUPPORTING LOCAL AREA 7 FREEDOM OF INFORMATION

More information

A guide on how to do business with Stockport NHS Foundation Trust. Procurement Buying In to Buying Locally

A guide on how to do business with Stockport NHS Foundation Trust. Procurement Buying In to Buying Locally A guide on how to do business with Stockport NHS Foundation Trust Procurement Buying In to Buying Locally Contents Page Introduction 3 Aim of the guide 4 Corporate Citizenship more than a hospital 4 The

More information

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement

Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Procurement Policy Note Supporting Apprenticeships and Skills Through Public Procurement Action Note 14/15 27 August 2015 Issue 1. Raising skills levels within the UK workforce is key to delivering sustainable

More information

JOB DESCRIPTION. 1. JOB TITLE: Assistant Procurement Officer. 4. DEPARTMENT: Chief Financial Officer/Bursar s Office

JOB DESCRIPTION. 1. JOB TITLE: Assistant Procurement Officer. 4. DEPARTMENT: Chief Financial Officer/Bursar s Office JOB DESCRIPTION 1. JOB TITLE: Assistant Procurement Officer 2. REFERENCE NUMBER: HR13297a 3. ROLE CODE: APOBO 4. DEPARTMENT: Chief Financial Officer/Bursar s Office 5. ORGANISATION CHART: Chief Financial

More information

MALAYSIA S GOVERNMENT PROCUREMENT REGIME

MALAYSIA S GOVERNMENT PROCUREMENT REGIME MALAYSIA S GOVERNMENT PROCUREMENT REGIME 1. INTRODUCTION The prime objective of the Malaysian Government procurement is to support Government programmes by obtaining value for money through acquisition

More information

Tender feedback in Catering & Cleaning

Tender feedback in Catering & Cleaning Briefing 12-44 September 2012 Tender feedback in Catering & Cleaning This briefing provides the information that those tendering for public sector contracts should request in the event that a particular

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

Tender Evaluation and Contract Award

Tender Evaluation and Contract Award Brief 9 January 2011 Public Procurement Tender Evaluation and Contract Award C O N T E N T S Key principles governing the process of evaluation of tenders How does an evaluation panel operate? How does

More information

Contents. 1. Doing Business with Gwynedd Council. 1. 2. Council Structure and Contacts 2

Contents. 1. Doing Business with Gwynedd Council. 1. 2. Council Structure and Contacts 2 Contents Page 1. Doing Business with Gwynedd Council. 1 2. Council Structure and Contacts 2 3. How to find out about the opportunities offered by Gwynedd Council 3 4. Types of Procurement 3 5. Tendering

More information

Guidance on Framework Agreements

Guidance on Framework Agreements 1. Introduction Guidance on Framework Agreements The purpose of this document is to provide guidance to public purchasers on the operation of framework agreements as provided for under current public procurement

More information

INCOME MANAGEMENT POLICY

INCOME MANAGEMENT POLICY INCOME MANAGEMENT POLICY 1. Principles 2. Aims 3. Methods * Arrears Prevention * Debt Recovery * Rent Accounting 4. Statutory and Regulatory Requirements 5. Performance Monitoring 6. Review 7. Date of

More information

PROCEDURE FS 1 PROCUREMENT POLICY

PROCEDURE FS 1 PROCUREMENT POLICY PROCEDURE FS 1 PROCUREMENT POLICY CONTENTS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7 Section 8 Section 9 Section 10 Section 11 Section 12 Section 13 Appendix A Appendix B Appendix

More information

e-procurement A Guide For Suppliers

e-procurement A Guide For Suppliers e-procurement A Guide For Suppliers 1. Introduction Background The Government has given councils targets for the implementation of e-procurement and for benefits to be achieved from e-procurement. These

More information

Procurement, Contracting and Contract Management Policy

Procurement, Contracting and Contract Management Policy Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources

More information

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations

Officer Delegated Decision Report - Procurement. For All Procurement Awards, Waivers, Contract Extensions & Variations G atew a y T h r ee For All Procurement Awards, Waivers, Contract Extensions & Variations Fuel Cards Payment Solutions Contract Requisition Number R000760 Wards All Report authorised by: (Enter name and

More information

QUOTATION AND TENDER PROCESS

QUOTATION AND TENDER PROCESS QUOTATION AND TENDER PROCESS Introduction The quotation and tender processes are both used to obtain written offers from suppliers for the supply of goods and services. The quotation process is normally

More information

Contract Management Guideline

Contract Management Guideline www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract

More information

Circular 10/14: Initiatives to assist SMEs in Public Procurement

Circular 10/14: Initiatives to assist SMEs in Public Procurement Ref: DPE108/001/2014 16 April 2014 To Heads of Departments 1 Circular 10/14: Initiatives to assist SMEs in Public Procurement A Dhuine Uasail, 1. In the context of the reform of the Public Service and

More information

University of Edinburgh Procurement Strategy 2012 16 updated May 2013

University of Edinburgh Procurement Strategy 2012 16 updated May 2013 University of Edinburgh Procurement Strategy 2012 16 updated May 2013 At the University of Edinburgh, we aim to meet our needs for goods, services and works in a way that achieves value for money on a

More information

The Tender Process. 1. The Process. 2. Why Use Tendering?

The Tender Process. 1. The Process. 2. Why Use Tendering? The Tender Process CiCS Programme and Project Unit July 2014 This document briefly describes when and how a project should undertake the tendering process when making a significant purchase of either goods

More information

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS

RDTL Procurement Best Practice Guide 7: Managing Contracts. RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS RDTL MINISTRY OF FINANCE Procurement Service BEST PRACTICE GUIDE 7: MANAGING CONTRACTS 1 RDTL Procurement Guidelines The Procurement Legal Regime Decree Law sets out new procurement processes which must

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

THE SOUTH WEST WALES HIGHER EDUCATION PROCUREMENT PARTNERSHIP PURCHASING PROCEDURES

THE SOUTH WEST WALES HIGHER EDUCATION PROCUREMENT PARTNERSHIP PURCHASING PROCEDURES THE SOUTH WEST WALES HIGHER EDUCATION PROCUREMENT PARTNERSHIP PURCHASING PROCEDURES 1. INTRODUCTION 1.1. The University operates a Devolved Budgeting System under which the responsibility for day-to-day

More information

MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT

MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT CONTENTS Foreword ------------------------------------------------------------------------ 3 Executive Summary ---------------------------------------------------------

More information

Procurement Policy. Finance Policy

Procurement Policy. Finance Policy 1 Purpose Victoria University of Wellington (the University ) and its subsidiaries are large scale procurers of goods and services. To ensure continued accountability and robust governance, it is critical

More information

Tendering Policies and Procedures

Tendering Policies and Procedures Tendering Policies and Procedures Tendering Policies and Procedures Content Pg. Mission Statement..3 Introduction....4 Background to the EPS (formerly Shannon Consortium Procurement Network) 4 The Key

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com

More information

How to do business with Wiltshire Council

How to do business with Wiltshire Council How to do business with Wiltshire Council A guide for local small and medium size businesses including voluntary and community sector organisations June 2013 Page 1 Index 1. Introduction... 3 2. General

More information

Request for Quotation (RfQ028) Customer Relationship Management System (CRM)

Request for Quotation (RfQ028) Customer Relationship Management System (CRM) Request for Quotation (RfQ028) Customer Relationship Management System (CRM) Kings Road, Plymouth, PL1 5QG Issued: Request for Quotation P a g e 2 Confidentiality Statement This document, and any attachments

More information

WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR

WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR WATFORD BOROUGH COUNCIL PROCUREMENT RECOMMENDATION TO: CORPORATE MANAGEMENT BOARD SUBMITTED BY: TRICIA TAYLOR - CORPORATE DIRECTOR REQUIREMENT: INTEGRATED HR SYSTEMS WITH PAYROLL DATE: 11 November 2008

More information

Winning Business with West Lothian Council. Howden Park Centre 12:00-2:00pm 5 February 2014

Winning Business with West Lothian Council. Howden Park Centre 12:00-2:00pm 5 February 2014 Winning Business with West Lothian Council Howden Park Centre 12:00-2:00pm 5 February 2014 AGENDA Item Lead Officer 1. Introduction Douglas Niven 2. Presenting Tender Information Douglas Niven 3. EU and

More information

Mitchell Shire Council

Mitchell Shire Council ATTACHMENT Mitchell Shire Council Ordinary Council Meeting CONTRACT MANAGEMENT POLICY AND TENDERING POLICY Contract Management Policy 25 March 2013 Attachment 1 Pages 12 CORPORATE SERVICES DOCUMENT NUMBER

More information

TENDERING AND CONTRACT PROCEDURES. Documentation Control. Reference Corporate Governance Framework Chapter 6 Date approved

TENDERING AND CONTRACT PROCEDURES. Documentation Control. Reference Corporate Governance Framework Chapter 6 Date approved TENDERING AND CONTRACT PROCEDURES Documentation Control Reference Corporate Governance Framework Chapter 6 Date approved Approving Body Trust Board Implementation date 1 June 2010 Version 4 Supersedes

More information

This report outlines the business case for the purchase of an integrated HR & Payroll system.

This report outlines the business case for the purchase of an integrated HR & Payroll system. Agenda Item No. 10 HR & Payroll system HR&OD Manager This report outlines the business case for the purchase of an integrated HR & Payroll system. Cabinet member(s): Garry Wheatley Ward(s) affected: All

More information

Job Description. To lead and effectively manage the Empty Homes team which is responsible for:

Job Description. To lead and effectively manage the Empty Homes team which is responsible for: Job Description Post Title Post Number Service Area / Department SDU Accountable to (Line Manager) Responsible for (Direct Reports Post Title) Empty Homes Manager RT01008 Leasehold and Lettings Housing

More information

Contract Management Handbook. A Guide to contract management at the University

Contract Management Handbook. A Guide to contract management at the University Contract Management Handbook A Guide to contract management at the University July 2012 CONTENTS 1. INTRODUCTION... 4 2. PURPOSE... 4 2.1 Using this Handbook... 5 3. CONTRACT MANAGEMENT FRAMEWORK... 5

More information

Delivering Customer Focused Outcomes and Value for Money through Commissioning and Procurement

Delivering Customer Focused Outcomes and Value for Money through Commissioning and Procurement Delivering Customer Focused Outcomes and Value for Money through Commissioning and Procurement Procurement Strategy 2012-2015 V1.0 Please consider the environment if you need to print this document and

More information

Info sheet : Considering labour standards in the procurement process

Info sheet : Considering labour standards in the procurement process Info sheet : Considering labour standards in the procurement process In line with the EU procurement rules and the Government s value for money principle, contracting authorities can take steps to consider

More information

UNIVERSITY HOSPITAL POLICY

UNIVERSITY HOSPITAL POLICY UNIVERSITY HOSPITAL POLICY SUBJECT: PURCHASING SERVICES TITLE: PURCHASING PROCESS Responsible Executive: Executive Director, Supply Chain Management Responsible Office: Supply Chain Management CODING:

More information

NHS BLOOD AND TRANSPLANT 28 NOVEMBER 2013. Contract for the Collection and Disposal of Clinical Waste: Award Recommendation.

NHS BLOOD AND TRANSPLANT 28 NOVEMBER 2013. Contract for the Collection and Disposal of Clinical Waste: Award Recommendation. 13/123 NHS BLOOD AND TRANSPLANT 28 NOVEMBER 2013 Title Contract for the Collection and Disposal of Clinical Waste: Award Recommendation Executive Summary Collection and Disposal of Clinical Waste across

More information

NHS Confederation Procurement Procedure - "a toolkit"

NHS Confederation Procurement Procedure - a toolkit NHS Confederation Procurement Procedure - "a toolkit" 1 Contents Page 3 Section One: Introduction Page 5 Section Two: Good practice principles Page 6 Section three: Diagram of procurement process Page

More information

TENDERS AND QUOTATIONS POLICY & PROCEDURE

TENDERS AND QUOTATIONS POLICY & PROCEDURE Edition No: 2 ID Number: POLCF017 Dated: 30/11/2010 Review Date: 30/11/2011 Document ID: Policy & Procedure Document Type: Corporate Directorate: Finance Category: Finance Department(s): Finance Author:

More information

Procurement policy Working with our suppliers to support strategic growth

Procurement policy Working with our suppliers to support strategic growth Procurement policy Working with our suppliers to support strategic growth Mission Statement The Procurement Department is the focal point for commercial relationships with Eversheds supply chains, ensuring

More information

PROCUREMENT & LOGISTICS DEPARTMENT

PROCUREMENT & LOGISTICS DEPARTMENT PROCUREMENT & LOGISTICS DEPARTMENT Tender/OJEU Procedure Overview This procedure applies to all purchases over 50,000 not covered by existing contracts and should be followed in conjunction with the Tender/OJEU

More information

Outcome of Brokerage Services(encompassing payroll) Tender

Outcome of Brokerage Services(encompassing payroll) Tender Report to Cabinet Outcome of Brokerage Services(encompassing payroll) Tender Portfolio Holder: Cllr Jenny Harrison, Social Care & Safeguarding Officer Contact: Maggie Kufeldt, Executive Director - Health

More information

Board Governance Principles Amended September 29, 2012 Tyco International Ltd.

Board Governance Principles Amended September 29, 2012 Tyco International Ltd. BOD Approved 9/13/12 Board Governance Principles Amended September 29, 2012 Tyco International Ltd. 2012 Tyco International, Ltd. - Board Governance Principles 1 TABLE OF CONTENTS TYCO VISION AND VALUES...

More information

Yes. Assurance. Yes. Section 1 Summary and Recommendations

Yes. Assurance. Yes. Section 1 Summary and Recommendations REPORT FOR: CABINET Date of Meeting: 13 February 2014 Subject: Key Decision: Buildings Insurance for Residential Leaseholders Yes Responsible Officer: Simon George, Director of Finance and Assurance Portfolio

More information

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND A SUPPLIER S GUIDE Quality Education for a Healthier Scotland V4 Produced by: The NES Procurement Team commissioning@nes.scot.nhs.uk January 2012 INDEX 1.

More information

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT 1 Scope of Internal Audit 1.1 Terms of Reference 1.1.1 Do terms of reference: (a) establish the responsibilities and objectives

More information

The Victorian Public Sector values dictate the way we interact with each other, with our the market and guide the way that we make decisions.

The Victorian Public Sector values dictate the way we interact with each other, with our the market and guide the way that we make decisions. POSITION DESCRIPTION Position Title: Procurement Officer New Position Department: Finance Compliance & Procurement Date: 22/10/2015 Reports to (position): Procurement Manager Grade: 5 Positions that report

More information

Training Management Guidelines

Training Management Guidelines Training Management Guidelines February 2009 Training Management Guidelines - February 2009 These guidelines provide a strategic approach to training and skills development in the construction industry

More information

Page 97. Executive Head of Asset Planning, Management and Capital Delivery

Page 97. Executive Head of Asset Planning, Management and Capital Delivery Page 97 Agenda Item 7 Report to: Strategy and Resources Committee Date: 16 December 2013 Report of: Executive Head of Asset Planning, Management and Capital Delivery Ward Location: Not applicable Author

More information

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF) Management and Leadership Level 5 NVQ Diploma in Management and Leadership (QCF) 2014 Skills CFA Level 5 NVQ Diploma in Management and Leadership (QCF) Page 1 Level 5 NVQ Diploma in Management and Leadership

More information

Becoming Tender Ready

Becoming Tender Ready Becoming Tender Ready Difference Between Procurement & Tendering Procurement is the process of acquiring goods, works and services, covering both acquisition from third parties and from in-house providers.

More information

The EU Directives on Public Procurement

The EU Directives on Public Procurement Finance Division Procurement Services The EU Directives on Public Procurement 1. Introduction 1.1 The purpose of the EU Directives is to encourage open and transparent competition which is delivered through

More information

Subvented Social Welfare Non-Governmental Organisations Procurement Procedures

Subvented Social Welfare Non-Governmental Organisations Procurement Procedures Subvented Social Welfare Non-Governmental Organisations Procurement Procedures Corruption Prevention Department Independent Commission Against Corruption March 2001 CONTENTS Pages Introduction 1 The Basic

More information

Courtney Davis Head of Information Management. Public with separate exempt report

Courtney Davis Head of Information Management. Public with separate exempt report ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER [19 June 2015] Title Report of Wards Status Enclosures Decision to award Off Site Document Management Services Contract under ESPO framework Courtney Davis

More information

Outsourcing. Knowledge Summary

Outsourcing. Knowledge Summary Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best

More information

NEATH PORT TALBOT LOCAL HEALTH BOARD CORPORATE GOVERNANCE HANDBOOK

NEATH PORT TALBOT LOCAL HEALTH BOARD CORPORATE GOVERNANCE HANDBOOK NEATH PORT TALBOT LOCAL HEALTH BOARD CORPORATE GOVERNANCE HANDBOOK Purpose of this Handbook This handbook sets out, in broad terms, the Corporate Governance arrangements in place within Neath Port Talbot

More information

Procurement and Contract Management Strategy 2013-2017

Procurement and Contract Management Strategy 2013-2017 Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date

More information

Procurement Services Document Control Sheet

Procurement Services Document Control Sheet Procurement Services Document Control Sheet Document Reference: Standing Orders for Contracts 2010 Log of Changes Issue Date Originator Authorisation V0.1 September Rebecca Document came into place 2010

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: How to conduct a procurement procedure Status: PUBLIC Document no.: SOP/EMA/0121 Lead author Approver Effective date: 04.09.14 Name: Caroline Maignen Name: Stefano Marino

More information

Gravesham Borough Council. Leader of the Executive

Gravesham Borough Council. Leader of the Executive Classification: Key Decision: Part 1 Public Yes Gravesham Borough Council Report to: Leader of the Executive Date: 18 January 2013 Reporting officer: Subject: Kevin Burbidge, Director (Housing and Regeneration)

More information

Digital Inclusion Programme Started. BL2a

Digital Inclusion Programme Started. BL2a PROJECT BRIEF Project Name Digital Inclusion Programme Status: Started Release 18.05.2011 Reference Number: BL2a Purpose This document provides a firm foundation for a project and defines all major aspects

More information

Councillor David Chambers Date of Decision/Referral to O & S REPORT OF: STRATEGIC DIRECTOR (CORPORATE) SDC/08/37

Councillor David Chambers Date of Decision/Referral to O & S REPORT OF: STRATEGIC DIRECTOR (CORPORATE) SDC/08/37 REPORT TO INDIVIDUAL CABINET MEMBER FOR FINANCE, LEGAL AND ICT 20 MAY 2008 Key Decision YES Forward Plan Ref No Corporate Priority ALL Cabinet Portfolio Holder : Councillor David Chambers Date of Decision/Referral

More information

APUC Supply Chain Sustainability Policy

APUC Supply Chain Sustainability Policy APUC Supply Chain Sustainability Policy Vision APUC aims to be a leader, on behalf of client institutions, in driving forward the sustainable procurement agenda (please see Appendix 1 for the commonly

More information

Steel procurement in major projects: Guidance on the application of social issues. Purpose

Steel procurement in major projects: Guidance on the application of social issues. Purpose Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.

More information

Rent to Buy 2015 to 2017

Rent to Buy 2015 to 2017 Rent to Buy 2015 to 2017 BIDDING PROSPECTUS September 2014 Rent to Buy Contents Page Number Ministerial Foreword 2 Chapter 1 Overview of the fund 3 Chapter 2 The funding model 4 Chapter 3 Bidding requirements

More information