1 Public Works Department Pass Through Financing Program August 2013 What is Pass-Through Financing? Currently Texas has $4 Billion of transportation needs with no identified revenue stream to fund In 2003 the Texas Legislature authorized Texas Department of Transportation (TxDOT) to enter into agreements with public entities for the reimbursement of construction costs on state highway systems A program called Pass Through Financing was developed as a tool to help address the funding shortfall The local governmental entity issues debt to build the project and upon completion TxDOT pays back construction costs Purpose is to accelerate and build today, TxDOT projects scheduled for several years in the future. Repayment amount is set in an agreement with TxDOT and the repayment schedule is based on actual traffic counts (initially referred to as shadow tolls) 1

2 How does it work? The County becomes the developer on a segment of the State s highway system and is responsible for the project financing and soft costs Upon completion, TxDOT is responsible for reimbursement back to the County all construction costs The County must identify an additional funding source to cover the soft costs & financing (ad valorem tax, sales tax, etc.) In Bexar County we created the Advanced Transportation District (ATD) and the ATD sales tax was authorized by voters in the November 2004 election (City of San Antonio only) however this funding source is only available for projects inside the city limits Soft & financing costs can also be paid thru formation of a Public Improvement District (PID); Tax Increment Reinvestment Zone (TIRZ) or Road Improvement District (RID) Overview Currently 6 TxDOT Pass Through Projects totaling $158.4 Million Round 1: Blanco Road (Complete) $29.8 Million 2. Culebra Road (Complete) $26.5 Million Round 2: SH 211 (Design, Environmental, & ROW) $18.1 Million 2. FM 1957 (Design and Environmental) $37.5 Million Round 3: Loop 1604 East (Design Complete) $28 Million Round 4: FM 471 (Design & Environmental) $18.5 Million 2

3 Round 1: Blanco & Culebra Roads major groups of projects were identified by Bexar County as suitable to pursue under a pass through financing agreement with TxDOT. The magnitude of the original projects proposed totaled approximately $240 Million and consisted of both major interstate and local highway systems projects During negotiations liability concerns eliminated the major interstate projects. Of the 3 remaining local highway system projects, another project was also eliminated because the right of way and utility relocation was too complex and presented a significant risk to Bexar County. This left two projects: FM 3487 (Culebra Road) and FM 2696 (Blanco Road). Pass Thru Agreement with TxDOT for both projects was approved December ATD revenue for financing and soft costs was secured March Construction on both projects began May Round 1 Blanco Road Total Cost: $29.8 M (Complete) Traffic :14,400 ADT (in 2005) 23,900 ADT (projected by 2025) 38,070 ADT (actual post const.) Scope: Road was upgraded to a four lane divided section with bicycle lanes, curbs, sidewalks, and ditch drainage Significant existing residential communities Second of 5 Reimbursement Payments from TxDOT have been received. 3

4 Round 1 Blanco Road Full Reconstruction Urban, Controlled Access Facility Significant Utility Issues High Pressure Gas Main Underground Storm Drainage 6 Foot Bicycle Lanes 5 Foot Sidewalks Built Within Existing ROW Significant Coordination With TCEQ for Aquifer Protection, USACOE for Floodplain Compliance, and USFWS for Required Protection of Endangered Species Round 1 Culebra Road Total Cost: $26.5 M (Complete) Traffic: 25,000 ADT (in 2007) 83,500 ADT (projected in 2027) Scope: Culebra Road was expanded to 7 lanes including sidewalks, bike lanes and drainage improvements Significant commercial and residential development First of 5 Reimbursement Payments from TxDOT have been received. 4

5 Round 1 Culebra Road Roadway Widening (16 +/ each side) High Density Urban Setting Adds One Travel Lane Each Direction Adds 5 Foot Bicycle Lanes Adds 5 Foot Sidewalks Built Within Existing ROW Underground Storm Drainage Round 1 Lessons Learned Be in control of your own destiny! o o Hire your own design consultant 90% design plans on Culebra were provided by TxDOT, but after letting we discovered significant constructability issues. Had to re design project while under construction Manage the construction or the construction will manage you Develop a strong partnership with your DOT Obtain Buy in from all area Elected Officials Keep excellent records: Audits, audits, audits, Avoid projects requiring extensive right of way and separate utility relocations (anything you can t control that impacts your schedule) Step up and expand Public Outreach efforts 5

6 Round 2 SH 211 & Potranco Roads 2008 Western Bexar County is experiencing tremendous growth and severe urban congestion with average daily traffic counts exceeding the capacity of the existing infrastructure It is projected that 55% of all homes built in Bexar County over the next 10 years will be in this area with an estimated population of 250,000 4 private landowner groups approached the County requesting formation of a Public Improvement District (PID) to fund the infrastructure needs Landowners provided a $15 Million investment upfront for design, ROW, and environmental clearance on these projects Both Projects will enhance regional mobility and connectivity Both projects are being advanced by 15 to 25 years Round 2 SH 211 & Potranco Road Total Cost: $55.6 M SH 211 will consist of a 2 lane rural highway which completes the 7.6 mile gap from Culebra to Potranco. Will provide a major relief route to existing outer loop. Status: Completing Environmental Assessment; Est. Construction Start: 1Q 2015 FM 1957 (Potranco) will widen the 4.7 mile existing 2 lane roadway to 4 lanes Traffic is expected to increase from 34,000 ADT to 55,100 ADT in Status: Design 95% complete; Categorical Exclusion received July 2013; Est. Bid 1Q 2014 (still dealing with ROW) 6

7 Round 2 SH 211 & Potranco Status Bexar County approved the PID in May 2008 Delays in project development due to downturn in real estate market Landowners will complete Environmental Clearance, ROW Acquisition and Engineering Design at an approximate cost of $15 Million and donate those deliverables to the County. The County will issue bonds and construct the 2 projects. Estimated construction costs are $55.6 Million. TxDOT will reimburse the County $55.6 Million once the projects are complete. Westside PID will reimburse interest costs, reserve fund deposits, and Cost of Issuance associated with the County Bonds and any principal amounts that exceed the TxDOT reimbursement. Round 2 SH 211 & Potranco Road 7

8 Round 3 & 4: Loop 1604 East & FM 471 TxDOT issued a call for projects in May 2011 and March 2012 Loop 1604 East was selected because the corridor is an important component of the connection between IH 10 and IH 35 with 13% of the ADT coming from truck traffic. The new divided roadway will also address a major safety issue: five fatal accidents from head on collisions. FM 471 was selected because the project will increase roadway capacity to allow for projected growth, increase safety with the continuation of the existing section east of FM 1560 and added bicycle lanes and enhance regional mobility ATD revenue for the financing and soft costs was secured for both projects Round 3 Loop 1604 East Total Cost: $28 M Design Status: 100% Est. Bid 4Q 2013 Traffic: 25,100 ADT (in 2012) 39,200 ADT (projected in 2032) Scope: The proposed improvements will expand Loop 1604 from its existing two lane configuration to a four lane divided roadway. Signalized intersections are located at Lower Seguin Road, Autumn Run and Loop 1604 frontage 8

9 Round 4 FM 471 Total Cost: $18.5 M Design Status: 90%; Est. Bid 1Q 2014 Traffic: 19,700 ADT (in 2013) 33,000 ADT (projected in 2033) Scope: Reconstruction of FM 471 (approximately 2.4 miles) to include 2 lanes in each direction with continuous center left turn lane, curbs, bike lanes and necessary drainage facilities Overall Program Benefits This program along with the Advanced Transportation District Sales Tax, allows the County to finance and build today, TxDOT projects that were not funded or scheduled for construction for another 15 to 25 yrs. Eliminates significant congestion present today and allow us to plan for future growth Secures TxDOT dollars for local transportation projects which might not be available in the future Demonstrates Bexar County s continued commitment to solving local transportation issues. To date Bexar County is the largest recipient of Pass Through Financing projects in the State. These 6 projects which were undertaken by the County, represent a $159 Million investment in major mobility transportation projects which otherwise would have remained unfunded and unbuilt. 9

10 Questions? 10

Transportation Funding Overview SAMCo. Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006

Transportation Funding Overview SAMCo. Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006 Transportation Funding Overview SAMCo Victor Boyer, Executive Director San Antonio Mobility Coalition (SAMCo) January 10, 2006 San Antonio Mobility Coalition, Inc: Non profit, public/private partnership

More information

Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas

Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas Capturing the Value of Transportation to Finance Transportation: Case Studies from Texas Presented by: Rafael Aldrete, Texas A&M Transportation Institute NACTO Designing Cities Regional Conference Phoenix

More information

BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS. Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division

BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS. Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division BLENDING FUNDING IN SUPPORT OF TOLL PROJECTS Marcus Coronado, P. E. PPP Project Manager Strategic Projects Division Table of Contents 1 Legislative Appropriation Re quest: Budget & Method of Finance 3-5

More information

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing

RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing RESOLUTION NO. WHEREAS, the 2016-2017 City Budget Forecast estimates that housing (21.6 percent) and transportation (14.9 percent) are the two largest expense categories for the typical Austin family;

More information

Dallas-Fort Worth Area Major Transportation Projects

Dallas-Fort Worth Area Major Transportation Projects Dallas-Fort Worth Area Major Transportation Projects Presented by: Jeffrey C. Neal Program Manager Transportation North Central Texas Council of Governments (NCTCOG) August 14, 2014 Texas Society of Professional

More information

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094

DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 DOUGLAS COUNTY RESOLUTION NO. 87-38 CITY OF LAWRENCE RESOLUTION NO. 5094 A JOINT RESOLUTION OF THE GOVERNING BODIES OF DOUGLAS COUNTY AND THE CITY OF LAWRENCE CONCERNING THE SOUTH LAWRENCE TRAFFICWAY;

More information

SAN ANTONIO MOBILITY COALITION, INC.

SAN ANTONIO MOBILITY COALITION, INC. SAN ANTONIO MOBILITY COALITION, INC. Overview The San Antonio Mobility Coalition is a non-profit corporation organized in 2001 to advocate for highway, transit, and freight rail funding for the greater

More information

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_ 2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX

More information

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1 1. Report No. FHWA/TX-13/0-6737-1 4. Title and Subtitle EXECUTIVE REPORT: TOLL ROADS, TOLL RATES, AND DRIVER BEHAVIOR 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

City of Houston Economic Development 2010 in Review

City of Houston Economic Development 2010 in Review City of Houston Economic Development 2010 in Review TOTALS $654,000,000 in new capital investment 10,800 jobs TEXAS ENTERPRISE ZONE SPECIFIC PROJECTS The Texas Enterprise Zone Program is an economic development

More information

Public Improvement Districts (PIDs) Understand to Negotiate

Public Improvement Districts (PIDs) Understand to Negotiate Contacts Jim Sabonis Managing Director 325 North Saint Paul Street Suite 800 Dallas, Texas 75201 214.953.4195 jim.sabonis@firstsw.com Public Improvement Districts (PIDs) Understand to Negotiate Table of

More information

I-25 / Rio Bravo Interchange

I-25 / Rio Bravo Interchange I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND

More information

LBJ Express Project (LBJ Managed Lanes Project)

LBJ Express Project (LBJ Managed Lanes Project) (LBJ Managed Lanes Project) LBJ Through the Years LBJ Through the Years LBJ Through the Years History 1987 LBJ Corridor Study Begins 1987 2004 Extensive Planning - 200+ Public Meetings June 2004 LBJ Coalition

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

FY 2013-2016 SAN ANTONIO DISTRICT

FY 2013-2016 SAN ANTONIO DISTRICT FY 2013-2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM SAN ANTONIO DISTRICT HIGHWAY AUGUST 2012 FY 2013-2016 Transportation Improvement Program San Antonio Bexar County Metropolitan Area Opportunities

More information

Profile of the Government

Profile of the Government GAAP require that management provide a narrative introduction, overview, and analysis to accompany the basic financial statements in the form of the Management's Discussion and Analysis (MD&A). This letter

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Chapter 5 Financial Plan

Chapter 5 Financial Plan The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA_LU) requires that the MTP incorporate a financial plan for the planning period. The MTP is required to

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program

Capacity Deficiency Project Application Jackson MPO Surface Transportation Program Capacity Deficiency Project Application Jackson MPO Surface Transportation Program The following information must be completed for all Capacity Deficiency proposed Jackson MPO STP projects. MPO staff will

More information

RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) TPC Agenda Item 6A Mailout - 10/16/15 RESOLUTIONS FOR APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) OCTOBER AMENDMENTS Amendment

More information

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing

US 281 AT PREMONT PUBLIC HEARING. US 281 at Premont Public Hearing US 281 AT PREMONT PUBLIC HEARING Hearing Purpose The purpose of tonight s Public Hearing is for the public to: Learn about the status of the proposed project Review the purpose and need for the project

More information

Transportation Improvement Program FY 2006-2008

Transportation Improvement Program FY 2006-2008 Transportation Improvement Program FY 2006-2008 Hidalgo County Metropolitan Planning Organization Adopted By Policy Committee: March 24, 2005 Public Meeting Date: March 1, 2005 Public Meeting Date: April

More information

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan.

The financial plan was prepared in conjunction with the Technical Working Group. Refer to Table 3-1: Funding and Implementation Plan. 3 Financial Plan The purpose of the financial plan is to identify funding options that would be likely sources of money to advance recommendations made by this study. The Capitol Region Transportation

More information

KENTUCKY Technical Resources on the Internet. KENTUCKY TRANSPORTATION CABINET http://www.transportation.ky.gov/default2.html

KENTUCKY Technical Resources on the Internet. KENTUCKY TRANSPORTATION CABINET http://www.transportation.ky.gov/default2.html KENTUCKY Technical Resources on the Internet KENTUCKY TRANSPORTATION CABINET http://www.transportation.ky.gov/default2.html TRAFFIC SAFETY Safety Laws Traffic Records -Highway Fatalities -New Initiatives

More information

TxDOT: Open For Business

TxDOT: Open For Business T E X A S D E P A R T M E N T O F T R A N S P O R T A T I O N TxDOT: Open For Business PASS-THROUGH FINANCING Pass-Through Toll Finance The New T exas R oadmaps Texas has some big transportation challenges,

More information

Truck Lane Restriction Expansion

Truck Lane Restriction Expansion Truck Lane Restriction Expansion Dallas City Council Transportation and Environment Committee August 25, 2009 North Central Texas Council of Governments Transportation Department 1 Truck Lane Restrictions

More information

STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287

STATE HIGHWAY 360. PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287 STATE HIGHWAY 360 PUBLIC HEARING Thursday, October 17, 2013 FROM: E. SUBLETT ROAD/ W. CAMP WISDOM ROAD TO: US 287 TIMBERVIEW HIGH SCHOOL, ARLINGTON, TEXAS Project Vicinity Proposed Project Length: Approximately

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

Right-Of-Way Acquisition Information

Right-Of-Way Acquisition Information Right-Of-Way Acquisition Information Introduction Larimer County covers 2,600 square miles, and has over 1,000 lineal miles of public roads. These roads are located within public right-of-way (an area

More information

GENERA L OBLIGATION DEBT SERVICE SUMMARY

GENERA L OBLIGATION DEBT SERVICE SUMMARY GENERA L OBLIGATION DEBT SERVICE SUMMARY General Obligation debt is secured by and payable from the receipts of annual ad valorem taxes, within legal limits, on taxable property within the City. The City

More information

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014)

Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Southwest Light Rail Transit Minneapolis-St. Paul, Minnesota New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 15.7 Miles, 17 Stations

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

NWC Culebra & FM 1560 @ ALAMO RANCH PARKWAY HIGH-GROWTH FAR NW SAN ANTONIO, TX

NWC Culebra & FM 1560 @ ALAMO RANCH PARKWAY HIGH-GROWTH FAR NW SAN ANTONIO, TX Stillwater Ranch Scarborough Silver Oaks 1,700 lots Jefferson M.S. Ward SITE Carmel Canyon Apts 124 units Culebra Creek Soccer Park Meadows of Bridgewood 2,700 lots 1604 Greater Northwest ALAMO RANCH 3,500

More information

The Region s Most Expensive Commutes:

The Region s Most Expensive Commutes: The Region s Most Expensive Commutes: Congested Corridors in the Pittsburgh Area and Steps Needed to Relieve Traffic Congestion June 2013 Washington, DC Phone: (202) 466-6706 www.tripnet.org Founded in

More information

TRANSPORTATION Carson Howell, Analyst

TRANSPORTATION Carson Howell, Analyst State of Utah FY 2008 Budget Recommendations Carson Howell, Analyst AGENCY BUDGET OVERVIEW Mission: Build and maintain the State s transportation system, plan and implement new highway projects, improve

More information

GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121)

GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121) NORTH CAROLINA DEPARTMENT OF TRANSPORTATION GREENSBORO - HIGH POINT ROAD (SR 1486 / 4121) FROM PROPOSED US 311 BYPASS TO HILLTOP ROAD (SR 1424) TIP PROJECT U-2412 WBS Element 34802 Federal Project Number

More information

CHAN & PARTNERS ENGINEERING, LLC

CHAN & PARTNERS ENGINEERING, LLC July 2012 CHAN & PARTNERS ENGINEERING, LLC Consulting Civil Engineers Imagine Austin Comprehensive Plan Infrastructure, Operations, Maintenance & Service Cost Comparison Preferred Growth Scenario and Trend

More information

City of Houston Economic Development Programs. Presented by: Andy Icken Chief Development Officer

City of Houston Economic Development Programs. Presented by: Andy Icken Chief Development Officer City of Houston Economic Development Programs Presented by: Andy Icken Chief Development Officer Economic Development Policy of the Administration is to promote economic development through use of a variety

More information

Multi Modal Roadway Transportation Impact Fees and Asset Value

Multi Modal Roadway Transportation Impact Fees and Asset Value January 2010 SB 360 Article Series: Factors to be Considered in Transitioning from a Road Impact Fee to a Mobility Fee Contributing Authors: Steven A. Tindale, P.E., AICP Robert P. Wallace, P.E., AICP

More information

Virginia s Public- Private Partnership Approach. Barbara W. Reese, Summer/Fall 2006

Virginia s Public- Private Partnership Approach. Barbara W. Reese, Summer/Fall 2006 Virginia s Public- Private Partnership Approach Barbara W. Reese, Summer/Fall 2006 The Context Commonwealth responsible for maintaining the third largest highway system in country more than 70,000 miles

More information

Office of Capital Facilities

Office of Capital Facilities LOB #57: LAND ACQUISITION Office of Capital Facilities Purpose Land Acquisition s purpose is to acquire the land rights necessary to enable construction of all County capital improvement projects. This

More information

Overcoming the. Challenges of ORT Conversion in an Urban Environment. July 12, 2015

Overcoming the. Challenges of ORT Conversion in an Urban Environment. July 12, 2015 Overcoming the July 12, 2015 Challenges of ORT Conversion in an Urban Environment PRESENTING: Daniel P. Menendez, P.E. Assistant Director of Engineering 1 The MDX System Highly Dense Urban Environment

More information

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP

Lone Star Regional Rail Project - Update. Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP Lone Star Regional Rail Project - Update Joseph Black Rail Director, Lone Star Rail District Joseph Lessard Planning Director, Knudson LP August 20, 2015 Lone Star Regional Rail Project - Update Presentation

More information

H-GAC 2015 Call for Projects - Selected Projects

H-GAC 2015 Call for Projects - Selected Projects APPROVED PROJECTS AND REGIONAL PROGRAMS N/A H-GAC Regional Freeway Incident Management N/A $8,000 Current TIP Surveillance and active response on all limited-access freeways. Includes Towing (e.g. SafeClear),

More information

WSDOT s Approach to Seismic Retrofit of Highway Structures

WSDOT s Approach to Seismic Retrofit of Highway Structures WSDOT s Approach to Seismic Retrofit of Highway Structures Role of the Lifeline Route in Reducing Network Risk Lynn Peterson Secretary of Transportation Patrick Morin, PE Capital Program Development &

More information

TRANSPORTATION. Understanding State Road and Highway Funding in Texas. 2012 2013 Statewide Edition TEXAS DEPARTMENT OF TRANSPORTATION 2019 2013 2024 F

TRANSPORTATION. Understanding State Road and Highway Funding in Texas. 2012 2013 Statewide Edition TEXAS DEPARTMENT OF TRANSPORTATION 2019 2013 2024 F EXAS EPARMEN OF Statewide Edition FUNING Understanding State Road and Highway Funding in exas FUNING CHALLENGES AHEA F E ? Current state revenue projections show that less than half of that amount will

More information

FM 969 CORRIDOR. APPENDIX c

FM 969 CORRIDOR. APPENDIX c FM 969 CORRIDOR APPENDIX c c utility technical memorandum State of Texas Registered Firm No. F-3572 CAS CONSULTING & SERVICES, INC. Civil, Transportation, and Environmental Engineering Austin Dallas Houston

More information

Texas Case Studies in Access Management. Ed Hard, TTI

Texas Case Studies in Access Management. Ed Hard, TTI Texas Case Studies in Access Management Ed Hard, TTI 8 th National Conference on Access Management August 15, 2006 Presentation Overview TxDOT Arterial Widenings, College Station, TX Processes for Median

More information

Tier 1 Strategies. WV Route 14 Corridor Management Plan

Tier 1 Strategies. WV Route 14 Corridor Management Plan 1.1 1.2 1.3 1.4 Signal timing optimization system improvements. Improve geometry traffic control at high crash intersections. Construct intersection capacity improvement projects. Widen longer sections

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

FIRST ANNUAL REGIONAL CONFERENCE IN CORPUS CHRISTI

FIRST ANNUAL REGIONAL CONFERENCE IN CORPUS CHRISTI VOLUME 4 November 2010 2010 STITE Officers: P.E. Pape-Dawson Engineers,! ""#$! %&' Pate Engineers %' %!(!!)! *%' %! '! Committee Chairs: Membership: Mike Garza, Pate Engineers. Website: City of San Antonio

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1

More information

Planning and Zoning Commission Johnston, Iowa June 29, 2015

Planning and Zoning Commission Johnston, Iowa June 29, 2015 ITEM NO. 15-19 Planning and Zoning Commission Johnston, Iowa June 29, 2015 SUBJECT: Consider recommending approval of the Final Plat for Crosshaven Plat 6 subdividing 28.28 acres into 47 single family

More information

Access Management South Dakota Department of Transportation

Access Management South Dakota Department of Transportation Public Meeting/ Open House October 21, 2014 Minnehaha County Environmental Assessment and Section 4(f) De Minimis Analysis Northern Segment of Hwy 100 I-90 to South of Madison Street Minnehaha County The

More information

WASHINGTON STATE TRANSPORTATION BY THE NUMBERS:

WASHINGTON STATE TRANSPORTATION BY THE NUMBERS: WASHINGTON STATE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2014 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective

More information

How To Calculate Bond Prices In Texas

How To Calculate Bond Prices In Texas General Obligation Debt Issuance November 2007 Finance, Audit & Accountability October 8, 2007 Purpose The purpose of this briefing is to provide information regarding the sale of $304.5m in general obligation

More information

Straw Proposal #1 Fund the entire Railroad Quiet Zone implementation through a general obligation bond at an estimated cost of $6,485,000.

Straw Proposal #1 Fund the entire Railroad Quiet Zone implementation through a general obligation bond at an estimated cost of $6,485,000. Memorandum Date: March 2, 2016 To: Railroad Quiet Zone Citizen Advisory Panel From: Mark Schoening, P.E., City Engineer Subject: Railroad Quiet Zone Potential Funding Sources for Implementation An outline

More information

Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES

Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES Table of Contents 39.03.18 - RULES GOVERNING OVERLEGAL PERMITS FOR RELOCATION OF BUILDINGS OR HOUSES 000.LEGAL AUTHORITY.... 2 001.TITLE AND SCOPE... 2 002. -- 009. (RESERVED).... 2 010.DEFINITIONS....

More information

Connecticut s Bold Vision for a Transportation Future

Connecticut s Bold Vision for a Transportation Future Connecticut s Bold Vision for a Transportation Future Middlesex Chamber October 15, 2015 Commissioner Jim Redeker 1 2 The Challenge, Vision, & Plan The Challenge our infrastructure, our economy, our quality

More information

FORT HAYS STATE UNIVERSITY

FORT HAYS STATE UNIVERSITY FORT HAYS STATE UNIVERSITY Actual FY 2014 Agency Est. FY 2015 FY 2015 Agency Req. Agency Req. FY 2017 FY 2017 Operating Expenditures: State General Fund $ 32,656,997 $ 34,036,691 $ 33,988,112 $ 33,921,728

More information

SAN ANTONIO CATEGORY 7 RECAP FY 2011

SAN ANTONIO CATEGORY 7 RECAP FY 2011 CATEGORY 7 RECAP FY 2011 A + B = C D + E = F C + F = G G - H = I A B C D E F G H I FY Balance Carryover from FY 10 FY 11 (includes all adjustments) Total Available of Funds Funds Obligated On Projects

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

General Obligation Bond Projects FYE 2013-2018

General Obligation Bond Projects FYE 2013-2018 General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation

More information

Findings and Recommendations. June 2015

Findings and Recommendations. June 2015 Findings and Recommendations Preface Following GO Hillsborough s extensive citizen feedback, it is apparent that citizens believe Hillsborough County is facing a potential transportation crisis. In fact,

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama

The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama FEBRUARY 2016 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization that

More information

Public Finance. Creative Financings that Build Communities. Attorney Advertising

Public Finance. Creative Financings that Build Communities. Attorney Advertising Public Finance Creative Financings that Build Communities Attorney Advertising After serving as counsel in billions of dollars of financings, we understand how to achieve our clients financial objectives

More information

PUNCH LIST MANAGEMENT USING THE CLOUD. John Dames, PE CH2MHILL Blake Axen, PE TxDOT

PUNCH LIST MANAGEMENT USING THE CLOUD. John Dames, PE CH2MHILL Blake Axen, PE TxDOT PUNCH LIST MANAGEMENT USING THE CLOUD John Dames, PE CH2MHILL Blake Axen, PE TxDOT March 23, 2015 North Tarrant Express (NTE) Project - Intro Project Purpose: Improved mobility along one of the most congested

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)

Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total

More information

Gov. Rec. FY 2015. Agency Req. FY 2016

Gov. Rec. FY 2015. Agency Req. FY 2016 UNIVERSITY OF KANSAS Actual FY 2014 Agency Est. Agency Req. Agency Req. FY 2017 FY 2017 Operating Expenditures: State General Fund $ 135,402,775 $ 137,384,253 $ 137,168,039 $ 136,930,098 $ 135,932,220

More information

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission

A Presentation by the Project Managers: Rick Canizales Prince William County. Jana Lynott, AICP Northern Virginia Transportation Commission A Presentation by the Project Managers: Rick Canizales Prince William County & Jana Lynott, AICP Northern Virginia Transportation Commission for the: Public Open House and Hearing December 6, 2005 George

More information

Lake Erie Commission OVERVIEW

Lake Erie Commission OVERVIEW LEC - Overview No GRF funding. Lake Erie Commission Funding is increased 5.0% in FY02 and 3.2% in FY03. OVERVIEW The Lake Erie Commission (LEC) is responsible for coordinating state policies and programs

More information

Measuring the Street:

Measuring the Street: Measuring the Street: New Metrics for 21st Century Streets 1 Measuring the Street: New Metrics for 21st Century Streets New York City s streets are constantly called on to the meet new and varied needs

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application): Transportation Assessment and Management Study Guidelines for Consultants INTRODUCTION This document is intended to provide guidelines for transportation consultants who produce Transportation reports

More information

South Greeley Highway Corridor: Main Street of South Cheyenne

South Greeley Highway Corridor: Main Street of South Cheyenne South Greeley Highway Corridor: Main Street of South Cheyenne South Cheyenne Community Development Association Adopted by the Laramie County Board of Commissioners, June 18, 2013 The South Cheyenne Community

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

county Tax Planning - The White Flint Sector Plan Area of Montgomery, Maryland

county Tax Planning - The White Flint Sector Plan Area of Montgomery, Maryland Resolution No.: Introduced: Adopted: 16-1570 October 5,2010 November 30, 2010 COUNTY COUNCIL FOR MONTGOlVIERY COUNTY, MARYLAND By: Council President at the Request of the County Executive SUBJECT: White

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP

An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP An Overview of Managed Lanes in the U.S.A. Darren Henderson, AICP Today s s Discussion The Basics HOV Lanes Pricing Darren Henderson, AICP PB, Houston, TX Active Traffic Management The Latest Projects

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE

12MAP-21, a funding and authorization bill to govern U.S. federal surface MONITORING IMPLEMENTATION AND PERFORMANCE MONITORING IMPLEMENTATION AND PERFORMANCE 12MAP-21, a funding and authorization bill to govern U.S. federal surface transportation spending, creates a data-driven, performance-based multimodal program

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

NEW YORK S TOP TRANSPORTATION ISSUES:

NEW YORK S TOP TRANSPORTATION ISSUES: NEW YORK S TOP TRANSPORTATION ISSUES: Meeting the State s Need for Safe, Smooth and Efficient Mobility JANUARY 2016 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

PRIORITIZATION PROCESSES

PRIORITIZATION PROCESSES PROJECT SELECTION & PRIORITIZATION PROCESSES STIP Workshop Presented by: Bill Lawrence April 2011 Purpose and Review Overview of Project Selection Process Review Various Prioritization Processes Tk Take

More information

Background and Goals for the Project

Background and Goals for the Project City of Asheville, NC REQUEST FOR PROPOSALS Wilma Dykeman Riverway Environmental Analysis, Project Development, and Preliminary Design Submittal Address: Dan Baechtold, AICP City of Asheville Engineering

More information

Capital Projects Funds

Capital Projects Funds Capital Projects Funds Park Improvement Fund ----------------------------- To account for funding for multi-year Park Improvement projects, such as the purchase of land and development of neighborhood

More information

REAL ESTATE ACQUISITION

REAL ESTATE ACQUISITION REAL ESTATE ACQUISITION Summary of Real Estate Acquisition Guidelines Planning Phase 1. Define the right-of-way needed through preliminary design of the project; 2. Obtain surveys for right-of-way needed;

More information

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015)

Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Mid-Coast Corridor Transit Project San Diego, California New Starts Engineering (Rating Assigned November 2015) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total Capital

More information

Public Meeting Oral Comments

Public Meeting Oral Comments Public Meeting Oral Comments My name is Alan Atkinson. I'm here as a private landowner and developer in this area. There's three projects I'd like to mention briefly. The first one is Project 300549. It's

More information

CITY OF SAN ANTONIO TAX ABATEMENT GUIDELINES

CITY OF SAN ANTONIO TAX ABATEMENT GUIDELINES CITY OF SAN ANTONIO TAX ABATEMENT GUIDELINES Effective January 1, 2015 through December 31, 2016 (Approved by City Council December 11, 2014) CITY OF SAN ANTONIO Economic Development Department P.O. Box

More information

TH 23 Access Management Study Richmond to Paynesville

TH 23 Access Management Study Richmond to Paynesville TH 23 Access Management Study Richmond to Paynesville Prepared For: Minnesota Department of Transportation District 8 Prepared By: Short Elliott Hendrickson Inc. July 2015 Table of Contents I. Introduction...

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High

Multi-Modal Corridor Degree of Complexity: High Cost/Benefit: High Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different

More information

Connecticut s Bold Vision for a Transportation Future

Connecticut s Bold Vision for a Transportation Future Connecticut s Bold Vision for a Transportation Future 1 Governor s Proposal: Presents bold vision Based on: technical analyses & public outreach done as part of TransformCT o 18-month strategic planning

More information