1 Methodology for Selection and Prioritization of Infrastructure Projects I. Introduction Serbia has high needs for infrastructure development in order to adequately prepare for future EU accession and to meet national development goals. Given that both domestic and external financial resources for infrastructure are limited, it is important to focus available funding on strategically significant infrastructure projects i.e. on those projects which will make the largest contributions (impacts) towards the achievement of national policy objectives for accession and socio-economic development. It should be noted that the identification of strategically significant projects will be an important element in the successful adoption of the Sector Approach under IPA2 for the programming period Past and on-going donor assistance (including EU assistance) has supported infrastructure project preparation at both central and local government levels. Notable in this respect are the EU PPF 1 and SIDA 2 projects (support to central government institutions), the EU MISP 3 projects (support to municipalities) and the Western Balkans Investment Framework (support and leveraged IFI investments at the level of the Western Balkans Region). As a consequence a large number of procedures, documents and manuals have been produced to support infrastructure project development in Serbia. The purpose of this Concept Paper is to build on this existing base of documentation and to develop a consolidated standard methodology which can be used by the Serbian authorities for the selection of strategically significant projects. This methodology should generally be applicable to all funding sources (particularly IPA2) and should address the needs of both central and local governments. The methodology is a basis for a successful programming process during which the selection of projects for funding is performed and the financial arrangement for funding the individual projects is identified. A major problem identified by EUD /SEIO task managers and sector specialists is that often assessments of project maturity do not take into account the quality of project documentation. Inadequate and incomplete documentation is a significant factor in delaying the full preparation of infrastructure projects in Serbia, leading to delays in tendering, subsequent slow implementation and poor absorption of available funding. Given that the costs of preparing major infrastructure projects can be as much as 10% of the total project value, the selection of projects with inadequate documentation also results in inefficient and ineffective use of technical assistance budgets. Linked to the problem of poor documentation is the poor capacity of line ministries and public utility companies to monitor the preparation of infrastructure projects. A system whereby nominated lead ministries which will act as focal points for coordinating and managing project preparation is currently being established but it is still to be fine-tuned and is not standardised among the various responsible bodies /ministries. 1 PPF=Project Preparation Facility 2 SIDA=Swedish International Development Agency 3 MISP=Municipality Infrastructure Support Programme 1
2 II. Proposed Methodology Two main weaknesses have been identified in the existing selection procedures. Firstly, little attention is paid to the strategic significance of projects i.e. to their potential contribution towards achieving strategic objectives. Secondly, the assessment of project readiness (maturity) does not take into account the quality (reliability of data) and completeness of planning and technical documentation. In response to these weaknesses, it is proposed to incorporate additional assessments into the existing project selection process, namely the Strategic Relevance Assessment and the Gap Assessment of the projects before final selection. These assessments are shown in Figure 1 (steps 3 and 5). The prioritization criteria will be developed separately for the following sectors and sub-sectors: energy, transport, environment (waste management, water/wastewater), and business infrastructure (industrial zones, business parks, incubators). The proposed methodology is a top-down process where potential projects are initially derived either directly from national strategies or from other central /local government sources etc. Identified projects will have had a variable amount of preparatory work carried out on them and therefore are likely to exist in a variety of formats. In order to establish the minimum level of information needed for the prioritisation process, the projects identified in step 2 should be summarised in a standardised Project Identification Form (PIF), a template for such a PIF has been developed by the SEIO and includes few very simple eligibility criteria. The long list of projects is assessed for strategic relevance (step 3) and short list of projects will be done in order to check the scope of the project, analyse alternative options and using technical, institutional, financial, environmental criteria as shown in step 5. A final list of priority projects is produced and depending on their readiness, the projects are classified into four groups. This sequence of screening and assessment steps should act as a quality filter gradually reducing the long list of potential projects to a prioritised project pipeline, thereby ensuring that only the strategic projects are selected for full preparation. This in turn should decrease the problems encountered during implementation. 2
3 Figure 1: Proposed Methodology for Infrastructure Project Prioritisation (1) Identify relevant infrastructures projects pipelines consolidate and standardize sector-based processes for projects identification (by the line Ministries) (SLAP, various Strategy/Action plans,) (2) Identification of a broad list of potential strategic projects through Project Identification Form submitted to SEIO by line Ministries through ISDACON data-base - Project Identification Form (PIF) step (2) (3) Strategic Relevance Assessment (Filtering step) - Strategic Relevance Assessment criteria based on PIF - step (3) (4) Short list of relevant projects (5) Gap Assessment Analysis: Project Identification (objectives, investment type, options identification) Technical elements (Spatial Planning + technical documentation) Institutional readiness (Institutional framework and capacity) Financial/Economic elements (expenditure coverage affordability) Social/Environmental elements (EIA, social/environmental impacts) - Gap Assessment Questionnaire/ Gap Assessment Report Questionnaire + Project Documentation will provide data for step (5) (6) Final list of prioritized projects (to be included in ISDACON) Project preparation in accordance with the Serbian legal requirements and EU procedures 3
4 III. Project Identification (Step 1) Identify relevant infrastructures projects pipelines consolidate and standardize sector-based processes for projects identification (by the line Ministries) (SLAP, various Strategy/Action plans,) The first step in the prioritisation process is the identification of a pipeline of infrastructure projects which potentially might be important in the implementation of sector strategies or national /regional socio-economic development programmes (Figure 1, step 1). This step aims to consolidate and coordinate existing identification procedures currently used by line ministries, national enterprises, local authorities, regional agencies and SEIO. The two main sources of pipeline projects are expected to be: a) Structured project pipelines/mechanisms (SLAP 4 and respective line ministry databases), b) Sector Strategy Action Plans - Master Plans. The main elements of the project identification step are summarized in Table 1, below. Table 1: Summary of Project Identification Scope Key Actors Inputs Method Outputs Consolidate and coordinate existing processes for project identification in order to provide a basis for the subsequent formulation and selection of strategic infrastructure projects - Line Ministries - Projects proponents 5 (Line Ministries, National Enterprises, Public Utility Companies (PUCs), Municipalities, etc.) - National Strategies/ Sector Strategies and other Policy Documents - SLAP and other project databases Identification of potential projects from existing project databases and pipelines according to a sector strategic objectives following National Sector Strategies/Action Plans. Identified infrastructure projects pipeline formulated Identify potential infrastructure projects sources/pipelines 4 SLAP will be treated as one of several sources of potential infrastructure projects in the sectors of environment and business development, as SLAP does not cover the sectors of transport and energy 5 One should differ between the proponents in respect of this methodology from the project proponents in the programming process. Project proponents in respect of this methodology are all the state bodies involved in realisation of infrastructural projects. Project proponents in respect of programming process can only include line ministries 4
5 IV. Standardise Information for Potential Projects (Step 2) Identification of a broad list of potential strategic projects through Project Identification Form (PIF) submitted to SEIO by line Ministries through ISDACON data-base Given that projects will be identified from a wide variety of sources it is likely that long list projects will exist in a number of different formats and will be at different stages of preparation, For example, many (but not all) projects registered on the SLAP database are assessed on 6 separate criteria 6 which are individually scored and used to provide an overall assessment of project quality. By contrast, projects identified by line ministries may exist only as short project concept notes containing less information with little or no prior assessment. It is therefore proposed that project promoters should complete a standard Project Identification Form (PIF) which will provide sufficient information for the following step in the prioritisation process (assessment of strategic relevance) to be carried out. In order to ensure that this step is carried out consistently and efficiently, it is further proposed that the process of coordinating the preparation and analysis of PIFs is managed by one institution, namely SEIO through ISDACON database. This includes the establishment and operation of inter-ministerial Sector Working Groups and the management of a database, ISDACON, which can be readily adapted to host a national infrastructure project pipeline. A standard PIF template has been developed for the following sectors: environment, transport, energy and business development. Regardless of sector, each PIF template will address three sets of basic project information, these are as follows: a) General data and information, including information on sector institutional set up and policy ownership, b) Eligibility/Consistency with EU policies IPA priorities/country Strategy Paper Overall national strategic framework Individual sector strategies, c) Questions for Strategic Relevance Assessment based on sector Strategic Relevance criteria agreed with line Ministries, and on whose basis the projects will be assessed in the next step of the prioritisation process (Figure 1, step 3). Project data from PIFs will be uploaded to the ISDACON 7 database by the line Ministry. It is proposed that access to the data base for PIF submission will be constantly open, whilst assessment of PIFs will be done periodically (say every 12 months) by SEIO and that these assessments are systematically reviewed and presented to by the relevant Sector Working Groups. The main elements of this step are summarized in Table 2, below. Table 2: Main Elements for Establishing a Common Database of Project Information Scope Key Actors Inputs Method Outputs Ensure that all potential infrastructure projects have the minimum, standardised, information needed for: (i) identifying institutional ownership & set-up; (ii) eligibility screening; (iii) assessing strategic relevance. Provide easy and user- friendly access to a comprehensive database of infrastructure project proponents, institutional policy owners and basic project parameters. - SEIO/ISDACON for projects data base construction and management - Projects proponents and Institutional owners for PIF completion and submission to SEIO Infrastructure projects PIFs submitted by proponents/li ne Ministries - Acquisition by SEIO of basic project information through a PIF to be completed by project promoters and/or public institutions responsible for the project. - Insertion of completed PIFs in a national sector based data base of infrastructure projects hosted/managed by ISDACON National consolidated sector-based infrastructure projects database, easily accessible for both the submission and consultation of PIFs 6 SLAP assessment criteria are: (i) environmental; (ii) financial; (iii) socio-economic; (iv) technical; (v) institutional; (vi) maturity 7 It should be noted that it is not proposed to either combine or merge the SLAP and ISDACON databases. The specified PIF data fields will be completed for all SLAP-sourced projects regardless of whether they have been previously assessed using the SLAP scoring criteria (as described above). 5
6 6
7 V. Assessment of Strategic Relevance and Development (Step 3) Strategic Relevance Assessment (Step 4) Short list of relevant projects The information /data provided in PIFs will be used to assess the strategic relevance of potential projects defined as the extent to which an individual project will contribute towards achieving overall and sector policy objectives and / or meeting sector targets as given in the strategic framework. In the case of sectors where there is no adopted national strategy in place (e.g. the water sector) the analysis of PIF data will be used to assessing overall project impacts using the sector strategic relevance criteria outlined below. Specific Strategic Relevance Criteria (together with related assessment questions) for scoring the estimated strategic relevance /impact of proposed projects have been developed. Strategic relevance criteria have been developed separately for each of the sectors and sub-sectors covered by this methodology. Strategic relevance criteria will follow the main aspects of project relevance for each of the sectors/subsectors (defined main areas for strategic relevance): Transport 1. Demand/supply and origin/destination factors 2. Relation with other transport corridor/routes 3. Traffic safety and security of transport 4. Economy growth potential (export/import), economy systems and sectors affected by the project Energy 1. Sustainable Energy Development 2. Enhanced competition 3. Social impact 4. Impact in terms of economy and employment 5. Compliance with the international obligations Environment: water/wastewater 1. Construction and upgrading of Wastewater treatment facilities and Extension of Wastewater Collection Systems 2. Construction of water treatment facilities and water supply systems 3. Upgrading of the adequate flood protection levels Environment: Municipal waste 1. Integrated waste management 2. Reduction of negative impact of hazardous waste on environment and human health 3. Impact on local development 4. Impact on environment and human population Business infrastructure (will be developed for Industrial zones, Technological parks, Tourism infrastructure and Business incubators). 1. Export Market Demand and Private Sector Demand 2. BRI Outputs and Financial Sustainability 3. Availability of Skilled Labour and Employment Generation. NB: please have in mind that each of these criteria for all the sector/subsector will be assessed by the specific questions relevant for respective areas. The assessment of the strategic relevance of the project is performed by SEIO and line ministries in the sector working group format. 7
8 Projects will be assessed within SEIO and the results will be communicated via regular Sector Working Group meetings (which include SEIO and line Ministries) and shortlisted by sector/sub-sector accordingly to their strategic relevance. Institutional policy ownership and the institutional set up for project preparation (at the level of policy owner) will also be identified. In case the necessary structure for project preparation and monitoring does not exist, implementation of strategically important infrastructure projects will be postponed until the necessary mitigation measures can be undertaken to address the identified weaknesses (capacity building, training, TA etc). A necessary precondition for moving to the next step is that the declared institutional set up should demonstrate sufficient capacities, for project preparation and monitoring of implementation. The main elements for assessing strategic relevance and developing a short list of projects are given in Table 3 below. Final shortlists per sector/sub-sector for projects funding will be published by SEIO/ISDACON and shortlisted projects will be submitted to next step (Gap Assessment). Table 3: Main Elements for Assessing Strategic Significance and Short-Listing Projects Scope Key actors Inputs Method Outputs 1. Assess project Strategic Relevance according to sector Strategic Relevance Criteria agreed with line Ministries (and where possible, extracted from National Strategies) - SEIO - Sector Working Groups Strategic Relevance Criteria agreed with line Ministries for each of the Strategic relevance of each project will be assessed in relation to their compliance, consistency and coherence with the sector/sub-sector Strategic Relevance Criteria. 2. Promote only Strategically relevant projects with all the main preconditions for its implementation ISDACON data base of Strategic Infrastructure Project 1. Strategic Relevance Assessments for potential projects 2. Short-List of strategically relevant Infrastructure Projects according to established Strategic Relevance Criteria. 8
9 VI. Gap Assessment (Step 5) Gap Assessment Analysis (Step 6) Final list of prioritised projects Gap assessment is the process of assessing the quality and completeness of the project documentation of relevant projects with preconditions relevant for implementation (short list projects) and is carried out in the following sequence: Firstly, proponents of Shortlisted Projects are requested to provide further detailed information by means of specific Gap Assessment Questionnaires (per sector and sub-sector) and providing SEIO with any existing project documentation). Gap Assessment Questionnaires specific to each of the sectors /sub-sectors have been prepared. Secondly, the technical assessment process is coordinated by SEIO (TA supported and in close cooperation with experts from line Ministries, PUCs etc.) who will undertake detailed and complete Gap Analyses of all shortlisted projects by means of analysis of completed Gap assessment questionnaires and related technical documentation, including: - Project Identification (objectives, investment type, options identifications); - Technical maturity (Spatial Planning + technical documentation); - Institutional readiness (Institutional framework and capacity); - Financial/Economic maturity (expenditure coverage affordability); - Social/Environmental maturity (EIA, socio/environmental impacts). Thirdly, the Gap Assessment Analysis is presented in a final Gap Assessment Reports including outputs and recommendations for selected projects. On the basis of these Gap Assessment Reports, projects will be divided into 4 groups according to their degree of MATURITY and proposed as being: a) ready for initiating tendering procedure for works; b) ready for preparation of missing technical documentation; c) minor gap to be addressed before preparation of technical documentation; d) substantial gaps to be addressed before preparation. The main elements of the Gap Assessment step are shown below in Table 4. Table 4: Main Elements of Gap Assessment 9
10 Scope Key actors Inputs Method Outputs Undertake Gap Assessment Analysis of shortlisted projects through specific questionnaires (per sector/sub-sector) and related project documentation. Prepare Gap Assessment Reports of shortlisted projects, including outputs and recommendations for the preparation phase - Technical Assessment coordinated by SEIO (TA supported) in close cooperation with line Ministries - Projects Project s Gap Assessment Questionnaire (to be completed by the project proponents Projects technical documentation Project proponents for Rank shortlisted projects according to their degree of MATURITY and propose them for a) ready for initiating; b) ready for preparation of missing technical documentation; c) minor gap to be addressed before preparation of technical documentation; d) substantial gaps to be addressed before preparation - Project Gap Assessment Questionnaires provided to all Project proponents that passed step 3 (Figure 1). The Gap Assessment Questionnaires will be different for each sector (transport, energy, environment and business infrastructure) and sub-sectors (e.g. waterwastewater, solid waste, etc.). - Project proponent fills up the Gap Assessment Questionnaire and provides requested information + project documentation. - The questionnaires will lead to the technical assessment of the project readiness and will include detailed assessment of project s technical documentation. - The projects will be prioritized for each sector/sub-sector. In addition, detailed inputs and recommendation for their preparation/ will be provided through the Gap Assessment Report. Gap Assessment Reports, including recommendations for further steps related to each of specific projects Final list of prioritized projects preparation and implementation in four groups. 10
STRATEGIC PLANNING BACKGROUND AND PRACTICE
Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of
More informationHow To Improve The Environment In Serbia
ENVIRONMENTAL INFRASTRUCTURE SUPPORT PROGRAMME (EISP) SIDA MEMSP IMG Programme Proposal July 2011 July 2013 (estimated, depending on approval date) Contents 1. Summary... 2 2. Background... 3 3. Strategic
More information6 STEP 6 - PREPARING THE ACTION PLAN 2
CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN
More informationLao PDR Public-Private Partnership Policy
Lao PDR Public-Private Partnership Policy Supported by the Asian Development Bank GRANT-0309 LAO Governance and Capacity Development in Public Sector Management Program (Public Private Partnerships) Table
More information2015 EX-POST EVALUATION
2015 EX-POST EVALUATION Of the project entitled Enhancement of regional competitiveness through Corporate Social Responsibility measures FINAL REPORT Evaluation conducted by: PREPARED BY: Aleksandra Stanek-Kowalczyk
More informationTERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR.
TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR. 1. Background information 1.1. Sector-wide approach in Dutch bilateral aid The sector-wide approach has been developed as a
More informationInvitation for Expression of Interest
Invitation for Expression of Interest Consulting Services for the Transaction Advisory Services for involvement of operator being able to manage based on a lease contract in areas serviced by Yerevan Water
More informationThe Public Participation Process in Cyprus
The Public Participation Process in Cyprus Priority Actions Programme Regional Activity Centre Split, February 2007 Table of Contents 1. Introduction... 1 2. Benefits of Public Participation in Decision
More informationREPORT 2014/078 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2014/078 Audit of the Office for the Coordination of Humanitarian Affairs (OCHA) Managing Agent role for the Somalia Common Humanitarian Fund Overall results relating to
More informationCROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements
CROATIA - TURKEY Preparation Screening Bi-lateral meetings List of questions related to key acquis requirements Please describe the provisions in place, and envisaged. Please underline any problem or difficulty
More informationPeriodic risk assessment by internal audit
Periodic risk assessment by internal audit I Introduction The Good Practice Internal Audit Manual Template, developed by the Internal Audit CoP of Pempal, defines the importance and the impact that an
More informationV1.0 - Eurojuris ISO 9001:2008 Certified
Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation
More informationUGANDA. Climate Change Case Studies
UGANDA Climate Change Case Studies Introduction The Department of Meteorology, as National Focal Point for the UNFCCC has coordinated several climate change projects and programmes. Some, which we think
More informationDeveloping a Public-Private Partnership Framework: Policies and PPP Units
Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework
More informationQUALITY IN EVERYDAY WORK
QUALITY IN EVERYDAY WORK Quality Guide for the Teacher Education College Version 2.5 Updates: Organisational change 1.1.2009 JAMK s mission and vision 5.1.2010 Planning and development discussion practices
More informationDistrict Health Management
S E C T I O N 3 District Health Management About this section This section describes the responsibilities of district management teams and outlines the district health management cycle. Special emphasis
More informationQUALITY IN EVERYDAY WORK. Quality Guide for the Teacher Education College Version 2.7
QUALITY IN EVERYDAY WORK Quality Guide for the Teacher Education College Version 2.7 Updates: Organisational change 1.1.2009 JAMK s mission and vision 5.1.2010 Planning and development discussion practices
More information2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects
More informationProgramme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows
JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme
More informationForest Carbon Partnership Facility (FCPF)
Forest Carbon Partnership Facility (FCPF) Readiness Mechanism Review and Assessment of Readiness Preparation Proposals DRAFT September 4, 2009 This Program Document updates Program Document FMT 2009-1-Rev.2
More informationChapter Six: Respect for Human Rights in Merger, Acquisition and Disposal Relationships
83 Chapter Six: Respect for Human Rights in Merger, Acquisition and Disposal Relationships Overview Brief overview of merger, acquisition and disposal relationships An acquisition and disposal contract
More informationUPTIME MAGAZINE. june/july15 JUNE/JULY 2015. uptimemagazine.com
june/july15 UPTIME MAGAZINE JUNE/JULY 2015 uptimemagazine.com AM Developing Plans Creating Value From Physical Assets by Mark Ruby 46 june/july 15A sset management plans form the cornerstone of an effective
More informationMunicipal Asset Management Toolkit
Municipal Asset Management Toolkit A Guideline for Local Decision Makers Implemented by: Network of Associations of Local Authorities of South East Europe WHAT IS ASSET MANAGEMENT? An integrated approach
More informationPROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3
PROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3 1. PPG title To Harmonize the Legal, Regulatory and Institutional Framework for Sanitary and Phytosanitary (SPS) control Management System 2. Theme 1,
More informationVietnam's Experiences in Strengthening. Procurement and Public Financial Management Systems. in Harmonization, Alignment and Capacity Development
Vietnam's Experiences in Strengthening Procurement and Public Financial Management Systems in Harmonization, Alignment and Capacity Development Mr. Chairman, Ladies and gentlemen, Dr. Duong Duc Ung Director
More informationGuidelines for the National IP Strategy of the Republic of Macedonia (2013 2016) Version 2
Guidelines for the National IP Strategy of the Republic of Macedonia (2013 2016) Version 2 Contents 1. General information on IP strategy... 2 What Is An Intellectual Property Strategy?... 2 Why Is An
More informationBusiness Intelligence is a system that collects, integrates, analyses and presents business information to support better business decision making.
UNIVERSITY OF EXETER BUSINESS INTELLIGENCE Key Messages & Communications Plan 1 Key Messages Background: Staff from across the University extract information from a variety of data storage areas to support
More information1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3
TABLE OF CONTENTS 1 INTRODUCTION AND SUMMARY OF ACHIEVEMENTS... 2 2 PROJECT MANAGEMENT... 3 3 GENERAL PROGRESS IN THE PROJECT... 3 4 DETAILED OVERVIEW OF THE PROGRESS... 4 4.1 Progress on Component 1 -
More informationThe World Bank. 1 System choice
Selecting road management systems (Source: Robinson, R, 1995. Rethinking policy, strategy and information under severe budget constraints: management information and tools to prioritise works. In: World
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 1. Sector Performance, Problems, and
More informationGovernment Shared Services: A Strategic Vision - July 2011
Government Shared Services: A Strategic Vision - July 2011 INTRODUCTION When the Coalition Government came to office it was a stated priority to reduce the deficit and ensure critical front-line services
More informationI. BASIC PROVISIONS. Subject of regulation
LAW ON ENVIRONMENTAL IMPACT ASSESSMENT Published in the Official Gazette of the Republic of Serbia, No. 135/2004 ( Službeni glasnik Republike Srbije, br. 135/04) I. BASIC PROVISIONS Subject of regulation
More informationDraft Programme Document
Draft Programme Document CHANGE MANAGEMENT, PUBLIC SECTOR DEVELOPMENT AND PROGRAMME SUPPORT A Programme under the National Agriculture Development Framework APRIL 2009 1 Table of Contents I. Executive
More informationEnporion Case Study: Spend Analysis
Enporion Case Study: Spend Analysis Innovative Analysis of Inventory and Spend Data by Enporion Allows Two Merging Companies to Optimize MRO Strategy and Realize Merger Synergy Savings. The return in year
More informationReduce risk. Reduce cost. Raise performance.
Reduce risk. Reduce cost. Raise performance. Services for professional procurement. Be better informed, make better decisions. Achilles procurement toolkit Support for sourcing and supplier management
More informationProject Fiche No. 8 Implementation and follow-up of the Small Business Act (SBA)
1. Basic information Project Fiche No. 8 Implementation and follow-up of the Small Business Act (SBA) 1.1 CRIS Number: 2010/XXXX 1.2 Title: Implementation and follow-up of the Small Business Act (SBA)
More informationInformation Commissioner's Office
Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com
More informationConstruction Bond Audit Report. Office of Auditor General
Construction Bond Audit Report (This page was left blank) TABLE OF CONTENTS Executive Summary 5 Background, Scope and Objectives, and Methodology....7 Audit Findings, Recommendations, and Management s
More informationMeta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism.
Meta-Evaluation of interventions undertaken by the Luxembourg Cooperation in the subsector of professional training in hospitality and tourism. In 2013, the Directorate for Development Cooperation and
More informationDG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES
Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?
More informationENVS402 Environmental Impact Assessment. undertaking EIA. 1 ENVS402 EIA by Dr. Subodh Sharma
ENVS402 Environmental Impact Assessment Chapter 3: Steps involved in undertaking EIA 1 Introduction There are two aspects of project management: 1. First how EIA is linked to the main stages of the project
More informationRisk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
More informationFORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE)
CAPACITY BUILDING FOR HUMAN RESOURCE DEVELOPMENT POLICY AND STRATEGY IN PUBLIC SERVICE IN AFRICA WORKSHOP FORMULATING HUMAN RESOURCE DEVELOPMENT POLICY FOR THE PUBLIC SERVICE (KENYAN CASE) PRESENTED BY:
More informationTERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT
TERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT 1. Background The agency responsible for statistical information in Ghana is the Ghana Statistical Service (GSS) established in 1985 by PNDC
More informationCase Story. The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda)
Case Story The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda) Executive Summary (1) A Time Release study (TRS) is a unique tool 1 and method
More information18. Fast Track to Innovation Pilot Revised
EN HORIZON 2020 WORK PROGRAMME 2014-2015 18. Revised This part is new to the Work Programme 2014-2015 and relates to the Fast Track to Innovation action which is introduced into this work programme for
More informationResources for Implementing the WWF Project & Programme Standards. Step 4.3 Analyze Operational and Financial Functions/ Performance
Resources for Implementing the WWF Project & Programme Standards Step 4.3 Analyze Operational and Financial Functions/ Performance March 2007 Step 4.3 Analyze Operational and Financial Performance Contents
More informationSUMMARY OF THE FORUM Vietnam: Readiness for WTO Accession Hanoi, June 3-4, 2003 and Ho Chi Minh City, June 6-7, 2003
SUMMARY OF THE FORUM Vietnam: Readiness for WTO Accession Hanoi, June 3-4, 2003 and Ho Chi Minh City, June 6-7, 2003 Forum as the most comprehensive event on WTO accession to date. The international forum
More informationProcurement Performance Measurement System
Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance
More informationApplication requirements
Application requirements SBogoly@fgsz.hu CEF Energy Info Day Olga Sihmane - CEF Programme and Call Coordinator, INEA 16 March 2015 Before starting the application: Action vs PCI Types of actions Content
More informationWater Mains Rehabilitation Framework (NI) Northern Ireland Water
PROJECT: CLIENT: MAIN CONTRACTOR: Water Mains Rehabilitation Framework (NI) Northern Ireland Water Farrans Background Northern Ireland Water manages a water mains infrastructure that supplies 625 million
More informationSERVICE CONTRACT NOTICE. Development of a sustainable information system for MAFWM Location - Serbia
Ref. Ares(2013)2579227-05/07/2013 Public document to be completed by the Contracting Authority SERVICE CONTRACT NOTICE Development of a sustainable information system for MAFWM Location - Serbia 1. Publication
More informationProject Appraisal and Scrutiny Committee Recommendation. E-mail, file storage system and server upgrades
Cambridge City Council To: Report by: Scrutiny committee: Wards affected: Executive Councillor for Customer Services and Resources James Nightingale, Head of ICT Client Services Strategy and Resources
More informationROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD
ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers
More informationMonitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015
Monitoring and Evaluation Framework and Strategy GAVI Alliance 2011-2015 NOTE TO READERS The 2011-2015 Monitoring and Evaluation Framework and Strategy will continue to be used through the end of 2016.
More informationCAPITAL PLANNING GUIDELINES
CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS
More informationPROJECT MANAGEMENT AND COORDINATION
PROJECT MANAGEMENT AND COORDINATION a) MANAGEMENT Owing to the sheer magnitude of surveys/censuses and administrative data operations involved in this project, various committees have been constituted
More informationCENTRAL GRANT APPLICATION GUIDELINES
CENTRAL GRANT APPLICATION GUIDELINES 1. What does the Foundation fund? DM Thomas Foundation for Young People makes grants to charities that meet one of our chosen areas of focus. Our primary remits are:
More informationURBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS
URBACT III OPERATIONAL PROGRAMME (2014-2020) CALL FOR PROPOSALS FOR THE CREATION OF 20 ACTION-PLANNING NETWORKS Open 30 March 2015 16 June 2015 1 TABLE OF CONTENT INTRODUCTION... 3 SECTION 1 - ABOUT URBACT
More informationThe Corporation of the TOWN OF MILTON
The Corporation of the TOWN OF MILTON Report To: From: Mayor G.A. Krantz & Members of Council William Mann, Acting Chief Administrative Officer Date: May 26, 2014 Report No: Subject: Recommendation: ES-020-014
More informationStandard Summary Project Fiche IPA centralised programmes
Standard Summary Project Fiche IPA centralised programmes Project number 15: Implementation of Hospital Information System (HIS) 1 BASIC INFORMATION 1.1 CRIS Number: 2008/020-406 1.2 Title: Implementation
More informationCORPORATE INFORMATION AND TECHNOLOGY STRATEGY
Version 1.1 CORPORATE INFORMATION AND TECHNOLOGY STRATEGY The City of Edmonton s Information and Technology Plan, 2013-2016 Bringing the Ways to Life through Information and Technology June 2013 2 Copyright
More informationExternal aid programmes - Service contract - Contract notice - Restricted procedure
1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:340372-2010:text:en:html HR-Zagreb: IPA preparation of the 'Han Agency marketing plan' and 'Plan of sustainable economic development
More informationANNEX VI MODEL TERMS OF REFERENCE FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS PART ï
'4. J ' S., --t r - i^v. ^l- ' 1 I Version of 18.11.2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR EDUCATION AND CULTURE Lifelong learning: higher education and international affairs Cooperation and
More informationResources for Implementing the WWF Project & Programme Standards. Step 2.3 Design Operational Plan
Resources for Implementing the WWF Project & Programme Standards Step 2.3 Design Operational Plan June 2007 Step 2.3 Design Operational Plan Contents What Is An Operational Plan?... 1 Why Is An Operational
More informationWORLD HEALTH ORGANIZATION
WORLD HEALTH ORGANIZATION FIFTY-SIXTH WORLD HEALTH ASSEMBLY A56/27 Provisional agenda item 14.18 24 April 2003 International Conference on Primary Health Care, Alma-Ata: twenty-fifth anniversary Report
More informationNATIONAL E-PROCUREMENT PROJECT GUIDANCE NOTES
NATIONAL E-PROCUREMENT PROJECT GUIDANCE NOTES PROCUREMENT SPEND ANALYSIS Title: Procurement Analysis Identification: Supports organisations in gathering and analysing procurement spend to highlight system
More informationEnvironment Sustainability and Highways
Job Title: Marketing Intelligence Officer Job Grade: Band 4 Directorate: Environment Sustainability and Highways Job Reference Number: P01851 The Role The Marketing Intelligence Officer will: Devise intelligence
More information10721/16 GSC/lt 1 DGB 2B
Council of the European Union Brussels, 28 June 2016 (OR. en) 10721/16 OUTCOME OF PROCEEDINGS From: General Secretariat of the Council On: 28 June 2016 To: Delegations No. prev. doc.: 10320/16 REV 1 Subject:
More informationCork City Council CORPORATE PROCUREMENT PLAN
Cork City Council CORPORATE PROCUREMENT PLAN 2008 2010 Foreword Cork City Council is committed to delivering excellent quality services. The role a strategic approach to procurement has in achieving such
More informationPostdoctoral Researchers International Mobility Experience (P.R.I.M.E.) 2015
Postdoctoral Researchers International Mobility Experience (P.R.I.M.E.) 2015 Objective With this new programme and funding from the Federal Ministry of Education and Research (BMBF) and the European Union
More informationSECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Kyrgyz Republic, 2013 2017 SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and
More informationMAGENTA KEYLINE IS A CUTTER GUIDE, DO NOT PRINT. PLEASE SET TRAPPING THROUGHOUT
Risk & Assurance Integrated software solution Managing risks and providing assurance that the process is working is a key requirement for any organisation, as is having an effective and efficient software
More informationSNH/11/11/B957143 CORPORATE RISK MANAGEMENT POLICY AND RISK REGISTER
CORPORATE RISK MANAGEMENT POLICY AND RISK REGISTER SNH/11/11/B957143 Summary 1. This paper presents Board with a revised SNH Risk management policy and new list of corporate risks in the light of previous
More informationCITIES IN CRISIS CONSULTATIONS - Gaziantep, Turkey
CITIES IN CRISIS CONSULTATIONS - Gaziantep, Turkey April 06 Overview of Urban Consultations By 050 over 70% of the global population will live in urban areas. This accelerating urbanization trend is accompanied
More informationHR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical Devices 2012/S 157-261208
1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:261208-2012:text:en:html HR-Zagreb: IPA digital archival information system software in the Agency for Medicinal Products and Medical
More informationIn recent years, fiscal policy in China has been prudent. Fiscal deficits
1 Fiscal Policy in China STEVEN DUNAWAY AND ANNALISA FEDELINO* In recent years, fiscal policy in China has been prudent. Fiscal deficits have been lower than budgeted, because revenue overperformances
More informationCity of Orillia Strategic Plan
City of Orillia Strategic Plan October 13, 2011 Carolyn Kearns Consultant ck@carolynkearns.ca w: 416-368-7008 m: 416-436-5191 REVISED STRATEGIC PLAN Council has developed a draft Strategic Plan to guide
More informationKey Steps to a Management Skills Audit
Key Steps to a Management Skills Audit COPYRIGHT NOTICE PPA Consulting Pty Ltd (ACN 079 090 547) 2005-2013 You may only use this document for your own personal use or the internal use of your employer.
More informationSeed Fund Proposal Application Form Template
Seed Fund Proposal Application Form Template Cover Page JSF Seed Fund Proposal Title: Name of implementing agency(s): Proposal location: Implementation Period : Start ---------- Completion----------------
More informationPROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
More informationCathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
More informationScreening report Croatia
8 March 2007 Screening report Croatia Chapter 22 Regional policy and coordination of structural instruments Date of screening meetings: Explanatory meeting: 11 12 September 2006 Bilateral meeting: 5 6
More informationQuick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
More informationTRANSPORT AND RURAL INFRASTRUCTURE. A literature review for the Transport and Rural Infrastructure Project
TRANSPORT AND RURAL INFRASTRUCTURE A literature review for the Transport and Rural Infrastructure Project Balla, G.S. (2000) Evaluation of Infrastructural Interventions for Rural Poverty Alleviation. UN
More informationTentative Action Plan
Republic of Serbia Ministry of Science and Environmental Protection Serbia and Montenegro Tentative Action Plan Draft 1 Belgrade, September 2005 Tentative Action Plan - Draft 1 Section 1 and 2 Information
More informationPUBLIC SECTOR CAPACITY INJECTION PROJECT CALL FOR JOB APPLICATIONS
Federal Republic of Somalia National Civil Service Commission Capacity Injection Mechanism Unit Jamhuriyadda Federaalka Somaliya Guddiga Qaranka Shaqaalaha Rayidka Xarunta Mashruuca Tayeynta PUBLIC SECTOR
More informationSite Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners
Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment
More informationThe New Programming Period 2007-2013. Working Document No.1
EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES
More informationPROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and
More informationSpace project management
ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards
More informationRwanda Natural Capital Accounting
Rwanda Natural Capital Accounting Presented for: Mrs. Fatina Mukarubibi PS Ministry of Natural Resources Date: June 1, 2015 Wealth Accounting and the Valuation of Ecosystem Services www.wavespartnership.org
More informationSummary. Remit and points of departure
Summary The digital society and the digital economy are already here. Digitalisation means that it is becoming natural for people, organisations and things to communicate digitally. This changes how we
More informationFrom the light to the full application form focus on work plan
Lead Applicant Training, Prague, 20 October 2015 From the light to the full application form focus on work plan Monika Schönerklee-Grasser, Head of JS Evaluation and Monitoring Unit Full application form
More informationHUMAN RESOURCES FOR HEALTH A KEY PRIORITY FOR THE MINISTRY OF HEALTH
HUMAN RESOURCES FOR HEALTH A KEY PRIORITY FOR THE MINISTRY OF HEALTH BACKGROUND In line with a global awakening of the imminent crisis in human resources for health, the WHO country office has reflected
More informationProject Management Manual
Project Management Manual PM01 Introduction to the Project Management Manual Ref: PM01 (V7.01) - Uncontrolled once Printed Issued on 20 th December 2006 Manual Owner: James Couper Head of Project Management
More informationPart B1: Business case developing the business case
Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project
More informationScope of Work Consultancy Services of Communication Specialist for the Development of Project Communication Strategy and Plan 1. PURPOSE The purpose
Scope of Work Consultancy Services of Communication Specialist for the Development of Project Communication Strategy and Plan 1. PURPOSE The purpose of this technical assistance is to provide short-term
More informationProject Athena Phase 1 Human Resources and Payroll
Executive 14 November 2011 Report from the Director of Finance and Corporate Services Project Athena Phase 1 Human Resources and Payroll Wards Affected: [ALL] 1.0 Summary 1.1 This report concerns the transfer
More information2015 Russian Nanotechnology Investment Enabling Technology Leadership Award
2015 Russian Nanotechnology Investment Enabling Technology Leadership Award 2015 Contents Background and Company Performance... 3 Technology Leverage and Customer Impact of OJSC RUSNANO... 3-5 Conclusion...
More information