1 SPE/IADC Case History: Automated Drilling Performance Measurement of Crews and Drilling Equipment Ketil Andersen, Per Arild Sjøwall, StatoilHydro, Eric Maidla, Buddy King, Nexen Data Solutions Inc., Gerhard Thonhauser, Philipp Zöllner, TDE Thonhauser Data Engineering GmbH Copyright 2009, SPE/IADC Drilling Conference and Exhibition This paper was prepared for presentation at the SPE/IADC Drilling Conference and Exhibition held in Amsterdam, The Netherlands, March This paper was selected for presentation by an SPE/IADC program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers or the International Association of Drilling Contractors and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers or the International Association of Drilling Contractors, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers or the International Association of Drilling Contractors is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE/IADC copyright. Abstract This paper describes the development and implementation of a unique new capability to automatically measure the performance of drilling crews, drilling equipment and downtime. The methodology and supporting technology make it possible to carry out a detailed comparison of the performance of equipment and crews across a large number of installations. The system was tested on 8 drilling units (fixed and mobile) in the North Sea. When the data is analysed and plotted as a histogram (frequency against time taken for each task) the information provided gives: The management a process to select the best supplier based on the performance of its equipment when compared to the technical limit of that equipment. The crews the most consistent and efficient way of working (best practice). The management an automated measuring tool to set and follow up the targets for crew performance. A tool that makes hidden down time visible, so appropriate actions can be taken to improve performance. A process to see if operations can be eliminated or considerably reduced in time (reaming, circulating, etc). When it comes to crew handling of the equipment the results show a performance improvement of 30%. There are potential time savings of between 40 to 60% in some individual drilling tasks such as slip to slip connection times and weight to weight connection times. This is achieved by performing each operation in a more efficient and consistent way. Optimizing a number of identified KPIs for drilling, including tripping and casing running times, shows a potential saving of between 8 to 15% of the total well construction time. Automated Drilling Performance Measurement (ADPM) has been proven in over 30 wells on 8 rigs in the North Sea. This paper also describes the implementation strategy and approach including the elements of the change management and training that are required to implement this new drilling performance process. Introduction One of StatoilHydro s objectives is to increase the number of wells delivered into production each year. It is the company s aim to reverse the dropping trend, shown in Figure 1, where drilling performance measured in meters per day for European wells, as reported by Rushmore, has dropped in the last 3-4 years. Our goal for the future must be to exceed the best performance delivered in any previous year.
2 2 [SPE/IADC ] Figure 1: European trend of average meters drilled per day based on Rushmore data. One element in achieving this target is to find the hidden down time. Use of an Automated Drilling Performance Measurement (ADPM) system to measure the detailed performance of the drilling process is a step change in our ability to efficiently identify hidden down time. Figure 2 is showing the time efficiency break down definitions used in this paper. Figure 2: An Example of a Weight to Weight Time per Connection for a sample well showing hidden down time. This KPI can be used to target improvement opportunities. Reduction in non-productive time has been studied in great detail by Bond, et al.[1], van Oort, et al. [2], Thonhauser, et al, [3] and Thonhauser [4]. The difference between those studies and this paper being that an ADPM system has been used. New visual aids have also been developed that represent the performance of equipment and crews. This system also provides base line data, in a structured manner that allows rig crew and management to improve the overall team efficiency.
3 [SPE/IADC ] 3 The method presented here involves all personnel in the well construction process including the drilling contractor, service companies and operator personnel. The process uses an objective measurement tool to measure operations in an unbiased manner. Automation is necessary to measure detailed performance for routine drilling operations because it would be very difficult, if not impossible, to manually measure these individual operations in a consistent way (e.g. slip to slip connections during tripping operations, etc). In Non-routine operations, in particular the ones leading to downtime time, data and information are generally well described in the morning report (e.g. different equipment breakdown by contractors and service companies, waiting on weather, etc). This is further illustrated in Figure 3 and Figure 4 below. The following definitions have been used throughout this paper. A Slip to Slip Connection represents the time in slips during tripping operations limited to drill pipe connections only (i.e. tripping of BHA components etc. is not considered). The KPI starts when the drill string is put in slips and ends when it comes out of slips. A Weight to Weight Connection represents the time between two drilled stands. This KPI starts when the drill string is lifted off bottom and lasts until the string is on bottom again. This operation includes all wellbore conditioning as well as the drilling slip to slip connection conducted during this interval. Figure 3: Automated Drilling Performance Measurement (ADPM) detection example for Well A.
4 4 [SPE/IADC ] Figure 4: Comparison of a 24 hour period between the ADPM system and the Daily Morning Report. There is a large discrepancy between the two reports (duration values in hours rounded). It can be seen in Figure 4 that the morning report shows a 13h30min drilling with no detail given for any wellbore conditioning time. By using the ADPM system it is possible to identify that only 6h18mins were actually used for making hole and that 13h41mins were used on wellbore treatment time (i.e. reaming and washing upwards/downwards, and circulating.) Implementation Approach Figure 5 shows our approach to the implementation of the Automated Drilling Performance Measurement System from data measurement through to decision support and the implementation of any actions that may result. Not only is it necessary to ensure that the technology is robust and accurate, it is just as important to ensure that all the personnel involved have been adequately trained and have trust in the system and the results that it gives. Relationships between the teams involved must be open and honest to allow this system to be successfully implemented. Figure 5: Some of the prerequisites for improvement. As outlined in Figure 5 the following pre-requisites have to be in place: The appropriate levels of instrumentation and sensors on the rig equipment IT infrastructure, databases and bandwidth to store and transmit the data and information
5 [SPE/IADC ] 5 Real-time processing and analysis combined with visualisation and/or pattern recognition Clearly defined work tasks A process to continuously improve and innovate The appropriate level of training and competency for the teams involved A high level of collaboration and communication both between rigs and between the rigs and the support offices Visibility of performance data to all relevant parties In order to overcome existing limitations, as outlined in Figure 6, a new way of working has to be developed as part of the implementation strategy. New Way of Working Current Situation Difficult to measure efficiency between man and machine Goal Automated measurements Major time variations in identical tasks Minor time variations Major variations in execution of identical tasks Standardized task execution No detailed reference measurements (once daily) Detailed reference measurements with other teams and eq. Figure 6: The desired new way of working The ADPM system makes visible information and data in areas of the operation where it was previously not possible to get the level of detail needed for the performance to be improved. Once it is possible to break down the operation into component parts, it is possible to focus on the objective of reducing the non-productive time. Figure 2 illustrated the opportunity to improve the Weight to Weight Connection key performance indicator (drilling connection KPI). Figure 7 shows an example of a process to achieve the desired improvement in this KPI. What is important here is that the ADPM is able to identify the hidden down time that was previously invisible. The ADPM makes it possible to target and remove the hidden down time and significantly improve performance. Figure 7: Process followed to enhance the drilling performance.
6 6 [SPE/IADC ] Automated performance measurement is vital to identifying improvement areas in drilling operational tasks. These automatic measurements can also be used to indentify best practices leading to the development of standardized procedures. A standard is defined with the involvement of the whole team and needs to compensate for the differences in equipment that individual rigs may have. The standard must be realistic, achievable and have the buy in from all teams involved. The objective here is to agree on a safe and consistent procedure that can be followed given the appropriate level of training and competency. The objective is not only to reduce time taken but to improve the operational efficiency and safety performance by the consistent use of standardized tasks. The identification and removal of unnecessary tasks is also carried out. Implementation Strategy The ADPM system was implemented in StatoilHydro over a period of a few years. The first part, which was started in February 2004, was to implement a database system capable of transferring data utilizing the WITSML protocol. This took place over 2 ½ years. The second part was a trial phase to check for the algorithm accuracy, data frequency issues, and implementation issues. Three wells on three rigs were selected to be analyzed between December 2006 and March Among the main findings were: 1. Accuracy of the automatic operations detection: 1.1. Data Quality Check Morning Reports and the digital log plots were checked against the ADPM outputs and the accuracy and precision were confirmed. 2. Data Issues: 2.1. Time Synchronization Comparing the real-time data to the daily reports from the DBR system (StatoilHydro s Daily Drilling Report) showed a time-shift of one hour. This didn t pose a problem to the ADPM system made it hard to compare both reports against each other this was corrected Bit Depth Oscillations One well contained very strange bit depth oscillations this was flagged to the data provider and then fixed Data Channel Spikes Two wells contained very strange spikes on some of their data channels. This was also flagged to the data provider who solved the problem Data Frequency Issues Some data points from two wells were closer to 30 second time frequency rather than 10 second or less. This made it hard to detect certain KPI s e.g. Slip to slip connections. This was corrected by working with the data provider who then started providing a consistent 5 second data sampling rate WITSML Server Up-Time This was a continuous problem that was fixed during the trial WITSML Server Data Scramble Some drilling parameters in the database contained data from two different providers that were mixed into the same channel. It was impossible to unscramble since the data frequency from each channel was not constant. The solution was to go straight to the original data from one single provider. 3. Usability of the Information: The ADPM daily tracking report was shown to complement the daily morning reports produced by the company s representatives on the rig. Key Performance Indicators were then established against which the crew s performance was measured. Following on from this trial StatoilHydro defined a number of KPI s that could be measured using the ADPM system. In addition to this, a set of visualizations techniques were developed to analyze the large amounts of data collected; these included the histogram plots for different time intervals, daily, weekly etc. An example of these KPI s is given in the summary table (Fig 15). A second trial phase was carried out to check upon the scalability of the system. Four new rigs were chosen for the trial which took place between April and June The scalability issues were addressed, however, some of the data issues from the first trial showed up again. This lead the group to believe that there was a need for continuity between trials, without any interruption, otherwise the same systematic recurring issues would continue to arise. A third phase was to implement the Automated Drilling Performance Measurement System on a continuous basis on 5 rigs. This started in January 2008 and required a greater amount of involvement from all the operating groups. A significant
7 [SPE/IADC ] 7 amount of effort was required to ensure the appropriate amount of team engagement to make the implementation of the system a success. Improvement Process The key principal underlying the ADPM process is that if we can measure an operation, we can improve it. However, if we cannot measure it, we don t know if we can improve it or not. The ADPM process creates a significant amount of digital data (eight drilling functions measured every 1 to 5 seconds). This is an enormous amount of data to be processed. It also needs to be presented in an easy and straightforward manner and to be able to convey a quick and precise message to those managing the operations. Histogram plots were selected as the preferred visual aid as they can summarize large quantities of data and are easy to interpret. These plots were used to analyze any KPI at any level (rig performance, individual crew performance, aggregated group performance by hole size, etc.). An example of how the histograms are used is illustrated in Figure 8. In this particular example a process for selecting a best practice is outlined that takes safety and efficiency into consideration. Very short task times can be attributed to bad measurement, data imperfection, or unsafe practices which a simple investigation should clarify. The idea here is to define a best practice that is safe, achievable and measurable. It is essential that any best practice has the buy in from all the crews involved if it is to be implemented successfully. Best Practice Step 1: Define Current State Step 2: Identify Exceptions Exceptional Short Maybe taking Shortcuts Exceptional Long Operational Problems Step 3: Define Best Practice as Target for Future Operations Figure 8: Using histograms to select best practice. Once agreement has been reached on the best practice target value, the histograms will help to show whether the best practice is actually met, and if not, what the amount of deviation from the target value is. This is further illustrated in Figure 9.
8 8 [SPE/IADC ] Figure 9: Using histograms to verify the consistency around the best practice target. The best practice should be a realistically achievable target by properly trained crews performing routine operations under good conditions. It should also be noted that the target should not be a fast moving target. The idea here is to take small steps towards a sound and safe practice and only revise the best practice after sufficient experience has been gained at the current performance level (a year or so). The primary aim is to have a consistent delivery of the best practice rather than pushing the technical limit. As will be demonstrated later in the case history, the fact that routine operations can be done consistently and close to best practices will yield significant savings in safety, time and money. Further Improvements by implementing new technology to lower Average Operations Duration Team Effort to define new Target Figure 10: Using histograms to select a new best practice target. The final step in this process it to make sure that the measurement and performance gains are sustainable into the future even after all targets are met. Implementation Example Figure 11 and Figure 12 are examples of the starting data sets that can be used to establish a best practice for a drilling weight to weight connection. All the drilling connection task times were measured and the best times for each of the tasks were used to define a best composite time for the entire operation. This is shown in Figure 12. From the analysis it was determined that a certain amount of reaming and washing was necessary but that each crew was making different decisions on how much reaming and washing was appropriate. How much time is necessary for this
9 [SPE/IADC ] 9 operation is a judgment call which should come from torque and drag plots supplied by engineering. The driller should follow the best practice and only make changes from it if he observers deviating trends from established engineering plots. Kucs, et al. [5] and Freithofnig, et al. [6]. A standard procedure for the connection task can be defined with the goal to have only small variations around the implementation of standard procedure in operation. Figure 11 shows the comparison of a fast and a slow weight to weight connection. As can be seen the fast connection took just over half the time of the slow connection min 26.4 min Figure 11: Overlay of Fast and Slow Weight to Weight Connections as part of the analysis. In order to analyze weight to weight connection the entire task was broken down into smaller steps. These are: Reaming up Reaming down Waiting on connection, which represents the hidden down time from stopping reaming and washing until starting the slip to slip connection Slip to slip connection Waiting on drilling, which is also hidden down time and should be eliminated Figure 12 shows this operation broken down into the smaller steps as a standardized best practice. This process of breaking a task down into smaller steps is key to the overall performance improvement approach and allows the comparison of different work steps to identify potential areas for improvement.
10 10 [SPE/IADC ] 9.2 min Drilling Connection (Weight to Weight Connection) Figure 12: Example of a best practice Weight to Weight Connection If there is little or no drag one should not ream the stand as is shown in Figure 13. Additional time of 0.5min is invested to check whether up and down weight is consistent with the theoretical drag values. By analyzing the plot it can also be seen that time can be saved by pumping up the MWD survey while drilling. In this example, it is possible to save 5.3 minutes for each connection using this standardized procedure: Saved reaming time Saved time waiting on survey Additional time to take weight readings Total savings -3.2min -2.6min +0.5min -5.3min Table 1: Weight to Weight Connection time saving potential 3.9 min Figure 13: Theoretical best composite time ([7] A.W. Iyoho etal.) for a Weight to Weight Connection Reducing the hidden non-productive time has lead to significant benefits in safer task handling and a reduction in wellbore aging (formation exposure to drilling fluids chemicals and pressure). This is expected to lead to less formation related problems helping achieve earlier production at lower costs. All this leads to the main target of drilling more wells in a calendar year.
11 [SPE/IADC ] 11 Case Study It is not only the measurement of the data that is important but the manner in which this information is provided to the rig crews, service people and operator personnel. All efforts must be made to ensure that the people involved in the implementation of this process see it as a value adding approach to achieve the optimal performance targets for the drilling of the well. Having an open and honest culture between the teams and ensuring that all the parties are involved is a key success factor. All teams involved must feel that they can not only challenge the process but are recognised for their part implementing the continuous improvement process. With this in mind, the case studies will cover a variety of KPI measurements and define a summary of the potential savings. The first example, Figure 14, comes from four rigs performing the same operation under similar conditions. The KPI measured is the Slip to Slip time while tripping pipe. What can be seen in this plot is: Both Rigs A and B manage to make tripping connections consistently around 2 minutes as is shown by their 50% value. The Rigs C and D perform the same operation consistently at 1.5 and 1.3 minutes respectively, this is shown by their corresponding 50% values. When looking at the high performance end of the spectrum it is possible to see that Rig C and D manage to perform this operation below 1 minute for more than 2600 repetitions. Rig A Rig B Rig C Rig D Figure 14: Example of comparison of 4 offshore rigs in the North Sea Area The observations in Figure allow the following conclusions to be drawn: The lower end of the data spread reveals the technical limit for the rig. Based on this observation it is possible to start a detailed operational analysis breaking down the slip to slip connection into its component parts to investigate the equipment performance:
12 12 [SPE/IADC ] Iron roughneck performance Hosting system performance Racking system performance, etc. This type of equipment performance capability analysis is then performed with the drilling contractor and the crews to find the improvement potential. Comparison can also be made between different equipment suppliers. Ultimately this information could be used as part of an equipment procurement strategy. Figure 15 illustrates another example of making tripping connections with 4 crews on the same rig. Each crew has performed this task a large amount of times. In order to further analyse this data we have also included a table that summarizes some of the data, for instance, Crew B has performed this operation 879 times compared to Crew A that has carried it out 1886 times. The average values contained in the table are important as these allow us to see if there is a learning curve (or improvement) over time. The best practice time was set at 1.17 minutes based on Crew D s performance. The cumulative time to the right of the target value is called the savings potential. This value is an indication of the savings that can be realized once the crew starts improving and moves towards the best practice time for an operation. In addition to the savings potential the histogram plots also show the scatter of the data. This gives an indication of the consistency with which the crew is performing an operation. This may also highlight the need for further training. Figure 15: Comparison of four crews on the same rig carrying out a slip to slip connection. Many other KPI s may be indentified and analysed in this way. By adding these performance opportunities together an overall savings potential can be calculated. A summary of these findings for one well is shown in Figure 16. The table is self
13 [SPE/IADC ] 13 explanatory and points out that just by focusing on routine operations there is a potential saving of 7.6 days for the 61 day well. This further confirms the value added of ADPM as a means to achieve the company s goal of increasing the number of producing wells delivered per year. KPI Slip to Slip Time Moving Time Weight to Weight Drilling Stand* Tripping Casing/Liner Tripping Casing/Liner Phase All ¼ 8 ½ All ¼ 8 ½ ¼ 8 ½ ¼ 8 ½ Lower Cut-Off [min] Upper Cut-Off [min] Benchmark [min] Savings Potential [h] * 12.2* 21.8* Savings Potential [%] * 25.83* 22.26* Time analysed by pronova Total Savings Potential (incl. 10% of Drilling Stand Time) 61 days 7.6 days * only 10% are included for total savings potential Figure 16: Example of savings potential for a North Sea Area offshore well. Figure 17 shows the performance improvement for the weight to weight connection time KPI for 8 StatoilHydro wells. There has been an improvement of 28% for this KPI as a result of the use of the Automated Drilling Performance Measurement System. Figure 17: Performance improvement of 28% for the weight to weight connection time has been seen following analysis on 27 wells on 8 rigs.
14 14 [SPE/IADC ] Conclusions Based on the findings of this work the following conclusions can be made: A new approach to improving the drilling process based on rigorous measurement of drilling performance has been developed and implemented. Breaking down an operational task into its component parts and measuring the performance of each part is key to the process. Automation is necessary to measure detailed performance for routine drilling operations and to identify the hidden downtime. Simple visual aids that turn data into information and enhance the decision making process are vital to getting the system used in the field. An approach the looks at the entire process from data measurement through to decision support and includes team engagement is essential to having a successful implementation. ADPM can also be used to indentify best practices leading to the development of standardized procedures. This approach can track the performance of different crews and normalise their performance for the different equipment they are using. ADPM has been proven to work in over 30 wells across 8 different rigs in the North Sea showing that the system is scalable. This approach can identify tasks that can either be eliminated or considerably reduced in time. This study has shown a performance improvement of 30% for the crew handling of the equipment in specific tasks. This approach has identified a potential of 40-60% in the time taken for some specific drilling tasks. Optimizing a number of identified KPIs for the drilling operation has shown that there is a potential saving of between 8 to 15% of the total well construction time by using this approach. ADPM provides management with visibility of the performance of crews and equipment across the entire rig fleet and allows targets to be set for crew and equipment performance. Performance data and information provided by ADPM can be used to support a drilling equipment procurement strategy. The use of Automated Drilling Performance Measurement can make a step change in is drilling performance and reverse the current downward performance trend for meters drilled per day. The capability that ADPM provides has the potential to form the basis for closed loop automated control for drilling operations. Acknowledgements The authors would like to thank StatoilHydro, Nexen Data Solutions Inc. and TDE Thonhauser Data Engineering GmbH for the permission to publish this paper. Special thanks go to the pronova team and all who have been involved defining and implementing the vision of a new way of working to improve drilling performance. References 1. Bond, D.F., Scott, P.W., Page P.E., and Windham, T.M., Applying Technical Limit Methodology for Step Change in Understanding and Performance, SPE/IADC presented at the 1996 SPE/IADC Drilling Conference, New Orleans (USA), March vanoort, E., Taylor, E., Thonhauser, G., Maidla, E., Real-time rig-activity detection allows to indentify and minimize invisible lost time, World Oil April 2008, Page 39ff 3. Thonhauser, G., Wallnoefer, G., Mathis, W., Use of Real-Time Rig Sensor Data to Improve Daily Drilling Reporting, Benchmarking and Planning - A Case Study, SPE presented at the 2006 SPE Intelligent Energy Conference, Amsterdam (The Netherlands), April Thonhauser G., Using Real-time Data for Automated Drilling Performance Analysis, European Oil and Gas Magazine , Page 170ff 5. Kucs R., Hermann F. Spörker H.F., Thonhauser G. Automated Real Time Hookload and Torque Monitoring, IADC/SPE presented at the 2008 IADC/SPE Drilling Conference held in Orlando, Florida, U.S.A., 4 6 March Freithofnig, H.J., Spoerker, H.F., Thonhauser, G., Analysis of Hook Load Data to Optimize Ream and Wash Operations, SPE presented the SPE/IADC Middle East Drilling Technology Conference & Exhibition held in Abu Dhabi, UAE, October A.W. Iyoho, SPE, K.K. Millheim, SPE, B.K. Virginillo, Methodology and Benefits of a Drilling Analysis Paradigm, IADC/SPE 87121, presented at the IADC/SPE Drilling Conference held in Dallas, Texas, U.S.A., 2-4 March 2004.
CLEAR. Hole cleaning and wellbore risk reduction service
CLEAR Hole cleaning and wellbore risk reduction service The CLEAR* hole cleaning and wellbore risk reduction service, delivered by Geoservices, a Schlumberger company, monitors hole cleaning effectiveness
More informationOil & Gas Practice How to achieve 50% reduction in offshore drilling costs
Oil & Gas Practice How to achieve 50% reduction in offshore drilling costs Anders Brun, Guus Aerts and Marte Jerkø May 2015 2 How to achieve 50% reduction in offshore drilling costs How to achieve 50%
More informationBeyond the Traditional Rig Count with Drillinginfo
December 2015 Beyond the Traditional Rig Count with Drillinginfo How Drillinginfo is Revolutionizing Rig Intelligence with Real Time Data on the U.S. Rig Fleet Rig Counts Rig counts have long been used
More informationTBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH
TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH Outline Field study Lessons learned Rig design changes Mechanization
More informationAn Introduction to. Metrics. used during. Software Development
An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote
More informationElectronic Drilling Recorder
Electronic Drilling Recorder Drilling Surface logging systems Evaluation Completion Production Intervention Data management Integrated data systems Real-time operations Drilling optimization Electronic
More informationDrilling Performance Benchmark Metrics Overview: Benchmark Metric Definitions Below the Mudline (BML) SPUD Date Kick Off Point (KOP) KOP Date
Page 1 of 7 Drilling Performance Benchmark Metrics Overview: The primary application of the Dodson Drilling Performance Benchmark Database System is to measure and rank drilling performance for wells drilled
More informationOpenWells Software. DecisionSpace Drilling & Completions. Streamline activity and morning reporting. Improve drilling operations DATA SHEET
DATA SHEET OpenWells Software OVERVIEW DecisionSpace Drilling & Completions KEY FEATURES Comprehensive operations reporting from site selection to abandonment Simple, visual data entry saves time and reduces
More informationCOMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA GEOTHERMAL FIELDS.
Proceedings 5 th African Rift geothermal Conference Arusha, Tanzania, 29-31 October 2014 COMPARISON OF DRILLING TECHNOLOGIES BETWEEN TOP DRIVE AND ROTARY TABLE IN GEOTHERMAL FIELDS: A CASE STUDY OF OLKARIA
More informationDecisionSpace Well Engineering Software
DATA SHEET DecisionSpace Well Engineering Software DecisionSpace Drilling & Completions Key features Configure the right tools to drill any type of well Dramatically simple to use, complete complex fluids
More informationTruTrak Automated directional drilling system
D r i l l i n g a n d E v a l u a t i o n TruTrak Automated directional drilling system Answering the need for improved drilling precision and efficiency Simple wells are not so simple anymore While 2D
More informationInfor Enterprise Asset Management (EAM)
PROGRESSIVE Infor Enterprise Asset Management (EAM) Joined up thinking dedicated to the oil & gas industry www.progressive-tsl.com Infor Enterprise Asset Management (EAM) Infor Enterprise Asset Management
More informationEnhance Production in 6 Steps Using Preventive Maintenance
Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using
More informationPresents. WITSML Solutions For Your Business
Presents WITSML Solutions For Your Business WHAT IS WITSML? WITSML (Wellsite Information Transfer Standard Markup Language) is a petroleum industry standard way of sharing drilling and completions related
More informationPattern Recognition and Data-Driven Analytics for Fast and Accurate Replication of Complex Numerical Reservoir Models at the Grid Block Level
SPE-167897-MS Pattern Recognition and Data-Driven Analytics for Fast and Accurate Replication of Complex Numerical Reservoir Models at the Grid Block Level S. Amini, S.D. Mohaghegh, West Virginia University;
More informationBHA Design. 2011 Best-drilling-practices.tk. All rights reserved.
BHA Design Drill Collar vs. Heavy Weight Drill Pipe Use minimum number of drill collars in the BHA. The noticeable exception is the drilling of vertical wells. The main advantages of omitting drill collars
More informationDisseminating Research and Writing Research Proposals
Disseminating Research and Writing Research Proposals Research proposals Research dissemination Research Proposals Many benefits of writing a research proposal Helps researcher clarify purpose and design
More informationWell Service Manager Planning, Scheduling and Evaluation Software
Well Service Manager Planning, Scheduling and Evaluation Software Efficiently gather and store well information for effectively managing all well activities, including planning versus actual cost management.
More informationSelf-Improving Supply Chains
Self-Improving Supply Chains Cyrus Hadavi Ph.D. Adexa, Inc. All Rights Reserved January 4, 2016 Self-Improving Supply Chains Imagine a world where supply chain planning systems can mold themselves into
More informationBusiness Process Services. White Paper. Leveraging the Internet of Things and Analytics for Smart Energy Management
Business Process Services White Paper Leveraging the Internet of Things and Analytics for Smart Energy Management About the Author Akhil Bhardwaj Akhil Bhardwaj is a Senior Manager in the Analytics and
More informationGuide to Media Evaluation. 1. What is the purpose of Media Evaluation? 2. What forms can it take?
Guide to Media Evaluation 1. What is the purpose of Media Evaluation? Good strategic management of corporate and marketing communication requires clear vision, planning and review. Effective communication
More informationThe development and application of a maintenance and performance monitoring database
Safety and Reliability for Managing Risk Guedes Soares & Zio (eds) 2006 Taylor & Francis Group, London, ISBN 0-415-41620-5 The development and application of a maintenance and performance monitoring database
More informationidocuments Solutions Overview Enterprise financial management & workforce solutions www.idocuments.net June 2015
idocuments Enterprise financial management & workforce solutions Solutions Overview June 2015 Sy na nt i x Ltd. All r ig ht s r es er ved. P a g e 1 17 Contents Introducing idocuments... 3 Mobile Approvals
More informationMonte Carlo analysis used for Contingency estimating.
Monte Carlo analysis used for Contingency estimating. Author s identification number: Date of authorship: July 24, 2007 Page: 1 of 15 TABLE OF CONTENTS: LIST OF TABLES:...3 LIST OF FIGURES:...3 ABSTRACT:...4
More informationProductivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects
Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects Dr. Rashad Zakieh (PMP) 27 April, 2010 Copyright Saudi Aramco, 2010. All rights reserved.
More informationPRODUCTION OPTIMIZATION CONSULTING SERVICES. Delivering comprehensive optimization solutions from a single well to a full field PRODUCTION
PRODUCTION PRODUCTION OPTIMIZATION CONSULTING SERVICES Delivering comprehensive optimization solutions from a single well to a full field DRILLING & FORMATION EVALUATION WELL CONSTRUCTION COMPLETION &
More informationContractor Management Applying Safety Analytics and Insurance Benchmarking
Session No. 543 Contractor Management Applying Safety Analytics and Insurance Benchmarking Introduction Dag Yemenu, VP Technical Services Brett Parker, CPCU, CIC, CRIS, ARe ISN Software Corporation Dallas,
More informationMaintenance, Repair, and Operations (MRO) in Asset Intensive Industries. February 2013 Nuris Ismail, Reid Paquin
Maintenance, Repair, and Operations (MRO) in Asset Intensive Industries February 2013 Nuris Ismail, Reid Paquin Maintenance, Repair, and Operations (MRO) in Asset Intensive Industries The impact Maintenance,
More informationGETTING STARTED WITH LABVIEW POINT-BY-POINT VIS
USER GUIDE GETTING STARTED WITH LABVIEW POINT-BY-POINT VIS Contents Using the LabVIEW Point-By-Point VI Libraries... 2 Initializing Point-By-Point VIs... 3 Frequently Asked Questions... 5 What Are the
More informationDrilling Problems. pull
Drilling Problems Pipe Sticking Lost Circulation Hole Deviation Pipe Failures Borehole Instability Mud Contamination Formation Damage Hole Cleaning H S General Equipment & Personnel Pipe Sticking Can not
More informationThe Travel and Expense Management Guide for 2014
The Travel and Expense Management Guide for 2014 Trends for the Future March 2014 Louis Berard The Travel and Expense Management Guide for 2014: Trends for the Future In December 2013 and January 2014,
More informationSample Career Ladder/Lattice for Energy (Petroleum Sector)
Click on a job title to see examples of descriptive information about the job. Click on a link between job titles to see the critical development experiences needed to move to that job on the pathway.
More informationWhy Smart Water Networks Boost Efficiency
Why Smart Water Networks Boost Efficiency by Jeff M. Miller and Mark Leinmiller Executive summary The Smart Water Network (SWAN) is the water utility industry s equivalent to the energy industry s Smart
More informationOTC-26021-MS. New Findings in Drilling and Wells using Big Data Analytics J. Johnston, CGG; A. Guichard, Teradata. Abstract
OTC-26021-MS New Findings in Drilling and Wells using Big Data Analytics J. Johnston, CGG; A. Guichard, Teradata Copyright 2015, Offshore Technology Conference This paper was prepared for presentation
More informationMeeting the challenges of today s oil and gas exploration and production industry.
Meeting the challenges of today s oil and gas exploration and production industry. Leveraging innovative technology to improve production and lower costs Executive Brief Executive overview The deep waters
More informationOpenWells Software. DecisionSpace Drilling & Completions. Streamline activity and morning reporting. Improve drilling operations DATA SHEET
DATA SHEET OpenWells Software OVERVIEW DecisionSpace Drilling & Completions KEY FEATURES Comprehensive operations reporting from site selection to abandonment Simple, visual data entry saves time and reduces
More informationDelivering Better Results for Recruitment. Recruitment Product Brochure
Delivering Better Results for Recruitment Recruitment Product Brochure The approach we adopted to implement Active Dashboards helped the business identify and prioritise the most important metrics. As
More informationTestScape. On-line, test data management and root cause analysis system. On-line Visibility. Ease of Use. Modular and Scalable.
TestScape On-line, test data management and root cause analysis system On-line Visibility Minimize time to information Rapid root cause analysis Consistent view across all equipment Common view of test
More informationSC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
More informationThe Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1
The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is
More informationAUTOMATIC HYDRAULIC DRILLING RIGS HH Series HH Series hydraulic hoist series The drilling industry is actively involved in developing new technologies to solve common problems, such as increasing safety
More informationGrassroots Drilling. A History and Look Ahead. David Wennerstrom. ICOTA Roundtable October 2005 Canadian Chapter
Grassroots Drilling A History and Look Ahead David Wennerstrom ICOTA Roundtable October 2005 Canadian Chapter In the past 10 years CTD rigs have come to dominate much of the shallow gas drilling market
More informationQuality & Safety Manual
Purpose: This Quality & Safety Manual is intended to clarify and document the Quality and Health & Safety policies of GGS Oil and Gas Systems and to describe how the organization organizes its activities
More informationJOURNAL OF INFORMATION, KNOWLEDGE AND RESEARCH IN MECHANICAL ENGINEERING
Automated Spares and Inventory Management System For Upstream Oil and Gas Producing Facilities Using RFID Based Item Tracking Integrated With Enterprise Resource Planning Through Centralized Onshore Sourcing
More informationFlour Milling Process Analysis Get more out of your production with High Resolution in-line analysis. ProFoss. Dedicated Analytical Solutions
Flour Milling Process Analysis Get more out of your production with High Resolution in-line analysis ProFoss Dedicated Analytical Solutions Get a clearer picture of your flour milling production with High
More informationDECISYON 360 ASSET OPTIMIZATION SOLUTION FOR U.S. ELECTRICAL ENERGY SUPPLIER MAY 2015
Unifying People, Process, Data & Things CASE STUDY DECISYON 360 ASSET OPTIMIZATION SOLUTION FOR U.S. ELECTRICAL ENERGY SUPPLIER MAY 2015 Decisyon, Inc. 2015 All Rights Reserved TABLE OF CONTENTS THE BOTTOM
More informationMozzarella Process Analysis Get more out of your production with High Resolution in-line analysis. ProFoss. Dedicated Analytical Solutions
Mozzarella Process Analysis Get more out of your production with High Resolution in-line analysis ProFoss Dedicated Analytical Solutions Get a clearer picture of your mozzarella production with High Resolution
More informationDensity Curve. A density curve is the graph of a continuous probability distribution. It must satisfy the following properties:
Density Curve A density curve is the graph of a continuous probability distribution. It must satisfy the following properties: 1. The total area under the curve must equal 1. 2. Every point on the curve
More informationMcKinsey on Electric Power and Natural Gas
McKinsey on Electric Power and Natural Gas Perspectives on electric power and natural gas Number 1, Winter 2008 Pioneers to industrialists: How to grow profitably as the renewables sector matures 3 As
More informationThe Effect of Dropping a Ball from Different Heights on the Number of Times the Ball Bounces
The Effect of Dropping a Ball from Different Heights on the Number of Times the Ball Bounces Or: How I Learned to Stop Worrying and Love the Ball Comment [DP1]: Titles, headings, and figure/table captions
More informationCritical Limitations of Wind Turbine Power Curve Warranties
Critical Limitations of Wind Turbine Power Curve Warranties A. Albers Deutsche WindGuard Consulting GmbH, Oldenburger Straße 65, D-26316 Varel, Germany E-mail: a.albers@windguard.de, Tel: (++49) (0)4451/9515-15,
More informationHydraulic Safety Program
Reduction of Risk and Elimination of Incident Associated with Hydraulics Hydraulic Safety Authority of Canada Preface The use of Hydraulic operated equipment has increased. Automation of many functions
More informationWonderware: Corporate Energy Management CEM. Dawid Sadie General Manager: Sales Wonderware Southern Africa
Wonderware: Corporate Energy Management CEM Dawid Sadie General Manager: Sales Wonderware Southern Africa If you Google? (The Oxford Dictionary) energy noun (pl. energies) 1 the strength and vitality required
More informationRecommendations Relating to the Application of Requirements Governing Seafarers Hours of Work and Rest
Oil Companies International Marine Forum s Relating to the Application of Requirements Governing Seafarers Hours of Work and Rest January 2012 The OCIMF mission is to be the foremost authority on the safe
More informationA smarter approach to extracting natural resources in Canada
A smarter approach to extracting natural resources in Canada Data is the industry s untapped resource Highligbhts In many cases, information technology assets are underutilized in the Canadian natural
More informationIFS-8000 V2.0 INFORMATION FUSION SYSTEM
IFS-8000 V2.0 INFORMATION FUSION SYSTEM IFS-8000 V2.0 Overview IFS-8000 v2.0 is a flexible, scalable and modular IT system to support the processes of aggregation of information from intercepts to intelligence
More informationCybersecurity Analytics for a Smarter Planet
IBM Institute for Advanced Security December 2010 White Paper Cybersecurity Analytics for a Smarter Planet Enabling complex analytics with ultra-low latencies on cybersecurity data in motion 2 Cybersecurity
More informationBlue: C= 77 M= 24 Y=19 K=0 Font: Avenir. Clockwork LCM Cloud. Technology Whitepaper
Technology Whitepaper Clockwork Solutions, LLC. 1 (800) 994-1336 A Teakwood Capital Company Copyright 2013 TABLE OF CONTENTS Clockwork Solutions Bringing Cloud Technology to the World Clockwork Cloud Computing
More informationManufacturing Analytics: Uncovering Secrets on Your Factory Floor
SIGHT MACHINE WHITE PAPER Manufacturing Analytics: Uncovering Secrets on Your Factory Floor Quick Take For manufacturers, operational insight is often masked by mountains of process and part data flowing
More informationUnderstand, Maintain and Service Your Torque Wrench
Understand, Maintain and Service Your Torque Wrench White Paper A torque wrench is a precision tool and should be treated and maintained like a measuring instrument. A torque wrench must be properly calibrated
More informationEquipment Performance Monitoring
Equipment Performance Monitoring Web-based equipment monitoring cuts costs and increases equipment uptime This document explains the process of how AMS Performance Monitor operates to enable organizations
More informationAutomated Equipment Data Analytics to Detect Issues, Trends, Faults & Anomalies
AABC Commissioning Group AIA Provider Number 50111116 Automated Equipment Data Analytics to Detect Issues, Trends, Faults & Anomalies Course Number: CXENERGY1633 Paul Bergquist SkyFoundry April 12, 2016
More informationWoods Hole Group, Inc. Oceanography and Measurement Systems Division INTEGRATED REAL-TIME MONITORING SYSTEM
Woods Hole Group, Inc. INTEGRATED REAL-TIME MONITORING SYSTEM Woods Hole Group, Inc. (WHG) has developed the Integrated Real-time Monitoring System (IRMS) as a general-purpose data acquisition and telemetry
More informationPredictive Maintenance: Shops see the future
Predictive Maintenance: Shops see the future Sean Kilcarr June 2013 Marrying date and analytical tools will help predict truck maintenance needs Isn t predicting future maintenance needs what many, if
More informationShale Gas. New conventions for unconventional development for the engineering and construction industry
Shale Gas New conventions for unconventional development for the engineering and construction industry Reducing the drag: achieving speed and efficiency in shale well development planning and execution
More informationData Center Solutions
Data Center Solutions New Data Center Challenges Require New Solutions Data Center Architecture. Inside and Out. Data centers are mission-critical facilities. A silo-based approach to designing, deploying
More informationHKSA 500 Issued July 2009; revised July 2010, May 2013, February 2015
HKSA 500 Issued July 2009; revised July 2010, May 2013, February 2015 Effective for audits of financial statements for periods beginning on or after 15 December 2009 Hong Kong Standard on Auditing 500
More informationOTC 12979. Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc.
OTC 12979 Managing the Cost & Schedule Risk of Offshore Development Projects Richard E. Westney Westney Project Services, Inc. Copyright 2001, Offshore Technology Conference This paper was prepared for
More informationIDS Reporting and Knowledge Management Services. Offshore Europe 2015
IDS Reporting and Knowledge Management Services Offshore Europe 2015 What does IDS do? IDS provides web-delivered operational reporting solutions to operators, service companies, and drilling contractors.
More informationContinuous Gas Circulation; A New Artificial Lift Method
Gas Well Deliquification Workshop Adams Mark Hotel, February 25-27, 2008 Continuous Gas Circulation; A New Artificial Lift Method Jim Hacksma - Consultant CGC (continuous gas circulation) Not Really New.
More informationBest Practices for Print Service Management. Best Practices in Open Print Management
Best Practices for Print Service Management Best Practices in Open Print Management Best Practices for Print Service Management Plan Design Measure Analyze Improve Control 1. Develop and maintain a print
More informationQUALITY TOOLBOX. Understanding Processes with Hierarchical Process Mapping. Robert B. Pojasek. Why Process Mapping?
QUALITY TOOLBOX Understanding Processes with Hierarchical Process Mapping In my work, I spend a lot of time talking to people about hierarchical process mapping. It strikes me as funny that whenever I
More information10k. 8-week training program
10k 8-week training program T H E G O A L O F T H I S P L A N I S N T T O G E T Y O U A C R O S S T H E F I N I S H L I N E, I T S T O G E T T H E B E S T V E R S I O N O F Y O U A C R O S S T H E F I
More informationBy Steven C. Severini, P.E., Member ASHRAE
The following article was published in ASHRAE Journal, July 2004. Copyright 2004 American Society of Heating, Refrigerating and Air- Conditioning Engineers, Inc. It is presented for educational purposes
More informationUse of Human Big Data to Help Improve Productivity in Service Businesses
Hitachi Review Vol. 6 (216), No. 2 847 Featured Articles Use of Human Big Data to Help Improve Productivity in Service Businesses Satomi Tsuji Hisanaga Omori Kenji Samejima Kazuo Yano, Dr. Eng. OVERVIEW:
More informationData Mining for Manufacturing: Preventive Maintenance, Failure Prediction, Quality Control
Data Mining for Manufacturing: Preventive Maintenance, Failure Prediction, Quality Control Andre BERGMANN Salzgitter Mannesmann Forschung GmbH; Duisburg, Germany Phone: +49 203 9993154, Fax: +49 203 9993234;
More informationShort-Term Forecasting in Retail Energy Markets
Itron White Paper Energy Forecasting Short-Term Forecasting in Retail Energy Markets Frank A. Monforte, Ph.D Director, Itron Forecasting 2006, Itron Inc. All rights reserved. 1 Introduction 4 Forecasting
More informationNOV Drilling Simulator. Presented by Tore Berg
NOV Drilling Simulator Presented by Tore Berg Company Overview National Oilwell Varco is a worldwide leader in the design, manufacture and sale of equipment and components used in oil and gas drilling
More informationHOW DOES AMR WORK? #nwgreducebills
HOW DOES AMR WORK? CLEVER SOFTWARE TO SHOW WHERE YOU CAN MAKE SAVINGS AMR uses wireless technology that allows remote communication between your meters and our secure online portal. A data logger is installed
More informationImplementing Portfolio Management: Integrating Process, People and Tools
AAPG Annual Meeting March 10-13, 2002 Houston, Texas Implementing Portfolio Management: Integrating Process, People and Howell, John III, Portfolio Decisions, Inc., Houston, TX: Warren, Lillian H., Portfolio
More informationChapter 10. Control Design: Intuition or Analysis?
Chapter 10 Control Design: Intuition or Analysis? Dan P. Dumdie 10.1 Introduction In previous chapters, we discussed some of the many different types of control methods available and typically used in
More informationPerformance evaluation and quality assurance of Varian enhanced dynamic wedges
JOURNAL OF APPLIED CLINICAL MEDICAL PHYSICS, VOLUME 7, NUMBER 1, WINTER 2006 Performance evaluation and quality assurance of Varian enhanced dynamic wedges Parham Alaei and Patrick D. Higgins Department
More informationKnow-how and commitment are always included. Service offer of CG Drives & Automation
Know-how and commitment are always included Service offer of CG Drives & Automation We put all our energy into saving yours! Saving energy is not just about your electricity bill. It s about relying on
More informationFlairFlex. Real-time fluid logging and analysis service
FlairFlex Real-time fluid logging and analysis service FlairFlex Real-time fluid logging and analysis service The FlairFlex* service from Geoservices provides early insight into reservoir fluid properties
More informationTraining Programme: Introduction to the Regulation of Electricity Markets June 14-16, 16, 2010 Istanbul, Turkey. Electricity demand
INOGATE/ERRA Training Programme: Introduction to the Regulation of Electricity Markets June 14-16, 16, 2010 Istanbul, Turkey Electricity demand András Kiss Research Associate Regional Centre for Energy
More informationTechnical Management Software based on Cloud Computing
Technical Management Software based on Cloud Computing 1 I need a tool that improves operational efficiency while lowering costs. MESPAS Cloud Advantage: the smart way to simplify processes and maximize
More informationWELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards
WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards Note: Operating instructions updated July 2014 WELL COMMANDER: Versatile multicycle ball-activated drilling
More informationFog Computing and the Internet of Things: Extend the Cloud to Where the Things Are
White Paper Fog Computing and the Internet of Things: Extend the Cloud to Where the Things Are What You Will Learn The Internet of Things (IoT) is generating an unprecedented volume and variety of data.
More informationQUICK FACTS. Facilitating Application Packaging on Behalf of a Global Professional Services Company
[ Professional Services, Technology Deployment ] TEKsystems Global Services Customer Success Stories Client Profile Industry: Professional Services Revenue: Over $13 billion Employees: Over 250,000 Geographic
More informationIBAPro Project Management Methodology
IBAPro Project Management Methodology A description of the IBApps Project Management Methodology and Implementation Process Version 2.2, June 2013 Contents 1. Project Management... 3 2. Phases... 3 2.1.
More informationTEACHER NOTES MATH NSPIRED
Math Objectives Students will understand that normal distributions can be used to approximate binomial distributions whenever both np and n(1 p) are sufficiently large. Students will understand that when
More informationInforCloudSuite. Business. Overview INFOR CLOUDSUITE BUSINESS 1
InforCloudSuite Business Overview INFOR CLOUDSUITE BUSINESS 1 What if... You could implement a highly flexible ERP solution that was built to manage all of your business needs, from financials and human
More informationRisk management a practical approach
Risk management a practical approach Introduction Preventing work related accidents and injuries is the primary concern for all those involved in health and safety. Work related accidents and injuries
More informationSmart Data Center Solutions
Smart Data Center Solutions New Data Center Challenges Require New Solutions Data Center Architecture. Inside and Out. Data centers are mission-critical facilities. A silo-based approach to designing,
More informationCommon Tools for Displaying and Communicating Data for Process Improvement
Common Tools for Displaying and Communicating Data for Process Improvement Packet includes: Tool Use Page # Box and Whisker Plot Check Sheet Control Chart Histogram Pareto Diagram Run Chart Scatter Plot
More informationNeelesh Kamkolkar, Product Manager. A Guide to Scaling Tableau Server for Self-Service Analytics
Neelesh Kamkolkar, Product Manager A Guide to Scaling Tableau Server for Self-Service Analytics 2 Many Tableau customers choose to deliver self-service analytics to their entire organization. They strategically
More informationA Sarsa based Autonomous Stock Trading Agent
A Sarsa based Autonomous Stock Trading Agent Achal Augustine The University of Texas at Austin Department of Computer Science Austin, TX 78712 USA achal@cs.utexas.edu Abstract This paper describes an autonomous
More informationProcedure for Marine Traffic Simulation with AIS Data
http://www.transnav.eu the International Journal on Marine Navigation and Safety of Sea Transportation Volume 9 Number 1 March 2015 DOI: 10.12716/1001.09.01.07 Procedure for Marine Traffic Simulation with
More informationNot All are Equal Many questions have arisen since the widespread availability of wideband air-fuel meters.
By Mike Kojima [Note: This is extracted from, and owned by, www.fordmuscle.com. For complete text, and to view discussions, please visit: http://www.fordmuscle.com/archives/2007/06/widebandshootout/index.php
More informationEMC DOCUMENTUM MANAGING DISTRIBUTED ACCESS
EMC DOCUMENTUM MANAGING DISTRIBUTED ACCESS This white paper describes the various distributed architectures supported by EMC Documentum and the relative merits and demerits of each model. It can be used
More information