BUILDING STANDARDS DIVISION EXAMPLE CONSTRUCTIONS AND GENERIC INTERNAL CONSTRUCTIONS FOR USE WITH SECTION 5: NOISE OF THE TECHNICAL HANDBOOKS

Size: px
Start display at page:

Download "BUILDING STANDARDS DIVISION EXAMPLE CONSTRUCTIONS AND GENERIC INTERNAL CONSTRUCTIONS FOR USE WITH SECTION 5: NOISE OF THE TECHNICAL HANDBOOKS"

Transcription

1 BUILDING STANDARDS DIVISION EXAMPLE CONSTRUCTIONS AND GENERIC INTERNAL CONSTRUCTIONS FOR USE WITH SECTION 5: NOISE OF THE TECHNICAL HANDBOOKS

2

3 CONTENTS Page 1.a 1.b 1.c 2.a 2.b 2.c 3.a 3.b 3.c 3.d 3.e 4.a 4.b 4.c B1 B2 B3 Introduction Status of document Background Aims Example Constructions Section 1 Example Constructions Design of Example Constructions Separating wall details links to wall types Separating floor details links to floor types Section 2 Design and specification considerations Design and specification On-site construction practices separating walls On-site construction practices separating floors Section 3 Component specification and acoustic performance requirements Wall ties for blockwork cavity walls Bonded Resilient Covers (BRC s) over isolated screeds Floating Floor Treatments (FFT s) Resilient ceiling bars Downlighters (recessed lighting) Generic Internal Constructions Internal walls and intermediate floors Internal wall details Intermediate floor details Annex A Explanation of terms Annex B Laboratory test procedures for building products and components for manufacturers General requirements for the selection of Bonded Resilient Coverings (BRC s) and Floating Floor Treatments (FFT s) Determination of the acoustic performance of Bonded Resilient Coverings (BRC s) used with concrete core floors Determination of the acoustic performance of requirements of Floating Floor Treatments (FFT s) used with timber joist or lightweight frame core floors

4 B4 B5 B6 Determination of the acoustic performance of resilient ceiling bars Determination of the influence on the acoustic performance of timber separating floors due to the presence of downlighters (recessed lighting) Determination of the acoustic performance of downlighters and recessed lighting used with timber core floors Version Date Notes October 2010 New Document 2

5 INTRODUCTION Status of this document This document provides guidance on one way of meeting some of the requirements of the functional standards set out in Regulation 9 of the Building (Scotland) Regulations 2004, as amended. However, it is acceptable to propose alternative solutions provided they fully satisfy the functional standards. Background A reduction in sound transmission passing through a separating wall or floor is achieved by limiting airborne sound, such as that from speech or television, and impact sound such as that from footsteps by providing sound insulation measures. Sound insulation involves a system approach using a combination of products and components. The wide range of acoustic product testing and the logarithmic approach for sound insulation performance does not lend itself to a straightforward design process. A non-acoustician will find this complex. Past experience has shown that one of the most common causes of failure to meet the sound insulation performance levels was the specification or subsititution of unsuitable products. Aims The main aim of this document is to provide examples of the most commonly used separating wall, separating floor, internal wall and intermediate floor constructions. These examples offer a prepared solution to meeting certain aspects of Standard 5.1 and Standard 5.2. When built correctly, and taking into account the flanking elements, they should meet the sound performance levels given in and of the Technical Handbooks. Annex B of this document contains the relevant test information sought by manufactures to demonstrate that their products are suitable to be used in an Example Construction specification. 3

6 EXAMPLE CONSTRUCTIONS SECTION 1 1.a Design of Example Constructions The Example Constructions have been designed with the following in mind: to reduce horizontal impact sound transmission through separating wall constructions from sound caused by switches, inserting plugs into sockets or cupboard doors closing; to provide suitable measures to reduce impact sound transmission through separating floor constructions which incorporate wood based floor coverings; to reduce flanking sound transmission through other construction elements which are not part of the separating wall or floor, such as inner leafs of external walls. The common factors which are illustrated in each detail are: core wall or floor construction; wall linings; isolating, resilient or floating floor layers; interaction with other building elements; - junction with the external wall - junction with separating wall or floor - junction for the ground floor - junction with internal walls or floors - junction with the ceiling and roof space lining details for vertical soil vent pipes and wall mounted service penetrations; separating walls between a dwelling and a common area (e.g. stairway for flats and maisonettes). Other requirements of the Scottish building regulations which are not illustrated by these details, but which should be considered by the designer include: structure; fire resistance and flame spread; damp-proofing arrangements; precipitation; ventilation; thermal performance of elements; thermal bridging and air leakage. 4

7 1.b Separating wall details SEPARATING WALLS DETAILS 1.00 DENSE BLOCK SOLID WALL 1.01 Isometric and construction detail 1.02 External wall junction Wall Type 1 Masonry solid walls (dense blockwork) for use in attached houses, flats and maisonettes 1.03 Separating floor junction: Floor Type 2A 1.04 Separating floor junction: Floor Type 2B 1.05 Ground floor junction: Floating Floor Treatment (FFT) 1.06 Ground floor junction: isolated screed 1.07 Ceiling and roof junction 1.08 Separating wall: dwelling to common area 2.00 DENSE BLOCK CAVITY WALL 2.01 Isometric and construction detail 2.02 External wall junction Wall Type 2 Masonry cavity walls (dense blockwork) for use in attached houses, flats and maisonettes 2.03 Separating floor junction: Floor Type 2A 2.04 Separating floor junction: Floor Type 2B 2.05 Ground floor junction 2.06 Internal floor junction: floor joists on hangers 2.07 Internal floor junction: floor joists built-in 2.08 Ceiling and roof junction 2.09 Separating wall: dwelling to common area 5

8 SEPARATING WALLS DETAIL 3.00 TIMBER FRAME TWIN STUD WALL 3.01 Isometric and construction detail 3.02 External wall junction Wall Type 3 Timber frame twin stud walls (with and without sheathing) for use in attached houses, flats and maisonettes 3.03 Separating floor junction: Floor Type 3A 3.04 Separating floor junction: Floor Type 3B 3.05 Ground floor junction 3.06 Ground floor junction: raft foundation 3.07 Internal wall junction 3.08 Internal floor junction 3.09 Ceiling and roof junction 3.10 Services and sockets 3.11 Separating wall: dwelling to common area 4.00 METAL FRAME TWIN STUD WALL 4.01 Isometric and construction detail 4.02 External wall junction: metal stud framing Wall Type 4 Metal frame twin stud walls for use in attached metal frame houses and in-situ concrete frame, flats and maisonettes 4.03 External wall junction: in-situ concrete framing 4.04 Separating floor junction: Floor Type 1A 4.05 Separating floor junction: Floor Type 1B 4.06 Ground floor junction 4.07 Ground floor junction: raft foundation 4.08 Internal wall junction 4.09 Internal floor junction 4.10 Ceiling and roof junction 4.11 Services and sockets 4.12 Separating wall: dwelling to common area 6

9 1.c Separating floor details SEPARATING FLOORS DETAIL 5.00 IN-SITU CONCRETE: with isolated screed and Bonded Resilient Cover (BRC) 5.01 Isometric and construction detail Floor Type 1A 5.02 Isolated screed and Bonded Resilient Cover (BRC) In-situ concrete slab with isolating screed and Bonded Resilient Cover (BRC) 5.03 Ceiling treatment 5.04 External wall junction: metal stud inner leaf 5.05 External wall junction: dense block inner leaf 5.06 Separating wall junction: Wall Type Services: vertical soil vent pipes (SVP's) 6.00 IN-SITU CONCRETE: with Floating Floor Treatment (FFT) 6.01 Isometric and construction detail Floor Type 1B In-situ concrete slab with Floating Floor Treatment (FFT) 6.02 Floating Floor Treatment (FFT) 6.03 Ceiling treatment 6.04 External wall junction: metal stud inner leaf 6.05 External wall junction: dense block inner leaf 6.06 Separating wall junction: Wall Type Services: vertical soil vent pipes (SVP's) 7

10 SEPARATING FLOORS DETAIL 7.00 PRECAST CONCRETE SLAB: with isolated screed and Bonded Resilient Cover (BRC) 7.01 Isometric and construction detail Floor Type 2A 7.02 Isolated screed and Bonded Resilient Cover (BRC) Precast concrete slab with isolating screed and bonded resilient cover 7.03 Ceiling treatment 7.04 External wall junction: dense block inner leaf 7.05 Separating wall junction: Wall Type Separating wall junction: Wall Type Services: vertical soil vent pipes (SVP's) 8.00 PRECAST CONCRETE SLAB: with Floating Floor Treatment (FFT) 8.01 Isometric and construction detail 8.02 Floating Floor Treatment (FFT) Floor Type 2B 8.03 Ceiling treatment Precast concrete slab with floating floor treatment 8.04 External wall junction: dense block inner leaf 8.05 Separating wall junction: Wall Type Separating wall junction: Wall Type Services: vertical soil vent pipes (SVP's) 8

11 SEPARATING FLOORS DETAIL 9.00 TIMBER FRAME FLOOR: with solid joists 9.01 Isometric and construction detail 9.02 Floating Floor treatment (FFT) 9.03 Ceiling treatment Floor Type 3A Timber frame floor with solid joists 9.04 External wall junction: timber frame inner leaf 9.05 Separating wall junction: Wall Type Internal wall junction: loadbearing 9.07 Internal wall junction: non-loadbearing 9.08 Services: vertical soil vent pipes (SVP's) TIMBER FRAME FLOOR: with engineered I- joists Isometric and construction detail Floating Floor Treatment (FFT) Floor Type 3B Timber frame floor with engineered I-joists Ceiling treatment External wall junction: timber frame inner leaf Separating wall junction: Wall Type Internal wall junction: loadbearing Internal wall junction: non-loadbearing Services: vertical soil vent pipes SVP's 9

12 SECTION 2 DESIGN AND SPECIFICATION CONSIDERATIONS 2.a Design and specification At the design stage of any development the design and specification are important as in the past this has found to be the most common cause of sound performance failure. Design and specification consideration should include: the minimum block density; the Floating Floor Treatment (FFT) achieves the performance requirements in 3c; the resilient ceiling bar achieves the performance requirements in 3d; the wall tie type for blockwork cavity separating walls should always be wall tie Type A, see 3a; the minimum cavity width or floor cavity depth; the minimum gypsum board density (to achieve a high enough level of mass); the use of mineral wool based boards (as they have acoustic absorption properties) and not rigid insulation boards (as they have very low acoustic absorption properties). 2.b On-site construction practices (separating walls) Generally, the approved design and specification should be adhered to and the substitution of products should be avoided. Past experience has shown the following on-site construction practices will assist in achieving the sound insulation performance; Wall Type 1 - Dense block solid wall using a dense block as specified; laying the 215 mm block full width on its side; fully filling perpends and bed joints with mortar; achieving external wall inner leaf continuity with the separating wall; installing independent metal frame studs at a minimum 30 mm offset from the blockwork face; fully filling the metal frame stud width and height with quilt insulation. Wall Type 2 - Dense block cavity wall using a dense block as specified; fully filling perpends and bed joints with mortar; using Wall Tie Type A in the separating wall leafs, see 3a; keeping the wall ties free of mortar and debris at the base of the wall cavity (to help prevent bridging of the cavity wall leafs); 10

13 achieving a minimum 75 mm cavity width; scratching the wet render (to increase the mechanical bond for the dab and gypsum based board). Wall Type 3 - Timber frame twin stud wall achieving the minimum cavity width between linings; achieving a minimum of 50 mm between sheathed stud walls; fully covering the wall face of the stud bay with quilt insulation; staggering the joints of gypsum board linings; achieve the minimum gypsum board density; avoid spanning joists into the wall cavity (to prevent bridging of the twin frame) using a rigid cavity stop fixed to one frame only (to prevent bridging of the twin frame). Wall Type 4 - Metal frame twin stud wall building a 200 mm minimum cavity width between linings; fully covering the wall face of the stud bay with quilt insulation; staggering the joints of gypsum board linings; achieve the minimum gypsum board density; using a rigid cavity stop fixed to one frame only (to prevent bridging of the twin frame). 2.c On-Site construction practices (Separating Floors) Generally, the approved design and specification should be adhered to and the substitution of products should be avoided. Past experience has shown the following on-site construction practices will assist in achieving the sound insulation performance; Isolated screeds installing both isolating layers; isolating the screed (to prevent the screed bridging the core slab); isolating the screed (to prevent the screed bridging the perimeter wall, wall linings and skirting) ; achieving the minimum depth of 65 mm sand:cement screed. Bonded Resilient Covers (BRC) using a resilient cover that achieves the performance requirements in 3b. Floating Floor Treatments (FFT) using the minimum FFT depth specified; using a FFT that achieves the performance requirements in 3c; installing the perimeter flanking strip (to isolate flooring boards from skirtings and wall linings); using the correct screw length (to prevent screws or nails bridging the resilient layer); taking care installing services (to prevent them bridging the resilient layer). 11

14 Suspended ceiling treatments using a metal frame ceiling where required; building to the correct ceiling void depth; achieving the minimum mass per unit area of the ceiling board. Resilient ceiling bars using resilient ceiling bar that achieve the performance requirements in 3d; using the correct screw length (to prevent the ceiling board screw fixings touching the joist). 12

15 SECTION 3 COMPONENT SPECIFICATION AND ACOUSTIC PERFORMANCE REQUIREMENTS 3.a Wall ties for blockwork cavity walls Specification of the correct wall tie is important. A wall tie will transmit sound and can affect the sound insulation performance. For example if the wall tie is too thick or too stiff, or a build up of mortar or debris on the wall tie has been allowed to form, this will increase sound transmission leaf to leaf (acoustic bridging). Therefore, it is important that wall ties and cavities are protected during construction and kept clear of mortar or debris. Particular attention should be paid to Section 1: Structure of the Technical Handbooks. Separating walls wall tie Type A All wall ties used in separating walls involving cavity blockwork should be tie Type A. Tie Type A should achieve an appropriate measured dynamic stiffness for the cavity width. The specification for wall ties dynamic stiffness, K Xmm in MN/m with a cavity width of X mm and n ties/m 2 is n.k Xmm <4.8 MN/m 3. A wall tie manufacturer will be able to provide product specification details which achieve the stiffness for wall tie Type A. External walls - wall tie Type A or B Wall ties used in external blockwork cavity walls can be tie Type A (as above) or tie Type B (depending on strength requirements), which have an appropriate measured dynamic stiffness for the cavity width. The specification for wall ties of dynamic stiffness, K Xmm in MN/m with a cavity width of X mm and n ties/m 2 is n.k Xmm <4.8 MN/m 3 (tie Type A) or <113 MN/m 3 (tie Type B). A wall tie manufacturer will be able to provide product specification details to achieve these requirements for tie Type A or tie Type B for external walls. 3.b Bonded Resilient Covers (BRC s) over an isolated screed A resilient cover is a thin resilient layer used below a floor covering, which can be bonded to a concrete floor or to the surface of an isolated screed. When bonded it is referred to as a Bonded Resilient Cover (BRC). The use of a BRC does not generally affect airborne transmission but can reduce impact sound transmission. Isolated screed The resilient layer can also be used as an isolating layer underneath a screed, as in floor detail 1A and 2A, to improve airborne and impact sound transmission. However, the isolating layer on its own is not sufficient to repeatedly achieve the required impact performance against 13

16 impact noise such as footsteps. There has been an increase in the use of wood based floor coverings, such as laminate flooring, laid directly on a screed finish without a resilient layer (underlay, between a wood based floor covering and a screed). This will increase sound transmission into the dwelling below, therefore a BRC should be used and cover the entire floor surface of the room. Where BRC s are used for concrete core floors they should be tested with a wood based floor covering laid over the resilient layer. This would provide a more realistic performance for how these components may perform for impact sound insulation in buildings with hard floor finishes. The BRC used in concrete core floors should: be tested for impact performance in an acoustic laboratory, as outlined in Annex B; and achieve the required minimum sound insulation performance as described in the table below. Minimum performance requirements of BRC s used with concrete core floors [1-3] Impact Lw 17 db Notes: 1) The above performance requirement is based on a resilient floor covering which has been tested in a laboratory in accordance with Annex B under a wood based floor covering. Any material adopted for use in the Example Constructions should also have been tested under a wood based floor covering. Testing directly onto the resilient cover will lead to an exaggerated performance which does not reflect its true performance under a wood based floor covering when built. 2) Annex B outlines the laboratory test requirements for resilient floor coverings with concrete core floors. 3) BRC s should only be used with concrete core floors. 3.c Floating Floor Treatments (FFT s) A floating floor treatment (FFT) is a timber floating floor system, normally timber, which may utilise battens, cradles or a platform base. All of these use a resilient layer to provide isolation from the base floor and adjacent wall elements. FFT s can increase the airborne and impact performance for both concrete core floors and lightweight frame floors (such as timber joist separating floors). FFT S are referred to in terms of FFT1, FFT2 or FFT3, which relates to their structure type, design depth and their acoustic performance. These FFT s apply to resilient battens and cradle systems which support a timber based tongue and grooved (t&g) floor board. All FFT s require acoustic isolation flanking strips at the room perimeter. The flanking strip should be installed such that it isolates the floor board edge form the perimeter wall, wall linings and skirtings. Further descriptive 14

17 information relating to the relative FFT is provided in each Example Construction. FFT1 and FFT3 - the composite resilient batten used is composed of a timber batten with a pre-bonded, continuous resilient material to provide isolation between the flooring surface layers and floor base or core. FFT2 - the cradle / saddle is used as an intermediate support system (with a resilient layer base, either pre-bonded or already integral) using levelling packer pieces to support a timber batten, isolating it from the floor base. Cradles should not be used on timber joist floors unless the supporting deck has sufficient stiffness and strength properties to cope with concentrated point loads. The incorporation of C tr (measurement criteria for low frequency noise) within the laboratory test requirements for FFT s for timber joist floors or lightweight frame floors will enhance the low frequency performance of these structures. The FFT s used in concrete core floors, timber joist or lightweight frame core floors should: be tested in an acoustic laboratory, as outlined in Annex B; and achieve the required airborne and impact sound insulation performance as described in the tables below. Minimum performance requirements of FFT s used with concrete core floors FFT1, FFT2 and FFT3 [1] Airborne Rw Impact Lw 5 db 22 db Note: 1) Annex B outlines the laboratory test requirements for FFT s on concrete core floors. Minimum performance requirements of FFT s used with timber joist or lightweight frame floors FFT1 [1] Airborne Rw Airborne Rw + C tr Impact Lw 17 db 13 db 16 db Note: 1) Annex B outlines the laboratory test requirements for FFT s when used with timber joist or lightweight frame floors 3.d Resilient ceiling bars Resilient ceiling bars are generally metal based and can increase both airborne and impact sound insulation performance. Resilient ceiling bars are used to support ceiling board linings and mounted perpendicular to the joist span for timber frame and lightweight frame floors. They can improve both the airborne and the impact performance of the separating 15

18 lightweight frame floor. Resilient ceiling bars vary in thickness and are used to support ceiling board linings and mounted perpendicular to the joist span. To obtain the best acoustic performance for both airborne and impact sound insulation the ceiling board fixings into the resilient bar should not come into direct contact with the joists. Care should be taken to ensure the correct screw length is used for fixing. The incorporation of C tr within the laboratory test requirements for resilient ceiling bars for timber joist floors or lightweight frame floors will enhance the low frequency performance of these structures. The resilient ceiling bars for timber joist floors should: be tested in an acoustic laboratory, as outlined in Annex B; and achieve the required impact sound insulation performance as described in the table below Minimum performance requirements of resilient ceiling bars used with timber joist or lightweight frame floors [1] Airborne Rw Airborne Rw + C tr Impact Lw 16 db 14 db 16 db Note: 1) Annex B outlines the laboratory test requirements for resilient ceiling bars with timber joist or lightweight frame core floors. 3.e Downlighters (recessed lighting) Downlighters (or recessed lighting) are often mounted such that they penetrate the ceiling board lining. The junction between the ceiling board and downlighter perimeter should be well sealed. It is recommended that downlighters should: be at centres of not less than 0.75m; have openings no greater than 100 mm diameter or 100x100 mm; be installed at no more than one downlighter per 2m 2 of total ceiling area in each room. Downlighters may be installed at a greater density than 1 per 2m 2 if the light fittings are supported by test evidence undertaken in accordance with Annex B. Particular attention should be paid to Section 2: Fire of the Technical Handbooks. 16

19 GENERIC INTERNAL CONSTRUCTIONS The following internal constructions are provided for internal walls and intermediate floors. 4.a Internal walls and intermediate floors INTERNAL WALLS DETAIL LINK Wall Type Timber or metal frame with gypsum based board linings on each side of frame Timber or metal frame with gypsum based board linings on each side of frame and absorbent material Concrete block wall, plaster or gypsum based board finish on both sides Aircrete block wall, plaster or gypsum based board finish both sides INTERMEDIATE FLOORS Floor Type DETAIL LINK Timber or metal joist, with wood based board and gypsum based board ceiling and absorbent material Concrete beams with infilling blocks, bonded screed and ceiling 3.0 Concrete planks 17

20 4.b Internal wall details Type 1 Timber or metal frame with gypsum based board linings on each side of frame Each lining to be 2 layers of gypsum based board, total minimum mass per unit area 10 kg/m 2 each layer; Linings fixed to timber frame 75 x 38 mm at 600 mm centres with a minimum distance between linings of 75 mm, or metal C type frame at 600 mm centres with a minimum distance between linings of 48 mm; All joints staggered and well sealed. Section Timber or metal frame Type 2 Timber or metal frame with gypsum based board linings on each side of frame and absorbent material Single layer of gypsum based board of minimum mass per unit area 10 kg/m 2 ; Linings fixed to timber frame 75 x 38 mm at 600 mm centres with a minimum distance between linings of 75 mm, or metal C type frame at 600 mm centres with a minimum distance between linings of 48 mm; An absorbent layer of mineral wool batts or quilt (minimum thickness 25 mm and minimum density 10 kg/m 3 ) that may be wire reinforced and suspended in the cavity; All joints well sealed. Section Timber or metal frame Type 3 Concrete block wall, plaster or gypsum based board finish on both sides Minimum mass per unit area, excluding finish 120 kg/m 2 ; All joints well sealed; Plaster or gypsum based board on both sides. Section 18

21 Type 4 Aircrete block wall, plaster or gypsum based board finish both sides Plaster finish, minimum mass per unit area, including finish 90 kg/m 2 ; Gypsum based board finish, mass per unit area, including finish 75 kg/m 2 ; All joints well sealed. Note 1: this wall type should only be used with separating walls included in Example Constructions where there is no recommended mass on the internal masonry walls. Note 2: this wall type should not be used as a load-bearing wall connected to a separating floor included in Example Constructions. Section 19

22 4.c Intermediate floor details Type 1 Concrete slab Minimum mass per unit area 180 kg/m 2 ; Regulating screed optional; Ceiling finish optional. Section Type 2 Concrete beams with infilling blocks, bonded screed and ceiling Minimum mass per unit area of beam and block 220 kg/m 2 ; Bonded screed. Sand cement screeds should have a minimum thickness of 40 mm. For proprietary bonded screed products, screed thickness should be as recommended by the manufacturer; Ceiling finish - single layer of gypsum based board, minimum mass per unit area 10 kg/m 2 ; Fix using timber battens or proprietary resilient channels. If resilient channels are used, incorporate an absorbent layer of mineral wool, minimum density 10 kg/m 2 that fills the ceiling void. Section Type 3 Timber or metal joist, with wood-based board and gypsum based board ceiling and absorbent material Floor surface of timber - or wood-based board, minimum mass per unit area 15 kg/m 2 ; 47 x 200 mm joists at 450 mm centres; Ceiling treatment of two layers of gypsum based board, minimum mass per unit area 10 kg/m 2 and fixed using any accepted fixing method; An absorbent layer of mineral wool, minimum thickness 100 mm, minimum density 10 kg/m 3 and laid in between the joists. Timber or metal joist Section 20

23 Annex A Explanation of terms The following terms are provided for clarity, and are for use with the Example Constructions and Generic Internal Constructions. It is not the intention that any of these terms relate to proprietary products. Absorption is the conversion of sound energy into heat, often by the use of a porous material. Absorbent material is a material that absorbs sound energy, such as mineral wool. Airborne sound is sound which is propagated from a noise source through the medium of air. Examples of these are speech and sound from a television. Airborne sound transmission is direct transmission of airborne sound through walls or floors. When sound energy is created in a room, for instance by conversation, some of the energy is reflected or absorbed by room surfaces but some may set up vibrations in the walls and floor. Depending on both the amount of energy and the type of construction, this can result in sound being transmitted to adjacent parts of the building. Air path is a void in construction elements, which adversely affects the performance of sound resisting construction. Examples of air paths include incomplete mortar joints, porous building materials, gaps around pipes and shrinkage cracks. Bonded resilient cover (BRC) is a thin resilient floor covering normally of minimum 3 mm thickness which is bonded to the isolated screed surface to reduce impact sound transmission such as footfall noise. Cavity stop is a proprietary product or material such as mineral wool (fibre) used to close the gap in a cavity wall. Composite resilient batten this is composed of a timber batten with a pre-bonded resilient material to provide isolation between the flooring surface layers and floor base. Cradle/Saddle is an intermediate support system (with a resilient layer base, either pre-bonded or already integral) using levelling packer pieces to support a timber batten, isolating it from the floor base. Decibel (db) is the unit used for different acoustic quantities to indicate the level with respect to a reference level. Density (kg/m 3 ) is the mass per unit volume, expressed in kilograms per cubic metre (kg/m 3 ). Blockwork is commonly referred to by industry in terms of strength (in 21

24 Newtons). However, it is the density that has the important role in terms of sound insulation. Direct transmission refers to the path of either airborne or impact sound through elements of construction. D nt,w is the weighted standardized level difference. A single-number quantity (weighted) which characterises the airborne sound insulation between two rooms, in accordance with BS EN ISO 717-1:1997 Flanking element (flanking wall) is any building element that contributes to the airborne sound or impact transmission between rooms in a building which is not the direct separating element (i.e. not the separating wall or separating floor). Flanking strip or edge strip is a resilient strip using foamed polyethylene normally 5 mm thick, which is located at the perimeter of a floor to isolate the floor boards from the walls and skirtings. Flanking transmission is airborne or impact transmission between rooms that is transmitted via flanking elements and/or flanking elements in conjunction with the main separating elements. An example of a flanking element is the inner leaf of an external wall that connects to the separating core of a wall or floor. Flexible closer is a flexible cavity stop or cavity barrier which seals the air path in cavities linking adjoining dwellings. Floating floor treatment (FFT) is a timber floating floor system which may use battens, cradles or platform base, all of which use a resilient layer to provide isolation from the base floor and adjacent wall elements. Gypsum based board is a dry lining board applied to walls, ceilings and within floating floor treatments which has gypsum content. It may also have fibre reinforcement within the board. Impact sound is sound which is propagated from a noise source through a direct medium. An example of this is footfall on a floor. Impact sound transmission is sound which is spread from an impact noise source in direct contact with a building element. Isolation is a strategy to limit the number and type of rigid connections between elements of construction. L nt,w is the weighted standardized impact sound pressure level. A single-number quantity (weighted) to characterise the impact sound insulation of floors, in accordance with BS EN ISO 717-2: Mass is a physical quantity that expresses the amount of matter in a body. Walls and floors may be described in terms of the surface density (mass per unit area, kg/m 2 ) of the wall face or the floor surface, which is the sum of the surface densities 22

25 of each component of the construction. The density of materials is expressed as mass per unit volume, kg/m 3, which can be provided via the core structure and linings such as in-situ concrete or solid dense block walls. Mass per unit area (or surface density) is expressed in terms of kilograms per square metre (kg/m 2 ). This is often used to describe boards, panels, flooring and dry linings (see gypsum based board). Resilience can reduce structural vibration transmission and still maintain material performance and overall dimensions, examples include floating floor treatments such as resilient battens or cradles, or resilient ceiling bars. Resilient ceiling bars are generally metal based and vary in thickness from 11 mm to 30 mm. They are mounted perpendicular to the joist span direction and can increase both airborne and impact sound insulation. Care should be taken to ensure that the ceiling board fixings into the resilient bar do not come into contact with the joists and reduce the potential performance. Resilient noggin a small section of resilient ceiling bar which is used to assist in bracing non load bearing partitions. R w a single-number quantity (weighted) which characterises the airborne sound insulation of a building element from measurements undertaken in a laboratory, in accordance with BS EN ISO 717-1: 1997 Stiffness can improve low frequency sound insulation, for example in floors, by reducing the potential for deflection or movement of the primary structure, therefore the correct spacing and depth of joists is important. 23

26 Annex B Laboratory test procedures for building products and components Annex B is aimed at manufacturers of acoustic products and outlines the laboratory test procedures and methodologies for the acoustic testing of building components which may be used as part of the Example Constructions. The weighting terms (as the name suggests) used in this annex applies a focus or weighting of how the wall or floor is performing for certain types of frequencies and sounds. Such terms are applied to reflect the location the wall or floor may be situated within / adjacent to and the type of noise source the wall has to insulate against. The building components which may be assessed by laboratory testing are described in the following sections: B1 B2 B3 B4 B5 B6 General requirements for the testing of Bonded Resilient Covers (BRC s), Floating Floor Treatments (FFT s) and resilient bars Determination of the acoustic performance of Bonded Resilient Floor Coverings (BRC s) used with concrete core floors Determination of the acoustic performance of Floating Floor Treatments (FFT s) used with concrete core floors Determination of the acoustic performance of Floating Floor Treatments (FFT s) used with timber core floors Determination of the acoustic performance of resilient bars used with timber core floors Determination of the acoustic performance of downlighters and recessed lighting used with timber core floors 24

27 B1 General requirements for the testing of Bonded Resilient Coverings (BRC s), Floating Floor Treatments (FFT s) and resilient bars Test facility accreditation The test facility must have UKAS Accreditation (or European equivalent) for the measurement of sound insulation in the laboratory for both airborne sound insulation and impact sound transmission. Test facility requirements The test measurement should be undertaken in accordance with: BS EN ISO 140-3: 1995 for FFT s and resilient bars only; BS EN ISO 140-6: 1998 for FFT s and resilient bars only; BS EN ISO 140-8: 1998 for BRC s only. The performance of each measurement should be rated in accordance with: BS EN ISO 717-1: 1997 (for airborne sound), and BS EN ISO 717-2: 1997 (for impact sound). The measurements should be undertaken in a laboratory with suppressed flanking transmission and in accordance with: BS EN ISO 140-1: 1998; and BS EN ISO 140-2: B2 Determination of the acoustic performance of Bonded Resilient Coverings (BRC s) used with concrete core floors To determine the acoustic performance of BRC s used with concrete core separating floors impact measurements should be undertaken in an acoustic test laboratory. The measurement and performance rating criteria are outlined below. Test facility accreditation and requirements in accordance with B1. Core floor Testing should be undertaken on a core (or base) floor which consists of an in-situ concrete slab 140 mm thick. The tapping machine should not be placed directly onto the resilient floor cover as this leads to exaggerated performance values which are not representative of real buildings with hard floor finishes. The test sample resilient floor cover should be tested with a wood based floor covering laid over the test sample area. The test sample area and wood based floor covering should be of sufficient size to permit a tapping machine to be placed on top of the test materials. The wood based floor covering should be 8 mm (min) to 16 mm (max) thickness with a nominal density of 600 kg/m 3 (+/- 30 kg/m 3 ). 25

28 The floor test samples should be measured with a uniformly distributed load of 25 kg/m 2 with at least one weight per square metre of the flooring area as described in BS EN ISO Testing required Impact Test 1 - Determination of L n,w for the core (or base) concrete floor. Test 2 - Determination of L n,w for the core (or base) concrete floor with the resilient cover applied to the core floor surface. Expression of performance The impact sound transmission performance of the resilient covering should be expressed as the weighted reduction in impact sound transmission/pressure level ( L w ) as a result of the application of the resilient covering to the core floor ( L w = Test 1 Test 2). 26

29 B3 Determination of the acoustic performance of Floating Floor Treatments (FFT s) used with concrete core floors To determine the acoustic performance of FFT s used with concrete core separating floors airborne and impact measurements should be undertaken in an acoustic test laboratory. The measurement and performance rating criteria are outlined below. Test facility accreditation and requirements in accordance with B1. In addition to B1, the R max value of the laboratory test facility should be at least 10 db greater than the sound insulation of the structure under test. Core floor The airborne and impact performance for FFT s can be determined by using an insitu concrete floor in accordance with B2 or the pre-cast concrete core floor below. CORE (BASE) Concrete floor with FFT s Testing should be undertaken on a core (or base) floor which consists of the following construction: Screed Precast slab (plank) Core floor construction 10 mm (min) 25 mm (max) levelling screed min. 80 kg/m 2 with bonding agent applied such that it is directly bonded to the entire floor surface of the slab (planks). 150 mm deep hollow-core precast concrete slab (plank) of mass per unit area kg/m 2. The hollow segments of the precast slab (plank) should be located at regular centres and should be distributed over a minimum of 80% of the slab (plank) width. The precast concrete hollow-core slab (planks) should be mounted in the test aperture to cover the entire test aperture area. The slab (planks) should be tightly abutted and all joints should be filled with grout including top and bottom joints. No voids should remain at the floor perimeter junction with the test aperture border. No ceiling treatments or layers should be applied. 27

30 The FFT should cover the entire test area of the core floor surface and should be constructed in accordance with the manufacturer s instructions. Floating Floor Treatment (FFT) All FFT s require a resilient flanking strip to isolate the edge of the floor board from the perimeter walls. The manufacturer should use the flanking strip, which they would normally use on site, in the laboratory measurements. The flanking strip design and specification should be consistent with the Example Constructions. Testing required (FFT) For the purposes of evaluating the performance of a FFT for concrete core floors four different measurements are required (two airborne and two impact). Airborne Test 1 Determination of R w for the core (or base) concrete floor. Test 2 Determination of R w for the core (or base) concrete floor with the FFT applied to the core floor surface. Impact Test 3 Determination of L n,w for the core (or base) concrete floor. Test 4 Determination of L n,w for the core (or base) concrete floor with the FFT applied to the core floor surface. Expression of performance The airborne sound insulation performance of the FFT should be expressed as the improvement in airborne sound insulation ( R w ) as a result of the application of the FFT to the core floor ( R w = Test 2 Test 1) The impact sound transmission performance of the FFT should be expressed as the reduction in impact sound transmission ( L w ) as a result of the application of the FFT to the core floor ( L w = Test 3 Test 4). 28

31 B4 Determination of the acoustic performance requirements of Floating Floor treatments (FFT) used with timber core floors To determine the acoustic performance of floating floor treatments used with timber joist or lightweight frame separating floors airborne and impact measurements should be undertaken in an acoustic test laboratory. The following sections outline the measurement and performance rating criteria. Test facility and accreditation in accordance with B1. In addition to B1, the R max value of the laboratory test facility should be at least 10 db greater than the sound insulation of structure under test. CORE (OR BASE) Timber joist floor with FFT Testing should be undertaken on a core (or base) floor which consists of the following construction construction: Floor decking Joists Insulation Ceiling Core floor construction 15 mm OSB timber decking board (or equivalent timber based board) with mass per unit area of kg/m mm x 50 mm solid timber joists at least SC3 grade timber 100 mm glass based mineral wool insulation with a density of kg/m 3 Two layers of 12.5 mm gypsum based board with a mass per unit area for each layer of kg/m 2 The timber joists should be mounted on joist hangers at 450 mm centres and the 100 mm (deep) glass based mineral wool insulation should be placed in the cavities between the joists and also between cavities formed between the joists and the test aperture border. The floor decking should be mounted on the timber joists with screws at 300 mm centres. All junctions between the floor surface perimeter and test aperture should be sealed with a flexible or acoustic sealant. The ceiling layers should be mounted with joints staggered and the first layer (inner layer) should be fixed to the underside of the joists with screws, at 300 mm centres within the field of the boards and at 150 mm centres at the board ends. The second layer (outer layer) should be fixed with screws, at 230 mm centres within the field of the boards and at 150 mm centres at the board ends. The perimeter of the ceiling should be sealed with flexible or acoustic mastic sealant and all joints and screwheads taped with self adhesive tape. 29

32 The FFT should cover the entire test area of the core floor surface and should be constructed in accordance with the manufacturer s instructions. Floating Floor Treatment (FFT) All FFT s require a flanking strip to isolate the edge of the floor board from the perimeter walls. As such the manufacturer should also use the resilient layer and flanking strip which they would normally use on site in the laboratory measurements. The flanking strip design and specification should be consistent with the Example Constructions. Testing required For the purposes of evaluating the performance of a FFT for timber separating floors four different measurements are required (two airborne and two impact). Airborne Test 1 Determination of R w and R w +C tr for the core (or base) timber floor. Test 2 Determination of R w and R w +C tr for the core (or base) timber floor with the floating floor treatment applied to the core floor surface. Impact Test 3 Determination of L n,w for the core (or base) timber floor. Test 4 Determination of L n,w for the core (or base) timber floor with the floating floor treatment applied to the core floor surface. Expression of performance The airborne sound insulation performance of the FFT should be expressed as the improvement in airborne sound insulation for two categories of performance ( R w and R w +C tr ) as a result of the application of the FFT to the core floor ( R w = Test 2 Test 1) and ( R w +C tr = Test 2 Test 1). The impact sound transmission performance of the FFT should be expressed as the reduction in impact sound transmission ( L w ) as a result of the application of the FFT to the core floor ( L w = Test 3 Test 4). 30

33 B5 Determination of the acoustic performance of resilient bars used with timber core floors To determine the acoustic performance of resilient bars for use within separating floors airborne and impact measurements should be undertaken in an acoustic test laboratory. The performance of the resilient bars is calculated from the improvement in airborne and impact performance by a ceiling connected via resilient bars as opposed to a direct fix ceiling. The ceiling linings should be identical in both tests. Test facility and accreditation in accordance with B1. Direct fix ceiling versus resilient bar ceiling Testing should be undertaken on a floor with a direct fix ceiling which consists of the following construction specification: Floor Decking Joists Insulation Ceiling Floor construction with direct fix ceiling 15 mm OSB timber decking board (or equivalent timber based board) with mass per unit area of kg/m mm x 50 mm solid timber joists SC3 grade timber 100 mm glass based mineral wool insulation with a density of kg/m 3 Two layers of gypsum based board with an overall mass per unit area of kg/m 2. The timber joists should be mounted on joist hangers at 450 mm centres and the 100 mm (deep) glass based mineral wool insulation should be placed in the cavities between the joists and also between cavities formed between the joists and the test aperture border. The floor decking should be mounted on the timber joists with screws at 300 mm centres. All junctions between the floor surface perimeter and test aperture should be sealed with a flexible or acoustic mastic sealant. The direct fix ceiling is composed of two layers of gypsum based board which have an overall mass per unit area of kg/m 2 and have a minimum overall thickness of 30 mm. The ceiling layers should be mounted with joints staggered and the first layer (inner layer) should be fixed to the underside of the joists with screws, at 300 mm centres within the fields of the boards and 150 mm centres at the board ends, and the second layer (outer layer) should be fixed with screws, at 230 mm centres within the fields of the boards and at 150 mm centres at the board ends. The perimeter of the ceiling should be sealed with flexible or acoustic mastic sealant and all joints and screwheads taped with self adhesive tape. 31

34 Floor construction with the ceiling connected via resilient bars The floor construction and components used should be identical to the Direct Fix test structure except that the ceiling is only connected to the joists via the resilient bars. The resilient bars should be directly connected to the joists at 400 mm centres using metal screws, mounted perpendicular to the joist direction span and in accordance with the manufacturer s instructions. The gypsum based board ceiling layers should be identical in their material properties to those used for the Direct Fix ceiling. Testing Required For the purposes of evaluating the performance of resilient bars for four different measurements are required (two airborne and two impact measurements). The following measurements are required: Airborne Test 1 Determination of R w and R w +C tr for the floor with a direct fix ceiling. Test 2 Determination of R w and R w +C tr for the floor with a ceiling connected with resilient bars. Impact Test 3 - Determination of L n,w for the floor with a direct fix ceiling. Test 4 - Determination of L n,w for the floor with a ceiling connected with resilient bars. Expression of performance The airborne sound insulation performance of resilient bars should be expressed as the improvement in airborne sound insulation for two categories of performance 32

35 ( R w and R w +C tr ) as a result of the application of the resilient bar connected ceiling as opposed to the direct fix ceiling ( R w = Test 2 Test 1) and ( R w +C tr = Test 2 Test 1). The impact sound transmission performance of resilient bars should be expressed as the reduction in impact sound transmission ( L w ) as a result of the application of the resilient bar connected ceiling as opposed to the direct fix ceiling ( L w = Test 3 Test 4). 33

36 B6 Determination of the acoustic performance of downlighters and recessed lighting used with timber core floors This test procedure may also be used where a manufacturer may wish to test closer spacing or increased density of downlighters (i.e. less than 1 per 2m 2 ). To determine the influence on the acoustic performance due to the presence of downlighters for use within timber separating floors airborne and impact measurements should be undertaken in an acoustic test laboratory. The influence on the acoustic performance of the timber floor is calculated from airborne and impact measurements on a timber floor structure with and without downlighters present. The timber floor structure must be identical in both sets of tests (for airborne and impact) except for the presence of the downlighters. Test facility and accreditation in accordance with B1. In addition to B1, for downlighters to qualify the difference in performance with the downlighters present should be no worse than 1 db for both airborne measurements and impact measurements. Core timber floor with and without downlighters Testing should be undertaken on a floor with the following construction specification: Floor Decking Joists Insulation Ceiling Construction of initial timber floor (no downlighters) 15 mm OSB timber decking board (or equivalent timber based board) with mass per unit area of kg/m mm x 50 mm solid timber joists SC3 grade timber 100 mm glass based mineral wool insulation with a density of kg/m 3 Two layers of gypsum based board with an overall mass per unit area of kg/m 2. The timber joists should be mounted on joist hangers at 450 mm centres and the 100 mm (deep) glass based mineral wool insulation should be placed in the cavities between the joists and also between cavities formed between the joists and the test aperture border. The floor decking should be mounted on the timber joists with screws at 300 mm centres. All junctions between the floor surface perimeter and test aperture should be sealed with a flexible or acoustic mastic sealant. The direct fix ceiling is composed of two layers of gypsum based board which have an overall mass per unit area of kg/m 2 and have a minimum overall thickness of 30 mm. The ceiling layers should be mounted with joints staggered and the first layer (inner layer) should be fixed to the underside of the joists with screws, at 300 mm centres within the fields of the boards 34

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with Section Separating Floors Timber frame floor with I-Beams Product: Earthwool Acoustic Roll and Floorfoam Easy Edge Strip Timber frame floor with solid timber joists Product: Earthwool Acoustic Roll and

More information

Rockwool Flexi Insulation Application Guide

Rockwool Flexi Insulation Application Guide Pitched roof Rafters InterMediate floors INTERNAL partitions external Framed walls separating floors Separating Walls Rockwool Flexi Insulation Application Guide Ground floor The perfect fit for any framed

More information

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37

Contents. APA Construction Details. Full fill cavity walls 2-13. Partial fill cavity walls 14-25. Solid externally insulated walls 26-37 Contents Pages Full fill cavity walls 2-13 Partial fill cavity walls 14-25 Solid externally insulated walls 26-37 Appendix (BRE confirmation of Ψ and y-values) 38-40 Page 1 of 40 APA Construction Details

More information

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available. APR 1200 Acoustic Partition Roll CI/Sfb Ref: APR002 Glass mineral wool roll designed to provide high levels of sound insulation in walls and floors to meet Part E (England & Wales) and Section 5 (Scotland)

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

Lightweight Partition Design for Residential and Commercial Buildings

Lightweight Partition Design for Residential and Commercial Buildings Lightweight Partition Design for Residential and Commercial Buildings Stanley D. Gatland II, CertainTeed Corporation, Valley Forge, Pennsylvania Guidelines are presented for the design and proper installation

More information

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS NOISE TECHNICAL FACT SHEET FACT SHEET 5 SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS The sound insulation of exterior walls and roof-ceiling systems refers to their ability to reduce external

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

sound reduction systems for commercial, educational and industrial environments

sound reduction systems for commercial, educational and industrial environments sound reduction systems for commercial, educational and industrial environments Tel: +44 ()14 3874 Fax: +44 ()14 38957 E-mail: info@soundreduction.co.uk Web: www.soundreduction.co.uk soundblocker Acoustic

More information

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details D Installation Details D1 General D2 Walls D3 Ceilings D4 Reference D Installation Details D Contents D1 General Installation and Fastening Sequence for Steel Studs D1.1 Fastener Selection D1.3 D2 Walls

More information

ONLINE VERSION. The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 ONLINE VERSION

ONLINE VERSION. The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 ONLINE VERSION The Building Regulations 2010 The Building (Approved Inspectors etc) Regulations 2010 E1 E2 E3 E4 E Protection against sound from other parts of the building and adjoining buildings Protection against

More information

Module 3.7. Thermal bridging

Module 3.7. Thermal bridging Module 3.7 Thermal bridging Learning Outcomes On successful completion of this module learners will be able to - Describe construction details which influence thermal bridging. 2 Introduction to thermal

More information

Post and Beam Construction

Post and Beam Construction Post and Beam Construction A Presentation By the Canadian Wood Council Canadian Conseil Wood canadien Council du bois Early settlers introduced the concept of post and beam construction in North America

More information

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5 Accredited Construction Details (Scotland) 2010 For the limitation of thermal bridging and air infiltration in low and medium rise domestic buildings Introduction & Principles Issued in support of Junction

More information

Energy Company Obligation (ECO): Technical Monitoring Questions

Energy Company Obligation (ECO): Technical Monitoring Questions Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified

More information

Controlling the Transmission of Impact Sound through Floors

Controlling the Transmission of Impact Sound through Floors Construction Technology Update No. 35 Controlling the Transmission of Impact Sound through Floors by A.C.C. Warnock This Update presents guidelines for controlling the transmission of impact sound through

More information

Understanding BS EN 771-3: Aggregate concrete masonry units

Understanding BS EN 771-3: Aggregate concrete masonry units 60 Charles Street, Leicester LE1 1FB Tel: 0116 253 6161 Fax: 0116 251 4568 Email: enquiries@cba-blocks.org.uk Website: www.cba-blocks.org.uk February 2006 Understanding BS EN 771-3: Aggregate concrete

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

Section 3.1.2. Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining Section Timber Frame Walls Single layer between studs Product: Earthwool FrameTherm Rolls and Slabs Tf01 Single layer between studs with service void Product: Earthwool FrameTherm Rolls and Slabs Tf02

More information

Multi-layer Insulation Blanket for Roofs

Multi-layer Insulation Blanket for Roofs Multilayer Insulation Blanket for Roofs Thermal Insulation in a 40mm thin, flexible, multilayer membrane Meets requirements of L1A, L1B 2010 In accordance with BR443 NHBC Acceptance Pitched & Flat roof

More information

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction

C05. S03. P02 P08 FireWall. Including C05. S01. P02 Specialist partitions introduction C05. S03. P02 P08 Including C05. S01. P02 Specialist partitions introduction C05 Specialist partitions Introduction Specialist partitions This section details specialist lightweight systems where high-security,

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

PRESTRESSED CONCRETE FLOORING BEAMS

PRESTRESSED CONCRETE FLOORING BEAMS PRESTRESSED CONCRETE FLOORING BEAMS TRIED & TRUSTED Introduction Established in 2001 TT Concrete Products Limited has become a prominent manufacturer of prestressed concrete flooring beams throughout the

More information

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap

Knauf Aquapanel Interior. Tile Backing. Cement board for wet areas. Will not deteriorate in water. Easy to score and snap Tile Backing Will not deteriorate in water Easy to score and snap Resistant to mould and mildew Knauf Aquapanel Interior Cement board for wet areas Knauf Aquapanel Interior Cement Board Drywall for Wet

More information

Rev 1-12.2013. Code of Practice. SIP Technology. www.uksips.org

Rev 1-12.2013. Code of Practice. SIP Technology. www.uksips.org Rev 1-12.2013 Code of Practice SIP Technology www.uksips.org What are Structural Insulated Panels (SIPS)? SIPS are prefabricated, high performance, lightweight, building panels that can be used in floors,

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

Dubai Municipality Standard DMS 1: Part 5: 2004

Dubai Municipality Standard DMS 1: Part 5: 2004 Specification for precast concrete blocks Part 5: Normal-weight concrete-polystyrene sandwich masonry blocks Issue Date Revision Revision Description Prepared by Approved by Authorized by 19/12/2004 Issue

More information

Report Number BTC 17755F

Report Number BTC 17755F Leics. LE NP Tel () 4 Fax () 4 Email btc.testing@saintgobain.com Report Number BTC 77F A FIRE RESISTANCE TEST ON A LOADBEARING TIMBER JOIST FLOOR INCORPORATING 4mm x 7mm x 47mm SOLID JOISTS PROTECTED BY

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION This worksection has been written for Class 1 and 10a buildings that fully conform to the scope of AS 4773.1. If the works include isolated structures, (totally separate

More information

The Pocket Guide To Insulation August 2013

The Pocket Guide To Insulation August 2013 The Pocket Guide To Insulation August 2013 Introduction Knauf Insulation is the UK s leading manufacturer of insulation products, including: Earthwool glass and rock mineral wool Polyfoam ECO extruded

More information

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES

CERTIFICATE OF APPROVAL No CF 5055 ARABIAN VERMICULITE INDUSTRIES CERTIFICATE OF APPROVAL No CF 5055 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of 1 st Industrial Area,

More information

VIPAC ENGINEERS & SCIENTISTS

VIPAC ENGINEERS & SCIENTISTS VIPAC ENGINEERS & SCIENTISTS Vipac Engineers & Scientists Limited A.B.N. 33 005 453 627 The Victorian Technology Centre Private Bag 16, Port Melbourne, VIC, 3207, AUSTRALIA Telephone +61 3 9647 9700, Facsimile

More information

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors

PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors For distribution in Asia Pacific PASSIVE FIRE PROTECTION SYSTEMS Application & Technical Manual: Ceilings & Floors Contents

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

Manual lifting and handling

Manual lifting and handling Manual lifting and handling When installing British Gypsum products and systems care should be taken to ensure that appropriate methods of handling and lifting are adopted. The following guidance details

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

Acoustics factsheet Requirements for new homes and how NHBC can help

Acoustics factsheet Requirements for new homes and how NHBC can help Acoustics factsheet Requirements for new homes and how NHBC can help New homes are built to high standards; however, acoustics and noise control are important factors requiring careful consideration during

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Timber Decks. Technical Note. March 2007

Timber Decks. Technical Note. March 2007 Timber Decks Technical Note. March 2007 This Technical Note contains general information for residential timber decks and floor frame structures for veranda s, patios etc which are exposed to the weather.

More information

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs The better way to build TM Installation Manual EXTERIOR WALL SIPs July 2015 EXTERIOR WALL SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

Ultimate Acoustic Solutions for Floors & Ceilings

Ultimate Acoustic Solutions for Floors & Ceilings Ultimate Acoustic Solutions for Floors & Ceilings Uniclass L586+L542:N372 EPIC E42+E512:Y45 CI/SfB (43)+(45) R+T (P2) Contains SRS Ltd s Rigorous Standard Details for: Building Regulations Approved Document

More information

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas

FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas FERMACELL Powerpanel H 2 O for Wet & Moisture affected areas Powerpanel H 2 O is a cement based board from FERMACELL. Board Characteristics Board Thickness 12.5 mm Board Sizes 1000 x 1200 mm 50 sheets/pallet

More information

Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors

Best Practice in Best Pra ctice in teel constr uction - onstr industrial B uildings esidential Buildings 01 Introduction 02 Key Design Factors Best Practice in Steel Construction - Industrial Residential Buildings Contents The Steel Construction Institute (SCI) develops and promotes the effective use of steel in construction. It is an independent,

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection

PB301 July 2009. Lightweight Building Solutions. Bushfire Protection. www.boral.com.au/bushfireprotection PB301 July 2009 Lightweight Building Solutions Bushfire Protection www.boral.com.au/bushfireprotection Attached or adjacent within 6m roofed structures such as garages, carports, verandas and the like,

More information

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01. Section 5.0 Basements Wall insulated externally Product: Polyfoam ECO Ba01 Wall insulated internally Product: Polyfoam ECO Ba02 Basements Basements Basement design Waterproofing BS 8102: 2009 Code of practice

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

British Gypsum Guide to Timber Frame Construction. March 1998

British Gypsum Guide to Timber Frame Construction. March 1998 British Gypsum Guide to Timber Frame Construction March 1998 Timber frame construction has a centuries long tradition in the UK, however, over the last 80 years it has continuously evolved to meet the

More information

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com

FireWall. High performance fireresistant. FireWall. www.british-gypsum.com FireWall FireWall High performance fireresistant wall system FireWall is a non-loadbearing wall which provides up to 240 minutes fire resistance. It is used in certain ground floor basement situations

More information

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls.

Improving the flood resistance of your home. Advice sheet 4: Flood-resilient walls. Improving the flood resistance of your home Advice sheet 4: Flood-resilient walls. This sheet provides guidance on identifying different types of wall, and reducing the flow of floodwater through them

More information

Metsä Wood. Jussi Björman. R&D Engineer

Metsä Wood. Jussi Björman. R&D Engineer Metsä Wood Jussi Björman R&D Engineer METSÄ GROUP Net sales, total 5,0 EUR billion Personnel, total 9 600 METSÄLIITTO COOPERATIVE Group s parent company Owned by 116,000 Finnish forest owners METSÄ FOREST

More information

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing Good Craftsmanship Guide Carpentry and Joinery- Carcassing Introduction This Good Craftsmanship Guide highlights key problems with the major elements of Carpentry and Joinery - Carcassing, and gives guidance

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare?

The right solutions. However, it is inevitable that with the introduction of any new construction system the question arises How does it compare? Value assessment. The right solutions. We Believe We believe that Porotherm offers both short and long term value to all involved in the building process - from bricklayer to client and everyone in between.

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01

Section 2.4. Built-up Metal Roofs. Rail and bracket system. Standing seam system. Bu02. Product: Earthwool FactoryClad range Bu01 Section Built-up Metal Roofs Rail and bracket system Product: Earthwool FactoryClad range Bu01 Standing seam system Product: Earthwool FactoryClad range and Earthwool Universal Slab Bu02 Built-up Metal

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED

CERTIFICATE OF APPROVAL No CF 291 SCHOTT UK LIMITED CERTIFICATE OF APPROVAL No CF 291 This is to certify that, in accordance with TS General Requirements for Certification of Fire Protection Products The undermentioned products of Drummond Road, Stafford.

More information

Timber Frame Construction

Timber Frame Construction Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction

More information

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

Acoustic. Publication date June 2011. www.polymaxinsulation.com.au

Acoustic. Publication date June 2011. www.polymaxinsulation.com.au Acoustic Design Gui de Publication date June 2011 Contents Insulation Acoustic Design Guide Quick Product Selector Guide p.1 Introduction p.2 Acoustic Product Descriptions p.2 Sound Transmission p.3 Residential

More information

Acoustic performance of dwellings and specifics for lightweight constructions Professor Eddy Gerretsen

Acoustic performance of dwellings and specifics for lightweight constructions Professor Eddy Gerretsen Acoustic performance of dwellings and specifics for lightweight constructions Professor Eddy Gerretsen Content Introduction Performance quantities Construction principles What performance is required Does

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

Fire Resistance of Brick Masonry

Fire Resistance of Brick Masonry TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Fire Resistance of Brick Masonry 16 March 2008 Abstract: This Technical Note presents

More information

We care about. Environmentally-Friendly Building Products from Renewable Resources. natural building products. Product range overview

We care about. Environmentally-Friendly Building Products from Renewable Resources. natural building products. Product range overview http://upload.wikimedia.org/wikipedia/commons/a/ae/flag_of_the_united_kingdom.svg.0.0 :8 Seite von Environmentally-Friendly Building Products from Renewable Resources Product range overview We care about

More information

Building Systems by Stora Enso. Residential multi-storey buildings

Building Systems by Stora Enso. Residential multi-storey buildings Building Systems by Stora Enso Residential multi-storey buildings Table of contents 1 Introduction and disclaimer... 3 1.1 Introduction... 4 1.2 The benefits of the system... 5 1.3 Disclaimer... 5 2 Anatomy

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Innovation - High performance roof, wall and floor insulation board. delivering better performance

Innovation - High performance roof, wall and floor insulation board. delivering better performance 2010 VERSION 1 IRL High performance roof, wall and floor insulation board Innovation - delivering better performance PRODUCT SPECIFICATION INSTALLATION GUIDE I ve worked with Xtratherm for years, they

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

FIRE RATED GLAZING System Guide

FIRE RATED GLAZING System Guide SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation

More information

Post-insulation of cellar ceiling and cellar walls

Post-insulation of cellar ceiling and cellar walls WP5 Education and Economic Promotion Post-insulation of cellar ceiling and cellar walls Educational product: New lecture material for training modules dealing with knowledge and skills how to apply suitable

More information

Building Regulations for the Conservation of Fuel and Power

Building Regulations for the Conservation of Fuel and Power Insulation CI/SfB Rn7 M2 First Issue April 2014 Building Regulations for the Conservation of Fuel and Power ENGLAND EXISTING DWELLINGS 2013 EDITION Low Energy Low Carbon Buildings Contents Page Introduction

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

Timber Frame Walls Rethinking Construction

Timber Frame Walls Rethinking Construction Insulation Fifth Issue November 2007 Timber Frame Walls Rethinking Construction INSULATION BEST PRACTICE FOR THE 21ST CENTURY Summary 9 mm OSB sheathing 3 mm skim coated 15 mm plasterboard Rock or glass

More information

Gypsum Board Systems Manual

Gypsum Board Systems Manual CertainTeed Gypsum Board Systems Manual Fire Resistance and Sound Control Design Manual Division 09 GYPSUM BOARD SYSTEMS MANUAL TABLE OF CONTENTS Introduction General Fire Resistance...1 Sound Control...3

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

Color logos Reverse logos Acoustics Black only logos

Color logos Reverse logos Acoustics Black only logos Acoustics ACOUSTICS General The basic purpose of architectural acoustics is to provide a satisfactory environment in which the desired sounds are clearly heard by the intended listeners and the unwanted

More information

Annex of the certificate (Page 1/6) Accreditation Scope

Annex of the certificate (Page 1/6) Accreditation Scope As a Testing Laboratory Annex of the certificate (Page 1/6) Accreditation Scope Address: Küçük Çiğli Mh. 8780/1 Sk. No:5 Çiğli 35681 İZMİR / TÜRKİYE Phone : 0 232 376 24 25 Fax : 0 232 386 33 98 E-Mail

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP

DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP DIY GUIDE 10 EASY STEPS FOR TREATMENT OF RISING DAMP CONTENTS WHAT IS RISING DAMP STEP 1 SURVEY STEP 2 METER READINGS STEP 3 CONCLUSION STEP 4 PREPARATION FOR TREATMENT STEP 5 TYPE OF TREATMENT STEP 6

More information

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION Bill Robinson BSc. C. Eng. M. I. Struct. E. Timber Design Services 1 IS440 Timber frame

More information

The Scottish Building Standards TECHNICAL HANDBOOK CONSERVATORIES

The Scottish Building Standards TECHNICAL HANDBOOK CONSERVATORIES The Scottish Building Standards TECHNICAL HANDBOOK CONSERVATORIES The Scottish Building Standards TECHNICAL HANDBOOK CONSERVATORIES Crown copyright 2006 Cover designed and produced by Astron Text pages

More information