Manchester City Council Item 8 Planning and Highways Committee 28 June 2012

Size: px
Start display at page:

Download "Manchester City Council Item 8 Planning and Highways Committee 28 June 2012"

Transcription

1 Application Number /WST/2012/N1 Date of Appln 8th May 2012 Committee Date 28th Jun 2012 Ward Miles Platting And Newton Heath Ward Proposal Location Applicant Agent Erection of a first floor extension above existing single storey office Viridor Waste Management Facility, Reliance Street, Newton Heath, Manchester, M40 3EZ Mr Chris Bottomley, Viridor Waste Management Ltd, Pilsworth South Quarry & Landfill, Pilsworth Road, Pilsworth, Manchester, BL9 8QZ, Mr Matthew Stafford, Fairhurst, 12th Floor, Portland Tower, Portland Street, Manchester, M1 3LF, Background Planning permission was granted for construction of a new Mechanical Biological Treatment Facility involving erection of two 17m high anaerobic digester tanks, 10 m high maturation building, buffer storage tanks, 4 x 20m high stacks, effluent treatment plant, gas holder, 8m high back up flare, new vehicle enclosure to Dano plant and extension/refurbishment of existing household waste recycling centre under ref /FO/2007/N1 subject to conditions on 9 October A further application (ref: /FO/2009/N1) was subsequently submitted, and sought changing the biofilter with a Regenerative Thermal Oxidiser (a new form of air clean up technology), which was to ensure a more reliable pollution plant with respect to odour and emissions to air. This application was approved subject to conditions on 16th March This development has been implemented and the Biological Treatment Facility is now operational. Description The proposed development would involve erecting a first floor extension above the existing single storey flat roofed office building located to the east of staff car park. As such the first floor area would be the same as the existing ground floor i.e metres x metres, and the overall height of the resultant structure would be 6.1metres. The proposed first floor accommodation would comprise 2 offices, a meeting room and ancillary toilet facilities, with access being via an external staircase on the eastern elevation. The structure would be brick clad to match the exterior at ground level. Two additional air conditioning units would be located on the western elevation at first floor level. The applicant seeks consent for 24 hour use of the proposed first floor extension. In respect of lighting provision, no lighting is shown on the submitted plans. Consultations Local Residents - s have been received from two residents on Holly Bank and Fern Bank, who wish to object to the proposed development. They advise that they have some initial objections which require further information before an ultimate decision can be made. As a group of residents, they advise they

2 have formally expressed their concerns relating to initial planning permission for the plant. They state their homes have suffered (and continue to suffer) problems of odour, lighting and the visual oppression of the plant. They requested further information in regard to the purpose of the new building, the exact dimensions and location in relation to their homes; when the building would be in use and the provisions for lighting and noise outside of operational hours. One resident feels that due to the existing problems listed above any additional construction work on this site should not be granted until a satisfactory solution to residents outstanding issues has been implemented. She advises that residents are currently experiencing noise from the site 24 hours a day and feel that any additional construction can only add to this already unacceptable intrusion on their lives, and hopes consideration will be given to these comments in a sympathetic manner as their lives have been majorly disrupted due to this site for the last 4 years. On receipt of information forwarded, she questions the need for construction being allowed to take place on Saturdays and advises residents have experienced noise nuisance from this site (which has yet to be resolved) since initial construction began and feel it is unnecessary to inflict yet more noise on the local residents especially at weekends; queries why 24 hour usage is necessary, and feels that lighting needs to be approved at planning otherwise there will be problems for us (the neighbours) as we found with the initial site. These need to be operated by motion sensors or they will be left on indefinitely as this has been a problem at the site in the past with a light being left on which is situated on top of the R.T.O. Lighting has been a major concern with some lights on site shining directly onto and into our properties. She advised that residents have been advised there would be no visual impact on them, but as there is no screening of the plant at all they won't know whether it impacts on our view until it has been built. The original plans state there would be minimal visual impact but this has definitely not been the case. Two further s have been received from the second resident seeking further information on hours of use; construction hours and control of construction noise; and querying what plans are in place to ensure lighting does not remain on outside of these hours, and suggesting lighting is pre-timed or uses motion sensors. She advises residents have previously had to ring the plant outside of operational hours to request lights are turned off as they can glare into their properties. This can include lamp-posts which are similarly several meters high. Relying on the operation of a manual switch to turn things off can fall to error. On receipt of the information forwarded to the resident to respond to her queries, further comments were received - confirming her wish to maintain her objection, and questioning the need for 24 hour usage, and expressing concern about the lack of detail in the use of lighting. In respect of lighting she expresses a preference for automatic/sensor lighting, as in the past 2-3 months, she has contacted the plant on at least 3 separate occasions when a switch had forgotten to be switched off and lighting was glaring into her property. On receiving confirmation no external lighting is proposed, she has stated that internal lighting is of equal importance in this example. There is glare/reflection from existing internal lighting off the external grey structures (one dome-like structure in particular).

3 Head of Environmental Health - Any significant comments will be reported to Committee. Head of Environmental Health (Contaminated Land Section) - Any significant comments will be reported to Committee. Environment Agency - Have no objections to the proposal. Issues There are a number of policies, national and local, relevant to this application which include: The Unitary Development Plan for the City of Manchester (1995) The site falls with the wider area covered by policy EM6. Policy EM6 states that Newton Heath is an established residential area and contains the Newton Heath District Centre. Within Newton Heath development will be permitted which includes: i. Retail, community facilities and mixed use development within Newton Heath District Centre; ii. Locating mixed use development along Oldham Road and around the proposed Metrolink stop; iii. Extending the type, size and tenure of new housing to create a mixed and balanced community with the introduction of more owner occupied housing; iv. Provision of environmental improvements to enhance recreational open space, public areas, the Rochdale Canal and Oldham Road; v. Retention of the modified grid street pattern which links to areas of open space, the Rochdale Canal and Newton Heath District Centre; vi. Improvements to the provision of pedestrian and cycle links between Newton Heath and Central Park and Sportcity, and within Newton Heath to the District Centre, proposed Metrolink stop and the quality bus corridor on Oldham Road. Policy H2.2 is also relevant and states that the Council will not allow development, which will have an unacceptable impact on residential areas. The matters that the Council will consider will include the scale and appearance of the development and its impact in terms of noise, vibration, traffic generation, road safety and air pollution. Policy DC Relates to the proposals contribution to the local noise environment and the impact of existing noise sources on the development has been assessed, particularly in relation to the proposed residential units. Policy DC Relates to the assessment of the development, in terms of measures to control noise, including the provision of noise insulation. The policies relating to the impact of the proposal in respect of noise and lighting are explored in more detail within the issues section of the report.

4 National Planning Policy Framework The Framework re-iterates that planning law requires that applications for planning permission must be determined in accordance with the development plan unless material considerations indicate otherwise. The statutory status of the development plan remains as the starting point for decision making. However, paragraph 14 states that `at the heart of the Framework is a presumption in favour of sustainable development and, in `decision-taking, this means that development proposals should accord with the development plan should be approved without delay unless: Any adverse impacts of doing so would significantly and demonstrably outweigh the benefits, when assessed against the policies in this Framework taken as a whole; or Specific policies in this Framework indicate development should be restricted. National Policy Framework has been related to the proposed development, with particular emphasis given to the following: These issues have been considered with reference to the core strategy policies as set out in the committee report. Core planning principles in Framework - Within the overarching roles that the planning system ought to play, a set of core land-use planning principles should underpin both plan-making and decision-taking. In this case specific weight is given to the need to: i. Proactively drive and support sustainable economic development to deliver the homes, business and industrial units, infrastructure and thriving local places that the country needs; ii. Secure high quality design and a good standard of amenity for all existing and future occupants of land and buildings; iii. Take account of the different roles and character of different areas, promoting the vitality of our main urban areas; iv. Support the transition to a low carbon future in a changing climate, taking full account of flood risk and encourage the reuse of existing resources, including conversion of existing buildings, and encourage the use of renewable resources, including renewable energy; Contribute to conserving and enhancing the natural environment and reducing pollution; v. Encourage the effective use of land by reusing land that has been previously developed (brownfield land), provided that it is not of high environmental value; vi. Promote mixed use developments, and encourage multiple benefits from the use of land in urban and rural areas, recognising that some open land can perform many functions; vii. Actively manage patterns of growth to make the fullest possible use of public transport, walking and cycling, and focus significant development in locations which are or can be made sustainable; and viii. Take account of and support local strategies to improve health, social and cultural wellbeing for all, and deliver sufficient community and cultural facilities and services to meet local needs. The following specific policies are considered to be particularly relevant to the proposed development:

5 i. Policy 7: Requiring good design Reflects upon the importance of design to the built environment and its contribution to sustainable development and making places better for people. It is considered that the design of the first floor accommodation is in keeping with the existing building, and would be appropriate in regard the location of the proposed facility. Emerging Core Strategy Manchester s emerging Core Strategy will be the key Development Plan Document in the Local Development Framework and will replace significant elements of the existing Unitary Development Plan. The Core Strategy went through Examination in Public in November last year and the Inspector s final report will be published shortly. The Core Strategy is expected to be adopted by the City Council in July this year. Policies in the Core Strategy have been referred to in the body of this report. The following specific policies are considered to be particularly relevant to the proposed development: The following specific policies are considered to be particularly relevant to the proposed development: Policy DM1 Development Management - Follows the principles advocated in the aforementioned policies and informs that all development should have regard to the following specific issues for which more detailed guidance may be given within a supplementary planning document:- - Appropriate siting, layout, scale, form, massing, materials and detail. - Impact on the surrounding areas in terms of the design, scale and appearance of the proposed development. Development should have regard to the character of the surrounding area. - Effects on amenity, including privacy, light, noise, vibration, air quality and road safety and traffic generation. This could also include proposals which would be sensitive to existing environmental conditions, such as noise. - Accessibility: buildings and neighbourhoods fully accessible to disabled people, access to new development by sustainable transport modes. - Community safety and crime prevention. - Design for health. - Adequacy of internal accommodation and external amenity space. - Refuse storage and collection. - Vehicular access and car parking. - Effects relating to biodiversity, landscape, archaeological or built heritage. - Green Infrastructure including open space, both public and private. - Flood risk and drainage. - Existing or proposed hazardous installations. - Developers will be required to demonstrate that new development incorporates sustainable construction techniques. For reasons to be outlined below, it is considered the proposal accords with this policy.

6 Policy EN19 - Waste. Policy EN19 advises that the Council will - Work with other Districts through the Greater Manchester Joint Waste Development Plan Document (GMJWDPD) to safeguard existing sites for waste management and identify and safeguard new sites in existing areas of employment where appropriate. Require all developers, including those of new waste management facilities within the district to demonstrate the proposal s consistency with the principles of the waste hierarchy ( prevention, reduction, re-use, recycling/composting, energy recovery, final disposal); - Require all developers of new waste management facilities within the District to plan for and, where appropriate, use sustainable modes for waste transport, including use of modes such as rail and the Manchester Ship Canal; - Require all developers to submit a waste management plan to demonstrate how both construction and demolition waste will be minimised and recycled on site wherever possible and how the sustainable waste management needs of the end user will be met. - Have full regard to the economic and environmental benefits that well designed and run, waste management facilities can bring to the District, subject to any conditions required to protect the amenity of existing adjacent users. - Promote the development of innovation and technological advancement within the sustainable waste management industry, aiming to achieve a close-loop waste management system. - Require waste management practises to have full regard to the environmental, social and economic impacts of such development and encourage long term benefits in improving the environment, the regeneration of areas in need of investment and collocation with other employment uses where appropriate; - Encourage communities to take responsibility for the waste they create through the provision of accessible facilities. The proposed development would accord with the above policy EN19, in that the provision of additional ancillary office accommodation is required in the connection of the running of an existing Mechanical Biological Treatment Facility. North West of England Plan Regional Spatial Strategy (RSS) to 2021 The Regional Spatial Strategy (RSS) for North West England was adopted in September 2008 and replaces the previously published Regional Planning Guidance (RPG13). The RSS provides a framework for development and investment in the region over the next fifteen to twenty years. The document sets out the framework for delivering sustainable development in the North West. The strategy allocated a maximum housing provision of 63,000 for Manchester between 2003 and There are a number of policies relevant to this development proposal within the RSS including the following: Policy DP1 `Spatial Principles' outlines the main principles that underpin the RSS to which all other regional, sub-regional and local plans and strategies and all individual proposals, schemes and investment decisions should adhere to. These include to

7 promote sustainable communities, promote sustainable economic development, make the best use of existing resources and infrastructure, manage travel demand, reduce the need to travel, and increase accessibility, marry opportunity and need, promote environmental quality, mainstreaming rural issues, and to reduce emissions and adapt to climate change. Policy DP7 'Promote Environmental Quality' outlines that environmental quality (including air, coastal and inland waters), should be protected and enhanced, especially by understanding and respecting the character and distinctiveness of places and landscapes, the protection and enhancement of the historic environment, promoting good quality design in new development and ensuring that development respects its setting taking into account relevant design requirements, reclaiming derelict land and remediating contaminated land for end-uses to improve the image of the region and use land resources efficiently, maximising opportunities for the regeneration of derelict or dilapidated areas, and maintaining and enhancing the quantity and quality of biodiversity and habitat. The general thrust of the RSS sets out to deliver sustainable developments, having regard to economic, social and environmental issues relevant to a particular area. In this instance it is considered that the proposal accords with the aspirations of the Regional Spatial Strategy. Layout and Design The proposed first floor extension to the existing office accommodation has been designed to match the external design of the ground floor accommodation i.e. brick clad with a flat roof. The planning agent was asked to revise the scheme so that the roller shutters at first floor level would have recessed boxes in addition to being powder coated to match the existing shutters at ground level. Revised plans showing these revisions have been received, and it is proposed to condition them accordingly. Visual Impact The nature and scale of the proposed development is significantly lower in height the existing structures to the south-east and north-east within the waste treatment plant. Given the distance of the proposed development is approx 85m from the river valley and approx 95metres from the nearest residential accommodation, it is not considered that the first floor accommodation would have an unduly detrimental impact on the visual amenities of the area. The proposal is set well into the site and would be seen within the context of the existing waste treatment site. Noise The previously approved applications for the Mechanical Biological Treatment Facility were accompanied by a Noise Assessment. However, residents have continued to raise concerns over noise in respect of the overall Mechanical Biological Treatment Facility operation, in particular a `hum which causes disturbance. This matter is subject to a thorough on-going investigation by City Council officers and Viridor to find the source and implement appropriate mitigation measures. This application relates solely to the provision of office accommodation. It is not considered that the

8 proposal would give rise to noise which would adversely impact on local residents. However, in view of noise issues on this site it is recommended that an acoustic insulation condition in respect of external plant i.e. air-handling units is attached to any planning approval. Hours of operation The Mechanical Biological Treatment Facility by the nature of the operations on the site is a 24 hour facility.as such the applicant is seeking that the proposed office floorspace could be used on a 24 hour seven days a week basis, for management and administrative work to support the operations on the site. Given the nature and scale of the office floorspace being proposed, it is not considered that the intensity of the use would give rises to residential disamenity as to warrant the refusal of planning permission. Lighting No lighting is proposed in connection with the proposed first floor accommodation and this has been confirmed by the planning agent in an dated 8th June Residents concerns in respect external and internal lighting at the Mechanical Biological Treatment Facility have been noted, but it is considered that the level of lighting within the proposed office accommodation and the location of the office within the site, should not give rise to residential disamentiy. Issues in connection with external lighting have been and continue to be addressed by Viridor when they arise. Disabled Access The ground floor office accommodation has ramped access ( which would be retained), but it is proposed that the first floor accommodation would be accessed by an external staircase on the eastern elevation of the building. Other matters raised by residents In respect of concerns expressed about odour, Viridor and City Council officers have fully investigated issues of odour previously raised in connection with the operation of the Mechanical Biological Treatment Facility. Mitigation measures have been introduced in order to minimise the problem. This issue is not considered to be relevant to the current proposal which is for additional office accommodation on the site. Regular resident liaison meetings are held by Viridor with Councillor and officers in attendance in order to ensure issues including odour, noise and lighting are dealt with if they arise at this site. Residents also have contact numbers of Viridor staff to enable contact with Viridor if problems any problems occur. Human Rights Act 1998 considerations This application needs to be considered against the provisions of the Human Rights Act Under Article 6, the applicants (and those third parties, including local residents, who have made representations) have the right to a fair hearing and to this end the Committee must give full consideration to their comments. Protocol 1 Article 1, and Article 8 where appropriate, confer(s) a right of respect for a person s home, other land and business assets. In taking account of all material considerations, including Council policy as set out in the Unitary Development Plan,

9 the Head of Planning has concluded that some rights conferred by these articles on the applicant(s)/objector(s)/resident(s) and other occupiers and owners of nearby land that might be affected may be interfered with but that that interference is in accordance with the law and justified by being in the public interest and on the basis of the planning merits of the development proposal. He believes that any restriction on these rights posed by the approval of the application is proportionate to the wider benefits of approval and that such a decision falls within the margin of discretion afforded to the Council under the Town and Country Planning Acts. Recommendation APPROVE Reason for recommendation On the basis that the proposal is in accord with the City Council's Unitary Development Plan (in particular Policies H2.2, DC26.1, DC26.5) and with other material considerations of material weight (in particular the Guide to Development in Manchester Supplementary Planning Document; the Emerging Core Strategy policies EN19 and DM1; and the National Planning Policy Framework policy 7; and there are no material considerations of sufficient weight to indicate otherwise, in that the development would ancillary office accommodation to support the operation of the Mechanical Biological Treatment Facility, the scheme design that does not harm the character of the area, and there would not be any significant impacts on the residential amenities of adjoining occupiers. Conditions to be attached to the decision 1) The development must be begun not later than the expiration of three years beginning with the date of this permission. Reason - Required to be imposed pursuant to Section 91 of the Town and Country Planning Act ) The development hereby approved shall be carried out in accordance with the following drawings and documents unless otherwise agreed in writing by the City Council as Local Planning Authority: Design and Access Statement (April 2012) Ground Investigation CCG-C (March 2012), Planning Supporting Statement, plan refs: 93218/8001 rev.a, 93218/8002 rev.a, 93218/8003 rev.a, 93218/8004 rev.a 93218/8006 rev.a date stamped as received 27th April 2012; As amended by letter dated 6th June 2012, plan ref: 93218/8005 rev. B received by dated 8th June 2012, and dated 8th June 2012 confirming no external lighting to the proposed first floor extension. Reason - To ensure that the development is carried out in accordance with the approved plans, pursuant to policy H2.2 of the Manchester Unitary Development Plan, and policy DM1 of the emerging Core Strategy for Manchester. 3) No development that is hereby approved shall commence unless and until samples and specifications of all materials to be used on all external elevations of the

10 development have been submitted to and approved in writing by the City Council as local planning authority. The development shall be constructed only using the approved materials unless otherwise agreed in writing by the City Council as local planning authority. Reason - To ensure that the appearance of the development is acceptable to the City Council as local planning authority in the interests of the visual amenity of the area within which the site is located, pursuant to policy H2.2 of the Manchester Unitary Development Plan, and policy DM1 of the emerging Core Strategy for Manchester. 4) The hours of construction of the development hereby approved shall be restricted to 7.30am to 6:00pm on Monday to Friday, 8.30am to 2.00pm on Saturday, with no work at any other time including Sundays and Public Holidays, unless otherwise agreed with the local planning authority. Reason - In interests of residential amenity in order to reduce disturbance during construction in accordance with Policies H2.2 of the Unitary Development Plan for the City of Manchester, and policy DM1 of the emerging Core Strategy for Manchester. 5) Before first occupation of the development the building, together with any externally mounted ancillary equipment, shall be acoustically insulated in accordance with a scheme submitted to and approved in writing by the City Council as local planning authority in order to secure a reduction in the level of noise emanating from the equipment. Reason - To safeguard the amenities of the occupiers of nearby residential accommodation, pursuant to policy H2.2 of the Manchester Unitary Development Plan, and policy DM1 of the emerging Core Strategy for Manchester. Local Government (Access to Information) Act 1985 The documents referred to in the course of this report are either contained in the file(s) relating to application ref: /WST/2012/N1 held by planning or are City Council planning policies, the Unitary Development Plan for the City of Manchester, national planning guidance documents, or relevant decisions on other applications or appeals, copies of which are held by the Planning Division. The following residents, businesses and other third parties in the area were consulted/notified on the application: Environmental Health Environment Agency Contaminated Land Section 1 Dean Avenue, Manchester, M40 3AD 2 Dean Avenue, Manchester, M40 3AD High Peak Street, Manchester, M40 3AJ

11 4 High Peak Street, Manchester, M40 3AJ 1-13, 2-20 Colclough Close, Manchester, M40 3AN Williams Road, Moston, Manchester, M40 0AP 1-29 Lilmore Avenue, Manchester, M40 1EY Williams Road, Moston, Manchester, M40 0AP 1 5 (all) Holly Bank, Williams Road, Moston, Manchester, M40 0AH 1-5 (all) Fern Bank, Williams Road, Moston, Manchester, M40 0BW The Fairway, Manchester, M40 3WA 1-11, 2-8 Calverton Drive, Manchester, M40 3AQ 2-22 Gullane Close, Manchester, M40 The Fairway, Manchester, M40 3WA Flat 1, 6 High Peak Street, Manchester, M40 3AJ Flat 2, 6 High Peak Street, Manchester, M40 3AJ Flat 1, 8 High Peak Street, Manchester, M40 3AJ Flat 2, 8 High Peak Street, Manchester, M1 3AJ Unit 9, Reliance Street Enterprise Park, Reliance Street, Manchester, M40 3AL Unit 10, Reliance Street Enterprise Park, Reliance Street, Manchester, M40 3AL Unit 1, Reliance Street Trading Estate, Reliance Street, Manchester, M40 3AL Unit 1b, Reliance Street Trading Estate, Reliance Street, Manchester, M40 3AL 6 Reliance Street, Manchester, M40 3AL Reliance Street Enterprise Park, Reliance Street, Manchester, M40 3AL Fern Bank, Williams Road, Moston, Manchester, M40 0BW Holly Bank, Williams Road, Moston, Manchester, M40 0AH Unit 5, Reliance Street Trading Estate, Reliance Street, Manchester, M40 3AL Broadhurst Primary School, Williams Road, Moston, Manchester, M40 3AQ Units 7 And 8, Reliance Street Enterprise Park, Reliance Street, Manchester, M40 3AL Enterprise Park, Reliance Street, Manchester, M40 3AL Moston Grange Nursing Home, 29 High Peak Street, Manchester, M40 3AT 3 Dean Avenue, Manchester, M40 3AD 4 Dean Avenue, Manchester, M40 3AD 5 Dean Avenue, Manchester, M40 3AD Flat 1, 5 Dean Avenue, Manchester, M40 3AD Flat 2, 5 Dean Avenue, Manchester, M40 3AD Flat 1, 4 Dean Avenue, Manchester, M40 3AD Flat 2, 4 Dean Avenue, Manchester, M40 3AD Flat 1, 3 Dean Avenue, Manchester, M40 3AD Flat 2, 3 Dean Avenue, Manchester, M40 3AD 56 Williams Road, Moston, Manchester, M40 0AP 60 Williams Road, Moston, Manchester, M40 0AP Caretakers Bungalow, Williams Road, Moston, Manchester, M40 0AP Talbot House Support Centre, 1 High Peak Street, Manchester, M40 3AT Williams Road, Moston, Manchester, M40 0AP Representations were received from the following third parties: 1 Holly Bank, Williams Road, Moston, Manchester, M40 0AH 6 Fern Bank, Williams Road, Moston, Manchester, M40 0BW

12 Relevant Contact Officer : Sue Wills Telephone number : s.wills@manchester.gov.uk

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014 Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012 Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340. SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

Reference: 05/00928/FUL Officer: Mr David Jeanes

Reference: 05/00928/FUL Officer: Mr David Jeanes DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application

More information

Development Control Committee 12 March, 2015 WD/D/14/002782 ITEM NUMBER 6

Development Control Committee 12 March, 2015 WD/D/14/002782 ITEM NUMBER 6 Development Control Committee 12 March, 2015 WD/D/14/002782 ITEM NUMBER 6 Application Number: WD/D/14/002782 Variation of condition Registration Date: 27 October, 2014 Application Site: UNIT 1, 43 SOUTH

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

73 MAIN STREET SHIRLEY SOLIHULL

73 MAIN STREET SHIRLEY SOLIHULL 2014/58/S 73 MAIN STREET SHIRLEY Application No: Ward/Area: Location: 2014/58/S BLYTHE 73 MAIN STREET SHIRLEY SOLIHULL Date Registered: 13/01/2014 Applicant: Proposal: WILLIAM HILL ORGANIZATION LTD CHANGE

More information

3. The consent hereby granted does not include any external alterations.

3. The consent hereby granted does not include any external alterations. Keith WARD 23 02/00425/FUL 19th March 2002 Change of use of retail shop to form pool room at 150 Mid Street Keith Banffshire AB55 3BJ for Mr Gordon Maver Comments: This application is being referred to

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

21 Plumbers Row, London, E1 1EQ

21 Plumbers Row, London, E1 1EQ Committee: Development Date: 19 th October 2011 Classification: Unrestricted Agenda Item No: Report of: Corporate Director of Development and Renewal Case Officer: Shahara Ali-Hempstead Title: Planning

More information

LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007

LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007 LONDON BOROUGH OF TOWER HAMLETS MINUTES OF THE DEVELOPMENT COMMITTEE HELD AT 7.30 P.M. ON WEDNESDAY, 22 AUGUST 2007 COUNCIL CHAMBER, 1ST FLOOR, TOWN HALL, MULBERRY PLACE, 5 CLOVE CRESCENT, LONDON, E14

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

1.1 The application property is an extended two-storey semi-detached house fronting Bedale Road. The side garden adjoins a link road to Wydale Road.

1.1 The application property is an extended two-storey semi-detached house fronting Bedale Road. The side garden adjoins a link road to Wydale Road. COMMITTEE REPORT Date: 13 October 2011 Ward: Osbaldwick Team: Major and Parish: Osbaldwick Parish Commercial Team Council Reference: 11/02264/FUL Application at: 27 Bedale Avenue Osbaldwick York YO10 3NG

More information

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Rotherham Metropolitan Borough Council

Rotherham Metropolitan Borough Council Rotherham Metropolitan Borough Council Town and Country Planning Act 1990 Self Architects The White House 24A St Andrews Road Sheffield S11 9AL Reference RB2014/1110 Decision Date 20 October 2014 Description

More information

13 Oakleigh Gardens London N20 9AB

13 Oakleigh Gardens London N20 9AB Location 13 Oakleigh Gardens London N20 9AB Reference: 15/00608/HSE Received: 2nd February 2015 Accepted: 2nd February 2015 Ward: Oakleigh Expiry 30th March 2015 Applicant: Mr A Peqini Proposal: Single

More information

National Planning Policy Framework

National Planning Policy Framework National Planning Policy Framework www.communities.gov.uk community, opportunity, prosperity National Planning Policy Framework March 2012 Department for Communities and Local Government Crown copyright,

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009

Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Ward: Purley DELEGATED BUSINESS MEETING Lead Officer: Head of Planning Control week of 23/03/2009 Application No. 09/00389/LP - 51-61 Whytecliffe Road South, Purley, CR8 1. SUMMARY 1.1 This report concerns

More information

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Application No: 11/1683N Location: Proposal: Applicant: Expiry Date: UNIT DC 360, FOURTH AVENUE, CREWE Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Mr A Fornal, Juwi Renewable Energies

More information

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF

AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF DC/2015/00494 AGRICULTURAL BUILDING WITH PHOTOVOLTARIC SOLAR PANELS TO SOUTH FACING ROOF LAND AT ONEN, ADJACENT TO B4233, NP25 5EN. RECOMMENDATION: APPROVE Case Officer: Elizabeth Bennett Date Registered:

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

2 February 2016. - Loss of public car park in landuse terms. - Effect on local residential amenity and local highways network.

2 February 2016. - Loss of public car park in landuse terms. - Effect on local residential amenity and local highways network. CITY OF WESTMINSTER PLANNING APPLICATIONS COMMITTEE Report of Director of Planning Subject of Report Proposal Agent On behalf of Date 2 February 2016 Classification For General Release Ward(s) involved

More information

Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.

Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area. Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Rural dwellings including bed and breakfast accommodation

Rural dwellings including bed and breakfast accommodation MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

POLICY P350.5 Trees on Development Sites and Street Verges. Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342

POLICY P350.5 Trees on Development Sites and Street Verges. Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342 POLICY P350.5 Trees on Development Sites and Street Verges Strategic Plan Goal 3 Environmental Management Relevant Management Practice Nil Relevant Delegation Delegations DC 342 and DM 342 Rationale Trees

More information

Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990

Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990 Application for Outline Planning Permission with All Matters Reserved Town and Country Planning Act 1990 1. Applicant Name and Address Please enter the Applicant Details, including full name and title.

More information

BASILDON BOROUGH COUNCIL

BASILDON BOROUGH COUNCIL BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms Coventry Development Plan 2016 Appendix 89 Glossary of Key Terms Area Action Plan A Development Plan Document which focuses upon a specific location or an area subject to significant change. Affordable

More information

Technical Advice Note: Retail Impact Assessments

Technical Advice Note: Retail Impact Assessments Technical Advice Note: Retail Impact Assessments 1 A GUIDE FOR RETAIL IMPACT ASSESSMENTS INTRODUCTION This Technical Advice Note (TAN) has been prepared to assist applicants seeking planning permission

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

23.1 RENEWABLE ENERGY

23.1 RENEWABLE ENERGY Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.

More information

PLANNING POLICY 3.3.5

PLANNING POLICY 3.3.5 PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1) with proprietor's accommodation.

Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1) with proprietor's accommodation. Item 4a Case Officer Ward Proposal Location Applicant 13/00168/FUL Caron Taylor Adlington And Anderton Change of use of an existing vacant office building to a Bed & Breakfast Guest House (Use Class C1)

More information

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 18 March 2009 Recommendation by Development Quality Manager 4(9) 09/161 Alteration and Extension to Existing Public House to Provide a New Bookmakers

More information

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning 2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3

More information

Policy Background Reports

Policy Background Reports Supporting Document for Proposed Local Development Plan 2015 East Dunbartonshire Policy Background Reports Strategic Environmental Assessment: Environment Report Action Programme Habitats Regulations Appraisal

More information

Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation

Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation Planning Policy Statement 8 (PPS 8) Open Space, Sport and Outdoor Recreation Planning Policy Statements (PPSs) set out the policies of the Department of the Environment on particular aspects of land-use

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015. Change of use of shop to residential flat (first floor) and shop alterations

APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015. Change of use of shop to residential flat (first floor) and shop alterations DATE OF COMMITTEE: 12-May-2015 APPLICATION NO. 15/P/00168 RECEIVED: 27-Mar-2015 PROPOSAL: Change of use of shop to residential flat (first floor) and shop alterations LOCATION: APPLICATION TYPE: APPLICANT:

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation.

Page 117. DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010. Report of the Executive Head of Planning and Transportation. Page 117 Agenda Item 10 DEVELOPMENT CONTROL COMMITTEE - Date:1 September 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/63099/ADV WARD: A03 / STONECOT Time Taken: 5 weeks,

More information

Application No : 14/00957/FULL3 Ward: Penge And Cator. Applicant : Travis Perkins (Properties) Limited Objections : NO

Application No : 14/00957/FULL3 Ward: Penge And Cator. Applicant : Travis Perkins (Properties) Limited Objections : NO SECTION 2 Applications meriting special consideration Application No : 14/00957/FULL3 Ward: Penge And Cator Address : 14 Anerley Station Road Penge London SE20 8PY OS Grid Ref: E: 534681 N: 169887 Applicant

More information

Basics of Sustainability. Environmental Impact Assessments (EIA)

Basics of Sustainability. Environmental Impact Assessments (EIA) Basics of Sustainability 8 Environmental Impact Assessments (EIA) 1 Contents Page Aims... 2 Introduction... 3 The Objectives of EIAs... 3 Developments that Require an EIA... 4 Key Stages of an EIA... 6

More information

Guidance on Non-Material Amendments and Minor Material Amendments

Guidance on Non-Material Amendments and Minor Material Amendments Minerals and Waste Forum Implementation Planning Advisory Group Guidance on Non-Material Amendments and Minor Material Amendments April 2012 1 Non-Material Amendments and Minor Material Amendments 1) Non-material

More information

Page 19. Report of the Executive Head of Planning and Transportation. Ref: A2010/62734/FUL WARD: A03 / STONECOT Time Taken: 7 weeks, 0 days

Page 19. Report of the Executive Head of Planning and Transportation. Ref: A2010/62734/FUL WARD: A03 / STONECOT Time Taken: 7 weeks, 0 days Page 19 Agenda Item 3 DEVELOPMENT CONTROL COMMITTEE - Date: 23 June 2010 Report of the Executive Head of Planning and Transportation. Ref: A2010/62734/FUL WARD: A03 / STONECOT Time Taken: 7 weeks, 0 days

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

CONSTRUCTION SEQUENCE & PROGRAMME

CONSTRUCTION SEQUENCE & PROGRAMME CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone

More information

DESIGN AND ACCESS STATEMENT

DESIGN AND ACCESS STATEMENT CHANGE OF USE OF EXISTING RESIDENTIAL ANNEXE TO A SEPARATE DWELLING AND CONSTRUCTION OF A NEW WALL FENCE AND GATES AT LITTLE NOOKE CHAPEL LANE WYRE PIDDLE PERSHORE WORCESTERSHIRE WR10 2JA 1.0 INTRODUCTION

More information

Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990

Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990 Application for Planning Permission and conservation area consent for demolition in a conservation area. Town and Country Planning Act 1990 Publication of applications on planning authority websites. Please

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Appendix 1 Denbighshire County Council PLANNING STRATEGY DEVELOPER GUIDANCE NOTE November 2015 SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries. Context

More information

Camden Development Policies

Camden Development Policies Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location

More information

Application No. 12/00349/FUL Ward: Longbridge. 33 Faircross Parade, Longbridge Road, Barking

Application No. 12/00349/FUL Ward: Longbridge. 33 Faircross Parade, Longbridge Road, Barking Application No. 12/00349/FUL Ward: Longbridge Reason for Referral to DCB as set out in Section I of the Council Constitution Address: Development: Applicant: The application has attracted two petitions

More information

Planning Policy Statement (PPS 11) Planning & Waste Management

Planning Policy Statement (PPS 11) Planning & Waste Management Planning Policy Statement (PPS 11) Planning & Waste Management Planning Policy Statement 11 (PPS 11) Planning and Waste Management Planning Policy Statements (PPSs) set out the policies of the Department

More information

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

Item Date Received 11th February 2015 Officer Mr Sav Patel Target Date 8th April 2015 Ward Abbey

Item Date Received 11th February 2015 Officer Mr Sav Patel Target Date 8th April 2015 Ward Abbey PLANNING COMMITTEE Date: 5 TH AUGUST 2015 Application Number 15/0068/FUL Agenda Item Date Received 11th February 2015 Officer Mr Sav Patel Target Date 8th April 2015 Ward Abbey Site 10 Coldhams Lane Cambridge

More information

Planning Policy Statement 2015

Planning Policy Statement 2015 Planning Policy Statement 2015 Introduction It is just over 50 years since national planning legislation was first implemented in Ireland. The Government wishes to reaffirm its strong belief in the value

More information

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY

More information

Decision Due Date: 18 April 2015

Decision Due Date: 18 April 2015 App.No: 150195 Decision Due Date: 18 April 2015 Ward: Devonshire Officer: Richard Elder Site visit date: 8 May 2015 Site Notice(s) Expiry date: 27 March 2015 Neighbour Con Expiry: 27 March 2015 Press Notice(s):

More information

Plain English guide to planning for free schools

Plain English guide to planning for free schools Plain English guide to planning for free schools January 2015 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You

More information

A report by Head of Planning Applications Group to Planning Applications Committee on 16 March 2004.

A report by Head of Planning Applications Group to Planning Applications Committee on 16 March 2004. Proposed adult education centre, performing arts facility, domed tennis court covering and replacement hard play area, The A report by Head of Planning Applications Group to Planning Applications Committee

More information

City Council Report for Information

City Council Report for Information City Council Report for Information Report to: Subject: Report of: Neighbourhood Scrutiny Committee Sustainable Development Assistant Chief Executive (Regeneration) Summary This report outlines measures

More information

Mr A McWilliams Bespoke Building 16 Deal Crescent Berkley Pendlesham Worcester WR4 0LJ

Mr A McWilliams Bespoke Building 16 Deal Crescent Berkley Pendlesham Worcester WR4 0LJ Our Ref: W/12/00059/PN Your ref: The person dealing with this enquiry is: Lucy Parsons Direct Dial No: 01386 565322 27/02/2012 Mr A McWilliams Bespoke Building 16 Deal Crescent Berkley Pendlesham Worcester

More information

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

FIRST STREET NORTH CREATING PLACES FOR PEOPLE About This Consultation Manchester City Council and Ask Property Developments are seeking to develop First Street North, a 2.2 acre site to the north of the Number One Building, within the 20 acre First

More information

CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT.

CHANGE OF USE FROM AGRICULTURE TO A USE FOR CARAVAN STORAGE COMPOUND AND OPERATIONAL DEVELOPMENT. 2014/1898 BIRMINGHAM ROAD MERIDEN Application No: Ward/Area: Location: 2014/1898/S MERIDEN BIRMINGHAM ROAD MERIDEN Date Registered: 21/11/2014 Applicant: Proposal: MR VAUGHN WILLIAMS CHANGE OF USE FROM

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

143 RUMBUSH LANE SHIRLEY SOLIHULL

143 RUMBUSH LANE SHIRLEY SOLIHULL 2014/514 143 RUMBUSH LANE SHIRLEY Application No: Ward/Area: Location: 2014/514/S BLYTHE 143 RUMBUSH LANE SHIRLEY SOLIHULL Date Registered: 14/03/2014 Applicant: Proposal: MR JAMIE LONG DEMOLITION OF GARAGE

More information

Application No: 5/11/9004 District: South Lakeland

Application No: 5/11/9004 District: South Lakeland DEVELOPMENT CONTROL AND REGULATION COMMITTEE 20 July 2011 A Report by the Assistant Director - Planning & Sustainability Application No: 5/11/9004 District: South Lakeland Applicant: United Utilities Clearwater

More information

Officer Update Report. Section 1 Site Location Map

Officer Update Report. Section 1 Site Location Map Officer Update Report Section 1 Site Location Map 1 Section 2 Application Summary Location Ward Proposal Application Applicant Agent 137 Stamford Street, London SE1 9NN Bishop s Retrospective change of

More information

The Planning System: General Principles

The Planning System: General Principles The Planning System: General Principles The Plan-Led System: Structure 1. In England there is a hierarchical structure of guidance and plans covering national, regional and local planning which includes:

More information

Item D3 Wind Swanley Technology ogy College, St Mary s Road, Swanley SE/09/

Item D3 Wind Swanley Technology ogy College, St Mary s Road, Swanley SE/09/ Wind turbine with 15m mast and solar photovoltaic panels Swanley Technology ogy College, St Mary s Road, Swanley SE/09/ /09/889 A report by Head of Planning Applications Group to Planning Applications

More information

3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains.

3.0 Table of Development Note: This table must be read in conjunction with the explanation provided in Part 5, Division 1, Chapter 2 Using Domains. Part 5 Division 2 Chapter 2 Domains Domains Park Living 1.0 Intent The purpose of this domain is to provide a variety of opportunities for low density residential activity within areas of semi-rural landscapes,

More information

Planning Policy Statement 3 (PPS 3 Revised Feb 2005) Access, Movement and Parking

Planning Policy Statement 3 (PPS 3 Revised Feb 2005) Access, Movement and Parking Planning Policy Statement 3 (PPS 3 Revised Feb 2005) Access, Movement and Parking Planning Policy Statements (PPSs) set out the policies of the Department of the Environment on particular aspects of land-use

More information

Supporting high quality development in Haringey- Our pre application advice services

Supporting high quality development in Haringey- Our pre application advice services Supporting high quality development in Haringey- Our pre application advice services Charges from 1 April 2015 Thank you for taking the time to consider the pre application advice services offered by Haringey

More information

Rochdale Unitary Development Plan Review: 2001-2016: Inspector s Report

Rochdale Unitary Development Plan Review: 2001-2016: Inspector s Report CHAPTER 11: LEISURE AND TOURISM G/LT/1 (Part One Policy) Leisure and Tourism Objections: 215/3 Sport England 215/4 Sport England 98/16 Countryside Agency North West Key Issues: should the policy be more

More information

The Green Belt A Guide for Householders

The Green Belt A Guide for Householders The Green Belt A Guide for Householders Introduction Much of Mole Valley lies within the Metropolitan Green Belt. This leaflet outlines the purpose, importance and characteristics of the Green Belt and

More information

READING BOROUGH COUNCIL REPORT BY DIRECTOR OF ENVIRONMENT

READING BOROUGH COUNCIL REPORT BY DIRECTOR OF ENVIRONMENT READING BOROUGH COUNCIL REPORT BY DIRECTOR OF ENVIRONMENT TO: PLANNING APPLICATIONS COMMITTEE DATE: 29 April 2015 AGENDA ITEM: 7 TITLE: Ministerial Announcement and the Introduction of additional permitted

More information

Pre-Application Planning Advice

Pre-Application Planning Advice Pre-Application Planning Advice Guidance Note and Schedule of Fees Regeneration and Planning (Development Management) December 2014 The Development Management Service is responsible for the determination

More information

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)

Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of

More information

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN

FULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN 6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION

More information

ITEM NO: 08 Application No. 11/00308/RTD Site Address: Site Location Plan (for identification purposes only, not to scale)

ITEM NO: 08 Application No. 11/00308/RTD Site Address: Site Location Plan (for identification purposes only, not to scale) ITEM NO: 08 Application No. 11/00308/RTD Site Address: Proposal: Applicant: Agent: Ward: Owlsmoor Date Registered: 26 April 2011 Target Decision Date: 21 June 2011 Land Adjacent To Electricity Substation

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 3 April 2013 by Simon Warder MA BSc(Hons) DipUD(Dist) MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 15 April

More information