1 DEVELOPMENT CONTROL AND REGULATION COMMITTEE 20 July 2011 A Report by the Assistant Director - Planning & Sustainability Application No: 5/11/9004 District: South Lakeland Applicant: United Utilities Clearwater 4 Lingley Green Avenue Warrington Parish: Received: Grange Town Council 11 May 2011 PROPOSAL: Construction of a control kiosk, pressure relief column, temporary access off Yew Tree Road and upgrading of access off Carter Fold. To include the removal of 7no. trees. Playing Field, Yew Tree Road, Grange-over-Sands

2 RECOMMENDATION 1.1 That planning permission is Granted for the reasons stated in Appendix 1 and subject to the conditions in Appendix THE PROPOSAL 2.1 The proposal is for the siting of a control kiosk and a pressure release column and construction of temporary compound and access track. Kiosk m x 1.2 m x 2.15 m Pressure relief column 6 m 2.2 The existing Waste water Treatment Works (WwTW) is located to the south west of the proposed works. The kiosk and pressure release column would be located to the north east of the site, close to the boundary with the tennis courts. The site forms part of a large area of public open space which includes a playgroup, play areas and football pitch. The site also provides an informal pedestrian route for residents to the west of Grange which accesses the footpath and underpass to the south of the site which links to the promenade. The site is located within Grange-over-Sands Conservation Area. 2.3 The construction materials of the control kiosk would be glass reinforced plastic (GRP) and the pressure relief column would be steel painted, both would be dark green in colour. 2.4 Vehicular access during construction works would be from Yew Tree Road, which connects onto the B5277 which forms part of the main transport route around the Cartmel Penisula. The temporary construction access surfacing would consist of concrete and stone. No construction traffic would enter the site from the existing Cart Lane access. 2.5 It is proposed to start construction works in September 2011 for a period of 15 months. Hours of construction are proposed as to Monday to Friday and to Saturday with no working on Sunday, Bank or Public holidays. 2.6 The works also include the removal of 7 trees to the south of the site. 2.7 The nearest residential receptor is 60 m from the proposed works. 2.8 The works form part of a much larger scheme which would include an underground tank and associated pipe connections. These works are classed as Permitted Development as identified in the General Permitted Development (Development Management Procedure) Order 2010, Schedule 2, Part 16, Class a (A). 3.0 CONSULTATIONS AND REPRESENTATIONS 3.1 South Lakeland District Council Concern is raised with regards to the access track as this would be for a full width road and constructed of stone this would have a permanent and significant impact on the perceived open nature of the area. We are concerned with regards to the restoration of the site once works have been completed. Concern is raised with regards to the colour of the control box and stack. The development does not make allowance for future growth in the area.

3 3.2 South Lakeland District Council Arboricultural Officer The development requires the removal of 7 trees, the proposed replacement planting with 12 trees would be acceptable mitigation. The tree protection measures proposed are adequate to provide the required level of protection to the retained trees. T27/28 is a large Ash tree which forms a prominent feature in the local landscape and particular attention should be placed upon ensuring its full protection during the works. 3.3 South Lakeland District Council Environmental Health No comments to make. 3.4 Highway Authority The existing access must not be used for the construction phase of the development, upon completion of the scheme the temporary access must be closed off and any extraordinary damage made good to the public highway (Yew Tree Road will need resurfacing at least). It is recommended that the following conditions are imposed on the granting of planning permission use of approved access only temporary access, close existing access during construction, surfacing of access drive, surface water discharge onto highway and access gates recessed. A road opening permit would be required. 3.5 Natural England No objection to the proposal being carried out according to the terms and conditions of the application and plans submitted. 3.6 Environment Agency The mitigation proposed in the executive summary of the extended phase 1 habitat survey 2010, must be implemented during this development. 3.7 Network Rail The developer must ensure that their proposal both during and after completion of works on site does not encroach onto Network Rail land, it must not affect the safety, operation or integrity of the railway and its infrastructure or undermine or damage adversely affect any railway land or structures, nor over sail or encroach upon the air space of any Network Rail land or cause to obstruct or interfere with any works or proposed Network Rail development both now and in the future to be undertaken on Network Rail land an infrastructure. 3.8 The local Member - Mr WJ Wearing has been notified. 3.9 Grange-over-Sands Town Council The following observations are made a. Grange residents should be kept informed throughout the blasting phase b. Pre-structural surveys should be carried out on adjacent properties c. Wheelwash and road sweeper should be available d. Intrusive and traffic movement before should be kept to a minimum e. Constraints on noise levels should be monitored f. Comprehensive risk analysis should be undertaken to assess traffic control measures g. A new gate should be installed at the Yew Tree Road access

4 h. Post and wire fencing between the site access track and the footpath next to the railway should either be removed or replaced with new barrier style i. Concerned with the siting of the control kiosk within close proximity to the tennis courts and the potential of unauthorised access to the tennis courts j. GRP is inappropriate in Conservation Area k. New arrangements and equipment should not create any nuisance for neighbours from odour or noisy equipment l. Right of way should be maintained from Yew Tree Road to the underpass at the south of the site. m. The area should be maintained to a high standard n. Limits should be set on upper frequency of vehicle movements o. Limits should be set on upper frequency of blasting detonations, decibel levels, size and frequency for trucks taking material. p. Maximum noise levels should be a planning condition q. Acceptable arrangements for cleaning and maintenance of the screens should be specified r. Condition should specify the size of cranes that may be used s. Parking restrictions should be clearly set out 3.10 One letter of representation has been received from 17 Yew Tree Road who is concerned regarding the loss of view and the disruption to playing field users during construction works. 4.0 PLANNING ASSESSMENT 4.1 The Cumbria Minerals and Waste Development Framework Generic Development Control Policies recognises that improvements to the wastewater treatment system in Cumbria could be required to meet the EC Directives on bathing water and urban wastewater. The plan also recognises that such facilities have strong locational requirements in order to tie in with existing infrastructure. Policy DC 4(f) of the Plan establishes a presumption in favour of approval of wastewater treatment facilities. It states that, proposals which are likely to have significant adverse effects on the environment or communities would only be permitted where they present the best practical environmental option. 4.2 The works form part of United Utilities (UU) AMP5 (Asset Management Plan 5) Programme. This is a major programme of work to provide new assets, together with refurbishing and upgrading existing UU assets across the region as required by the water industry regulator Office of Water Services (OFWAT) and the Environment Agency (EA), to be implemented between 2005 and 2010.

5 4.3 The works are required to reduce spills to 3 per bathing season. During times of high flow (typical storm conditions) flows within the network have to be contained until the capacity in the sewers has reduced to such an extent that the contained flows can be released back into the network and passed forward for full treatment at the WwTW. The works are essential to the upgrading the existing works as this has been identified as unsatisfactory intermittent discharge (UID) in relation to coastal discharge standards. 4.4 The site forms part of a large area of public open space which is used for sporting and recreational purposes. The site undulates in a southern to northern direction. The flatter land is to the south of the site and forms the application site. The site is bounded to the east by the west coast rail line and Morecambe Bay and to the south/west are residential properties and to the north agricultural land. 4.5 The existing pumping station is located in the south west corner of the site. This is a 1920 s style building, which is screened by mature trees. The work is proposed to the north-east of the existing pumping station on an area of relatively flat land, located close to the railway line and enclosed tennis courts. 4.6 It is proposed to locate the kiosk and the pressure release column parallel to the boundary fence on the western boundary of the tennis courts. Grange Town Council have raised concern with regards to the position being close to the boundary with the tennis courts and the potential for unauthorised access to the tennis courts. There are two existing storage boxes within the tennis court, which could provide access at times when the courts are out of use. 4.7 Access to the site during construction is via the B5277 on to Yew Tree Road. There is an existing vehicular access on to the open space, which would need to be widened to allow HGVs to access the site. The Highway Authority have not raised any objection to the use of the temporary access during construction works. However, an appropriately worded condition would be included on the granting of any planning permission to ensure parking restrictions, warning signs, etc are available to warn pedestrians/drivers of potential issues. 4.8 There is currently a vehicular access off Carter Fold which serves the recreational ground. It is proposed to upgrade this access with crushed stone and the area around the proposed works with grasscrete. The access track runs parallel with a public right of way which serves the promenade. It is proposed to re-profile the banking along the track and plant 10 new trees along the access to help screen the track. South Lakeland District Council have raised concern that the upgrade of the track would have a visual impact on the area. I am of the opinion that should planning permission be granted with the mitigation works proposed the visual impact of the track would be minimal. 4.9 The works would be for a maximum period of 15 months with an anticipated start date September The site would be visible from the B5277, west coast rail line and promenade. However this would be a temporary impact and the land reinstated on completion. An appropriately worded condition would be included to the granting of any planning permission to ensure that the site is returned to its original state.

6 4.10 It is proposed to remove 7 trees along the southern boundary of the site to allow an upgrade on the existing access track. A replacement planting scheme is proposed to plant 12 trees to compensate for the loss of these trees. There is a large mature Ash tree which is to be retained, an appropriately worded condition would be imposed on the granting of any planning permission requiring a root protection zone to ensure no damage occurs to the tree Grange Town Council have raised concerns on a number of issues the majority of which are outside the scope of this planning application. However, where relevant their concerns would be controlled by an appropriately worded condition and an associated informative s in place bring other issues to the applicants attention One letter of objection has been received who is concerned with regards to the loss of view and the disruption during construction works. The works are for a temporary period of time and once completed the site would be restored to its original condition. Human Rights Act The proposal will have a limited impact on the visual, residential amenities and environmental amenity of the area. Any impacts on the rights of local property owners to a private and family life and peaceful enjoyment of their possessions (Article 8 and Article 1 of Protocol 1) are minimal and proportionate to the wider social and economic interests of the community. Conclusion 4.14 These works are essential to upgrade the existing WwTW for Grange which do not meet current EU standards. The site would have a temporary impact on the visual amenities of the area, but this would only be for a short period of time. I recommend that planning permission is granted. Paul Feehily Assistant Director - Planning & Sustainability Contact Mrs Jayne Petersen, Kendal, tel: , jayne.peterson@cumbria.gov.uk Background Papers Planning Application File Reference No. 5/11/9004 Electoral Division Identification Grange ED - Mr WJ Wearing \\ccc-prdc-fp05\kendal\filing\planning\applications\southlakeland\2011\ _uu_grange-over_sands_pp \dcandr Report.doc

7 Appendix 1 Ref No. 5/11/9004 Development Control and Regulation Committee 20 July 2011 THE TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE) (ENGLAND) ORDER 2010 Summary of Reasons For Grant of Planning Permission 1 This application has been determined in accordance with the Town and Country Planning Acts, in the context of national and regional planning policy guidance and advice and the relevant development plan policies. 2 The key development plan policies taken into account by the County Council before granting permission were as follows: Cumbria Minerals and Waste Development Framework - Generic Development Control Policies Policy DC4 Criteria for Waste Management Facilities Waste management facilities that accord with Core Strategy Policies 2, 8 and 9 and which do not have adverse environmental impacts will be permitted if they conform to the locational and other criteria. Waste water treatment facilities will be permitted in appropriate locations if proposals have minimised any adverse environmental impacts. South Lakeland Local Plan 2006 Policy S26 Development which fails to provide adequate means of sewage disposal and treatment, or where the capacity of the existing foul sewerage system or treatment works would be exceeded, will not be permitted. 3 In summary, the reasons for granting permission are that the County Council is of the opinion that the proposed development is in accordance with the development plan, there are no material considerations that indicate the decision should be made otherwise and with the planning conditions included in the notice of planning consent, any harm would reasonably by mitigated. Furthermore, any potential harm to interests of acknowledged importance is likely to be negligible and would be outweighed by the benefits of the development.

8 Appendix 2 Ref No. 5/11/9004 Development Control and Regulation Committee - 20 July 2011 Conditions Time Limits 1. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. To comply with Section 91 of the Town and Country Planning Act 1990 Approved Documents 2. The development shall be carried out strictly in accordance with the approved documents, hereinafter referred to as the approved scheme. The approved scheme shall comprise the following: a. The submitted Application Form dated 6 May 2011 b. Design and Access Statement dated 6 May 2011 c. Supporting Statement dated 6 May 2011 d. Great Crested Newts Scoping Survey Report dated April 2010 e. Arboricultural Report f. Extended Phase 1 Habitat Survey dated June 2010 g. Plans numbered: LAK0073/ /00/97/2001 rev A Site location plan LAK0073/ /00/97/2002 rev A Proposed site layout LAK0073/ /00/97/2003 rev A Proposed elevations LAK0073/ /00/97/2004 rev A Temporary construction access LAK0073/ /00/97/2005 rev A Proposed pressure balancing stack and control kiosk LAK0073/ /00/97/2006 rev A Proposed elevations LAK0073/ /00/97/2007 rev A Proposed section D-D UU/ES/L/ /5026/2623 Tree replacement plan UU/ES/L/ /5026/2622 Tree removal and tree protection plan h. The details or schemes approved in relation to conditions attached to this permission. i. This Decision Notice To ensure the development is carried out to an approved appropriate standard and to avoid confusion as to what comprises the approved scheme. 3. No development shall take place until a Construction Method Statement has been submitted to, and approved in writing by, the local planning authority. The approved statement shall be adhered to throughout the construction period. The Statement shall provide: details of the type, size & location of on-site facilities for construction workers; a traffic management plan, including but not limited to details of: parking restrictions on Yew Tree Road parking for site workers and visitors to the construction site; the anticipated number and type of vehicles accessing the site; measures to safeguard pedestrian and cyclists around the site; vehicle turning and manoeuvring areas for loading and unloading of all

9 construction vehicles safely; works access and traffic direction signage; site security during construction, and measures to control: noise; dust; odour, vibration To ensure that no operations take place which would lead to an unacceptable impact upon the amenity of local residents and safety of users of the public highway. 4 The construction access, parking, turning and manoeuvring areas, signage and safeguarding measures shall be in place before any building work commences on site. The carrying out of this development without the provision of these facilities during the construction work is likely to lead to inconvenience and danger to road users. To support Local Transport Policies: LD8 5 No construction works relating to the development hereby approved shall be undertaken except between the hours of 08:00 to 18:00 Mondays to Fridays and 08:00 to 13:00 Saturdays and not at all on Sundays and Bank/Public Holidays In the interests of preserving the amenity of neighbouring residents 6 During the construction stage no vehicles shall leave the site in a condition that would give rise to the deposit of mud, dust or other debris on the public highway. In the interests of highway safety 7 During construction works traffic shall only access the site from Yew Tree Road only. To avoid vehicles entering or leaving the site by an unauthorised access or route in the interest of highway safety. 8 The access shall be surfaced with bituminous or cement bound materials and shall be constructed and completed before the development is brought into use. In the interests of highway safety. 9 No development shall take place until details of all measures to be taken to prevent surface water discharging onto or off the highway has been submitted to, and approved in writing by, the local planning authority. When approved the measures shall be implemented prior to the development being completed and shall be maintained thereafter. In the interests of highway safety and environmental management

10 10 Access gates, shall be hung to open inwards only away from the highway, be recessed no less than 4.5 metres as measured from the carriageway edge of the adjacent highway. In the interests of highway safety. 11 No development shall take place until details of the height, type, position and (including angle of glare) of any floodlights, whether temporary or permanent, shall be submitted to and approved in writing by the Local Planning Authority prior to the development hereby permitted being commenced. The details shall demonstrate that no light will be positioned so as to be directly visible from residential property. The details and measures so approved shall be carried out and maintained thereafter. In the interests of visual amenity 12 No development shall commence, nor shall any materials or machinery be brought onto the site, until a 1.2 metre high fence in a continuous length, one metre beyond the crown spread of the ash tree to the southern boundary of the site has been erected in accordance with a plan submitted to the Local Planning Authority and agreed in writing by them. The fencing must remain throughout the period of construction and no materials, equipment or waste shall be stored, or burnt within the area or any excavation or changes in level take place within the fenced area. No changes in ground levels shall be made within the fenced area without the prior written approval of the Local Planning Authority. To protect trees during the construction period and in the interests of visual amenity. 13 A detailed scheme for the restoration of the site shall be submitted for approval by the Local Planning Authority within 3 months of commencement of development. To provide information not submitted with the application which is necessary to secure the proper restoration of the site. Informatives 1. Failure to supply details under the requirements of conditions would result in the proposal being in breach of the planning permission and action maybe taken to rectify this. 2. During the blasting phase, residents shall be informed in advance of forthcoming blasts. 3. A right of way shall be maintained from Yew Tree Road to the underpass at the south of the site, this should be clearly marked.

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

Applicant: United Utilities Plc Parish: Skelton Clearwater 4 Lingley Green Avenue Received: 14 August 2013 Warrington

Applicant: United Utilities Plc Parish: Skelton Clearwater 4 Lingley Green Avenue Received: 14 August 2013 Warrington DEVELOPMENT CONTROL AND REGULATION COMMITTEE 18 October 2013 A Report to the Assistant Director - Planning & Sustainability Application No: 3/13/9009 District: Eden Applicant: United Utilities Plc Parish:

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012

PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 Division(s): Sutton Courtenay & Harwell Contact Officer: John Duncalfe (john.duncalfe@oxfordshire.gov.uk) Tel: 01865 815356 PLANNING & REGULATION COMMITTEE 16 JANUARY 2012 TO CRUSH, SCREEN, BLEND AND STOCK

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340.

The land is allocated within the Westbury on Trym Conservation Area and the land is protected by a blanket TPO 340. SITE DESCRIPTION The site is occupied by a large single dwelling house which was built in 2007. The building is surrounded by large trees and has a substantial rear garden. The land is allocated within

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012 Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design.

Figure 5.6a Construction worksites and corridor access Note: Indicative only, subject to detailed design. A 0 NORTH 200 metres George Lane worksite North Strathfield Station worksite Strath eld Triangle A B Existing rail corridor Proposed underpass approach New/extended bridge Worksites Existing track Proposed

More information

Construction Management Plan Template

Construction Management Plan Template Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

University Arms Hotel, Cambridge

University Arms Hotel, Cambridge Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN

More information

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information

Kings Road, Beith. Development Brief. Part 1: Site Specific Information Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular

More information

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state

More information

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy. UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR) HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU

K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve

More information

Construction Phase Traffic Management Plan

Construction Phase Traffic Management Plan Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:

More information

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details

More information

Application for Planning Permission. Town and Country Planning Act 1990

Application for Planning Permission. Town and Country Planning Act 1990 Application for Planning Permission. Town and Country Planning Act 1990 Publication of applications on planning authority websites. Please note that the information provided on this application form and

More information

Construction Site Set Up Requirements

Construction Site Set Up Requirements Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

Rural dwellings including bed and breakfast accommodation

Rural dwellings including bed and breakfast accommodation MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

A report by Head of Planning Applications Group to Planning Applications Committee on 16 March 2004.

A report by Head of Planning Applications Group to Planning Applications Committee on 16 March 2004. Proposed adult education centre, performing arts facility, domed tennis court covering and replacement hard play area, The A report by Head of Planning Applications Group to Planning Applications Committee

More information

WITHOUT PREJUDICE. City of Port Phillip Planning Permit Application No. P0039/2015

WITHOUT PREJUDICE. City of Port Phillip Planning Permit Application No. P0039/2015 WITHOUT PREJUDICE City of Port Phillip Planning Permit Application No. P0039/2015 VCAT Reference: P0822/2015 Draft Conditions Proposed by the City of Port Phillip for VCAT Application for Review P0822/2015

More information

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014

Manchester City Council Item 6 Planning and Highways Committee 8 May 2014 Application Number 104843/FO/2014/N1 Date of Appln 28th Feb 2014 Committee Date 8th May 2014 Ward Moston Ward Proposal Location Applicant Agent Change of use of ground floor to a hot food takeaway (Fish

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Decision Due Date: 18 April 2015

Decision Due Date: 18 April 2015 App.No: 150195 Decision Due Date: 18 April 2015 Ward: Devonshire Officer: Richard Elder Site visit date: 8 May 2015 Site Notice(s) Expiry date: 27 March 2015 Neighbour Con Expiry: 27 March 2015 Press Notice(s):

More information

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD

More information

GUIDELINES FOR OUTDOOR EATING FACILITY

GUIDELINES FOR OUTDOOR EATING FACILITY GUIDELINES FOR OUTDOOR EATING FACILITY The purpose of this guideline is to provide information on the application requirements to establish an Outdoor Eating Facility in the Town and the Town s requirements

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose

SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance

More information

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015 Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1

More information

CONTACTS: Mitchell Shire Council 57346200. M.S.C. Building Department 57346230. M.S.C. Health Department 57346238

CONTACTS: Mitchell Shire Council 57346200. M.S.C. Building Department 57346230. M.S.C. Health Department 57346238 CONTACTS: Mitchell Shire Council 57346200 M.S.C. Building Department 57346230 M.S.C. Health Department 57346238 M.S.C. Enforcement & Compliance Unit 57346274 Building Control Commission 92856458 USEFUL

More information

Assessment of Site Deliverability in the Market Towns

Assessment of Site Deliverability in the Market Towns East Cambridgeshire District Council of Site Deliverability in the Market Towns August 2014 Annex 1 to the Site Results Technical Background Paper (February 2013) 0 Contents: 1. Introduction 1.1 Role of

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12

CORPORATE PROCUREMENT UNIT SITE & SECURITY PROCEDURES BOSTON SPA VERSION 9 SEPT12 SITE PROCEDURES BSPA VERSION 9 PAGE 1 OF 9 CONTENTS PAGE 1. GENERAL INFORMATION 3 2. ACCESS 3 3. SECURITY 3 4. VEHICLE PARKING 4 5. PERMITS TO WORK 4 6. DELIVERY, UNLOADING AND STORAGE 4 7. HOURS OF WORK

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Construction Management Statement. Introduction. Contents

Construction Management Statement. Introduction. Contents Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates

More information

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE

EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES CONDITIONS OF SITE LICENCE Residential Site Licence Conditions of Licence February 2014 EAST LINDSEY DISTRICT COUNCIL ~ RESIDENTIAL CARAVAN SITES Index of conditions CONDITIONS OF SITE LICENCE 1. Period of use 2. Bases 3. Siting

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

CONDITION 19(13) BE PARTIALLY DISCHARGED IN RELATION TO THE DETAILS OF THE SIZE, APPEARANCE AND LOCATION OF THE NOISE BARRIERS IN ROUTE SECTION H.

CONDITION 19(13) BE PARTIALLY DISCHARGED IN RELATION TO THE DETAILS OF THE SIZE, APPEARANCE AND LOCATION OF THE NOISE BARRIERS IN ROUTE SECTION H. WEST AREA PLANNING COMMITTEE 15 th December 2015 Application Number: 15/03110/CND Decision Due by: 18th December 2015 Proposal: Details submitted in compliance with Condition 19, Part 13 (Noise barriers-

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Manchester City Council Planning and Highways Committee 2 June 2011

Manchester City Council Planning and Highways Committee 2 June 2011 Application Number 095804/FO/2011/N1 Date of Appln 21st Mar 2011 Committee Date 2nd Jun 2011 Ward Cheetham Ward Proposal Location Applicant Agent Installation of 929 square metre mezzanine floor area to

More information

PLANNING SERVICES UNIT

PLANNING SERVICES UNIT SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY. Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

Guidance on Non-Material Amendments and Minor Material Amendments

Guidance on Non-Material Amendments and Minor Material Amendments Minerals and Waste Forum Implementation Planning Advisory Group Guidance on Non-Material Amendments and Minor Material Amendments April 2012 1 Non-Material Amendments and Minor Material Amendments 1) Non-material

More information

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment

More information

Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019

Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019 Original signed by Robyn Pearson on 17/10/2014 Date determined: 15/10/14 Date operates: 17/10/14 Date lapses: 17/10/2019 KE Architects P/L 49 Galvin Street MAROUBRA NSW 2035 D211/14 RP (PDS) ENVIRONMENTAL

More information

3. The consent hereby granted does not include any external alterations.

3. The consent hereby granted does not include any external alterations. Keith WARD 23 02/00425/FUL 19th March 2002 Change of use of retail shop to form pool room at 150 Mid Street Keith Banffshire AB55 3BJ for Mr Gordon Maver Comments: This application is being referred to

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

environment briefing02

environment briefing02 PRODUCED BY THE SAFETY, HEALTH & ENVIRONMENT GROUP OF THE ENERGY NETWORKS ASSOCIATION - JULY 2006 environment briefing02 transporting electricity Overhead Lines or Underground Cables? Introduction The

More information

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Application No: 11/1683N Location: Proposal: Applicant: Expiry Date: UNIT DC 360, FOURTH AVENUE, CREWE Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Mr A Fornal, Juwi Renewable Energies

More information

Item D3 Wind Swanley Technology ogy College, St Mary s Road, Swanley SE/09/

Item D3 Wind Swanley Technology ogy College, St Mary s Road, Swanley SE/09/ Wind turbine with 15m mast and solar photovoltaic panels Swanley Technology ogy College, St Mary s Road, Swanley SE/09/ /09/889 A report by Head of Planning Applications Group to Planning Applications

More information

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for

More information

Department for Communities and Local Government

Department for Communities and Local Government Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Recycling & Energy Recovery Facility

Recycling & Energy Recovery Facility Recycling & Energy Recovery Facility Cross Green Industrial Estate Leeds Environmental Statement Volume 1: Non-Technical Summary The Proposed Development Project Background Leeds City Council (LCC) intends

More information

BASILDON BOROUGH COUNCIL

BASILDON BOROUGH COUNCIL BASILDON BOROUGH COUNCIL Report to: Planning Committee December 05 PLANNING APPLICATION NO. 5/00699/FULL DEMOLITION OF ALL EXISTING OUTBUILDINGS AND REMOVAL OF ASSOCIATED LAWFUL USES AND TWO NO. RESIDENTIAL

More information

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES

IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES IPSWICH BOROUGH COUNCIL SCHEDULE OF REGISTERS/INFORMATION FOR LOCAL SEARCH ENQUIRIES Information from Suffolk County Council Information publicly available - free of charge Information available - with

More information

143 RUMBUSH LANE SHIRLEY SOLIHULL

143 RUMBUSH LANE SHIRLEY SOLIHULL 2014/514 143 RUMBUSH LANE SHIRLEY Application No: Ward/Area: Location: 2014/514/S BLYTHE 143 RUMBUSH LANE SHIRLEY SOLIHULL Date Registered: 14/03/2014 Applicant: Proposal: MR JAMIE LONG DEMOLITION OF GARAGE

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval

Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:

More information

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid

More information

4 JUNE 2009 NOT EXEMPT

4 JUNE 2009 NOT EXEMPT STIRLING COUNCIL THIS REPORT RELATES TO ITEM 7 ON THE AGENDA PLANNING PANEL ENVIRONMENT SERVICES 4 JUNE 2009 NOT EXEMPT PROPOSED CONSERVATORY AND WINDOW REPLACEMENT AT 35 PARK TERRACE, KINGS PARK, STIRLING,

More information

1.1 The application property is an extended two-storey semi-detached house fronting Bedale Road. The side garden adjoins a link road to Wydale Road.

1.1 The application property is an extended two-storey semi-detached house fronting Bedale Road. The side garden adjoins a link road to Wydale Road. COMMITTEE REPORT Date: 13 October 2011 Ward: Osbaldwick Team: Major and Parish: Osbaldwick Parish Commercial Team Council Reference: 11/02264/FUL Application at: 27 Bedale Avenue Osbaldwick York YO10 3NG

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Application Decision

Application Decision Application Decision By Gina Warman Appointed by the Secretary of State for Environment, Food and Rural Affairs The Planning Inspectorate Common Land Casework Team 4/05 Kite Wing Temple Quay House 2 The

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information