Pre-feasibility Report Coal Washery unit (0.96 MTPA)

Size: px
Start display at page:

Download "Pre-feasibility Report Coal Washery unit (0.96 MTPA)"

Transcription

1 Table of Contents 1.0 INTRODUCTION Acknowledgement Executive Summary Project at a Glance: PRODUCT & ITS USES AND MARKET Washed Coal: Availability of Raw Material Sources of Raw Materials: Availability of Utilities Selection of Site & LOCATION OF PLANT Manufacturing Process Process of Coal Benefication: Raw Coal Receipt and Handling Arrangement: Washing Section: Advantages of Using Washed Coal Water System & Plant Utilities: Source of Water Water Consumption ENVIRONEMENTAL MANAGEMENT PLAN :: 1 :: -

2 1.0 INTRODUCTION Hind Energy and Coal Beneficiation (P) Limited incorporated on with Registrar of Companies, Gwalior (M.P.). Considering the potential of Steel Industries in India and the experience gained by the group in this sector, HECBIPL decides to install the Coal Washery unit in the District of Bilaspur Coal Washery: HECBIPL propose to install coal Washery unit with annual installed capacity of 1 x 0.96 Million Tons/ Year. In addition to all the above positives, the promoters are locally based and have excellent rapport with the District and state government authorities, who are extending their full co-operation and assistance to encourage upcoming Industrial units in the state. 1.2 Acknowledgement We wish to express sincere gratitude to the management of M/s HECBIPL for the confidence reposed in entrusting this valued assignment and for spontaneous and timely cooperation by their Management and Officials in preparation of this Feasibility Report. - :: 2 :: -

3 2.0 Executive Summary 2.1 Hind Energy and Coal Beneficiation (P) Limited (HECBIPL) has been promoted by well established entrepreneur belonging to Bilaspur in Chhattisgarh state and already engage in Washing of coal in big way in the state of Chhattisgarh. Seeking the huge gap in demand and supply of washed coal; HECBIPL propose to install the 1 x 0.96 MTPA Coal Washery. 2.2 HECBIPL proposed to acquire about 12 acres of land for the Installation of coal washery at Village: Dhatura, Tehsil: Pali??, District: Koraba (C.G.). 2.3 Requirement of Water for proposed unit will be 495 KL/ Day, required for Washing of coal and domestic purpose which will be met through ground water sources. 2.4 The project cost estimated for installation of the proposed plant works out to Rs Crores. This is inclusive of equipment cost as erected including civil and structural works, taxes & duties and contingencies. - :: 3 :: -

4 3.0 Project at a Glance: 1. Name of the proposed unit : Hind Energy and Coal Bneficiation (P) Limited 2. Registered Office : Near Sai Parisar, Shrikant Verma Marg, Bilaspur, (C.G) 3. Unit Location : Village Tehsil District : Dhatura : Pali, : Koraba (Chhattisgarh) 4. Name of Directors : i. Shri Pawan Agrawal, Director ii. Shri Sanjay Agrawal, Director iii. Shri Rajiv Agrawal, Director iv. Shri Satish Agrawal, Director 5. Industry : Washing of Coal 6. Proposed Install Capacity : 0.96 Million Tons/ Year 7. Project cost (Rs. in Lakhs) Particulars i. Land & Site Development ii. Building & Civil Works iii. Plant & Machinery iv. Electrical Installation v. Preliminary & Pre-operative Expenses vi. Contingencies vii. Deposits 7.00 viii. Pollution control Equipments ix. Other Fixed Assets 6.00 x. Margin Money for Working Capital Total Investment Means of Finance Rs. in Lakhs Particulars i. Share Capital ii. Term Loan Total Investment No. of working Days : 335 days - :: 4 :: -

5 4.0 PRODUCT & ITS USES AND MARKET 4.1 Washed Coal: India is a strong player in the sponge iron business. The installed capacity of Sponge Iron in the country increased from 1.52 million tons per annum in to million tons per in There are 53 sponge iron units in the country producing 7 million tons per annum and 3 gas based units covering a capacity of 3.76 million tons per annum. Despite the lower number of gas based plants gas based sponge iron production accounted for 44% of the total domestic production, the rest 56% being coal-based. In the year 2002, with 6.53 million tones of production, India had become the world s largest producer of sponge iron. It recorded a 16.87% increase in production from 5.59 to 6.53 million tones. Domestic Scenario In order to push up the production of sponge iron in the country and to gainfully utilize natural resources, the Government is encouraging the development of coal washery. The factors in favor of sponge iron industry:- It reduces dependency on imported scrap. Global sponge iron prices are on an upswing as demand for steel seems insatiable and domestic prices have followed suit. Off take in sponge iron demand by EAF (Electric Arc Furnace) and Induction Furnaces will continue to remain firm even as price of scrap increases. - :: 5 :: -

6 Scrap as a percentage of total steel production has reduced significantly in the last few years leading to lower availability of scrap Lower ship breaking activities is also contributing to lower availability of scrap and hence higher sponge iron demand To boost productivity, sponge iron is also finding increased use in blast furnaces. This has furthered the metallic demand No major capacity coming up in the medium term. It will be at least two years before new capacity comes up Coal Quality for Sponge Iron making Coal plays a dual role in the sponge iron process by acting as reductant as well as a fuel for providing heat to maintain the requisite temperature inside the kiln at ºC. For sponge iron industries, where the quality of coal varies widely depending on the variation in the technological propriety and process parameters, no stringent specification has been made till to date. Available Coal Quality The major production of the non-coking / steam coal (>85%) in the country is of inferior quality (Grades E, F & G) where as the Sponge Iron Industry needs coal of B & C Grades at the most. As such most of the sponge iron plants are not getting the coal of required quality from the coal-mines. The average ash in the coal being supplied is 25 to 30%. Apart from the inferior quality, there is a wide range of variation in the quality of coal being supplied on day to-day basis and this causes problem in optimization of the inputs to the Kiln and control of it s performance in terms of quality and - :: 6 :: -

7 quantity of the out-put. In case of the Consortium the present supplies of washed coal form the present Supplier neither consistent nor adequate. Conclusion As such there is a need for a Coal Washery with a superior technology not only to get better heat-value coal but also to get the consistency in the quality which lends itself for optimization of the inputs to the Kiln resulting in better performance and more profitability. - :: 7 :: -

8 5.0 Availability of Raw Material A brief description of potential sources of various raw materials, their availability and quality with respect to location and requirement of plant has been presented in this chapter. 5.1 Sources of Raw Materials: Raw Coal Run off mines (ROM): Only raw material required for coal washery is raw coal that will be taken from near by mine of SECL, Bilaspur. Annual requirement of raw coal for proposed washery will be 0.96 Million Tons/ Year. - :: 8 :: -

9 6.0 Availability of Utilities For successful running of any unit most important factor is the availability of Raw Materials, as well as Utilities & Power, Water Connectivity which are required to efficiently run the Equipment. The company has proposed to install their Plant & Machinery and for effective utilization and achieve desired production levels the aforesaid items are elementary and constitute the basis which was kept in mind for the purpose of the proposal: WATER: - It is required only for washing purposed under industrial usage of the said unit. Total amount of makeup water required for operation of plant is about 495 M 3 / day this is inclusive of Washing, dust suppression and Domestic Purposes. All the effluent generated shall be treated through ETP of appropriate size and treated water will be utilized for dust suppression. POWER: HECBIPL propose to draw power from CSPTDCL Grid. MANPOWER: Increased industrial activity and rise in establishments of industries in the last few years have lead to the availability of experienced Skilled & Unskilled, Technical, Professional & Administrative personal for the Coal Washery within the State of Chhattisgarh. - :: 9 :: -

10 7.0 Selection of Site & LOCATION OF PLANT Selection of the site for any project is the most important aspect for it s successful operation & better economic viability. Proximity to Raw material source, assured supply of fuel and other infrastructural support are required to be essentially examined while selecting the site of the plant. The following basic requirements are necessarily required to be fulfilled. i. Easy & nearer access to Raw Material sources as coal etc. ii. iii. iv. Availability of water from continuous source. Power supply/ evacuation arrangement. Nearer access through road. M/s HECBIPL decided to install proposed Coal Washery at Dhatura Village, Pali Tehsil, Koraba District. The above site has the following preliminary advantages. i. Major coal mines of SECL located within radial distance of 100 km from the site. ii. iii. iv. Ample water is available nearer to the site through out the year. The site is already well connected with Road as well as Rail. Thus the approach is excellent. Soil condition of the site is also favorable. - :: 10 :: -

11 8.0 Manufacturing Process 8.1 Process of Coal Benefication: The entire process and operations to be carried out at the unit are described in brief as follows: Raw Coal Receipt and Handling Arrangement: Raw coal in the size range 200-0mm, from the mines will be received by wagons at nearby railway siding. The stock pile will have a self flowing capacity of tons. In addition arrangements for stocking of raw coal to an extent of 500 tons on the ground (close to the stock pile) will also be provided. A Pay loader will be used for reclamation of coal from ground stock. Two mechanical vibratory feeders, 500 TPH each have been provided for reclamation of coal from the stock pile for feeding to the Reclaim conveyor of 500 TPH capacity; which will carry the coal to the screen cum crusher house. The reclaim conveyor will feed the coal to a vibratory screen for screening the coal at 50mm. The mm coal will then be fed to a 1200 mm wide picking conveyer for picking/removing the shales / stones which will be disposed off by trucks. The mm coal form the picking conveyor, after removal of stones, will then be fed to a double roll crusher down to- 50mm. The crushed coal from the crusher and the 50-0mm undersize coal from the vibratory screen will be carried by belt conveyor to supply the coal to the washery Washing Section: The washery feed conveyor carrying crushed coal (50-0mm) will discharge on to a Desliming Vibrating screen for wet-removal of coal below 0.63mm. The over flow of this screen will be sent to a mixing box where the coal gets mixed with the magnetite medium of required specific gravity. The coal plus magnetite from the mixing box will be pumped to the Heavy Media Cyclone by a centrifugal pump. The HM Cyclones will separated - :: 11 :: -

12 washed/clean coal and rejects by density. The over flow (Clean coal) form the HM cyclone will be fed to a Draining and Rinsing horizontal vibrating screen for initial dewatering and for removal/recovery of magnetite. The overflow of this D & R screen will then be fed to a Vibrating Basket Centrifuge for further / final dewatering of clean coal. The underflow of the HM cyclones (rejects) will be fed to a Draining and Rinsing horizontal vibrating screen for dewatering and removal of media. The magnetite with correct density, from the D & R screens for clean and rejects will be fed to the Correct/Heavy media sump from where it will be pumped for reuse. The dilute media from the D & R screen will be fed to the dilute media sump from where it will be pumped to a magnetic separator to recover the magnetite. The effluent generated after recovery of magnetite from the magnetic separator will be pumped to a thickener to recover process water and to thicken the slurry. The underflow form the desliming screens and the under flow form the thickener will be charged/transported hydraulically to a tailings/slime pond from natural drying. The clear water form this pond will be pumped back to the system for reuse. The naturally dried material will be disposed of manually. It is proposed to use powdered magnetite as media which will be added by manual process. - :: 12 :: -

13 9.0 Advantages of Using Washed Coal Below mentioned are the uses of Washed/Beneficiated Coal: i) In the process of washing the coal the abrasive non-coaly mater like stones and shale will be removed from the raw coal. As such use of washed coal in the Sponge Iron plant will result in less wear and tear of the Machinery. The life of the Rotary Kiln will be prolonged with the use of washed coal. ii) iii) iv) Due to the uniform size of the washed coal and the uniform quality (Ash content being more or less uniform with a very little variation) as compared to much larger variation in the quality of Raw Coal form the coal mines, the operating parameters of manufacturing the sponge iron can be better regulated. Together with this and with the increased heat value of washed coal the productivity of the Rotary Kiln will increase by 15 to 20% Use of cleaner coal will improve the environmental conditions. Less production of char from the Kiln (which contains un-burnt coal & other nonmagnetic material) v) Use of Rejects from the coal Washery along with non-magnetic Kiln discharge/char and coal fines in a FBC will result in generation of additional electric power which will improve the financial performance of the Sponge Iron industry. * - :: 13 :: -

14 10.0 Water System & Plant Utilities: 10.1 Source of Water The desired amount of water will be met through ground water sources Water Consumption Make up water requirement for the project will be about 495 M 3 / day for operation of Coal Washery unit. - :: 14 :: -

15 11.0 ENVIRONEMENTAL MANAGEMENT PLAN The generated waste water from coal washery is fully recycled either in process or for dust suppression within plant premises. There will not be any waste water discharge outside the premises. Regarding air pollution control measures bag filters are installed at appropriate location. The entire material handling yard will be of RCC. Dust spraying and sprinkling system will be deployed. Apart from aforesaid measures good green belt in and around plant premises will be developed as per CPCB Guidelines. * - :: 15 :: -

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company)

Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company) Iron Ore Processing for the Blast Furnace (Courtesy of the National Steel Pellet Company) The following describes operations at the National Steel Pellet Company, an iron ore mining and processing facility

More information

ACTIVATED CARBON PLANT IN KERALA

ACTIVATED CARBON PLANT IN KERALA PROJECT PROFILE ON ACTIVATED CARBON PLANT IN KERALA Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR ACTIVATED CARBON PLANT INTRODUCTION Activated Carbon is the carbon produced

More information

Pellet Process - Uses and Exposures

Pellet Process - Uses and Exposures Pellet Process - Uses and Exposures 1 PROCESS - MANUFACTURING & USES 1 1.1 Manufacturing of pellets 2 Pellets are formed from the raw materials fine ores and additives of < 0.05 mm - into 9-16 mm spheres

More information

COARSE DRY COAL CLEANING

COARSE DRY COAL CLEANING COARSE DRY COAL CLEANING R. Q. Honaker University of Kentucky Department of Mining Engineering Lexington, Kentucky, USA 40506-0107 0107 Workshop on Coal Beneficiation and Utilization of Rejects : Initiatives,

More information

PROJECT PROFILE. RICE MILL (Capacity 4 TPH)

PROJECT PROFILE. RICE MILL (Capacity 4 TPH) PROJECT PROFILE ON RICE MILL (Capacity 4 TPH) PREPARED BY 8 th Floor, Parishrama Bhavan, Basheerbagh, Hyderabad 1. Introduction: The Rice milling is the process that helps in removal of hulls and bran

More information

Pre Feasibility Report

Pre Feasibility Report Pre Feasibility Report On Proposed to install 4.0 MTPA Coal Washery At Survey No. 83/2, 14, 15, 23, 24, 26 31 Mouza Sasti (Panderpauni) Tahsil Rajura, District Chandrapur. Submitted to MINISTRY OF ENVIRONMENT,

More information

Efficiency on a large scale CFB Steam Boilers

Efficiency on a large scale CFB Steam Boilers Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch

More information

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division

No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division No. J-11015/290/2013-IA.II(M) GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS IA-II (Coal-Mining) Division Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi- 110 003 To The Managing Director

More information

Case Study: Treatment of alluvial sand, treatment of washing water and sludge.

Case Study: Treatment of alluvial sand, treatment of washing water and sludge. Case Study: Treatment of alluvial sand, treatment of washing water and sludge. Client: FAMY & Cie SARL Site of BELLEGARDE Presentation of the project: The company Famy operates in the department of Ain,

More information

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation

PROJECT PROFILE MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE ON MODERN COLD STORAGE Prepared by: Kerala State Industrial Development Corporation PROJECT PROFILE FOR MODERN COLD STORAGE INTRODUCTION Cold Storage is a special kind of room, the temperature

More information

1 VEGETABLE OIL REFINERY. 1.1 Introduction

1 VEGETABLE OIL REFINERY. 1.1 Introduction 1 VEGETABLE OIL REFINERY 1.1 Introduction Vegetable oil and fat resources are indispensable to mankind as a source of nutrient and industrial raw materials. Crude vegetable oil obtained from various oil

More information

Environment Impact Assessment of Thermal Power Plant for Sustainable Development

Environment Impact Assessment of Thermal Power Plant for Sustainable Development International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment

More information

PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION

PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION PROFESSIONAL CEMENT PLANT OPTIMIZATION, MODERNIZATION AND ENERGY CONSERVATION Dr. Hans Wilhelm Meyer & Marc Lambert PEG S.A., Geneva, Switzerland ABSTRACT Optimization, modernization and energy conservation

More information

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 6 (Sep. - Oct. 2013), PP 25-29 Performance of the Boiler and To Improving the Boiler Efficiency

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

TISSUE PAPER MANUFACTURING

TISSUE PAPER MANUFACTURING PROJECT PROFILE ON TISSUE PAPER MANUFACTURING Prepared by: Kerala State Industrial Development Corporation September 2012 1 TISSUE PAPER PROJECT SUMMARY 1 The Proposal : To set up a Tissue Paper Production

More information

Iron and Steel Manufacturing

Iron and Steel Manufacturing Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Iron and Steel Manufacturing Industry Description and Practices Steel is manufactured by the chemical reduction of iron

More information

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

A guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume

A guide to volume measurement solutions for the. Mining Industry. Changing the market from level to volume A guide to volume measurement solutions for the Mining Industry 1 Changing the market from level to volume Potash Production 2 Changing the market from level to volume Potash Production Potash Production

More information

Xstrata Alloys in Profile

Xstrata Alloys in Profile Southern African Pyrometallurgy 2006, Edited by R.T. Jones, South African Institute of Mining and Metallurgy, Johannesburg, 5-8 March 2006 Xstrata Alloys in Profile O. Naiker and T. Riley Xstrata Alloys,

More information

Papaya is grown in considerable quantity in MP. The area of MP in the year 2004-05 is 684 ha and production 18500 MT.

Papaya is grown in considerable quantity in MP. The area of MP in the year 2004-05 is 684 ha and production 18500 MT. 1 TUTTY-FRUITY 1.1 Introduction Tutty-fruity is made from unripe papaya fruit and contains substantial quantum of sugar. It is used as an additive in ice-cream and some sweets but its major consumption

More information

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based)

EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) EXECUTIVE SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT CEMENT PLANT PROJECT 2 MILLION TONS PER ANNUM (Flyash and Slag Based) vill Gejamuda, tehsil & Dist-Raigarh, (Chattisgarh) CONTENTS 1.0 Introduction

More information

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works)

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works) BEST PRACTICES TOWARDS ENERGY EFFECIENCY UltraTech Cement Limited. (Unit -Kotputli Cement Works) Best Practices towards Energy Efficiency 1. Selected Vertical Mills installed at Raw Mill, Cement Mills

More information

SINTERING AND PELLETISATION OF INDIAN IRON ORES

SINTERING AND PELLETISATION OF INDIAN IRON ORES SINTERING AND PELLETISATION OF INDIAN IRON ORES By SURESH KUMAR* & T.M. SRINIVASAN** 1 * Vice President, Mineral Enterprises Limited, Bangalore ** Managing Director, FerroGreen Technologies Pvt. Ltd. Bangalore

More information

FOR SALE: RECYCLING PLANT FOR. - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC 28-90 HYDRO. Single shaft shredder

FOR SALE: RECYCLING PLANT FOR. - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC 28-90 HYDRO. Single shaft shredder FOR SALE: RECYCLING PLANT FOR - Aluminum scrap - Light metals - WEEE - Mixed industrial waste BANO PREMAC 28-90 HYDRO Single shaft shredder Stationary, weight 40 ton Table of content Sale of BANO PREMAC

More information

1.3 Properties of Coal

1.3 Properties of Coal 1.3 Properties of Classification is classified into three major types namely anthracite, bituminous, and lignite. However there is no clear demarcation between them and coal is also further classified

More information

I BAU HAMBURG Dry Product Handling

I BAU HAMBURG Dry Product Handling IBAU HAMBURG Your efficient partner for modern and effective bulk material handling I BAU HAMBURG PLANT DESIGN - ENGINEERING - EPC-CONTRACTING CEMENT - THERMAL POWER - MINERALS Central Cone Silos Single

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Waste Incineration Plants

Waste Incineration Plants Waste Incineration Plants Modern Technology for a better Environmental Welcome at Hafner! We Manufacture Systems for Energy Recovery from Wastes and Biomass as well as for Treatment of Hazardous Wastes.

More information

APPLICATION FOR EXEMPTION Assessing Authority

APPLICATION FOR EXEMPTION Assessing Authority TO: Combined Request for Pollution Control and Recycling Property Tax Exemption and Iowa Code Section 427.1 (19) APPLICATION FOR EXEMPTION Assessing Authority IMPORTANT: The application should be filed

More information

Waste to Energy in Düsseldorf. for a clean city.

Waste to Energy in Düsseldorf. for a clean city. Waste to Energy in Düsseldorf for a clean city. Waste Management in Düsseldorf. Düsseldorf s public utilities company known as Stadtwerke Düsseldorf operates a waste to energy plant (WtE) that has been

More information

Lecture 12: Exercise on mineral processing. Contents. Problems 1 to 7

Lecture 12: Exercise on mineral processing. Contents. Problems 1 to 7 Lecture 12: Exercise on mineral processing Contents Problems 1 to 7 A floatation plant treats feed whose grade is 0.8 % Cu. The plant produces concentrate and tailings. The copper grade of concentrate

More information

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS

PRE- FEASIBILITY STUDY REPORT. M/s. SAI MINERALS PRE- FEASIBILITY STUDY REPORT FOR M/s. SAI MINERALS BLACK TRAP MINING (AREA 04-00-00 HECTARE) OF APPLICANT (Mr. AMARJITSINH R. VARACHHIYA) (PARTNER) AT SURVEY NO: 13, AT: ASHNAVI, TAL: JHAGADIA, DIST:

More information

Techno Economic Feasibility Report of M/s Bravo Sponge Iron Pvt Ltd. At: Mahuda P.O- Rukni in Purliya district of West Bengal

Techno Economic Feasibility Report of M/s Bravo Sponge Iron Pvt Ltd. At: Mahuda P.O- Rukni in Purliya district of West Bengal CHAPTER-1 INTRODUCTION M/s Bravo Sponge Iron Pvt. Ltd. has existing 1x95 TPD & 1x100 TPD DRI kiln producing 62,400 TPA Sponge Iron for sale village- Mahuda, P.O- Rukni, Puruliya District of West Bengal

More information

Stora Enso Fors Ltd Sweden

Stora Enso Fors Ltd Sweden THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden

More information

CONSTRUCTION AND DEMOLITION WASTE

CONSTRUCTION AND DEMOLITION WASTE CHAPTER 4 CONSTRUCTION AND DEMOLITION WASTE 4.1 INTRODUCTION Construction and demolition waste is generated whenever any construction/demolition activity takes place, such as, building roads, bridges,

More information

7 CHAPTER ANNUAL REPORT 2014-15 COAL DISTRIBUTION AND MARKETING

7 CHAPTER ANNUAL REPORT 2014-15 COAL DISTRIBUTION AND MARKETING 7 CHAPTER ANNUAL REPORT 2014-15 COAL DISTRIBUTION AND MARKETING ANNUAL REPORT 2014-15 58 MINISTRY OF COAL Coal Distribution and Marketing The Marketing Division of CIL plans, coordinates and monitors the

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

IWR Integrated Waste Recycling. Integrated System for treatment and recycling of Municipal Solid Waste

IWR Integrated Waste Recycling. Integrated System for treatment and recycling of Municipal Solid Waste IWR Integrated Waste Recycling Integrated System for treatment and recycling of Municipal Solid Waste 1 1. Introduction IWR is an integrated system, realised by different Italian companies, manufacturers

More information

VEGETABLE OIL REFINERY

VEGETABLE OIL REFINERY VEGETABLE OIL REFINERY 1.0 INTRODUCTION: Vegetable oil and fat resources are indispensable to mankind as a source of nutrient and industrial raw materials. Crude vegetable oil obtained from various oil

More information

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour.

A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Did You Know? A pound of coal supplies enough electricity to power ten 100-watt light bulbs for about an hour. Nonrenewable Coal Coal Basics Coal Takes Millions of Years To Create Coal is a combustible

More information

How To Conduct An Environmental Impact Assessment

How To Conduct An Environmental Impact Assessment Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

Optimize Your Process

Optimize Your Process Optimize Your Process Instrument Solutions for the Coal Mining Industry Part of Thermo Fisher Scientific The Power to Help You Profit Optimizing Performance with Online Elemental Analysis Every year 1.1

More information

Outotec HIGmills; A Fine Grinding Technology

Outotec HIGmills; A Fine Grinding Technology 23 rd International Mining Congress & Exhibition of Turkey 16-19 April 2013 ANTALYA Outotec HIGmills; A Fine Grinding Technology H. Lehto Outotec Finland Oy A. Paz Outotec Pty Ltd, Perth, Australia I.

More information

WASTE WATER TREATMENT for surface treatment applications

WASTE WATER TREATMENT for surface treatment applications WASTE WATER TREATMENT for surface treatment applications Effluent an important cost factor Effluent cannot be avoided Water and compound are essential for vibratory mass finishing. During the finishing

More information

Cooking at the Speed of light!

Cooking at the Speed of light! Cooking at the Infrared Cooking & Colouring Infrabaker is a modular infrared continuous cooking system developed by Infrabaker International. The machine is designed to cook and/or put colour on a wide

More information

M2M-TECHNOLOGY: THE NEW STANDARD TO MINIMIZE BAUXITE RESIDUE

M2M-TECHNOLOGY: THE NEW STANDARD TO MINIMIZE BAUXITE RESIDUE Proceedings of the International Conference on Aluminium, INCAL 2007; 21-23 November 2007; Hyderabad Vol.1 (2007) 257-263; Eds. S. Subramanian and D. H. Sastry The Aluminium Association of India M2M-TECHNOLOGY:

More information

PROJECT PROFILE ON MUSTARD OIL

PROJECT PROFILE ON MUSTARD OIL PROJECT PROFILE ON MUSTARD OIL NAME OF THE PRODUCT : MUSTARD OIL. PRODUCT CODE : 211001023. QUALITY & STANDARD : PFA regulation is mandatory. Ag Mark for quality products. ISI Specification for Mustard

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout

Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout Application of the Thermo Scientific CQM Online Coal Analyzer in Anjialing Coal Preparation Plant s Rail Loadout Pingshuo Coal Industry Limited Liability Corporation (PSC) is China Coal Energy Group's

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of JHILIMINDA SAND BED OVER 20.30 ACRES OR 8.215 HA IN VILLAGE JHILIMINDA, ATTABIRA TAHASIL OF BARGARH DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

Description of the Water Conserv II Facility

Description of the Water Conserv II Facility Description of the Water Conserv II Facility Introduction The Water Conserv II (WCII) Water Reclamation Facility provides service to a majority of the southwest section of Orlando. The WCII facility has

More information

PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, 31251. Quality Standard : IS : 44 : 1991 IS : 05 : 1994

PROJECT PROFILE. Product : Red Iron Oxide. Product Code : 24117, 31251. Quality Standard : IS : 44 : 1991 IS : 05 : 1994 PROJECT PROFILE Product : Red Iron Oxide Product Code : 24117, 31251 Quality Standard : IS : 44 : 1991 IS : 05 : 1994 Production Capacity ( Per Annum) : Quantity - 300M.T Value - Rs.1,50,00,000/- Month

More information

Separation magnetism Daniel Norrgran and Jaisen N. Kohmuench, Eriez, US, examine new developments in coal preparation equipment

Separation magnetism Daniel Norrgran and Jaisen N. Kohmuench, Eriez, US, examine new developments in coal preparation equipment Separation magnetism Daniel Norrgran and Jaisen N. Kohmuench, Eriez, US, examine new developments in coal preparation equipment Figure 1. Suspended electromagnet. The magnet is suspended over the conveyor

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR SOIL MINING of M/s. BHAVINKUMAR VINODBHAI LAD SURVEY NO. 98, MOJE ANCHELI, TAL. BARDOLI, DIST. SURAT, GUJARAT 1 CONTENTS Sr. Description Page No. No. 1.

More information

For personal use only

For personal use only Mawson Iron Project PERTH 21 ST NOVEMBER 2015 Dr Gavin England General Manager DISCLAIMER AND COMPETENT PERSONS STATEMENT Slogan XXXX URBANISATION & INDUSTRIALISATION Chinese urbanisation and industrialisation

More information

WELCOME TO MINERAÇÃO PARAGOMINAS. José Flávio Alves - General Manager of Operational Support November 7, 2012

WELCOME TO MINERAÇÃO PARAGOMINAS. José Flávio Alves - General Manager of Operational Support November 7, 2012 WELCOME TO MINERAÇÃO PARAGOMINAS José Flávio Alves - General Manager of Operational Support November 7, 2012 What is bauxite? Rock composed mainly of aluminum oxide and aluminum hydroxide minerals Other

More information

Steel production. Furnace linings made from carbon and graphite are applied for the production of primary iron.

Steel production. Furnace linings made from carbon and graphite are applied for the production of primary iron. Steel production Furnace linings made from carbon and graphite are applied for the production of primary iron. Graphite electrodes and nipples (connecting pins) are applied for the production of steel.

More information

What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes?

What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes? What is Cement? History Overview of the Cement Manufacturing Process Brief Overview of Kiln Operations Why Burn Wastes? A hydraulic cement made by finely pulverizing the clinker produced by calcining to

More information

ZERO WASTE ELECTRIC ARC FURNACE (EAF) STEELMAKING CHAPARRAL STEEL COMPANY TARGET

ZERO WASTE ELECTRIC ARC FURNACE (EAF) STEELMAKING CHAPARRAL STEEL COMPANY TARGET ZERO WASTE ELECTRIC ARC FURNACE (EAF) STEELMAKING CHAPARRAL STEEL COMPANY TARGET Libor F. Rostik ChaparraI Steel Company Midlothian Texas EPA Region III Waste Minimization/Pollution Prevention Technical

More information

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2 WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper

More information

Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product Code (Based on NIC -2004) for Bricks & Tiles: 26921

Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product Code (Based on NIC -2004) for Bricks & Tiles: 26921 Project Profile Flyash Bricks & Pavement Tiles ( COMBINED ) Product: Flyash Bricks & Pavement Tiles Product Code (Based on NIC -2004) for Bricks & Tiles: 26921 Product Code: (Based on ASICC -2000) for

More information

Well Positioned for the Future

Well Positioned for the Future Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments

More information

Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant

Molasses Based Ethanol / Rectified Spirit Plant. Molasses Based Fuel Ethanol (Bio-Fuel) Plant Sector Agro and Food Processing Sub - sector Agro Processing Industry Project No. AF-34 Project Title Molasses Based Fuel Ethanol (Bio-Fuel) Plant Project Description The proposed project envisages setting

More information

STINGA TECHNOLOGIES BUSINESS DEVELOPMENT LICENSE USAGE- COMMERCIAL SHARING

STINGA TECHNOLOGIES BUSINESS DEVELOPMENT LICENSE USAGE- COMMERCIAL SHARING STINGA TECHNOLOGIES BUSINESS DEVELOPMENT LICENSE USAGE- COMMERCIAL SHARING Work 1 - September 2013 PROJECT SPECIFICATIONS INCREASING CURRENT THERMIC POWER PLANTS EFFICIENCY WITH OUR COAL DRYING TECHNOLOGY,

More information

UniSort NIR Technologies

UniSort NIR Technologies The first near infra-red (NIR) sorting systems were used to process recyclable materials in the early 1990s. Until then, recyclable materials were only collected sporadically, and sorted more or less by

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 1.214 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

AGJ APRÍTÓGÉPGYÁR Kft.

AGJ APRÍTÓGÉPGYÁR Kft. 1 AGJ APRÍTÓGÉPGYÁR Kft. Headquarters: H 5100 Jászberény, Honvéd u.27. Location: H 5100 Jászberény, Sportpálya u.1. Postal address: H 5101 Jászberény, PF.: 44 Tel.: +36 57 515 355, Fax: +36 57 515 356

More information

In-Pit Crushing and Conveying Phil Morriss

In-Pit Crushing and Conveying Phil Morriss In-Pit Crushing and Conveying Phil Morriss AGENDA 1. Introduction - what is In-Pit Crushing and Conveying (IPCC)? 2. What does a quarry need from IPCC? 3. Why and when should we consider using it? 4. How

More information

INDUSTRIAL PLANTS, COMPUTER & MACHINERY Manufacturing & Trade Co.Ltd.

INDUSTRIAL PLANTS, COMPUTER & MACHINERY Manufacturing & Trade Co.Ltd. INDUSTRIAL PLANTS, COMPUTER & MACHINERY Manufacturing & Trade Co.Ltd. Reference list: 2013 1 1. CNL Cimento Nacional LDA Maputo - Mozambik Project Definition : Capacity increasing the existing plant as

More information

Batching and Mixing Plants

Batching and Mixing Plants Batching and Mixing Plants Technique Strength Results Ready-mix plant with sheeted, square steel in-line bins. Precast and pipe factory with concrete in-line bins and bucket elevator. Individual solutions

More information

Introducing the Improved MAS DRD "Waterless" Cleaning System for Plastic Film, Flakes and Fibers

Introducing the Improved MAS DRD Waterless Cleaning System for Plastic Film, Flakes and Fibers PRESS RELEASE - For Immediate Distribution Introducing the Improved MAS DRD "Waterless" Cleaning System for Plastic Film, Flakes and Fibers September 28, 2015 - The Upper Austrian plastics machinery manufacturer

More information

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment Greening Our Future By Educating Tomorrow s Workforce Module 2: Lean Manufacturing and the Environment 11/16/2011 Module 2: Lean Manufacturing and the Environment What You Will Learn From This Module:

More information

Carbon Footprint of CMC Hospital for 2013

Carbon Footprint of CMC Hospital for 2013 Carbon Footprint of CMC Hospital for 2013 Carbon footprint of CMC Hospital campus was estimated for the year 2011 and 2012 and the total CO2e emission was estimated at 15271.74 CO2e tons and 15456.61 CO2e

More information

Modern Sand Reclamation Technologies for Economy, Environment Friendliness and Energy Efficiency

Modern Sand Reclamation Technologies for Economy, Environment Friendliness and Energy Efficiency Modern Sand Reclamation Technologies for Economy, Environment Friendliness and Energy Efficiency Aniruddha Ghosh GM, The Wesman Engineering Co. Ltd, Kolkata ABSTRACT Unlike green sand, chemically-bonded

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary The proposed project is Building stone quarry having lease area of 0.809 ha and falls under Category- A as per EIA Notification 2006 and its amendments of

More information

Coke Manufacturing. Industry Description and Practices. Waste Characteristics

Coke Manufacturing. Industry Description and Practices. Waste Characteristics Pollution Prevention and Abatement Handbook WORLD BANK GROUP Effective July 1998 Coke Manufacturing Industry Description and Practices Coke and coke by-products, including coke oven gas, are produced by

More information

Energy consumption. Environmental indicators

Energy consumption. Environmental indicators Environmental indicators The Inditex system of indicators shows the environmental impact of the Group in terms of consuming natural resources, using energy, generating waste and generating atmospheric

More information

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh

The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery

More information

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency

Urban Environmental Management in Singapore. Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Urban Environmental Management in Singapore Jothieswaran P Chief Engineer Pollution Control Department National Environment Agency Introduction City state comprising a main island and some islets Land

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

CHILLY AND TURMERIC POWDER

CHILLY AND TURMERIC POWDER CHILLY AND TURMERIC POWDER 1.0 INTRODUCTION Spices are an integral part of the Indian diet since centuries and they are used in vegetarian and non-vegetarian food and snack preparations. They help enhance

More information

Table 1.1: Typical Characteristics of Anaerobically Digested Wastewater

Table 1.1: Typical Characteristics of Anaerobically Digested Wastewater Solar Detoxification of Distillery Waste Anil K. Rajvanshi and Nandini Nimbkar Nimbkar Agricultural Research Institute (NARI), P.O. Box 44, PHALTAN-415523, Maharashtra E-mail : nariphaltan@gmail.com Introduction

More information

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable.

2.1 Compliance with PFA Act is mandatory. Adherence to AGMARK is advisable. MINI OIL MILL 1.0 INTRODUCTION Consumption of edible oils is increasing year after year and India imports large quantities every year. Different types of oilseeds are grown in the country like groundnuts,

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE TO Building Stone MINING ACTIVITY FOR CATEGORY B3 UNDER THE EIA NOTIFICATION 3006 AMENDED ON 31/05/3013 TO 1.97.58 SHREE SHAH ENGINEERING

More information

AN INTRODUCTION TO THE RADOS XRF ORE SORTER. RS Fickling Metanza Mineral Processors (Pty) Ltd

AN INTRODUCTION TO THE RADOS XRF ORE SORTER. RS Fickling Metanza Mineral Processors (Pty) Ltd 6 th Southern African Base Metals Conference 2011 AN INTRODUCTION TO THE RADOS XRF ORE SORTER RS Fickling Metanza Mineral Processors (Pty) Ltd 1. ABSTRACT RADOS has developed ore sorters in Russia over

More information

Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data

Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data Tokyo Steel s Views to Global Warming revised on June 25, 2010 with the latest data 1. Introduction A worldwide movement to control global warming is under way. In 1997, the Kyoto Protocol became the world

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Dairy Farming. 1. Introduction. 2. Scope for Dairy Farming and its National Importance. 3. Financial Assistance Available from Banks for Dairy Farming

Dairy Farming. 1. Introduction. 2. Scope for Dairy Farming and its National Importance. 3. Financial Assistance Available from Banks for Dairy Farming Dairy Farming 1. Introduction Dairying is an important source of subsidiary income to small/marginal farmers and agricultural labourers. In addition to milk, the manure from animals provides a good source

More information

Stone crusher dust as a fine aggregate in Concrete for paving blocks

Stone crusher dust as a fine aggregate in Concrete for paving blocks Stone crusher dust as a fine aggregate in Concrete for paving blocks Radhikesh P. Nanda 1, Amiya K. Das 2, Moharana.N.C 3 1 Associate Professor, Department of Civil Engineering, NIT Durgapur, Durgapur

More information

Biomass Energy Demonstration Grant BES-10-10 Lansing Board of Water & Light

Biomass Energy Demonstration Grant BES-10-10 Lansing Board of Water & Light Biomass Energy Demonstration Grant BES-10-10 Lansing Board of Water & Light Introduction The Lansing Board of Water & Light (BWL) is a publicly owned utility owned by the citizens of Lansing. It is the

More information

HDPE LAMINATED COLLAPSIBLE TUBES

HDPE LAMINATED COLLAPSIBLE TUBES HDPE LAMINATED COLLAPSIBLE TUBES 1. INTRODUCTION A typical Lamitube is a 5 layer structure with aluminium foil in the middle layer and polyethylene as an inner and outer layer. The Aluminium foil layer

More information

PRE- FEASIBILITY STUDY REPORT

PRE- FEASIBILITY STUDY REPORT PRE- FEASIBILITY STUDY REPORT FOR RAJNIKANT GORDHANBHAI CHANIYARA PROPOSED BLACK TRAP MINING (AREA 03-00-53 HECTARE) OF APPLICANT (Mr.Rajnikant Gordhanbhai chaniyara) (PAWOR OF ATTORNEY) AT BLOCK NO: 66

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of SRIPURA SAND BED-BOVER 35.25 ACRES OR 14.265 HA IN VILLAGE SRIPURA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20) Prepared

More information

SURGE IN INDIAN STEEL INDUSTRY : CHALLENGES OF INPUT SECURITY

SURGE IN INDIAN STEEL INDUSTRY : CHALLENGES OF INPUT SECURITY SURGE IN INDIAN STEEL INDUSTRY : CHALLENGES OF INPUT SECURITY Dr Subir Bhattacharya, Senior Manager U. K. Vishwakarma, DGM A. P. Singh DGM I/c & K. K. Mehrotra, Director (Engineering) MECON Limited, Ranchi

More information

Guidelines on AIR POLLUTION CONTROL for. Joss Paper Burning at Chinese Temples, Crematoria and Similar Places

Guidelines on AIR POLLUTION CONTROL for. Joss Paper Burning at Chinese Temples, Crematoria and Similar Places Guidelines on AIR POLLUTION CONTROL for Joss Paper Burning at Chinese Temples, Crematoria and Similar Places CONTENTS 1 Introduction 2 Major Considerations 3 Best Available Technology for Control of Air

More information

Built to last, designed to perform

Built to last, designed to perform Built to last, designed to perform Scalping and precision screening Easy service and maintenance access Screen box 4200 x 1500 mm Electric version available Fuel Saving by load sense hydraulic system Advanced

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MASONRY STONE (CHEJA PATTHAR) MINING PROJECT (ML Area: 1.0 ha, M.L. No. 65/2011, Production Capacity-1, 11,780 TPA) Near Village: Gangora, Tehsil: Pahari, District: Bharatapur

More information