INSTALLATION RULES PAPER 2 STUDY GUIDE

Size: px
Start display at page:

Download "INSTALLATION RULES PAPER 2 STUDY GUIDE"

Transcription

1 INSTALLATION RULES PAPER 2 STUDY GUIDE Compiled By: Leonard Fikani Ndlovu info@installationrulesstudymate.co.za Website:

2 INSTALLATION RULES PAPER 2 STUDY GUIDE Leornard Fikani Ndlovu PO Box 4367 Durban 4000 Kwazulu Natal Province South Africa E mail: info@installationrulesstudymate.co.za Website: By Leornard FikaniNdlovu Ndlovu, Author All rights reserved. No part of this Study Guide may be reproduced or transmitted in any form or by any means without written permission from the Author.

3 TABLE OF CONTENTS Page No. Introduction 11 Syllabus 12 Important Tables 13 Important Formulas 14 Resistance Touch Voltage Voltage Drop Neutral Current Load Moment AC PSCC DC PSCC Power Example 1 24 General Knowledge Example 2 27 Calculating The Volt Drop Of A Cable Sixth Method Seventh Method Example 3 34 Determine The Minimum Main Cable Size

4 Page No. Determine The Actual % Volt Drop Determine The Main Protection Tripping Rating Determine The Current Unbalanced Factor Determine The Resistance Of The ECC Example 4 47 SIX Different Methods To Determine Volt Drop Determine Using Monogram Model The Specific Resistance Specific Resistance Of Copper Specific Resistance Of Aluminum Practical Example Of How The Monogram Is Used In Volt Drop Calculations Example 5 55 Calculate The Three Phase Prospective Fault Current Calculate The Phase To Phase Prospective Fault Current Calculate The Volt Drop At The Load Calculate The Minimum ECC Size Calculate The Touch Voltage Example 6 68 Determine The Minimum Cable Size

5 Calculate The Volt Drop DB To A Calculate The Volt Drop DB To B Page No. Calculate The % Volt Drop Worst Case Determine The Main Protection Level Determine The Specific Value Of Copper Cable Used Example 7 91 Calculate The Connected Load Determine The Minimum Cable Size From DB To Load

6 Determine The Minimum Main Cable Size Calculate The % Volt Drop At The Load Page No. Give The Maximum Allowable Touch Voltage According To The Code Example Calculate The Maximum Volt Drop DB To Circuit A Test Your Answer By making Use Of Table E.1 Methods 2 To 5 Calculate The Maximum Volt Drop DB To Circuit B First Mthd Method Calculate The Minimum Copper Cable Size For A 3 Phase Motor Is Your Cable Size Suitable (Correct) Explain? Example Determine The Total Volt Drop Of The Supply Calculate The Total Resistance Of The Supply Cable

7 Page No. Test The Total Volt Drop Of The Supply Using Any Other Method By Making Use Of TABLE E.1 Only, Calculate The Length Of ECC Example Calculate The % Volt Drop Of A Single Phase Motor Sixth Method Determine The Resistance Of The ECC First Mthd Method Calculate The Touch Voltage At The Motor Example Calculate The PSCC For A Three Phase Fault Calculate The Touch Voltage At The Load Determine The Total Loop Impedance Example Calculate The PSCC For A Three Phase Fault Calculate The Touch Voltage At The Load Determine The Total Loop Impedance

8 Page No. Example Calculate The PSCC Of A DC Supply Example Calculate The PSCC Of A DC Supply Example Determine How Many PVC Conductors May Be Added To The Given Conduit Example Determine How Many PVC Conductors May Be Added To The Given Conduit Example Determine The Conduit Size For The Given Installation Example Derive From Basic Principles The Approximate Resistance Value Exercise 172 Derive From Basic Principles The Approximate Resistance Value Example Calculate The Maximum Value Of The Protection Device Calculate Maximum Value Of The Protection Device Calculate The Maximum Length Of The ECC Determine The Actual Resistance Value For The Above Length Calculate The Actual Length Of The ECC Determine The Actual Touch Voltage For This Conductor Calculate The Aerial Area Of The ECC

9 Application Of Table 6.28 Calculate The Minimum Size Of The ECC Page No. Example Loop Impedance Test And PSCC Test Example Earth Electrode Test Accuracy And Resolution Verification Of Test Instrument Example Insulation Resistance Test Verification Of Test Instruments Example How The Touch Voltage Is Determined Module Module Module Module Module Module 6 207

10 Page No. Module Module Module Module Module Important Annexures 221 Paper 2 Checklist 222 Module 6 Answers 224

11 WELCOME We would like to welcome you to the Installation Rules Paper 2 Study Guide and we thank you for investing in our study material. If you have never taken this Exam or have attempted it before, this Study Guide together with the accompanying Software will give you some idea of what to expect the actual Exam session to be like and to sharpen your skills on how to answer such Exam questions. Our Study Tools are designed to facilitate your Exam preparation process and to shorten your preparation time. The main objective of our Study Tools is to give you the knowledge, practice and confidence necessary to pass the Exams with flying colours on the first try. This objective is achieved by providing excellent Study Tools packed with detailed, step by step examples and many Exam Style Questions. The Installation Rules Study Tools ensures that your understanding of the material covered in the Regulation Standards is solidified and also ensures that all the objectives and aims of the Installation Rules Course are satisfied keep in mind that for the Installation Rules Exams you are required to demonstrate sufficient knowledge, understanding and application of the regulation standards. The latest standards (Books) that will be required for the Installation Rules Paper 2 are: SANS and SANS The information provided in this guide is divided into two sections: Section 1 gives you worked out examples of calculations and some theory questions for Paper Two. Most of the examples are taken from Past Exam Papers. Section 2 is divided into Modules 1 to 11 make sure to answer ALL the questions in these Modules. For ease of use each question in the Modules have Page numbers next to them indicating where you can get the answer to that particular question in the Regulation Book. We have included answers to Module 6, and for answers to calculation questions please refer to Examples. First, work with the Study Guide and for revision and practice run the Exam Simulator. We have also included 10 Revision Questions in a separate file as well, you may use this as the final preparation for your Exam. We wish you all the best. Installation Rules Study Mate Team Page 11

12 INSTALLATION RULES PAPER 2 SYLLABUS SANS LATEST EDITION: The Wiring Of Premises Part 1 [LV Installations] Section 6: Section 8: Annexure B: Annexure C: Annexure E: Annexure G: Annexure K: Annexure L: Annexure N: Annexure 0: Installation Requirements Verification And Certification Limits of arm s reach Installation Components Calculation Of Voltage Drop Conductors In Conduits Notification Of A Potential Danger Installations Of Surge Protection Devices (SPDs) Into Low Voltage Systems Earthing Arrangements And Equipotential Bonding Of IT Installations For Functional Purposes Classification Of Safety Services Necessary For Medical Locations SANS 1973 LATEST EDITION: Low Voltage Switch Gear, Control Gear Assemblies Safety Of Assemblies With A Rated Prospective Short Circuit Current Of Up To & Including 10 ka Page 12

13 IMPORTANT TABLES FOR PAPER 2 You have to be able to apply the following Tables in solving many of paper 2 calculations: Page Tbl Table 63(b) Table 6.4 (b) 107 Table Table Table Table Table Table Table Table E Table E Page 13

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DOMESTIC ELECTRICAL INSTALLATION CERTIFICATE (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) DETAILS OF THE CLEINT Client and address ADDRESS OF THE INSTALLATION Installation

More information

PROTECTION AGAINST ELECTRIC SHOCK by John Ware

PROTECTION AGAINST ELECTRIC SHOCK by John Ware 16 become live under fault conditions. The potential of the metal enclosure is higher than that of the main earthing terminal of the installation (and that of Earth) because of a potential difference created

More information

Section B: Electricity

Section B: Electricity Section B: Electricity We use mains electricity, supplied by power stations, for all kinds of appliances in our homes, so it is very important to know how to use it safely. In this chapter you will learn

More information

Airdac CNE and SNE, 600/1000V, Polyethylene Sheath, SANS 1507, NRS 063 & NRS 017

Airdac CNE and SNE, 600/1000V, Polyethylene Sheath, SANS 1507, NRS 063 & NRS 017 Airdac CNE and SNE, 600/1000V, Polyethylene Sheath, SANS 1507, NRS 063 & NRS 017 Conductor: Hard Drawn Copper Conductor Class 2 Insulation: LV-XLPE Phase Color Code(SNE): Red, Black & Bare Copper Phase

More information

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits

Trade of Electrician. Three-phase Distribution Boards And Socket Circuits Trade of Electrician Standards Based Apprenticeship Three-phase Distribution Boards And Socket Circuits Phase 2 Module No. 2.3 Unit No. 2.3.2 COURSE NOTES Created by Charlie Walsh - Athlone TC Revision

More information

CHAPTER 2 EXAMPLES AND TABLES

CHAPTER 2 EXAMPLES AND TABLES CHAPTER 2 EXAMPLES AND TABLES COMMENTARY AT 210.20(A) EXCEPTION An overcurrent device that supplies continuous and noncontinuous loads must have a rating that is not less than the sum of 100 percent of

More information

ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations)

ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) Original Certificate DETAILS OF THE CLIENT Certificate reference: ELECTRICAL INSTALLATION CONDITION REPORT (Requirements for Electrical Installations BS 7671 IEE Wiring Regulations) Name: Address: PURPOSE

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time

Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to

More information

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

CHECKING AND TESTING ELECTRICAL INSTALLING WORK CHECKING AND TESTING ELECTRICAL INSTALLING WORK Department of Consumer and Employment Protection Energy Safety Preface It is a requirement of the Electricity (Licensing) Regulations 1991 that all electrical

More information

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS

CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS CUSTOMER REQUIREMENTS AT POWER SUBSTATIONS Customer Handout Date Aug 2, 2010 Version 1.0 File Name Customer Requirements At Power Substations Document Id Outside Plant Engineering 1 Table Of Contents 1.0

More information

How Much Voltage Drop Is Acceptable?

How Much Voltage Drop Is Acceptable? How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed

More information

Grounding of Electrical Systems NEW CODE: Grounding and Bonding

Grounding of Electrical Systems NEW CODE: Grounding and Bonding Grounding of Electrical Systems NEW CODE: Grounding and Bonding Presented By Scott Peele PE Grounding of Electrical Systems Outline Defining the Terms Why should I Ground? Types of Grounding Systems Separately

More information

Chapter 9. Bonding and Grounding

Chapter 9. Bonding and Grounding Chapter 9 Bonding and Grounding Objectives Describe why the cable should be bonded Describe bonding and grounding procedures Define Bonding and Grounding Explain Safety Benefits and intent of bonding and

More information

MASTER ELECTRICIAN CODE EXAMINATION EXAMINATION REFERENCE MATERIAL AND CONTENT OUTLINE. Answers to sample questions: CONTENT OUTLINE

MASTER ELECTRICIAN CODE EXAMINATION EXAMINATION REFERENCE MATERIAL AND CONTENT OUTLINE. Answers to sample questions: CONTENT OUTLINE Answers to sample questions: Question Answer Reference 1 4 Section 362.12(6) 2 2 Table 310-16; 310.15(B)(2)(a) 3 4 Table. 250-66 4 2 Table 430.250 & 430.52 5 2 American Electrician Handbook, Figure 7-159

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

ACTIV-8 PLUS Insulated Conductor Bar

ACTIV-8 PLUS Insulated Conductor Bar ACTIV-8 PLUS Insulated Conductor Bar A product made in Australia www.conductix.com.au ACTIV-8 PLUS ACTIV-8 is the most widely used and stocked conductor rail in use in Australia. It was designed by Conductix

More information

Circuit Electrical Testing

Circuit Electrical Testing Safe Isolation Procedure Circuit Electrical Testing Site Safety Management It is essential from the outset that effective management and control of the system, apparatus and equipment used on site is achieved

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

A product made in Australia. Insulated Conductor Rail ACTIV-8 PLUS

A product made in Australia. Insulated Conductor Rail ACTIV-8 PLUS A product made in Australia Insulated Conductor Rail ACTIV-8 PLUS ACTIV-8 PLUS The Industry Standard in Conductor Rails ACTIV-8 is the most widely used and stocked conductor rail in use in Australia. It

More information

STREETLIGHT SYSTEM GROUNDING AND BONDING

STREETLIGHT SYSTEM GROUNDING AND BONDING Page: 1 of 8 STREETLIGHT SYSTEM GROUNDING AND BONDING 1. Scope This Construction Standard covers the grounding and bonding requirements for single phase streetlight systems served by the Looped Radial

More information

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13 Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified

More information

Errors Related to Cable Resistance Imbalance in Three Wire RTDs

Errors Related to Cable Resistance Imbalance in Three Wire RTDs Errors Related to Cable Resistance Imbalance in Three Wire RTDs 1.0 Introduction There are multiple sources of error that can impact the accuracy of an RTD measurement. The cable incorporated into the

More information

Electrical Grounding. Appendix C

Electrical Grounding. Appendix C Appendix C Electrical Grounding Low-Voltage Equipment Grounding The most frequently cited Office of Safety and Health Administration (OSHA) electrical violation is improper occupational grounding of equipment

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

GUIDELINES FOR ELECTRICAL WIRING IN RESIDENTIAL BUILDINGS

GUIDELINES FOR ELECTRICAL WIRING IN RESIDENTIAL BUILDINGS GUIDELINES FOR ELECTRICAL WIRING IN RESIDENTIAL BUILDINGS 2008 EDITION www.st.gov.my CONTENTS Chapter Title Page 1. 1.1 1.2 1.3 Introduction Purpose References 4 4 5 2. Supply System 6 2.1 Electricity

More information

AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System

AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System AJ s Technical Tips: Designing a Small Solar PV System Part IV; Selecting Wires for the System A little while back Simon Nyukuri of Kitale wrote to ask me about sizing wires and cables for solar PV systems.

More information

GUIDE TO THE AM2 EXAM

GUIDE TO THE AM2 EXAM AM2 GUIDE TO THE AM2 EXAM What is AM2? AM2 or the Achievement Measurement 2 is a practical performance skill test administered by the National Electrotechnical Training (NET). You must take the AM2 test

More information

Current Probes. User Manual

Current Probes. User Manual Current Probes User Manual ETS-Lindgren L.P. reserves the right to make changes to any product described herein in order to improve function, design, or for any other reason. Nothing contained herein shall

More information

Fault location on power cables. Fault location on power cables

Fault location on power cables. Fault location on power cables Fault location on power cables Fault location on power cables Contents: 1. Introduction 2. Construction of power cables 3. Cable faults 01. Introduction Fault location on communication and power cables

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting 12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.

More information

Grounding Demystified

Grounding Demystified Grounding Demystified 3-1 Importance Of Grounding Techniques 45 40 35 30 25 20 15 10 5 0 Grounding 42% Case 22% Cable 18% Percent Used Filter 12% PCB 6% Grounding 42% Case Shield 22% Cable Shielding 18%

More information

Video Camera Installation Guide

Video Camera Installation Guide Video Camera Installation Guide The intent of this guide is to provide the information needed to complete or modify a video camera installation to avoid lightning and induced power surge damage. This guide

More information

A B Brown. This sheet forms part of *Inspection Report Number/*Certificate Number NA/ * EC/ * PIR *Delete as applicable DB1 60898

A B Brown. This sheet forms part of *Inspection Report Number/*Certificate Number NA/ * EC/ * PIR *Delete as applicable DB1 60898 NAPIT Electrical Test Continuation Sheet Requirements for Electrical Installations BS 767 [IEE Wiring Regulations] and for Please complete all the unshaded areas. This sheet forms part of *Inspection Report

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

Electrical Safety. At Construction Worksites. Use electricity safely at worksites and avoid injury and hazards

Electrical Safety. At Construction Worksites. Use electricity safely at worksites and avoid injury and hazards Electrical Safety At Construction Worksites Use electricity safely at worksites and avoid injury and hazards Use an industrial plug and not a household plug for any hand-held tools and electrical equipment

More information

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured. SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation

More information

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance WHITE PAPER Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance Overview Enphase has developed a new microinverter family that includes the M250 and new

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62305-3 Edition 2.0 2010-12 colour inside Protection against lightning Part 3: Physical damage to structures and life hazard INTERNATIONAL ELECTROTECHNICAL COMMISSION PRICE CODE

More information

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE

LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE LV MCC LOW VOLTAGE SWITCHGEAR MOTOR CONTROL CENTRE PRODUCT GUIDE 380/415/690 Volt AC 50/65/80/100 ka 1. Product Guide Low Voltage Motor Control Centre CONTSTRUCTION Continuous "poured in place" gasket

More information

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022.

The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022. The U.S. Department of Labor projects that electrician careers will grow to 698,200 by 2022. Train now for affordable Electrician careers and get wired for success. Residential Electrician Diploma Program

More information

Top Commercial / Residential Electrical Requirements *

Top Commercial / Residential Electrical Requirements * Department of Community Development Building Division 4800 West 92 nd Avenue Westminster, Colorado 80031 For Information call (303) 658-2075 Fax (303) 706-3922 www.westminsterpermits.com Top Commercial

More information

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EARTHING AND BONDING AT SECONDARY SUBSTATIONS DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the

More information

MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing

MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing Release: 1 MEM10019 Select circuit protection devices by type and rating, fit to switchboards and

More information

Journeyman Class Schedule

Journeyman Class Schedule Journeyman Class Schedule San Diego Electrical Training Center Fall 2015 semester 4675 Viewridge Avenue Vol. 2015-3 tri-annual San Diego, CA 92123-1644 The classes listed in this schedule are designed

More information

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation Medium Voltage (MV) & High Voltage (HV) Training Module 6 Date of the presentation Electrical System Basics MV vs. HV - Definitions Differences between USA and the rest of the world IEC define a high voltage

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

CITY OF LOS ANGELES CALIFORNIA

CITY OF LOS ANGELES CALIFORNIA BOARD OF BUILDING AND SAFETY COMMISSIONERS VAN AMBATIELOS PRESIDENT E. FELICIA BRANNON VICE-PRESIDENT JOSELYN GEAGA-ROSENTHAL GEORGE HOVAGUIMIAN JAVIER NUNEZ CITY OF LOS ANGELES CALIFORNIA ERIC GARCETTI

More information

Regulation IO-6.0: Electrical Safety Regulations

Regulation IO-6.0: Electrical Safety Regulations Regulation IO-6.0: Electrical Safety Regulations 6.1 Workmanship & Material 6.2 Electrical Conductors 6.3 Overcurrent Protective Devices 6.4 Precautions against Earth Leakage and Earthfault Currents 6.5

More information

Fundamentals of Power

Fundamentals of Power Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At

More information

Candidate Self-Assessment Checklist

Candidate Self-Assessment Checklist General Information This is a compulsory document which must be completed by all candidates due to undertake the AM2 Assessment of Occupational Competence and provided to the assessment centre prior to

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 13 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia ELECTIRAL GROUNDING TABLE OF CONTENT

More information

Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers

Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers 9229 Waterford Centre Dr. Bldg C, Suite 110 Austin, Tx 78758 Application Bulletin 103 - NEC Reference Guide for SolarBridge-Enabled AC Module Installers Current Version: 13 AC Modules are a new product

More information

1. Franklin Rod Performance 2. LEC/DAS Performance

1. Franklin Rod Performance 2. LEC/DAS Performance THREE ESSENTIALS OF LIGHTNING PROTECTION: BONDING, GROUNDING AND SURGE PROTECTION by Richard Kithil, President and Orlando Alzamora, Vice-President National Lightning Safety Institute (NLSI) 1.0 Summary.

More information

Voltage Drop (Single-Phase)

Voltage Drop (Single-Phase) Voltage Drop (Single-Phase) To Find: To Find Voltage Drop Formula: 2 x K x L x I V.D. = ------------------- C.M. Variables: C.M. = Circular Mill Area (Chapter 9, Table 8) To Find Voltage Drop Percentage

More information

SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation

SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation SANS 10142-1 : 2008 CODE OF PRACTICE THE WIRING OF PREMISES Part 1 : Low Voltage Installation 4 Compliance Proof of Compliance (Sub clause 4.1.1) The SABS safety mark The SABS approved performance mark

More information

Network Standard Advice No. 1420C 9/6/2011

Network Standard Advice No. 1420C 9/6/2011 Network Standard Advice No. 1420C 9/6/2011 TO: Customers, Service Providers and Ausgrid Staff. Advisory Note on Changes to the Use of 11kV Cable Types. Introduction This Network Standard Advice (NSA) provides

More information

Electrical Resistance Resistance (R)

Electrical Resistance Resistance (R) Electrical Resistance Resistance (R) Any device in a circuit which converts electrical energy into some other form impedes the current. The device which converts electrical energy to heat energy is termed

More information

Test Before Touch Easier Said Than Done. Ken Crawford, DuPont Kent Haggerty, Dupont

Test Before Touch Easier Said Than Done. Ken Crawford, DuPont Kent Haggerty, Dupont Test Before Touch Easier Said Than Done Ken Crawford, DuPont Kent Haggerty, Dupont Overview Test Before Touch (TBT) Principles Key Learnings by One Company One Method for Performing a TBT Induced Voltages

More information

Physics. Cambridge IGCSE. Workbook. David Sang. Second edition. 9780521757843 Cambers & Sibley: IGCSE Physics Cover. C M Y K

Physics. Cambridge IGCSE. Workbook. David Sang. Second edition. 9780521757843 Cambers & Sibley: IGCSE Physics Cover. C M Y K Cambridge IGCSE Physics, Second edition matches the requirements of the latest Cambridge IGCSE Physics syllabus (0625). It is endorsed by Cambridge International Examinations for use with their examination.

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Introduction to Electricity & Magnetism. Dr Lisa Jardine-Wright Cavendish Laboratory

Introduction to Electricity & Magnetism. Dr Lisa Jardine-Wright Cavendish Laboratory Introduction to Electricity & Magnetism Dr Lisa Jardine-Wright Cavendish Laboratory Examples of uses of electricity Christmas lights Cars Electronic devices Human body Electricity? Electricity is the presence

More information

Checklist Testing and inspection without interconnection

Checklist Testing and inspection without interconnection Shams Dubai Checklist Testing and inspection without interconnection Version.0 AUGUST 205 TABLE OF CONTENTS Scope...5. PV PLANT AND INSPECTION DATA... 6 2 TESTING EQUIPMENT...7 3 DOCUMENTS... 8 3. Reference

More information

SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS

SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE WELDERS SIZING THE PRIMARY POWER SYSTEM FOR RESISTANCE S By Jack Farrow, May, 2004 WELDING TECHNOLOGY CORPORATION ABSTRACT Information on how to select the correct size of substation transformer and 480V bus to

More information

A guide to our training courses and premises. 01444 872 145 www.electriciancourses4u.co.uk

A guide to our training courses and premises. 01444 872 145 www.electriciancourses4u.co.uk A guide to our training courses and premises Contents 3. About Us 4. Why Us? 5. Our Premises 6-16. Training Courses 6. Domestic Electrician Course 7. Domestic Electrician Package 8. 17th Edition Course

More information

CONFLEX ELECTRIC CABLE

CONFLEX ELECTRIC CABLE CONFLEX ELECTRIC CABLE CONFLEX - 0.6/1kV Flexible VSD/EMC Cables Applications WW VSD/EMC cables are manufactured for use where electrical interference distorts signal transmission in electric motors. Standard

More information

Electrical safety requirements in DC distribution systems

Electrical safety requirements in DC distribution systems Electrical safety requirements in DC distribution systems PAUL J.L.AN TICHELEN, DOMINIQUE WEYEN ITO Boeretang 200, 2400 Mol BELGIUM Abstract: This paper focuses on the safety requirements for the DC bus

More information

The following table shows approximate percentage wise the

The following table shows approximate percentage wise the SHORT-CIRCUIT CALCULATION INTRODUCTION Designing an electrical system is easy and simple, if only the normal operation of the network is taken into consideration. However, abnormal conditions which are

More information

Data Bulletin Variable Frequency Drives and Short-Circuit Current Ratings

Data Bulletin Variable Frequency Drives and Short-Circuit Current Ratings Data Bulletin Variable Frequency Drives and Short-Circuit Current Ratings 8800DB1203 03/2013 Retain for future use. Introduction Short-circuit current s (SCCRs) for variable frequency drives (VFDs) is

More information

Services. Three Phase Service

Services. Three Phase Service Services Primary Service vs Secondary Service Overhead vs Underground Common Service Types Three Phase Wye Closed Open Delta Corner Grounded Center Tapped Open Single Phase Three Phase Service Wye Delta

More information

Project Name: Nortrax Section 26 41 00 Project No: 13-013 SURGE PROTECTION DEVICES Page 1

Project Name: Nortrax Section 26 41 00 Project No: 13-013 SURGE PROTECTION DEVICES Page 1 Page 1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divisions 1 Specification sections apply to

More information

Copper wire figures. AWG Table

Copper wire figures. AWG Table Tyco Electronics Corporation Crompton Instruments 1610 Cobb International Parkway, Unit #4 Kennesaw, GA 30152 Tel. 770-425-8903 Fax. 770-423-7194 Copper wire figures NOTE: This information and the circuits

More information

EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM

EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM EVC40 EMERGENCY VOICE COMMUNICATION SYSTEM INSTALLATION MANUAL Protec Fire Detection PLC, Protec House, Churchill Way, Nelson, Lancashire, BB9 6RT. Telephone: +44 (0) 1282 717171 Fax: +44 (0) 1282 717273

More information

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies DATE: November 17, 1999 REVISION: AUTHOR: John Merrell Introduction In some short circuit studies, the X/R ratio is ignored when comparing

More information

November 2014. Stray Voltage Test Procedure for Electrical Contractors

November 2014. Stray Voltage Test Procedure for Electrical Contractors Stray Voltage Test Procedure for Electrical Contractors 1 LIMITATION OF LIABILITY AND DISCLAIMER Any person who uses, relies on, or otherwise deals with this document and the information herein, does so

More information

6/14/02 Chapter 14: Use of Electrical Test Equipment 1/20

6/14/02 Chapter 14: Use of Electrical Test Equipment 1/20 USE OF ELECTRICAL TEST EQUIPMENT Test equipment is necessary for determining proper set-up, adjustment, operation, and maintenance of electrical systems and control panels. The following is a general procedure

More information

rpsa FIRE PROTECTION ENGINEERS

rpsa FIRE PROTECTION ENGINEERS R.P. SCHIFILITI ASSOCIATES, INC. P.O. Box 297 Reading, Massachusetts 01867-0497 USA 781.944.9300 Fax / Data 781.942.7500 Telephone Sample Fire Alarm System Calculations 1. A fire alarm manufacturer specifies

More information

SURGE PROTECTIVE DEVICES

SURGE PROTECTIVE DEVICES SURGE PROTECTIVE DEVICES 1. INTRODUCTION In order to ensure safety of people, protection of equipment and, to a certain extent, continuity of supply, insulation co-ordination aims at reducing the likelihood

More information

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches PART 1 GENERAL 1.01 Scope Optional Standby Power Generator Systems A. Furnish and install automatic transfer switches

More information

Electrical Contractors Association

Electrical Contractors Association Electrical Contractors Association Presents BS 7671 2008: Amendment No 1 BS 7671: 2008 Amendment No 1, 2011 IEE Wiring Regulations Now called IET Wiring Regulations History 1882 first edition of the Wiring

More information

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU

ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU ALTERNATIVE METHODS FOR INTERNAL ARC TESTS ON 12 KV AND 24 KV METAL-ENCLOSED SWITCHGEARS WITH COMPACT RMU George CURCANU, Constantin ILINCA, Ilie SBORA ICMET Craiova, Romania, Calea Bucuresti 144, phone:

More information

What are the Requirements for an Accurate DSL Line Simulator? Paradyne International, France

What are the Requirements for an Accurate DSL Line Simulator? Paradyne International, France Title: Source: Author: Contact: What are the Requirements for an Accurate DSL Line Simulator? Paradyne International, France Jack Douglass Jack Douglass Paradyne Networks, Inc. Voice: 949-233-3558 Email:

More information

Electrical Design Training Class Ampacity WSDOT Winter 2008 BZA

Electrical Design Training Class Ampacity WSDOT Winter 2008 BZA Electrical Design Training Class Ampacity WSDOT Winter 2008 BZA presented by: Keith Calais 1 What is it? Ampacity is the current, in Amperes, that a conductor can carry continuously under the conditions

More information

Tri-Rated Flexible PVC Equipment Wire

Tri-Rated Flexible PVC Equipment Wire Application: High temperature, flame retardant wire designed for use in the switch control, relay and instrumentation panels of power switchgear and for purposes such as internal connectors in rectifier

More information

6 ELECTRICAL PARAMETERS

6 ELECTRICAL PARAMETERS 6 ELECTRICAL PARAMETERS For power, low voltage and medium voltage cables, cross section nominal areas are calculated in taking into account several parameters as: permissible current carrying capacities

More information

CURRENT RATINGS MORE THAN A CABLE

CURRENT RATINGS MORE THAN A CABLE CURRENT RTINGS Updated for the 17th Edition of the IEE Wiring Regulations MORE THN CBLE C O M P N Y EI CBLES, DURHM ROD, BIRTLEY, CO DURHM. DH3 2R Tel: +44 (0)191 410 3111 Fax: +44 (0)191 410 8312 E-mail:

More information

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F TABLE OF CONTENTS Appendix F - Electrical Engineering Design Criteria F.1 Introduction...F-1 F.2 Codes and Standards...F-1 F.3 Switchyard and Transformers...F-1

More information

Occupational Profile: Electrical & Electronics Engineering Technician

Occupational Profile: Electrical & Electronics Engineering Technician Occupational Profile: Electrical & Electronics Engineering Technician A competent Electrical & Electronics Engineering Technician should be able to demonstrate the following skills and competences: 1.

More information

Secondary Unit Substations

Secondary Unit Substations 14 SWITCHGEAR Secondary Unit Substations Overview Siemens offers a wide variety of unit substation designs to meet customer requirements. A unit substation consists of one or more transformers mechanically

More information

Cable Size Selection for Energy Efficiency

Cable Size Selection for Energy Efficiency Cable Size Selection for Energy Efficiency Introduction The traditional method for determining the appropriate cable size for a particular installation involves the selection of the smallest size conductor

More information

101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer

101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION. Cutler-Hammer 101 BASICS SERIES LEARNING MODULE 3: FUNDAMENTALS OF ELECTRICAL DISTRIBUTION Cutler-Hammer WELCOME Welcome to Module 3, Fundamentals of Electrical Distribution. If you have successfully completed Module

More information

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392

Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading. Ramandeep Kaur Aujla S.NO 250447392 1 Generator Stator Protection, under/over voltage, under /over frequency and unbalanced loading By Ramandeep Kaur Aujla S.NO 250447392 ES 586b: Theory and applications of protective relays Department of

More information

Grounding & Bonding Why it is done And How to Install Properly

Grounding & Bonding Why it is done And How to Install Properly Grounding & Bonding Why it is done And How to Install Properly The technical information provided herein is to assist qualifi ed persons in planning and installing electric service to farms and residences.

More information

Telecommunications Training Catalog

Telecommunications Training Catalog Open Enrollment & Contract Courses Online Training Customized Training Technical Assistance Telecommunications Training Catalog Boost Your Knowledge BitRate with Us! The Telecommunications Training Program

More information

Douglas J. Reinemann, Ph.D. University of Wisconsin-Madison, Department of Agricultural Engineering Madison, Wisconsin. and

Douglas J. Reinemann, Ph.D. University of Wisconsin-Madison, Department of Agricultural Engineering Madison, Wisconsin. and Paper o. 953623 An ASAE Meeting Presentation ELECTRICAL SERVICE TO AGRICULTURAL BUILDIGS: FOUR- WIRE AD THREE-WIRE SYSTEMS by Mark A. Cook, Daniel M. Dasho P. E., and Richard Reines Public Service Commission

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Customer Interface Publication: KCH CIP002. Public Switched Telephone Network (PSTN)

Customer Interface Publication: KCH CIP002. Public Switched Telephone Network (PSTN) Customer Interface Publication: KCH CIP002 Public Switched Telephone Network (PSTN) Technical Characteristics of the Private Branch Exchange (PBX) Analogue Multi-Line Interface Issue: 1.1 August 2007 The

More information

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5 AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC

More information

Tamura Closed Loop Hall Effect Current Sensors

Tamura Closed Loop Hall Effect Current Sensors Tamura Closed Loop Hall Effect Current Sensors AC, DC, & Complex Currents Galvanic Isolation Fast Response Wide Frequency Bandwidth Quality & Reliability RoHs Compliance Closed Loop Hall Effect Sensors

More information