Homework 6 (Key) Chapter 7 in the text book, Problems: 10, 15, 12, 17, 24, 25

Size: px
Start display at page:

Download "Homework 6 (Key) Chapter 7 in the text book, Problems: 10, 15, 12, 17, 24, 25"

Transcription

1 Homework 6 (Key) Chapter 7 in the text book, Problems: 10, 15, 12, 17, 24, The purchase price of a natural gas-fired commercial boiler (capacity X) was $181,000 eight years ago. Another boiler of the same basic design, except with capacity 1.42X, is being considered to purchase. If it is purchased, some optional features presently costing $28,000 would be added for your application. If the cost index was 162 for this type of equipment when the capacity X boiler was purchased, and is 221 now, and the applicable cost capacity factor is 0.8, what is your estimate of the purchase price for the new boiler? Let C A = cost of new boiler S A = 1.42 X C B = cost of new boiler S B = X C A = $181,000 *(221/162) = $246,920 C B = $246,920 *(1.42 X/X) 0.8 = $326,879 Total cost with options = $326,879 + $28,000 =$354, A 250-ft 2 shell and tube heat exchanger was purchased for $13,500 in 1989 when the index value was 830. Estimate the cost of a 150-ft 2 shell and tube heat exchanger in 2001 when the index value is 964 and the appropriate cost capacity factor is 0.6. C 2001 (250 ft 2 ) = $13,500*(964/830) = $15,680 C 2001 (150 ft 2 ) = $15,680*(150/250) 0.6 = $11, If an ammonia plant that produces 500,000 pounds per year cost $2,500,000 to construct eight years ago, what would a 1,500,000-pound-per year plant cost now? Suppose that the construction cost index has increased an average rate of 12% per year of the past eight years and that the cost-capacity factor (X) to reflect the economy of scale is C B (8 years ago) = $2,500,000 C B (now) = 2,500,000*(1.12) 8 = $6,189,908 S A = 1,500,000 lbs/yr S B = 500,000 lbs/yr X = 0.65 C A = C B (S A /S B ) X = $6,189,908*(1,500,000/500,000) 0.65 = $12,641,919 1

2 7-17. The standard labor hours per output unit for Product A were based on a time study of the thirty-second unit. If the learning curve, based on previous experience with similar products, is 85%, (a) what was the number of hours required for the first unit and (b) what is the estimated number of hours needed for the 1,000 th output unit? Z 32 = 8.74 hours; s = 0.85 (85% learning curve); n = (log 0.85)/(log 2) = (a) Z 32 = K*(32) = 8.74 K = (8.74)/(32) = 19.7 hours (b) Z 1000 = 19.7*(1000) = 3.9 hours You have been asked to estimate the per unit selling price of a new line of widgets. Pertinent data are as follows: Direct labor rate $15.00 per hour Production material $375 per 100 widgets Factory overhead 125% of direct labor Packing costs 75% of direct labor Desired profit 20% of total manufacturing cost Past experience has shown that an 80% learning curve applies to the labor required for producing widgets. The time to complete the first widget has been estimated to be 1.76 hours. Use the estimated time to complete the 50 th widget as your as your standard time for the purpose of estimating the unit selling price. The estimate of direct labor hours is based on the time to produce the 50 th unit. K = 1.76 hours s = 0.8 (80% learning curve) n = (log 0.8)/(log 2) = Z 50 = 1.76*(50) = 0.5 hours Factory Labor = ($15/hr)*(0.5 hr/widget) = $7.50 / widget Production Material = $375 / 100 widgets = $3.75 / widget Factory Overhead = (1.25)*($7.50 / widget) = $9.375 / widget Packing Cost = (0.75)*($7.50 / widget) = $5.625 / widget Total Manufacturing Cost = $26.25 / widget Desired Profit = (0.20)*($26.25 / widget) = $5.25 / widget Unit Selling Price = / widget 2

3 7-25. A personal computer company is trying to bring a new model of PC ( Pentium Plus ) to the market. According to the marketing department, the best selling price for a similar model from a world-class competitor is $2,500 per computer. The company wants to sell at the same price as its best competitor. The cost breakdown of the new model is shown below: Assembling time for the 1 st unit: 1.00 hr Handling time: 10% of Assembling Time Direct labor rate: $15/hr Planning labor: 10% of Direct Labor Quality Control: 50% of Direct Labor Factory Overhead: 200% of Total Labor General & Administrative expense: 300% of Total Labor Direct material cost: $200/per computer Outside manufacture: $2000/per computer Packing cost: 10% of Total Labor Facility rental: 10% of Total Labor Profit: 20% of Total Manufacturing Cost Number of Units: 20,000 Since the company mainly produces sub-assemblies purchased from other manufacturers and repackages the product, the direct material cost is estimated at only $200 per computer. Direct labor time consists of handling time and assembling time. The company estimates the learning curve for assembling the new model is 95%. How can the company reduce its cost to meet the best competitors price? Before examining potential cost reductions, the current manufacturing cost must be estimated. Total Direct Labor Time = Assembly Time + Handling Time A 95% learning curve applies to the assembly time K = 1 hr, s = 0.95, n = log 0.95 / log2 = Time to assemble all 20,000 units = (1)S 1 (u) T 20,000 = 10, hours Adding in handling time as 10% of assembly time Total Factory (direct) Labor = (10,378.26)*(1.1) = 11, hours 3

4 Using the table (from the book), the total manufacturing cost and selling price are $2, and $2, respectively. MANUFACTURING COST ELEMENTS Unit Estimate Units Cost/ Units Factor of Row Row Total A. Factory Labor $15.00 $171, B. Planning Labor 10% A 17, C. Quality Control 50% A 85, D. TOTAL LABOR $273, E. Factory Overhead 200% D 547, F. General & Admin. Expense 300% D 821, G. Production Material $ ,000,000 H. Outside Manufacture $2, ,000,000 I. SUBTOTAL 45,643, J. Packaging Costs 10% D 27, K. TOTAL DIRECT CHARGE 45,671, L. Other Direct Charge M. Facility Rental 10% D 27, N. TOYAL MANUFACTURING COST 45,698, O. Quantity (lot size) P. MANUFACTURING COST/ UNIT 2, Q. Profit/ Fee 20% P R. UNIT SELLING PRICE 2, Given the competitor s selling price of $2,500 and assuming a desired return on sales of 20%, the target cost is given by: Target Cost = (1 0.2)*($2,500) = $2,000 It will be difficult for the company to assemble the computer for less than $2,000. The estimated outside manufacturing cost alone is $2,000 per computer. This cost should be reduced if the target cost of $2000 is to be achieved. 4

5 As shown in the following table, the cost of $2,00 can be reached if the outside manufacturing cost can be reduced to 1,715 (a reduction). MANUFACTURING COST ELEMENTS Unit Estimate Units Cost/ Units Factor of Row Row Total A. Factory Labor $15.00 $171, B. Planning Labor 10% A 17, C. Quality Control 50% A 85, D. TOTAL LABOR $273, E. Factory Overhead 200% D 547, F. General & Admin. Expense 300% D 821, G. Production Material $ ,000,000 H. Outside Manufacture $1, ,301,286 I. SUBTOTAL 39,945, J. Packaging Costs 10% D 27, K. TOTAL DIRECT CHARGE 39,972, L. Other Direct Charge M. Facility Rental 10% D 27, N. TOYAL MANUFACTURING COST 40,000, O. Quantity (lot size) P. MANUFACTURING COST/ UNIT 2, Q. Profit/ Fee 20% P 400 R. UNIT SELLING PRICE 2,

Flexible budgets and budget variances. First, let us consider the following example: Standard Cost Sheet Product: Widget

Flexible budgets and budget variances. First, let us consider the following example: Standard Cost Sheet Product: Widget Flexible budgets and budget variances First, let us consider the following example: Standard Cost Sheet Product: Widget Direct materials 2 lbs. @ $4.00 $ 8.00 Direct labor 0.5 hrs. @ $20.00 10.00 Variable

More information

SEEM 2440A/B Engineering Economics First term, 2011 12. Midterm Examination

SEEM 2440A/B Engineering Economics First term, 2011 12. Midterm Examination SEEM 2440A/B Engineering Economics First term, 2011 12 Midterm Examination Instructions Exam Duration: 90 minutes Total Marks: 100 This examination paper comprises of THREE questions. Answer ALL questions.

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. MBA 640, Survey of Microeconomics, Quiz #4 Fall 2006 Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) In the short run, A) there are no variable

More information

Pricing decisions and profitability analysis

Pricing decisions and profitability analysis Pricing decisions and profitability analysis Solutions to Chapter 11 questions Question 11.24 (a) (b) Computation of full costs and budgeted cost-plus selling price EXE WYE Stores Maintenance Admin ( m)

More information

Management Accounting 243 Pricing Decision Analysis

Management Accounting 243 Pricing Decision Analysis Management Accounting 243 Pricing Decision Analysis The setting of a price for a product is one of the most important decisions and certainly one of the more complex. A change in price not only directly

More information

PART A: For each worker, determine that worker's marginal product of labor.

PART A: For each worker, determine that worker's marginal product of labor. ECON 3310 Homework #4 - Solutions 1: Suppose the following indicates how many units of output y you can produce per hour with different levels of labor input (given your current factory capacity): PART

More information

EXERCISES. Testing Equipment Vehicle Estimated average annual income: $24,300/6... $4,050 $15,000/8... $1,875

EXERCISES. Testing Equipment Vehicle Estimated average annual income: $24,300/6... $4,050 $15,000/8... $1,875 Ex. 25 1 (FIN MAN); Ex. 10 1 (MAN) EXERCISES Testing Equipment Vehicle Estimated average annual income: $24,300/6... $4,050 $15,000/8... $1,875 Average investment: ($90,000 + 0)/2... $45,000 ($25,000 +

More information

Repair, Modify or Replace?? What is the right answer?? By : Joe Mozeika

Repair, Modify or Replace?? What is the right answer?? By : Joe Mozeika Repair, Modify or Replace?? What is the right answer?? By : Joe Mozeika First you have to determine what s really wrong with what you have? Analyze how old your unit is? What are really trying to achieve

More information

Investit Software Inc. www.investitsoftware.com. OUTSOURCING DECISION EXAMPLE WITH EXPENSES ONLY COMPARISON Example USA

Investit Software Inc. www.investitsoftware.com. OUTSOURCING DECISION EXAMPLE WITH EXPENSES ONLY COMPARISON Example USA OUTSOURCING DECISION EXAMPLE WITH EXPENSES ONLY COMPARISON Example USA INTRODUCTION This example shows how to compare two investments that; Involves an investment in equipment Incurs operating costs Uses

More information

Part 1 : 07/28/10 08:41:15

Part 1 : 07/28/10 08:41:15 Question 1 - CIA 1192 IV-21 - Manufacturing Input Variances - Materials and Labor A manufacturer has the following direct materials standard for one of its products. Direct materials: 3 pounds @ $1.60/pound

More information

A. a change in demand. B. a change in quantity demanded. C. a change in quantity supplied. D. unit elasticity. E. a change in average variable cost.

A. a change in demand. B. a change in quantity demanded. C. a change in quantity supplied. D. unit elasticity. E. a change in average variable cost. 1. The supply of gasoline changes, causing the price of gasoline to change. The resulting movement from one point to another along the demand curve for gasoline is called A. a change in demand. B. a change

More information

Solutions to Homework Problems for Basic Cost Behavior by David Albrecht

Solutions to Homework Problems for Basic Cost Behavior by David Albrecht Solutions to Homework Problems for Basic Cost Behavior by David Albrecht Solution to Problem #11 This problem focuses on being able to work with both total cost and average per unit cost. As a brief review,

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. Practice for Perfect Competition Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Which of the following is a defining characteristic of a

More information

Financial Statements for Manufacturing Businesses

Financial Statements for Manufacturing Businesses Management Accounting 31 Financial Statements for Manufacturing Businesses Importance of Financial Statements Accounting plays a critical role in decision-making. Accounting provides the financial framework

More information

Paper F5. Performance Management. Monday 2 December 2013. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants

Paper F5. Performance Management. Monday 2 December 2013. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants Fundamentals Level Skills Module Performance Management Monday 2 December 2013 Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FIVE questions are compulsory and MUST be attempted. Formulae

More information

Chapter 22 The Cost of Production Extra Multiple Choice Questions for Review

Chapter 22 The Cost of Production Extra Multiple Choice Questions for Review Chapter 22 The Cost of Production Extra Multiple Choice Questions for Review 1. Implicit costs are: A) equal to total fixed costs. B) comprised entirely of variable costs. C) "payments" for self-employed

More information

Variable Costs. Breakeven Analysis. Examples of Variable Costs. Variable Costs. Mixed

Variable Costs. Breakeven Analysis. Examples of Variable Costs. Variable Costs. Mixed Breakeven Analysis Variable Vary directly in proportion to activity: Example: if sales increase by 5%, then the Variable will increase by 5% Remain the same, regardless of the activity level Mixed Combines

More information

Econ 101, section 3, F06 Schroeter Exam #4, Red. Choose the single best answer for each question.

Econ 101, section 3, F06 Schroeter Exam #4, Red. Choose the single best answer for each question. Econ 101, section 3, F06 Schroeter Exam #4, Red Choose the single best answer for each question. 1. Profit is defined as a. net revenue minus depreciation. *. total revenue minus total cost. c. average

More information

Break-even Analysis. Thus, if we assume that price and AVC are constant, (1) can be rewritten as follows TFC AVC

Break-even Analysis. Thus, if we assume that price and AVC are constant, (1) can be rewritten as follows TFC AVC Break-even Analysis An enterprise, whether or not a profit maximizer, often finds it useful to know what price (or output level) must be for total revenue just equal total cost. This can be done with a

More information

Contents. Financial Analysis Report

Contents. Financial Analysis Report Contents Page Introduction 5 Operational Costs & Profit/Loss 7 Detail of Expenses & Profit/Loss for 2007 9 Operating Ratio Analysis 13 Operational Costs by Company Sales 19 Profit/Loss History 1985 through

More information

There is no difference when everyone is identical. All systems are equal

There is no difference when everyone is identical. All systems are equal PART I: Short Answer 5 marks each 1) What is the difference between an ambient and emissions standard; and what are the enforcement issues with each? Ambient set an air/water quality level. It is the true

More information

Absorption Costing - Overview

Absorption Costing - Overview Absorption Costing - Overview 1. Overview of Absorption costing and Variable Costing 2. Review how costs for Manufacturing are transferred to the product 3. Job Order Vs. Process Costing 4. Overhead Application

More information

Annual fixed cost $135,000 $204,000 Variable cost per switch $0.65 $0.30

Annual fixed cost $135,000 $204,000 Variable cost per switch $0.65 $0.30 11-34 Calista Company manufactures electronic equipment In 2008, it purchased the special switches used in each of its products from an outside supplier. The supplier charged Calista $2 per switch. Calista

More information

Ch.1 Purchasing & Supply Chain Management

Ch.1 Purchasing & Supply Chain Management Module 1 : Purchasing Process. Ch.1 Purchasing & Supply Chain Management Edited by Dr. Seung Hyun Lee (Ph.D., CPM) IEMS Research Center, E-mail : lkangsan@iems.co.kr Definition of Supply Chain. Definition

More information

Accounting and Finance Management Accounting Computer-Based Exemplars Int 2/Higher 3841

Accounting and Finance Management Accounting Computer-Based Exemplars Int 2/Higher 3841 Accounting and Finance Management Accounting Computer-Based Exemplars Int 2/Higher 3841 Autumn 1998 HIGHER STILL Accounting and Finance Management Accounting Computer-Based Exemplars Overhead Apportionment

More information

A Profitability and Cash Flow Analysis of Typical Greenhouse Production in North Florida Using Tomato as an Example

A Profitability and Cash Flow Analysis of Typical Greenhouse Production in North Florida Using Tomato as an Example A Profitability and Cash Flow Analysis of Typical Greenhouse Production in North Florida Using Tomato as an Example John Smith, Tim Hewitt, Robert Hochmuth and George Hochmuth Introduction Growing crops

More information

Everything You Always Wanted To know About Product Cost but Were Afraid to Ask.

Everything You Always Wanted To know About Product Cost but Were Afraid to Ask. Everything You Always Wanted To know About Product Cost but Were Afraid to Ask. Some Facts About Product Cost Source: Ford Motor Company General rule of thumb you have locked in 70 95 % of your product

More information

Econ 101: Principles of Microeconomics

Econ 101: Principles of Microeconomics Econ 101: Principles of Microeconomics Chapter 12 - Behind the Supply Curve - Inputs and Costs Fall 2010 Herriges (ISU) Ch. 12 Behind the Supply Curve Fall 2010 1 / 30 Outline 1 The Production Function

More information

Quiz Chapter 7 - Solution

Quiz Chapter 7 - Solution Quiz Chapter 7 - Solution 1. In an income statement prepared as an internal report using the variable costing method, variable selling and administrative expenses would: A) not be used. B) be treated the

More information

CHAPTER 10 In-Class QUIZ

CHAPTER 10 In-Class QUIZ CHAPTER 10 In-Class QUIZ 1. A mixed cost function has a constant component of $20,000. If the total cost is $60,000 and the independent variable has the value 200, what is the value of the slope coefficient?

More information

Chapter 6 Competitive Markets

Chapter 6 Competitive Markets Chapter 6 Competitive Markets After reading Chapter 6, COMPETITIVE MARKETS, you should be able to: List and explain the characteristics of Perfect Competition and Monopolistic Competition Explain why a

More information

Learning Objectives. After reading Chapter 11 and working the problems for Chapter 11 in the textbook and in this Workbook, you should be able to:

Learning Objectives. After reading Chapter 11 and working the problems for Chapter 11 in the textbook and in this Workbook, you should be able to: Learning Objectives After reading Chapter 11 and working the problems for Chapter 11 in the textbook and in this Workbook, you should be able to: Discuss three characteristics of perfectly competitive

More information

Marginal Costing and Absorption Costing

Marginal Costing and Absorption Costing Marginal Costing and Absorption Costing Learning Objectives To understand the meanings of marginal cost and marginal costing To distinguish between marginal costing and absorption costing To ascertain

More information

MONOPOLIES HOW ARE MONOPOLIES ACHIEVED?

MONOPOLIES HOW ARE MONOPOLIES ACHIEVED? Monopoly 18 The public, policy-makers, and economists are concerned with the power that monopoly industries have. In this chapter I discuss how monopolies behave and the case against monopolies. The case

More information

CE2451 Engineering Economics & Cost Analysis. Objectives of this course

CE2451 Engineering Economics & Cost Analysis. Objectives of this course CE2451 Engineering Economics & Cost Analysis Dr. M. Selvakumar Associate Professor Department of Civil Engineering Sri Venkateswara College of Engineering Objectives of this course The main objective of

More information

SOMETIMES the cost of installing a landscape plan

SOMETIMES the cost of installing a landscape plan Pricing the Landscape Plan SOMETIMES the cost of installing a landscape plan can be quite shocking for those not familiar with all the elements of a landscape. When one breaks down the various expenses

More information

Engineering Economics ECIV 5245

Engineering Economics ECIV 5245 Engineering Economics ECIV 5245 Chapter 2 Engineering Costs and Cost Estimating COSTS Fixed and Variable Marginal and average Direct and Indirect Sunk and Opportunity Recurring and Non-recurring Incremental

More information

The Basic Framework of Budgeting

The Basic Framework of Budgeting Master Budgeting 1 The Basic Framework of Budgeting A budget is a detailed quantitative plan for acquiring and using financial and other resources over a specified forthcoming time period. 1. The act of

More information

COST ESTIMATING METHODOLOGY

COST ESTIMATING METHODOLOGY NCMA DINNER MEETING TRAINING COST ESTIMATING METHODOLOGY 1 David Maldonado COST ESTIMATING METHODOLOGY TABLE OF CONTENT I. Estimating Overview II. Functional Estimating Methods III. Estimating Methods

More information

Budgetary Planning. Managerial Accounting Fifth Edition Weygandt Kimmel Kieso. Page 9-2

Budgetary Planning. Managerial Accounting Fifth Edition Weygandt Kimmel Kieso. Page 9-2 9-1 Budgetary Planning Managerial Accounting Fifth Edition Weygandt Kimmel Kieso 9-2 study objectives 1. Indicate the benefits of budgeting. 2. State the essentials of effective budgeting. 3. Identify

More information

The budgeting process

The budgeting process The budgeting process Question IM 15.1 Intermediate Question IM 15.2 Intermediate Question IM 15.3 Question IM 15.4 Question IM 15.5 Outline: (a) the objectives of budgetary planning and control systems;

More information

Chapter 5: Strategic Capacity Planning for Products and Services

Chapter 5: Strategic Capacity Planning for Products and Services Chapter 5: Strategic Capacity Planning for Products and Services Assistant Prof. Abed Schokry Operations and Productions Management First Semester 2010 / 2011 Learning Outcomes: Chapter 5 After finishing

More information

COST THEORY. I What costs matter? A Opportunity Costs

COST THEORY. I What costs matter? A Opportunity Costs COST THEORY Cost theory is related to production theory, they are often used together. However, the question is how much to produce, as opposed to which inputs to use. That is, assume that we use production

More information

Chapter 04 Firm Production, Cost, and Revenue

Chapter 04 Firm Production, Cost, and Revenue Chapter 04 Firm Production, Cost, and Revenue Multiple Choice Questions 1. A key assumption about the way firms behave is that they a. Minimize costs B. Maximize profit c. Maximize market share d. Maximize

More information

Microeconomics Topic 6: Be able to explain and calculate average and marginal cost to make production decisions.

Microeconomics Topic 6: Be able to explain and calculate average and marginal cost to make production decisions. Microeconomics Topic 6: Be able to explain and calculate average and marginal cost to make production decisions. Reference: Gregory Mankiw s Principles of Microeconomics, 2 nd edition, Chapter 13. Long-Run

More information

Quiz Chapter 4 - Solutions

Quiz Chapter 4 - Solutions Quiz Chapter 4 - Solutions 1. Salter Company uses the FIFO method in its process costing system. The company reported 25,000 equivalent units for materials last month. The company's beginning work in process

More information

CHAPTER 10 MARKET POWER: MONOPOLY AND MONOPSONY

CHAPTER 10 MARKET POWER: MONOPOLY AND MONOPSONY CHAPTER 10 MARKET POWER: MONOPOLY AND MONOPSONY EXERCISES 3. A monopolist firm faces a demand with constant elasticity of -.0. It has a constant marginal cost of $0 per unit and sets a price to maximize

More information

This resource provides an example of. an activity for a topic within Theme 2.

This resource provides an example of. an activity for a topic within Theme 2. Planning Click to edit activity: Master Theme title style 2 Click to edit Master text styles This resource provides an example of an activity for a topic within Theme 2. The Planning Activity document

More information

Management Accounting 303 Segmental Profitability Analysis and Evaluation

Management Accounting 303 Segmental Profitability Analysis and Evaluation Management Accounting 303 Segmental Profitability Analysis and Evaluation Unless a business is a not-for-profit business, all businesses have as a primary goal the earning of profit. In the long run, sustained

More information

Schedule to Regulation PR No. 30/53

Schedule to Regulation PR No. 30/53 Schedule to Regulation PR No. 30/53 Rules for the Determination of Cost Prices Contents Page I. General 5 1. Scope 5 2. Contractor's Accounting System 5 3. Declaration by the Contractor 5 II. Determination

More information

110. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS

110. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS 0. PROFILE ON PRODUCTION OF GLASS BOTTLES AND TUMBLERS 0-2 TABLE OF CONTENTS PAGE I. SUMMARY 0-3 II. PRODUCT DESCRIPTION & APPLICATION 0-3 III. MARKET STUDY AND PLANT CAPACITY 0-4 A. MARKET STUDY 0-4 B.

More information

Long-Run Average Cost. Econ 410: Micro Theory. Long-Run Average Cost. Long-Run Average Cost. Economies of Scale & Scope Minimizing Cost Mathematically

Long-Run Average Cost. Econ 410: Micro Theory. Long-Run Average Cost. Long-Run Average Cost. Economies of Scale & Scope Minimizing Cost Mathematically Slide 1 Slide 3 Econ 410: Micro Theory & Scope Minimizing Cost Mathematically Friday, November 9 th, 2007 Cost But, at some point, average costs for a firm will tend to increase. Why? Factory space and

More information

Technology, Production, and Costs

Technology, Production, and Costs Chapter 10 Technology, Production, and Costs 10.1 Technology: An Economic Definition 10.1 LEARNING OBJECTIVE Learning Objective 1 Define technology and give examples of technological change. A firm s technology

More information

Understanding Depreciation, Fixed, and Variable Costs

Understanding Depreciation, Fixed, and Variable Costs Lesson D4 2 Understanding Depreciation, Fixed, and Variable Costs Unit D. Basic Agribusiness Principles and Skills Problem Area 4. Applying Basic Economic Principles in Agribusiness Lesson 2. Understanding

More information

Learning Curve Theory

Learning Curve Theory CHAPTER 16 Learning Curve Theory Basic Concepts Learning Curve Learning curve is a geometrical progression, which reveals that there is steadily decreasing cost for the accomplishment of a given repetitive

More information

4. The accountant s product costing art

4. The accountant s product costing art 4. The accountant s product costing art How to move from cost pools to product costs Define an appropriate number of cost pools Each cost pool aggregates costs associated with some set of activities Estimate

More information

Q D = 100 - (5)(5) = 75 Q S = 50 + (5)(5) = 75.

Q D = 100 - (5)(5) = 75 Q S = 50 + (5)(5) = 75. 4. The rent control agency of New York City has found that aggregate demand is Q D = 100-5P. Quantity is measured in tens of thousands of apartments. Price, the average monthly rental rate, is measured

More information

Exercise 17-1 (15 minutes)

Exercise 17-1 (15 minutes) Exercise 17-1 (15 minutes) 1. 2002 2001 Sales... 100.0% 100.0 % Less cost of goods sold... 63.2 60.0 Gross margin... 36.8 40.0 Selling expenses... 18.0 17.5 Administrative expenses... 13.6 14.6 Total expenses...

More information

Review 3. Table 14-2. The following table presents cost and revenue information for Soper s Port Vineyard.

Review 3. Table 14-2. The following table presents cost and revenue information for Soper s Port Vineyard. Review 3 Chapters 10, 11, 12, 13, 14 are included in Midterm 3. There will be 40-45 questions. Most of the questions will be definitional, make sure you read the text carefully. Table 14-2 The following

More information

Module Title: Management Accounting 2

Module Title: Management Accounting 2 CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Semester 2 Examinations 2008/09 Module Title: Management Accounting 2 Module Code: ACCT 6004 School: Business Programme Title: Bachelor of

More information

House Published on www.jps-dir.com

House Published on www.jps-dir.com I. Cost - Volume - Profit (Break - Even) Analysis A. Definitions 1. Cost - Volume - Profit (CVP) Analysis: is a means of predicting the relationships among revenues, variable costs, and fixed costs at

More information

Paper F5. Performance Management. Monday 11 June 2012. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants

Paper F5. Performance Management. Monday 11 June 2012. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants Fundamentals Level Skills Module Performance Management Monday 11 June 2012 Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FIVE questions are compulsory and MUST be attempted. Formulae

More information

74. PROFILE ON BAKING OVENS

74. PROFILE ON BAKING OVENS 74. PROFILE ON BAKING OVENS 74-2 TABLE OF CONTENTS PAGE I. SUMMARY 74-3 II. PRODUCT DESCRIPTION & APPLICATION 74-4 III. MARKET STUDY AND PLANT CAPACITY 74-4 A. MARKET STUDY 74-4 B. PLANT CAPACITY & PRODUCTION

More information

CHAPTER 8 COSTS OF PRODUCTION

CHAPTER 8 COSTS OF PRODUCTION CHAPTER 8 COSTS OF PRODUCTION Chapter in a Nutshell This chapter gives an in-depth look at the costs of production for firms, both in the short run and in the long run. Although production techniques may

More information

Chapter 7. Comparative Advantage and the Gains from International Trade

Chapter 7. Comparative Advantage and the Gains from International Trade Chapter 7. Comparative Advantage and the Gains from International Trade Instructor: JINKOOK LEE Department of Economics / Texas A&M University ECON 203 502 Principles of Macroeconomics International Trade

More information

, to its new position, ATC 2

, to its new position, ATC 2 S171-S184_Krugman2e_PS_Ch12.qxp 9/16/08 9:22 PM Page S-171 Behind the Supply Curve: Inputs and Costs chapter: 12 1. Changes in the prices of key commodities can have a significant impact on a company s

More information

ACG 3024 Accounting for Non-Financial Majors Homework Portfolio Study Guide

ACG 3024 Accounting for Non-Financial Majors Homework Portfolio Study Guide ACG 3024 Accounting for Non-Financial Majors Homework Portfolio Study Guide These are similar questions with the answers to help guide you when preparing the Homework Portfolio that you will upload to

More information

Standard Costs Overview

Standard Costs Overview Overview 1. What are standard Costs. 2. Why do we set standard costs? 3. How do we set the standards? 4. Calculating Variances: DM and DL - Disaggregating variances into price and volume. - Difference

More information

LABOR UNIONS. Appendix. Key Concepts

LABOR UNIONS. Appendix. Key Concepts Appendix LABOR UNION Key Concepts Market Power in the Labor Market A labor union is an organized group of workers that aims to increase wages and influence other job conditions. Craft union a group of

More information

Price Theory Lecture 4: Production & Cost

Price Theory Lecture 4: Production & Cost Price Theory Lecture 4: Production & Cost Now that we ve explained the demand side of the market, our goal is to develop a greater understanding of the supply side. Ultimately, we want to use a theory

More information

Economics 100 Exam 2

Economics 100 Exam 2 Name: 1. During the long run: Economics 100 Exam 2 A. Output is limited because of the law of diminishing returns B. The scale of operations cannot be changed C. The firm must decide how to use the current

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question on the accompanying scantron.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question on the accompanying scantron. Principles of Microeconomics, Quiz #5 Fall 2007 Name MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question on the accompanying scantron. 1) Perfect competition

More information

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS

PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS PREPARING DETAILED BREAKDOWNS FOR CHANGE ORDER PROPOSALS I. GENERAL A. All work to be performed under the change order must be itemized, including the work of all subcontractors. B. Items must be relevant

More information

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. Chapter 11 Monopoly practice Davidson spring2007 MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) A monopoly industry is characterized by 1) A)

More information

Marginal and absorption costing

Marginal and absorption costing Marginal and absorption costing Topic list Syllabus reference 1 Marginal cost and marginal costing D4 2 The principles of marginal costing D4 3 Marginal costing and absorption costing and the calculation

More information

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan 48121 Ford Customer Service Division

Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan 48121 Ford Customer Service Division Michael A. Berardi Ford Motor Company Director P. O. Box 1904 Service Engineering Operations Dearborn, Michigan 48121 Ford Customer Service Division TO: All U.S. Ford and Lincoln Dealers October 30, 2013

More information

TEST A CHAPTER 6, EQUATIONS, INEQUALITIES, PROBLEM SOLVING. 1. Factor x 2-5x + 6. 2. Factor x 2-4x - 5.

TEST A CHAPTER 6, EQUATIONS, INEQUALITIES, PROBLEM SOLVING. 1. Factor x 2-5x + 6. 2. Factor x 2-4x - 5. TEST A CHAPTER 6, EQUATIONS, INEQUALITIES, PROBLEM SOLVING. Factor x 2-5x + 6. 2. Factor x 2-4x - 5. 3. Solve: (x + 2)(x - 3) = 0 x(x - 3)(x + 4) = 0 4. Solve by factoring: x 2 + x + 2 = 0. 5. Solve by

More information

Cost-Estimation Techniques

Cost-Estimation Techniques CHAPTER 3 Cost-Estimation Techniques The objective of Chapter 3 is to present an assortment of methods for estimating important factors in an engineering economy study. The High Cost of Office Rental Space

More information

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE

CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS 1200-3-20-.01 PURPOSE 1200-3-20-.01 PURPOSE CHAPTER 1200-3-20 LIMITS ON EMISSIONS DUE TO MALFUNCTIONS, START-UPS, AND SHUTDOWNS (1) The purpose of this chapter is to place reasonable limits on the amount of emissions an air

More information

At the end of Chapter 18, you should be able to answer the following:

At the end of Chapter 18, you should be able to answer the following: 1 How to Study for Chapter 18 Pure Monopoly Chapter 18 considers the opposite of perfect competition --- pure monopoly. 1. Begin by looking over the Objectives listed below. This will tell you the main

More information

Building a financial perspective into an engineering program

Building a financial perspective into an engineering program Building a financial perspective into an engineering program P.J.Gregory Department of Mechanical Engineering, Monash University, Clayton Campus, Victoria, Australia (Peter.gregory@eng.monash.edu.au) Abstract

More information

Variable Cost increases in direct proportion to Volume Fixed Costs do not change as Volume changes (in a relevant range).

Variable Cost increases in direct proportion to Volume Fixed Costs do not change as Volume changes (in a relevant range). Variable Cost increases in direct proportion to Volume Fixed Costs do not change as Volume changes (in a relevant range). If we are in business and we are selling something our price is going to be larger

More information

Incremental Analysis and Decision-making Costs

Incremental Analysis and Decision-making Costs Management Accounting 161 Incremental Analysis and Decision-making Costs Nature of Incremental Analysis Decision-making is essentially a process of selecting the best alternative given the available information

More information

Enterprise Budget and Cash Flow for Greenhouse Tomato Production - Florida Greenhouse Vegetable Production Handbook, Vol 3 1

Enterprise Budget and Cash Flow for Greenhouse Tomato Production - Florida Greenhouse Vegetable Production Handbook, Vol 3 1 HS792 Enterprise Budget and Cash Flow for Greenhouse Tomato Production - Florida Greenhouse Vegetable Production Handbook, Vol 3 1 J. L. Smith, T. D. Hewitt, R. C. Hochmuth, and G. J. Hochmuth 2 Introduction

More information

Commercial Semi-Instantaneous Water Heaters

Commercial Semi-Instantaneous Water Heaters FEATURES HWI Models A. O. Smith s HWI models are available for operation with steam or boiler water as the energy source. They are factory assembled with components sized, piped and checked at the factory

More information

Chapter 6. Commodity Forwards and Futures. Question 6.1. Question 6.2

Chapter 6. Commodity Forwards and Futures. Question 6.1. Question 6.2 Chapter 6 Commodity Forwards and Futures Question 6.1 The spot price of a widget is $70.00. With a continuously compounded annual risk-free rate of 5%, we can calculate the annualized lease rates according

More information

1. Managerial accounting: A. is governed by generally accepted accounting principles. B. places emphasis on special-purpose information.

1. Managerial accounting: A. is governed by generally accepted accounting principles. B. places emphasis on special-purpose information. 1. Managerial accounting: A. is governed by generally accepted accounting principles. B. places emphasis on special-purpose information. C. pertains to the entity as a whole and is highly aggregated. D.

More information

Paper F5. Performance Management. Monday 5 December 2011. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants

Paper F5. Performance Management. Monday 5 December 2011. Fundamentals Level Skills Module. The Association of Chartered Certified Accountants Fundamentals Level Skills Module Performance Management Monday 5 December 2011 Time allowed Reading and planning: Writing: 15 minutes 3 hours ALL FIVE questions are compulsory and MUST be attempted. Formulae

More information

Thermal Coupling Of Cooling and Heating Systems

Thermal Coupling Of Cooling and Heating Systems This article was published in ASHRAE Journal, February 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not

More information

Econ 202 Exam 3 Practice Problems

Econ 202 Exam 3 Practice Problems Econ 202 Exam 3 Practice Problems Principles of Microeconomics Dr. Phillip Miller Multiple Choice Identify the choice that best completes the statement or answers the question. Chapter 13 Production and

More information

y = a + bx Chapter 10: Horngren 13e The Dependent Variable: The cost that is being predicted The Independent Variable: The cost driver

y = a + bx Chapter 10: Horngren 13e The Dependent Variable: The cost that is being predicted The Independent Variable: The cost driver Chapter 10: Dt Determining ii How Costs Behave Bh Horngren 13e 1 The Linear Cost Function y = a + bx The Dependent Variable: The cost that is being predicted The Independent Variable: The cost driver The

More information

20,000 Barrel Per Day Crude Oil Refinery

20,000 Barrel Per Day Crude Oil Refinery 20,000 Barrel Per Day Crude Oil Refinery (For Sale) AT THE EXCEPTIONAL PRICE OF $39,500,000.00 PRICE INCLUDES SHIPPING AND INSTALLATION Includes 2- TEN T B/D DISTILLILATION UNITS (SELLER NEEDS TO SELL

More information

Understanding Variance Analysis By: Helen O Brien Gately B Comm; MAcc; FCA. Examiner: Formation 2 Management Accounting

Understanding Variance Analysis By: Helen O Brien Gately B Comm; MAcc; FCA. Examiner: Formation 2 Management Accounting Understanding Variance Analysis By: Helen O Brien Gately B Comm; MAcc; FCA. Examiner: Formation 2 Management Accounting It often appears that students who experience difficulties with variance analysis

More information

1. Kyle stacks 30 sheets of paper as shown to the right. Each sheet weighs about 5 g. How can you find the weight of the whole stack?

1. Kyle stacks 30 sheets of paper as shown to the right. Each sheet weighs about 5 g. How can you find the weight of the whole stack? Prisms and Cylinders Answer Key Vocabulary: cylinder, height (of a cylinder or prism), prism, volume Prior Knowledge Questions (Do these BEFORE using the Gizmo.) [Note: The purpose of these questions is

More information

COVER PAGE. INDICATE NAME OF THE BUSINESS (Top part of page)

COVER PAGE. INDICATE NAME OF THE BUSINESS (Top part of page) COVER PAGE INDICATE NAME OF THE BUSINESS (Top part of page) INDICATE WHAT THE BUSINESS PLAN HAS BEEN PREPARED FOR AND THE FINANCIER TO WHOM IT WILL BE SUBMITTED (Middle part of the page) INDICATE THE AUTHOR

More information

ELS NET. Metra's electronic locking system

ELS NET. Metra's electronic locking system ELS NET Metra's electronic locking system Improves your service & facility management Use electronically controlled lockers for ski resorts, hotel, university, factory, hospital Can be used with storage

More information

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and

More information

Econ 102 Aggregate Supply and Demand

Econ 102 Aggregate Supply and Demand Econ 102 ggregate Supply and Demand 1. s on previous homework assignments, turn in a news article together with your summary and explanation of why it is relevant to this week s topic, ggregate Supply

More information

Economics 380: International Economics Fall 2000 Exam #2 100 Points

Economics 380: International Economics Fall 2000 Exam #2 100 Points Economics 380: International Economics Fall 2000 Exam #2 100 Points Name (ID) YOU SHOULD HAVE 7 PAGES FOR THIS EXAM. EXAM WILL END AT 1:50. MAKE SURE YOUR NAME IS ON THE FIRST AND LAST PAGE OF THE EXAM.

More information