Managing Risk on the Railway Infrastructure. ZETA-TECH Associates, Inc., Cherry Hill, New Jersey, USA,

Size: px
Start display at page:

Download "Managing Risk on the Railway Infrastructure. ZETA-TECH Associates, Inc., Cherry Hill, New Jersey, USA,"

Transcription

1 Managing Risk on the Railway Infrastructure Allan M. Zarembski, Ph.D., P.E., FASME 1, Joseph W. Palese, PE, MSCE, MBA 1 ZETA-TECH Associates, Inc., Cherry Hill, New Jersey, USA, zarembski@zetatech.com Abstract Risk management and together with its associated management of safety is a fundamental focus of railway officers worldwide. This includes the issue of derailment prevention as well as the related issue of risk management for those categories of track failure or degradation that can result in a derailment. Recently, a new generation of track safety management tools has been developed that quantify and analyze the risk associated with key track failure modes. This paper will describe three such new generation risk management tools that deal directly with track safety in key track failure (and derailment) areas. These models have been implemented on railways in the US and worldwide and have been shown to be effective tools in controlling and reducing the risk of derailments in their respective track risk areas. The specific models to be discussed in this article are: Broken rail risk model, which quantifies the risk of occurrence of a broken rail (and associated broken rail derailment) and allows railways to adjust their UT test schedules to reduce that risk. Track buckling risk model which identifies and prioritizes locations of high potential buckling risk and directs railway engineers to them for appropriate action Vehicle/track geometry risk model, which identifies and prioritizes locations of high potential for vehicle/track geometry related derailments. All three of these models rely on research that has been developed over the last several decades, and the resulting body of knowledge on the theory behind these track failure modes. All of these models are designed to be applicable in large-scale applications, to identify potential failure sites across an entire route, division or railway system. Applications up to 25,000 miles (40,000 km) have been made using these risk analysis tools across an entire rail network. Results, in full-scale applications on major railways in the US and Europe have shown significant and quantifiable reductions in derailments themselves and in corresponding derailment causing conditions. In several large-scale applications of the broken rail risk model, significant benefits in terms of reduced occurrence of broken rails and reduced broken rail derailments have been reported. In one such application, a reduction in broken rails (service defects) on the order of 28% was reported over a threeyear application period. Concurrently, the same railway reported a reduction in rail caused derailments of 33%. Similar results were reported on another large-scale railroad application this past year. Likewise, full-scale applications of the buckling risk assessment model resulted in a high percentage of high risk sites identified for immediate action by local forces. On one major railway application, between 30 and 50% of the identified sites were the subject of immediate corrective action by local forces. This railway likewise reported a dramatic reduction in both track buckling related derailments and track buckling incidents.

2 Introduction In recent years, railways have turned to the discipline of risk management to improve safety and reduce the potential risk of accidents or derailments. Since accidents and derailments are very low probability of occurrence events, it is necessary to focus on the derailment causes themselves and develop risk management tools that quantify and analyze the risk for each key derailment or accident area. One such high risk area, for which a risk management approach has been developed, is broken rail safety, a major track-caused derailment category. In the United States alone, an average of over 280 derailments a year have occurred over the last 8 years with a total average annual cost of over $100 Million. Increased testing has a direct effect on this behavior, where both the service defect rate and the number of derailments decrease with increased testing. However, increased testing is expensive and should be judiciously applied. Simply increasing testing across the board is not the best approach. Rather, assessment of the rail condition, and the risk of broken rails (service defects) offers the most efficient and cost effective approach to increasing rail testing. A second such high-risk area is that of track buckling. Track buckling, the sudden lateral movement of the track due to thermally generated longitudinal rail forces, remains a major track failure mode both in North America and worldwide. Over the last five years, there have been, on average, 34 derailments a year in the US alone, with a FRA reported cost of over $11 Million annually. These derailments, coupled with high maintenance costs associated with buckling prevention, have forced railway systems to pay careful attention to those factors that can influence the potential for track buckling. Since techniques to monitor the neutral temperature of the rail, and thus predict the onset of buckling by measurement, are very limited and difficult to employ, railroads generally rely on preventive measures to control buckling risk. Yet a third such high-risk area is the vehicle/track interaction area, where a combination of geometric parameters or repeated geometric anomalies can lead to unsafe vehicle dynamic response. Current track recording car based measurement of geometric parameters and comparison to pre-set safety limits is insufficient. This is evidenced by the more than 100 such vehicle-track interaction related derailments reported in the US alone each year. The need fro a more focused approach to identify these high-risk areas is apparent. This paper will address these three high derailment areas and show how a risk based approach has been used to help identify high risk areas and effectively and economically focus resources on these high risk areas to control and reduce the number of derailments. Broken Rail Risk Management Control of broken rail derailments is a serious concern to maintenance of way officers worldwide. Research studies have shown a relationship between rail defect occurrence and broken rail derailments [1, 2]. Furthermore, breaking rail defects into two detection categories - detected defects 1 and service defects 2 - have shown a strong correlation between service defects and derailments. Early US studies found that for fatigue related defects, a broken rail derailment occurred every 133 service defects for a derailment per defect rate of [2]. Subsequent research, focusing on control of rail service defects by improved inspection efficiencies, showed the potential for controlling the risk of broken rail derailments by reducing the percentage of service defects and the associated service defect rate [3, 4]. Examination of data from over 50,000 km (30,000 miles) of railroad date for the period 1995 though 2003 supports the findings of a relationship between rail defects, particularly service defects, and derailments [5]. Figure 1 illustrates this behavior showing a strong relationship between derailment rate (derailments per mile of track) and service defects. 1 Those defects located by non-destructive inspection processes such as ultrasonic testing. 2 Those defects located by visual inspection, observation of breaks, etc WCRR2006 2

3 Increased testing has a direct effect on this behavior, as shown in Figures 2A and 2B, where both the service defect rate and the number of derailments decrease with increased testing. However as noted previously, increased testing is expensive and as such must be optimized. Simply increasing testing across the board is not the best approach. Rather, assessment of the rail condition, and the associated risk of broken rails, which has been found to be related to the rate of service defects, offers the most efficient and cost effective approach to increasing rail testing. Such an approach was developed by Volpe National Transportation Systems Center of the US Department of Transportation in the early 1990s [3]. This approach was modified and adapted by ZETA- TECH into its RailTest risk based ultrasonic test scheduling model and has been applied extensively in the United States and Europe [4]. The objective of this analysis methodology is to schedule ultrasonic testing (UT) so that a defined level of risk (of rail failure) is held constant, even as rail ages. Risk is defined as the number of service defects (e.g. rail breaks) per mile per year, which, as shown above, is related to the occurrence of broken rail derailments. The risk analysis methodology addresses several key factors that affect the occurrence of rail breaks, to include defect initiation and growth and the reliability of the non-destructive detection technique. It analyzes the probability that a rail defect will escape detection and grow to critical size before the next scheduled rail test. It then adjusts the rail test schedule to minimize the risk of missing such a defect. A key parameter in this scheduling process is the risk itself, defined as service defects per mile per year. Analysis of defect records on thousand of track segments has shown that many locations of higher than acceptable risk do occur and that these locations have a higher probability of experiencing a broken rail. Table 1 presents risk guidelines developed by ZETA-TECH through application of this broken rail risk methodology on a broad range of freight and passenger railways in North America and Europe [4]. Those track segments that exceed these risk levels are deemed high-risk areas and must be addressed by improved UT testing, either through the use of better equipment or through improved test scheduling. Improved test scheduling has been achieved on several major rail systems in the US and Europe through application of the RailTest risk based methodology with dramatic and consistent results. For example, a multi-year application on BNSF shows a well documented reduction in both service defects and in rail related derailments. This is illustrated in Figure 3, which shows service defect and derailment rate for nine-year period from 1985 through There was a well-defined reduction in service defect rate and in broken rail derailments from time of RailTest application in Table 2 presents a consolidated set of rail defect data comparing conventional UT scheduling techniques ( pre-railtest ) and risk based scheduling ( post-railtest ). As can be seen, the derailment rate decreases by about 1/3 (33 %). Similarly, the service defect rate decreases by over 40% and the ratio of service defects to total defects (percentage of defects not-found by UT testing) decreases by 30%. However, the ratio of derailments to service defects remains virtually constant, or one derailment every 125 defects, thus supporting the earlier results that there is strong relationship between service defects and broken rail derailments. In an application of RailTest on the Scotland Zone of Network Rail, the relationship between allowable level of risk and required miles of UT testing was evaluated, as illustrated in Table 2 [6]. As can be seen in this table, the additional testing required to achieve a lower level of risk can be determined together with the associated extra cost. Thus the impact of moving from current risk levels to a more appropriate level, as defined in Table 1, can be assessed. In these and other large-scale applications of RailTest, significant benefits in terms of reduced occurrence of broken rails and reduced broken rail derailments have been reported. WCRR2006 3

4 Quantifying and Controlling the Risk of Track Buckling Track buckling, is likewise of concern to railways worldwide, because of the sudden nature of its occurrence and associated high the potential for a derailment. Research studies have indicated that one out of every ten buckles results in a derailment [7]. As noted previously, there are currently no effective techniques for large scale monitoring of the potential for track buckling. Although extensive research has been addressed at the development of non-destructive techniques to measure longitudinal rail force, and thus monitor the potential for track buckling, these techniques have not proved successful to date. The result is a focus on visual monitoring and inspection. Recently, however, a risk based methodology for the assessment of track buckling potential has been developed using track buckling theory and the newest generation of track buckling analysis models [8, 9]. This methodology has been implement into a production analysis model, called BuckleRisk, which allows for large-scale application on large railway networks. This model is designed to identify high-risk track buckling sites using site-specific risk factors to develop a site risk value. Based on the magnitude of this value, the potential for a track buckle occurring at the site is defined and the need for any follow up action identified. In this methodology the railway is divided into small homogeneous analysis segments, of the order of 0.2 to 0.4 km in length, and, for each segment, a buckling risk value or risk factor is calculated based on track, traffic and environmental conditions present at that segment. These risk factor values are based on track buckling theory which relates the potential for track buckling to the increase in rail temperature above the neutral or force free temperature of the rail and to the buckling resistance of the track structure. Using the relationship between temperature and longitudinal rail force, the buckling risk values were designed to correspond to an equivalent temperature increase. Thus buckling risk consists of: Base risk which is the actual rail temperature increase above neutral for a given site Supplemental risk factors which are track and traffic related and that effect the strength or neutral temperature of the track; defined in terms of equivalent increase or decrease in temperature above the base value. A partial listing of these risk factors is shown in Table 4. By adding together the base risk with the supplemental risk factors, an equivalent temperature increase is developed which in turn is directly related to the risk of the track segment buckling. The higher this risk value the greater the potential for track buckling at that site. Table 5 illustrates the application of the buckling risk factor methodology. This example is taken from an actual BNSF track segment [8]. It should be noted that the other factors were not applied since they were not relevant to or present in this segment. The risk factor of 86 represents a high-risk site. Follow up field inspection of this site confirmed the high buckling risk assessment and led to follow up action by local forces. In a recent full system application on the BNSF Railroad in the US [8], 24,200 track miles were analyzed, divided into 133,012 segments, with an average segment length of 0.30 km. For each of these segments, data was collected from BNSF and external databases as shown in Figure 4. The risk analysis identified 30 segments (0.02% of system) considered very high risk with index values greater than 80 [see Figure 5] and an additional 961 segments (0.72% of system) considered high buckling risk with index values of between 70 and 79. The 30 very high-risk segments underwent immediate inspection by local forces. As a result of these follow up inspections, 9 of the 30 segments (30%) were destressed (rail removed) immediately (see Figure 6). Several additional BuckleRisk runs were made through the summer hot weather season (June through August), which likewise identified high-risk areas for destressing and observation. Overall, the application of the BuckleRisk model on BNSF identified over 100 very high risk sites during the 2004 buckling season, contributing to the 2004 work year having the lowest number of track buckling derailments in recent BNSF history. WCRR2006 4

5 Track Geometry The current approach for assessing the safety of railway track includes the inspection of track geometry, usually with the use of an automated track-recording car. Track geometry measurements, such as gage, surface, alignment, cross level, and twist, are measured and compared with predefined limits, usually railway or government defined standards. These standards, while often loosely based on the dynamic behavior of select rail vehicles, are generally defined based on what can actually be measured by the recording cars, rather than what conditions increase the risk of vehicle/track related derailments. This approach, while effective, in general, still does not capture all of the conditions that can lead to a vehicle/track related derailment. This can be clearly seen in Figure 7, which shows a three-year history of US derailments that were reported to be caused either by track geometry problems or by poor dynamic response of the rail vehicle. Derailments caused by poor rail vehicle dynamics make up a significant percentage of those reported as geometric or dynamic causes 3. Here too a need for a more focused, risk-based approach was identified. Specifically, a method for assessing track geometry based, not only on static geometry standards, but also on the interaction between the track and vehicle. This endeavor has led to the development of dynamic simulation model that is used to perform this real-time analysis using a continuous input stream of track geometry data (on the track geometry car). The objective is to identify locations producing unsafe vehicle performance in the field and provide the railroad with an immediate defect report that will allow them to take fast corrective action. In order to be a practical and effective system, any such real time analysis tool must identify locations in track likely to result in dynamically unsafe vehicle performance. Such a system must be capable of running in real-time on board a track geometry vehicle traveling at full track speed and to simultaneously different vehicle types and speeds. This is to ensure a comprehensive analysis that takes into account the variations in vehicle response due to such attributes as truck spacing, weight, and variations in truck suspension characteristics, etc. The desire to assess track safety for a range of simulated speeds stems from the fact that not all derailments occur precisely at track speed; many occur during operations well below posted speed limits. The resulting system, TrackSafe, has the capability of simultaneously simulating several vehicle types with each vehicle being analyzed over a range of traveling speeds [10-13]. This is illustrated in Table 6, which shows that up to 60 vehicle-speed combinations can be analyzed simultaneously at a test speed of 60 mph (100 kph). Using the measurements of surface and cross-level that are input to TrackSafe, the model generates response predictions for the car body bounce, roll angle, pitch angle, vertical acceleration, and vertical wheel. These values are determined on a foot-by-foot basis for every foot that input geometry data is supplied. Using established thresholds for these values, response predictions are assessed to determine if the rail vehicle is well behaved, or if it exhibits significant derailment potential. A recent analysis of a rail line which had experienced several geometry related derailments was performed using TrackSafe [13]. Figure 8 shows results from the derailment investigation. In this analysis, the two derailment sites were both flagged with red roll violations over a range of speeds. This result further showed the importance of testing at a wide range of operating speeds and not just at track speed. It was only in the small range of speeds from 20 to 25 miles per hour where red level roll warnings were predicted. However, examination of the derailment investigation results in Figure 8 shows that there were more locations flagged with red-level dynamic response warnings than just the two places where the 3 US FRA derailment causes: T101 Cross level of track irregular (at joints), T102 Cross level of track irregular (not at joints), M405 Interaction of lateral/vertical forces (includes harmonic rock off) WCRR2006 5

6 derailments took place. In total, over the 50-mile segment, there were 16 unique locations identified as being likely to produce unsafe response. Thus, an important issue is the ability to prioritize the list of track locations expected to produce potentially unsafe response. The resulting prioritization index can be used to determine which of the locations identified by TrackSafe are the most critical. Given constraints on time and money, this prioritization index is a key factor in the decision-making process regarding track repair and maintenance. Table 7 presents the TrackSafe prioritization index as applied to the 16 high-risk locations. Note: Both of the derailment sites received a full rating of 100. One other site also was rated with a 100. This location rated highly due to the curvature and the wide range of speeds predicted to lead to poor response. All other locations received priority ratings ranging from 78.8 to With such a list, the railroad has better information about which locations are the most in need of attention. Another recent real time implementation, performed on a major US railroad at track speeds of 50 mph (83 kph), examined four different railway vehicle models each with 21 speeds being simulated. TrackSafe was able to conduct the 84 simultaneous simulations in real-time aboard the geometry vehicle and identify a number of locations throughout the line that resulted in poor (red-level) dynamic response predictions for each car and varying speeds. This included sites where traditional track geometry defects were not identified, but where observation of dynamic behavior of vehicles, confirmed high dynamic activity. The results over a 152-mile line segment are shown in Table 8, which shows 21 unique locations flagged by TrackSafe due to predictions of poor dynamic response (red violations). This amounts to an average of one (1) flagged track location every 7.23 miles over the 152-mile line. It should be observed that no one-car type flagged all 21 locations. This finding shows the importance of testing the track for multiple vehicle types simultaneously. Summary These risk based assessment tools have been shown to contribute directly to a reduction in track failures (broken rails, track buckles) and their associated derailment classes through their ability to selectively identify high risk locations and bring remedial action to bear on these identified locations. All three of these models rely on research that has been developed over the last several decades, and the resulting body of knowledge on the theory behind these track failure modes. All of these models are designed to be applicable in large-scale applications, to identify potential failure sites across an entire route, division or railway system. Applications up to 25,000 miles (40,000 km) have been made using these risk analysis tools across an entire rail network. The results have been clear and impressive. Use of risk-based test scheduling techniques reduces the risk of derailments. In the case of broken rail derailments, use of risk based assessment and rail test scheduling allows for the determination of optimum rail test intervals, per segments of track, based on a defined level of risk for that segment. The result has been a demonstrated reduction in the rate of broken rails and broken rail derailments by 30% or more. Furthermore, the use of service defect rate based risk definitions also defines the maximum allowable risk for different classes of track. Thus, appropriate levels of risk are quantified, thus allowing for comparison of current defect levels with desired levels, such as 0.06 to 0.08 for freight only routes, 0.04 to 0.06 for freight lines with limited passenger traffic, and 0.01 to for passenger dominated lines, with higher speed lines requiring lower allowable levels of risk. Likewise, full-scale applications of the buckling risk assessment model resulted in a high percentage of high risk sites identified for immediate action by local forces. On one major railway application, between 30 and 50% of the identified sites were the subject of immediate corrective action by local forces. This railway likewise reported a dramatic reduction in both track buckling related derailments and track buckling incidents. The use of risk based assessment techniques represents a new approach to identifying locations with high potential for failure, and allows railways to more efficiently utilize their resources to manage safety and control risk. WCRR2006 6

7 References: 1. Orringer, O. and Bush, M. W., Applying Modern Fracture Mechanics to Improve the Control of Rail Fatigue Defects in Track, Bulletin of the American Railway Engineering Association, Bulletin 689, Volume 84, September Zarembski, A. M., Rail Defect Type vs. Derailment Risk, Tracking R&D, Railway Track & Structures, July Orringer, O., Control of Rail Integrity By Self-Adaptive Scheduling of Rail Tests, US Department of Transportation Federal Railroad Administration Report, DOT/FRA/ORD-90/) 05, June Zarembski, A.M., Palese, J.W., Risk Based Ultrasonic Rail Test Scheduling: Practical Applications in Europe and North America, Conference Contact Mechanics and Wear of Rail/Wheel Systems (CM2003), Gothenberg, Sweden, June Zarembski, A.M., Palese, J.P., Characterization of Broken Rail Risk for Freight and Passenger Railway Operations, 2005 AREMA Annual Conference, Chicago, IL, September 25-28, Palese, J.W., Zarembski, A.M., Practical Applications of Risk Based Ultrasonic Rail Test Scheduling in Europe and North America, Asset Management for Railway Infrastructure Asia 2005, Singapore, February 23-24, Zarembski, A. M., and Magee, G., An Investigation of Railroad Maintenance Practices to Prevent Track Buckling, American Railway Engineering Association 80th Annual Technical Conference, Chicago, IL, March Zarembski, A.M., Grissom, G.T., Henry M. Lees, Development of Track Buckling Risk Analysis Methodology, AREMA 2004 Annual Conference & Exposition, Nashville, TN, September 19-22, Zarembski, A.M., Grissom, G.T., Lees, H.M., Assessing the Risk of Track Buckling, Railway Track & Structures Magazine, February, Bonaventura, C. S., Palese, J. W., and Zarembski, A. M., Intelligent System for Real-time Prediction of Railway Vehicle Response to the Interaction with Track Geometry, Proceedings of the 2000 ASME/IEEE Joint Railroad Conference, pp , April Bonaventura, C. S., Palese, J. W., and Zarembski, A. M., Real-time Prediction of Railway Vehicle Response to the Interaction with Track Geometry, Implementation of Heavy Haul Technology for Network Efficiency - Proceedings of A Specialist Technical Session, pp , May 5-9, Bonaventura, C. S., Palese, J. W., and Zarembski, A. M., Performance of a Track Geometry Car Based Real-Time Dynamics Simulator using Multiple Vehicle Types, Proceedings of the IMECE 2003: 2003 ASME International Mechanical Engineering Congress and Exposition (IMECE 03), November 16-21, Bonaventura, C. S., Palese, J. W., and Zarembski, A. M., TRACKSAFE: A Track Geometry Car Based Real-Time Dynamics Simulator, Proceedings of ASME JRC Joint Rail Conference, March 16-18, 2005, Pueblo, Colorado WCRR2006 7

8 Risk [service defects (rail breaks)/mile/year] Traffic Type 0.09 to 0.10 General freight route (no passenger or Hazmat 4 ) 0.07 to 0.08 Key freight line 0.06 to 0.07 Freight route with Hazmat but no passenger traffic 0.04 to 0.06 Freight with limited passenger traffic 0.01 to 0.03 Low-speed passenger route (less than 90 mph) to 0.01 Moderate-speed Passenger route (90 to 125 mph) High speed passenger line route (125 mph and higher) Table 1: Broken Rail Risk Guidelines Mainline Tracks Only Pre- Post Reduction RailTest RailTest Number of Derailments % Derailments/mile % Service defects/mile/year % Detected defects/mile/year % Total defects/mile/year % Derailments/Service Defects % Service/Detected Defects % Derailments/Total Defects % Service/Total Defects % Detected/Total Defects Table 2: Rail Defect 5 Statistics for Selected Railroads 4 Hazardous materials 5 fatigue related defects such as normally included in the RailTest analysis WCRR2006 8

9 Restricted 6 Un-Restricted Risk = Risk = 0.01 Risk = 0.03 Risk = 0.06 Test miles Increase 29% 23% 17% 12% (decrease) over standard Test miles Increase (decrease) over standard 25% 16% 4% -5% Table 3. Summary Annual Test Requirements for UT Test Cars Curvature Track Grade Train Braking/Acceleration Tonnage Presence of Hard Spot in Track Track Characteristics Rail size Tie type Fastener type Anchoring Tie spacing (in.) Ballast type /condition Track consolidation (MGT) Shoulder width (in.) Ballast crib condition Track Class Recent Maintenance Activity Track /Rail Movement History of Track Buckles Time Since Last Adjustment Rail Repair Cold weather plug Weld repair Track Geometry exceptions Table 4: Track Buckling Risk Parameters 6 This is based on reducing intervals where called for by RailTest but not increasing test intervals beyond current railway standards. WCRR2006 9

10 Location: Wyoming, Orin Sub (Seg Num 186), MP 0.15 to MP 0.4 (track 2) MGT degree curve -1.27% grade -136 RE CWR, Welded -Wood Ties /Cut Spikes -Grade Crossing and Turnout present -Signal Present -Class 2 (Freight Speed 25 mph) -Repaired Service Failed Rails (added 1 rail on 11/4/03 and 1/21/04) -Last Destress or Rail Gang > 5 years -Max Surface Defect: 0.39 in -Max Alignment Defect: 0.3 in Maximum Rail Temperature = 133 F Ambient 103 F Rail Increase 30 F Target Neutral Temp TNT = 95 F Increase above TNT = 38 F Risk Factors: -Base Risk Factor = 38 -Curvature Factor = +9 -Grade heavy braking (>20 MGT) with hardspot = +14 -Surface / Alignment Factor = +1 -Rail Added Factor (2 in) = +19 -Last reported rail adjustment >5 years = +5 Risk Factor= 86 (high) Table 5: Buckling Risk Example Geometry Car Speed mph (kph) Number of Vehicle Types Simulated Maximum Number of Speeds that can be Simulated per Vehicle Total Number of Vehicle- Speed Combinations Achieved 79 (130) (130) (100) Table 6: Real-Time Simulation Capability On-Board Track Geometry Car WCRR

11 Order Milepost Milepost Degree of Priority Number Start End Curvature Index Derail X X Table 7: Prioritization Indices for Locations Flagged for Poor Response Milepost SET MET LET EBC JCH X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Table 8: Predictions of Poor Dynamic Response by Vehicle Type WCRR

12 Derailments/mile vs Service defects/mile/yr (RailTest) Derailments/mile S/m ile/yr Figure 1: Derailment Rate vs. Service Defects ( ) 0.1 Service defects/mile/year vs Test Miles Service defects/mile/yr Test Miles (normalized) Figure 2A: Service Defect Rate vs. Test Miles (normalized) WCRR

13 Derailm ents vs Test Miles 30 Derailments Test Miles (normalized) Figure 2B: Derailments vs. Test Miles (normalized) BNSF Service Defect Rate vs Derailment Rate Service defects/mile/year Derailments/mile year Service Def/mile/yr Derail/mile Figure 3: Derailment Rate vs. Service Defect Rate, US Class 1 RR ( ) WCRR

14 Figure 4: BuckleRisk Data Sources WCRR

15 Figure 5: BuckleRisk Output WCRR

16 High Risk Segment Report of February 2004 and Follow Up Action Risk Line Action Sub Division Name BMP EMP Factor Segment Taken Notes 82 AURORA Y Destressed 04/12/04, 1" out 80 AURORA Y Destressed 04/16/04, 0.5" out 84 VALLEY No Field inspected, nothing found, discrepancies w / data 80 KOOTENAI RIVER 36 1, , Y Destressed 4 locations, 8.5" out 80 SEATTLE No Destressed 09/24/03, 1" out 80 SEATTLE No Destressed 12/02/03, 3.5" out 82 SIOUX CITY No Destressed on 7/29/03 80 SIOUX CITY No Notes stating reason for no destress 81 MARSHALL Y Destressed TNT 04/22/04 83 RED RIVER VALLEY Y Destressed but no date, 2" out 83 RED RIVER VALLEY Y Destressed but no date, 2" out 81 RED RIVER VALLEY No Destressed but no date, 1.5" out 81 RED RIVER VALLEY No Destressed but no date, 2" out 80 THAYER SOUTH 1, No Still need to w ork on 1 Work Order, 6.5" out 82 CHICKASHA 1, No Destressed but no date. 81 CHICKASHA 1, No Destressed but no date. 80 ST JOSEPH 3, No Is 0'45" curve not 5 degree curve 80 CHILLICOTHE 7, No retied in 2003 w ith new ins jt cut in and 0" rail added 80 CHILLICOTHE 7, No retied in 2003 w ith new ins jt cut in and 0" rail added 80 MARCELINE 7, Y Destressed 4/16/04, 2.5" out 83 PANHANDLE 7, No Gave 2 Work order numbers. No dates of action 83 PANHANDLE 7, No Gave 2 Work order numbers, 4.5" rmvd. On 1 WO. 83 SLATON 7, No Mail Note: Location of TO not in res. area. (?) 85 ARKANSAS CITY 7, No Note: no rail added locations remaining 81 RED ROCK 7, Y Removed 2" w hen w elding joint 85 GALVESTON 7, No Destressed 11/19/03 80 GALVESTON 7, No Destressed 11/25/03 83 LAMPASAS 7, Y Destressed 03/31/04, 0.5" out 81 LAMPASAS 7, No Destressed 07/02/03, 2.25" out 81 LAMPASAS 7, No Destressed 11/12/03 30 High Risk Sites Reported: Action Taken on 9 sites ( 30%) Figure 6: High Risk Segment Report of February 2004 and Follow Up Action WCRR

17 Figure 7: US Reported Vehicle Track Interaction Derailments WCRR

18 Speed (mph) High c.g. Hopper Response Predictions on Line w ith Tw o Derailment Sites Milepost FRA Class Yellow Roll Yellow Wheel Unload Speed Red Wheel Unload Red Roll Class Figure 8: Derailment investigation predictions for high c.g. hopper car WCRR

Some Examples of Big Data in Railroad Engineering

Some Examples of Big Data in Railroad Engineering 2014 IEEE International Conference on Big Data Some Examples of Big Data in Railroad Engineering Allan M Zarembski Department of Civil and Environmental Engineering University of Delaware Newark, DE, USA

More information

Big Data in Railroad Engineering

Big Data in Railroad Engineering Big Data in Railroad Engineering Dr. Allan M Zarembski Director of Railroad Engineering and Safety Program Department of Civil and Environmental Engineering University of Delaware Newark, Delaware dramz@udel.edu

More information

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement

More information

FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * *

FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * * FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING By P. Jeffrey McQueen, P.E., Consulting Engineer Abstract The AREMA Manual for Railway Engineering, Chapter 30, Part 4, gives

More information

Chapter 3. Track and Wheel Load Testing

Chapter 3. Track and Wheel Load Testing Chapter 3 Track and Wheel Load Testing This chapter describes the track, truck, and testing equipment that were used by the Transportation Technology Center, Inc. (TTCI) for collecting the data that was

More information

RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS

RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS Page 1 of 19 RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS Andrew Kish Manager, Guideways and Structures USDOT/Volpe Center, Cambridge, MA Gopal Samavedam Director, Structures & Transportation

More information

2015 Rail Safety Seminar & Expo: April 20-22, 2015 2015 Bus Safety Seminar & Expo: April 22-23, 2015

2015 Rail Safety Seminar & Expo: April 20-22, 2015 2015 Bus Safety Seminar & Expo: April 22-23, 2015 2015 Rail Safety Seminar & Expo: April 20-22, 2015 2015 Bus Safety Seminar & Expo: April 22-23, 2015 PRESENTER BIO: Kyle Jordan Senior Software Engineer, L.B. Foster Kyle Jordan has 14 years of experience

More information

Framework for Short-Line Railroad Track Asset Management and Condition Reporting

Framework for Short-Line Railroad Track Asset Management and Condition Reporting Framework for Short-Line Railroad Track Asset Management and Condition Reporting Michael N. Grussing 1, and Donald R.Uzarski, Ph.D., RE. 2, 1. Research Civil Engineer, Engineer Research and Development

More information

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions 1 WMATA System 6 Lines: 5 radial and 1 spur 234 mainline track miles and 91 stations Crew of 54 Track Inspectors

More information

NATIONWIDE WAYSIDE DETECTOR SYSTEM

NATIONWIDE WAYSIDE DETECTOR SYSTEM Nationwide Wayside Detector System Keeps Rail s Record Safety Performance on Track Freight railroads make safety their #1 priority and continually look to improve on their record safety performance through

More information

Railway Track Design

Railway Track Design Chapter Railway Track Design Basic considerations and guidelines to be used in the establishment of railway horizontal and vertical alignments. The route upon which a train travels and the track is constructed

More information

Industry Track Inspection

Industry Track Inspection Industry Track Inspection Track Supervisor Phone Number 1 TABLE OF CONTENTS INTRODUCTION 3 GAUGE 4 ALINEMENT 6 TRACK SURFACE 8 BALLAST 11 CROSSTIES 13 DEFECTIVE RAILS 16 RAIL JOINTS 17 TURNOUTS 18 OTHER

More information

Reducing Rail Surface Defect Service Failures on the CSXT Railroad

Reducing Rail Surface Defect Service Failures on the CSXT Railroad Reducing Rail Surface Defect Service Failures on the CSXT Railroad Bill Bell Manager Rail Services; CSX Transportation Ron Bright Direcr Track Testing; CSX Transportation Dennis Witt, PE Engineer Standards

More information

RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION

RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION Washington Summary DATE:

More information

IV. INDUSTRIAL TRACK DESIGN

IV. INDUSTRIAL TRACK DESIGN IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these

More information

Professional Truck Driver Training Course Syllabus

Professional Truck Driver Training Course Syllabus Professional Truck Driver Training Course Syllabus The curriculum standards of this course incorporate the curricular recommendations of the U. S. Department of Transportation s Federal Highway Administration

More information

Railroad Safety Data Frequently Asked Questions (FAQ)

Railroad Safety Data Frequently Asked Questions (FAQ) Railroad Safety Data Frequently Asked Questions (FAQ) Table of Contents Railroad Classifications and Groupings...3 How are railroads classified on this site and what definitions are used for those classifications?...

More information

Analysis of Causes of Major Train Derailment and Their Effect on Accident Rates

Analysis of Causes of Major Train Derailment and Their Effect on Accident Rates Analysis of Causes of Major Train Derailment and Their Effect on Accident Rates Xiang Liu, M. Rapik Saat, and Christopher P. L. Barkan Analysis of the causes of train accidents is critical for rational

More information

Examining rails in detail. Rail inspection: Rail testing Rail measurement Welding monitoring and vehicle testing Consulting

Examining rails in detail. Rail inspection: Rail testing Rail measurement Welding monitoring and vehicle testing Consulting Examining rails in detail Rail inspection: Rail testing Rail measurement Welding monitoring and vehicle testing Rail inspection Value retention and safety for your rails Our tests Geometrical testing of

More information

Institute of Railway Technology

Institute of Railway Technology Advancing the Railway Industry through Technology Institute of Railway Technology An Institute of Monash University The Institute of Railway Technology (IRT) at Monash University is the premier track and

More information

Office of Safety and Compliance

Office of Safety and Compliance The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.

More information

Condition monitoring and condition-based railway Asset Management for High Speed lines

Condition monitoring and condition-based railway Asset Management for High Speed lines Fast track to Sustainable Mobility Condition monitoring and condition-based railway Asset Management for High Speed lines Stasha Jovanovic & Giuseppe Aurisicchio MER MEC S.p.A. Italy 1 Activities Object

More information

Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement. Task 2.

Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement. Task 2. Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement Task 2.5 Review of MNR s Established Maintenance Programs and Asset Management

More information

RAILWAY INVESTIGATION REPORT R01W0182 MAIN-TRACK DERAILMENT

RAILWAY INVESTIGATION REPORT R01W0182 MAIN-TRACK DERAILMENT RAILWAY INVESTIGATION REPORT R01W0182 MAIN-TRACK DERAILMENT CANADIAN PACIFIC RAILWAY TRAIN 218-29 MILE 8.15, BROADVIEW SUBDIVISION KEMNAY, MANITOBA 01 OCTOBER 2001 The Transportation Safety Board of Canada

More information

4.0 Inventory of the Existing Rail System

4.0 Inventory of the Existing Rail System 4.0 Inventory of the Existing Rail System Introduction The purpose of this task was to develop a geographic information system (GIS) database inventory of the existing freight rail system within the Sioux

More information

Accident / Incident Reporting Guidelines for Provincial Railways

Accident / Incident Reporting Guidelines for Provincial Railways Accident / Incident Reporting Guidelines for Provincial Railways 1) Reportable Railway Accident A reportable railway accident means an accident resulting directly from operation of rolling stock, where:

More information

VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST

VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST Proceedings of: JRC2002 The 2002 ASME/IEEE Joint Rail Conference April 23-25, 2002, Washington D.C. VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST Robert A. MacNeill and Steven

More information

Embedded Rail Slab Track

Embedded Rail Slab Track Embedded Rail Slab Track 01 Commissioned section of the BBEST system on the West Coast Main Line at Crewe in September 2003 Balfour Beatty Rail has developed, for supply to railway clients, main contractors

More information

The case for rail transportation of hazardous materials

The case for rail transportation of hazardous materials ABSTRACT The case for rail transportation of hazardous materials H. Barry Spraggins University of Nevada, Reno Safe transportation of hazardous materials in the United States is an important national issue.

More information

Robustness to unintended ignition key rotation with key ring only

Robustness to unintended ignition key rotation with key ring only Robustness to unintended ignition key rotation with key ring only GM North American Engineering Joe Fedullo Ali Seyam 5/6/14 Data collected 2/24/14 4/3/14 5/6/2014 Summary_5_16_14.pptx 1 Robustness to

More information

Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle

Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle J. Rainer Oswald VAE Aktiengesellschaft, PO Box 1, 874 Zeltweg, Austria Abstract This paper describes a new method for turnout

More information

Introduction to Railroad Track Structural Design

Introduction to Railroad Track Structural Design BCR2A 09 Railroad Track Design Including Asphalt Trackbeds Pre-Conference Workshop Introduction to Railroad Track Structural Design Don Uzarski, Ph.D., P.E. uzarski@illinois.edu Interaction, Vertical Load

More information

GENERAL KNOWLEDGE PRACTICE TEST

GENERAL KNOWLEDGE PRACTICE TEST GENERAL KNOWLEDGE PRACTICE TEST 1. Driving under the influence of any drug that makes you drive unsafely is: a. Permitted if it is prescribed by a doctor b. Against the law c. Permitted if it is a diet

More information

BNSF RAILWAY Safety and Hazmat Overview

BNSF RAILWAY Safety and Hazmat Overview BNSF RAILWAY Safety and Hazmat Overview BNSF s Safety Overview Rail is safest mode of land transportation BNSF s safety vision is to prevent accidents in the first place BNSF has a broad-based risk reduction

More information

Handbook on the Ultrasonic Examination. Austenitic Welds

Handbook on the Ultrasonic Examination. Austenitic Welds Handbook on the Ultrasonic Examination Austenitic Welds The International Institute of Welding Edition Handbook On the Ultrasonic Examination of Austenitic Welds Compiled by COMMISSION V Testing, Measurement,

More information

Cloud computing for maintenance of railway signalling systems

Cloud computing for maintenance of railway signalling systems Cloud computing for maintenance of railway signalling systems Amparo Morant, Diego Galar Division of Operation and Maintenance Engineering Luleå University of technology Luleå, 97 817, Sweden Amparo.morant@1tu.se

More information

Tram-train in the UK?

Tram-train in the UK? Tram-train in the UK? INCOSE 25 th February 2009 By Giles Thomas What is a tram train? a light rail vehicle capable of operating on a street tramway and a conventional railway What is tram train? A combination

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

21ST CENTURY RAILROADS: SAFETY THROUGH TECHNOLOGY

21ST CENTURY RAILROADS: SAFETY THROUGH TECHNOLOGY MONITORING ASSET HEALTH THROUGH ADVANCED TECHNOLOGY With 28,000 locomotives, more than 1.4 million rail cars and enough rail to circle the earth more than thirteen times, railroads rely on advanced technologies

More information

Highway Motor Transportation

Highway Motor Transportation Highway Motor Transportation WW I: Motor carrier industry started, converted automobiles were used for pick up and delivery in local areas Railroads encouraged the growth. They had difficulty with small

More information

Design Verification The Case for Verification, Not Validation

Design Verification The Case for Verification, Not Validation Overview: The FDA requires medical device companies to verify that all the design outputs meet the design inputs. The FDA also requires that the final medical device must be validated to the user needs.

More information

Evaluation and Field Load Testing of Timber Railroad Bridge

Evaluation and Field Load Testing of Timber Railroad Bridge Transportation Research Record 1696 Paper No. 5B0112 323 Evaluation and Field Load Testing of Timber Railroad Bridge Terry J. Wipf, Michael A. Ritter, and Douglas L. Wood Several spans of a 60-year-old

More information

www.tuv.com TUV Rheinland Rail Sciences, Inc.

www.tuv.com TUV Rheinland Rail Sciences, Inc. www.tuv.com TUV Rheinland Rail Sciences, Inc. TUV Rheinland Rail Sciences, Inc. (TUV-RSI) Since 1987, TUV-RSI has been providing specialized consulting, testing, engineering and training services in the

More information

Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach

Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach PSAM5 ---------- 1 Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach Gerd Matschke, Thorsten Tielkes, Peter Deeg and Burkhard Schulte-Werning Deutsche Bahn AG, Research and

More information

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle

More information

The Telematics Application Innovation Based On the Big Data. China Telecom Transportation ICT Application Base(Shanghai)

The Telematics Application Innovation Based On the Big Data. China Telecom Transportation ICT Application Base(Shanghai) The Telematics Application Innovation Based On the Big Data China Telecom Transportation ICT Application Base(Shanghai) Big Data be the basis for Telematics Innovation Providing service s based on the

More information

Railway Freight Car Inspection and Safety Rules

Railway Freight Car Inspection and Safety Rules Railway Freight Car Inspection and Safety Rules December 24, 2012 PART I GENERAL... 3 1. SHORT TITLE... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. SAFETY INSPECTIONS... 5 5. PRE-DEPARTURE INSPECTION... 6 6.

More information

Operating Vehicle Control Devices

Operating Vehicle Control Devices Module 2 Topic 3 Operating Vehicle Control Devices 1. Identify the vehicle controls in the pictures below: 1. 2. 3. 4. 7. 7. 5. 6. 1. accelerator 2. parking brake 3. foot brake 4. gear shift lever_ 5.

More information

SELF-STEERING AXLE TABLE OF CONTENTS

SELF-STEERING AXLE TABLE OF CONTENTS SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -

More information

OPERATOR'S MANUAL i-shift transmission

OPERATOR'S MANUAL i-shift transmission OPERATOR'S MANUAL i-shift transmission R Volvo Trucks. Driving Success. Table of Contents i Foreword... 1 Safety Information... 2 Volvo I-Shift Transmission... 4 General Information... 4 Gear Selector...

More information

The risk of derailment and collision, and safety systems to prevent the risk

The risk of derailment and collision, and safety systems to prevent the risk The risk of derailment and collision, and safety systems to prevent the risk Tomohisa NAKAMURA Transport safety department East Japan Railway Company Introduction Since our establishment in 1987, we have

More information

Risk Assessment / Risk Management Protocol

Risk Assessment / Risk Management Protocol 1 Canadian Pacific Railway Risk Assessment / Risk Management Protocol Overview / Outline At Canadian Pacific Railway, we conduct risk assessments of our activities and operations for a number of different

More information

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT?

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? SIGHT DISTANCE Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? Drivers must be able to: Stop for objects in the roadway Stop for stationary

More information

Cisco Positive Train Control: Enhancing End-to-End Rail Safety

Cisco Positive Train Control: Enhancing End-to-End Rail Safety Solution Overview Cisco Positive Train Control: Enhancing End-to-End Rail Safety What You Will Learn Positive Train Control (PTC), one of many new safety measures mandated by the U.S. Federal Government,

More information

HOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST

HOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST ` HOW TO PREPARE FOR YOUR MARYLAND NONCOMMERCIAL CLASS C DRIVER S TEST A portion of your noncommercial driving test will be conducted on a closed course to test your basic control of the vehicle, and a

More information

Pipeline External Corrosion Analysis Using a 3D Laser Scanner

Pipeline External Corrosion Analysis Using a 3D Laser Scanner Pipeline Technology Conference 2013 Pipeline External Corrosion Analysis Using a 3D Laser Scanner Pierre-Hugues ALLARD, Charles MONY Creaform, www.creaform3d.com 5825 rue St-Georges, Lévis (QC), Canada,

More information

TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL

TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL TRAINER NOTES FOR LESSON PLAN 2012 13 School Bus Instructors Inservice TITLE OF LESSON: TRAINING UPDATES FOR A CDL Length of Lesson: 30 minutes TRAINER NOTES: Hand out lesson plan at the beginning of the

More information

Vehicle Standards Instruction (General 18.0) Projecting Loads Released January 2014

Vehicle Standards Instruction (General 18.0) Projecting Loads Released January 2014 Vehicle Standards Instruction (General 18.0) Projecting Loads Released January 2014 This Vehicle Standards Instruction (VSI) has been produced to explain the requirements for transporting projecting loads

More information

R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m

R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m R e q u e s t f o r Q u o t e s H a r d w o o d S w i t c h T i e s 15-15 2 0 1 3, 2 0 1 4, 2 0 1 5 C a p i t a l M a i n t e n a n c e P r o g r a m The Northern New England Passenger Rail Authority (NNEPRA),

More information

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT

ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT I. GENERAL ROAD SAFETY GUIDELINES FOR TAH ROAD INFRASTRUCTURE SAFETY MANAGEMENT ANNEX III B i. The setting up and implementing of appropriate management procedures is an essential tool for improving the

More information

Deploying Predictive Analytics Solutions in the Rail Industry and Seeing a Return on Investment

Deploying Predictive Analytics Solutions in the Rail Industry and Seeing a Return on Investment Robert Morris, Ph.D. Co- Founder & Chief Science Officer Predikto, Inc. Deploying Predictive Analytics Solutions in the Rail Industry and Seeing a Return on Investment SHOWING BUSINESS VALUE FROM DEPLOYED

More information

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety.

Document Name: Driving Skills. Purpose: To outline necessary driving skills required to maximize driving safety. Document Name: Driving Skills Date Created: 8 October 2013 Date Reviewed: 4 February 2014 Date Approved: 29 July 2015 Purpose: To outline necessary driving skills required to maximize driving safety. Overview:

More information

Construction of Quality Hot Mix Asphalt Pavements

Construction of Quality Hot Mix Asphalt Pavements 59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed

More information

QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS

QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS State of Florida Department of Transportation QUALITY ASSURANCE FOR MOBILE RETROREFLECTIVITY UNITS FDOT Office State Materials Office Authors Patrick Upshaw Joshua Sevearance Hyung Lee Date of Publication

More information

An Introduction to. Metrics. used during. Software Development

An Introduction to. Metrics. used during. Software Development An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote

More information

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE - 20 - WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE F. Diernhofer 1, C. Sommerlechner 2, B. Fößleitner 2 1 ILF Consulting Engineers, Austria 2 ÖBB-Infrastruktur

More information

Impact of Hurricane Ike

Impact of Hurricane Ike Island Transit History, Design and Impact of Hurricane Ike By Gary A. Gordon, P.E. Assistant Federal Security Director-Surface Surface, South Central Region and Michael Worthy Director of Transportation,

More information

TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURE

TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURE TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURES V4.0 TASK 1: PERSONAL PROTECTIVE EQUIPMENT PERFORMANCE MEASURE DOT Approved Helmet Proper Reflective Equipment Full Fingered Gloves Proper Eye Protection

More information

PUNISHMENTS PRESCRIBED IN ACCIDENT AND ENGINE FAILURE CASES

PUNISHMENTS PRESCRIBED IN ACCIDENT AND ENGINE FAILURE CASES PUNISHMENTS PRESCRIBED IN ACCIDENT AND ENGINE FAILURE CASES NOTE : (i) D Staff : Staff directly held responsible for the accident. S Staff : Staff who are found to have secondary responsibility. In their

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

Simulation Facilitates Introduction of New Rail Grinding Applications

Simulation Facilitates Introduction of New Rail Grinding Applications Summary Simulation Facilitates Introduction of New Rail Grinding Applications Dr. Wolfgang Schöch Speno International SA 26, Parc Chateau-Banquet, CH - 1211 Geneva, Switzerland Telephone: + 41 22 906 4600

More information

SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK

SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK John Parola, (formerly Chief Engr.Track, Amtrak) currently VP, HNTB Inc., Philadelphia, PA Conrad Ruppert, Jr. Division Engineer, Amtrak, Boston, MA INTRODUCTION:

More information

87-A DISTRICT DIVISION MOST COMMON TRAFFIC CIVIL INFRACTION VIOLATIONS

87-A DISTRICT DIVISION MOST COMMON TRAFFIC CIVIL INFRACTION VIOLATIONS 87-A DISTRICT DIVISION MOST COMMON TRAFFIC CIVIL INFRACTION VIOLATIONS Revised as of 04/2016 Misdemeanor violations may require a hearing date at which time fine and costs will be assessed. Section Code

More information

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015 GE/RT8000/M3 Rule Book Module M3 Managing incidents, floods and snow Issue 2 September 2015 Comes into force 5 December 2015 Published by: RSSB The authoritative version of this document is available at

More information

Machine-Vision Inspection of Railroad Track

Machine-Vision Inspection of Railroad Track Sawadisavi et al. 1 Machine-Vision Inspection of Railroad Track Steven Sawadisavi, Graduate Research Assistant J. Riley Edwards, Lecturer Esther Resendiz*, Graduate Research Assistant John M. Hart*, Research

More information

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013 Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles

More information

Rehabilitation of Canadian National Railway Track Servicing Oil Sands in Northern Alberta The Athabasca Northern Railway

Rehabilitation of Canadian National Railway Track Servicing Oil Sands in Northern Alberta The Athabasca Northern Railway Rehabilitation of Canadian National Railway Track Servicing Oil Sands in Northern Alberta The Athabasca Northern Railway Tom Bourgonje CN, Regional Chief Engineer Scott A. Diercks Loram, Product Development

More information

Appendix A. About RailSys 3.0. A.1 Introduction

Appendix A. About RailSys 3.0. A.1 Introduction Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research

More information

Multivariate Statistical Model for Predicting Occurrence and Location of Broken Rails

Multivariate Statistical Model for Predicting Occurrence and Location of Broken Rails 48 ------------------------------------Transportation Research Record 1825 Paper No. 03-3680 I Multivariate Statistical Model for Predicting Occurrence and Location of Broken Rails C. Tyler Dick, Christopher

More information

PdM Overview. Predictive Maintenance Services

PdM Overview. Predictive Maintenance Services PdM Overview Predictive Maintenance Services Objective Assessments Maximize Uptime, Lower Costs Predictive Maintenance (PdM) solutions from Rexnord Industrial Services help manage the condition of your

More information

Risk - Based Inspection Frequencies

Risk - Based Inspection Frequencies Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection

More information

COMBINED SHORT LINE RAILROAD LIABILITY INSURANCE & PROPERTY/INLAND MARINE INSURANCE APPLICATION

COMBINED SHORT LINE RAILROAD LIABILITY INSURANCE & PROPERTY/INLAND MARINE INSURANCE APPLICATION COMBINED SHORT LINE RAILROAD LIABILITY INSURANCE & PROPERTY/INLAND MARINE INSURANCE APPLICATION Note: This application is for claims made insurance coverage for Liability Insurance. Please type or print

More information

The Development of Virtual Testing Model for Korea High Speed Train

The Development of Virtual Testing Model for Korea High Speed Train The Development of Virtual Testing Model for Korea High Speed Train 1 S.R. Kim, 2 J.S. Koo, 3 T.S. Kwon, 4 H.S. Han Korea University of Science and Technology, Daejeon, Korea 1 ; Seoul National University

More information

Tyre Awareness Training

Tyre Awareness Training Tyre Awareness Training Tyre Law Tread depth Tyres on cars, light vans (not exceeding 3,500kg gross weight) and light trailers must have a tread depth of at least 1.6mm across the central three-quarters

More information

KINETIC ENERGY RECOVERY SYSTEM BY MEANS OF FLYWHEEL ENERGY STORAGE

KINETIC ENERGY RECOVERY SYSTEM BY MEANS OF FLYWHEEL ENERGY STORAGE ADVANCED ENGINEERING 3(2009)1, ISSN 1846-5900 KINETIC ENERGY RECOVERY SYSTEM BY MEANS OF FLYWHEEL ENERGY STORAGE Cibulka, J. Abstract: This paper deals with the design of Kinetic Energy Recovery Systems

More information

The accident of CSXT petroleum Crude Oil Train Derailment and Hazardous Materials Release

The accident of CSXT petroleum Crude Oil Train Derailment and Hazardous Materials Release National Transportation Safety Board Railroad Accident Brief CSXT Petroleum Crude Oil Train Derailment and Hazardous Materials Release Accident No.: DCA14FR008 Location: Lynchburg, Virginia Date: April

More information

Railroad Accident Brief

Railroad Accident Brief National Transportation Safety Board Railroad Accident Brief Collision of Two Chicago Transit Authority Trains Accident No.: DCA13FR014 Location: Forest Park, Illinois Date: September 30, 2013 Time: 7:42

More information

Climate Change Adaptation for London s Transport System

Climate Change Adaptation for London s Transport System Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation

More information

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit Version I - July 2012 An executive agency for the

More information

2016 Minnesota School Bus Driver Road-eo Competition

2016 Minnesota School Bus Driver Road-eo Competition 2016 Minnesota School Bus Driver Road-eo Competition North Metro Driver Exam Station I-35W and Co Rd I Arden Hills May 7, 2016 MSBOA MAPT Office of Pupil Transportation Safety Driver and Vehicle Services

More information

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE By: William G. Byers, P.E. Burlington Northern and Santa Fe Railway 4515 Kansas Avenue Kansas City, Kansas 66106 Phone (913) 551-4070 Fax

More information

Section 14. Forklift Safety Contents 14.1 Operator Safety

Section 14. Forklift Safety Contents 14.1 Operator Safety Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5

More information

Modelling Cost of Maintenance Contract for Rail Infrastructure

Modelling Cost of Maintenance Contract for Rail Infrastructure Proceedings of the 21 International Conference on Industrial Engineering and Operations Management Dhaka, Bangladesh, January 9 1, 21 Modelling Cost of Maintenance Contract for Rail Infrastructure Anisur

More information

Assembling Claim Adjuster Notes and Other Unstructured Data for Data Analytics Applications

Assembling Claim Adjuster Notes and Other Unstructured Data for Data Analytics Applications Assembling Claim Adjuster Notes and Other Unstructured Data for Data Analytics Applications Presented at CAS Ratemaking and Product Management Seminar March 22, 2011 (New Orleans) Presented by Philip S.

More information

BARREL ALIGNMENT- A CRITICAL FACTOR IN REDUCING EXTRUDER WEAR

BARREL ALIGNMENT- A CRITICAL FACTOR IN REDUCING EXTRUDER WEAR BARREL ALIGNMENT- A CRITICAL FACTOR IN REDUCING EXTRUDER WEAR Jeff A. Myers- BARR Inc., Onsted, MI Mike Puhalla Milacron, Batavia, OH Abstract As processors increase the demand on the extruder for increased

More information

GEOMETRIC DESIGN CIVL 3161

GEOMETRIC DESIGN CIVL 3161 GEOMETRIC DESIGN CIVL 3161 Reading Assignment: p. 45-72 (4 th ed.) p.45-75 (previous ed.) in Mannering textbook. Geometric design of highway facilities deals with the proportion of physical elements of

More information

THE UNIVERSITY OF CHICAGO VEHICLE LOSS CONTROL PROGRAM

THE UNIVERSITY OF CHICAGO VEHICLE LOSS CONTROL PROGRAM THE UNIVERSITY OF CHICAGO VEHICLE LOSS CONTROL PROGRAM I. GUIDING PRINCIPLES A. Anyone driving a vehicle on University business shall do so in a safe, responsible fashion. B. Vehicles shall be operated

More information

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning

More information

Big Data in Transportation Engineering

Big Data in Transportation Engineering Big Data in Transportation Engineering Nii Attoh-Okine Professor Department of Civil and Environmental Engineering University of Delaware, Newark, DE, USA Email: okine@udel.edu IEEE Workshop on Large Data

More information