1 PSAM Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach Gerd Matschke, Thorsten Tielkes, Peter Deeg and Burkhard Schulte-Werning Deutsche Bahn AG, Research and Technology Centre, Department of Aerodynamics, Voelckerstrasse 5, Munich, Germany, Aerodynamik@bku.db.de Peter Locher, Charles Fermaud and Hans Bohnenblust Ernst Basler + Partners Ltd., Zollikerstrasse 65, 8702 Zollikon, Switzerland, Peter.Locher@ebp.ch Abstract For several years Deutsche Bahn AG (German Rail) has been investigating the risks from the operation of lightweight end coaches due to cross winds. The methodology, which can be applied to all types of rail traffic, is described for high-speed trains. It involves the computation of permissible wind speeds using wind tunnel and simulation techniques, followed by a quantitative assessment of the frequency with which the permissible wind speed is exceeded at the leading vehicle. Safety criteria are used to derive to which extent countermeasures are necessary to guarantee safe railway operations. The methodology was approved by the responsible federal authorities and is successfully being applied in practice. 1. Background and description of the problem Since 1872 there have been at least 28 railway accidents involving passenger trains in Japan due to cross winds [1]. The great majority of all known accidents occurred on narrow gauge lines at wind speeds considerably in excess of 30 m/s. The authors are aware of only three accidents world-wide in which passenger trains running on standard gauge lines were affected. At Deutsche Bahn AG (DB) two new generations of high-speed trains have been introduced since The use of a driving trailer in the ICE2 respectively the electrical multiple-unit concept implemented in the ICE3 together with the systematic use of lightweight materials made the construction of end coaches possible whose weight is approximately 53 tonnes. Since it cannot be ruled out that strong cross winds pose a hazard to these light vehicles, the issue has been investigated by DB in an extensive research programme that has been running since 1994 [2]. Similar research has been done by the railway operators in Japan [3], Britain [4] and Sweden. Existing high-speed railway lines in Germany allow maximum train speeds
2 PSAM5 of 280 km/h, while new lines are designed for 300 km/h. For lightweight bodied vehicles a speed of 200 km/h has been shown to be sufficiently safe even in the presence of strong gusts. The approach adopted by DB is to increase the speed, which has been 200 km/h so far for such vehicles, whilst ensuring by suitable countermeasures that the risks due to cross winds do not increase accordingly. Peak wind speeds of 25 m/s are exceeded on embankments or high bridges on German high-speed lines on an average of 3 days per year. Strong winds from the west prevail so that sections of track that run north-south are most exposed to cross winds. A detailed methodology for establishing an adequate level of protection has been worked out, which is applicable to all rail traffic. This methodology is illustrated by application to high-speed rail traffic with light end coaches, as safety requirements are the most stringent in this case. 2. Methodology of risk assessment and safety planning The risks posed by cross winds to rail traffic are mainly influenced by vehicle properties (such as weight, location of centre of gravity, shape and running gear), line parameters (such as curve radii, cant and quality of track geometry), vehicle speed and the probability of occurrence of strong cross winds. Figure 1 provides an overview of the methodology adopted to guarantee safe train operation. The approach is broken down into four main steps. Step 1: Vehicle-specific permissible cross wind speeds Safety p roof Param eters of the vehicle, track and superstructure Characteristic wind curve Step 2: Line-specific risk assessment Train speed, track geometry Permissible wind speed Probability of strong winds W ind statistics, characteristics of surroundings Frequency F CWC of exceeding the permissible wind speed Step 3: Risk appraisal Com parison with safety target F CWC F CWC,target? if YES: No m easures Step 4: Planning of safety measures if NO: Possible measures Š reduction of train speed Š modifications at the vehicle Š wind-protection measures Figure 1: Methodology with four main steps
3 PSAM Step 1: Determination of vehicle-specific permissible cross wind speeds The time-dependent contact forces between wheel and rail are calculated for a given gust scenario using multi-body simulations. Aerodynamic coefficients measured in a wind tunnel, the main characteristics of running gear, irregularities in track geometry and superstructure behaviour are being taken into account. The results of these simulations are summarised in so-called characteristic wind curves (CWC). They describe for a particular vehicle how the permissible wind speed, at which the contact forces between wheel and rail fall below specified limits, varies as a function of vehicle speed and uncompensated lateral acceleration. The threshold values for the contact forces are chosen in a conservative way, which is common practice in railway engineering. Even a significant violation of these values does not immediately cause a derailment. This was quantitatively demonstrated for a lightweight driving trailer, which has not yet experienced a wind induced accident despite 30 years of operation with over one billion kilometres and almost certainly numerous violations of the permissible wind speed. For high-speed trains, however, neither statistically-based arguments nor computational methods are available to specify quantitatively derailment probabilities in case of cross wind speeds above the permissible value. Step 2: Line-specific probabilistic risk assessment A quantitative description of the occurrence of strong winds must be based on probabilistic methods. In order to be able to make comparisons with other hazards to railway operations, a quantitative assessment of the individual or societal risks arising as a result of derailments due to cross winds would be desirable. However, due to lack of knowledge about probabilities of wind induced derailments, it is assumed that the risks are proportional to the frequency with which the permissible wind speed is exceeded at the vehicle. As all safety measures directly act on this frequency such a simplification is useful for practical applications. The frequency of exceeding a vehicle s CWC is determined quantitatively for homogeneous sections of track (typical length: 100 m) as follows: - Determination of the local permissible wind speed on the basis of the CWC - Determination of the probability of occurrence of strong winds as a function of cross wind speed. This step involves transferring direction dependent statistical wind data from representative measuring stations to the line by the German weather service. Line direction, locality of track (embankment, bridge, cutting), surface roughness of the surrounding area and the presence of structures close to the track (particularly, noise protection walls and buildings) are being taken into account.
4 PSAM5 - Estimate of the frequency of the permissible wind speed being exceeded at the leading vehicle (f CWC,i ). By assuming that train operation and occurrence of strong winds are not correlated, this frequency can be computed for section i by use of formula 1: ptrain, i pcwc, i fcwc, i = (1) F CWC = f CWC, i (2) t gust p train,i is the probability of the presence of a train, p CWC,i is the probability that the relevant permissible wind speed is exceeded at a given moment, and t gust is the assumed mean duration of a gust. By taking the sum over all sections according to formula 2, an overall frequency F CWC can be calculated, which refers to an entire high-speed line and a given kilometric train performance. Step 3: Risk appraisal The decision which risk level posed by cross winds to planned high-speed train operation is acceptable is based on article 2 of the German Railway Construction and Operation Regulations. According to this regulation, the safety level once achieved must not be lowered as a result of constructional or operational modifications (principle of proof of equal safety according to GAMAB: Globalement Au Moins Aussi Bon ). Following an agreement with the German federal railway authorities, the currently authorised ICE2 service on the Hanover - Wuerzburg high-speed line with a maximum speed of 200 km/h has been adopted as a reference, defining the cross wind safety target for all high-speed train operations in Germany. The comparison is based upon the frequency F CWC in formula 2 and referred to 1 million train kilometres with a lightweight leading vehicle operating between two main stations. There is no local safety target concerning the values of f CWC,i on individual sections. Step 4: Planning of safety measures If the frequency F CWC calculated for a planned service exceeds the target value, measures must be taken so that F CWC is reduced to a value below. The main types of countermeasures are: - Reducing train speed (permanently or during periods of strong winds [5]), - Wind-protection measures (walls or fences as windbreakers), - Constructional modifications to the vehicle (e.g. lowering the centre-ofgravity, improved aerodynamics, adding extra weight) - Improving the quality of the track geometry Generally, a optimal set of measures are implemented so that the required safety level can be achieved most economically. i
5 PSAM Results and planning of safety measures The most important results from the investigations about the risks due to cross winds for the ICE2 driving trailer on the Hanover Wuerzburg and Hanover Berlin high-speed lines can be summarised as follows: - The lowest permissible wind speed of 22 m/s occurs in curves with a high noncompensated lateral acceleration. For straight sections of track, the permissible wind speed is at or above 29 m/s, depending upon the actual speed of the train. - The frequency with which the CWC is exceeded varies widely depending on the characteristics of the particular sections of line investigated, cf. Figure 2. Particularly critical are curves on exposed embankments or bridges when the wind impinges on the train from the inside of the curve frequency of exceeding the CWC (lower line) [per 100 m-sections and year] distance along railway line [km] train speed (upper dotted curve, one direction) [km/h] Figure 2: Frequency of exceeding the CWC along a typical high-speed line (peaks correspond to curves on embankments or bridges) - At a maximum vehicle speed of 280 km/h, the cumulative value F CWC along the entire high-speed line is on average five times higher than that at 200 km/h. - Because the prevailing wind direction is from the west, the danger posed by cross winds on the north-south Hanover Wuerzburg line is about an order of magnitude greater than that on the east-west Hanover Berlin line. - Since the reference risk is the one associated with the 200 km/h ICE2 service on the high-speed line Hanover - Wuerzburg, any increase in the speed of the ICE2 will require the implementation of appropriate countermeasures. In order for the ICE2 with leading trailer to run at the targeted maximum speed of 280 km/h, approximately 10 km of wind barriers would be required along the
6 PSAM5 most susceptible sections of track. An alternative approach is the installation of a wind warning system which would automatically trigger a speed reduction when strong winds are forecast [5]. 4. Summary and conclusions The methodology described in this paper is suitable for making a transparent and quantitative comparison of the hazards posed by cross winds to different vehicles on selected railway lines. Safety criteria have been defined which allow a clear decision about the extent to which countermeasures are necessary to guarantee the safe running of trains with lightweight end coaches. The methodology has already proved its worth in practical applications and has been approved by the German federal railway authorities. It has been adopted by DB as a guideline. Given that in the future operation with lightweight end coaches will be common practice with many railways, the existing methodology may form a useful starting point for other railways when dealing with the problems posed by cross winds to rail traffic operations. DB therefore proposes to incorporate the knowledge gained into the relevant European standards or directives such as TSI or CEN TC256. DB is already co-operating in the area of the risks due to cross winds with the East Japan Railway Company and proposes to intensify existing partnerships with various European railways. References 1. Fujii T., Maeda T., Ishida H., Imai T., Tanemoto K. and Suzuki M., Wind- Induced Accidents of Train/Vehicles and Their Measures in Japan, Quarterly Report of Railway Technical Research Institute, Vol. 40, No. 1, March Matschke G., Schulte-Werning B., Measures and Strategies to Minimise the Effect of Strong Cross Winds on High Speed Trains. Proceedings of WCRR World Congress of Railway Research, Florence, Italy, Vol. E, , Kunieda M., Theoretical Study on the Mechanics of Overturn of Railway Rolling Stock (in Japanese), The Railway Technical Research Institute, No. 793, Cooper R.K., The Probability of Trains Overturning in High Winds, Proc. Of the 5 th International Conference of Wind Engineering, Fort Collins, Colorado, Matschke G., Tielkes Th., Schulte-Werning B., Locher P., Fermaud Ch., Bohnenblust H., A Short-Term Wind Warning System to Counteract the Effects of Cross Wind on High Speed Trains. Paper for PSAM 5, International Conference of Probabilistic Safety Assessment and Management, Osaka, Japan, 2000
Crosswind Behavior of Rail Vehicles: A Systematic Investigation of the Sensitivity to Vehicle Parameters
Crosswind Behavior of Rail Vehicles: A Systematic Investigation of the Sensitivity to Vehicle Parameters Prof. Dr.-Ing. Rolf Naumann, Dipl.-Ing (FH) Norman Welge LSA - Labor für Strukturanalyse Introduction
More informationRailway Business Strategy and R&D in Europe
Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway
More informationRHEDA MRT The ballastless track for underground and surface commuter transit
RHEDA MRT The ballastless track for underground and surface commuter transit 2 3 Cities on the move Living and working today confront people with increasing demands for mobility. Planners and engineers
More informationHSR THE TRAIN OF THE FUTURE New technologies and research trends
HSR THE TRAIN OF THE FUTURE New technologies and research trends Manuel S. Pereira* * ERRAC Vice-Chairman JUL 2008 The third dimension: Competitiveness & innovation ENERGY/POWER BIOMECHANICS HUMAN/MACHINE
More informationThe risk of derailment and collision, and safety systems to prevent the risk
The risk of derailment and collision, and safety systems to prevent the risk Tomohisa NAKAMURA Transport safety department East Japan Railway Company Introduction Since our establishment in 1987, we have
More informationExamining rails in detail. Rail inspection: Rail testing Rail measurement Welding monitoring and vehicle testing Consulting
Examining rails in detail Rail inspection: Rail testing Rail measurement Welding monitoring and vehicle testing Rail inspection Value retention and safety for your rails Our tests Geometrical testing of
More informationGuideline. Date: 12.06.2013
Guideline Detailed definition and clarification of open points in the aerodynamic requirements of TSI HS RST 2008 and TSI CR LOC&PAS 2011 in 4.2.6.2.1 passengers on platform, 4.2.6.2.2 workers at the track
More informationDesigning a Wind Alarm System for the TGV-Mediterranée
Designing a wind alarm system for the TGV-Mediterranée Designing a Wind Alarm System for the TGV-Mediterranée Didier Delaunay a1, Louis-Marie Cléon b, Christian Sacré a, Florence Sourget b, Pierre-Etienne
More informationIRG-Rail (13) 2. Independent Regulators Group Rail IRG Rail Annual Market Monitoring Report
IRG-Rail (13) 2 Independent Regulators Group Rail IRG Rail Annual Market Monitoring Report February 2013 Index 1 Introduction...3 2 Aim of the report...3 3 Methodology...4 4 Findings...5 a) Market structure...5
More informationOperating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV
Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany
More informationValve Train Design and Calculation for High-Performance Engines
Valve Train Design and Calculation for High-Performance Engines Camshaft Design System is a computing programme for the design of different types of valve trains. Starting from the related acceleration
More informationAlignment design for Citybanan in Stockholm
Alignment design for Citybanan in Stockholm B. Kufver Halcrow, Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom Abstract The Western Main Line into Stockholm Central Station was
More informationPlatoon illustration Source: VOLVO
SARTRE: SAfe Road TRains for the Environment Arturo Dávila Mario Nombela IDIADA Automotive Technology SA 1. Introduction The SARTRE project aims at encouraging an evolutional change in the use of personal
More informationWind tunnel test study the influence of wind screen on wind pressure distribution above railway tracks
The Seventh International Colloquium on Bluff Body Aerodynamics and Applications (BBAA7) Shanghai, China; September 2-6, 2012 Wind tunnel test study the influence of wind screen on wind pressure distribution
More informationWho am I? PhD s and Industry a personal view. Outline of talk. The Railway Research Centre at the University of Birmingham
Who am I? PhD s and Industry a personal view Head of Civil Engineering at the University of Birmingham Director of Birmingham Railway Research Centre, Director of Rail Research UK Council member of EURNEX
More information11. Monitoring. 11.1 Performance monitoring in LTP2
178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the
More informationDB Guidelines on Integrated Plant Protection Management 2 nd UIC International Workshop on Vegetation Management Paris, May 24 and 25, 2016
Platzhalter für Titelbild Hier können Sie Bilder aus der Mediathek einfügen! Placeholder for title picture You can insert here pictures from the Mediathek! DB Guidelines on Integrated Plant Protection
More informationWhy build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
More informationPrinciples and development of quality assurance in welding of rail structures
Principles and development of quality assurance in welding of rail structures Dipl.-Ing. Horst Büttemeier, Minden; Dipl.-Ing. Reiner Linder, Sprockhövel; Prof. Dr.-Ing. Steffen Keitel, Duisburg Foreword
More informationAnalysing the Metro Cityring in Copenhagen
Computers in Railways XI 45 Analysing the Metro Cityring in Copenhagen A. H. Kaas & E. M. Jacobsen Atkins, Denmark Abstract When planning new infrastructure it is important that the infrastructure is well
More informationThe future is already here
Transrapid International A joint company of Siemens and ThyssenKrupp The future is already here The Transrapid maglev system in Shanghai The future is already here in Shanghai Shanghai is a city of superlatives
More informationEUROCODE 1 Actions on Building Structures
EU-Russia cooperation on standardisation for construction Moscow, 9-10 October 2008 1 EUROCODE 1 Actions on Building Structures Paolo Formichi CEN/TC250/SC1 University of Pisa (Italy) EU-Russia cooperation
More informationRailway Reform in Europe: from endangered species to sustainable systems?
Railway Reform in Europe: from endangered species to sustainable systems? International workshop on railway reform Ankara, 8 October 2009 Paul Guitink 09 July 2009 1 Content of this presentation representing
More informationClimate Change Adaptation for London s Transport System
Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation
More informationThe Real Service Life and Repair Costs for Bridge Edge Beams
The Real Service Life and Repair Costs for Bridge Edge Beams Hans-Åke MATTSSON*, Håkan SUNDQUIST ** *) MSc, PhD Student, Department of Civil and Architectural Engineering, Division of Structural Design
More informationThe Gotthard Base Tunnel
The Gotthard Base Tunnel The tunnel On 11 December 2016, the Gotthard Base Tunnel will come into scheduled operation. At 57 kilometres in length, it is the longest rail tunnel in the world. It has virtually
More informationSingle Axle Running Gears FEBA - a New Concept of Radial Steering
Single Axle Running Gears - a New Concept of Radial Steering Oldrich Polach DaimlerChrysler Rail Systems (Switzerland) Ltd, Winterthur OP BWED, 8-Mai- - Seite 1 - _Milan.ppt Contents Introduction of Adtranz
More informationINTERACTION BETWEEN MOVING VEHICLES AND RAILWAY TRACK AT HIGH SPEED
INTERACTION BETWEEN MOVING VEHICLES AND RAILWAY TRACK AT HIGH SPEED Prof.Dr.Ir. C. Esveld Professor of Railway Engineering TU Delft, The Netherlands Dr.Ir. A.W.M. Kok Associate Professor of Railway Engineering
More informationBasics of vehicle aerodynamics
Basics of vehicle aerodynamics Prof. Tamás Lajos Budapest University of Technology and Economics Department of Fluid Mechanics University of Rome La Sapienza 2002 Influence of flow characteristics on the
More informationBV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.
Simulation models: important aids for Banverket's planning process M. Wahlborg Banverket Swedish National Rail Administration, Planning Department, S-781 85 Borlange, Sweden Abstract When making decisions
More informationINSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers
INSTRUCTOR S GUIDE Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers WHAT WE DO Operation Lifesaver is a nationwide, non-profit public information and education
More informationHigh speed railway principles
High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,
More informationThe rail engineering service provider. Consulting, planning, project management
The rail engineering service provider Consulting, planning, project management The rail engineering service provider Rail infrastructure is a complex system in which all the elements must be precisely
More informationMeasure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
More informationNumerical investigation of aerodynamic action on track vicinity within the electric locomotive operation
Applied and Computational Mechanics 1 (2007) 215-224 Numerical investigation of aerodynamic action on track vicinity within the electric locomotive operation J. Novák a, * a Department of Fluid Mechanics,
More informationCondition monitoring and condition-based railway Asset Management for High Speed lines
Fast track to Sustainable Mobility Condition monitoring and condition-based railway Asset Management for High Speed lines Stasha Jovanovic & Giuseppe Aurisicchio MER MEC S.p.A. Italy 1 Activities Object
More informationMacroFlo Opening Types User Guide <Virtual Environment> 6.0
MacroFlo Opening Types User Guide 6.0 Page 1 of 18 Contents 1. Introduction...4 2. What Are Opening Types?...5 3. MacroFlo Opening Types Manager Interface...5 3.1. Add... 5 3.2. Reference
More informationResearch for High Speed. Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France
Research for High Speed Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France Presentation Outline Learning from the speed record (574,8 km/h=357.2 mph) Tests on Duplex trainsets
More informationConcept for Railway and Transportation in Southern Norway. High Speed Line Oslo Hadeland Gjøvik Moelv. with High Speed Line Oslo Trondheim / Ålesund
Concept for Railway and Transportation in Southern Norway High Speed Line with High Speed Line Oslo Trondheim / Ålesund DB International GmbH Ottmar Grein Gjøvik, 28.10.2011 Concept for Railway and Transportation
More informationDRAFT APPENDIX D MID/EASTERN CORRIDOR, RAILWAY
APPENDIX D MID/EASTERN CORRIDOR, RAILWAY Fact sheet 13 Improvement on the Scandinavian rail freight corridor Hirtshals-Hamburg Improvements for rail freight in the corridor A new intermodal terminal will
More informationBAFFLES AS A MEANS OF STATION PROTECTION FROM HIGH AIR VELOCITIES - COMPARISON OF ANALYTICAL AND FIELD MEASUREMENTS RESULTS
- 289 - BAFFLES AS A MEANS OF STATION PROTECTION FROM HIGH AIR VELOCITIES - COMPARISON OF ANALYTICAL AND FIELD MEASUREMENTS RESULTS Maevski Igor, PhD, PE Jacobs Engineering, USA ABSTRACT Draught relief
More informationExperience with Safety Integrity Level (SIL) Allocation in Railway Applications
Experience with Safety Integrity Level (SIL) Allocation in Railway Applications Peter Wigger Institute for Software, Electronics, Railroad Technology (ISEB), TÜV InterTraffic GmbH, a company of the TÜV
More informationRailway-vehicle Technologies for European Railways
Hitachi Review Vol. 57 (2008), No. 1 61 Railway-vehicle Technologies for European Railways Takeshi Kawasaki, Dr. Eng. Takashi Yamaguchi, Dr. Eng. Toshihiko Mochida OVERVIEW: At Hitachi, Ltd. a bulk order
More informationTrapeze Rail System Simulation and Planning
trapeze Rail System English Software for Rail Modelling and Planning Trapeze Rail System Simulation and Planning www.trapezegroup.com Enabling future railway plans Cost reductions through integrated planning
More informationCatastrophe Bond Risk Modelling
Catastrophe Bond Risk Modelling Dr. Paul Rockett Manager, Risk Markets 6 th December 2007 Bringing Science to the Art of Underwriting Agenda Natural Catastrophe Modelling Index Linked Securities Parametric
More informationValidity of Skid Resistance Data Collected Under Western Australian Conditions
Validity of Skid Resistance Data Collected Under Western Australian Conditions Soet W.J. and Barnsley R. Main Roads Western Australia ABSTRACT Main Roads Western Australia manages an extensive arterial
More informationSTRUCTURAL DEFORMATION CAUSED BY AERODYNAMIC EXCITATIONS DURING THE PASSING OF MAGLEV VEHICLES
BBAA VI International Colloquium on: Bluff Bodies Aerodynamics & Applications Milano, Italy, July, 20-24 2008 STRUCTURAL DEFORMATION CAUSED BY AERODYNAMIC EXCITATIONS DURING THE PASSING OF MAGLEV VEHICLES
More informationSBB Infrastructure, Measurement and Diagnostic Technology.
SBB Infrastructure, Measurement and Diagnostic Technology. Your partner for testing railway technology. Contents. Measurement and Diagnostic Technology 4 3 Infrastructure diagnostics 6 Running gear technology
More informationStrategic Plan for Control Period 5, 2014 2019. Issue Two 2015-2016
Infrastructure Standards Committee Strategic Plan for Control Period 5, 2014 2019 Issue Two 2015-2016 Approved by the Infrastructure Standards Committee 05 March 2015 ISCC/020 Email: enquirydesk@rssb.co.uk
More informationStop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
More informationThe Influence of Aerodynamics on the Design of High-Performance Road Vehicles
The Influence of Aerodynamics on the Design of High-Performance Road Vehicles Guido Buresti Department of Aerospace Engineering University of Pisa (Italy) 1 CONTENTS ELEMENTS OF AERODYNAMICS AERODYNAMICS
More informationTram-train in the UK?
Tram-train in the UK? INCOSE 25 th February 2009 By Giles Thomas What is a tram train? a light rail vehicle capable of operating on a street tramway and a conventional railway What is tram train? A combination
More informationFREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011. Environmental Protection Agency (EPA)
FREQUENTLY ASKED QUESTIONS: National Response to I-131 from Japan Nuclear Power Plant March 27, 2011 Environmental Protection Agency (EPA) Are the levels we re seeing in precipitation likely to lead to
More informationRail research Successes and challenges
Rail research Successes and challenges DEUFRAKO 30 ans de coopération francoallemande dans le domaine de la recherche sur les transports Alain Le Guellec, SNCF Direction de l Innovation et de la Recherche
More informationArrival and Departure. Information for disabled passengers and passengers with reduced mobility at Frankfurt Airport
Arrival and Departure Information for disabled passengers and passengers with reduced mobility at Frankfurt Airport Valid from 1.9.2011 i Please note, that due to ongoing construction works within the
More informationDriver - Vehicle Environment simulation. Mauro Marchitto Kite Solutions
Driver - Vehicle Environment simulation Mauro Marchitto Kite Solutions Summary From the DVE to the SSDrive tool Overview of SSDrive model Matlab Simulink SSDrive model SSDrive model validation: VTI driving
More informationRoads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time?
Roads Task Force - Technical Note 10 What is the capacity of the road network for private motorised traffic and how has this changed over time? Introduction This paper forms one of a series of thematic
More informationOur Group strategic framework
Our Group strategic framework The Executive Committee focuses on evolving and delivering the Group strategy. For 2012, the Group strategic framework has been refreshed. Our purpose (why we exist) Network
More informationMastering very high speed
Mastering very high speed François Lacôte Senior vice president March 2008 A history of speed in France 1972 Gas turbine unit TGV001 achieved 318km/h (197.6 mph) 1978 Pre-series PSE achieved 260 km/h (161.6
More informationw o r k o G f E A x - p r S i t n c e Elegance and Strength BBR HiAm CONA Strand Stay Cable Damping Systems
e o b a l N e t w o r k l o G f E A x - p r S i t n c e 1 9 4 4 - s Elegance and Strength BBR HiAm CONA Strand Stay Cable Damping Systems 1 Cable vibration and damping Despite the wide use of cable-stayed
More informationMethods of Technical Risk Assessment in a Regional Context
Methods of Technical Risk Assessment in a Regional Context Principles and methods for risk evaluation Wolfgang Kröger, Professor and Head of former Laboratory for Safety Analysis (www.lsa.ethz.ch) Founding
More informationHigh Speed Driver Competency and Training
High Speed Driver Competency and Training CODE OF PRACTISE DRIVER DEVELOPMENT What competency should a High Speed Driver have and if training is necessary, what training? Joint Emergency Service High Speed
More informationOpening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima
Opening of Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima Introduction In preparation for the December 2010 opening of the Tohoku Shinkansen
More informationParameter identification of a linear single track vehicle model
Parameter identification of a linear single track vehicle model Edouard Davin D&C 2011.004 Traineeship report Coach: dr. Ir. I.J.M. Besselink Supervisors: prof. dr. H. Nijmeijer Eindhoven University of
More informationChapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
More informationAnalysis of intersection accidents - An accident causation and prevention perspective
Analysis of intersection accidents - An accident causation and prevention perspective Julia Werneke 1 & Mark Vollrath 2 1 Chalmers University of Technology, Goteborg, Sweden 2 TU Braunschweig, Braunschweig,
More informationEvaluation of traffic control policy in disaster case. by using traffic simulation model
19th ITS World Congress, Vienna, Austria, 22/26 October 2012 AP-00345 Evaluation of traffic control policy in disaster case by using traffic simulation model DAISUKE OSHIMA 1*, SHINJI TANAKA 2, TAKASHI
More informationGreen Global NCAP labelling / green scoring Workshop, 30.04.2013
Green Global NCAP labelling / green scoring Workshop, 30.04.2013 Homologation test cycles worldwide Status of the WLTP Heinz Steven 13.04.2013 1 Introduction Road vehicles have to comply with limit values
More informationBriefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013
Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles
More informationSafety performance of traffic management at major motorway road works
Safety performance of traffic management at major motorway road works Prepared for Safety Standards and Research, Safety and Information Division, Highways Agency M Freeman, J Mitchell and G A Coe TRL
More informationBogie subsystems. Wheel flange lubrication. Extract from the Railway technical handbook, volume 1, chapter 9, page 176 to 181
Bogie subsystems Wheel flange lubrication Extract from the Railway technical handbook, volume 1, chapter 9, page 176 to 181 Railway technical handbook Volume 1 Axleboxes, wheelset bearings, sensors, condition
More informationTurnout Geometry Optimization with Dynamic Simulation of Track and Vehicle
Turnout Geometry Optimization with Dynamic Simulation of Track and Vehicle J. Rainer Oswald VAE Aktiengesellschaft, PO Box 1, 874 Zeltweg, Austria Abstract This paper describes a new method for turnout
More informationNetwork Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008
Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption
More informationApplicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC)
Applicable standards in CR Rolling stock - Freight wagons TSI (2006/861/EC) Click here to enter text. ERA 1.0 Page 1/13 Standards or other documents referred to in the rolling stock- freight wagons TSI
More informationHigh speed train vehicle dynamics. challenges and opportunities
High speed train vehicle dynamics challenges and opportunities NSJT 2012 Rickard Persson On the agenda The vehicle The organization in a vehicle dynamics point of view Opportunity: Influence the track
More informationRelevant parameters for a reference test track Deliverable D1.7
RIVAS Railway Induced Vibration Abatement Solutions Collaborative project Relevant parameters for a reference test track Deliverable D1.7 Submission date: 20/08/2012 Project Coordinator: Bernd Asmussen
More informationwww.siemens.com Siemens AG Mobility Division Nonnendammallee 101 13629 Berlin Germany
Siemens AG Mobility Division Nonnendammallee 101 13629 Berlin Germany Siemens AG 2014 Printed in Germany HL 14069151 PA 08140.5 Dispo 21704 Order No.: A19100-V800-B813-V3-7600 ICE and ICx are registered
More informationA New Impact Scenario for P-V Tram Certification
A New Impact Scenario for P-V Tram Certification Authors Marco ANGHILERI * Luigi-M L CASTELLETTI * Matteo PIROLA * Fabio PISTOCHINI * and Stefano RAITI ** Affiliations * Politecnico di Milano, Department
More informationRail Roughness Monitoring in the Netherlands
Rail Roughness Monitoring in the Netherlands A.H.W.M. Kuijpers M+P consulting engineers, P.O. Box 2094, 5260 CB, Vught, The Netherlands Tel.: +31 73 6589050; Fax: +31 73 6589051 ArdKuijpers@mp.nl Summary
More informationEmbedded Rail Slab Track
Embedded Rail Slab Track 01 Commissioned section of the BBEST system on the West Coast Main Line at Crewe in September 2003 Balfour Beatty Rail has developed, for supply to railway clients, main contractors
More informationSARTRE: SAfe Road TRains for the Environment
SARTRE: SAfe Road TRains for the Environment Arturo Dávila Mario Nombela IDIADA Automotive Technology SA London Heathrow, September 21, 2010. The research leading to these results has received funding
More informationINTRODUCTION TO BEAMS
CHAPTER Structural Steel Design LRFD Method INTRODUCTION TO BEAMS Third Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering Part II Structural Steel Design and Analysis
More informationVEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST
Proceedings of: JRC2002 The 2002 ASME/IEEE Joint Rail Conference April 23-25, 2002, Washington D.C. VEHICLE POSTMORTEM AND DATA ANALYSIS OF A PASSENGER RAIL CAR COLLISION TEST Robert A. MacNeill and Steven
More informationStationary uplift measurement as a diagnostic tool for pantograph monitoring. H. Möller, H. Maly, B. Sarnes
Stationary uplift measurement as a diagnostic tool for pantograph monitoring H. Möller, H. Maly, B. Sarnes Abstract: The present paper describes a prototype of an automatic uplift measurement system capable
More informationCASE STUDY. JNIOSH (National Institute of Occupational Safety & Health, Japan) Reproduction of Multi-modal Sensation.
CASE STUDY JNIOSH (National Institute of Occupational Safety & Health, Japan) Reproduction of Multi-modal Sensation Japan Automotive NVH Simulator Traditionally, a single- or multi-degree-of-freedom (DOF)
More informationsiemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021
siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 Product description One train consists of three cars in the configuration Mc-M-Mc. The cars at the front and at
More informationRural Road Safety Policy in Korea: Lesson Learned
Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development Nov. 17 th, Seoul Rural Road Safety Policy in Korea: Lesson Learned Sangjin HAN Korea Transport Institute
More informationRail Vehicle Dynamics (SD2313), 8 credits
11-01-11, Rev 1 Course Description Rail Vehicle Dynamics (SD2313), 8 credits Academic year 2010/2011, period 3 (January - March 2011) Teachers MB = Mats Berg, phone: 08-790 84 76, e-mail: mabe@kth.se AO
More informationand fuel consumption from new cars: Assessing the near-term technology potential in the EU
www.theicct.org Briefing January 2013 Reducing CO 2 and fuel consumption from new cars: Assessing the near-term technology potential in the EU 1. Effect of the EU-CO 2 regulation The average CO 2 emissions
More informationAnalysis of Accidents by Older Drivers in Japan
Analysis of Accidents by Older Drivers in Japan Kazumoto Morita 1, Michiaki Sekine 1 1 National Traffic Safety and Environment Laboratory, Japan Abstract Since Japan is a rapidly aging society, ensuring
More informationDeveloping Safety Management Systems for Track Workers Using Smart Phone GPS
, pp.137-148 http://dx.doi.org/10.14257/ijca.2013.6.5.13 Developing Safety Management Systems for Track Workers Using Smart Phone GPS Jin-Hee Ku 1 and Duk-Kyu Park 2 1 Dept of Liberal Education and 2 Dept
More informationManaging Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
More informationAcoustic design according to room shape
Acoustic design according to room shape The shape of the room defines the movement of the sound waves within the room. Placement of acoustic materials should be determined by the way the sound moves in
More informationSimulator Training Emergency Vehicles Exclusion Criteria (T1)
Exclusion (T1) Exclusion (T1) A) This programme is limited to skills training only. The driving activities are practiced until they are carried out perfectly. B) The programme is clearly aimed at sporting
More informationEN 1991-1-4:2005. Wind actions
EN 1991 Eurocode 1: Actions on structures Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1991-1-4:2005 Wind actions EN 1991-1-4:2005 Contents Brussels, 18-20 February
More informationNoise Evaluation of Shinkansen High-speed Test Train (FASTECH360S,Z)
Noise Evaluation of Shinkansen High-speed Test Train (FASTECH360S,Z) H.Yamada, Y.Wakabayashi, T.Kurita, M.Horiuchi R&D Center of JR East Group, East Japan Railway Company, Saitama, Japan Abstract Noise
More informationEurotunnel Group: Revenue increase in 2015. Revenues from Shuttle Services increased by 5% to 579.7 million
PRESS RELEASE January 06 Eurotunnel Group: Revenue increase in Revenues for the year, excluding MyFerryLink, increased by 5% to. billion Channel Tunnel Fixed Link Revenues from Shuttle Services increased
More informationAbstract. 1 Introduction
Assessment of flood risks in polders along the Dutch lakes F. den Heijer* & A.P. de LoofP WL\delft hydraulics ^Ministry of Transport, Public Works and Water Management, Directorate General of Public Works
More informationTips and Technology For Bosch Partners
Tips and Technology For Bosch Partners Current information for the successful workshop No. 04/2015 Electrics / Elektronics Driver Assistance Systems In this issue, we are continuing our series on automated
More informationRail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005
Rail Accident Report Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005 Report 03/2006 This investigation was carried out in accordance with: The Railway
More information