1 SYSTEMS OF TRACK INFRASTRUCTURE SAFETY at AMTRAK John Parola, (formerly Chief Engr.Track, Amtrak) currently VP, HNTB Inc., Philadelphia, PA Conrad Ruppert, Jr. Division Engineer, Amtrak, Boston, MA INTRODUCTION: America made a conscious decision to venture into regular high-speed rail operations in the late 1970 s. By 1983, Amtrak s Metroliner was operating at a maximum speed of 120 MPH and in 1986 permission was granted by the FRA to go to a maximum of 125 MPH. In 1990 Amtrak received permission to operate though curves at up to 5 of cant deficiency (unbalance). By the early 1990 s America was ready to move forward into implementing a new generation of high-speed rail operations in the United States on Amtrak s Northeast Corridor. In 1998 new safety standards for high-speed rail operations for Class 6, 7, 8 & 9 were finalized and in December 2000 Amtrak put into revenue service our ACELA Express Trainset that operates at speeds up to 150 MPH and a maximum cant deficiency of 7 through curves. Unlike high-speed operations in Europe, Amtrak does not have a dedicated roadbed for high-speed trains, nor have we completely rebuilt our roadbed with new materials. In fact, what is so interesting is that Amtrak has implemented America s high-speed rail operations on what is one of the most unique, diverse, and challenging infrastructures in the world. This was accomplished through engineering ingenuity, partnerships with the FRA and other key elements of the railroad industry, and the technical know how and competence of Amtrak s Engineering Department. This presentation is about how we keep our railway safe. It is about the people, the infrastructure and the processes. Amtrak owns and operates on 1,744 miles of infrastructure in the Northeast Corridor. The infrastructure is operated and maintained up to and including FRA Class 8 with a maximum operating speed of 150 MPH. We enable safe train operations of our diverse physical plant (wood tie, concrete tie, freight, commuter, and high-speed trains) by employing multiple systems of safety. It is what we call a multi-faceted holistic approach to Track Infrastructure Safety. We believe our inspections, training, testing, standards, and quality assurance processes are second to none! This presentation will outline the systems and methodology we use, the challenges we face, and the philosophy we employ that enables each and every one of us within the Engineering Department to sleep well at night. We are extremely proud of the safety services we deliver to our employees and the traveling public. OUR GUIDING PHILOSOPHY: Safety is our highest priority! It is written on the first page of our operating rulebook that, SAFETY is of first importance in the discharge of duty. This guiding principle is the first responsibility of every employee. Focusing on safety has also proven to be the most cost effective, least capital-intensive approach to operating a successful railway business

2 As Amtrak s primary business is the transport of people, the value of human life remains in the forefront of our decisions regarding the safety of our operations, the track infrastructure, and the methods we employ to build and maintain the track. Consequently, multiple, redundant systems of safety must be in place to ensure the safety of our employees and the traveling public. That is to say, we expect that it is entirely possible to have one of our safety systems fail without compromising the safety of our track or the people riding over it. CHALLENGES: Amtrak maintains the track infrastructure on the Northeast Corridor for a diverse traffic base. We offer three levels of passenger service, Acela Express, Acela Regional, and Inter-City/Mail & Express trains. Operations also support seven commuter agencies and five freight railroads. Each of these different train types presents a unique challenge to the track infrastructure. The table below illustrates the maximum operating speeds for each service and the FRA track class for that service. SERVICE MAXIMUM SPEED FRA TRACK CLASS Acela Express 150 MPH 8 Acela Regional 125 MPH 7 Intercity/Mail & Express 90 MPH 5 Commuter 110 MPH 6 Freight 60 MPH 4 Given the frequency of operations, both during the daylight commission hours for most passenger service and at night for the through freight service, there are limited windows of opportunity for track construction and maintenance operations. The combination of services also requires strict adherence to tight track geometry standards for high-speed operations while at the same time providing the track strength and durability needed to support heavy-axle load freights. With this in mind, our track inspection processes must be able to identify very small geometry deviations and must detect weak points in the track structure prior to them becoming failed conditions. Lastly, on-track protection of our people in this busy corridor presents it s own unique challenges. The volume and speed of trains in multiple-track electrified territory is an everyday challenge to our people, a challenge that must be faced with attention to safety at all times. To illustrate our unique operating environment, the diagram below depicts a typical configuration of the tracks in multiple-track territory.

3 One additional challenge worth mentioning, while our high-speed train sets operate up to a maximum of 7 inches of cant deficiency on our curves, the freight trains may operate in an over-balance condition. Thus our rail profile, lubrication and work methods must consider these extremes. THE TRACK INFRASTRUCTURE: The infrastructure is complex. Here are a few examples that depict the diversity of our physical plant. ΠThe track configuration at Penn Station New York is a complex maze of slip switches that are unique in many regards. Add to that nearly 1,200 daily train movements within this 21 track, seven tunnel station area in downtown Manhattan; ΠThe NEC has both conventional wood timbered interlockings as well as high-speed interlockings with concrete tied No.32.7 movable-point frog crossovers; ΠThe track structure consists of both concrete tied track for high-speed operation as well as conventional wood tie track; ΠAs is the case with most railroads, the challenge of providing adequate drainage to our infrastructure is ever present, particularly in urban areas; ΠThe Northeast Corridor is electrified in its entirety between Washington, DC and Boston, MA. Maintaining the track in electrified territory is challenging, both from the perspective of maintain proper track and wire alignment, as well as the constraints imposed on work methods allowed under the wire. ΠThere are 11 functional movable bridges on the route, most of which were built in the early 1900 s. ΠThere are 12 tunnels totaling 20.6 miles, seven of which lead into and out of Pennsylvania Station in New York City. SYSTEMS OF TRACK SAFETY: As mentioned earlier, we have multiple redundant systems of safety. These systems together enable safe train operations on the Northeast Corridor. The systems can be grouped into five categories: 1. Training and Preparedness; 2. Standards, Inspections, and Audits;

4 3. Applied Technology and Trend Analyses; 4. Targeted Track Maintenance and Renewal. 1. Training and Preparedness: Training of our supervisors, foremen, and track inspectors provides the base support to our safety systems. To obtain qualifications in these classes requires the following for Track Supervisors and Track Foremen: Track Track SUPERVISOR and FOREMAN Supervisor Foreman Training and Qualification Requirements: Requalify: Requalify: Roadway Worker Protection (RWP) Annually Annually Track Safety, Maintenance and Construction Standards 3 years 3 years (MW-1000) CWR Training and Exam 1 time 1 time ARASA Supervisor Exam 1 time 1 time Inspection of High-Speed Track Training 1 time 1 time Electrical Operating Instructions (AMT-2) 2 years 2 years Operating Rules & Instructions (NORAC) Annually Annually Physical Characteristics 1 time Annually Training and qualification requirements for Track Inspectors are as follow: FRA Class FRA Class TRACK INSPECTOR 1 thru 5 6 thru 9 Training and Qualification Requirements: Requalify: Requalify: Roadway Worker Protection (RWP) Annually Annually Track Safety, Maintenance and Construction Standards 3 years 3 years (MW-1000) CWR Training and Exam 1 time 1 time ARASA Supervisor Exam 1 time 1 time Inspection of High-Speed Track Training 1 time 1 time Electrical Operating Instructions (AMT-2) 2 years 2 years Operating Rules & Instructions (NORAC) Annually Annually Physical Characteristics Annually Annually Track Inspection Work Experience 1 year 5 years (Inspection of Class 4 or higher track) Additionally, we have in place a course entitled High Impact Track Inspection. Within this course, extensive training is given focused on the detection of track defects. Following classroom instruction, track inspectors and foremen receive one on one field mentoring from qualified instructors. During this time, hands-on defect detection and

5 measurement techniques are demonstrated and practiced. At the end of the training, the inspector must demonstrate his/her proficiency and the mentor completes a rating sheet. The sheet will either indicate the inspector is proficient or it will depict areas where further follow up training is required. Ensuring that the track inspectors and foremen have the necessary tools and knowledge to perform their safety sensitive work competently is the desired output from this foundational training. There is one common theme that is drilled throughout the training and that is WHEN CONDITIONS WARRANT, THERE IS NEVER AN EXCUSE TO NOT PLACE A REQUIRED SLOW ORDER ON THE TRACK TO ENSURE SAFETY! 2. Standards, Inspections and Audits: Standards: Our track safety standards are defined in our book entitled the Limits and Specifications for the Safety, Maintenance and Construction of Track (MW-1000). This manual was compiled by teams of track experts at Amtrak and from the railway industry as a whole. It evolved from the earlier predecessor roads, (e.g. The Pennsylvania Railroad, The Penn Central, etc.), with a significant revision occurring in September Amtrak s current book has sections defining track safety standards, track maintenance limits, and track construction specifications. In addition, the book contains additional sections specific to track buckling counter measures, miter rail systems, high-speed track geometry, turnouts and crossings and specialty trackwork. Our goal at Amtrak is to maintain the track between the new construction specifications and the maintenance limits. As track deteriorates, we flag track geometry defects at the maintenance thresholds. Once a defect condition is at the maintenance limit we target the section of track for work to return it to a state of repair below the maintenance limits. The challenge to keep maintenance defects from becoming safety defects is met with trend analyses and degradation prediction models. Track surfacing, gauging, and curve rail or component replacement are the most frequent actions taken to correct conditions. Capital program work is planned around the elimination of root cause conditions that underlie our Track Geometry Car (TGC) defects. Safety Standards are the bare minimum allowable for a specific class of track. Slow orders are placed immediately when a safety defect is observed through either field inspections or when one of our automated Track Geometry Measuring Cars identifies a defect. As we progress in our efforts to upgrade the track structure of the Northeast Corridor, safety level defects have become the rare exception rather than the norm. Amtrak also published an Engineering Practices Manual and a portfolio of Standard Plans. These provide detailed information to both engineering managers and field supervisors to ensure consistency and safety in all aspects of track inspection, maintenance, and construction. They included detailed plans, material specifications, and accepted work methods. Both the manual and portfolio are updated routinely as new technologies emerge, as new materials become available, and as work methods change.

6 Inspections: Amtrak performs a variety of inspections of the track infrastructure that include visual walking & hi-rail inspections and automated rail vehicle based measurements. Our inspections either meet or exceed FRA inspection requirements. In addition to the inspections performed on Amtrak owned and/or maintained right-of-way, an annual Track Geometry Car Inspection is made on all routes traversed by Amtrak trains throughout the United States. Engineering managers and supervisors of the host railroad are invited and encouraged to ride their respective territories. Detailed exception reports and brush charts are provided to the host railroad at the end of each line segment. The type and frequency of inspections we perform are summarized in the following table: Type of Inspection Track Class Frequency Exceeds FRA Requirements? Track Geometry Measuring 1 3 Annually Yes System (TGMS) days (15-days preferred) Yes days Yes (15-days preferred) Gage Restraint Measuring 1 5 Annually Yes System (GRMS) 6 & 7 Annually Yes 8 Annually Same Internal Rail Flaw Detection 1 5 Semi-Annually Yes (Automated) 6 8 Semi-Annually Same Internal Rail Flaw Detection 1 2 NA Yes Turnouts, Crossovers & Miter 3 5 Semi-Annually Yes Rails (Hand Testing) 6 8 Semi-Annually Yes Visual Track Inspections 1 8 Semi-Weekly Same (Walking and Hi-Rail) Joint Switch Inspection 1 8 Monthly Yes (Track and C&S) Miter Rail and Expansion 1 8 Monthly Yes Joint Inspection Joint Miter Rail and Movable 1 8 Monthly Yes Bridge Inspection (All Disciplines) Automated Remote 8 Daily Same Monitoring System (ARMS) Detailed Switch Inspection 1 8 Annually Yes Head-End Riding Inspection 1 8 Monthly Yes Right-of-Way Inspection 1 8 Semi-Annually Yes (Walking or Hi-Rail) (Spring & Fall) Special Inspections (Flood, Fire, Temperature Extremes) 1 8 As Required Same

7 It is worth noting several key elements in our automated inspection process and to provide more details on these inspections. As noted in the table below, the frequency of automated tests shows a significant shift from traditional applications. Twice within 60- Track Geometry Measuring System (TGMS) Track Description Inspection Frequency FRA Regulation Minimum EP2007* Preferred EP2007* Segments with track Every 30-days Every 15-days speed è 125 MPH (1) days Segments with track Twice within Every 30-days Every 30-days speed è 110 MPH (2) 120-days Segments with track Not Regulated Every 90-days Every 45-days speed è 90 MPH Other main tracks, Not Regulated Annually Every 6 months terminals, turnouts, and crossovers (3) Contract Carrier Not Regulated Every 2 Years Annually Routes (4) Commuter Contract Operations Not Regulated As Required by the Contract (1) Not less than 15-days between inspections (2) Not less than 30-days between inspections (3) The TSAVe may be used to perform track geometry testing on these routes (4) As needed based on ARMS surveys or request from the Route Engineer * EP2007 Section 2007 of Amtrak s Engineering Practice Manual Track Structure Assessment Vehicle (TSAVe) Track Description Inspection Frequency FRA Regulation Minimum EP2007* Preferred EP2007* Segments with track Annually Annually Annually speed è 125 MPH (1) Segments with track Not Regulated Annually Annually speed è 110 MPH Other main tracks, terminals, turnouts, and crossovers (2) Not Regulated Annually Annually (1) Not less than 180-days between inspections (2) Amtrak Northeast Corridor routes only. (3) The TSAVe may be used to perform track geometry testing on these routes * EP2007 Section 2007 of Amtrak s Engineering Practice Manual We depend on these frequent tests to determine the predictability and progression of defects. The goal of this inspection regime is to significantly reduce, if not eliminate, safety level defects. This approach to inspection also ensures that the progression of

8 deteriorated conditions is tracked to allow maintenance intervention at the appropriate time and level to minimize both costs and impacts on train operations. These technologybased tools are highly valued and have become the key drivers of our track work activities. Audits: In addition to inspections, Amtrak s Engineering Management Team performs a series of inspection audits to verify that the required frequencies of inspections are met and that the quality of inspections is consistent with our rigorous safety standards. Managers at both the Division and System level carry out these audits as described in the following table: Type of Audit Supervisor s Audit of Inspection Records Asst. Division Engineer Track Audit (Accompanies each Track Inspector over territory) Engineering Inspection Record Audit (performed by System Engineering teams) Interlocking Inspection Audit (performed by System Engineering teams) Track Class Frequency Exceeds FRA Requirements? 1 8 Monthly Yes 1 8 Annually Yes 1 8 Semi-Annually Yes 1 8 Bi-Annually Yes 3. Applied Technology and Trend Analyses: Amtrak owns and operates two track geometry-measuring cars and one self-propelled Track Structure Assessment Vehicle (TSAVe) that has both a Gage Restraint Measuring System (GRMS) and contact Track Geometry Measuring System. Both track geometry cars are converted passenger coaches, (the ATK10002 is an Amfleet coach and the ATK10003 is an Acela Express coach.) The cars operate in regular passenger train consists, measuring track geometry, catenary geometry, and ride quality at normal track speeds (up to 150 MPH.) Measurement location is determined by a GPS based system. These tools drive most, if not all that we do in the track maintenance area as well as the development of our annual track capital programs. Given the frequency of inspections, vast quantities of inspection and measurement data are recorded, compiled, and stored. Turning this measured data into useful and accessible engineering management information led to the development of two information management systems. Commonly referred to as the AMM and GEO systems, they provide both a relational database of asset information and graphic visualization tools to evaluate historical data and to perform trend analyses of the track s performance and deterioration.

9 A typical view of the graphic visualization provided by the AMM System is shown below. This view has windows depicting Track Layout, Design & Measured Cross-Level, Geometry Exceptions, Measured Gage, Alignment, Profile, and Catenary Height. This visualization tools provides the ability to zoom and scroll on the selected views. Additional windows of data can be added and can be based on pre-defined data plots, file plots, date-based information or comments. The export of the data in text or spreadsheet format from the displayed in the windows is also possible for more detailed analysis and trending. The system provides open access to the asset information at all levels within the Engineering Department, from Track Inspector to Chief Engineer and provides the means to accurately located track geometry defects, to relate defects to track features, and to perform root cause analysis of poorly performing sections of track. In addition, the asset information database provides the means to plan track maintenance and renewal activities, both from a tactical and strategic perspective. 4. Targeted Track Maintenance and Renewal: As mentioned earlier our track programs are formulated from data collected by our track geometry measuring cars. In addition, we perform field walkouts to verify the required need, perform root-cause analyses, and program our work accordingly. Targeting work

10 on a needs basis enables us to stay two steps ahead of the track geometry challenges that present themselves on our diverse infrastructure. Seamless within our programmed work is a quality rating system for both maintenance and construction activities. This quality system is built off our standards and our people are continually challenged to deliver work that meets or exceeds our standards numerical rating system. We are driven by the tight standard requirements for high-speed train operations and even the simplest tasks have technical consequences. The methods we use to make our field welds, transpose rail, surface track, change pads and insulators on our concrete ties, spot surface and spot gage all become a technically complex process when we consider their affect on the high speed vehicles that traverse the railway. Our new Acela Express train has indeed changed the way we do business with track maintenance and construction. A SUCCESS STORY: The following is a story, which illustrates our focus on safety and how our systems approach can lead to success. The story is about how we moved our railway s track geometry from meeting FRA Class 7 with some exceptions to exceeding FRA Class 8 standards today. We did it By using a team approach with both system and division crews involved; Through the application of sound engineering principles; With a lot of hard work by dedicated employees, and; Without a lot of money. The story is called COUNTDOWN TO ACELA. COUNTDOWN TO ACELA began in early Having received early modeling reports on our new high-speed train set, we learned that it might react unfavorably to certain types of track geometry conditions. Amongst these were change in gage in 31 feet that could not exceed ½ inch, multiple chord defects that would excite the new vehicle and vertical profile changes to include a short warp defect that would occur within 10 feet. With this information in hand we set our track geometry car up to detect Class 8 defects and routinely tested the Northeast Corridor during the 18 months prior to the introduction of our new service. We also implemented a new policy whereby speed restrictions were applied IMMEDIATELY from the track geometry car as soon as a Level 1 geometry defect was detected and prior to field verification. After making our first couple of runs, we found that even if we repaired a gage change condition it could recur or move down the railway. Our wood interlockings, with cut spike construction had too much play in them to hold to the tight geometry parameters. After our initial runs, we identified safety and maintenance defects. We also placed many slow orders on the railway, which did not make us too popular with the operating

11 department. Clearly, we had a difficult challenge ahead and the following steps took us to success. Step 1. Identify the key need locations; Step 2. Conduct a field walkout inspection of each interlocking with a team of experts to come up with a site-specific solution; Step 3. Replace timbers and install Pandrol fasteners in our wood interlockings located in high-speed territory; Step 4. Re-align the track and turnouts using laser liners to place the normal side of all turnouts to perfect gage with little or no variation; Step 5. Field weld short leg frogs, spot undercut and surface as conditions warrant; Step 6. Target patch CWR areas and curve pad and insulator replacements to correct gage conditions Step 7. Instituted the policy of operating our TGC every two weeks at nights. On the car were the Chief engineer of Maintenance, Chief Engineer of Track, Division Engineer, and his staff down to the Track Supervisor, the director of Track Geometry and the Senior Director of Track Maintenance. (We all bonded and came together to work as a team and ready our roadbed for ACELA EXPRESS.) Step 8. Analyze trends and use predictability models to complement our process of targeting key area for work activities. Step 9. Conduct additional field walkout inspections as needed to ensure success. In the end, we made it happen. As you can see from the following graph, Level 1 geometry defects decreased from a high of 70+ in April 1999 to less than 5 in May Today, we consistently have runs with less than 5 Level 1 defects, often with none at all! Our work on maintaining this track geometry is not done. In fact, it is like and similar to all work on safety in that the challenge is ever present.

12 What We Learned: ΠWe learned that together we are better, that is when all engineering members focused on the same goal we will be successful. ΠWe learned that track infrastructure safety on Amtrak requires multiple, redundant systems of safety to enable the day-to-day delivery of a safe track infrastructure. ΠWe learned that not everything had to be renewed and that as an engineering team we can be creative and maximize our dollars to achieve desired results. ΠLastly, we learned that hard work could be rewarding and fun. Here is a picture taken at midnight some time in late 1999 when we achieved our TGC run northward from Washington to NY without any safety defects. Since then, we have completed round trip runs from Washington to Boston without any defects. CONCLUSION: This paper is presented on behalf of our entire Amtrak Engineering Team. We have successfully launched America's first high speed train as "One Team, One Amtrak. We are proud and we well know that our work on Track Infrastructure Safety will never be complete. It is what we do, it is our core competency, and we believe our Track Infrastructure Safety processes are second to none. SAFETY FIRST LIVE IT!

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions

WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions WMATA S Automated Track Analysis Technology & Data Leveraging for Maintenance Decisions 1 WMATA System 6 Lines: 5 radial and 1 spur 234 mainline track miles and 91 stations Crew of 54 Track Inspectors

More information

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs

Why NEC FUTURE? 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS. Study Partners. Key Needs 457 MILES LONG 2,200 DAILY TRAINS 750,000 DAILY PASSENGERS THE NEC IS THE BUSIEST RAIL CORRIDOR IN THE NATION, AND IS VITAL TO THE ECONOMY AND CITIES OF THE NORTHEAST. Why NEC FUTURE? The Northeast United

More information

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and

Integration of PTC and Ride Quality Data. Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier. and Integration of PTC and Ride Quality Data Presented by: Wabtec Railway Electronics, I-ETMS PTC Supplier and dfuzion, Inc., rmetrix Ride Performance Assessment System Supplier The FRA mandate to implement

More information

Chapter 3. Track and Wheel Load Testing

Chapter 3. Track and Wheel Load Testing Chapter 3 Track and Wheel Load Testing This chapter describes the track, truck, and testing equipment that were used by the Transportation Technology Center, Inc. (TTCI) for collecting the data that was

More information

Framework for Short-Line Railroad Track Asset Management and Condition Reporting

Framework for Short-Line Railroad Track Asset Management and Condition Reporting Framework for Short-Line Railroad Track Asset Management and Condition Reporting Michael N. Grussing 1, and Donald R.Uzarski, Ph.D., RE. 2, 1. Research Civil Engineer, Engineer Research and Development

More information

AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility

AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment

More information

Wilmington to Newark Commuter Rail Improvement Project

Wilmington to Newark Commuter Rail Improvement Project Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion

More information

CSX Track Chart and Engineering Information System

CSX Track Chart and Engineering Information System Roy Anderson (CSX Transportation), David Maas (CSX Transportation), Brian Mack (Optram, Inc.), Ted Selig (Optram, Inc.) September 10, 2000 ABSTRACT Railroads have made a considerable investment in information

More information

ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS

ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS ACQUISITION AND PROCUREMENT: NEW JERSEY HIGH-SPEED RAIL IMPROVEMENT PROGRAM HAS COST AND SCHEDULE RISKS Audit Report OIG-A-2015-012 June 17, 2015 DRAFT REPORT Page intentionally left blank NATIONAL RAILROAD

More information

Railway Track Design

Railway Track Design Chapter Railway Track Design Basic considerations and guidelines to be used in the establishment of railway horizontal and vertical alignments. The route upon which a train travels and the track is constructed

More information

Industry Track Inspection

Industry Track Inspection Industry Track Inspection Track Supervisor Phone Number 1 TABLE OF CONTENTS INTRODUCTION 3 GAUGE 4 ALINEMENT 6 TRACK SURFACE 8 BALLAST 11 CROSSTIES 13 DEFECTIVE RAILS 16 RAIL JOINTS 17 TURNOUTS 18 OTHER

More information

Briefing On New Jersey High Speed Rail Improvement Program. October 10, 2012

Briefing On New Jersey High Speed Rail Improvement Program. October 10, 2012 Briefing On New Jersey High Speed Rail Improvement Program October 10, 2012 Limits Of Work: Trenton To New Brunswick I Ladder In Pennsylvania Station New York New Frequency Converter At Metuchen Amtrak

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

21ST CENTURY RAILROADS: SAFETY THROUGH TECHNOLOGY

21ST CENTURY RAILROADS: SAFETY THROUGH TECHNOLOGY MONITORING ASSET HEALTH THROUGH ADVANCED TECHNOLOGY With 28,000 locomotives, more than 1.4 million rail cars and enough rail to circle the earth more than thirteen times, railroads rely on advanced technologies

More information

FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * *

FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING * * * FLEXURAL PERFORMANCE REQUIREMENTS FOR PRESTRESSED CONCRETE TIES BY FACTORING By P. Jeffrey McQueen, P.E., Consulting Engineer Abstract The AREMA Manual for Railway Engineering, Chapter 30, Part 4, gives

More information

IV. INDUSTRIAL TRACK DESIGN

IV. INDUSTRIAL TRACK DESIGN IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these

More information

Rail Automation. What is ACSES? usa.siemens.com/rail-automation

Rail Automation. What is ACSES? usa.siemens.com/rail-automation Rail Automation What is ACSES? usa.siemens.com/rail-automation What is ACSES? Siemens, a specialist in the area of US Cab Signal design, offers a carborne product that provides both Civil Speed Enforcement

More information

GOVERNANCE: Improved Policies, Practices, and Training Can Enhance Capital Project Management DRAFT. Audit Report OIG-A-2014-009 July 15, 2014

GOVERNANCE: Improved Policies, Practices, and Training Can Enhance Capital Project Management DRAFT. Audit Report OIG-A-2014-009 July 15, 2014 GOVERNANCE: Improved Policies, Practices, and Training Can Enhance Capital Project Management July 15, 2014 DRAFT This page intentionally left blank. NATIONAL RAILROAD PASSENGER CORPORATION REPORT HIGHLIGHTS

More information

SOLIDWORKS SOFTWARE OPTIMIZATION

SOLIDWORKS SOFTWARE OPTIMIZATION W H I T E P A P E R SOLIDWORKS SOFTWARE OPTIMIZATION Overview Optimization is the calculation of weight, stress, cost, deflection, natural frequencies, and temperature factors, which are dependent on variables

More information

Northeast Corridor State of Good Repair Spend Plan

Northeast Corridor State of Good Repair Spend Plan Northeast Corridor State of Good Repair Spend Plan Prepared by Amtrak Under Section 211 of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432) Submitted to the U.S. Secretary

More information

National Railroad Passenger Corporation AMTRAK. Fiscal Years 2013 2017 Five Year Plan. May 2013

National Railroad Passenger Corporation AMTRAK. Fiscal Years 2013 2017 Five Year Plan. May 2013 National Railroad Passenger Corporation AMTRAK Fiscal Years 2013 2017 Five Year Plan May 2013 Table of Contents Introduction... 4 Background... 4 PRIIA Sections 209 and 212... 5 Amtrak s Strategic Plan...

More information

National Railroad Passenger Corp. (AMTRAK) Session 1 Threats and Constraints. Continuous. - Continuous Monitoring. - Continuous Assessment

National Railroad Passenger Corp. (AMTRAK) Session 1 Threats and Constraints. Continuous. - Continuous Monitoring. - Continuous Assessment 0 National Railroad Passenger Corp. (AMTRAK) Session 1 Threats and Constraints Continuous - Continuous Monitoring - Continuous Assessment - Continuous Education 1 Amtrak Information Security Challenges

More information

Experts in Rail Maintenance and Infrastructure

Experts in Rail Maintenance and Infrastructure Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail

More information

Asset Management Systems Information

Asset Management Systems Information Asset Management Systems Information Required to Maintain Service Delivery and Asset State Of Good Repair Willem Ebersöhn Ph.D. Vice president Encada. LLC. Valerie Marcolongo President Encada. LLC. 4/18/2012

More information

Some Examples of Big Data in Railroad Engineering

Some Examples of Big Data in Railroad Engineering 2014 IEEE International Conference on Big Data Some Examples of Big Data in Railroad Engineering Allan M Zarembski Department of Civil and Environmental Engineering University of Delaware Newark, DE, USA

More information

National Transportation Safety Board

National Transportation Safety Board National Transportation Safety Board Railroad Accident Brief Angels Flight Railway Derailment Accident No.: DCA13FR011 Location: Los Angeles, California Date: September 5, 2013 Time: 11:30 a.m. pacific

More information

RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION

RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION RAILROAD ACCIDENT INVESTIGATION REPORT NO. 4129 THE PENNSYLVANIA RAILROAD COMPANY WEST JEFFERSON, O. AUGUST 4, 1967 DEPARTMENT OF TRANSPORTATION FEDERAL RAILROAD ADMINISTRATION Washington Summary DATE:

More information

Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement. Task 2.

Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement. Task 2. Review of Metro-North Railroad s Maintenance-Of-Way Department Operations, Track Inspection, Maintenance, and Replacement Task 2.5 Review of MNR s Established Maintenance Programs and Asset Management

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM OCS Requirements TM 3.2.1 Prepared by: Signed document on file 09 July 09_ Xavier de Vimal Checked by: Signed document on file 10 July 09_ Richard Schmedes Approved by: Signed document

More information

The Gateway Program and Hudson Tunnel Project

The Gateway Program and Hudson Tunnel Project The Gateway Program and Hudson Tunnel Project Presented to: NJ State Senate Oversight Committee Stephen Gardner Executive Vice President NEC Business Development August 10, 2015 1 The Need for Gateway

More information

Spatially Enabling an Asset Management Database

Spatially Enabling an Asset Management Database Spatially Enabling an Asset Management Database John Woollett, GIS Manager (Operations) Tube Lines Ralph Diment Intergraph UK Helen Neaves Intergraph UK Bruce Aquila Intergraph Introduction Background

More information

Management Incentive Plan Statement

Management Incentive Plan Statement Management Incentive Plan Statement (Effective from 1 April 2009) Management Incentive Plan Statement Page 1 of 10 Contents Management Incentive Plan Statement... 2 Participants 2 Principal terms and underlying

More information

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY

More information

Condition monitoring and condition-based railway Asset Management for High Speed lines

Condition monitoring and condition-based railway Asset Management for High Speed lines Fast track to Sustainable Mobility Condition monitoring and condition-based railway Asset Management for High Speed lines Stasha Jovanovic & Giuseppe Aurisicchio MER MEC S.p.A. Italy 1 Activities Object

More information

Revealing the Big Picture Using Business Process Management

Revealing the Big Picture Using Business Process Management Revealing the Big Picture Using Business Process Management Page 1 of 20 Page 2 of 20 Introduction In today s business environment, change is inevitable. Changes in technology, organizational structure,

More information

REAL PROPERTY MANAGEMENT: Applying Best Practices Can Improve Real Property Inventory Management Information

REAL PROPERTY MANAGEMENT: Applying Best Practices Can Improve Real Property Inventory Management Information REAL PROPERTY MANAGEMENT: Applying Best Practices Can Improve Real Property Inventory Management Information Report No. OIG-A-2013-015 June 12, 2013 NATIONAL RAILROAD PASSENGER CORPORATION The Inspector

More information

NATIONAL TRANSPORT AND SAFETY AUTHORITY

NATIONAL TRANSPORT AND SAFETY AUTHORITY NATIONAL TRANSPORT AND SAFETY AUTHORITY SCHOOL TRANSPORTATION SAFETY GUIDELINES BY THE NATIONAL TRANSPORT AND SAFETY AUTHORITY School transportation plays an important and long-term role in the lives of

More information

AUDIT PLAN FOR FISCAL YEAR 2016

AUDIT PLAN FOR FISCAL YEAR 2016 AUDIT PLAN FOR FISCAL YEAR 2016 This page intentionally left blank. NATIONAL RAILROAD PASSENGER CORPORATION Office of Inspector General NATIONAL RAILROAD PASSENGER CORPORATION INSPECTOR GENERAL S MESSAGE

More information

An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor

An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor An Interim Assessment of Achieving Improved Trip Times on the Northeast Corridor Prepared by Amtrak Under Section 212(d) of the Passenger Rail Investment and Improvement Act of 2008 (Public Law 110-432)

More information

Fire Apparatus Operator Aircraft Rescue and Fire Fighting

Fire Apparatus Operator Aircraft Rescue and Fire Fighting Fire Apparatus Operator Aircraft Rescue and Fire Fighting Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2014 Edition. Alabama Fire College

More information

Performance Goals and Objectives:

Performance Goals and Objectives: Online Briefing Winter 2011 2012 Purpose: The purpose of the Project is to examine and recommend ways of introducing higher passenger train speeds on the Empire Corridor and ways to improve reliability,

More information

Climate Change Adaptation for London s Transport System

Climate Change Adaptation for London s Transport System Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation

More information

SYSTEMWIDE REQUIREMENTS

SYSTEMWIDE REQUIREMENTS SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a

More information

U.S. System Summary: EMPIRE CORRIDOR

U.S. System Summary: EMPIRE CORRIDOR U.S. System Summary: EMPIRE CORRIDOR Empire Corridor High-Speed Rail System (Source: NYSDOT) The Empire Corridor high-speed rail system is an established high-speed rail system containing 463 miles of

More information

Ellipse + Fieldreach Network Rail, AMT-Sybex Case Study

Ellipse + Fieldreach Network Rail, AMT-Sybex Case Study Ellipse + Fieldreach Network Rail, AMT-Sybex Case Study Keeping services on track with accurate asset information Summary In 2013, Network Rail launched a major initiative, called ORBIS, to boost the safety

More information

Integrating Quality Assurance into the GIS Project Life Cycle

Integrating Quality Assurance into the GIS Project Life Cycle Integrating Quality Assurance into the GIS Project Life Cycle Abstract GIS databases are an ever-evolving entity. From their humble beginnings as paper maps, through the digital conversion process, to

More information

Pavement Management System Overview

Pavement Management System Overview TABLE OF CONTENTS The Home Screen... 3 The Gutter... 4 Icons... 4 Quick Links... 5 Miscellaneous... 6 PMS Menus... 7 Setup Menu... 7 Construction Setup... 7 1. Material Codes... 8 2. Standard Sections...

More information

How To Expand Commuter Rail Between Worcester And Boston

How To Expand Commuter Rail Between Worcester And Boston AN INDEPENDENT VOICE FOR RESPONSIBLE GOVERNMENT CONNECTING THE HEART OF THE COMMONWEALTH WITH THE HUB OF THE UNIVERSE: MAKING THE CASE FOR EXPANDING COMMUTER RAIL SERVICE BETWEEN WORCESTER AND BOSTON Report

More information

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1

Technical Report Documentation Page. 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-13/0-6737-1 1. Report No. FHWA/TX-13/0-6737-1 4. Title and Subtitle EXECUTIVE REPORT: TOLL ROADS, TOLL RATES, AND DRIVER BEHAVIOR 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril

New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3 hour service to NYC Sleeper, parlor & gril New Haven Hartford Springfield Rail Project Gateway to New England Program Update July 2011 1 New Haven Hartford Springfield Rail Corridor Glory Days: 1925 1955 1955 22 trains/day in 1947 Bankers Ltd 3

More information

VIII. TRANSPORTATION

VIII. TRANSPORTATION VIII. TRANSPORTATION Railroad Railroads came to Vermont and Mount Holly in the late 1840s and early 1850s. The Rutland and Burlington Railroad was originally built through Mount Holly to Bellows Falls.

More information

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics

PFMEA Process Failure Mode and Effects Analysis. James Davis, General Dynamics PFMEA Process Failure Mode and Effects Analysis James Davis, General Dynamics Purpose The purpose of this presentation is to share the benefits of a detailed Process Flow Diagram, conducted during a Process

More information

NW Natural & Pipeline Safety

NW Natural & Pipeline Safety NW Natural & Pipeline Safety We Grew Up Here NW Natural is an Oregon-based utility company founded in 1859. The company purchases natural gas for its core market in western Oregon and southwestern Washington,

More information

B&P Tunnel Project Scoping Report. Sample Elected Official and Key Stakeholder Correspondence. Appendix B

B&P Tunnel Project Scoping Report. Sample Elected Official and Key Stakeholder Correspondence. Appendix B B&P Tunnel Project Scoping Report Appendix B: Sample Elected Official and Key Stakeholder Correspondence September 2014 Appendix B 81 Mosher Street Baltimore, MD 21217 bptunnel.com info@bptunnel.com May

More information

RAILWAY CATENARY SYSTEMS. Components and Systems for the Electrification of Railway Lines. ibemo

RAILWAY CATENARY SYSTEMS. Components and Systems for the Electrification of Railway Lines. ibemo Connectors, Clamps, Compensating Devices, Insulators and Safety Equipment for Overhead Catenary Lines RAILWAY CATENARY SYSTEMS Components and Systems for the Electrification of Railway Lines. Welcome to

More information

A Review of Transit Technology Specifications

A Review of Transit Technology Specifications . Transit Technologies Worksheet A Review of Transit Technology Specifications 1 2 3 4 5 6 1. Heavy Rail Transit 2. Commuter Rail Transit 3. Light Rail Transit 4. Modern Streetcar 5. Heritage Trolley 6.

More information

RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS

RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS Page 1 of 19 RISK ANALYSIS BASED CWR TRACK BUCKLING SAFETY EVALUATIONS Andrew Kish Manager, Guideways and Structures USDOT/Volpe Center, Cambridge, MA Gopal Samavedam Director, Structures & Transportation

More information

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express

PART II SCHEDULE. Scope of Services. Special Terms and Conditions. Virginia Railway Express PART II SCHEDULE SECTION TITLE D E Scope of Services Special Terms and Conditions 11 SECTION D SCOPE OF SERVICES D.1 OVERVIEW A. The selected firm is referred to herein as either the Consultant or the

More information

Thameslink new Class 700 trains

Thameslink new Class 700 trains Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,

More information

Railroad Safety Data Frequently Asked Questions (FAQ)

Railroad Safety Data Frequently Asked Questions (FAQ) Railroad Safety Data Frequently Asked Questions (FAQ) Table of Contents Railroad Classifications and Groupings...3 How are railroads classified on this site and what definitions are used for those classifications?...

More information

Girl Scout Journey FAQs Frequently Asked Questions

Girl Scout Journey FAQs Frequently Asked Questions Girl Scout Journey FAQs Frequently Asked Questions 1. How do we pick which Girl Scout Journey to do? 2. How long does it take to complete a Girl Scout Journey? How long is a typical Girl Scout Journey

More information

AASHTO RR101 Webinar Equipment

AASHTO RR101 Webinar Equipment Presentation to AASHTO RR101 Webinar Equipment M. Bergeron Chief Mechanical Officer April 9, 2013 Agenda Amtrak Mechanical Department Maintenance Plan & Production Capabilities Amtrak Train 5 Bull Gulch,

More information

Railway Crossing Information System

Railway Crossing Information System Railway Crossing Information System ITS Canada Presentation June 2, 2014 Ian Steele, P.Eng Agenda Click to edit Master title style RBRC Program Project Background Concept of Operations Design Process Design

More information

By JD Riley at 11:05 am, Oct 24, 2012 Part 242 Submission October 24, 2012

By JD Riley at 11:05 am, Oct 24, 2012 Part 242 Submission October 24, 2012 October 24, 2012 Request for Approval of Electronic Submission Part 242 Submission As provided for in 49 CFR 242.101, Burlington Northern Santa Fe (BNSF) will maintain a program for determining the certification

More information

LIGHT RAIL OPERATOR TEST RULEBOOK EFFECTIVE OCTOBER 1, 2011

LIGHT RAIL OPERATOR TEST RULEBOOK EFFECTIVE OCTOBER 1, 2011 LIGHT RAIL TECHNICAL TRAINING DEPARTMENT LIGHT RAIL OPERATOR TEST RULEBOOK DOCUMENT: TTT-RA-0787 EFFECTIVE OCTOBER 1, 2011 This test rulebook contains rules currently used by Light Rail Operations, but

More information

HOURS OF SERVICE ACT

HOURS OF SERVICE ACT HOURS OF SERVICE ACT The Hours of Service Act was dramatically changed by the Rail Safety Improvement Act. The Hours of Service Act was originally enacted in 1907 to promote the safety of the workers and

More information

Introduction to the Design Process

Introduction to the Design Process Introduction to the Design Process Accreditation Board for Engineering and Technology (ABET) Definition of Design Engineering design is the process of devising a system, component, or process to meet desired

More information

Trapeze Rail System Simulation and Planning

Trapeze Rail System Simulation and Planning trapeze Rail System English Software for Rail Modelling and Planning Trapeze Rail System Simulation and Planning www.trapezegroup.com Enabling future railway plans Cost reductions through integrated planning

More information

Handbook 16. Handbook 16. AC electrified lines. GE/RT8000/HB16 Rule Book

Handbook 16. Handbook 16. AC electrified lines. GE/RT8000/HB16 Rule Book GE/RT8000/HB16 Rule Book Uncontrolled When Printed Handbook 16 AC electrified lines Handbook 16 Issue 3 September 2015 Comes into force 05 December 2015 This handbook is for those personnel who need to

More information

WHAT IS INSURANCE? INSURANCE IS RECOVERY

WHAT IS INSURANCE? INSURANCE IS RECOVERY TEACHER S NOTES Purpose: to explore the effect of a car accident on a person s life to recognize the role of insurance as an essential emergency tool for replacement, repair and rehabilitation to explore

More information

Comparison of CMS Preventive Maintenance Regulations

Comparison of CMS Preventive Maintenance Regulations Comparison of CMS Preventive Maintenance Regulations CMS Regulations Before December 2, 2011 From: State Operations Manual - Appendix A - Survey Protocol, Regulations and Interpretive Guidelines for Hospitals

More information

Base Station Design and Architecture for Wireless Sensor Networks

Base Station Design and Architecture for Wireless Sensor Networks Base Station Design and Architecture for Wireless Sensor Networks David Kohanbash*, Abhinav Valada, George Kantor Carnegie Mellon University Robotics Institute, 5000 Forbes Ave, Pittsburgh, PA, 15213 USA

More information

PURPOSE AND NEED FOR ACTION

PURPOSE AND NEED FOR ACTION Section 2 PURPOSE AND NEED FOR ACTION 2. Purpose and Need for Action 2.0 Purpose and Need for Action This chapter describes the purpose and need for improved high speed passenger rail on the Chicago to

More information

RHEDA MRT The ballastless track for underground and surface commuter transit

RHEDA MRT The ballastless track for underground and surface commuter transit RHEDA MRT The ballastless track for underground and surface commuter transit 2 3 Cities on the move Living and working today confront people with increasing demands for mobility. Planners and engineers

More information

The Consultants Guide to. Successfully Implementing 5S

The Consultants Guide to. Successfully Implementing 5S The Consultants Guide to Successfully Implementing 5S Norm Bain NBI Email: nb@leanjourney.ca January 2010 Preface When I was first introduced to the 5S system, I thought this is pretty lame. What a convoluted

More information

Railway Simulation & Timetable Planning

Railway Simulation & Timetable Planning Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1

More information

Cloud computing for maintenance of railway signalling systems

Cloud computing for maintenance of railway signalling systems Cloud computing for maintenance of railway signalling systems Amparo Morant, Diego Galar Division of Operation and Maintenance Engineering Luleå University of technology Luleå, 97 817, Sweden Amparo.morant@1tu.se

More information

Utah Transit Authority

Utah Transit Authority Utah Transit Authority Overview The Utah Transit Authority (UTA) is submitting its 2012 FrontRunner South Safety and Activation Program for consideration for an APTA Rail Safety & Security Excellence Award.

More information

Harry s GPS LapTimer. Documentation v1.2. Harry s Technologies

Harry s GPS LapTimer. Documentation v1.2. Harry s Technologies Harry s GPS LapTimer Documentation v1.2 Harry s Technologies Points of Interest and Triggers Introduction Looking into the multifaceted functionality provided by LapTimer, the probably most important feature

More information

Financial Coaching: Understanding the Skills Needed to Become a Successful Coach

Financial Coaching: Understanding the Skills Needed to Become a Successful Coach Financial Coaching: Understanding the Skills Needed to Become a Successful Coach Financial Coaching: Understanding the Skills Needed to Become a Successful Coach $ A Learning Series from the Financial

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Alignment design for Citybanan in Stockholm

Alignment design for Citybanan in Stockholm Alignment design for Citybanan in Stockholm B. Kufver Halcrow, Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom Abstract The Western Main Line into Stockholm Central Station was

More information

Quality Thinking in other Industries. Dominic Parry Inspired Pharma Training. WEB www.inspiredpharma.com GMP BLOG inspiredpharmablog.

Quality Thinking in other Industries. Dominic Parry Inspired Pharma Training. WEB www.inspiredpharma.com GMP BLOG inspiredpharmablog. Quality Thinking in other Industries Dominic Parry Inspired Pharma Training WEB www.inspiredpharma.com GMP BLOG inspiredpharmablog.com Welcome The traditional focus on quality Quality in the eyes of GMP

More information

2016 Asset Management & Maintenance Priorities Survey

2016 Asset Management & Maintenance Priorities Survey 2016 Asset Management & Maintenance Priorities Survey An Original Study from 2016 Asset Management & Maintenance Priorities Survey Copyright 2016 Assetivity Pty Ltd. All Rights Reserved. Published by Assetivity

More information

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873

Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's

More information

2.1 Prior Richmond to South Hampton Roads Rail Service

2.1 Prior Richmond to South Hampton Roads Rail Service 2.0 BACKGROUND 2.1 Prior Richmond to South Hampton Roads Rail Service The Norfolk and Western (N&W), now NS, the Seaboard Air Line (SAL) and the Atlantic Coast Line (ACL), both now CSXT, previously operated

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

Supplier Quality Requirements

Supplier Quality Requirements Key Elements Procedures # 2 Supplier Quality Requirements Section List of content Page 1.0 Foreword 2 2.0 Definitions and acronyms 2 3.0 Basic Quality Requirements 3 4.0 Part Specific Quality Requirements

More information

Lean Management Standards: Manufacturing

Lean Management Standards: Manufacturing Leader Standard Work. Do leaders have standard work? Do they follow it? Do you carry it with you as a routine? Do you have it with you now?. Is leader standard work regularly reviewed for updating? Has

More information

STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION

STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION STATEMENT OF LINDA BAUER DARR PRESIDENT AMERICAN SHORT LINE & REGIONAL RAILROAD ASSOCIATION BEFORE THE UNITED STATES HOUSE OF REPRESENTATIVES COMMITTEE ON TRANSPORTATION AND INFRASTRUCTURE S SUBCOMMITTEE

More information

ABSTRACT. Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community

ABSTRACT. Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community ABSTRACT Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community City governments face great challenges to protect the public when critical

More information

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM The aviation industry is developing a new positioning and landing system based on the Global Navigation Satellite System (GNSS). The GNSS landing system

More information

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle

More information

Written Technical Proposal Central Florida Rail Corridor (CFRC) Operations & Maintenance RFP-DOT-12-13-5002-O&M Submitted by:

Written Technical Proposal Central Florida Rail Corridor (CFRC) Operations & Maintenance RFP-DOT-12-13-5002-O&M Submitted by: Written Technical Proposal Central Florida Rail Corridor (CFRC) Operations & Maintenance RFP-DOT-12-13-5002-O&M Submitted by: Veolia Transportation Services, Inc. 8601 Georgia Ave., Suite 604 Silver Spring,

More information

- Internal distribution only. Corporate Real Estate and Facilities Cost Reduction

- Internal distribution only. Corporate Real Estate and Facilities Cost Reduction - Internal distribution only Corporate Real Estate and Facilities Cost Reduction Summary By moving from typical to best practice, organisations can improve value for money and reduce their real estate

More information

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Presentation Meeting Middlebury WCRS(23) Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College

More information

HOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES

HOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES HOURS OF SERVICE ACT REFERENCE MANUAL FOR EMPLOYEES DIRECTLY ENGAGED OR CONNECTED WITH THE MOVEMENT OF PASSENGER TRAINS OR ENGINES Revised by the System Operating Practices Department 03/26/2012 INTRODUCTION

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Timisoara - 13 th of September 2012 1 The European Vision for Railway Transport The European Commission's

More information