1 Armstrong Creek Building a sustainable future Guidelines for future developments: preparing a sustainability framework plan and business case This document shows you how to develop a comprehensive framework plan and business case to guide sustainable urban growth planning and investment in Victoria and beyond. Included in this guideline: Introduction What is a framework plan? How to create a successful framework plan and business case key steps - Step 1: Identify and engage key stakeholders - Step 2: Establish the scope of the framework plan - Step 3: Determine sustainability inputs and outputs - Step 4: Develop your business case - Step 5: Implementing the framework plan: putting plans, policies and procedures in place Applying these guidelines: the Armstrong Creek development Introduction An integrated, sustainable approach to the planning and design of urban infrastructure can lead to significant environmental, social and economic benefits. These include savings in: public sector capital investment ongoing household (lifecycle) costs business (operating) costs. This approach reflects best practice in public sector investment for urban development. It can also be applied to the development of Precinct Structure Plans or where there is a need for a sustainable growth development. The development of a framework plan (or Interagency Infrastructure Delivery Plan), underpinned by a sound economic, social and environmental business case, is critical to the delivery of any urban development. These guidelines focus primarily on the broader economic (public sector) implications of development, rather than the narrower financial (private sector) aspects of urban development. Page 1

2 What is a framework plan? A framework plan is an outline plan which provides guidance on how an urban development or precinct should be developed. A framework plan should include co-ordinated input from local council, key agencies and developers. It should identify and consolidate all technical, cost and benefit data, as well as addressing the following elements: - Roads and bridges - Rail lines, public transport services and access points - Residential housing options and areas - Commercial and/or industrial precincts - Employment options and areas - Water and wastewater provision - Energy generation and distribution - Major activity centres - Neighbourhood activity centres - Local centres - Schools and colleges - Parklands and biodiversity corridors - Rural land management - Water and energy demand management - Telecommunications - Cultural and heritage provision. Creating a successful framework plan requires the support of all key stakeholders from Local and State Government and the private sector. The framework plan will be an evolving document that can be used to: Facilitate co-ordinated infrastructure delivery Speed up land delivery Improve affordability Deliver improved environmental outcomes. How to create a successful framework plan and business case key steps The following are key steps that will enable you to create a successful framework plan and business case for sustainable urban development. Step 1: Identify and engage key stakeholders and decision makers Form partnerships between local councils, state agencies, developers and communities to ensure that sustainable development principles are followed from the initial planning stages through to development, including: - Collective agreement on the vision for the future of a particular location or precinct - Joint operation of working groups and committees to oversee technical studies - Collective agreement on how specific infrastructure components should be interactively developed - Shared efforts to minimise delays in the delivery of services and available land releases. Step 2: Establish the scope of the framework plan Create an initial framework plan that can be used to identify: Relevant inputs and outputs Assumptions Project monitoring Evaluation criteria Project risks. This requires specification of individual project components. (The Logframe 1 methodology could be used as a template). Attention also needs to be given to the likely nature of risk associated with specific infrastructure program components, e.g. cost and delivery targets for key infrastructure items. 1 Logframe stands for Logical Framework and is essentially a very simple method of tying in goals and objectives into inputs, processes and outputs. It is widely used by development agencies such as the World Bank. Logframe was developed in the 1970s mainly for infrastructure development projects, dating back to a mixture of strategic planning and management by objectives models, with all the strengths and weaknesses of such approaches on highly complex projects. Guidelines for future developments: preparing a sustainability framework plan and business case Page 2

3 Armstrong Creek Building a sustainable future Technical working groups should be established to scope the project and outline key planning and design principles, and to define specific performance criteria for each of the key building services and infrastructure components, including: - Identifying the range of technical skills offered by all stakeholders - Specifying specific infrastructure investigations to be undertaken - Identifying how sustainability principles can be introduced at all early planning stages. What should the framework plan address? The framework plan should address the following: Establish a shared vision for the development, i.e. identify the overarching goals and the specific objectives. In particular: - All key stakeholders should understand and agree on the vision and objectives - The overarching vision needs to be clearly defined prior to the specification of key objectives for the development - These specific objectives can be prioritised where the agreed range is significant and varied. Establish the physical dimensions and components of the proposed development area: - Work out the boundaries of the proposed urban development and clarify the ownership of all properties involved - Establish the legal and technical status of all physical infrastructure already in place, including roads, drainage, service easements, water storages, etc. - Identify points of interconnection with surrounding regions, such as shared recreational and educational facilities, transport hubs and commercial centres. Establish 20-year (minimum) forecasts of the scale of residential and commercial development under a range of future growth scenarios. Policies for both the urban and non-urban areas should be formulated within this timeframe as well. These forecasts should include: - Consideration of alternative future growth scenarios in order to accommodate future changes in economic growth, employment and investment conditions - Strategic development goals to allow for residential, industrial and commercial land uses - Forms of land use patterns that can emerge in the immediate short-term and long-term. Establish a timescale for non-sequential land development that all parties agree to. This should cover: - Urban land release - Water and wastewater service delivery - Public transport - Energy generation and distribution - Activity/community centres - Commercial and industrial land release - Educational facilities - Open space and recreational facilities. Step 3: Determine sustainability inputs and outputs Define the development principles for both the urban and non-urban areas to cover a minimum 20-year time period, including: - Agreement on specific residential, commercial and industrial land demand estimates by year, e.g. the number of allotments to be available per year under low, most likely and high development scenarios - Defining the individual logistics and supply issues involved in the delivery of building services and infrastructure components, e.g. water, wastewater, service and access roads, telecommunications, etc. - Establishing principles to cover open space and rural land areas and corridors for wildlife conservation management. Page 3

4 Identify the availability and proximity of resources for both the urban and non-urban areas including: - Energy - Renewable Energy - Water/Recycled Water - Telecommunications - Public Transport. Develop key sustainability performance indicators for both residential and commercial development. These should include: - Minimising total potable water consumption (water delivery targets, water recycling targets) - Minimising greenhouse gas emissions per household - Minimising energy consumption - Minimising waste generation and disposal maximising recycling - Minimising total land cost delivery - Minimising annual household costs - Minimising the dependence on private vehicle ownership and use - Maximising the level of public transport use. Step 4: Develop your business case The framework plan should be underpinned by a sound whole of development business case to support necessary public sector funding. This will be achieved by determining estimated capital costs and operating costs for all major infrastructure components for both a conventional development approach and a sustainable development approach. Determine and evaluate costs, benefit and risks of both the Business as Usual and the sustainability approach using a business case. When developing your business case, it is important to: Use technical working groups to estimate the Business as Usual delivery procedures and related costs of specific infrastructure Engage technical consultants to specify the nature of specific sustainability options Embrace the whole community by considering a broad range of factors, including: - How land will be zoned, serviced and released for residential and industrial use - Provision of essential building services and infrastructure, such as energy, water, wastewater management, access roads, telecommunications, schools and community centres, open spaces and recreational facilities - Public transport planning and service delivery to achieve optimal sustainability outcomes (i.e. energy savings, reductions in greenhouse gas emissions, decreases in car ownership levels and less road congestion). Identify costs and benefits Identify all costs and benefits relating to both the conventional and sustainable development options over a 20-year timeframe. These will need to be estimated in constant prices according to Department of Treasury and Finance and COAG investment procedures, including: - Closely following cost-benefit procedures - Eliminating all taxes from the costs - Using the correct discount rate as determined by the State Government - Estimating separate investment criteria for both the Business as Usual /conventional approach to the delivery of infrastructure and the sustainable approach to delivery (Economic Internal Rate of Return [EIRR], Net Present Value [NPV] and Benefit-Cost Ratio [BCR]). Estimate and monetise all forecast sustainability benefits, including: - Specifying the assumptions relied upon to estimate the benefits - Estimating the additional or incremental gains from the introduction of each sustainability component, e.g. savings from water recycling, savings from energy consumption per residential allotment - Identifying the rate at which the benefits will grow per year over the 20 years. Guidelines for future developments: preparing a sustainability framework plan and business case Page 4

5 Armstrong Creek Building a sustainable future Identify the differences in benefits and costs over 20- to 30-year time periods between a conventional and a sustainable approach to urban development, by: - Undertaking two separate business cases, as required by State/COAG agreements to compare the differences in the delivery of benefits - Clearly identifying the range of sustainability outcomes or deliverables that could be achieved in both cases (e.g. reductions in potable water, energy and private vehicle use). Evaluating costs and benefits Complete a series of 20-year cost-benefit analyses for both the conventional and sustainable development program options. Report the key investment criteria (i.e. EIRR, NPV, BCR), involving: - Preparation of comprehensive spreadsheet models, incorporating all capital, operating and maintenance (O&M) costs, benefits and residual values, with associated economic criteria - Providing detailed assumptions underpinning each of the cost and benefit components - Ensuring that benefits are carefully scheduled to follow the completion of all capital costs (avoid inflating the impacts in early years) - Checking that all growth rates for O&M costs and individual benefits can be justified. Fully estimate the economic cost and benefits of not adopting a sustainable approach to urban development so that an informed decision can be made. By developing a clear picture of the with and without sustainability options, it is possible to: - Engage a wider audience or stakeholder presence by identifying the economic cost penalty of not proceeding with a sustainability agenda - Provide an alternative form of project or development program justification to that developed from a business case, supported by a cost-benefit analysis - Allow for both direct and indirect (multiplier) impacts to be identified, quantified and monetised (multiplier impacts are not included in cost-benefit analyses). Risk analysis Complete detailed risk analyses for the sustainable development approach. Specify how specific risk levels can be mitigated, including: - Identifying which of the benefit and cost components are most likely to be uncertain and be least reliable - Completing a series of what ifs or sensitivity tests for the key economic variables to determine how the economic criteria (EIRR, NPV, BCR) change (e.g. increase capital and O&M costs by 20%; reduce key sustainability benefits such as water savings or energy cost reductions by 10% or 20% per year; compare the results with and without the sensitivity analyses) - Examining the specific cost or benefit variables most at risk and identifying mechanisms to limit the riskiness by alternative technical options or re-specifying the nature of the sustainability benefit. Identify the range of benefits that accrue to key stakeholders over the timeframe Determine benefits for key stakeholders for the preferred development option (i.e. householders, commercial enterprises, developers, local councils, infrastructure providers, State Government), by: - Using the individual cost and benefit columns of the business case cost-benefit analysis, identify the range of benefits to various stakeholder as a percentage of the total benefits - Identifying the rate of growth of specific beneficiary groups over the 20-year period - Identifying if specific O&M cost components are more intensive than others. Page 5

6 Step 5: Implementing the framework plan: putting plans, policies and procedures in place Finalise the framework plan (or Interagency Infrastructure Delivery Plan). This plan should include co-ordinated input from the local council, key agencies and developers. It should also identify and bring together all the technical and cost-benefit data, and address key elements such as: - Roads and bridges - Rail lines, public transport services and access points - Residential housing options and areas - Commercial and/or industrial precinct areas - Employment options and areas - Water and wastewater provision - Energy generation and distribution - Major activity centres - Neighbourhood activity centres - Local centres - Schools and colleges - Parklands and biodiversity corridors - Rural land management - Water and energy demand management - Telecommunications - Cultural and heritage provision. Develop a strategy to progress the framework plan and program through State Government. Specify the nature of the required public sector investment by: - Summarising the overarching array of sustainability benefits to be generated - Identifying a time schedule for project implementation - Documenting the nature of the Local Government, State Government and private sector investment requirements, by year, for the project s life - Identifying the extent of user pays and cost-recovery opportunities for each of the investment needs. Identify ownership and structure of the project implementation unit required for the implementation of the proposed development plan or program of investment, including: - Clarifying the roles of the various stakeholders moving forward - Establishing and agreeing as to which agency or authority will have primary responsibility for implementation - Determining which stakeholder groups will finance the necessary ongoing technical, environmental and planning studies and investigations - Developing a management structure to enable the ongoing implementation of the development program. Establish clear governance principles to ensure the timely delivery of the proposed plan or program. - Identify the roles of all relevant State Government agencies - Establish how progress will be documented and reported - Identify which agencies will be responsible for advisory or liaison roles with State Ministers. Develop precinct plans that integrate the above, and: - Define objectives - Identify opportunities and challenges - Identify the various components of the vision - Provide schedules for the delivery of components and services. Guidelines for future developments: preparing a sustainability framework plan and business case Page 6

7 Armstrong Creek Building a sustainable future Applying these guidelines: the Armstrong Creek development The principles that form the basis of these guidelines were used in the development of a business case sponsored by Sustainability Victoria, on behalf of the Victorian Government. The business case assessed opportunities to achieve better environmental outcomes for the Armstrong Creek development while not compromising the economic and social objectives of the City of Greater Geelong. The Armstrong Creek business case demonstrates the financial and economic case for sustainable development. Using a whole-of-development analysis, it shows that combining a range of existing sustainable technologies, with a strategic development roll-out, provides financial, social and environmental benefits. This case study illustrates a sustainable future for all Victorians. Creating a sustainable development at Armstrong Creek could deliver $466 million in savings (NPV) to residents, developers and the community over 15 years, including $48 million in capital investment savings (NPV) compared with a conventional development approach. This is illustrated in the graph below. An important additional finding is that in terms of the total benefits to be derived from the alternative, sustainability-based approach to the development of Armstrong Creek, more than 80 per cent of the total benefits are expected to flow to home owners in the Armstrong Creek growth area. Economic results of the business case $ $ Net benefits from development ($million) - $ $ $ $ $ Year 1 (2011/12) to Year 12(2025/26) Net present value (NPV) BAU Development approach =$69m Sustainable development approach =$535m Overall additional NPV Benefit over 15 years = $466m - $ Alternative sustainable development net benefits stream Figure 1 Economic results of the business case (Note: net benefits are not discounted cash flow) BAU Approach net benefits stream Page 7

8 For more information To download copies of the reports, fact sheets and guidelines, please visit /armstrongcreek For any enquiries, please Guidelines for future developments: preparing a sustainability framework plan and business case

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners Action the COI Table Of Contents Introduction... 3 Benefit of carrying out a site assessment... 4 How to carry out a site assessment

More information

INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS

INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS (To be read in conjunction with Infrastructure Australia s Better Infrastructure Decision-Making guidelines) Templates

More information

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia

Adapting Northern Adelaide - Submission towards the new Climate Change Strategy for South Australia 16 October 2015 Adapting Northern Adelaide Project City of Salisbury and City of Playford Polaris Innovation Centre Mawson Lakes SA 5095 Climate Change Team, GPO Box 1047 Adelaide SA 5001 climatechange@sa.gov.au

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines 2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Non Government Schools

Non Government Schools Non Government Schools context A comprehensive approach to land use planning for education provision is needed in new suburbs. This includes planning for non government schools, which account for around

More information

Project Evaluation Guidelines

Project Evaluation Guidelines Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone

More information

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper

december 08 tpp 08-5 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper december 08 Guidelines for Capital Business Cases OFFICE OF FINANCIAL MANAGEMENT Policy & Guidelines Paper Preface The NSW Government is committed to the ongoing improvement of public services by ensuring

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY City of Salisbury ASSET MANAGEMENT STRATEGY Version 6 June 2015 City of Salisbury Asset Management Strategy Document Control Document Control NAMS.PLUS Asset Management www.ipwea.org/namsplus Document

More information

Preparing a Green Wedge Management Plan

Preparing a Green Wedge Management Plan Preparing a Green Wedge Management Plan Planning Practice Note 31 JUNE 2015 This practice note provides a guide for the preparation of Green Wedge Management Plans and sets out the general requirements

More information

CAPITAL PLANNING GUIDELINES

CAPITAL PLANNING GUIDELINES CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS

More information

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November 2010. Prepared by Capita Lovejoy on behalf of William Davis Limited COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT COPCUT RISE November 2010 Prepared by Capita Lovejoy on behalf of William Davis Limited Copcut Rise Land north of Copcut Lane, Droitwich Spa: Consultation

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

<Business Case Name> <Responsible Entity> <Date>

<Business Case Name> <Responsible Entity> <Date> (The entity Chief Information Officer, Chief Financial Officer and Business Area programme Lead must sign-off the completed business case) Signed: Date:

More information

Integrated water cycle planning processes and systems: A local government case study

Integrated water cycle planning processes and systems: A local government case study Integrated water cycle planning processes and systems: A local government case study Authors: Alan Barton (Brisbane City Council), Emma Hawkins (MWH, formerly of Lloyd Consulting) Integrated Water Cycle

More information

Social Return on Investment

Social Return on Investment Social Return on Investment Case study - London Borough September 2014 Overview The Social Value Act is transforming public sector procurement. Business needs to embrace this opportunity and use it to

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

Capital Planning Guidelines

Capital Planning Guidelines Capital Planning Guidelines Contents Capital Planning Guidelines... 1 1. INTRODUCTION... 3 2. CAPITAL PROJECTS EVALUATION PROCESS... 3 3. APPRAISAL PROCESS UNDERTAKEN BY DEPARTMENTS... 4 3.1 Extension

More information

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project evaluation 5 3.0 Project feasibility 7 3.1 Defining the objectives

More information

DISCUSSION PAPER OCTOBER 2015

DISCUSSION PAPER OCTOBER 2015 DISCUSSION PAPER OCTOBER 2015 MINISTER S FOREWORD 1 EXECUTIVE SUMMARY 2 1 SCOPE OF OPTIONS FOR DISCUSSION 7 Defines the scope of the Plan Melbourne refresh 2 GROWTH CHALLENGES, FUNDAMENTAL PRINCIPLES AND

More information

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

Public Consultation Series - The Strategic and Cost Planning Process in Dublin

Public Consultation Series - The Strategic and Cost Planning Process in Dublin Consultation Summary DOCUMENT CONTROL SHEET Client Project Title Document Title Document No. This Document Comprises National Transport Authority 2030 Vision Consultation Summary MDE0758RP0012 DCS TOC

More information

Major & State Significant Projects Committee. East West Link Consolidated Business Case SUBMISSION PROPOSAL

Major & State Significant Projects Committee. East West Link Consolidated Business Case SUBMISSION PROPOSAL Cabinet Secretariat Reference Submission No. MSSPC 12 Copy No. Submission to: Submission Title: Portfolio/s: Major & State Significant Projects Committee East West Link Consolidated Business Case Roads,

More information

The Chicken or the Egg? Infrastructure provision and urban development: A transport perspective.

The Chicken or the Egg? Infrastructure provision and urban development: A transport perspective. The Chicken or the Egg? Infrastructure provision and urban development: A transport perspective. CAMERON MARTYN Associate GTA Consultants Cameron.Martyn@gta.com.au ABSTRACT The timely delivery of transport

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Financial Planning Framework and Guidelines Long Term Financial Planning Framework and Guidelines for Western Australian Local Governments p1. Contents Foreword 4 1. Introduction 7 2. Purpose

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

6 STEP 6 - PREPARING THE ACTION PLAN 2

6 STEP 6 - PREPARING THE ACTION PLAN 2 CONTENTS 6 STEP 6 - PREPARING THE ACTION PLAN 2 6.1 USER GUIDE TO THIS STEP 2 6.2 KEY MESSAGES OF THIS STEP 4 6.3 PREPARING THE ACTION PLAN 5 6.4 PRE-FEASIBILITY STUDY 8 6.5 PREPARING AN INVESTMENT PLAN

More information

New Energy Jobs Fund. Application Guidelines

New Energy Jobs Fund. Application Guidelines New Energy Jobs Fund Application Guidelines i Table of Contents 1. Background... 1 2. The Program... 1 2.1. Objectives... 1 2.2. Overview... 1 2.3. Program Timetable... 2 3. Funding... 3 4. Eligibility...

More information

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent

HUNTER WATER CORPORATION. Greenprint For Sust ainable Urb an Wat er Managem ent HUNTER WATER CORPORATION Greenprint For Sust ainable Urb an Wat er Managem ent NOVEMBER 2012 Table of Contents Message from the Managing Director 4 1. Introduction 5 1.1 Cities of the Future 5 1.2 Our

More information

Implementation of Regional Planning Guidelines Best Practice Guidance

Implementation of Regional Planning Guidelines Best Practice Guidance Implementation of Regional Planning Guidelines Best Practice Guidance December 2010 Contents Section Page No Minister s Foreword Chapter 1: Purpose of Regional Planning Guidelines 3 1.1 Background 1.2

More information

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning 2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

Summary: Introduction

Summary: Introduction Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with

More information

Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014

Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 Latrobe City Council Submission Emissions Reduction Fund Green Paper February 2014 For further information in relation to this submission please contact Allison Jones General Manager Economic Sustainability

More information

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE

TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT. Engineering Services POLICY DIRECTIVE TITLE C171 ASSET MANAGEMENT POLICY DEPARTMENT Engineering Services POLICY DIRECTIVE This Asset Management policy will ensure that Asset Management is clearly recognised by Council and community in accordance

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Project Documentation Version: 2.2, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that

More information

Focus. Assessing the benefits of public transport. 1. Why focus on appraisal?

Focus. Assessing the benefits of public transport. 1. Why focus on appraisal? JANUARY 2009 A UITP position paper Focus Assessing the benefits of public transport 1. Why focus on appraisal? In recent years the economic appraisal of transport schemes has become an ever-more essential

More information

AUGUST 2013. Habitat compensation under the Biodiversity Conservation Strategy

AUGUST 2013. Habitat compensation under the Biodiversity Conservation Strategy AUGUST 2013 Habitat compensation under the Biodiversity Conservation Strategy Published by the Victorian Government Department of Environment and Primary Industries Melbourne, August 2013 The State of

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

DRAFT LONG TERM FINANCIAL PLANNING AND IMPLEMENTATION POLICY

DRAFT LONG TERM FINANCIAL PLANNING AND IMPLEMENTATION POLICY BITOU MUNICIPALITY DRAFT LONG TERM FINANCIAL PLANNING AND IMPLEMENTATION POLICY TABLE OF CONTENTS Page Number 1. INTRODUCTION 3 2. PURPOSE 3 3. GUIDING PRINCIPLES 4 4. DEVELOPMENT OF A FINANCIAL PLAN 4

More information

Proposal for a Demonstration Exemplar at British Sugar, York

Proposal for a Demonstration Exemplar at British Sugar, York Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a

More information

2015-2025. LONG TERM FINANCIAL PLAN Page 1

2015-2025. LONG TERM FINANCIAL PLAN Page 1 2015-2025 LONG TERM FINANCIAL PLAN Page 1 1. Executive Summary... 4 2. Background... 5 2.1 Key Statistics... 5 2.2 City of Perth Strategic Priorities... 5 3. Integrated Planning and Reporting Framework...

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

Housing Association Regulatory Assessment

Housing Association Regulatory Assessment Welsh Government Housing Directorate - Regulation Housing Association Regulatory Assessment Melin Homes Limited Registration number: L110 Date of publication: 20 December 2013 Welsh Government Housing

More information

Project Assessment Framework Establish service capability

Project Assessment Framework Establish service capability Project Assessment Framework Establish service capability July 2015 Component of the Project Assessment Framework (PAF) This document forms part of the Project Assessment Framework, as outlined below.

More information

Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme

Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme Case study for the OECD Working Party on Resource Productivity and Waste: The Australian National Television and Computer Recycling Scheme Contents Executive Summary... 3 Background... 4 The Australian

More information

Budget development and management within departments

Budget development and management within departments V I C T O R I A Auditor General Victoria Budget development and management within departments Ordered to be printed by Authority. Government Printer for the State of Victoria No. 39, Session 2003-2004

More information

Stage 1: Colocation feasibility study racing codes and exhibition facilities. Chief Minister, Treasury and Economic Development Directorate

Stage 1: Colocation feasibility study racing codes and exhibition facilities. Chief Minister, Treasury and Economic Development Directorate Stage 1: Colocation feasibility study racing codes and exhibition facilities Chief Minister, Treasury and Economic Development Directorate 16 September 2014 Stage 1: Colocation feasibility study racing

More information

CE Entrepreneurship. Investment decision making

CE Entrepreneurship. Investment decision making CE Entrepreneurship Investment decision making Cash Flow For projects where there is a need to spend money to develop a product or establish a service which results in cash coming into the business in

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

Overview - State Tax Review Discussion Paper

Overview - State Tax Review Discussion Paper Overview - State Tax Review Discussion Paper FEBRUARY 2015 WWW.YOURSAY.SA.GOV.AU Why Are We Reviewing Our State Tax System? South Australia is already a great place to live and we value that as a community.

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Partnerships Victoria Requirements

Partnerships Victoria Requirements Partnerships Victoria Requirements May 2013 Version Control Version Control Last Updated Updated sections Rationale 1 February 2009 Original publication 2 January 2010 Section 12 and Annexure 6 Annexure

More information

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015

to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 D to Asset Management Policy and Guidance Draft Version 1.4 9 July 2015 This page has been left blank intentionally Page 2 of 24 Page 3 of 24 This page has been left blank intentionally Page 4 of 24 Strategic

More information

Queensland Treasury. Queensland Government. Program Evaluation Guidelines

Queensland Treasury. Queensland Government. Program Evaluation Guidelines Queensland Treasury Queensland Government Program Evaluation Guidelines November 2014 Document details Security Classification Date of Review of Security Classification Authority Author PUBLIC November

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

the indicator development process

the indicator development process Part Two Part Two: the indicator development process the indicator development process Part Two: the indicator development process Key elements of the indicator development process Define strategic directions

More information

Proposed New Starts/Small Starts Policy Guidance

Proposed New Starts/Small Starts Policy Guidance Proposed New Starts/Small Starts Policy Guidance Table of Contents I. INTRODUCTION... 1 II. PROJECT JUSTIFICATION CRITERIA... 4 MOBILITY IMPROVEMENTS... 4 OPERATING EFFICIENCIES... 5 Measure:... 5 Calculation:...

More information

ICT Business Case Guide

ICT Business Case Guide ICT Business Case Guide JULY 2012 AGIMO is part of the Department of Finance and Deregulation Contents Introduction 3 First Pass Business Case 5 1. Executive Summary 6 2. Current Situation 7 3. Proposed

More information

State-wide Public Library Management System Technology Capabilities. Business Case. Version 2.0

State-wide Public Library Management System Technology Capabilities. Business Case. Version 2.0 State-wide Public Library Management System Technology Capabilities Business Case Version 2.0 Public Library Services File Number: PLS 046/2009 1 EXECUTIVE OVERVIEW 1.1 Introduction Currently two major

More information

Gallia County. Strategic Technology Plan

Gallia County. Strategic Technology Plan Gallia County Strategic Technology Plan Gallia County Executive Summary Why Is This Important? Gallia County s Current Broadband Situation Throughout the past decade, the distinction between local and

More information

Plan Melbourne Refresh Discussion paper

Plan Melbourne Refresh Discussion paper Attachment 1 Bayside City Council Submission to the Victoria State Government Plan Melbourne Refresh Discussion paper November 2015 Submission Contents 1. Introduction and scope... 3 2. Background.3 3.

More information

Waste Management Action Plan 2011-2015

Waste Management Action Plan 2011-2015 Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action

More information

Business Plan Template for 2014-2020 Operations

Business Plan Template for 2014-2020 Operations Business Plan Template for 2014-2020 Operations Outline Guidance on Requirements for WEFO Assessment Page 1 of 27 Background Information for Applicants Please note: Key terms that have associated glossary

More information

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013

NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 APPENDIX 1 NORTH AYRSHIRE COUNCIL CORPORATE ASSET MANAGEMENT STRATEGY 2013-2023 JANUARY 2013 Page 1 of 10 1. INTRODUCTION It is widely recognised that asset management is a core component of effective

More information

City of Victoria Community Energy and Emissions Plan

City of Victoria Community Energy and Emissions Plan City of Victoria Community Energy and Emissions Plan FINAL REPORT 31 May 2012 Prepared for: Allison Ashcroft, City of Victoria Prepared by: Nicole Miller Duncan Cavens Table of Contents Table of Contents...

More information

Occupant: Vacant File reference: 2011/0390

Occupant: Vacant File reference: 2011/0390 ROLE DESCRIPTION SECTION A: GENERAL INFORMATION Role: Research Scientist Climate Applications Classification code: PO 3 Division: SA Research & Development Institute Type of appointment: Branch: Sustainable

More information

The environment management services industry

The environment management services industry The environment management services industry Author: Paul J Perkins AM, Adjunct Professor, Australian National University and Chairman of the Barton Group. Citation: Perkins P 2006, The environment management

More information

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1

The achievement of all indicators for policies in the whole plan collectively contribute to the delivery of Policy 1 Cornwall Local Plan 2010-2030: Proposed Monitoring Framework Part 1: Strategic Policies Policy 1: Presumption in Favour of Sustainable Development Policy 2: Spatial Strategy Policy 2a Key Targets Job provision

More information

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property

More information

Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan

Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan STAFF REPORT ACTION REQUIRED Lawrence Heights Revitalization Corporate Implementation Actions and Social Development Plan Date: June 8, 2010 To: From: Wards: Community Development and Recreation Committee

More information

MANDATORY ROLLOUT OF INTERVAL METERS FOR ELECTRICITY CUSTOMERS

MANDATORY ROLLOUT OF INTERVAL METERS FOR ELECTRICITY CUSTOMERS July 2004 Interval Meter Rollout MANDATORY ROLLOUT OF INTERVAL METERS FOR ELECTRICITY CUSTOMERS Final decision 2nd Floor, 35 Spring St Melbourne VIC 3000 Australia Phone: 61 3 9651 0222, Fax: 61 3 9651

More information

Roads of National Significance. Economic Assessments Review. NZ Transport Agency. July 2010

Roads of National Significance. Economic Assessments Review. NZ Transport Agency. July 2010 NZ Transport Agency Roads of National Significance Economic Assessments Review July 2010 Melbourne Sydney Brisbane Wellington Johannesburg Cape Town Windhoek Contact Person Andrew Cooper Director 04 499

More information

Executive Summary. Purpose of the Long Term Financial Plan. General assumptions. Objectives of Long Term Financial Plan. Assumptions and forecasts

Executive Summary. Purpose of the Long Term Financial Plan. General assumptions. Objectives of Long Term Financial Plan. Assumptions and forecasts Contents Executive Summary... 1 Purpose of Long Term Financial Plan... 1 Objectives of Long Term Financial Plan... 1 Assumptions and forecasts... 1 General assumptions... 1 Revenue Forecasts... 3 Rates

More information

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth

Melbourne Water. Principles for Provision of Waterway and Drainage Services for Urban Growth Melbourne Water Principles for Provision of Waterway and Drainage Services for Urban Growth Contents About Melbourne Water 3 Principles for Creating Development Services Schemes 4 Preface 4 (Original)

More information

Project Management Manual

Project Management Manual Project Management Manual PM01 Introduction to the Project Management Manual Ref: PM01 (V7.01) - Uncontrolled once Printed Issued on 20 th December 2006 Manual Owner: James Couper Head of Project Management

More information

Asset Management Policy March 2014

Asset Management Policy March 2014 Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and

More information

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology

2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology 2017 19 TasNetworks Regulatory Proposal Expenditure Forecasting Methodology Version Number 1 26 June 2015 Tasmanian Networks Pty Ltd (ACN 167 357 299) Table of contents 1 Introduction... 1 2 Meeting our

More information

1. a) How effective is the current Climate Change Act 2010 in driving climate change action by:

1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Public Submission Review of Climate Change Act 2010 City of Melbourne Questions 1. a) How effective is the current Climate Change Act 2010 in driving climate change action by: Government? (tick one only)

More information

9.1 Draft Revenue and financing policy

9.1 Draft Revenue and financing policy 1. Policy purpose and overview The purpose of the Revenue and financing policy is to provide predictability and certainty about sources and levels of funding available to the council. It explains the rationale

More information

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders. Vision Statement: Provide goals, objectives, and policies that preserve, improve, and promote responsible use and protect the City s natural and built environment. Goals, Objectives and Policies: Goal

More information

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc

Communications strategy refresh. January 2012. 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Communications strategy refresh January 2012 1 c:\documents and settings\mhln.snh\objcache\objects\a654473.doc Contents 1. Introduction p 3 a. SNH: corporate aims and objectives b. SNH and communications

More information

Project Assessment Framework Cost-benefit analysis

Project Assessment Framework Cost-benefit analysis Project Assessment Framework Cost-benefit analysis July 2015 Component of the Project Assessment Framework (PAF) This document forms part of the Project Assessment Framework, as outlined below. Overarching

More information

Financial Strategy 2016 2026

Financial Strategy 2016 2026 Financial Strategy 2016 2026 Table of Contents 1. Executive Summary and Overview... 4 1.1 Executive Summary... 4 1.1.1 The Financial Strategy and Long-Term Financial Forecast... 4 1.1.2 The Financial Strategy

More information

Renewable Energy for Kent

Renewable Energy for Kent Design + Planning Building Engineering Renewable Energy for Kent Part I: Overview and Action Plan April 2012 Updated Version 1 Committing a Path The development of low carbon and renewable energy sources

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

Office of the Minister of Transport. Chair Cabinet NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING. Proposal

Office of the Minister of Transport. Chair Cabinet NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING. Proposal Chair Cabinet Office of the Minister of Transport NATIONAL LAND TRANSPORT FUND: FUTURE FUNDING Proposal 1. This paper advises on future transport expenditure and revenue pressures, discusses options for

More information

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services

More information

Introduction to. Aalborg s Sustainability Strategy 2013-2016

Introduction to. Aalborg s Sustainability Strategy 2013-2016 Introduction to Aalborg s Sustainability Strategy 2013-2016 2 Foreword Aalborg should be a sustainable municipality, which will be to the benefit of local citizens, businesses and the environment. With

More information

1. Introduction 1. 2. Campbelltown City Council A Unique Environment 2. 3. Structure 3. 4. Campbelltown City Council s Strategic Planning Framework 4

1. Introduction 1. 2. Campbelltown City Council A Unique Environment 2. 3. Structure 3. 4. Campbelltown City Council s Strategic Planning Framework 4 TABLE OF CONTENTS Contents 1. Introduction 1 2. Campbelltown City Council A Unique Environment 2 3. Structure 3 4. Campbelltown City Council s Strategic Planning Framework 4 5. Strong Foundations 5 6.

More information

Frequently Asked Questions: Department of the Environment Natural Resource Management (NRM) Monitoring, Evaluation, Reporting and Improvement (MERI)

Frequently Asked Questions: Department of the Environment Natural Resource Management (NRM) Monitoring, Evaluation, Reporting and Improvement (MERI) Frequently Asked Questions: Department of the Environment Natural Resource Management (NRM) Monitoring, Evaluation, Reporting and Improvement (MERI) Version: 27 November 2013. This document may be updated

More information

At the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?

At the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used? At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

UGANDA. Climate Change Case Studies

UGANDA. Climate Change Case Studies UGANDA Climate Change Case Studies Introduction The Department of Meteorology, as National Focal Point for the UNFCCC has coordinated several climate change projects and programmes. Some, which we think