1 City of Victoria Community Energy and Emissions Plan FINAL REPORT 31 May 2012 Prepared for: Allison Ashcroft, City of Victoria Prepared by: Nicole Miller Duncan Cavens

2 Table of Contents Table of Contents... 2 List of Tables... 5 List of Figures... 6 EXECUTIVE SUMMARY CITY OF VICTORIA LAND USE AND ENERGY CONTEXT Introduction Managing constraints Supporting initiatives and policy Planned Community Growth Local Energy Demand and Supply Current energy demand and CEEI baseline Local energy supply potential Baseline and BAU Scenario COMMUNITY ENERGY AND EMISSIONS PLAN METHODOLOGY Overview The Climate Action Navigator Tool CAN tool outputs Stakeholder Engagement Workshops VISION, GOALS AND TARGETS Vision and Goals Energy and Emissions Targets CLIMATE ACTION STRATEGIES Overview Summary of estimated energy and emission savings and cost Emissions reductions and electricity consumption Land Use Building Retrofits Overview Selected Targets Strategy Evaluation New construction Overview Selected targets

3 4.5.3 Strategy evaluation District Energy Overview District energy distribution system District energy supply Renewable electricity generation Selected targets Strategy evaluation Transportation Overview Transportation demand management Transit system improvements Additional travel behaviour changes Vehicle electrification Selected targets Strategy evaluation Waste Overview Waste diversion Selected targets Strategy evaluation Offsets Overview Urban forestry Offset purchases Selected targets RECOMMENDATIONS Target refinements Additional analysis Recommended policies and actions Building retrofit actions New construction actions District energy actions Transportation actions Solid waste actions

4 5.2.6 Offset actions IMPLEMENTATION Adoption of plan Prioritized strategies and actions Roles, responsibilities and resources Partnerships and engagement Progress reporting APPENDIX A: Results from CAN stakeholder workshops APPENDIX B: CAN tool modeling methods APPENDIX C: BC Hydro s Structured Decision Making (SDM) Framework APPENDIX D: CEEP scope of work / proposal 4

5 List of Tables Table 1: Population and Housing Projections Table 2: Estimated quantities of local energy available for district energy applications Table 3: 2007 Baseline and BAU scenario energy and emissions Table 4: CEEP Project Objectives Table 5: List of strategies and key CAN model variables Table 6: Energy and emissions reductions for 2020 and 2041, low range Table 7: Energy and emissions reductions for 2020 and 2041, high range Table 8: Comparison of 2007, BAU and CEEP energy consumption, including electricity Table 9: Comparison of 2007, BAU and CEEP emissions, including electricity Table 10: Building retrofit targets Table 11: Estimated changes in energy consumption, building retrofit strategies Table 12: Estimated changes in GHG emissions, building retrofit strategies Table 13: Building retrofit emission reductions and costs per tonne reduced GHG Table 14: Building new construction targets Table 15: Estimated changes in energy consumption, building new construction strategies Table 16: Estimated changes in GHG emissions, building new construction strategies Table 17: Building new construction emission reductions and costs per tonne reduced GHG Table 18: District energy targets Table 19: Estimated changes in energy consumption, district energy strategies Table 20: Estimated changes in GHG emissions, district energy strategies Table 21: District energy emission reductions and costs per tonne reduced GHG Table 22: Transportation targets Table 23: Estimated changes in energy consumption, transportation strategies Table 24: Estimated changes in GHG emissions, transportation strategies Table 25: Transportation emission reductions and costs per tonne reduced GHG Table 26: Waste diversion targets Table 27: Estimated changes in GHG emissions, waste diversion strategies Table 28: Waste emission reductions and costs per tonne reduced GHG Table 29: Potential 2020 impact-based targets Table 30: Potential 2041 impact-based targets Table 31: Prioritized strategies and actions Table 32: Recommended energy and GHG emission reduction strategies and actions, by City role

6 List of Figures Figure 1: The role of local government in climate action Figure 2: OCP urban place designations Figure 3: Victoria 2007 energy and emissions Figure 4: Total estimated building energy use Figure 5: Comparison of Victoria per capita emissions and city benchmarks Figure 6: Potential local energy sources Figure 7: The CAN tool interface Figure 8: CAN tool workshops Figure 9: Emission reductions by strategy, low range Figure 10: Emission reductions by strategy, high range Figure 11: Comparison of emission reductions and cost per tonne by strategy, low range Figure 12: Comparison of emission reductions and cost per tonne by strategy, high range

7 EXECUTIVE SUMMARY In May 2010, the City of Victoria enshrined in bylaw its commitment to reduce community greenhouse gas emissions (GHGs) by at least 33 percent below 2007 levels by 2020, a bold and aspirational target. To assist in meeting Victoria s target, the City has undertaken the development of a Community Energy and Emissions Plan (CEEP) using an innovative process. To achieve significant energy and emission reductions, Victoria must work within two primary constraints. First, local governments have a limited sphere of influence on energy consumption and GHG emissions in their communities. Second, local government resources both financial and human are limited (Section 1.1.1). These constraints, paired with the intensity of reductions required to meet established targets, demand that the resources invested in reducing community energy and GHG emissions be carefully directed and managed to maximize results. To support an actionable plan, the CEEP process has considered the following: Quantitative evaluation the CEEP process includes the quantitative evaluation of energy, emissions and associated costs to inform recommendations and priorities that are reflective of required financial and other City resources Stakeholder input the CEEP process brought together a variety of stakeholders, climate professionals and industry experts to develop the plan, to provide feedback and to develop key partnerships and collective commitment through early collaboration Identification of City roles and potential partnerships the CEEP process identifies the City s potential role and level of influence for each recommended action (i.e. control, influence, encourage) as well as potential partners to determine where resources outside of local government can be best leveraged (e.g. non-profit partnerships, CRD collaboration, consultation with utilities and property owners, etc.) Analysis for the City of Victoria CEEP was conducted using a new energy and emissions assessment tool, the Climate Action Navigator (CAN) (Section 2.2). This tool was used in facilitated workshops (Section 2.3) with City staff, invited climate professionals and industry experts to explore potential community energy reduction and emission mitigation strategies and to develop specific, measurable targets and actions as inputs to the final CEEP document. Using a structured decision making (SDM) approach (Appendix C), each strategy included in the CEEP has been evaluated against a series of objectives (Section 2.1) and associated quantitative and qualitative measures for the plan s three time horizons: 2020, 2041 and 2080 (Section 4). Quantitative measures (energy consumption, GHG emissions and cost) were analysed within the CAN tool. Qualitative measures were assessed first by participants in the CAN workshops, and subsequently by the CEEP project team. The following sections describe each of the strategies considered, and report on the findings made and discussions had by staff and stakeholders during the CAN workshops and through the course of the CEEP process. Low and high feasible targets specific to each strategy have been established based on the expertise of local and technical experts present at the workshops (Section 4). As presented at the beginning of Section 4, the project team took the low and high ranges of targets set by stakeholders for each strategy and used the CAN tool to model low and high future energy and 7

8 emission reduction scenarios for the City, to see what total reductions could be achieved. Using the low range of targets, total community emissions for the City are estimated to be reduced 14% by 2020 and 29% by 2041 (Figure 9). Using the high range of targets, total community emissions are estimated to be reduced 34% by 2020 and 49% by 2041 (Figure 10) from 2007 levels, exceeding the City s established 2020 target by 1%. For both the low and high range of targets set by stakeholders, a number of strategies have the potential to be achieved with little, no or even negative net costs (capital, fuel and operating expenses). However, many of these same strategies are not able to achieve a high level of emissions reductions (e.g. new construction). Nor may the City have much control over implementing actions in some of these areas. Taking these tradeoffs into consideration, some of the most promising strategies include new construction, building retrofits, and supporting shifts in transportation behaviour. As these strategies can provide significant savings in energy costs, they have the potential to have very low, or even positive, net costs over a 30 year horizon; however, they may be difficult to achieve in practice, particularly behavioural change. Given the predicted magnitude of the GHG reduction of each strategy, it is clear that Victoria will need to choose a range of strategies to reach its GHG reduction goals. These results are both encouraging and challenging. It is encouraging that local and technical experts were able to chart a path for energy and emissions reductions that could meet and even exceed the City s 2020 target. However, the City s target of 33% is on the high end of what stakeholders felt could be achieved. The challenge for the City, then, is to develop a course of implementation, beginning with this report, which strives to maximize gains from each strategy in innovative and engaging ways. The City s OCP and sustainability policies provide a sound framework for this to happen, but much action is still required. Due to the City s limited spheres of influence and limited financial and human resources, partnerships and engagement are critical aspects of CEEP implementation. Achieving the targets established in this report require that the City identify where resources outside of local government can best be leveraged, including provincial, regional (CRD), private, non-profit and utility partnerships. Partnerships such as these bring together the individuals and organizations best equipped or authorized to implement specific energy and emission reduction strategies. The following three pages summarize in graphic and tabular format the targets, strategies and actions developed for energy and GHG emissions reductions in the City (see Section 5 for more detail), as well as the low and high emissions reductions possible with the targets established by project stakeholders. 8

9 Recommended energy and GHG emission reduction strategies and actions, by City role (control, influence, encourage 1 ) Control Influence Encourage Develop innovative financing opportunities Develop programs and incentives Increase the use of high-efficiency systems Use market mechanisms as a tool to increase energy efficiency in existing buildings Building Retrofits (section 5.2.1) Increase awareness and knowledge Advance the energy efficiency reqirements of the BC building code Develop policies and incentives Increase the use of high-efficiency and DE ready systems Use market mechanisms as a tool to increase energy efficiency in new construction New Construction (section 5.2.2) Increase awareness and knowledge Use land use planning as a tool to increase opportunities for district energy Develop policies and incentives Increase the use of renewable energy sources District Energy (section 5.2.3) Increase awareness and knowledge Develop key partnerships Use land use planning as a tool to increase opportunities for alternative transportation Make pedestrian and cycling infrastructure a top priority Develop programs and incentives Use parking provisions and policies as tools to support alternative transportation Transportation (section 5.2.4) Increase the use of electric vehicles Develop key partnerships Develop programs and incentives Develop key partnerships Waste (section 5.2.5) 1 See section for more information on these roles. 9

10 Emission reductions by strategy, low range Energy (GJ) GHG (t) Energy (GJ) GHG (t) Cost ($/t) Business as Usual 9,624, ,362 10,401, ,770 $0 From BAU: decr/(incr) % decr/(incr) % decr/(incr) % decr/(incr) % avg Buildings Building Retrofits 348,997-4% 15,118-4% 1,038,136-10% 41,190-10% $2 New Construction 121,658-1% 9,778-2% 572,807-6% 38,838-9% ($17) District Energy 132,877-1% 6,455-2% (253,820) 2% 14,637-3% $27 Reductions Subtotal 603,532 31,351 1,357,123 94,665 ($1) Reduction from BAU -6% -7% -13% -23% Reduction from % 1% 0% -4% Transportation TDM 314,508-3% 21,498-5% 361,712-3% 24,725-6% $124 Transit Improvements 52,418-1% 3,583-1% 60,285-1% 4,121-1% $567 Behaviour Change 249,609-3% 17,062-4% 574,146-6% 39,246-9% $0 Vehicle Electrification 76,880-1% 6,981-2% 176,838-2% 16,056-4% $15 Reductions Subtotal 693,415 49,124 1,172,981 84,148 $62 Reduction from BAU -7% -12% -11% -20% Reduction from % -3% 2% -1% Waste Waste Diversion ,580-2% ,860-3% $1 TOTALS TOTAL reductions 1,296,947 90,055 2,530, ,673 $28 Reduction from % -14% -13% -29% Reduction from BAU -13% -21% -24% -41% Data may not sum to total due to rounding. 10

11 Emission reductions by strategy, high range Energy (GJ) GHG (t) Energy (GJ) GHG (t) Cost ($/t) Business as Usual 9,624, ,362 10,401, ,770 $0 From BAU: decr/(incr) % decr/(incr) % decr/(incr) % decr/(incr) % avg Buildings Building Retrofits 721,145-7% 31,345-7% 1,164,928-11% 50,707-12% $4 New Construction 226,586-2% 13,331-3% 1,240,920-12% 61,896-15% ($10) District Energy 267,599-3% 8,665-2% (13,908) 0% 25,119-6% $22 Reductions Subtotal 1,215,330 53,341 2,391, ,722 $2 Reduction from BAU -13% -13% -23% -33% Reduction from % -4% -12% -15% Transportation TDM 314,508-3% 21,498-5% 361,712-3% 24,725-6% $124 Transit Improvements 209,672-2% 14,332-3% 241,142-2% 16,483-4% $922 Behaviour Change 686,425-7% 46,921-11% 789,451-8% 53,963-13% $0 Vehicle Electrification 180,407-2% 16,425-4% 202,765-2% 18,511-4% $34 Reductions Subtotal 1,391,012 99,176 1,595, ,682 $154 Reduction from BAU -14% -24% -15% -27% Reduction from % -16% -3% -9% Waste Waste Diversion ,380-3% ,530-4% $1 TOTALS TOTAL reductions 2,606, ,897 3,987, ,934 $69 Reduction from % -34% -29% -49% Reduction from BAU -27% -40% -38% -58% Data may not sum to total due to rounding. 11

12 Figure 1 Corporate and community carbon footprint s - the role of local government in climate a ction 1. CITY OF VICTORIA LAND USE AND ENERGY CONTEXT 1.1 Introduction The City of Victoria has changed dramatically over the past 30 years, and is expecting continued growth and change in the coming decades. Among the challenges accompanying this growth are issues of climate change, energy and food security, aging populations and aging infrastructure. This Community Energy and Emission Plan (CEEP) specifically addresses the challenge of climate change, and sets a course to help the City become a more climate change resilient community through the analysis of local strategies and actions to mitigate community-wide energy and greenhouse gas (GHG) emissions. Bill 27, the Local Government (Green Communities) Act, requires local governments in British Columbia to establish in their official community plans GHG emissions reductions targets, policies and actions. In May 2010, the City of Victoria enshrined in bylaw its commitment to reduce community greenhouse gas emissions (GHGs) by at least 33 percent below 2007 levels by 2020, a bold and aspirational target. Achieving this target requires the development of compact and complete neighbourhoods to support alternative transportation modes, renewable energy, and better energy efficiency in new and existing buildings. To accomplish this, Victoria must work within two primary constraints. First, local governments have a limited sphere of influence on energy consumption and GHG emissions in their communities. The management of municipal assets and the provision of services account for only 1% of community GHG emissions (Figure 1), while approximately 40% to 50% of community emissions may be under the influence of local government through land use and transportation planning. Second, local government resources both financial and human are limited (Section 1.1.1). These constraints, paired with the intensity of reductions required to meet established targets, demand that the strategies explored and resources invested in reducing community energy and GHG emissions be carefully directed and managed to maximize results. Figure 1: The role of local government in climate action 12

13 To assist in meeting Victoria s targets, the City has undertaken the development of the CEEP using an innovative process. While CEEPs have now been completed by numerous local governments throughout BC, the challenge remains to develop sound methods by which to marry detailed, technical energy and GHG analysis with meaningful public and stakeholder engagement and decision making. New approaches to GHG modeling, public engagement and scenario visualization, building from a history of award-winning research and applied projects conducted at the University of British Columbia, have provided an opportunity for the City of Victoria to be at the forefront of community energy and emissions planning in the Province Managing constraints As noted, local governments face two primary constraints in dealing with energy reductions and emissions mitigation limited spheres of influence and limited financial and human resources. To address these constraints, and to create an actionable plan, the CEEP process has considered the following: Quantitative evaluation the CEEP process includes the quantitative evaluation of energy, emissions and associated costs to inform recommendations and priorities that are reflective of required financial resources Stakeholder input the CEEP process brought together a variety of stakeholders, climate professionals and industry experts to develop the plan, to provide feedback and to develop key partnerships and collective commitment through early collaboration Identification of City roles the CEEP process identifies the City s potential roles and levels of influence for each recommended action (i.e. control, influence, encourage, Table 32) as well as potential partners (Table 31) to identify where resources outside of local government can be best leveraged (e.g. non-profit partnerships, CRD collaboration, consultation with utilities and property owners, etc.) Supporting initiatives and policy A number of related initiatives and local factors are working together to support this plan and related policy. In 2009, the City of Victoria established a Sustainability department for developing and implementing integrated strategies to address complex environmental and social issues. In addition, a draft Sustainability Framework has been developed to help move the City s corporate and community activities in a more sustainable direction and includes specific goals on energy and climate change that guide this CEEP. The proposed Official Community Plan (OCP) outlines further policies and strategies for achieving planning goals and targets relating to energy and climate change. Additional initiatives and policy supporting this plan include: Climate change adaptation planning using ICLEI Canada risk framework Council commitment to carbon neutrality in municipal operations by 2012 as a signatory of the BC Climate Action Charter BC Transit s Victoria Regional Rapid Transit Strategy Capital Regional District (CRD) Regional Growth Strategy Adoption of Downtown Core Area Plan Renewal of the City s neighbourhood planning program Development of a City-wide Transportation Master Plan Development of three Utilities Master Plans Development of a Parks and Open Space Master Plan and an Urban Forest Management Plan Development of an Economic Development Strategy with a focus on clean technology District energy opportunity assessment and development of district energy governance 13

14 1.2 Planned Community Growth Over the past 30 years, the population of Victoria has increased from 63,800 in 1981 to nearly 83,000 in Most of this growth has occurred in the city core and through the development of higher density residential and mixed-use neighbourhoods that have revitalised former industrial lands. Growth in Victoria over the next 30 years is anticipated to continue at this pace, with an additional 20,000 residents expected by Associated with this growth, the City forecasts a demand for an additional 13,500 apartment units and 2,700 ground oriented units over the same time period. The CRD Regional Growth Strategy 2 establishes the target that a minimum of 15% of the CRD s total new residential units be accommodated within Victoria through Between 2001 and 2007, the City s share of growth has exceeded that target, with an average growth of 22% of the CRD s total. In the city core, the population has increased 17% between 2001 and 2006, with continued growth supported by policy 3 targeting that 50% of forecasted growth for the City, or a minimum of 10,000 new residents, be accommodated in the downtown area by The Downtown Core Area Plan 4 provides direction on supporting population increase, business growth, cultural development, walkability and high-capacity, frequent public transit. Table 1: Population and Housing Projections 5 Data may not sum to total due to rounding. 2 Capital Regional District. (2003). The Capital Regional District Regional Growth Strategy. Prepared by Regional Planning Services, Capital Regional District. 3 City of Victoria. (2012). City of Victoria Official Community Plan. Proposed OCP Bylaw for first reading. Prepared by City of Victoria Planning and Development Department Community Planning Division. 4 City of Victoria. (2011). Downtown Core Area Plan. Prepared by City of Victoria Planning and Development Department Community Planning Division. 5 Urban Futures. (2009). Managing Growth and Change in the City of Victoria: As assessment of the magnitude, nature and timing of population, housing and employment change in the City of Victoria, 2008 to Prepared for The City of Victoria. 14

15 The OCP provides further direction on the accommodation of growth within the Mayfair and Hillside Town Centres and designated Large Urban Villages (Figure 2). These designated areas are projected to accommodate 40% of the forecasted population growth through 2041 (approximately 8,000 residents). The remaining 10% of forecasted growth (approximately 2,000 residents) is planned to be absorbed within Small Urban Villages and existing neighbourhoods. The progressive land use planning initiatives already included in the City s OCP work hand in hand with the GHG mitigation strategies and actions detailed in this report. Figure 2: OCP urban place designations 15

16 1.3 Local Energy Demand and Supply Current energy demand and CEEI baseline An inventory of the City s 2007 community energy consumption and greenhouse gas emissions is documented in the 2007 Community Energy and Emissions Inventory (CEEI) provided by the BC Ministry of Environment 6. Modeled community energy and emissions used for analysis in the development of the CEEP have been calibrated to align with the CEEI numbers. See Table 3 (Section 1.4) for the calibrated 2007 baseline numbers used for this project. For the 2007 baseline year, total community GHG emissions were reported at 383,383 tonnes, or roughly 5 tonnes per Victoria resident. Proportionately, 44% of community GHG emissions were from transportation, 29% from commercial buildings, 22% from residential buildings and 5% from solid waste. The proportion of commercial emissions is high for due to the City s role as the central business district for the region. Additionally, residential emissions are shaped both by the City s lower than average reliance on natural gas, and a high percentage of heating oil for residential buildings (27% of residential energy use and 59% of residential emissions). In total, the City used over 9 million gigajoules (GJ) of energy from all sources, including electricity, natural gas, propane, gasoline, diesel and other energy sources. Electricity was the most commonly used form of energy, accounting for over one-third of all energy consumed. Buildings consumed over 70% of the total community energy (in GJ) and result in 51% of community GHG emissions. The lower proportion of building sector emissions, as compared to energy consumption, is due to the low-carbon supply of electricity providing many of the buildings services. Figure 4 illustrates total building energy consumption across the City. On a per capita basis (Figure 5), Victoria performs better than many North American cities due to the City s mild climate, low-emission electricity supply, and relatively compact land uses. In particular, certain Victoria neighbourhoods, such as Harris Green and downtown perform particularly well due to more efficient building forms, a mix of land uses, and options for alternative modes of transportation. However, Victoria s per capita emissions are also significantly higher than many leading European and Asian cities, and far higher than that global per capita levels considered necessary to avoid dangerous levels of climate change 7. Figure 3: Victoria 2007 energy and emissions 8 6 The CEEI report can be viewed at: 7 Dodman, D. (2009). Blaming cities for climate change? An analysis of urban greenhouse gas emissions inventories. Environment and Urbanization, 21(1), HB Lanarc. (2010). Victoria Energy and Emissions Baseline Mapping. Prepared for The City of Victoria. 16

17 Figure 4: Total estimated building energy use 9 Figure 5: Comparison of Victoria per capita emissions and city benchmarks 10 9 HB Lanarc. (2010). Victoria Energy and Emissions Baseline Mapping. Prepared for The City of Victoria. 10 HB Lanarc. (2010). Victoria Energy and Emissions Baseline Mapping. Prepared for The City of Victoria. 17

18 1.3.2 Local energy supply potential An assessment of local energy supply potential, with an emphasis on district energy, was completed by Kerr Wood Leidal in May This report reviewed opportunities for local renewable and/or alternative energy sources, including bioenergy, geoexchange, solar, wind, wastewater and heat recovery, and also identified existing district energy systems. The following map (Figure 6) summarizes the findings of the report. Among the key findings, the report identifies that there is as much as 785,000 MWh of renewable, low-carbon energy available locally within the City from a diversity of sources. This is enough energy to heat approximately 90,000 apartments more than enough to house the entire population of the City indicating the potential supply currently outweighs potential demand. However, the actual utilization of available renewable energy depends largely on appropriate land use planning to locate demands near supplies and requires significant investment in the required infrastructure and technologies associated with each energy source. Table 2 specifies the estimated energy potential for several local energy sources. Figure 6: Potential local energy sources 11 Table 2: Estimated quantities of local energy available for district energy applications 11 Kerr Wood Leidal Associates. (2010). Energy Baseline Mapping and Analysis: Assessment of District Energy Systems. Prepared for The City of Victoria. 18

19 1.4 Baseline and BAU Scenario A business as usual (BAU) scenario for the City projects the potential energy consumption and GHG emissions at 2020 and 2041 in the absence of additional energy or GHG mitigation policies or action. The BAU includes projected increases in population and employment, projected building types 12 and the effects of established senior government policies and regulations, such as vehicle emission standards and landfill gas capture. The BAU scenario developed for the City projects a 9% increase in emissions (6% increase in energy) by 2020 and a 21% increase in emissions (15% increase in energy) by Table 3 summarizes 2007 baseline and BAU energy and emissions. See Appendix B for further details on BAU calculations. Table 3: 2007 Baseline and BAU scenario energy and emissions Energy (GJ) Ground-Oriented Residential Buildings Data may not sum to total due to rounding. GHG Emissions (tonnes) BAU 2041 BAU BAU 2041 BAU Electricity 535, , ,986 3,668 3,697 3,595 Natural Gas 36, , ,481 1,870 5,275 9,205 Propane 126, , ,918 7,717 7,389 6,522 Heating Oil 727, , ,708 51,255 47,582 41,997 Wood 263, , , Renewable Subtotal 1,689,019 1,676,148 1,615,551 64,607 64,015 61,382 Apartment Residential Buildings Electricity 710, , ,736 4,869 5,209 5,732 Natural Gas 669, , ,834 34,133 39,366 48,289 Renewable Subtotal 1,379,857 1,526,741 1,777,570 39,002 44,575 54,021 Commercial Buildings Electricity 1,985,177 1,882,834 1,960,784 13,602 12,992 13,529 Natural Gas 1,573,177 1,820,596 1,921,538 80,232 92,850 97,998 Renewable Subtotal 3,558,354 3,703,430 3,882,322 93, , ,527 Buildings Total 6,627,230 6,906,319 7,275, , , ,930 Transportation Fossil Fuel 2,454,250 2,718,040 3,126, , , ,790 Electricity Transport. Total 2,454,250 2,718,040 3,126, , , ,790 Waste ,310 19,170 22,050 TOTAL 9,081,480 9,624,359 10,401, , , ,770 Increase from % 15% 9% 21% 12 Projections based on Urban Futures. (2009). Managing Growth and Change in the City of Victoria: As assessment of the magnitude, nature and timing of population, housing and employment change in the City of Victoria, 2008 to Prepared for The City of Victoria. 19

20 2. COMMUNITY ENERGY AND EMISSIONS PLAN METHODOLOGY 2.1 Overview Analysis for the City of Victoria CEEP was conducted using an innovative new energy and emissions assessment tool, the Climate Action Navigator (CAN) (Section 2.2). This tool was used in facilitated workshops (Section 2.3) with City staff and invited climate professionals and industry experts to explore potential community emission mitigation strategies and to develop specific, measurable targets and actions as inputs to the final CEEP document. In addition, it is intended that the CAN tool will be made available to the general public via the internet to educate the public about the impact and cost of different energy and emissions reduction strategies, to support transparency regarding the climate change mitigation planning process, and to illustrate the rigour used to model and analyse energy and emissions data. Using a structured decision making (SDM) approach (Appendix C), energy and emission reduction strategies, objectives and measures were developed by the CEEP project team, in consultation with the City s directors and assistant directors as well as the City s Integrated Planning Committee. Each strategy included in the CEEP has been evaluated against the developed objectives and associated quantitative and qualitative measures for the plan s three time horizons: 2020, 2041 and Quantitative measures (energy consumption, GHG emissions and cost) were analysed within the CAN tool (Section 2.2.1). Qualitative measures were assessed first by participants in the CAN workshops, and subsequently by the CEEP project team. The resulting strategies, energy and emissions effects, and associated costs are provided in Section 4, and were used for the prioritization of the strategies for ongoing and future implementation (Sections 5 and 6). Table 4: CEEP Project Objectives Measure Units Quantifiable Objectives Reduce community GHG emissions Total community GHG emissions tonnes/year Reduce cost of implementation Cost per tonne GHG reduced $/tonne Increase building energy efficiency Building sector energy consumption GJ/year Reduce waste Tonnes of waste reduced tonnes/year Reduce high GHG transportation modes Transportation sector GHG emissions tonnes/year Qualitative Objectives Maximize public involvement in implementation Maximize flexibility of strategies Maximize ease of implementation Minimize risk of implementation Work through partnerships where possible Maximize synergistic effects Minimize trade-offs 20

21 2.2 The Climate Action Navigator Tool The CAN tool has been developed from modeling methods originating at the University of British Columbia. Earlier versions of these methods have been applied in a number of award-winning projects such as Plan It Calgary, the City of North Vancouver s 100 Year Sustainability Vision, and the Emerald Hills Sustainable Urban Village in Strathcona County, Alberta. The methods were also used to provide the land use modeling for a recent major national study funded by the QUEST (Quality Urban Energy Systems of Tomorrow) consortium: The capacity for integrated urban energy solutions (ICES) policies to reduce urban greenhouse gas emissions. This study, led by MK Jaccard and Associates estimated the effects of municipal policies on overall national GHG reduction capacities. The modeling methods applied in the CAN tool use development patterns to represent urban form and transportation patterns at a city-wide scale, while allowing sub-models to access detailed building-level data for estimations of building energy, transportation demand and associated GHG emissions. Recently, a costing component has been added to this model, enabling strategies to be evaluated not only for reductions in GHG emissions but also for capital and operating (e.g. fuel and maintenance) costs. The CAN tool was explicitly created for use in interactive stakeholder workshops and allows for recalculation of model inputs in real-time. This feature enables CAN tool users to explore multiple scenarios quickly and to view the impacts of their choices. The tool further allows for comparative analysis of climate change mitigation strategies for decision making, and can be used as an educational tool, familiarizing users with various strategies, drivers and impacts. Specific strategies and settings assessed with the CAN tool are detailed throughout Section 4. Details on the modeling methods used for the CAN tool can be found in Appendix B CAN tool outputs The CAN tool provides a quantitative evaluation of energy and emission reduction strategies as measured by energy, GHG emissions and cost. Detailed methods for each of these calculations can be found in Appendix B. Energy is measured in gigajoules (GJ) and GHG emissions are measured in metric tonnes (t). Cost measures are provided as total incremental cost and incremental cost per tonne of emissions reduced. The cost of each strategy is determined by calculating the incremental capital cost, operating and fuel costs using a Net Present Value (NPV) approach. Incremental capital cost refers to the difference in cost as compared to conventional practice or technology for initial purchase and replacements depending on the lifespan of the technology. The NPV is calculated based on the standard Levelized Cost of Energy calculation method, which enables the cost comparison of different technologies or strategies of unequal life span, capital costs, operating costs, and efficiencies. This simplified method of estimating cost is appropriate for comparison purposes only, and is not intended to be used as a predictor of actual future expenses. The NPV method of calculation reflects both upfront capital costs and operating and fuel costs over time. The NPV of some strategies may be negative; this occurs when savings from reduced operating and energy costs over time outweigh the incremental cost of the initial capital investment. Other strategies may have seemingly high costs per tonne; however, this measure compares only against GHG emission reductions and does not capture substantial co-benefits associated with many strategies. 21

22 Figure 7: The CAN tool interface 22

23 2.3 Stakeholder Engagement Workshops To develop a realistic plan for energy and GHG reductions within the City of Victoria, a series of stakeholder workshops were held to explore a range of GHG reduction strategies. During the workshops, the interactive CAN tool was employed to allow participants to deeply engage with the strategies and their modeled performance. The workshops fulfilled a number of purposes: to educate workshop participants about the range of GHG/energy strategies available, to provide information on the associated costs and benefits of particular strategies, to examine the feasibility of the community s existing GHG reduction target of 33% by 2020, to involve stakeholders in creating a prioritized list of strategies that are best suited to the City of Victoria, and to help the City create specific targets for energy and GHG reductions using a "bottom-up" approach based on the selected strategies. The workshops began with an introduction to the process, followed by a presentation on the list of strategies for review. Baseline and business as usual modeling results, including energy implications and cost estimates, were presented. Stakeholders were then divided into small groups (tables of 6 to 8 participants), where they were engaged in facilitated discussions about the strategies presented. They were encouraged to critique the strategies and their assumptions and to suggest new strategies. Each group had access to the model, displayed on a 40 flat screen monitor, where model assumptions and outputs could be explored. Each group was asked to select a series of strategies and feasible targets towards achieving the City s 2020 reduction target (i.e. 33% by 2020). At the same time, the long term (2041 and 2080) implications were modeled and presented to provide understanding on how short term decisions translate into reductions over the long term. After the workshops, the CEEP project team used the outcomes from the workshops to inform the creation of the prioritized list of actions (see Sections 5 and 6). Figure 8: CAN tool workshops 23

24 3. VISION, GOALS AND TARGETS 3.1 Vision and Goals In recognition of the importance of energy and climate change planning in Victoria, the City has already identified an overarching sustainability vision, as well as a number of energy and climate specific goals and objectives: 2041 Vision (from the OCP): Victoria, as a community and municipal corporation, is an urban sustainability leader inspiring innovation, pride and progress towards greater ecological integrity, livability, economic vitality, and community resiliency as we confront the challenges facing society and the planet today and for generations to come. Energy and Climate Goals (from the OCP): 1. Victoria and Victorians are more resilient to climate change and energy scarcity and costs 2. New and existing buildings are energy efficient, and produce few greenhouse gas emissions 3. Transportation options reduce fossil fuel dependence, help conserve energy and produce low greenhouse gas emissions and other air contaminants 4. The waste stream to the regional landfill is reduced to a minimum, with recovery, re-use, recycling and composting of resources undertaken as standard practice 5. Victoria relies on clean, renewable, diverse and efficient energy sources Energy and Climate Objectives (from the OCP): 1. That climate change is mitigated through the reduction of greenhouse gas emissions from buildings, transportation and solid waste 2. That the community is prepared for climate change through adaptation planning that reduces future impacts on public health, property and the natural environment 3. That community energy consumption and generation are managed to give priority to conservation and efficiency, diversification of supply, renewable energy and low carbon fuels 4. That the supply, distribution and efficient use of energy, including the provision of renewable energy at the district scale, is achieved in alignment with the Urban Place Guidelines in [the OCP]. 24

25 3.2 Energy and Emissions Targets Few North American cities have set emissions targets as ambitious as those in British Columbia. As identified in the proposed OCP, Victoria has committed that the City s 2020 target for greenhouse gas emissions is to reduce levels by 33% from 2007 levels. Recommendations for greenhouse gas reduction strategies and strategy specific targets and actions, e.g. for building retrofits and district energy, are provided in Sections 4 and 5 of this document. 25

26 4. CLIMATE ACTION STRATEGIES 4.1 Overview Table 5 summarizes the GHG and energy reduction strategies considered by the project team, staff and stakeholders during the CEEP process. Strategies were organized and considered according to the BC Hydro energy hierarchy, beginning with demand reduction opportunities. Staff and stakeholders recognized early in the process that to meet the challenging 2020 target established by the City, a combination of all available energy and GHG reduction strategies would have to be implemented in effective and creative ways. The following sections describe each of the strategies listed in Table 5, and report on the findings made and discussions had by staff and stakeholders during the CAN workshops and through the course of the CEEP process. Low and high feasible targets specific to each strategy have been established based on the expertise of local and technical experts present at the workshops. Using a SDM approach (Appendix C), each strategy has been quantitatively and qualitatively evaluated against the project objectives identified previously in Table 4. As summarized in Section 4.2, the total emissions reductions resulting from the low and high targets range from a 2020 reduction of 14% below 2007 levels (using the low end of all targets) to a reduction of 34% below 2007 levels (using the high end of all targets). Sections 4.3 through 4.9 provide details on the energy, emissions, costs, and qualitative impacts of each strategy. For information on how quantitative results were calculated for each strategy, please see Appendix B. These results are both encouraging and challenging. It is encouraging that local and technical experts were able to chart a path for energy and emissions reductions that could meet and even exceed the City s 2020 target. However, the City s target of 33% is on the high end of what stakeholders felt could be achieved. The challenge for the City, then, is to develop a course of implementation, beginning with this report, which strives to maximise gains from each strategy in innovative and engaging ways. The City s OCP and sustainability policies provide a sound framework for this to happen, but much action is still required. Sections 5 and 6 of this report provide prioritized strategy recommendations and initial implementation considerations for achieving the ambitious task set by stakeholders, staff and the CEEP project team. 26

27 Table 5: List of strategies and key CAN model variables 27

28 4.2 Summary of estimated energy and emission savings and cost As presented at the beginning of Section 4, the project team took the low and high ranges of targets set by stakeholders for each strategy and used the CAN tool to model low and high future energy and emission reduction scenarios for the City, to see what total reductions could be achieved. Using the low range of targets, total community emissions for the City are estimated to be reduced 14% by 2020 and 29% by 2041 (Table 6). Using the high range of targets, total community emissions are estimated to be reduced 34% by 2020 and 49% by 2041 (Table 7), exceeding the City s established 2020 target by 1%. Tables 8 and 9 summarize energy consumption and GHG emissions for the 2007 baseline, 2020 and 2041 BAU scenarios (Section 1.4), and 2020 and 2041 high and low target scenarios. These tables also show electrical consumption and emissions resulting from electricity Emissions reductions and electricity consumption One of the key ways that emissions reductions have been achieved for both the low and high target ranges set by stakeholders is through the use of low-carbon hydroelectricity to displace fossil fuel consumption in both the building and transportation sectors. For transportation, the use of electric vehicles has been included to reduce GHG emissions and increase energy efficiency for private vehicles. For buildings, high efficiency electric heat pumps have been targeted as an important technology for space heating. However, stakeholders, staff and the CEEP project team have recognized that using increasing amounts of electricity may also have negative consequences such as increased electricity prices and challenges in maintaining a low-carbon electricity supply. For this reason, the strategies and targets selected by stakeholders and presented in this report use electricity as an opportunity for emissions reductions, but also rely on the BC Hydro energy hierarchy to use electricity strategically. For buildings, strategies to reduce overall heating demand and to identify potential sources of waste heat have been considered in tandem with the use of electric heating technologies. In addition, high efficiency electric heating systems such as air to air heat pumps have been preferenced over less efficient technologies such as electric baseboards. For transportation, strategies to reduce the demand for private vehicles overall are used in conjunction with an increase in electric vehicles. Emphasizing demand reduction strategies in combination with the use of low-carbon, hydroelectricity to reduce GHG emissions results in overall reductions in electricity consumption: from over 3.2 million GJ in 2007 to between 2.9 and 2.7 million GJ in 2020 (a reduction of 11% -17%), compared to 3.2 million for the BAU scenario. For 2041, electricity consumption is estimated at between 3.1 and 2.8 million GJ, compared to 3.3 million for the BAU scenario (Table 8). 28

29 Figure 9: Emission reductions by strategy, low range Table 6: Energy and emissions reductions for 2020 and 2041, low range Energy (GJ) GHG (t) Energy (GJ) GHG (t) Cost ($/t) Business as Usual 9,624, ,362 10,401, ,770 $0 From BAU: decr/(incr) % decr/(incr) % decr/(incr) % decr/(incr) % avg Buildings Building Retrofits 348,997-4% 15,118-4% 1,038,136-10% 41,190-10% $2 New Construction 121,658-1% 9,778-2% 572,807-6% 38,838-9% ($17) District Energy 132,877-1% 6,455-2% (253,820) 2% 14,637-3% $27 Reductions Subtotal 603,532 31,351 1,357,123 94,665 ($1) Reduction from BAU -6% -7% -13% -23% Reduction from % 1% 0% -4% Transportation TDM 314,508-3% 21,498-5% 361,712-3% 24,725-6% $124 Transit Improvements 52,418-1% 3,583-1% 60,285-1% 4,121-1% $567 Behaviour Change 249,609-3% 17,062-4% 574,146-6% 39,246-9% $0 Vehicle Electrification 76,880-1% 6,981-2% 176,838-2% 16,056-4% $15 Reductions Subtotal 693,415 49,124 1,172,981 84,148 $62 Reduction from BAU -7% -12% -11% -20% Reduction from % -3% 2% -1% Waste Waste Diversion ,580-2% ,860-3% $1 TOTALS TOTAL reductions 1,296,947 90,055 2,530, ,673 $28 Reduction from % -14% -13% -29% Reduction from BAU -13% -21% -24% -41% Data may not sum to total due to rounding. 29

30 Figure 10: Emission reductions by strategy, high range Table 7: Energy and emissions reductions for 2020 and 2041, high range Energy (GJ) GHG (t) Energy (GJ) GHG (t) Cost ($/t) Business as Usual 9,624, ,362 10,401, ,770 $0 From BAU: decr/(incr) % decr/(incr) % decr/(incr) % decr/(incr) % avg Buildings Building Retrofits 721,145-7% 31,345-7% 1,164,928-11% 50,707-12% $4 New Construction 226,586-2% 13,331-3% 1,240,920-12% 61,896-15% ($10) District Energy 267,599-3% 8,665-2% (13,908) 0% 25,119-6% $22 Reductions Subtotal 1,215,330 53,341 2,391, ,722 $2 Reduction from BAU -13% -13% -23% -33% Reduction from % -4% -12% -15% Transportation TDM 314,508-3% 21,498-5% 361,712-3% 24,725-6% $124 Transit Improvements 209,672-2% 14,332-3% 241,142-2% 16,483-4% $922 Behaviour Change 686,425-7% 46,921-11% 789,451-8% 53,963-13% $0 Vehicle Electrification 180,407-2% 16,425-4% 202,765-2% 18,511-4% $34 Reductions Subtotal 1,391,012 99,176 1,595, ,682 $154 Reduction from BAU -14% -24% -15% -27% Reduction from % -16% -3% -9% Waste Waste Diversion ,380-3% ,530-4% $1 TOTALS TOTAL reductions 2,606, ,897 3,987, ,934 $69 Reduction from % -34% -29% -49% Reduction from BAU -27% -40% -38% -58% Data may not sum to total due to rounding. 30

Corporate Carbon Neutral Plan

Corporate Carbon Neutral Plan This Carbon Neutral Plan will guide the District of 100 Mile House decision making process in terms of reducing corporate energy consumption and greenhouse gas emissions and in achieving carbon neutrality.

More information

2015 CARIP Climate Action/Carbon Neutral Progress Survey

2015 CARIP Climate Action/Carbon Neutral Progress Survey 2015 CARIP Climate Action/Carbon Neutral Progress Survey Filled Monday, March 14, 2016 BROAD PLANNING ACTIONS Broad planning refers to high level planning that sets the stage for GHG emissions reductions,

More information

Victoria City 2010 Community Energy and Emissions Inventory Monitoring and reporting on progress towards greenhouse gas emissions reduction targets

Victoria City 2010 Community Energy and Emissions Inventory Monitoring and reporting on progress towards greenhouse gas emissions reduction targets 1,000s of tonnes Victoria City Page 1 of 6 2010 GHG Emissions Sources (Total for this Community) 2010 GHG Emissions Sources (Total for BC) GHG Emissions Comparisons for this Community 12% 7% 250 200 40%

More information

Corporate & Community Climate Action Plan

Corporate & Community Climate Action Plan 2010 Corporate & Community Climate Action Plan Corporate Inventory Years: 2002 and 2007 Community Inventory Years: 2002 and 2007 Corporate & Community Climate Action Plan 2010 Corporate Inventory Years:

More information

Our Path to Carbon Neutrality. City of Prince George Carbon Neutral Plan

Our Path to Carbon Neutrality. City of Prince George Carbon Neutral Plan Our Path to Carbon Neutrality City of Prince George Carbon Neutral Plan December 2010 Executive Summary The Carbon Neutral Plan (the Plan) supports Council s two voluntary commitments regarding Greenhouse

More information

Government of British Columbia CARIP Reporting Template for 2010 1

Government of British Columbia CARIP Reporting Template for 2010 1 Government of British Columbia CARIP Reporting Template for 2010 1 CARIP Report Name of Local Government Member of Regional District (RD) Regional Growth Strategy (RGS) in region Population Report Submitted

More information

Climate Action Revenue Incentive (CARIP) Public Report for 2013

Climate Action Revenue Incentive (CARIP) Public Report for 2013 March 6, 2013 Climate Revenue Incentive Plan (CARIP) Public Report Climate Revenue Incentive (CARIP) Public Report for 2013 City of Quesnel Reported by: Tanya Turner tturner@quesnel.ca Contents General

More information

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report Electrical infrastructure serving the city of London CITY OF LONDON 2012 Corporate Energy Consumption Report September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 1 CORPORATE ENERGY

More information

Greenhouse gas abatement potential in Israel

Greenhouse gas abatement potential in Israel Greenhouse gas abatement potential in Israel Israel s GHG abatement cost curve Translated executive summary, November 2009 1 Executive Summary Background At the December 2009 UNFCCC Conference in Copenhagen,

More information

Climate Change Mitigation: a Strategic Approach for Cities

Climate Change Mitigation: a Strategic Approach for Cities Climate Change Mitigation: a Strategic Approach for Cities Toronto and Region Conservation (TRCA) has become a trusted source of information on climate change adaptation and mitigation. Getting to Carbon

More information

COMOX VALLEY REGIONAL DISTRICT CORPORATE ENERGY PLAN

COMOX VALLEY REGIONAL DISTRICT CORPORATE ENERGY PLAN COMOX VALLEY REGIONAL DISTRICT CORPORATE ENERGY PLAN February 4, 2011 Project delivered to: Michael Zbarsky Manager of Transit and Sustainability Prepared by: Stantec Consulting Ltd. Summary The Comox

More information

Climate control. Smart solutions that pay off.

Climate control. Smart solutions that pay off. Climate control Smart solutions that pay off. Cowichan Valley Regional District Corporate Greenhouse Gas Inventory & Emissions Reduction Plan 2012 Page 2 The CVRD s Environmental Policy Division offers

More information

POLICY ACTIONS INVESTING IN INNOVATION

POLICY ACTIONS INVESTING IN INNOVATION The BC Energy Plan ALTERNATIVE ENERGY Government will work with other agencies to maximize opportunities to develop, deploy and export British Columbia clean and alternative energy technologies. POLICY

More information

British Columbia s Clean Energy Vision

British Columbia s Clean Energy Vision British Columbia s Clean Energy Vision Innovative Technologies and Green Energy Solutions National Environmental Conference Brunei Darussalam July 1, 2010 Profile of British Columbia Overview British

More information

Climate Action Revenue Incentive Program (CARIP) Public Reporting - Carbon Neutral Progress Survey 2014

Climate Action Revenue Incentive Program (CARIP) Public Reporting - Carbon Neutral Progress Survey 2014 Climate Action Revenue Incentive Program (CARIP) Public Reporting - Carbon Neutral Progress Survey 2014 Filled Wednesday, May 22, 2015 Measuring Corporate GHG Emissions MEASURING CORPORATE GHG EMISSIONS

More information

CLIMATE ACTION IN BRITISH COLUMBIA 2014 PROGRESS REPORT

CLIMATE ACTION IN BRITISH COLUMBIA 2014 PROGRESS REPORT CLIMATE ACTION IN BRITISH COLUMBIA 2014 PROGRESS REPORT B.C. is continuing to work towards an economy that is prepared for climate change, and helping to reduce greenhouse gas emissions on a global scale.

More information

National Energy Benchmarking Framework: Report on Preliminary Working Group Findings

National Energy Benchmarking Framework: Report on Preliminary Working Group Findings National Energy Benchmarking Framework: Report on Preliminary Working Group Findings January 2016 Prepared by: Contact: Sundeep Virdi, MES, SBA Manager, Advocacy & Policy Canada Green Building Council

More information

GREENHOUSE GAS EMISSIONS INVENTORY

GREENHOUSE GAS EMISSIONS INVENTORY GREENHOUSE GAS EMISSIONS INVENTORY The first step in developing a plan to reduce greenhouse gases was to identify sources and quantities of greenhouse gases emitted in Fort Collins. An emissions inventory

More information

Ener ficiency. Corporate Energy and Greenhouse Gas Inventory. Consulting. Squamish-Lillooet Regional District. Prepared For: Prepared by:

Ener ficiency. Corporate Energy and Greenhouse Gas Inventory. Consulting. Squamish-Lillooet Regional District. Prepared For: Prepared by: Ener ficiency Consulting Corporate Energy and Greenhouse Gas Inventory Prepared For: Prepared by: Enerficiency Consulting 458 Abbs Road Gibsons, BC V0N 1V0 604-886 - 9864 October, 2009 1. Introduction

More information

WHISTLER ENERGY CONSUMPTION AND GREENHOUSE GAS PERFORMANCE TRENDS

WHISTLER ENERGY CONSUMPTION AND GREENHOUSE GAS PERFORMANCE TRENDS WHISTLER ENERGY CONSUMPTION AND GREENHOUSE GAS PERFORMANCE TRENDS ANNUAL REPORT Chief Administrator s Office June 2015 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY 1 2 INTRODUCTION 4 2.1 BACKGROUND 5 2.1.1 Whistler2020:

More information

Council Strategic Plan 2015-2018. squamish.ca

Council Strategic Plan 2015-2018. squamish.ca Council Strategic Plan 2015-2018 squamish.ca 2 Summary Our Council began their 2014 2018 term with a strategic planning exercise. The exercise identified a number of areas of focus for Council and directed

More information

Vancouver Landfill Gas Capture Optimization Project

Vancouver Landfill Gas Capture Optimization Project May 11, 2015 Vancouver Landfill Gas Capture Optimization Project Allocation of GHG Reduction Credits to Metro Vancouver and its Member Municipalities 2014 Reporting Year This report was prepared by the

More information

October 2010 CITY OF SURREY. Corporate Emissions Action Plan

October 2010 CITY OF SURREY. Corporate Emissions Action Plan October 2010 CITY OF SURREY Corporate Emissions Action Plan SUMMARY Overview The City of Surrey has undertaken this project to define opportunities to reduce energy consumption and greenhouse gas (GHG)

More information

Energy Conservation and Demand Management Plan. From: 2014-07-01 to: 2018-12-31

Energy Conservation and Demand Management Plan. From: 2014-07-01 to: 2018-12-31 Commitment Management Plan Township of Douro-Dummer From: 2014-07-01 to: 2018-12-31 1. Declaration of Commitment: The Township of Douro-Dummer will use existing resources and will leverage outside agencies

More information

The City of Calgary 2003 Corporate Greenhouse Gas Emission Inventory

The City of Calgary 2003 Corporate Greenhouse Gas Emission Inventory The City of Calgary 2003 Corporate Greenhouse Gas Emission Inventory January 2005 Prepared for: The Federation of Canadian Municipalities & ICLEI Local Governments for Sustainability Partners for Climate

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making Strathcona County

More information

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE

COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE COUNTY OF PETERBOROUGH - ENERGY MANAGEMENT PLAN TEMPLATE Energy management plans can be extremely large, complicated, and expensive. But they don t need to be. In its simplest form, an energy management

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007. Page 1 of 9

JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007. Page 1 of 9 JACKSON HOLE ENERGY EFFICIENCY ACTION PLAN FALL 2007 Page 1 of 9 TABLE OF CONTENTS I. SUMMARY 1. Introduction 2. Purpose 3. Energy Use Snapshot 4. Strategies 5. Short-Term Recommendations 6. Long-Term

More information

2015-18 Department Business Plan. Utilities

2015-18 Department Business Plan. Utilities 2015-18 Department Business Plan Utilities Updated June 2016 I am pleased to introduce Utilities 2015-18 Department Business Plan. The goals capture four main areas where Utilities will contribute to making

More information

RBC Environmental Blueprint

RBC Environmental Blueprint RBC Environmental Blueprint RBC ENVIRONMENTAL BLUEPRINT As one of Canada s largest banks and one of the largest banks in the world, we recognize the impact we have in the communities in which we live and

More information

PE9.4 Corrected Report

PE9.4 Corrected Report PE9.4 Corrected Report STAFF REPORT ACTION REQUIRED Toronto s 2013 Greenhouse Gas Inventory Date: December 17, 2015 To: From: Wards: Reference Number: Parks and Environment Committee Chief Corporate Officer

More information

Corporate Energy and Emissions Management Plan. December 2013

Corporate Energy and Emissions Management Plan. December 2013 Corporate Energy and Emissions Management Plan December 2013 Table of Contents Highlights... 1 Introduction and Background... 4 Why Have a Corporate Energy and Emissions Management Plan?... 5 Understanding

More information

Options for Reducing GHG Emissions in Calgary. Research Report

Options for Reducing GHG Emissions in Calgary. Research Report Options for Reducing GHG Emissions in Calgary Research Report February 2011 This report was compiled by the Pembina Institute based on the research presented in the appendix and feedback from stakeholders.

More information

Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN. Prepared by Stantec Consulting Ltd. January 2011 FINAL

Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN. Prepared by Stantec Consulting Ltd. January 2011 FINAL Regional District of Okanagan Similkameen CORPORATE CLIMATE ACTION PLAN Prepared by Stantec Consulting Ltd. January 2011 FINAL The South Okanagan Similkameen Climate Action Planning Project is a collaborative

More information

ALASKA S GREEN ECONOMY SUMMARY

ALASKA S GREEN ECONOMY SUMMARY ALASKA S GREEN ECONOMY SUMMARY The emerging green economy is diverse and widespread. To varying degrees, every state is witnessing growth in some green industry segment, and more often than not, this business

More information

Fiscal Year 2011 Resource Plan

Fiscal Year 2011 Resource Plan Salt River Project Fiscal Year 2011 Resource Plan Page 1 Last summer SRP hosted three resource planning workshops for a diverse group of stakeholders and customers to explain the planning process, discuss

More information

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments January 2015 Corporate Scope 2 accounting has traditionally been relatively straight forward. Common

More information

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Carbon emissions (kgco2) Page 1 PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 1. INTRODUCTION

More information

Climate Action Revenue Incentive (CARIP) Public Report for 2015

Climate Action Revenue Incentive (CARIP) Public Report for 2015 Climate Action Revenue Incentive (CARIP) Public Report for 2015 Local Government: The Corporation of the District of rth Vancouver Report Submitted by: Name: Jenn Meilleur / Paul Forsyth Role: Program

More information

Business Plan: Energy Conservation

Business Plan: Energy Conservation Business Plan: Energy Conservation How does this service contribute to the results identified in the City of London Strategic Plan? A Green and Growing City A Strong Economy This business area s key focus

More information

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1

SUSTAINABILITY CHARTER. May 2012. 1 R&CA Sustainability Charter V1 SUSTAINABILITY CHARTER May 2012 1 R&CA Sustainability Charter V1 Introduction By their very nature, restaurant and catering businesses are significant users of energy, water and raw materials. Cooking

More information

ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT

ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT Court Services and Offender Supervision Agency for the District of Columbia POLICY STATEMENT ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT I. COVERAGE This Policy Statement and its appended procedures

More information

1. Overview of Project Neutral

1. Overview of Project Neutral 1. Overview of Project Neutral Project Neutral (PN) is an ambitious initiative to transition neighbourhoods to carbon neutrality. Since 2010, PN has been working with community leaders in two Toronto neighbourhoods,

More information

Municipality of Port Hope Corporate Climate Action Plan 2010

Municipality of Port Hope Corporate Climate Action Plan 2010 Municipality of Port Hope Corporate Climate Action Plan 2010 December 2010 Presented to: Municipality of Port Hope 56 Queen Street Port Hope, ON L1A 3Z9 Presented By: ENVIRON EC (Canada) Inc. ii Executive

More information

Solar City Master Plan - Executive Summary

Solar City Master Plan - Executive Summary Solar City Master Plan - Executive Summary Meeting the growing energy demand is one of the biggest challenges that the world is facing today. Rising population and depleting fossil fuel resources are compelling

More information

TOWN OF. Smithers CORPORATE ENERGY & GHG EMISSIONS PLAN. For inventory years 2004 through 2010

TOWN OF. Smithers CORPORATE ENERGY & GHG EMISSIONS PLAN. For inventory years 2004 through 2010 TOWN OF Smithers 2012 CORPORATE ENERGY & GHG EMISSIONS PLAN For inventory years 2004 through 2010 TOWN OF Smithers CORPORATE ENERGY & GHG EMISSIONS PLAN For the 2004 to 2010 inventory years 2012 Prepared

More information

Calgary Transit Environmental Stewardship

Calgary Transit Environmental Stewardship Calgary Transit Environmental Stewardship Calgary 1 Million Population Uni-City Governance Coordinated Land Use and Transportation Planning The City Fastest Growing Economy in Canada #2 Corporate Head

More information

Communicating Your Commitment: Your Guide to Clean Energy Messaging

Communicating Your Commitment: Your Guide to Clean Energy Messaging Communicating Your Commitment: Your Guide to Clean Energy Messaging Congratulations on your recent purchase of clean energy from Renewable Choice! Whether you ve purchased green power in the form of renewable

More information

Compliance, Tools & Synchronization: A Guide to Climate Action Planning Resources in California

Compliance, Tools & Synchronization: A Guide to Climate Action Planning Resources in California Compliance, Tools & Synchronization: A Guide to Climate Action Planning Resources in California 3rd Annual Statewide Energy Efficiency Best Practices Forum Amruta Sudhalkar, Program Officer ICLEI Local

More information

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION

REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION REPUBLIC OF TURKEY INTENDED NATIONALLY DETERMINED CONTRIBUTION In accordance with decisions 1/CP.19 and 1/CP.20, the Republic of Turkey hereby presents its Intended Nationally Determined Contribution (INDC)

More information

Extending the Dialogue Among Canadians

Extending the Dialogue Among Canadians Nations fic and ization Acting on Climate Change: Extending the Dialogue Among Canadians A collection of texts in response to Acting on Climate Change: Solutions from Canadian Scholars, a consensus document

More information

DANISH DISTRICT ENERGY PLANNING EXPERIENCE

DANISH DISTRICT ENERGY PLANNING EXPERIENCE MOWAT ENERGY, A RESEARCH HUB AT THE MOWAT CENTRE, AT THE REQUEST OF THE ONTARIO MINISTRY OF ENERGY FUTURE INNOVATION IN ENERGY PLANNING: A SPECIAL SESSION TO ADVISE ON ONTARIO S LONG-TERM ENERGY FUTURE

More information

Town of Whitby Corporate Energy Management Plan

Town of Whitby Corporate Energy Management Plan Town of Whitby Corporate Energy Management Plan Corporate Energy Management Plan Town of Whitby This document was prepared for the Corporation of the Town of Whitby by IndEco Strategic Consulting Inc.

More information

Office of Climate Change, Energy Efficiency and Emissions Trading. Business Plan

Office of Climate Change, Energy Efficiency and Emissions Trading. Business Plan Office of Climate Change, Energy Efficiency and Emissions Trading Business Plan April 1, 2011 - March 31, 2014 Table of Contents Message from the Premier...3 1.0 OVERVIEW...4 2.0 MANDATE...5 3.0 LINES

More information

City of. Kelowna CORPORATE ENERGY & GHG EMISSIONS PLAN

City of. Kelowna CORPORATE ENERGY & GHG EMISSIONS PLAN City of Kelowna 2011 CORPORATE ENERGY & GHG EMISSIONS PLAN Prepared for: City of Kelowna 1435 Water Street Kelowna, BC V1Y 1J4 Tel: (250) 469-8500 ask@kelowna.ca City of Kelowna CORPORATE ENERGY & GHG

More information

City of Atlanta CLIMATE ACTION PLAN

City of Atlanta CLIMATE ACTION PLAN City of Atlanta CLIMATE ACTION PLAN Jairo Garcia, Ed.D. Mayor s Office of Sustainability August 7, 2015 Agenda 1. Overview Office of Sustainability 2. Overview Climate Action Plan 3. Climate Impacts a.

More information

Wood Pellets for Power and Heat. Gordon Murray, Executive Director

Wood Pellets for Power and Heat. Gordon Murray, Executive Director Wood Pellets for Power and Heat Gordon Murray, Executive Director Bioenergy overview Carbon cycle What are wood pellets and how are they made? Pellets for power Pellets for heat The wood pellet industry

More information

Call to Action on Smart Sustainable Cities

Call to Action on Smart Sustainable Cities Call to Action on Smart Sustainable Cities 1. Introduction Achieving sustainable urbanization, along with the preservation of our planet, has been recognized as one of the major challenges of our society

More information

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario

The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary

More information

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016)

Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) Dnro 7202/804/2008 Unofficial translation Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) 1 The starting points and grounds for the agreement

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs)

INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) UNITED REPUBLIC OF TANZANIA INTENDED NATIONALLY DETERMINED CONTRIBUTIONS (INDCs) 1. Introduction The United Republic of Tanzania, which comprises of Tanzania Mainland and Zanzibar, brings forth her Intended

More information

State Clean Energy Fund Support for Renewable Energy Projects

State Clean Energy Fund Support for Renewable Energy Projects State Clean Energy Fund Support for Renewable Energy Projects Key Findings from the 2009 CESA National Database Project Deployment Results from State Renewable Energy Program Activities: 2009 Annual and

More information

CSX Public Safety, Health, and Environmental Management System

CSX Public Safety, Health, and Environmental Management System CSX Public Safety, Health, and Environmental Management System As one of the nation s leading suppliers of rail and intermodal transportation, CSX Transportation (CSX) is committed to minimizing the impact

More information

DRAFT. Corporate Energy and Emissions

DRAFT. Corporate Energy and Emissions Corporate Energy and Emissions Table of Contents Highlights... 1 Introduction and Background... 4 Why Have a Corporate Energy and Emissions s Strategy?... 5 Understanding the City s Energy Needs and Emissions

More information

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders. Vision Statement: Provide goals, objectives, and policies that preserve, improve, and promote responsible use and protect the City s natural and built environment. Goals, Objectives and Policies: Goal

More information

Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan

Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan April 2014 Contents Summary...1 Introduction...2 Objectives of the Plan...3 Plan of Action...5 The Benefits of Energy Efficiency...

More information

THE CITY OF COURTENAY:

THE CITY OF COURTENAY: City of Courtenay THE CITY OF COURTENAY: CHANGING FOR OUR CLIMATE CITY OF COURTENAY STANDS UP AGAINST CLIMATE CHANGE IN BRITISH COLUMBIA WRITTEN BY SASHA ORMAN PRODUCED BY XAN WYNNE-JONES Photo: Boomer

More information

Introduction to. Aalborg s Sustainability Strategy 2013-2016

Introduction to. Aalborg s Sustainability Strategy 2013-2016 Introduction to Aalborg s Sustainability Strategy 2013-2016 2 Foreword Aalborg should be a sustainable municipality, which will be to the benefit of local citizens, businesses and the environment. With

More information

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas Transportation Association of Canada Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas The transportation funding and governance frameworks of Canada s metropolitan regions

More information

CRD WWTP Business Case Requirements

CRD WWTP Business Case Requirements DRAFT DRAFT DRAFT Overview Purpose of a Business Case CRD WWTP Business Case Requirements The purpose of the business case is to present sufficient information regarding the CRD s Core Area Sewage Treatment

More information

Peace River Regional District Corporate Energy Plan

Peace River Regional District Corporate Energy Plan Peace River Regional District Corporate Energy Plan Final Prepared for Peace River Regional District Project Contact: Bruce Simard General Manager of Development Services Prepared by The Sheltair Group

More information

Regional District of Kootenay Boundary

Regional District of Kootenay Boundary Regional District of Kootenay Boundary Corporate Greenhouse Gas Emissions Reduction Plan Final Report Prepared for Regional District of Kootenay Boundary Project Contact: Bryan Teasdale Prepared by The

More information

Recommendations on Proposed Comprehensive Plan Amendments

Recommendations on Proposed Comprehensive Plan Amendments October 30, 2015 Diane Sugimura Director City of Seattle Department of Planning and Development 700 Fifth Avenue, Suite 2000 P.O. Box 34019 Seattle, WA 98124-4019 Via e-mail Re: Recommendations on Proposed

More information

Los Angeles Regional Collaborative For Climate Action & Sustainability CHARTER PREAMBLE

Los Angeles Regional Collaborative For Climate Action & Sustainability CHARTER PREAMBLE CHARTER PREAMBLE The United Nations World Council on the Environment and Development defines sustainability as the ability to meet the needs of the present without compromising the ability of future generations

More information

2009 Energy Policy. Background

2009 Energy Policy. Background 2009 Energy Policy Background The citizens of Fort Collins created the municipal electric utility in 1935. In 1973, Fort Collins joined with Estes Park, Longmont and Loveland to create Platte River Power

More information

Columbus State Community College. Climate Action Plan

Columbus State Community College. Climate Action Plan Columbus State Community College Climate Action Plan September 2009 Contents Introduction... 3 Commitment... 3 Community Education... 4 Carbon Footprint... 4 Accounting for Student and Employee Commuting...

More information

Empowering Local Clean Energy Action FEDERAL POLICY AGENDA FOR 2011

Empowering Local Clean Energy Action FEDERAL POLICY AGENDA FOR 2011 Empowering Local Clean Energy Action FEDERAL POLICY AGENDA FOR 2011 L ocal government leadership is essential for America to achieve energy independence, renew economic prosperity and protect the environment.

More information

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Extended Abstract # 15 Whitney R. Leeman, J. Matthew Gerken, and Jeffrey A. Henderson

More information

Holland s Community Energy Plan

Holland s Community Energy Plan Holland s Community Energy Plan Michigan Green Communities Initiative recently hosted a conference call about the City of Holland s energy planning efforts. I was struck by the size and scope of the effort

More information

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.

COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789

More information

Corporate Energy Management Plan

Corporate Energy Management Plan Corporate Energy Management Plan Corporate Energy Management Plan Town of Aurora This document was prepared for the Town of Aurora by IndEco Strategic Consulting Inc. For additional information about

More information

GREEN ENGINEERING TECHNOLOGIES (PVT) LTD.

GREEN ENGINEERING TECHNOLOGIES (PVT) LTD. GREEN ENGINEERING TECHNOLOGIES (PVT) LTD. At Green Engineering Technologies (PVT) Ltd, we are making the world a cleaner, safer place and also it is our primary concern and the business. We are committed

More information

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 STAFF REPORT ACTION REQUIRED Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 Date: June 9, 2014 To: From: Wards: Reference Number: Parks and Environment

More information

ANALYSIS OF THE ADMINISTRATION S PROPOSED TAX INCENTIVES FOR ENERGY EFFICIENCY AND THE ENVIRONMENT

ANALYSIS OF THE ADMINISTRATION S PROPOSED TAX INCENTIVES FOR ENERGY EFFICIENCY AND THE ENVIRONMENT June 28, 1999 ANALYSIS OF THE ADMINISTRATION S PROPOSED TAX INCENTIVES FOR ENERGY EFFICIENCY AND THE ENVIRONMENT INTRODUCTION A few months ago in the FY 2000 budget the President proposed a $3.6 billion

More information

Community Efficiency - An MIT / Cambridge Collaboration

Community Efficiency - An MIT / Cambridge Collaboration Community Efficiency - An MIT / Cambridge Collaboration Challenging students to discover, analyze, and articulate strategic approaches to scaling transformative ideas Harvey Michaels, Lecturer and Director

More information

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity;

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity; 9 Greenhouse Gas Assessment 9.1 Introduction This chapter presents an assessment of the potential greenhouse gas emissions associated with the Simandou Railway and evaluates the significance of these in

More information

Queen s University Belfast Carbon Management Programme. Carbon Management Plan (CMP 2013)

Queen s University Belfast Carbon Management Programme. Carbon Management Plan (CMP 2013) Queen s University Belfast Carbon Management Programme Carbon Management Plan (CMP 2013) 5 June 2013 1 Contents Management Summary 1. Introduction 7 2. Carbon Management Strategy 2.1 Context and Drivers

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Renewable Energy for Kent

Renewable Energy for Kent Design + Planning Building Engineering Renewable Energy for Kent Part I: Overview and Action Plan April 2012 Updated Version 1 Committing a Path The development of low carbon and renewable energy sources

More information

I. 2030 CLIMATE AD EERGY POLICY FRAMEWORK

I. 2030 CLIMATE AD EERGY POLICY FRAMEWORK uropean Council Brussels, 23 October 2014 (OR. en) SN 79/14 NOT Subject: uropean Council (23 and 24 October 2014) Conclusions on 2030 Climate and nergy Policy Framework I. 2030 CLIMAT AD RGY POLICY FRAMWORK

More information

Tax Credit Extension: Impact on Renewables Investment and Emissions Outcomes

Tax Credit Extension: Impact on Renewables Investment and Emissions Outcomes CONCORD, MA - WASHINGTON, DC 47 Junction Square Drive Concord, MA 01742 978-369-5533 www.mjbradley.com MJB&A Issue Brief March 7, 2016 Tax Credit Extension: Impact on Renewables Investment and Emissions

More information

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction

EXECUTIVE SUMMARY. Asset Management Relationships and Dependencies. Introduction EXECUTIVE SUMMARY Introduction The Asset Management Plan demonstrates sound stewardship of the Region s existing assets to support services at desired levels and to ensure the support of the Region s infrastructure

More information

Action Plan Template. [Community Name] Climate Change Action Plan. Province of Manitoba Climate Change Planning Resources.

Action Plan Template. [Community Name] Climate Change Action Plan. Province of Manitoba Climate Change Planning Resources. [Community Name] Climate Change Action Plan Prepared By: Acknowledgements: Ex. council/board, staff, committee Date: When submitted to council/board Executive Summary A short summary outlining the main

More information

Settlements Must Be Integrated with Nature

Settlements Must Be Integrated with Nature Settlements Must Be Integrated with Nature Why it Matters Besides reducing the impact of new development on land and vegetation, BC communities must also become more integrated with the natural world.

More information

Kirklees Council Solar PV Projects

Kirklees Council Solar PV Projects Kirklees Council Solar PV Projects Kirklees Council is the local governing body for an area of 253 km 2 in northern England consisting of the towns of Huddersfield, Batley and Dewsbury and surrounding

More information

What. to Us. Green. Means. of our time.

What. to Us. Green. Means. of our time. A Northern Centre for Renewable Energy implementing bioenergy applied research & development regional sustainability Under construction: This facility will house Nexterra s biomass gasification technology

More information

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011

Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011 Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly

More information

CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA. Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya

CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA. Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya CHARCOAL PRODUCTION AND COMMERCIALIZATION IN KENYA Robert Pavel Oimeke Ag. Director Renewable Energy Energy Regulatory Commission, Kenya Joint UN Habitat / IRENA workshop: Renewables for Growing Cities

More information