1 W.E. AUDIT Well Design Assessment - Well Construction Assessment - Well Control Assessment - Emergency Response Assessment - General Aspect Assessment - Final Conclusions
2 Preliminary information (+/- 6 month before spud) Prelim. Geol. Info Prelim well design Reservoir Pressure / Temp Targets Equipment and casing design Order Long Lead items Formation tops Well trajectory Drilling Fluids
3 Well Design Geological Proposal (GEP) Surface location Targets Formation tops Pore/frac diagram Lithology Data acquisition Drilling Program Casing design Equipment design Pore/frac diagram Lithology Data acquisition Detailed Drilling Guidelines Step-by-step program Lessons Learned from previous wells Submit to SSM 4 weeks before spud
4 Location / HSE Location restrictions Environmental area? Military area? Shipping lane? Infrastructure (wind mills)? Platform development or exploration? Well design Well trajectory Platform / subsurface Spud timing Platform interface SIMOPS Site survey Environmental survey required? Shallow gas? Rig placement issues? SSS&H document Site specific HSE issues HAZID Submit to SSM 4 weeks before spud
5 A: WELL DESIGN ASSESSMENT Requirements Valid Data Input Process Checks External Input Barrier Policy Pore Pressure Well design Rules Status - Mature Drilling Province - Ample Acces to Data wells - Interpretation by Experienced Staff - Quality Checks / Reviews included in process - Service Providers, R.A., HAZOP, SIMOP, Pre-Spud - Operate in UK Well Examiners - Clearly defined in WE Policy. - In line with NORSOK - In line with Regulations - Accurate offset data. - Input well design: highest anticipated pressure - Wintershall WE Policy - Safety Factors Casing Design - Worst Case Full Evacuation - Kick Tolerances defined/calculated - Casing Shoe optimum placed - Contingies (liner) available as req. - Standardise casing / tubing - Well trajectory plan (D.L., LOT, HP)
6 B: WELL CONSTRUCTION ASSESSMENT Activity / Issue Circulating to UB fluid Cement Design Cement Job QA & C Cementing Operations Casing Installation Criteria to drill ahead Management of change Method / Controls - Test barriers as required -Inflow test - Cement Integrity check - Multiple Simulations in/extern - Quality check experienced staff - Bench tests / sampling - Best Practices (Hole, Mud, Float) - Pumping rates, returns check - Best Practices Applied - CBL in production string - Test as per well design - Hangers positively locked - Test as per well design - Specified in programme - Well Integrity never comprimised - All parties informed - Amendments recorded
7 C: WELL CONTROL ASSESSMENT Activity / Issue Interface with Drilling Contractor Critical Well Control Issues BOP rating versus max CIP Shearrams functionality Remote BOP panels Method / Controls - Active Communication (daily) - R.A., HAZOP, Pre-spud etc -Change Procedure -Certification - Contingency Planning - Staff Training Competence - Instrumentation to monitor well - In line with well design - Function & P. Test as per specific well requirements (in programme) - Can cut DP in use - Good practices & planning - Hydril & Casing/Variable Rams - 3 pcs on NGS (Floor, Office, below cantilever). Accumulator Capacity - Satisfies Close-Open-Close condition with max. W.H.P. Certification W.Control Equipment. - Certified as per SMS - As Build, drawings in Rig S.Case
8 D: EMERGENCY RESPONSE ASSESSMENT Activity / Issue ESD during SIMOPS Blow out Contingency plan Relief Well Design Method / Controls - Procedures in Place (Rig, Platform, HSE, Bridging Document, SIMOPS) - Procedures in Place - Contracts in place - Equipment at short notice - Insurance coverage - Agreement with OSRL (Spills) - OCES upgraded by NOGEPA(Rig) - Coastguard, RWS roles defined - Fast access to reliable subsurface data - Location data available - Equipment / Services available ER Training Supervisory Staff - ERT included in staff development portfolio (also Well Control Skills) - Regular Drills ER organisation Office - Exercises held last Review Action Upgrade - ERC well equiped Rijswijk & Den Helder
9 Assessment of Emergency Response D4 Training of Drilling Supervisory Staff: Reference: Wintershall Skills development for E & P professionals Wintershall competence training modules for drilling staff. Training is complemented by on the job training, coaching by Senior Experts, Drills, (Emergency) Exercises etc. Drilling Engineering Staff will also work as DSV
10 E: GENERAL ASPECTS ASSESSMENT Activity / Issue Acceptance Criteria W.E. staff Method / Controls - Corporate Skill portfolio & development scheme - Opco specific detailed job description & competence requirements Well Contruction included in HSE M.S? Safety Case delivery process for Well Ops. Level of Supervision - Well Construction is one of the defined Processes under the M.S. - Process complete > EOW close out - H/O well : RCO / MAXIMO - Processes include R.A. and describe R & R - Coordination through Project Planning, daily updates etc. - Bridging Document to match M.S. - Full for all critical operations - Short Communication Lines, Fast Responses
11 F: FINAL CONCLUSIONS Activity / Issue Well Design Comments - Sound, no changes required Well Construction Well Control - Proven techniques used and new techniques tried and implemented when Risk Reward balance positive. Low Error Avoidable NPT. - Adequate for our scope of Operations. Selection of competent & responsible Drilling Contractor crucial. Emergency Response General Aspects - Procedures in place and drills held. Improvements made when necessary. - Audit / Reviews: Frequency increase recommended. Service Providers to be included. - Documentation: W.E. Docs structure being upgraded to avoid duplication, inconsistencies etc. - Change Management to include routine/minor changes
12 F: STATEMENT CEO All justifiable measures have been taken, or are in the process of being taken, to ensure that the risk and environmental impact associated with the well delivery process are adequately managed at all times
13 Thank you Any questions?
14 Assessment of Well design A1 Well Planning Sequence Exploration/Appraisal Wells: Refer to Wintershall Process Management System Process Description includes roles of individuals taking Part in the process
Deepwater Horizon Blowout. follow-up in the Netherlands
Deepwater Horizon Blowout follow-up in the Netherlands IGM and NOGEPA Excom Meeting 6 October 2010 Presentation overview 1. Timeline (milestones from start Macondo blowout) 2. Self-assessment categories
More information1 What is the purpose of this document?
Executive Summary Comparing the Oil and Gas Drilling Regulatory Regimes of the, the, the U.K,, and 1 What is the purpose of this document? The National Energy Board (NEB) regulates offshore oil and gas
More informationDecisionSpace Well Engineering Software
DATA SHEET DecisionSpace Well Engineering Software DecisionSpace Drilling & Completions Key features Configure the right tools to drill any type of well Dramatically simple to use, complete complex fluids
More informationCertificate Programs in. Program Requirements
IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human
More informationHEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT STANDARDS. OCTOBER 2011- ISSUE No 01. Doc No: HSEC MS 001
HEALTH, SAFETY, ENVIRONMENT AND COMMUNITY MANAGEMENT S OCTOBER 2011- ISSUE No 01 Doc No: MS 001 Introduction Celtique Energie is in the business of exploring for oil and gas in proven basins in Europe.
More informationDeepwater Horizon Disaster
Deepwater Horizon Disaster Professor Satish Nagarajaiah Dept. of Civil & Env. Eng., Dept. of Mechanical Eng. & Material Sc. Rice University, Houston, TX, USA Satish.Nagarajaiah@rice.edu Member, Deepwater
More informationMaersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities
Maersk Resilient Maximised drilling efficiency and uptime Optimised for concurrent activities Maersk Resilient TYPE MSC CJ50-X100 MC, 350 ft jack-up drilling rig BUILT Keppel FELS, 2008 CLASS American
More informationPETROLEUM PRODUCTION MASTERCLASSES
PETROLEUM PRODUCTION MASTERCLASSES New For 2010! One Date Only Limited Places Available Book Now! Offshore Safety & Risk Management for the Oil Industry & Gas Industry 21st and 22nd of February 2011, New
More informationCAREER OPPORTUNITIY IN THE ENERGY SECTOR
Energy for the nation CAREER OPPORTUNITIY IN THE ENERGY SECTOR Kenya Electricity Generating Company Limited (KenGen) is the leading power producer in Kenya. The company has embarked on a transformation
More informationArgentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin*
WIERTNICTWO NAFTA GAZ TOM 24 ZESZYT 1 2007 Argentina Tataru*, Marcel Adrian Piteiu*, Dan-Paul Stefanescu*, Ioana Vlasin* NEW TECHNICAL CONSIDERATIONS OF ROMGAZ COMPANY REGARDING DRILLING, COMPLETION AND
More informationNORSOK STANDARD DRILLING & WELL OPERATIONS
NORSOK STANDARD DRILLING & WELL OPERATIONS D-010 Please note that whilst every effort has been made to ensure the accuracy of the NORSOK standards neither OLF nor TBL or any of their members will assume
More informationDeepwater Horizon Summary of Critical Events, Human Factors Issues and Implications
Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications 23 Sept 2010 Alison Hubbard David Embrey Deepwater Horizon Summary of Critical Events, Human Factors Issues and Healthcare
More information8 Briefing. Responsible investor
Issue Responsible investor 8 Briefing 20th September 2013 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed
More informationHPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol
HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL December 3, 2014 Presenter: Mike Cargol Agenda Development Update HPHT Capping Stack Mudline Closure Device Divert and Flow System Well Kill
More informationAberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System
Aberdeen Drilling Consultants Presentation on Asset Integrity and The ADC TRAMS System Presented by: Douglas G Hay, Managing Director, Aberdeen Drilling Consultants Overview TRAMS Overview Asset Integrity
More informationRESEARCH REPORT 013. Hazard assessment of well operations from vessels HSE
HSE Health & Safety Executive Hazard assessment of well operations from vessels Prepared by Team Energy Resources Limited for the Health and Safety Executive 2002 RESEARCH REPORT 013 HSE Health & Safety
More informationimproved subsea blow out preventer (bop) control systems call for proposals
improved subsea blow out preventer (bop) control systems call for proposals July 2013 Aims This is an open invitation to any organisation, from any sector, seeking partners and funding for innovative technologies
More informationAUTOMATIC HYDRAULIC DRILLING RIGS HH Series HH Series hydraulic hoist series The drilling industry is actively involved in developing new technologies to solve common problems, such as increasing safety
More informationDEEPWATER HORIZON. Summary report
1 Summary report DEEPWATER HORIZON Lessons learned and follow-up A Norwegian Oil Industry Association (OLF) report with contributions from the Norwegian Clean Seas Association for Operating Companies (NOFO)
More informationDeepwater Horizon Accident Investigation Report
Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other
More informationCLEAR. Hole cleaning and wellbore risk reduction service
CLEAR Hole cleaning and wellbore risk reduction service The CLEAR* hole cleaning and wellbore risk reduction service, delivered by Geoservices, a Schlumberger company, monitors hole cleaning effectiveness
More information@balance Xpress. Mobile MPD services
@balance Xpress Mobile MPD services Drill faster and reach farther with @balance Xpress mobile MPD services In operations around the world, M-I SWACO enables customers to improve drilling efficiency and
More information10 Wireline operations
10 WIRELINE OPERATIONS... 1 10.1 GENERAL... 1 10.2 WELL BARRIER SCHEMATICS... 1 10.3 WELL BARRIER ACCEPTANCE CRITERIA... 1 10.3.1 Well control equipment configuration... 1 10.3.2 Deployment of toolstrings...
More informationThis document, and more, is available for download from Martin's Marine Engineering Page - www.dieselduck.net
You may have heard the news in the last two days about the Deepwater Horizon drilling rig which caught fire, burned for two days, then sank in 5,000 ft of water in the Gulf of Mexico. There are still 11
More informationFORMATION DAMAGE AND WELL TREATMENT SYSTEM
FORMATION DAMAGE AND WELL TREATMENT SYSTEM FDWTS-10K Includes ability to test Liquid Permeability & Gas Permeability Fines migration & critical velocity Static Filtration Drilling mud invasion evaluation
More informationTHE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING
THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil
More informationSubsea School The training program
Subsea School The training program Table of Contents Welcome to the FMC Subsea School... 3 Training Schedules and Participation... 4 SS Subsea Technology Introduction... 5 MPS - Subsea Structures... 6
More informationDirectory. Maintenance Engineering
2 / 17 INDEX 1.0 INTRODUCTION... 3 2.0 MAINTENANCE POLICY... 4 2.1 MAINTENANCE MISSION... 5 2.2 CRITICAL SUCCESS FACTORS AND KEY RESULT AREAS... 6 2.3 OBJECTIVES... 7 3.0 MAINTENANCE ENGINEERING SERVICES...
More informationUnlocking your Data to Improve Performance in the Shale. Fred Kunzinger Upstream Practice Lead ECIM 2014
Unlocking your Data to Improve Performance in the Shale Fred Kunzinger Upstream Practice Lead ECIM 2014 Agenda Conventional vs. Unconventional The Rise of the Unconventional Play Challenges in the Shale
More information14th Turkmenistan International Oil & Gas Conference 2009
14th Turkmenistan International Oil & Gas Conference 2009 Matteo Marnoni HSE & SD Manager Burren Resources Petroleum Ltd 17-19 November 2009 Ashgabat, Turkmenistan Burun Cheleken 1900 s Kotur Tepe Barsa
More informationPRESIDENT ENERGY PLC. ( President or the Company ) PARAGUAY UPDATE
PRESIDENT ENERGY PLC ( President or the Company ) PARAGUAY UPDATE Highlights Lapacho well flows condensate and gas from the Santa Rosa Formation Management now have enough evidence to view commercialisation
More informationReport as Per Consulting Services Agreement Causation Factors for the Banjar Panji No. 1 Blowout
Neal Adams Services 16434 DeLozier Street Houston, Texas 77040 Office 713-849-4323 Fax 713-849-1943 www.nealadamsservices.com Registered in Texas, Louisiana, Oklahoma, Colorado and New Mexico Friday, September
More informationDrilling Performance Benchmark Metrics Overview: Benchmark Metric Definitions Below the Mudline (BML) SPUD Date Kick Off Point (KOP) KOP Date
Page 1 of 7 Drilling Performance Benchmark Metrics Overview: The primary application of the Dodson Drilling Performance Benchmark Database System is to measure and rank drilling performance for wells drilled
More informationOUR SERVICES. Training - Assessment - Events. Driving our industry forward. www.equipegroup.com. www.equipegroup.com
Driving our industry forward. OUR SERVICES Training - Assessment - Events EQUIPE TRAINING Geotechnical, Drilling and Health & Safety Training Health and Safety Courses IOSH Safe Supervision of Geotechnical
More informationThe SPE Foundation through member donations and a contribution from Offshore Europe
Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as
More informationDepartment of the Interior
Thursday, October 14, 2010 Part III Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement 30 CFR Part 250 Oil and Gas and Sulphur Operations in the Outer Continental
More informationWELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards
WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards Note: Operating instructions updated July 2014 WELL COMMANDER: Versatile multicycle ball-activated drilling
More informationDrilling Rigs and Well Technology. RAPID RIGS AND WELL TECHNOLOGY Cairn India Limited.
Drilling Rigs and Well Technology RAPID RIGS AND WELL TECHNOLOGY. 2 3 Cairn India has adopted an innovative approach for its onshore drilling program using state-of-the-art custom made Rapid Rig technology
More informationBelow is a step-by-step guide to the process of installing a borehole
Tel: 01600 860 344 Email: info@filterclean.co.uk Web: www.filterclean.co.uk Company number: 1337705 Below is a step-by-step guide to the process of installing a borehole Step 1 A Site Consultation/Basic
More informationIrresponsible of Statoil
Irresponsible of Statoil Having reviewed all the available information, Bellona feels it is irresponsible of Statoil to resume production at Gullfaks C. All production from the Gullfaks C platform was
More informationDEVELOPING KPIS THAT DRIVE PROCESS SAFETY IMPROVEMENT
DEVELOPING KPIS THAT DRIVE PROCESS SAFETY IMPROVEMENT Megan Brown Lloyds Register EMEA, Aberdeen, UK A case study is provided describing Lloyd s Register s development of a set of Key Performance Indicators
More informationGraduate Courses in Petroleum Engineering
Graduate Courses in Petroleum Engineering PEEG 510 ADVANCED WELL TEST ANALYSIS This course will review the fundamentals of fluid flow through porous media and then cover flow and build up test analysis
More informationARCTIC DIALOGUE GREENLAND
ARCTIC DIALOGUE GREENLAND Health, Safety and the Environment Assessing, Mitigating and Managing Risk 24 25th SEPTEMBER 2011 Simon Boxall Managing Director Marsh Energy Practice Risk Management What is
More informationUnderstanding Well Construction and Surface Footprint
Understanding Well Construction and Surface Footprint Well Construction Timeline Well Site Planning & Preparation Drilling Stage 1: Planning and Preparation Acquire Surface Lease Agreement Determination
More informationPressure Coring, A New Tool for Unconventional Oil & Gas Characterization. Matt Bjorum Global Product Line Manager
Pressure Coring, A New Tool for Unconventional Oil & Gas Characterization Matt Bjorum Global Product Line Manager Outline Technology Overview Coring Configurations Tool Overview Surface Handling and Data
More informationGuidelines for a PROJECT EXECUTION PLAN
Guidelines for a PROJECT EXECUTION PLAN 1. OBJECTIVES The objectives of this guideline are: To provide a standard template for Project Execution Plans (PEP); To identify the critical items which need to
More informationSIEM WIS AS. Siem WIS. UTC June 2008 By Jan Atle Andresen
Siem WIS UTC June 2008 By Jan Atle Andresen Agenda Background Challenges- Technology- Solutions Siem WIS background Well Intervention Solutions AS (Siem WIS), was established in February 2005 and is located
More informationLiquefied Natural Gas (LNG)
Graduate Diploma in Petroleum Studies Major in Liquefied Natural Gas (LNG) INDUCTION Launching ceremony Week 39, 2012 Administration / Plant visit / Fundamentals of LNG and LNG main risks awareness Module
More informationForebyggende arbeid i letefasen What do we do to prevent major accidents during exploration drilling?
Forebyggende arbeid i letefasen What do we do to prevent major accidents during exploration drilling? HSE seminar for small and new operators and licensees Per Olav Sætre, November 8 th 2012 Lundin Norway
More informationBS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions
BS PROGRAM IN PETROLEUM ENGINEERING (VERSION 2010) Course Descriptions PETE201 Introduction to Petroleum Engineering (Core) (1-0-1) The course's main goal is to provide the student with an overview of
More informationCase Study of Emergency Disconnect Sequence in the Gulf of Mexico
Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Trent Fleece Subsea BOP Operations Team Lead May 8, 2015 Case Study of Emergency Disconnect Sequence in Gulf of Mexico Industry Standards
More informationOFFSHORE FIELD DEVELOPMENT
OFFSHORE FIELD DEVELOPMENT OPTIONS & STRATEGY By: Nguyen Ngoc Hoan M.Sc of Petroleum Engineering Hoannn@pidc.com.vn PRESENTATION CONTENT Field Development Consideration Field Development Options & Strategy
More informationBOP Basic Safety Functions. Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS 2011.10.11
BOP Basic Safety Functions Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS 2011.10.11 Deepwater Horizon Deepwater Horizon Agenda What is a BOP/BOP Stack Safety Functions for a
More informationCubility - Facilities and offices
MudCube by Cubility Cubility - Facilities and offices Head office and sales offices Cubility s head office is located in Sandnes, Norway A major part of the oil and gas activity in the North Sea is operated
More informationAPPENDIX 2A. Shah Deniz Production Sharing Agreement Extract
APPENDIX 2A Shah Deniz Production Sharing Agreement Extract Shah Deniz Production Sharing Agreement Extract ARTICLE 26 - Environmental Protection and Safety 26.1 Environmental Standards Contractor shall
More informationCode of Practice for Coal Seam Gas
Code of Practice for Coal Seam Gas Well Integrity DEPARTMENT OF TRADE & INVESTMENT, REGIONAL INFRASTRUCTURE & SERVICES RESOURCES & ENERGY SEPTEMBER 2012, WWW.RESOURCES.NSW.GOV.AU Title: NSW Code of Practice
More informationDANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES
DANISH ENERGY AGENCY S GUIDELINES ON SAFETY- AND HEALTH RELATED CONDITIONS ON OFFSHORE INSTALLATIIONS, ETC. HEALTH & SAFETY CASES REV. 0 December 2012 TABLE OF CONTENT TABLE OF CONTENT... 2 DOCUMENT CONTROL...
More informationGuidance to Prevent Slips, Trips & Falls
Guidance to Prevent Slips, Trips & Falls Published June 2005 CONTENTS 1. Scope of this guidance 2. New plant/ installations 3. Maintenance 4. Housekeeping 1. Scope of this guidance Slips, trips and falls
More informationEnvironment IN THIS SECTION. 142 Integrity, standards And Management 145 Deep Water Drilling 148 Business Continuity and Emergency Response
IN THIS SECTION 142, standards And Management 145 Deep Water Drilling 148 Business Continuity and Emergency Response 151 Assessment Process for New Ventures 152 Security 153 Product Stewardship 153 Technology
More informationENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL
ENERGISTICS E&P BUSINESS PROCESS REFERENCE MODEL Access, receipt, or use of the E&P Business Process Reference Model is subject to the Energistics Product License Agreement found on the Energistics website.
More informationWellCAP IADC WELL CONTROL ACCREDITATION PROGRAM
WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WORKOVER & COMPLETION OPERATIONS CORE CURRICULUM AND RELATED FORM WCT-2WF FUNDAMENTAL LEVEL The purpose of the core curriculum is to identify a body of knowledge
More informationINTERTEK S ASSET INTEGRITY MANAGEMENT PROGRAM (AIM)
INTERTEK S ASSET INTEGRITY MANAGEMENT PROGRAM (AIM) Intertek AIM is a strategic management system consisting of specialized expertise, resources methodologies, and tools to assist production and process
More informationAnalysis of the Deepwater Horizon Accident in Relation to Arctic Waters
Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters Prof. ir. C.A. Willemse MBA, Dr. ir. P.H.A.J.M. van Gelder Delft University of Technology Delft, The Netherlands ABSTRACT One of
More informationPlug and Abandonment Forum
Plug and Abandonment Forum Developments in Non-Traditional Plug and Abandonment Methods Thomas Ferg ConocoPhillips Norway June 13, 2013 Efficient P&A Thoughts - Do as Much as Possible Without a Rig Remove
More informationSociety of Petroleum Engineers SPE Global Training Committee Training Course Review Process
Society of Petroleum Engineers SPE Global Training Committee Training Course Review Process The following guideline describes the process of evaluating a proposed training course for consideration by the
More informationTBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH
TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH Outline Field study Lessons learned Rig design changes Mechanization
More informationDirective 059: Well Drilling and Completion Data Filing Requirements
Directive 059 Directive 059: Well Drilling and Completion Data Filing Requirements December 19, 2012 Effective June 17, 2013, the Energy Resources Conservation Board (ERCB) has been succeeded by the Alberta
More informationDEPARTMENT OF LOGISTICS UNIVERSITY OF STELLENBOSCH POSTGRADUATE INFORMATION: LOGISTICS MANAGEMENT 2015
DEPARTMENT OF LOGISTICS UNIVERSITY OF STELLENBOSCH POSTGRADUATE INFORMATION: LOGISTICS MANAGEMENT 2015 Tel: 021 808 2249 Fax: 021 808 3406 E-mail: mmt@sun.ac.za Website: http://www.sun.ac.za/logistics
More informationTechnion Israel Institute of Technology Masters of Engineering in Energy Engineering
Technion Israel Institute of Technology Masters of Engineering in Energy Engineering Curriculum for a Specialization in Natural Gas & Petroleum Engineering (NG&PE) Introduction The Masters in Engineering
More informationMARINE OPERATIONS SIMULATION AND TRAINING AS A TOOL FOR LEARNING AND INNOVATION IN THE MARITIME CLUSTER
MARINE OPERATIONS SIMULATION AND TRAINING AS A TOOL FOR LEARNING AND INNOVATION IN THE MARITIME CLUSTER Regional industry: Offshore Ship Activity 213 Corporations: 15 Ship design 19 Ship owners 14 Ship
More informationNORSOK Standard D-010 Rev. 4, August 2012
Below is a listing of the main changes 1. Definitions of suspension, temporary and permanent abandonment 2. Included more examples of well barrier schematics 3. Included illustrations for permanent abandonment
More informationDeepwater Horizon: Lessons learned for the Norwegian Petroleum Industry with focus on Technical Aspects
A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 26, 2012 Guest Editors: Valerio Cozzani, Eddy De Rademaeker Copyright 2012, AIDIC Servizi S.r.l., ISBN 978-88-95608-17-4; ISSN 1974-9791 The Italian
More informationApplication of Real-Time Monitoring to Offshore Oil and Gas Operations National Academy of Sciences Workshop Houston, Texas
Application of Real-Time Monitoring to Offshore Oil and Gas Operations National Academy of Sciences Workshop Houston, Texas April 20, 2015 Dale Bradford Vice President Worldwide Drilling and Completions
More informationWorst Case Discharge (WCD)
U.S.A. Israel Workshop EIGOA Wohl Center, Bar-Ilan, Ramat-Gan, Israel July 22-25, 2012 Worst Case Discharge (WCD) Thierry M. De Cort United States Department of the Interior Bureau of Ocean Energy Management
More information1 - SOGS_General Presentation_V1 1-15 06 2011. SPIE Oil & Gas Services
1 - SOGS_General Presentation_V1 1-15 06 2011 SPIE Oil & Gas Services SPIE Group figures & organization Key figures & Range of competencies Organization Gauthier Louette Chairman and CEO Human Resources
More informationTRAINING AND SAFETY FOR AD
@adbiogas #UKADBiogas TRAINING AND SAFETY FOR AD KEVIN THROWER BIOTECHNOLOGY BUSINESS MANAGER NATIONAL SKILLS ACADEMY DAY TWO, 4 TH JULY 12.00 13.00 Process Safety Leadership for the Anaerobic Digestion
More informationHydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009
Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009 Hydraulic Fracturing Operations Well Construction and Integrity Guidelines
More informationDEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002)
DEPARTMENT OF PETROLEUM ENGINEERING Graduate Program (Version 2002) COURSE DESCRIPTION PETE 512 Advanced Drilling Engineering I (3-0-3) This course provides the student with a thorough understanding of
More informationFlorinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS
AGH DRILLING, OIL, GAS Vol. 30 No. 1 2013 http://dx.doi.org/10.7494/drill.2013.30.1.221 Florinel ªuþoiu*, Argentina Tãtaru*, Bogdan Simescu* RIGLESS JOBS IN GAS WELLS 1. INTRODUCTION At the same time with
More informationPRIVATE EQUITY INSIGHTS
In this Energy Investment Education Whitepaper, we discuss, Why It Is Financially Better To Own A Portfolio Of Producing Oil & Gas Working Interest Instead of Producing Royalty Interest. Paul Anthony Thomas
More informationPISTEP WHYSTEP? The Background. What information are we talking about?
PISTEP WHYSTEP? The Background Companies that operate in the process industries are under ever-increasing pressure from; competition the need to drive down costs timescales the need to achieve results
More informationA CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS
A CRITICAL REVIEW OF AN IMPROVED WELL CONTROL PROCEDURE FOR THE PREVENTION OF BLOWOUTS By Muhammad Imran B00535042 Submitted In partial fulfillment of the requirements for the degree of MEng in Petroleum
More informationFinance & Management. p. 79 to 84
ff p. 79 to 84 Proficiency Can be organized for a single company Financial Management of an International Oil & Gas Company 10 Days GIP / FMC GIP / MFP To deepen the knowledge of accounting in the oil
More informationAPI Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015
6.1.2.12 53-03-15 Referring to Section 6.1.2.12, can a surface BOP stack arrangement with one annular, one blind shear ram, and two pipe rams, with the fifth device being optional, be considered a Class
More informationSend your email directly to oseghaleokohue@chesssubseaengineering.com
Welcome to Chess Engineering Virtual Office - EVO Our engineering virtual office assistants are highly trained and provide a number of engineering support services depending on your EPIC business needs.
More informationRigorous Qualification and Development Program
FMC Subsea High Capacity 20K Wellhead System Overview 03/20/2013 UWD HC-20 Subsea Wellhead System Rigorous Qualification and Development Program 2 1 Qualification program Qualification testing is performed
More informationICHEME SYMPOSIUM SERIES NO. 139 A METHODOLOGY FOR CONCEPT RISK ASSESSMENT OF OFFSHORE DEVELOPMENTS
A METHODOLOGY FOR CONCEPT RISK ASSESSMENT OF OFFSHORE DEVELOPMENTS FK Crawley, Dr MM Grant, MD Green WS Atkins Consultants Limited, 20 N Claremont St., Glasgow G3 7LE This paper describes a simple means
More informationI.S. 3218 :2013 Fire Detection & Alarm Systems
I.S. 3218 :2013 Fire Detection & Alarm Systems Overview of significant changes 26 th March 2014 FPS Ltd Today s Programme Commencement Transition Competence & Qualifications System Certification System
More informationHow to avoid fluid losses that slow drilling
How to avoid fluid losses that slow drilling OVERVIEW As a result of the highly fractured geology in Kurdistan, operators encounter constant fluid and cement losses. Many report that wells expected to
More informationShell s Health, Safety and Environment (HSE) management system (see Figure 11-1) provides the framework for managing all aspects of the development.
Section 11.1 APPLICATION FOR APPROVAL OF THE DEVELOPMENT PLAN FOR NIGLINTGAK FIELD PROJECT DESCRIPTION INTRODUCTION 11.1.1 HSE MANAGEMENT SYSTEM Shell s Health, Safety and Environment (HSE) management
More informationIntegrated Risk Management Solutions
Integrated Risk Management Solutions Our services 2 RPS Integrated Risk Management Solutions provides specialist HSE & Risk Management consultancy services to the energy industry and other major hazard
More informationWell control equipment. Matanović Davorin, professor
Well control equipment Matanović Davorin, professor Blowout Preventers Blowout preventers (BOPs), in conjunction with other equipment and techniques, are used to close the well in and allow the crew to
More informationPetroleum, petrochemical and natural gas industries Competency management guidance for well operations personnel
Reference number of document: OGP Draft 117969 Date: 2013-05-01 Secretariat: OGP Petroleum, petrochemical and natural gas industries Competency management guidance for well personnel Disclaimer Whilst
More informationDeepwater Wells. Global Industry Response Group recommendations
Deepwater Wells Global Industry Response Group recommendations Report No. 463 May 2011 OGP Vision, Mission and Objectives Vision To work on behalf of the world s oil and gas exploration and production
More informationDeepwater Horizon Accident Investigation Report
Deepwater Horizon Accident Investigation Report September 8, 2010 This is the report of an internal BP incident investigation team. The report does not represent the views of any individual or entity other
More informationThe role of technology and knowhow in the sector
The role of technology and knowhow in the sector Japan-Norway Maritime Offshore Technology Seminar Henrik O. Madsen Numerous drivers for new and improved technology in the Maritime Offshore sector Developments
More informationTotal Subsea Solutions
Total Subsea Solutions Total Subsea Solutions Developing new energy reserves, managing, and improving producing fields means an unprecedented number of technical challenges. In partnership with our customers,
More informationAn Introduction to the ECSS Software Standards
An Introduction to the ECSS Software Standards Abstract This introduces the background, context, and rationale for the creation of the ECSS standards system presented in this course. Addresses the concept
More informationIntroduction to Subsea Production System
Introduction to Subsea Production System 04 Xmas Tree Systems Bjørn Søgård Xmas Tree Systems This module will cover: Main codes for XT equipment XT Principles and functions Typical schematic Main types
More informationProgramme title Minimum entry requirements Additional information
Programme title Minimum entry requirements Additional information Level 4 Diploma in Oil and Gas Level 5 Advanced Diploma in Oil and Gas Level 4 Diploma in Oil and Gas OR equivalent in a closely The following
More information