1 Terms of Reference For Project Supervision Consultants of South Asia Sub regional Economic Cooperation Power System expansion Project 1. Background and Definitions 1.1. Nepal is facing chronic power shortages. Currently, only 63 percent of the country s households have access to grid electricity. The Government of Nepal has set a target of providing electricity to all of the population in the nation by 2027 (75 percent through the national grid and 25 percent from decentralized generation solutions). In support of the Government s energy development goals, The Asian Development Bank (ADB) has approved financing under Loan 3139 for the South Asia Sub regional Economic Cooperation Power System Expansion Project. Loan 3139 will contribute to Nepal s energy development by scaling up both, on-grid and off-grid supply, facilitating crossborder power exchange, increasing access to electricity in rural areas and building capacity for on-grid and off-grid power sector development Nepal electricity Authority (NEA) is the Executing Agency (EA) for the on-grid component of Loan The term NEA, EA and the Employer have the same meaning and may be used interchangeably in this document depending on the context Aimed at increasing transfer capacity of the grid and access to grid electricity, the ongrid component of Loan 3139shall finance the following subprojects: a) Kaligandaki transmission corridor subproject consisting of: (i) 220kV transmission line from Dana-Kusma-New Butwal and associated 220 kv substations; (ii) 400 kv transmission line from New Butwal Bardaghat and associated substations; b) Marsyangdi - Kathmandu transmission line subproject consisting of: (i) 220 kv transmission line from Markichowk, Marsyangdi to Matatirtha, Kathmandu and associated substations at Markichowk and Matatirtha; c) Marsyangdi transmission corridor subproject consisting of: (i) 220 kv transmission line from Manang- Khudi and associated substations at Manang and bay extension at Khudi; (ii) 220 kv transmission line from Khudi-Udipur-Markichowk-Bharatpur and associated substations at Khudi, Udipur and Bharatpur and bay extension at Bharatpur; d) Samundratar - Trisuli 3 B Hub 132 kv transmission line subproject consisting of: (i) 132 kv transmission line from Samundratar to Trisuli 3 B Hub substation and associated substations at Samundratar and bay extension at Trisuli 3 B Hub substation;
2 e) Distribution system expansion in Eastern, Central and Western Nepal subproject; and f) Grid substation reinforcement subproject All subprojects listed in 1.3 shall be collectively referred to hereafter in this document as the Project The engineering design, supply of plants and equipment, construction, installation, testing and commissioning of transmission lines and associated substations, communications and protection facilities for all subprojects of the Project will be completed through turn-key contracts awarded to contractors following ADB s Procurement Guidelines The ADB has engaged a team of project preparation support consultants to assist NEA in conducting survey, carrying out design, preparing bidding documents and providing procurement support till contract award of turn-key contracts for all of the subprojects of the Project except for the section (i) in 1.3 c. For the section (i) in 1.3 c, the project preparation support consultants will finish survey and design but not the bidding documents and procurement. The project preparation support consultants are hereafter referred to as the PPS NEA seeks through this RFP to engage a team of project supervision consultants through a firm in accordance with ADB s Guidelines on the Use of Consultants by Asian Development Bank and Its Borrowers to supervise and implement the Project. This team will also provide procurement support for the turn-key contract for the section (i) in 1.3 (c) in addition to its role of Project supervision. The team of project supervision consultants is referred to hereafter as the PSC or the Consultant. The term PSC and Consultant may be used interchangeably in this document depending on the context. The services of the PSC are hereafter referred to as the Services This document set forth terms of references (TOR) for the Services. 2. Objective of the Services 2.3. The Services aim at providing high quality professional services to assist NEA in supervising and implementing the Project and to ensure that the Project will be completed according the schedule and that the completed Project will deliver the quality, capacity, performance, reliability and economic life as required by the Employer s requirement defined in the turn key contracts with the contractors. 3. Scope of the Services 3.3. The PSC is expected to deliver the Services for: a) Project supervision of all subprojects in 1.3; b) Procurement support for section (i) of subproject c) in 1.3; c) Capacity building of NEA staff.
3 4. Detailed Tasks 4.3. The PSC s detailed tasks are as follows: a) Project supervision (i) (ii) (iii) (iv) (v) For each and all turn-key contracts except for subproject (f) in 1.3for the Project, the PSC shall review and advise the NEA on approval of contractor s detailed design in accordance with the Employer s requirements and technical specifications in the contract. For each and all turn-key contracts for the Project, the PSC shall provide oversight of all aspects of the construction in order to assure that it is conducted properly in accordance with the contract. To ensure quality in project implementation, the PSC shall develop and implement a Quality Assurance Program (QAP). The QAP shall ensure that the plants and equipment supplied and installed meet the performance standards and technical characteristics of the technical specifications. The QAP shall cover all aspects of the project implementation including review and approval of design; quality of works during construction; monitoring schedule; inspection of materials before shipment, upon arrival and upon erection; review of documents to assure quality of delivered goods and comparison of as-built drawings to design. Furthermore, shortcomings in any of the aforementioned areas shall be addressed adequately by QAP. For each and all turn-key contracts for the Project, the PSC shall supervise the testing and commissioning. All components of the lines, substations, SCADA, communications and protection will be subject to an acceptance test to demonstrate their capability to meet warranted design criteria. For each component subject to test, the Consultant will review the contractor's test procedures for compliance with manufacturers' requirements and design criteria. The Consultant shall witness the tests and review the test results. If test results are not satisfactory, the consultant shall ensure that any lack of compliance is addressed and that the equipment and overall systems shall be re-tested until compliant results are achieved. During the commissioning phase, the Consultant shall provide training on the testing and commissioning of all aspects of the project. The Consultant shall assist NEA in this phase of the project and coordinate with the Contractor in addressing any issues with the project components that are unsatisfactory. At the end of this period, and when all acceptance tests have been completed to the Consultant's satisfaction, the Consultant will advise NEA that the construction is complete and all the project components are ready to be declared fully operational. The Consultant shall also prepare and recommend a provisional taking over certificate whenever due for the works or part of the works and alert NEA of work deficiencies and outstanding items, if any. The Consultant shall also confirm the remedial measures taken by the contractor, and recommend a final taking over certificate after expiry of the warranty period. The PSC shall hand over the completed Project including issuance of completion certificates, provisional acceptance and final acceptance certificates to NEA.
4 b) Procurement support for section (i) of subproject c) in 1.3. As the contract of PPS will end before the procurement of turn-key contract for the section (i) of subproject c) in 1.3, i.e. the 220 kv transmission line from Manang-Khudi and associated substation at Manang and bay extension at Khudi, the PSC shall take over for the preparation of bidding documents based on the survey and design done by the PPS. PPS shall provide procurement support to NEA until contract award. c) Capacity Building of NEA staff 5. Implementation Arrangement The PSC shall perform a needs assessment and develop a training program for NEA staff working on the Project as PSC s counterpart staff. The training program shall include tower and tower foundation design, 220 kv and higher voltage class substation design, protection system coordination and distribution system planning and loss reduction techniques. The NEA counterpart staff will assist the consultant to the extent possible during all phases of the project. All international experts of PSC are expected to work closely with the NEA staff and shall ensure that the NEA staff persons achieve higher skill levels as a result of their involvement The PSC shall report to the Project Management Directorate (PMD) of NEA and headed by the Deputy Managing Director who reports directly to the Managing Director of NEA. The PSC shall work closely with counterpart staff of PMD and NEA's specialized departments if necessary. The PSC shall also work with PPS as and when required The Consultant is expected to commence the service in December 2015, and the duration of the service will be sixty (60) months from December November Expertise and Person Month Requirements 6.1. It is estimated that in total 329 person-months of Services are required with 98 person months from international experts and 231 person months by national experts. Details on expertise and person month requirements are in Table 1. The international expertise should be provided by a consulting firm specializing in designing and supervising the construction of EHV transmission lines and substations in partnership with national firm(s) and/or individual national consultants in Nepal.
5 Table 1: Indicative PSC Expertise and Person Months Requirements Position No. Expertise Person Month Home Office Field Office Sum of A International Experts (HO) (FO) HO and FO 1 Team Leader/ Transmission Engineer (Electrical) Line Survey Engineer Structure Engineer, Transmission Line and Substation Electrical Engineer, Substation Civil Engineer, Transmission line and Substation SCADA/Communication Engineer Protection System Engineer Distribution System Engineer Environmental Safeguard Specialist Social Safeguard Specialist Subtotal B National Experts 1 Transmission Engineer Civil Engineer-Transmission and Substation Electrical Engineer-Substation Geotechnical Engineer Distribution System Engineer (3 Nos) Environmental Safeguard Specialist Social Safeguard Specialist Subtotal Total Responsibilities of the International Experts 7.1. All international experts indicated in Table 1 are considered as key experts. The main responsibilities of each international experts are highlighted, but not limited to, as follows: a) Team Leader and Transmission Electrical Engineer (i) As the Team Leader, the expert is responsible for: Leading and managing the entire team including both international and national experts and act as the team s point of contact with NEA and ADB. Preparing or leading the team to prepare all the reports as listed in the Reporting Requirements in 10. Handling contract administration matters related to the PSC contract. Assisting PMD/NEA in administration of all turn-key contracts for the Project. Reviewing the turn-key contractors health and safety plans. Monitoring project progress against plan, report on progress, and propose remedial measures as necessary. Reviewing the contractor's claims for extension of time or additional costs; and preparing variation instructions and cost review; certifying invoices/volume of works completed and recommend for payment.
6 Providing technical support to NEA in settlement of claims and disputes arising from the turn-key contracts. (ii) The Team Leader must also be an expert of transmission electrical engineering. As an transmission electrical engineer, he/she is responsible for: Providing inputs and advice to the project team and to NEA on transmission line and substation technical matters. Developing and maintaining a project quality assurance plan for NEA; and ensuring that works are executed in line with the plan and project requirements. Checking the drawings and technical designs submitted by the contractors and recommending them to NEA for approval. Reviewing, checking and certifying suppliers' equipment design, and approve the technical documents. Witness and certifying main equipment shop inspections. Assisting NEA with inspections and certifications of manufactured items prior to shipment and upon receipt. Recommending the acceptability of designs and works carried out by the contractors and suggest corrective measures to be undertaken. Supervising the installation, testing and commissioning of the transmission line and substations. Review and certify the contractor's testing and commissioning plans. Supervising testing and commissioning in conjunction with NEA and other team members. Certifying substantial completion and/or completion of main project components as defined in the contract documents. (iii) The Team Leader will lead the capacity building and be responsible for: Performing a training needs assessment for NEA staff and preparing a training program with the assistance of the consultant team. Contributing to capacity building of NEA counterpart staff. b) Line Survey Engineer (i) Perform an on- site route assessment in conjunction with the contractor s survey team. (ii) Check the details of check survey submitted by the contractor and recommend for approval. (iii) Make necessary inputs and advice to the project team and to NEA on transmission line and substation survey and location matters. (iv) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. c) Structural Engineer (Transmission/Substation) (i) Assist the consultant team to perform a training needs assessment for counterpart staff and prepare a training program.
7 (ii) Make necessary inputs and advice to the project team and to NEA on transmission line and transmission substation structural matters. (iii) Contribute to capacity building of NEA counterpart staff. (iv) Review the design parameters to be used for design of transmission towers, tower foundations and substation structures. Check the tower, tower foundation and substation structure designs submitted by the contractors and assist in approval of contractor's designs, drawings and technical information. (v) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. (vi) Witness and certify tower prototype tests prior to manufacturing and shipment. d) Electrical Engineer (Substations) (i) Assist the consultant team to perform a training needs assessment for counterpart staff and prepare a training program. (ii) Make necessary inputs and advice to the project team and to NEA on transmission line and transmission substation technical matters. (iii) Contribute to capacity building of NEA counterpart staff. (iv) Assist NEA in review and approval of contractor's drawings and technical information. (v) Witness and certify main equipment shop inspections and assist NEA with inspections and certifications of manufactured items prior to shipment and upon receipt. (vi) Supervise site construction and installation works in conjunction with NEA and other team members. (vii) Review and certify the contractor's testing and commissioning plans. (viii) Supervise testing and commissioning of substations in conjunction with NEA and other team members. (ix) Review, check and certify suppliers' equipment design, and approve the technical documents. (x) Assist with the review of contractor's claims for extension of time or additional costs; and prepare variation instructions and cost review; certify volume of works completed withdrawal applications and issue of monthly and final payment certificates. (xi) Assist with the certification of substantial completion and/or completion of main project components as defined in the contract documents. (xii) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. e) Civil Engineer (Transmission/Substations) (i) Assist the consultant team to perform a training needs assessment for counterpart staff and prepare a training program.
8 (ii) Make necessary inputs and advice to the project team and to NEA on transmission line and substation on technical matters. (iii) Contribute to capacity building of NEA counterpart staff. (iv) Review the design parameters submitted by contractors for design of transmission and distribution substation equipment foundation, control and other buildings and various civil structures including protection works required. Assist NEA in approval of foundation designs for tower foundations (in the absence of Structure Engineer), substation equipment, control and other buildings and protection works if any. (v) Supervise site construction and installation works in conjunction with NEA and other team members. (vi) Monitor project progress against plan, report on progress, and propose remedial measures as necessary. (vii) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. f) SCADA/Communications Engineer (i) Make necessary inputs and advice to the project team and to NEA on transmission line and substation communication matters. (ii) Assess NEA's existing SCADA and communications systems and prepare design concepts for interfacing with the transmission line and substations. (iii) Assist NEA in review and approval of contractor's drawings and technical information with regard to communication/scada system. (iv) Supervise site construction and installation works in conjunction with NEA and other team members. (v) Review and certify the contractor's testing and commissioning plans. (vi) Supervise testing and commissioning in conjunction with NEA and other team members. (vii) Review, check and certify suppliers' equipment design, and assist NEA in approving the technical documents. (viii) Supervise installation, testing and commissioning of the transmission line and substations SCADA and communication systems. Monitor project progress against plan, report on progress, and propose remedial measures as necessary. (ix) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. g) Protection Engineer (i) With the assistance of the consultant team, perform a training needs assessment for counterpart staff and prepare a training program. (ii) Make necessary inputs and advice to the project team and to NEA on transmission line and transmission substation protection system.
9 (iii) Assess NEA's existing protection systems and prepare design concepts for protection of the transmission line and substations. (iv) Contribute to capacity building of NEA counterpart staff. (v) Supervise site construction and installation works in conjunction with NEA and other team members. (vi) Review and certify the contractor's testing and commissioning plans. (vii) Supervise testing and commissioning in conjunction with NEA and other team members. (viii) Review, check and certify suppliers' equipment design, and assist NEA in approving the technical documents. (ix) Witness and certify main equipment shop inspections. (x) Supervise the testing and commissioning of the transmission line and substation protection systems. Monitor project progress against plan, report on progress, and propose remedial measures as necessary. (xi) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment. h) Distribution System Engineer (i) Assist the consultant team to perform a training needs assessment for counterpart staff and prepare a training program. (ii) Make necessary inputs and advice to the project team and to NEA on distribution networks and distribution substation technical matters. (iii) Contribute to capacity building of NEA counterpart staff. (iv) Assist NEA in review and approval of contractor's drawings and technical information. (v) Witness and certify main equipment shop inspections and assist NEA with inspections and certifications of manufactured main equipment prior to shipment and upon receipt. (vi) Supervise site construction and installation works in conjunction with NEA and other team members. (vii) Review and certify the contractor's testing and commissioning plans. (viii) Supervise testing and commissioning of substations in conjunction with NEA and other team members. (ix) Review, check and certify suppliers' equipment design, and approve the technical documents. (x) Assist with the review of contractor's claims for extension of time or additional costs; and prepare variation instructions and cost review; certify volume of works completed withdrawal applications and issue of monthly and final payment certificates. (xi) Assist with the certification of substantial completion and/or completion of main project components as defined in the contract documents. (xii) Perform other functions as may be assigned or delegated by Team Leader from time to time during the time of assignment.
10 i) Environmental Safeguard Specialist (i) Make necessary inputs and advice to the project team and to NEA on environmental distribution networks and distribution substation technical matters. (ii) Assist NEA as necessary to complete the IEEs and/or EIAs if necessary. (iii) Conduct a detailed qualitative and quantitative analysis of the anticipated changes to the baseline to determine the direct, indirect, induced and cumulative impacts of the project in construction, phase. These impacts may include, but not limited to, loss of habitat and ecosystems, loss of flora and fauna, impacts on wildlife, food supply chain and migration patterns of wild life, water quality, emission of greenhouse gases, erosion and sedimentation, loss of physical and cultural resources, impacts associated with construction etc. (iv) Update the IEEs and/or EIAs and EMP for the individual subprojects and assist NEA in implementation of EMPs for the subprojects. (v) (vi) (vii) (viii) (ix) (x) Update the Social Impact Assessment (SIA) for each subproject. Update/ Review construction contractors environmental health and safety plan (EHS) and recommend revisions as necessary. Conduct routine inspections of construction/installation activities including visual survey of ROW clearance, construction equipment storage areas, waste disposal areas and construction camps. Prepare semiannual safeguard monitoring report. Prepare an annual report on reforestation for each project component and sub-component requiring a reforestation program. Perform other functions as may be assigned or delegated by Team Leader from time to time. j) Social Safeguard Specialist (i) Update existing resettlement plan (RP) based selected transmission route alignment in accordance with the national laws, regulations and ADB s SPS (ii) Make necessary inputs and advice to the project team and to NEA on social safeguard issues as required by the national laws, regulations and ADB s SPS (iii) Prepare and /or update land acquisition and resettlement impact assessment based on selected route alignment and substation details. (iv) Review/revise the entitlement matrix for each subproject listing all likely effects, such as permanent and or temporary land acquisition, and a study to determine the replacement costs of all categories of losses based on the asset valuation process, with particular attention to vulnerable groups including indigenous peoples, women, children and the poor and socially excluded.
11 (v) Prepare and /or update detail cost estimate of land acquisition, RoW acquisition and resettlement for each subproject. Update the implementation schedule of RP. (vi) Update the implementation schedule consistent with all the resettlement plan requirements, making sure that major components are carried out before the civil works (vii) Provide guidance to the national environmental safeguard specialist and NEA s concerned staff responsible for social safeguard in data collection and census surveys of affected persons. (viii) Establish dialogue with affected peoples for incorporating their suggestions. (ix) Ensure compliance with all government rules and regulations and ensure that the RPs are in compliance with ADB s SPS (x) Submit all finalized/updated RPs to ADB for review and clearance for ADB review and clearance. (xi) Perform other functions as assigned or delegated by Team Leader from time to time during the time of assignment 8. Responsibilities of the National Experts 8.1. Although national consultants are classified as non-key in the proposal evaluation, they play important role in the PSC team with local knowledge of dealing with social, technical and geographical issues arising from the Project. Each national expert will perform the same or similar duties as his/her counterpart in the international team in his/her respective field. 9. Capacity Building 9.1. One of the basic objectives of the consulting services is the transfer of technology in this field to the NEA's engineers. This will be achieved by involving the NEA engineers with the PSC experts as much as possible in various activities of the project implementation during field works as well as in the home office of the Consultant NEA's six (6) engineers will visit the Consultant's home office for one month each to gain valuable experience and familiarity with the working and procedures of Consultant's design office particularly with regard to the detailed design review and the drawing approvals In addition to above the Consultant shall arrange four (4) training sessions in its home office for a total of sixteen (16) engineers. The duration of each session shall be one month. The cost of such training including the cost of travel, boarding, lodging and subsistence allowance in connection with the Engineer's training on Consultants offices will be quoted under Provisional Sum. The training shall be conducted in the in following disciplines: a) Design of 220 kv, 400 kv and higher voltage transmission lines (Selection of voltage level and conductor size, insulation coordination, tower earthing, conductor vibration damping, corona, sag and tension, communication, etc.)
12 b) Design of 220 kv and 400 kv tower structure and foundation ((Load calculation and analysis, tower member and connection design, foundation design, design drawings, testing procedures, etc.) c) Design of 400/220/132 kv Substations ((Selection of voltage level and switchgear (including GIS) equipment rating, insulation coordination, protection and relaying scheme, substation earthing, communication, etc.) d) Planning and Design of distribution networks and loss reduction of distribution systems The PSC shall provide hands on training on the latest version of internationally recognized transmission line design, transmission line tower/ substation design and transmission system planning software. The PLS CADD line design, PLS Tower, SAPS are recommended for this. Consultant shall provide with its proposal the details of proposed software The consultant shall also provide information and assist in procurement of latest issues of IEC and other Standards related to design, operation and maintenance of transmission and sub-station systems. 10. Reporting requirements The Consultant shall prepare the various reports and maintain records documenting decisions made at meetings, progress on project implementation, financial records and changes to the contract plans. All documents and reports would be made available on electronic format to ADB. The reporting shall, in general, comprise of the following: (i) Technical reports as necessary on designs and drawings submitted by the contractor (ii) Design report on standard transmission line towers (iii) Manual for checking drawings of towers and foundations (iv) Report on shop inspection and test witnessing (v) Formats (e.g. earthing measurement, concrete pouring, tower erection etc.) for site supervision (vi) Site supervision reports (vii) At NEA's request, all necessary reports concerning special matters related to the project (installation, work methodology, safety, claims, checklist for equipment testing and commissioning etc.) (viii) Monthly reports concerning physical progress/status of works, expenditures, delivery of materials etc. in the formats acceptable to NEA and ADB. (ix) Quarterly progress report giving the progress status, schedules, costs, budgets etc. in the formats acceptable to NEA and ADB. (x) Semi -annual and annual environmental report. (xi) Project Completion Report (PCR) as per requirement of NEA and ADB All documents and reports would be made available on electronic format to ADB. All reports will be in English language.
13 11. Counterpart Support and Inputs Provided by NEA NEA Project Team: Each subproject listed in 1 (a) to (e) above shall have its own contract management team comprising of project manager, engineer and other support staff. The subproject team shall provide contract documents, survey and other reports available to the Consultant. The subproject team shall work in close collaboration with the Consultant's team and be fully involved in all aspects of the consulting services. Both NEA and Consultant's teams shall work together as one single team in all matters related to the Project Construction Supervision: NEA engineers and technicians under the responsibility of the Consultant will carry out the day-to-day construction supervision at different site locations of the subprojects and the Consultant shall report to the Project Manager of each subproject who is deputed on behalf of the NEA. Besides, the NEA Project team shall help expedite in resolving the local problems, land acquisition, compensation and forest clearance. NEA will provide in total 70 and 76 man months of inputs of NEA electrical engineer and civil engineer respectively during construction supervision Administrative support for Consultant Team: If required by local regulations, NEA will provide Consultant with necessary support letters for obtaining visas and permits for its experts. The cost and timing of obtaining the above is entirely the responsibility of the consultants Office Space, Office Equipment, Transportation and Accommodation: NEA will provide office space, necessary furniture and office equipment (computers, fax, telephone etc.) in Kathmandu and in the project sites outside of Kathmandu for transmission line projects. NEA will provide office space and necessary furniture in specific locations outside of Kathmandu for supervision of distribution projects. However, the Consultant shall make his own arrangements for transportation in Kathmandu and local transportation and accommodation for its personnel in the project sites outside of Kathmandu. The Consultant shall arrange itself any other equipment required during execution of works. Consultant shall be responsible for international telephone bills, maintenance of office equipment and consumables necessary for its own use. 12. Qualification/Experience of Experts International Experts a) Team Leader and Transmission Line Electrical Engineer shall have preferably Master s Degree in Electrical Engineering/High Voltage Engineering and preferably more than 15 years' experience in transmission line projects and substantial experiences in developing countries other than his/her own country. The expert shall have previous team leader experience in detail design and construction supervision of 400 kv and above voltage level transmission line projects involving efficient conductor. Experience shall cover 400kV or higher voltage class transmission line design, specification, construction, testing and commissioning. It is expected that the amount of time spent by the Team Leader in the field (at the office in Kathmandu or project sites)will not be less than 80 percent of the required total person month inputs from the Team Leader during the execution of the project.
14 b) Line Survey Engineer shall have preferably Master s Degree in Survey/Civil Engineering and preferably 10 years of experience, with previous experience in detail survey of 400kV or above transmission lines in developing countries other than the expert s home country. Experience shall include route definition, detail survey and tower spotting in mountainous terrain and environmentally and socially sensitive situations. The expert shall have an understanding of line clearances and safety considerations. c) Structural Engineer (Transmission/Substations) shall have preferably Master s Degree in Structural Engineering, with preferably more than 15 years of experience in design of 400 kv and above voltage level transmission line towers and substation structures. The expert shall have previous experience in design and construction supervision of 400 kv and above voltage level transmission line projects with 100 km in length. d) Electrical Engineer (Substations) shall have preferably Master s Degree in Electrical/High Voltage Engineering, preferably with more than 15 years of experience in substation of 220 kv and above voltage level. The expert shall have previous experience in detail design, preparation of specifications and construction supervision of 220 kv or above voltage level substations. e) Civil Engineer (Transmission/Substations) shall have preferably Master s Degree in Civil Engineering with preferably more than 10 years of experience in the design of foundations for transmission line towers and substation structures for 220kV and above voltage level. The expert shall have previous experience in design and construction supervision of transmission line and substation projects of 220 kv and above voltage level. f) SCADA/Communications Engineer shall have preferably Master s Degree in Electrical/Communications Engineering or other relevant discipline with preferably over 10 years of experience in the design, selection and preparation of specification of SCADA and communication systems for 400kV and above voltage level transmission lines, substations and control center interfacing. The expert shall have previous experience in designing/planning SCADA/communication system for interconnected/integrated power grid system. g) Protection Engineer shall have preferably Master s Degree in Electrical Engineering with specialization in protection system and/or further qualifications and training in protection system engineering with preferably over 15 years of experience in design, selection and preparation of specifications of interconnected electrical power system. Previous experience of the expert shall cover design of protection system for 400kV transmission systems and substations. h) Distribution System Engineer shall have preferably Master s Degree in Electrical Engineering/High Voltage Engineering Power Engineering with more than 15 years of experience in system reinforcement, distribution system expansion and loss optimization of 33 kv, 11 kv and 400 V distribution systems. i) Environmental Safeguard Specialist shall have preferably Master's Degree in Environmental Science, Environment Management, Environmental Engineering or closely related discipline with more than 10 years of professional experience. The expert
15 shall have experience in conducting environmental impact analysis (EIA), initial environmental examinations (IEE) of 220 kv or above voltage class transmission line projects as per international standard and practice as well as well as latest ADB or other donor agencies guidelines with regard to environmental protection and resettlement. The specialist should be conversant with national laws relating to Initial Environment Examination (IEE)/Environmental Impact Assessment (EIA) and ADB s Safeguard Policy Statement j) Social Safeguard Specialist shall have preferably Master's Degree in Sociology/Social Science/Anthropological Science with more than 10 years of professional experience. The Specialist shall have experience in preparation of resettlement plan and indigenous peoples plan (IPP)etc., in 220 kv or above voltage class transmission line projects in accordance with the international practices as well as latest donor agencies guidelines, preferably ADB Guidelines with regard to environmental protection and resettlement. The Specialist should be conversant with national laws relating to land acquisition and resettlement and ADB s Safeguard policy Statement National Experts a) Electrical Engineer (Transmission) shall have preferably Master s Degree in Electrical Engineering/High Voltage Engineering and preferably 10 years of experience in transmission line design, specification, construction, testing and commissioning of 132 kv or above voltage class. b) Electrical Engineer (Substations) shall have preferably Master s Degree in Electrical/High Voltage Engineering, preferably with 10 years of experience in design, construction, testing and commissioning of 132 kv or above voltage level substations. c) Civil Engineer (Transmission/Substations) shall have preferably Master s Degree in Structure/Civil Engineering with preferably 10 years of experience in the design of foundations for transmission line towers and substation structures for 132 kv and above voltage level. The expert shall have previous experience in design and construction supervision of transmission line and substation projects of 132 kv and above voltage level. d) Geotechnical Engineer shall have preferably Master s Degree in Geotechnical/ Civil Engineering and preferably 10 years of experience, with previous experience in developing countries other than the expert s home country. The experience shall be in geotechnical investigation, test and design of tower foundations of 132 kv or above voltage level transmission lines and substation structures. e) Distribution System Engineer shall have preferably Master s Degree in Electrical Engineering/High Voltage Engineering with more than 10 years of experience in system reinforcement, distribution system expansion and loss optimization of distribution system. f) Environmental Safeguard Specialist shall have preferably Master's Degree in Environmental Science, Environment Management, Environmental Engineering or closely related discipline with more than ten (10) years of professional experience. The expert shall have experience in conducting environmental impact analysis (EIA), initial environmental examinations (IEE) of transmission line projects or hydropower projects as per international standard and practice as well as well as latest ADB or other donor agencies guidelines with regard to environmental protection and resettlement. The specialist should be conversant with national laws relating to Initial Environment
16 Examination (IEE)/Environmental Impact Assessment (EIA) and ADB s Safeguard Policy Statement g) Social Safeguard Specialist shall have preferably Master's Degree in Sociology/Social Science/ Anthropological Science with more than ten (10) years of professional experience. The Specialist shall have experience in preparation of resettlement plan; indigenous peoples plan (IPP) etc. of transmission line projects or hydropower projects in accordance with the international practices as well as latest donor agencies guidelines, preferably ADB Guidelines with regard to environmental protection and resettlement. The Specialist should be conversant with national laws relating to land acquisition and resettlement and ADB s Safeguard policy Statement 2009.
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate
NEPAL ELECTRICITY AUTHORITY (An Undertaking of Government of Nepal) Project Management Directorate Terms of Reference (ToR) For Consulting Services For Feasibility Study of Second Nepal-India 400 kv Cross
More informationFinancing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South
Financing New High Voltage Transmission Lines in Nepal Using HTLS Conductors Surendra Rajbhandari, Nepal Electricity Authority Zhang Lei, ADB South Asia Energy Division Asia Clean Energy Forum June 2015
More informationTERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS
A. Background TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS 1. The Government of Armenia has received financing from the Asian
More informationReport and Recommendation of the President to the Board of Directors
Report and Recommendation of the President to the Board of Directors Project Number: 44219 June 2014 Proposed Loan, Technical Assistance Grant, and Administration of Grants Nepal: South Asia Subregional
More informationEnvironmental Assessment
OP 4.01 Page 1 of 5 Environmental Assessment Note: OP 4.01 replaces the policy elements of IFC s Environmental Analysis and Review of International Finance Corporation Projects (Washington, D.C.: IFC,
More informationSemi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project
Semi Annual Environmental Monitoring Report July 2013 L2557/2558 SRI: Greater Colombo Wastewater Management Project This environmental monitoring report is a document of the borrower. The views expressed
More informationLOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK
LOAN NUMBER 3150-ARM(SF) LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 5 SEPTEMBER 2014 ARM 46416 LOAN AGREEMENT
More informationGENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II
GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT
More informationTABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6
Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application
More informationEngineering Council of South Africa
Government Gazette No. 26180, 2 April 2004 Page 1 of 30 Board Notice 42 of 2004 Engineering Council of South Africa Guideline Scope of Services and Tariff of Fees for Persons Registered in terms of the
More informationIslamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy
Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed
More informationBOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011
BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under
More informationBANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project
BANGLADESH POWER DEVELOPMENT BOARD Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project EOI Enquiry No.2320-BPDB(Sectt)/Dev-21/81 Dated: 19.11.2013 DOCUMENT FOR EXPRESSION
More informationii. Project Finance Specialist (national consultant; 9 person-months; intermittent).
1 ADDITIONAL CONSULTANTS FOR THE PUBLIC PRIVATE PARTNERSHIP CENTER AND THE DEPARTMENT OF FINANCE 1. Expansion of the PPP Center s consultant pool is proposed to strengthen PPP Center s capacity in thematic
More informationInterim Terms of Reference for Consultancy Services
Interim Terms of Reference for Consultancy Services Design for the Centre of Excellence in Biomedical Engineering at the University of Rwanda, College of Medicine and Health Sciences, Nyarugenge Campus
More informationMINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE
More informationPROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT
PROJECT AND CONSTRUCTION MANAGEMENT SERVICES FOR KUWAIT PORT AUTHORITY FOR PROJECTS AT SHUAIBA PORT - INTRODUCTION 1.1. General. Kuwait Ports Authority (KPA) through the Ministry Of Finance (MOF) wishes
More informationTERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT
TERMS OF REFERENCE FOR STRATEGIC PLANNING & MANAGEMENT EXPERT 1. Background The agency responsible for statistical information in Ghana is the Ghana Statistical Service (GSS) established in 1985 by PNDC
More informationVIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province
Due Diligence Report November 2014 VIE: Second Upper Secondary Education Development Project (USEDP II) - Ha Giang Province Quyet Tien Upper Secondary School Prepared by the Ministry of Education and Training,
More informationEx-Ante Evaluation (for Japanese ODA Loan)
Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Urgent Rehabilitation and Upgrade Project Phase I Loan Agreement:
More informationProject Administration Manual. Project Number: 45094 Loans: LXXXX March 2012. Democratic Republic of Timor-Leste: Road Network Upgrading Project
Project Administration Manual Project Number: 45094 Loans: LXXXX March 2012 Democratic Republic of Timor-Leste: Road Network Upgrading Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION
More informationLoan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power Project
Project Administration Manual Project Number: 43151 Loan Numbers: L2629 (OCR), L2630 (ADF), L8244 (JICA) Updated 2 June 2010 Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power
More informationEx-ante Evaluation - 1 -
Ex-ante Evaluation 1. Name of the Project Country: The Independent State of Samoa Project: Power Sector Expansion Project (Loan Agreement: December 10, 2007; Loan Amount: 4,598 million yen; Borrower: The
More informationOUTPUT: RURAL ROAD ASSET MANAGEMENT
Rural Roads Improvement Project II (RRP CAM 42334) OUTPUT: RURAL ROAD ASSET MANAGEMENT A. Introduction 1. The Project. The Royal Government of Cambodia (the Government) has requested for a loan from Asian
More informationSample Contract Provisions for Performance-Based Payment
Sample Contract Provisions for Performance-Based Payment (pages 13-16 of Using Performance-Based Payments to Improve Health Programs, The Manager, Vol. 10, No. 2, 2001). Reproduced with permission from
More informationJOB DESCRIPTION PROCUREMENT DIRECTOR
JOB DESCRIPTION PROCUREMENT DIRECTOR Public Institution Millennium Challenge Account Moldova intends to recruit a Procurement Director for its Management unit to assist the implementation of the Compact
More informationBi-annual Environmental Monitoring Report
Project Number: 2974-GEO (SF) Reporting period: Jul 2014-Jan 2015 GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT (Financed by the Asian Development Bank) Bi-annual Environmental Monitoring Report Prepared
More informationGeneration and Transmission Interconnection Process
PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents
More informationGRANT PROCUREMENT GUIDE
I. Purpose of Procurement Guide GRANT PROCUREMENT GUIDE Goods and services acquired with government funds are purchased utilizing the University's purchasing system in accordance with University policies.
More informationEA s LETTERHEAD. The EA wishes to engage the Consultant to provide the services for [insert name of Project]
EA s LETTERHEAD [Name of Consulting Firm] [Address] This Agreement is made this day of [month] [year] between [name of the executing agency] (the EA) and [Name of Consultant, if individual or Name of Consulting
More informationPeople s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development in Rural Areas
Technical Assistance Report Project Number: 48022 Policy and Advisory Technical Assistance (PATA) August 2014 People s Republic of China: Strategy and Transport Policy Study on Promoting Logistics Development
More informationPUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi
Anwar M. Raufi 1729 OUTLINE OF THE CONTENTS OF THE TOPIC TO BE PRESENTED 1- Procurement system of Afghanistan before ten years, i.e. before 2001. Afghanistan had a series of provisions regulating procurement
More informationFINANCING AGREEMENT N../AMADER/DG/DAF FOR THE ELECTRIFICATION OF. (Household Energy and Universal Rural Access Project)
IDA Loan N 3828 MLI FINANCING AGREEMENT N../AMADER/DG/DAF FOR THE ELECTRIFICATION OF (Household Energy and Universal Rural Access Project) Between: The Malian Agency for the Development of Household Energy
More informationThe Role of the Lender Common Infrastructure Design and Scoping Issues ESIA: The Management Planning Process Case Study Cross Cutting Themes:
Infrastructure Development, Ecosystem Services and the need for Adaptive Management: An EPFI s Perspective Chris Pullen Export Development Canada IAIA Biodiversity Symposium February 7, 2013 Presentation
More informationATTACHED TECHNICAL ASSISTANCE
Strengthening Economic Management Program II (RRP BHU 46371-002) ATTACHED TECHNICAL ASSISTANCE A. Introduction 1. The Ministry of Finance (MOF) of the Government of Bhutan requested capacity development
More informationARTWORK COMMISSION AGREEMENT
ARTWORK COMMISSION AGREEMENT THIS AGREEMENT is made the day of in the year BETWEEN the Minister for Works of Level 6, 16 Parkland Road, Osborne Park, WA 6017 being the body corporate created under Section
More informationASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
More informationProject Implementation and Administration Seminar Case Studies
BP01 PHILIPPINES EDUCATION PROJECT The project will construct and equip a new Institute of Technology in the Philippines. Table 1 provides project cost estimates. The work includes Construction of an academic
More informationAppendix D. Minimum Requirements For Developmental Resources. For
z Appendix D Minimum For Developmental Resources For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 MINIMUM REQUIREMENTS
More informationHow To Pay Off A Loan From A Bank
International Bank for Reconstruction and Development General Conditions for Loans Dated March 12, 2012 Table of Contents ARTICLE I Introductory Provisions... 1 Section 1.01. Application of General Conditions...
More informationThe South African Council for the Project and Construction Management Professions (SACPCMP)
The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act
More informationBi Annual Environmental Monitoring Report. Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche Financing Facility (MFF)
Bi Annual Environmental Monitoring Report Project Number: 2727 PK, Tranche II {Jan June, 2012} Islamic Republic of Pakistan Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche
More informationSection 3 - Evaluation and Qualification Criteria
Páge 1 of 13 This Section contains all the criteria that the Employer shall use to evaluate bids and qualify Bidders. In accordance with ITB 34 and ITB 35, no other methods, criteria and factors shall
More informationControlling Our Critical Path: A CDOT Guide to Better Project Management Practices
: A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it
More informationPREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS. (Ref No. Secy/PPC/CVL/01)
PREQUALIFICATION DOCUMENT FOR CONSULTANTS FOR CIVIL WORKS (Ref No. Secy/PPC/CVL/01) Inland Water Transport Development Company (IWTDC) No. 34-A, Street 27, Valley Road, Westridge, Rawalpindi Ph # 051-5491494-95,
More informationEnvironmental Assessment
BP 4.01 January 1999 These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and
More informationTHE CAPITAL MARKETS ACT (Cap. 485A)
GAZETTE NOTICE NO. 3362 THE CAPITAL MARKETS ACT (Cap. 485A) GUIDELINES ON CORPORATE GOVERNANCE PRACTICES BY PUBLIC LISTED COMPANIES IN KENYA IN EXERCISE of the powers conferred by sections 11(3) (v) and
More informationDraft Terms of Reference for appointment of Design and Supervision Consultants (DSC)
Draft Terms of Reference for appointment of Design and Supervision Consultants (DSC) 1.0 BACKGROUND: 1. Introduction: Indian coasts of about 5700 kilometers are highly vulnerable to tropical cyclones and
More informationHow To Write A Contract In The European
(Form-9) Agreement with Contractor for THIS AGREEMENT (hereinafter, together with the appendices and all the documents annexed hereto and forming an integral part hereof, referred to as the Contract )
More informationTHE LAW OF BIOMASS Setting Up Shop: Design, Engineering, and Construction of Biomass Projects
THE LAW OF BIOMASS Setting Up Shop: Design, Engineering, and Construction of Biomass Projects Karl F. Oles Stoel Rives LLP 600 University Street, Suite 3600 Seattle, WA 98101-4109 206-386-7535 kfoles@stoel.com
More informationCONTRACT MANAGEMENT ACTIVITIES
CONTRACT MANAGEMENT ACTIVITIES 6 CONTENT: 1. Procedures and Templates for Award of Contracts 2. Template for Informing Successful bidders 3. Template for Informing the World Bank 4. Contract Management
More informationJOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management
JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project
More informationHK Electric Smart Power Fund. Application Guideline
HK Electric Smart Power Fund Application Guideline Corporate Development Division 4/F Hongkong Electric Centre, 44 Kennedy Road, Hong Kong Hotline : 2887 3455 Fax : 2810 0506 Email : smartpowerfund@hkelectric.com
More informationIESL GUIDELINE STRUCTURE FOR ENGINEERING CONSULTANCY FEES 1. INTRODUCTION
IESL GUIDELINE STRUCTURE FOR ENGINEERING CONSULTANCY FEES 1. INTRODUCTION With respect to the practice of engineering, the Institution of Engineers Sri Lanka (IESL) Act is intended to ensure the provision
More informationOUTSOURCING. The Original Agreement provided for an optional 3-year extension to the original 10-year term.
Filed: -- EB--0 Exhibit C Tab Page of OUTSOURCING.0 BACKGROUND Hydro One Networks Inc. ( Networks ) entered into a -year master services agreement with Inergi LP ( Inergi ) on December, 0 for services
More informationConstruction CONSTRUCTION
135 R. English CONSTRUCTION Construction GOOD PRACTICE POINTERS Identify stakeholders most likely to be affected by construction. Notify local stakeholders of construction activities and changes to schedules.
More informationREGULATION (EEC) No 2309/93
REGULATION (EEC) No 2309/93 Council Regulation (EEC) No 2309/93 of 22 July 1993 laying down Community procedures for the authorization and supervision of medicinal products for human and veterinary use
More informationSection 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
More informationClimate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun
Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun SHEP Ghana s Self-help Electrification Programme By Henry Vanderpuye Energy Consultant, Ministry of Energy
More informationUpdated November 20, 2015. Director, System Planning
Updated November 20, 2015 Job Descriptions Job Title Reports To Job Description SYSTEM PLANNING & SERVICES VP Compliance Manages the system planning and services staff. The director is responsible for
More informationINTER-PARLIAMENTARY UNION
INTER-PARLIAMENTARY UNION 5, CHEMIN DU POMMIER CASE POSTALE 330 1218 LE GRAND-SACONNEX / GENÈVE (SUISSE) TELEPHONE (41.22) 919 41 50 - FAX (41.22) 919 41 60 - E-MAIL postbox@mail.ipu.org TELEGRAPHIC ADDRESS
More informationClassification Appeal Decision Under section 5112 of title 5, United States Code
U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Atlanta Oversight Division 75 Spring Street, SW., Suite 1018 Atlanta, GA
More informationREQUEST FOR EXPRESSIONS OF INTEREST/APPLICATIONS
JAMHUURIYADDA FEDRAALKA SOOMAALIYA WASAARADDA BOOSTADA IYO ISGAARSIINTA Federal Republic of Somalia MINISTRY OF POST AND TELECOMMUNICATIONS MASHRUUCA TAAKULAYNTA ISGAARSIINTA ICT SECTOR SUPPORT PROJECT
More informationFIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
More informationICC UNIFORM RULES FOR CONTRACT BONDS
ICC UNIFORM RULES FOR CONTRACT BONDS issued as ICC publication No. 524, adopted by the ICC Executive Board on 23 April 1993, come into effect on 1 January 1994 Copyright 1993 International Chamber of Commerce.
More informationCHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
More informationISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
More information46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP)
46575 STEG Tunisia power transmission project EBRD/EIB/STEG ENVIRONMENTAL AND SOCIAL ACTION PLAN (ESAP) Main STEG departments involved in the ESAP: DEQ: Division for Equipment (responsible for implementing
More informationRequest for Proposal Autodesk CAD Support
Request for Proposal Autodesk CAD Support Introduction Denver Water is inviting your firm to submit a proposal to provide Autodesk product-based services and support to meet the requirements of Denver
More informationUNITED NATIONS CHILDREN S FUND. Office in Serbia is seeking qualified
UNITED NATIONS CHILDREN S FUND Office in Serbia is seeking qualified Consultants for further analysis of the Multiple Indicator Cluster Surveys (MICS) VN: OPS/BEL/2014-29 The purpose of the assignment
More informationTerms of References for Infrastructure Expert
1. BACKGROUND Terms of References for Infrastructure Expert Sustainable Development Account Moldova (SDA Moldova) (hereinafter the institution) is a public entity established by the Government of the Republic
More informationNorth American Development Bank. Model Bidding Document: Consultant Services
North American Development Bank Model Bidding Document: Consultant Services MODEL DOCUMENTS Sample letter of invitation Outline for typical Terms of Reference Supplementary information for consultants
More informationHow To Build A House
CONTRACT TO BUILD A HOUSE AT I. Contract Parties Now comes (builder s name) (address) and (buyer s name) (address) to hereby agree to build a house on property located at (common address) and legally described
More informationEmployment Policies, Procedures & Guidance CONTRACT HIRE (CAR LEASING) SCHEME
CONTRACT HIRE (CAR LEASING) SCHEME 1. Introduction GUIDANCE NOTES The following details describe the conditions for providing a contract hire car to employees of the Council. Under the scheme, the Council
More informationGuidance for the Quality Assurance of Fire Protection Systems
Guidance for the Quality Assurance of Fire Protection Systems Prepared for: Office of Energy Research Office of Environment, Safety and Health Technical Support Prepared by: Roy F. Weston, Inc. October
More informationThe Swedish Natural Gas Act and Ordinances
The Swedish Natural Gas Act and Ordinances The Swedish Natural Gas Act and Ordinances CONTENTS Chapter 1 Introductory Provisions... 4 Chapter 2 Concession... 5 Chapter 3 Obligations of the Natural Gas
More informationEnvironmental & Social Assessment Procedures Basics
African Development Bank Group Environmental & Social Assessment Procedures Basics For public sector operations Compliance & Safeguards Division (ORQR.3) safeguards@afdb.org AFRICAN DEVELOPMENT BANK GROUP
More informationOfficial Journal of the European Union
L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an
More informationSection 7. Terms of Reference
APPENDIX-A TERMS OF REFERENCE UNION-LEVEL TECHNICAL ASSISTANCE TO PROVIDE INSTITUTIONAL SUPPORT TO THE MYANMAR NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT I. INTRODUCTION IDA GRANT H814MM FY 2013-16
More informationPerformance Standard 8:
Overview of Performance Standards on Environmental and Social Sustainability 1. IFC s Sustainability Framework articulates the Corporation s strategic commitment to sustainable development, and is an integral
More informationCONFORMED COPY CREDIT NUMBER 2932 YEM
CONFORMED COPY CREDIT NUMBER 2932 YEM Development Credit Agreement (Emergency Flood Rehabilitation Project) between REPUBLIC OF YEMEN and INTERNATIONAL DEVELOPMENT ASSOCIATION Dated December 30, 1996 DEVELOPMENT
More informationSAMPLE MULTI-YEAR LEASE AGREEMENT
SAMPLE MULTI-YEAR LEASE AGREEMENT This Lease Agreement is entered into on this day of, 2009, by and between as lessor ( Lessor ), and, as lessee ( Lessee ), for the Lease of certain land bounded by in,
More information05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246
CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 CIVIL ENGINEERING ASSOCIATE, 7246 Summary of Duties: Performs professional civil engineering work in researching,
More informationPERFORMANCE PLANNING AND APPRAISAL FORM MANAGEMENT PERSONNEL
Employee Name: Position Title: Department: Supervisor Name: Date of Review: For Period: To At the beginning of each performance cycle, employee and supervisor establish performance objectives based on
More informationKyrgyz Republic: Women s Entrepreneurship Development Project
Kyrgyz Republic: Women s Entrepreneurship Development Project Project Name Project Number 46010-001 Country Project Status Project Type / Modality of Assistance Source of Funding / Amount Women s Entrepreneurship
More informationProperty & Terrier Team Leader. Office based hot desk/touch down worker
ROLE PROFILE Role profile Career Grades C, D & E Role Title Property & Terrier Officer (Level 1) Role Grade: GRADE C Role Reference: Reports to: Behavioural Competency Job Type: Work Style Definition Primary
More informationQuality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
More informationI. BASIC PROVISIONS. Subject of regulation
LAW ON ENVIRONMENTAL IMPACT ASSESSMENT Published in the Official Gazette of the Republic of Serbia, No. 135/2004 ( Službeni glasnik Republike Srbije, br. 135/04) I. BASIC PROVISIONS Subject of regulation
More informationThe Role of Construction Managers. FIDIC offers two contributions on the question of the role of a construction manager in a construction contract:
The Role of Construction Managers FIDIC offers two contributions on the question of the role of a construction manager in a construction contract: A. Notes on the use of FIDIC in the Middle East B. A Communication
More informationAIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
More informationDGS-30-300 (VCCS Rev. 04/15) Page 1 of 7 REQUEST FOR PROPOSALS
(VCCS Rev. 04/15) Page 1 of 7 REQUEST FOR PROPOSALS Issue Date: July 10, 2015 RFP: LFCC-F-18161AE Title: Virginia Community College System Lord Fairfax Community College, Fauquier Campus Construct Academic
More informationLONG INTERNATIONAL. Andrew Avalon, P.E., PSP and Curtis W. Foster
Andrew Avalon, P.E., PSP and Curtis W. Foster LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com
More informationNEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN
NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE RESETTLEMENT ACTION PLAN November 2009 BACKGROUND Newmont Ghana Gold Ltd. (NGGL) has developed gold reserves at the Ahafo
More informationThe Dayton Power and Light Company. Pre-Qualification Filing
The Dayton Power and Light Company Pre-Qualification Filing April 2013 (i) Name and address of the entity including a point of contact The Dayton Power and Light Company 1065 Woodman Drive Dayton, Ohio
More informationAGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES
AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES This agreement is made and entered into, on day the. of, 1991 by and between: Mr/. of P.O. Box.. hereinafter refereed to as the "Owner" on
More informationArchitects and Engineers Professional Liability Proposal Form
Notice:Statement pursuant to Section 25(5) of the Insurance Act (Cap 142) or any amendments thereof; You are to disclose in this application, fully and faithfully, all the facts which you know or ought
More informationTECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project)
TECHNICAL ASSISTANCE (Uzbekistan: Second Small and Microfinance Development Project) A. Methodology and Key Activities 1. The Asian Development Bank (ADB) will engage a qualified team of consultants in
More informationCP#64 / Environmental Monitoring Services
CP#64 / Environmental Monitoring Services Issuing Authority: Acting Commissioner Basil Seggos Date Issued: November 4, 2015 New York State Department of Environmental Conservation DEC Policy Latest Date
More informationBuilding a Good Construction Loan Agreement Presented by Laura S. Peck 608.283.6729 lpeck@axley.com
BUILDING A GOOD CONSTRUCTION LOAN AGREEMENT July 29, 2014 This document was drafted for presentation purposes only. Before relying on legal information of a general nature, please consult legal counsel
More information