Bi Annual Environmental Monitoring Report. Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche Financing Facility (MFF)

Size: px
Start display at page:

Download "Bi Annual Environmental Monitoring Report. Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche Financing Facility (MFF)"

Transcription

1 Bi Annual Environmental Monitoring Report Project Number: 2727 PK, Tranche II {Jan June, 2012} Islamic Republic of Pakistan Power Distribution Enhancement Investment Project (PDEIP) Tranche II Multi Tranche Financing Facility (MFF) Financed by the ASIAN DEVELOPMENT BANK Prepared By: (Mr. Imran Malak / Mr. Mohammad Yasin) Environment & Social Safeguards Section Management Unit Office of the General Manager (Development) ISLAMABAD ELECTRIC SUPPLY COMPANY (IESCO) IESCO Head Office, Street 40, G 7 / 4, Islamabad, Pakistan. For Islamabad Electric Supply Company (IESCO). Pakistan Electric Power Company (PEPCO). This report does not necessarily reflect the views of or the Government concerned, and and the Government cannot be held liable for its contents.

2

3 ABBREVIATIONS AJK BPI E&SS EA EIA EPA EPD GMD GOP GS IA IEE IESCO KV MOW&P MFF NOC PDEIP PEPA PEPCO MU TL Asian Development Bank Azad Jammu & Kashmir British Power International Environmental and Social Safeguard Executing Agency Environmental Impact Assessment Environmental Protection Agency Environmental Protection Department General Manager Development Government of Pakistan Grid Substation Implementing Agency Initial Environmental Examination Islamabad Electric Supply Company Kilo Volt Ministry of Water and Power Multi Tranche Financing Facility No Objection Certificate Power Distribution Enhancement Investment Program / Project Pakistan Environmental Protection Act Pakistan Electric Power Company Management Unit Transmission Line Page 1 of 27

4 TABLE OF CONTENTS ABBREVIATIONS... 1 Part I INTRODUCTION IESCO Directorate of GM (Development) / Management Unit (MU) Environmental & Social Safeguard Section Management Unit Power Distribution Enhancement Investment Program (PDEIP) Tranche II Objective of the Program (PDEIP) Scope of the Work Present Status of the Project Monitoring Indicator of Part I set by Part II ENVIRONMENTAL MONITORING Monitoring Monitoring Indicator of Part II set by Part III ENVIRONMENTAL MANAGEMENT Compliance Status with Statuary Requirements Environment & Social Documents Awareness & Trainings EMMP as a part of Bidding Documents Clauses in the Bidding Documents Monitoring Indicators of Part III set by Annex I MONITORING DATA Annex II PHOTOGRAPHS Annex III IMPLEMENTATION REPORT ON EIA / IEE MITIGATION REQUIREMENTS Page 2 of 27

5 Part I INTRODUCTION 1.1 IESCO 1. Islamabad Electric Supply Company Ltd. (IESCO) is a public utility company, having more than 02 Million consumers and provides service to 04 Nos. Northern Districts of the Punjab Province (Rawalpindi, Attock, Jhelum and Chakwal); Capital Territory (Islamabad); and Southern parts of Azad Jammu & Kashmir (AJK). IESCO jurisdiction map is placed as below. Figure 1: IESCO Jurisdiction Map. Page 3 of 27

6 1.2 Directorate of GM (Development) / Management Unit (MU) 2. To carry out and handle investment projects IESCO has established Management Unit (MU) under the supervision of General Manager (Development). The MU comprises of 4 sections. i. Planning Scheduling & Coordination: To take the responsibilities for (i) identifying and proposing the subprojects to PEPCO / Donor Agency for approval and financing, (ii) Scheduling and Monitoring (iii) preparing the necessary documentation in line with the statutory, corporate and Donor policies including quarterly reports (iv) coordinate with the consultants. ii. Procurement: To take care of all responsibilities and tasks related to procurement (goods, works and services) and for the activities related to material planning, preparation of bidding documents according to the requirement of the Donors, getting the evaluation done and for placing the orders after approval of the Donors, inspection and then transportation to the site. Arrange release of material thru CRR Karachi and final delivery to the site. iii. iv. Project Finance: They are responsible for taking care of counterpart financing, funds flow arrangements, payments, recording and monitoring of both & WB funds. Also, will establish, monitor and manage the imprest account and statement of expenditure (SOE) procedures. Furthermore ensure timely preparation of the annual audited project accounts. Environment & Social Safeguard: To take care of all the responsibilities and tasks related to environment, land, and social (including involuntary resettlement and indigenous people) and provide oversight on occupational health, safety and environment safeguards in the working environment. 3. The organizational structure of MU IESCO is given below in Figure - 2. Page 4 of 27

7 General Manager (Development) Manager (Planning, Scheduling & Co-ordination) Manger (Procurement) Dy. Manager (Environment and Safeguards) Manager (Project Financing) Dy Manager (Monitoring Control & Coordination) Dy manager (Planning & Scheduling) DM (Procurement) DM (Procurement) AM (Social Impact) AM (Environment) DM (Project Financing) Assistant Manager (MC&C) Assistant Manager (P&S) Assistant Manager Assistant Manager Assistant Manager Assistant Manager Figure 2: Organizational Structure of MU IESCO. Page 5 of 27

8 1.3 Environmental & Social Safeguard Section Management Unit 4. The Environmental & Social Safeguard (E&SS) Section of MU, IESCO provides an overall supervision and advisory services during the Pre - Construction phase, Construction phase & Post Construction phase of the project. The E&SS also assists and advises GSC Directorate, Construction Directorate and other IESCO departments on environmental and social matters overall. Presently, the E&SS Section has one Environmental and one Social Impact expert under the supervision of a Deputy Manager Environmental and Social Safeguard (E&SS). 5. The organizational structure of E&SS MU IESCO is attached as below. GM (Development) M. Yousaf Awan Dy. Manager (E&SS) Mohammad Yasin Asstt. Manager (Social Impact) Sher Afzal Asstt. Manager (Environment) M. Imran Malak Figure3: Management Structure of. Page 6 of 27

9 1.4 Power Distribution Enhancement Investment Program (PDEIP) Tranche II. 6. Government of the Islamic Republic of Pakistan (GoP) through Ministry of Water and Power (MOW&P) with assistance of Asian Development Bank () is implementing the Power Distribution Enhancement Investment Program (PDEIP) under Multi Tranche Financing Facility (MFF). This Program is part of the GoP long term energy security strategy. Pakistan Electric Power Company (PEPCO) has been nominated by Ministry of Water and Power (MOW&P) to act as the Executing Agency (EA) while Islamabad Electric Supply Company (IESCO) is the Implementing Agency (IA) for execution work in its service area. Program basic information is provided in Table 1. Table 1: Program Basic Information. The Program Subproject Sponsoring Agency Executing Agency Implement Agency Power Distribution Enhancement Investment Program (PDEIP). Multi Tranche Financing Facility (MFF). Tranche II subproject. Government of Pakistan. Ministry of Water & Power (MoW&P). Pakistan Electric Power Company (PEPCO). Islamabad Electric Supply Company (IESCO). Type of Financing Loan amount US $ Million. Loan No PK ; Tranche II Subproject. Loan No PK ; Support Project. Loan Signing Date January 28, Loan Effectiveness Date October 05, Page 7 of 27

10 Closing Date March 31, Date of Last Review Mission March 05, Focal Person Focal Person for Environment & Social Safeguards General Manager (Development), Management Unit, Islamabad Electric Supply Company (IESCO). Deputy Manager (E&SS), Management Unit, Islamabad Electric Supply Company (IESCO). 7. The Power Distribution Enhancement Investment Program (PDEIP) Tranche-II is designed to provide grid-connected customers with adequate and reliable supply of electricity. The rehabilitation, augmentation, and expansion of power distribution infrastructure will increase the reliability of supply to residential, agricultural, commercial, and industrial customers across Pakistan. A reliable electricity supply will lead to social and economic benefits and improved conditions for schools, hospitals, and social services, among others. The main components of the program are given as under: Conversion / Up-gradation of Grid Stations Extension of Power Transformers in existing Grid Stations Augmentation of Power Transformers in existing Grid Stations New Transmission Lines Remodelling of Transmission Lines Installation of capacitors on 11 KV Rehabilitation works System Modernization Page 8 of 27

11 1.5 Objective of the Program (PDEIP) 8. The main objectives of this Investment Program are; (i) improve power distribution infrastructure through system rehabilitation, augmentation, and expansion; and relieve the power system from distribution bottlenecks and constraints; (ii) enable continued operation and maintenance in accordance with best international practices; and (iii) the system will be capable of meeting peak demand, with electricity outages significantly reduced. 1.6 Scope of the Work 9. IESCO Tranche II subproject includes 01 No. Conversion, 09 Nos. Extensions / Augmentations, 02 Nos. Transmission Lines (New), 01 No. Transmission Line (Remodelling) & Capacitors & Miscellaneous Electrical Equipment. The detail scope of work of Tranche - II subproject is reproduced below in Table - 2. Table 2: No Detail Scope of Work. Project Component Conversions 01 No. i. Conversion of NPS Grid Station on Turnkey Basis Extension / Augmentation 09 Nos. i. Mangla Right Bank (R. B. Mangla) ii. Satellite Town iii. H 11 Islamabad iv. Pindi Gheb v. Hajeera vi. Minhasa vii. Mangla Left Bank (L.B.Mangla) viii. E-8 Islamabad ix. Line Bay Extensions Transmission Lines (New) i. Hattian to Bagh Transmission Line 02 No. ii. Choa Saiden Shah - Noorpur Sehti Transmission Line Amount (Us $ Mill) Transmission Lines (Remodelling) 01 No Page 9 of 27

12 No. Project Component Amount (Us $ Mill) i. Mangla - Left Bank Magla - Rajjar Transmission Lines 05. Capacitors & Miscellaneous Equipment 5.50 Total Page 10 of 27

13 1.7 Present Status of the Project. 10. The civil works of Tranche II Subprojects have been awarded, the detail of work awarded is as below: No. Package Lot No. Description of Work Length of T / L (KM) Nos. of Locations Awarded to Contract Signed Date 1 ICB- 11/TR- II/ I Procurement of Plan t, Design, Supply, Installation, Testing, Commissioning, & Civil Works of 132 KV Noor Pur Sethi (AIS) Grid Station District Chakwal on Turn Key Basis. - 1 M/s Siemens (Pakistan) Engineering Co. Ltd. Islamabad. May 15, ICB- 11/TR- II/ II Procurement of Transmission Line Material, Construction Survey, Tower Sticking, Construction of Tower / Pile Foundation, Erection, Stringing, Testing & Commissioning of 132 KV T/L from Hattian to Bagh (AJ&K) For Bagh Grid Station M/s Pingaoo - Potential (JV), Lahore April 16, ICB- 11/TR- II/ III Procurement of Transmission Line Material, Construction Survey, Tower Sticking, Construction of Tower / Pile Foundation, Erection, Stringing, Testing & Commissioning of 132 KV SDT T/L from Mangla Power House to M/s Pingaoo - Potential (JV), Lahore May 24, Page 11 of 27

14 No. Package Lot No. Description of Work Rajjar Grid Station on ACSR Rail Conductor. Length of T / L (KM) Nos. of Locations Awarded to Contract Signed Date 4 ICB- 11/TR- II/ IV Procurement of Transmission Line Material, Construction Survey, Tower Sticking, Construction of Tower / Pile Foundation, Erection, Stringing, Testing & Commissioning of 132 KV T/L from Noor Pur Sethi to Choa Saiden Shah for Noor Pur Sethi Grid Station M/s Pingaoo - Potential (JV), Lahore April 16, Orientation / pre construction meeting were arranged by E&SS section for the contractors and they have been made aware of their responsibilities as per the EMP. Page 12 of 27

15 1.8 Monitoring Indicator of Part I set by. Description of Indicator. 1. Construction activities and Project Progress during previous 6 months. Remarks. Presently the project is in documentation phase and no component of project is in execution phase. The civil works of Tranche II Subprojects have been awarded to contractors. 2. Changes in project organization and Environmental Management Team. No change. 1. A meeting with M/s Siemens (Pakistan) Engineering Co. Ltd. Islamabad has been held on June 19, 2012 with respect to 132 KV Noor Pur Sethi (AIS) Grid Station District Chakwal. 3. Relationships with Contractors, Owner, Lender, etc. 2. A meeting with M/s Pingaoo - Potential (JV), Lahore has been held on July 12, 2012 with respect to 132 KV T/L from Hattian to Bagh (AJ&K), 132 KV SDT T/L from Mangla Power House to Rajjar Grid Station & 132 KV T/L from Noor Pur Sethi to Choa Saiden Shah. Page 13 of 27

16 Part II ENVIRONMENTAL MONITORING 2.1 Monitoring. 12. Environmental Monitoring of the projects will be carried out by the contractors under the supervision of Environmental and Social Safeguard (E&SS) section MU, IESCO during the execution phase. For this, field visit will also be carried out by E&SS Section, MU IESCO for the smooth and effective implantation of EMMP & Monitoring plan as prescribed in approved Environ mental Assessment Report. 2.2 Monitoring Indicator of Part II set by. Description of Indicator. Summarizes the previous six months monitoring data and provide explanations of any instances where environmental standards or guidelines are exceeded. Noise and Vibration. Water Quality. Air Quality. Flora and Fauna Monitoring. Remarks. Not Applicable at this stage. Not Applicable at this stage. Page 14 of 27

17 Part III ENVIRONMENTAL MANAGEMENT 3.1 Compliance Status with Statuary Requirements 13. The loan agreement of the project requires the Implementing Agency (IA) to implement the project in compliance with statuary / regulatory requirements of the country and requirements of Guidelines (May 2003). The detail of environmental & social compliance regarding statuary / regulatory requirements in accordance to & National Law is tabulated below. No. Regulatory Requirements. Status of Compliance. 01. Preparation of Environmental Assessment Reports. EIA Prepared. 02. Clearance from. Clearance given by. 03. Clearance / Obtaining of No Objection Certificate (NOC) from the Environmental Protection Agency (EPA). The Public Hearing for 132 KV Mangla Left Bank to Rajjar & 132 KV Choa Sadian Shah to Noor Pur Sethi Transmission Lines under Tranche II subprojects had been held on April 30, 2012 at 66 KV Noor Pur Sethi grid station. In process, Matter being followed up. The EIA has been requested to issue NOC at the earliest. 3.2 Environment & Social Documents 14. IESCO PDEIP Tranche II Projects has been classified as Category B Project in accordance to Environment Policy (2002) and Environmental Assessment Guidelines (2003). The project falls under Schedule II of Pakistan Page 15 of 27

18 Environmental Protection Act (PEPA), 1997, which requires Environmental Impact Assessment (EIA) to be carried out for the project. 15. Initial Environmental Examination (IEE) Reports were prepared by PEPCO through M/S British Power International (BPI), Lahore. 16. After the approval of the IEE reports were received from BPI through PEPCO in November These reports are available on IESCO website. 17. Under the Pakistan Environmental Protection Act 1997, the project components required preparation of Environmental Impact Assessment (EIA) report instead of IEE. Hence to comply the regulations and on advice of Pak EPA comprehensive EIA report was prepared by E&SS MU IESCO. 18. Being in Federal Capital, the EIA report was submitted to Pak EPA on January 01, 2011 for issuance of NOC after the approval of CEO, IESCO. Pak EPA further processed the reports to Punjab EPA & AJ&K EPA. The inspector of Punjab EPA visited the project sites in March April The comments of Pak EPA, Punjab EPA & AJ&K EPA have been received and their replies have been submitted vide Letter No. PMU/E&SS/-Tr II/ dated & Letter No. PMU/E&SS/-Tr II/ dated The Public Hearing for 132 KV Mangla Left Bank to Rajjar & 132 KV Choa Sadian Shah to Noor Pur Sethi Transmission Lines under Tranche II subprojects was held on April 30, 2012 at 66 KV Noor Pur Sethi grid station. Page 16 of 27

19 3.3 Awareness & Trainings 21. To develop the in-house capacity, IESCO arranged a numbers of training for different cadres / staff of GSC Directorate, who are responsible for supervision of development projects. 22. Environmental Management Plan (EMP) of Tranche II subproject was translated into Urdu and both English & Urdu version are available on IESCO website (www.iesco.com.pk). 3.4 EMMP as a part of Bidding Documents 23. Environmental Management & Mitigation Plan (EMMP) & Monitoring Plan of the approved EIA Reports have been made part of all the bidding documents of civil works of Tranche II sub projects. 3.4 Clauses in the Bidding Documents 24. The Clauses included in the bidding documents are; i. Required Personnel: The Bidder shall provide details of the proposed personnel and their experience records in the relevant Information Forms included in Section 4 (Bidding Forms). ii. The Bidder must demonstrate that it has the personnel for the key positions that meet the following requirements: Page 17 of 27

20 No. Position. Total Work Experience (Year). Experience in Similar Work (Years). 01. Project Manager Lead Design Engineer (Civil) Lead Design Engineer (Electrical) Construction Manager Environmentalist / HSE Officer Social / Resettlement Officer iii. Employer s Requirement / Supplementary Information: SI-03. Environmental Issues: The Contractor shall comply and carry out all the monitoring and mitigation measures as set forth in the Environmental & Social Management Plan (EMP). The EMP & Environmental Monitoring Plan are attached as Annexure with bidding document. iv. General Condition of Contract: Protection of Environment 46. Protection of Environment 46.1 The Contractor shall observe the environment mitigation measures that are set out in the Environmental Management Plan (EMP) that has been prepared for the Project The Contractor shall take all reasonable steps to protect the environment (both on and off the Site) and to limit damage and nuisance to people and property resulting from pollution, noise and other results of operations as set forth in the EMP. Page 18 of 27

21 46.3 The Contractor shall ensure that emissions, surface discharges and effluent from its activities shall not exceed the values stated in the Specifications, or as prescribed by the applicable laws The contractor shall Comply with all applicable environmental laws and regulations of Pakistan The contractor shall a) Establish an operational system for managing environmental impacts. b) Carry out all of the monitoring and mitigating measures set forth in the EIA and the EMP. c) Allocate the budget required to ensure that such measures are carried out, and the actual costs for the implementation of such measures shall be reimbursed by the employer to the contractor from provisional sums. The contractor shall submit to the employer quarterly reports on the carrying out of such measures The Contractor shall submit monthly & quarterly reports on carrying out such measures to the Employer. Page 19 of 27

22 v. Special Condition of Contract: 9. Contractor s Responsibilities. The Contractor shall comply with all applicable national, provincial, and local Environmental laws and regulations The Contractor shall; a) Establish an operational system for managing environmental impacts. b) Carry out all of the monitoring and mitigation measures set forth in the Initial Environmental Examination ( IEE ) and the Environmental Management Plan (EMP) attached hereto as Appendix 8 / Annexure C c) Allocate the budget required to ensure that such measures are carried out. d) The Contractor shall submit to the Employer quarterly report on the carrying out of such measures and the actual costs for the implementation of such measures shall be reimbursed by the Employer to the Contractor from Provisional Sums. vi. Contract Forms / Contract Agreement: The following documents shall constitute the Contract between the Employer and the Contractor, and each shall be read and construed as an integral part of the Contract (Reference GCC Clause 2): a) This Contract Agreement and the Appendices hereto b) Letter of Bid and Price Schedules submitted by the Contractor, c) Special Conditions, d) General Conditions, e) Specification, f) Drawings, g) Environmental & Social Mitigation Plan, h) Environmental Monitoring Plan, i) Other completed Bidding Forms submitted with the Letter of Bid, j) Any other documents part of the Employer s Requirements. Page 20 of 27

23 3.5 Monitoring Indicators of Part III set by. Description of Indicator. EMS, SSEMP and work plans. Report on delivery of documents, required amendments etc. Site Inspections and audits summarizes the number and type of site visits Non-compliance notices summarizes the details on the number of notices given out and the issues covered. Summaries the ranking of issues. Corrective action plans - report on timeliness of preparation and completion Consultation and complaints report on any consultation undertaken and list any complaints received. Remarks. EMP prepared. No amendments are required. Site Inspections will be carried out during execution phase of the project. Nil. Nil. Consultation carried out during preparation of Environmental Assessment reports. No complaints received yet. Page 21 of 27

24 MONITORING DATA Annex I. No. Description Status of Compliance 01. Establishment of PMU in IESCO. Yes. 02. Induction of E&SS Section and Staff in PMU. Yes. 03. Preparation of Environmental Assessment Reports (EIA Reports). Yes. 04. Clearance & approval of IEE / EIA Reports from. Yes. 05. Approval of IEE / EIA Reports from CEO, IESCO. Yes. 06. Uploading of EIA Reports on IESCO website. Yes. 07. Submission to Concerned EPA / EPD. Yes. 08. Public Hearing Session. 1 st Public Hearing Session had been held on April 30, 2012 at 132 KV Noor Pur Sethi G/S. 09. Clearance/ obtaining No Objection Certificate (NOC) from the EPA / EPD. In process, Matter is being followed up. 10. Training on Environment Issues. Yes. 11. Internal Monitoring & Field Visit. After the initiation of construction phase. 12. EMMP is made part of Bidding Documents Yes Provision made in BOQ of Bidding Documents for Environmental & Social Issues. Status of implementation of EMMP & Monitoring Parameters. Yes. To be Monitored during physical execution stage. 15. Project present Status. No physical work initiated. Page 22 of 27

25 Annex II. PHOTOGRAPHS (will be included during the execution phase of the project) Page 23 of 27

26 Annex III. IMPLEMENTATION REPORT ON EIA / IEE MITIGATION REQUIREMENTS Reference. Requirement. Action Time. Action Required. Remarks / Comments. Design Phase. Ensure requirements and recommendations EMP 1. Contract Clauses Design Phase. of environmental assessment are included in the contracts. Ensure environmentally responsible EMP 2. Procurement Design Phase. procurement. Ensure adequate disposal options for all EMP 3. Waste Disposal Design Phase. waste including transformer oil, residually contaminated soils, and scrap metal. EMP EMP EMP MP 4. Hazardous Waste Disposal 5. Prevent Spills & Contamination. 6. Hydrological Impacts 7. Temporary Drainage and Erosion Control Design Phase. Design Phase. Design Phase. Design Phase. EMP 8. Noise Design Phase. To ensure responsible disposal of hazardous waste in line with best practice. To prevent spills, contamination of soil groundwater and surface water. To minimize hydrological and drainage impacts during construction. Include mitigation in preliminary designs for erosion control and temporary drainage. Ensure cumulative noise impacts are acceptable in construction and operational phase. Complied. Complied. Complied. (Considered in the design / drawing of the grid station.) Complied. (Considered in the design / drawing of the grid station.) Complied. Considered in the design / drawing of the grid station.) Complied. (Considered in the design / drawing of the grid station.) Complied. (Considered in the design / drawing of the grid station & Transmission Lines.) Complied. EMP 9. Social Impacts Design Phase. To ensure that the adverse impacts due to On going. Page 24 of 27

27 (July Dec 2011) Reference. Requirement. Action Time. Action Required. Remarks / Comments. constructing lines over private land, property acquisition and resettlement are mitigated according to the LARP. Construction Phase. EMP EMP 1. Hydrology and Drainage Aspects. 2. Orientation for Contractor, and Workers. Construction Phase. Construction Phase. To ensure the proper implementation of any requirements mentioned in EPA conditions of approval letter in relation to hydrology of the project. To ensure that the GSC contractor and workers understand and have the capacity to ensure the Environmental requirements and implementation of mitigation measures. On going. Complied. Page 25 of 27

Bi-Annual Environmental Monitoring Report

Bi-Annual Environmental Monitoring Report Bi-Annual Environmental Monitoring Report Project Number: 2727-PAK-Tranche-II (January-June, 2012) Islamic Republic of Pakistan: Power Distribution Enhancement Investment Project Financed by the Asian

More information

Bi-annual Environmental Monitoring Report

Bi-annual Environmental Monitoring Report Project Number: 2974-GEO (SF) Reporting period: Jul 2014-Jan 2015 GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT (Financed by the Asian Development Bank) Bi-annual Environmental Monitoring Report Prepared

More information

TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS

TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS A. Background TERMS OF REFERENCE FOR PROJECT MANAGEMENT AND SUPERVISION CONSULTANTS REHABILITATION AND UPGRADE OF SCADA SYSTEM AND EMS 1. The Government of Armenia has received financing from the Asian

More information

GUIDELINES FOR FINANCIAL ASSISTANCE TO NGOs

GUIDELINES FOR FINANCIAL ASSISTANCE TO NGOs GUIDELINES FOR FINANCIAL ASSISTANCE TO NGOs GOVERNMENT OF PAKISTAN MINISTRY OF ENVIRONMENT Introduction Natural resources and the environment are critical for the future of Pakistan, both globally as well

More information

GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT

GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT Bi- annual Environmental Monitoring Report Project Number: 2974-GEO (SF) Reporting period: January 2015-July 2015 GEORGIA: POWER TRANSMISSION ENHANCEMENT PROJECT (Financed by the Asian Development Bank)

More information

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY

TERMS OF REFERENCE FOR SCOPING OF EIA STUDY TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking

More information

Role of the Environmental Management Representative (EMR)

Role of the Environmental Management Representative (EMR) Legacy Way Project Role of the Environmental Management Representative (EMR) What is Legacy Way The project consists of the following key elements: Two 4.2 km road tunnels connecting the Western Freeway

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

Terms of Reference For Project Supervision Consultants of South Asia Sub regional Economic Cooperation Power System expansion Project

Terms of Reference For Project Supervision Consultants of South Asia Sub regional Economic Cooperation Power System expansion Project Terms of Reference For Project Supervision Consultants of South Asia Sub regional Economic Cooperation Power System expansion Project 1. Background and Definitions 1.1. Nepal is facing chronic power shortages.

More information

Islamic Republic of Pakistan: Flood Emergency Reconstruction Project

Islamic Republic of Pakistan: Flood Emergency Reconstruction Project Flood Emergency Reconstruction Project (RRP PAK 44372) Project Administration Manual Project Number: 44372 Loan Number: {LXXXX} March 2011 Islamic Republic of Pakistan: Flood Emergency Reconstruction Project

More information

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows

Programme Manager/Procurement Specialist. Suva. Capital Works Manager. As soon as possible. As follows JOB DESCRIPTION Position: Location of position: Reporting to: Special functional relationships: Term of Appointment: Programme Manager/Procurement Specialist Suva Capital Works Manager Capital Works Programme

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Proposed (Concrete Cutting And Drilling) Environmental Management Plan SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part

More information

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2 Environmental Compliance Audit Report Project Number: 41456-033 June 2012 MFF 0054-VIE: Water Sector Investment Program Tranche 2 This environmental comliance audit report is a document of the borrower.

More information

Project Administration Manual. Project Number: 45094 Loans: LXXXX March 2012. Democratic Republic of Timor-Leste: Road Network Upgrading Project

Project Administration Manual. Project Number: 45094 Loans: LXXXX March 2012. Democratic Republic of Timor-Leste: Road Network Upgrading Project Project Administration Manual Project Number: 45094 Loans: LXXXX March 2012 Democratic Republic of Timor-Leste: Road Network Upgrading Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION

More information

THE MURREE-KAHUTA DEVELOPMENT AUTHORITY ACT, 1986

THE MURREE-KAHUTA DEVELOPMENT AUTHORITY ACT, 1986 1 of 8 6/2/2011 4:18 PM THE MURREE-KAHUTA DEVELOPMENT AUTHORITY ACT, 1986 (Pb. Act I of 1987) C O N T E N T S SECTIONS CHAPTER I PRELIMINARY 1. Short title, extent and commencement. 2. Definitions. CHAPTER

More information

Example of a (safety) management system

Example of a (safety) management system Example of a (safety) management system Below is an example of the content and structure of a management system for high hazards industry. As you may see, each management activity area or element includes

More information

Project Implementation and Administration Seminar Case Studies

Project Implementation and Administration Seminar Case Studies BP01 PHILIPPINES EDUCATION PROJECT The project will construct and equip a new Institute of Technology in the Philippines. Table 1 provides project cost estimates. The work includes Construction of an academic

More information

LOAN AGREEMENT (Special Operations)

LOAN AGREEMENT (Special Operations) LOAN NUMBER 3044-VIE (SF) LOAN AGREEMENT (Special Operations) (Secondary Cities Development Project in Quang Nam Province (Tam Ky), Ha Tinh Province (Ha Tinh) and Dak Lak Province (Buon Ma Thuot)) between

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

Comparison of HSESAP Revisions 2 and 3

Comparison of HSESAP Revisions 2 and 3 The structure of HSESAP Revision 3 is considerably modified from Revision 2. The following summary is provided to identify the comparative location of key information and any changes following the revision

More information

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project

Semi Annual Environmental Monitoring Report. July 2013 L2557/2558. SRI: Greater Colombo Wastewater Management Project Semi Annual Environmental Monitoring Report July 2013 L2557/2558 SRI: Greater Colombo Wastewater Management Project This environmental monitoring report is a document of the borrower. The views expressed

More information

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below:

The Terms of reference (ToR) for conducting Rapid EIA study for the proposed project is described below: Proposed Terms of Reference for EIA Study Objective: In order to identify the environmental impacts due to construction and operation of the proposed project and associated facilities, a study will be

More information

ABN AMRO s explanation to its participation in the BTC pipeline project

ABN AMRO s explanation to its participation in the BTC pipeline project ABN AMRO ABN AMRO s explanation to its participation in the BTC pipeline project What is the BTC Pipeline Project? The BTC Company (BTC Co.), a consortium of eleven shareholders, is currently constructing

More information

NAPCS Product List for NAICS 54162: Environmental Consulting Services

NAPCS Product List for NAICS 54162: Environmental Consulting Services NAPCS List for NAICS : Environmental Consulting Services National 1 Environmental consulting Providing objective information, advice, and guidance to clients concerning the preservation of air, water,

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE Annexure-IV PROPOSED TERMS OF REFERENCE 1.0 Proposed Scope of Work for EIA Study The components of the EIA study include: Detailed description of all elements of the project activities (existing and proposed

More information

U.S. Department of Justice Office of the Inspector General Audit Division

U.S. Department of Justice Office of the Inspector General Audit Division AUDIT OF THE DRUG ENFORCEMENT ADMINISTRATION S LANGUAGE SERVICES CONTRACT WITH SOS INTERNATIONAL, LTD. CONTRACT NUMBER DJDEA-05-C-0020 DALLAS FIELD DIVISION U.S. Department of Justice Office of the Inspector

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3

MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC. CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 MINISTRY OF TRANSPORT AND COMMUNICATIONS OF KYRGYZ REPUBLIC CAREC Transport Corridor 1 (Bishkek-Torugart Road) Project 3 financed by the Asian Development Bank under Loan 2755-KGZ (SF) TERMS OF REFERENCE

More information

Procedure & Training Manual Flying Training Directorate

Procedure & Training Manual Flying Training Directorate GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION Opp. Safdarjung Airport, New Delhi Procedure & Training Manual Flying Training Directorate This Manual is produced for the use by DGCA Officials

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and

More information

Environmental Incident Classification and Reporting

Environmental Incident Classification and Reporting Environmental Incident Classification and Reporting 9TP-PR-105/13.0 Procedure Applicable to Transport Projects Quality Management System Status: Approved Version: 13.0 Branch: Business unit: Planning and

More information

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference

CHAPTER 150: BUILDING REGULATIONS. Adoption of Regulatory Codes by Reference CHAPTER 150: BUILDING REGULATIONS Section Adoption of Regulatory Codes by Reference 150.01 Scope 150.02 Commercial Construction Code 150.03 Commercial Plumbing Code 150.04 Heating, Air Conditioning, Refrigeration

More information

Environmental and Social Management System Arrangements

Environmental and Social Management System Arrangements Environmental and Social Management System Arrangements Project Number: 48015-002 Loan Number: LXXXX September 2015 Proposed Loan and Technical Assistance Grant Mongolia: Supporting the Credit Guarantee

More information

Sydney Port Botany Terminal 3 Project Water Resource Management Plan

Sydney Port Botany Terminal 3 Project Water Resource Management Plan Civil Works Construction Contract Phase 1 1/8 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP

More information

PROGRAM IMPLEMENTATION SCHEDULE

PROGRAM IMPLEMENTATION SCHEDULE Water Sector Improvement Program (RRP PAL 44031) A. Program Description PROGRAM IMPLEMENTATION SCHEDULE 1. The Program will support reform of the water and sanitation sector, focusing on improving policy

More information

LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK

LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA. and ASIAN DEVELOPMENT BANK LOAN NUMBER 3150-ARM(SF) LOAN AGREEMENT (Special Operations) (Power Transmission Rehabilitation Project) between REPUBLIC OF ARMENIA and ASIAN DEVELOPMENT BANK DATED 5 SEPTEMBER 2014 ARM 46416 LOAN AGREEMENT

More information

Request for Expression of Interest (REoI)

Request for Expression of Interest (REoI) Government of Odisha Ministry of Housing and Urban Development Berhampur Municipal Corporation Request for Expression of Interest (REoI) India Odisha Disaster Recovery Project (ODRP) Loan No. :P148868

More information

PUBLIC PROCUREMENT AND DISPOSAL OF PUBLIC ASSETS AUTHORITY

PUBLIC PROCUREMENT AND DISPOSAL OF PUBLIC ASSETS AUTHORITY PUBLIC PROCUREMENT AND DISPOSAL OF PUBLIC ASSETS AUTHORITY REPORT ON THE APPLICATION FOR ADMINISTRATIVE REVIEW BY M/S ABB LIMITED IN RESPECT OF THE PROCUREMENT OF LUZIRA 33/11kV SUBSTATION CIVIL AND ELECTRICAL

More information

S.B.S. Resolution Nº 1928-2015 The Head of the Superintendency of Banks, Insurance Companies and Private Pension Fund Administrators

S.B.S. Resolution Nº 1928-2015 The Head of the Superintendency of Banks, Insurance Companies and Private Pension Fund Administrators Waiver of Responsibility The law and any other regulation translated into English are only referential. The official language for any legal purposes is Spanish as published in the Official Journal El Peruano.

More information

PAK: National Highway Development Sector Investment Program Tranche 2. Construction Supervision Package-2 (CSP-2) Sukkur Jacobabad (N65)

PAK: National Highway Development Sector Investment Program Tranche 2. Construction Supervision Package-2 (CSP-2) Sukkur Jacobabad (N65) Environmental Monitoring Report Bi-Annual Report July to December 2012 Loan 2540-PAK PAK: National Highway Development Sector Investment Program Tranche 2 Construction Supervision Package-2 (CSP-2) Sukkur

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance Ex-ante Evaluation 1. Name of the Project Country: India Project: Goa Water Supply and Sewerage Project (Loan Agreement: 09/14/2007; Loan Amount: 22,806 million yen; Borrower: The President of India )

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power Project

Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power Project Project Administration Manual Project Number: 43151 Loan Numbers: L2629 (OCR), L2630 (ADF), L8244 (JICA) Updated 2 June 2010 Loan and Administration of Cofinancing Republic of Uzbekistan: Talimarjan Power

More information

GOOD GOVERNANCE FRAMEWORK

GOOD GOVERNANCE FRAMEWORK Provincial Roads Improvement (RRP CAM 43309) GOOD GOVERNANCE FRAMEWORK In all instances, the Loan Agreement shall be the overriding legal document. Asian Development Bank () Procurement Guidelines (2010,

More information

GENERAL SPECIFICATION

GENERAL SPECIFICATION R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT

More information

APPLICATION FOR STATE REVOLVING FUND LOAN

APPLICATION FOR STATE REVOLVING FUND LOAN APPLICATION FOR STATE REVOLVING FUND LOAN for the Construction of Wastewater Treatment Facilities (Revised 02/2015) A completed application must be submitted for each proposed project. If any information

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan This environmental management plan outlines Red Bus Services objectives and strategies for protecting the environment. This plan sets out how Red Bus Services intends to comply

More information

APPLICATION for ISO Certification (All Standards)

APPLICATION for ISO Certification (All Standards) APPLICATION for ISO Certification (All Standards) Contents Section 1 General Information (Please complete this section for All standards) (Please complete ONLY the sections for the Standard(s) that you

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

communication tower means a tower or structure built to support equipment used to transmit communication signals;

communication tower means a tower or structure built to support equipment used to transmit communication signals; Ontario Ministry of Natural Resources Subject Communication Tower Sites on Crown Land Compiled by - Branch Lands & Waters Replaces Directive Title Communication Tower Sites Section Land Management Number

More information

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY

NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY NEWMONT GHANA GOLD LTD. AHAFO SOUTH PROJECT COMPLETION AUDIT TERMS OF REFERENCE ENVIRONMENTAL, HEALTH, AND SAFETY November 2009 Completion Audit November 2009 Terms of Reference Environmental, Health and

More information

PUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi

PUBLIC PROCUREMENT SYSTEM AND REFORM IN AFGHANISTAN Anwar M. Raufi Anwar M. Raufi 1729 OUTLINE OF THE CONTENTS OF THE TOPIC TO BE PRESENTED 1- Procurement system of Afghanistan before ten years, i.e. before 2001. Afghanistan had a series of provisions regulating procurement

More information

REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE MINISTÉRIO DAS OBRAS PUBLICAS, TRANSPORTES E COMUNICAÇÕES REQUEST FOR EXPRESSIONS OF INTEREST

REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE MINISTÉRIO DAS OBRAS PUBLICAS, TRANSPORTES E COMUNICAÇÕES REQUEST FOR EXPRESSIONS OF INTEREST REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE MINISTÉRIO DAS OBRAS PUBLICAS, TRANSPORTES E COMUNICAÇÕES REQUEST FOR EXPRESSIONS OF INTEREST EXTERNAL AUDITOR AUDIT OF ANNUAL PROJECTS FINANCIAL STATEMENT 1. The Democratic

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

Manoharpur Coal Block. Sl.No. Particulars

Manoharpur Coal Block. Sl.No. Particulars REQUEST FOR PROPOSAL ( RFP ) FOR SELECTION OF AN OWNER S MINING CONSULTANT FOR DEVELOPMENT OF COAL BLOCKS OF THE ORISSA POWER GENERATION CORPORATION LTD. 1. BACKGROUND Orissa Power Generation Corporation

More information

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission

More information

Examples of Good Practice

Examples of Good Practice Examples of Good Practice Cost Estimates and Financing Plans February 2015 Financial Management Unit Operations Services and Financial Management Department 1 TABLE OF CONTENTS 1 Introduction... 3 2 Investment

More information

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015

Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events) 2015 Redland City Council Subordinate Local Law No. 1.12 (Operation of Temporary Entertainment Events)

More information

WHS Contractor Management Procedure

WHS Contractor Management Procedure Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety

More information

Electric Power Plant Facilities Process Guidelines July 25, 2014

Electric Power Plant Facilities Process Guidelines July 25, 2014 Electric Power Plant Facilities Process Guidelines July 25, 2014 July 25, 2014 The attached checklists (Appendix 1 and Appendix 2) and flowchart (Appendix 3) are provided to assist applicants when determining

More information

GUIDELINES ON ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

GUIDELINES ON ENVIRONMENTAL AND SOCIAL CONSIDERATIONS GUIDELINES ON ENVIRONMENTAL AND SOCIAL CONSIDERATIONS IN TRADE INSURANCE January 2015 Incorporated Administrative Agency Nippon Export and Investment Insurance GUIDELINES ON ENVIRONMENTAL AND SOCIAL CONSIDERATIONS

More information

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA 7471 Travel agency and tour operator services Services rendered for passenger travel by

More information

ENVIRONMENTAL MANAGEMENT STRATEGY

ENVIRONMENTAL MANAGEMENT STRATEGY Jos& M. Cabral 36 1 ENVIRONMENTAL MANAGEMENT STRATEGY FOR INFRASTRUCTURE AGENCIES IN DEVELOPING COUNTRIES Jose M. Cabral' INTRODUCTION This paper describes an environmental management strategy for agencies

More information

TERMS OF REFERENCE. Project Management Consultant for Assam Urban Infrastructure Project (Assam)

TERMS OF REFERENCE. Project Management Consultant for Assam Urban Infrastructure Project (Assam) TERMS OF REFERENCE Project Management Consultant for Assam Urban Infrastructure Project (Assam) 1. Background The Assam Urban Infrastructure Project (AUIP) aims at integrating different Urban Subsectors

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

PROJECT PROCUREMENT PROCEDURES AND GUIDELINES

PROJECT PROCUREMENT PROCEDURES AND GUIDELINES CAPITAL ASSET MANAGEMENT PROJECT PROCUREMENT PROCEDURES AND GUIDELINES June 2003 Updated June 20, 2003 Ministry of Education Province of British Columbia TABLE OF CONTENTS EXECUTIVE SUMMARY... iii 1.0

More information

BUDGET MANAGEMENT AND OVERSIGHT POLICY

BUDGET MANAGEMENT AND OVERSIGHT POLICY ANNEXURE 15 BUDGET MANAGEMENT AND OVERSIGHT POLICY Budgets FINANCE DEPARTMENT City of Cape Town 1 Table of Contents 1. DEFINITIONS AND ABBREVIATIONS 3 2. PROBLEM STATEMENT 4 3. DESIRED OUTCOME 4 4. STRATEGIC

More information

Asbestos Storage Facility Plan Examples

Asbestos Storage Facility Plan Examples Asbestos Storage Facility Plan Examples The purpose of this document This document contains examples of what an operational plan, plans and specification, contingency plan and closure plan should look

More information

ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN

ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN Darkhan Wastewater Management Project (RRP MON 37697) ATTACHED TECHNICAL ASSISTANCE: DARKHAN URBAN UTILITY INSTITUTIONAL IMPROVEMENT ACTION PLAN A. Introduction 1. The capacity development technical assistance

More information

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project BANGLADESH POWER DEVELOPMENT BOARD Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project EOI Enquiry No.2320-BPDB(Sectt)/Dev-21/81 Dated: 19.11.2013 DOCUMENT FOR EXPRESSION

More information

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY

GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY 1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2

More information

http://agnis/sites/amsissuances/shared%20documents/201.1.htm

http://agnis/sites/amsissuances/shared%20documents/201.1.htm Page 1 of 11 Directive 201.1 11/4/91 ASSISTANCE DOCUMENTS AND MEMORANDUMS OF UNDERSTANDING TABLE OF CONTENTS Page I. PURPOSE... 2 II. REPLACEMENT HIGHLIGHTS... 2 III. POLICY... 2 IV. DEFINITIONS... 2 V.

More information

L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1)

L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Environmental Monitoring Report Semestral Report January 2012 L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Prepared by SAWMC,

More information

Construction CONSTRUCTION

Construction CONSTRUCTION 135 R. English CONSTRUCTION Construction GOOD PRACTICE POINTERS Identify stakeholders most likely to be affected by construction. Notify local stakeholders of construction activities and changes to schedules.

More information

MIAMI UNIVERSITY Internal Audit & Consulting Services Risk Discussion Questionnaire GENERAL INFORMATION

MIAMI UNIVERSITY Internal Audit & Consulting Services Risk Discussion Questionnaire GENERAL INFORMATION MIAMI UNIVERSITY Internal Audit & Consulting Services Risk Discussion Questionnaire Department or Process: Contact Person: Contact Phone: Date Completed: GENERAL INFORMATION 1. What is the Purpose/Mission/Objective

More information

Environmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024

Environmental Incident Response Procedure. Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Newcastle Gas Storage Facility Document Number: NGSF-PSV-NAS-EN-PLN-0024 Environmental Incident Response Procedure Document Number: NGSF-PSV-NAS-EN-PLN-0024 Version:

More information

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL

ENVIRONMENTAL, HEALTH & SAFETY MANAGEMENT SYSTEMS MANUAL September 7, 202 940. General Requirements (ISO 400 4.; OHSAS 800 4.).. Alcoa Fastening Systems Republic Operations (AFS Republic) has established, documented, implemented, maintains, and continuously

More information

Revenue and Financing Policy

Revenue and Financing Policy Current Revenue Policy Revenue and Financing Policy Group Activity Environmental Activity - Air Ambient Air Quality Monitor and report on strategy development and implementation. benefits from clean air.

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

Environmental Assessment

Environmental Assessment OP 4.01 Page 1 of 5 Environmental Assessment Note: OP 4.01 replaces the policy elements of IFC s Environmental Analysis and Review of International Finance Corporation Projects (Washington, D.C.: IFC,

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Independent State of Samoa Project: Power Sector Expansion Project (Loan Agreement: December 10, 2007; Loan Amount: 4,598 million yen; Borrower: The

More information

OVERSTRAND MUNICIPALITY

OVERSTRAND MUNICIPALITY C 3 / 001 OVERSTRAND MUNICIPALITY CONTRACT MANAGEMENT POLICY Approved by Council 28 May 2015 Implementation date: 1 July 2015 TABLE OF CONTENTS C 3 / 002 1. PRE-AMBLE 2 2. DEFINITIONS 3 3. ABBREVIATIONS

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

(IV) Proposed Terms of Reference for EIA Studies

(IV) Proposed Terms of Reference for EIA Studies ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project

More information

ENVIRONMENTAL PROTECTION AGENCY

ENVIRONMENTAL PROTECTION AGENCY ENVIRONMENTAL PROTECTION AGENCY Fees Requires application fees for state isolated wetlands permits to be credited to the Surface Water Protection Fund, which is used for the administration of surface water

More information

Guide to Preparing an Environmental Scoping Document

Guide to Preparing an Environmental Scoping Document ENVIRONMENTAL SCOPING DOCUMENT Guide to Preparing an Environmental Scoping Document 1. Introduction Where the EPA decides to assess a proposal under the Public Environmental Review (PER) process, the EPA

More information

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy

Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy Technical Assistance Report Project Number: 46347 Policy and Advisory Technical Assistance (PATA) February 2013 Islamic Republic of Afghanistan: Supporting the Inter-Ministerial Commission for Energy (Financed

More information

ORDINANCE NO.------- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:

ORDINANCE NO.------- THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS: ORDINANCE NO.------- An ordinance authorizing the award of one design-build contract for the decommissioning, disablement, demolition and removal of Scattergood Generating Station Unit 3 pursuant to a

More information

Natural Gas Pipeline Project In Pakistan On BOOT/BOT Basis

Natural Gas Pipeline Project In Pakistan On BOOT/BOT Basis Sui Northern Gas Pipelines Limited Natural Gas Pipeline Project In Pakistan On BOOT/BOT Basis Invitation for Expression of Interest (EOI) ENQUIRY NO:SNGPL/PD/11-2014 November 2014 TABLE OF CONTENTS 1.

More information

FINANCIAL MANAGEMENT AND PERFORMANCE ASSESSMENT

FINANCIAL MANAGEMENT AND PERFORMANCE ASSESSMENT Power Transmission Rehabilitation Project (RRP ARM 46416-002) A. Introduction FINANCIAL MANAGEMENT AND PERFORMANCE ASSESSMENT 1. An assessment on the financial management capacity and financial performance

More information

COASTAL APPLICATION FOR A MAJOR SITING PERMIT

COASTAL APPLICATION FOR A MAJOR SITING PERMIT Frank M. Rabauliman Administrator Commonwealth of the Northern Mariana Islands OFFICE OF THE GOVERNOR Bureau of Environmental and Coastal Quality Division of Coastal Resources Management Gualo Rai Center

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/17/2007 INTEGRATED SAFEGUARDS DATASHEET

More information

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. OM Section D14/BP Page 1 of 6 BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject. A. Introduction MULTITRANCHE FINANCING FACILITY

More information

Date: DRAFT Initiated by: AAS-100

Date: DRAFT Initiated by: AAS-100 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Quality Management for Federally Funded Airport Construction Projects Date: DRAFT Initiated by: AAS-100 AC No.:

More information

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011)

NEBOSH National Diploma in Environmental Management Unit ED1. (Material correct at 1/11/2011) NEBOSH National Diploma in Environmental Management Unit ED1 MANAGement of Environmental Risk element 6: Environmental Legislative Framework and Methods of Enforcement Sample material (Material correct

More information

COMPANY NAME. Environmental Management System Manual

COMPANY NAME. Environmental Management System Manual Revision No. : 1 Date : DD MM YYYY Prepared by : Approved by : (EMR) (Top Management) Revision History Revision Date Description Sections Affected Revised By Approved By Table of Content 0.0 Terms and

More information