1 SECTION III, DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, Code Case N-792, Fatigue Evaluations Including Environmental Effects....III R * Division 1, NB-1130, Boundaries of Jurisdiction....III Division 1, NB-1140 and NB-2121 (2007 Edition With the 2008 Addenda)....III Division 1, NB/NC/ND-2121(c) and NB/NC/ND-2124 (2011 Addenda)....III Division 1, NB/NC/ND-5521 (2011 Addenda)....III Division 1, NC-3218, Upper Limits of Test Pressure....III Division 1, NC/ND-4424, Surfaces of Welds....III Division 1, NC-7511, Set Pressure Limitations....III Division 1, NCA-3811(a), Limitation Imposed on Approved Suppliers....III Division 1, NCA-3855 and NB III Division 1, NCA , Utilization of Unqualified Source Material....III Division 1, NCA III Division 1, NCA , Control of Measuring and Test Equipment....III Division 1, NF-2121, Permitted Material Specifications....III Division 2, CC-5520, Inspection of Welds (1998 Edition)....III
2 Interpretation: III R Subject: Division 1, Code Case N-792, Fatigue Evaluations Including Environmental Effects File No.: * Question (1): Does Code Case N-792 provide a procedure that may be used in combination with NB (e) to satisfy the requirement of NCA-1130 to account for the effect for the light water reactor environment on the fatigue life of a component? Reply (1): Yes. Question (2): Is the use of Code Case N-792 mandatory? Reply (2): No. Question (3): Does Code Case N-792 permit the cumulative fatigue usage factor to exceed 1.0 when the fatigue analysis accounts for the effect of the light water reactor environment? Reply (3): No. Interpretation: III Subject: Division 1, NC-7511, Set Pressure Limitations File No.: Question: Are the relief valve set pressure limitations, as defined in NC-7511, applicable to relief valves that are installed for over-pressurization protection in isolated/inoperable piping systems for the purpose of protecting the system when pressurization beyond the design pressure of the system could occur due to high pressure in-leakage from a valve that isolates the system from a higher pressure system? Reply: Yes.
3 Interpretation: III Subject: Division 1, NC-3218, Upper Limits of Test Pressure File No.: Question: Does the Code provide stress limits for hydrostatic testing of Classes 2 and 3 piping? Interpretation: III Subject: Division 1, NF-2121, Permitted Material Specifications File No.: Question: In NF-2121(b), is shim material exempt from the requirements of Article NF-2000, when the shim material is welded to the support and designed primarily for compressive loading, provided the other requirements of NF-2121(b) (requirements in the Design Specification, not subject to injury from service fluid, etc.) are met? Reply: Yes, provided that the requirements of NF-4000 are met.
4 Interpretation: III Subject: Division 1, NCA-3855 and NB-2430 File No.: Question (1): May a Certificate Holder or a Material Organization approve a manufacturer of welding wire as an approved supplier of qualified source material with a limited-scope program [NCA-3811(b)] in accordance with NCA (b)(1)? Reply (1): Yes. Question (2): If the Certificate Holder or Material Organization purchases welding wire as an unqualified source material, do the provisions of NCA apply? Reply (2): Yes. Question (3): For Section III, Divisions 1 and 3 construction, a Certificate Holder purchases a heat of welding wire that was made by a manufacturer meeting the requirements of Question (1) and performs the tests required by NB/NC/ND/NE/NF/NG-2430 using that wire and a lot of flux. The wire and flux are identified as required by NB/NC/ND/NE/NF/NG Does this test allow production welding using all coils of wire and bags of flux that are marked with the same identification as were used to weld the test coupons? Reply (3): Yes. Interpretation: III Subject: Division 1, NCA , Utilization of Unqualified Source Material File No.: Question: Do the requirements of NCA (a)(3)(a) through (e) apply to material for which certificates of compliance are acceptable?
5 Interpretation: III Subject: Division 1, NC/ND-4424, Surfaces of Welds File No.: Question: Is a counterbore mandatory for a weld joint that meets the fitting and aligning requirements of NC/ND and the surface condition requirements of NC/ND-4424? Interpretation: III Subject: Division 1, NCA , Control of Measuring and Test Equipment File No.: Question: Do the rules of NCA apply to measuring equipment used by personnel who are not responsible for the verification or acceptance of items? Interpretation: III Subject: Division 1, NB-1130, Boundaries of Jurisdiction File No.: Question: Is weld buildup on a nozzle end face of a Class 1 component considered part of the nozzle rather than the piping? Reply: Yes. See NB-1132(a).
6 Interpretation: III Subject: Division 1, NB-1140 and NB-2121 (2007 Edition With the 2008 Addenda) File No.: Question: Does the Code restrict the use of mechanical and electrical penetration assemblies to (Class MC) containment vessels only? Interpretation: III Subject: Division 1, NCA-3811(a), Limitation Imposed on Approved Suppliers File No.: Question: Does NCA-3811(a) prohibit approved suppliers from qualifying other suppliers of source materials? Reply: Yes. Refer to the NCA-9200 definition of approved supplier. Interpretation: III Subject: Division 1, NCA File No.: Question: Is it a requirement of NCA that the implementation of the Quality System Program begins at the point where the polyethylene source material has been produced? Reply: Yes.
7 Interpretation: III Subject: Division 1, NB/NC/ND-5521 (2011 Addenda) File No.: Question: Do NB-5521(a), NC-5521(a), and ND-5521(a) allow an ASNT Central Certification Program (ACCP) certificate as proof of having met the General, Specific, and Practical exam requirements for Level II and for Level III, Basic, Method, Specific (Procedure Preparation), and Demonstration exam (the performance demonstration practical exam)? Interpretation: III Subject: Division 1, NB/NC/ND-2121(c) and NB/NC/ND-2124 (2011 Addenda) File No.: Question (1): Do the provisions of NB/NC/ND-2124 permit material outside of the NPS 4 size limit for bar, such as in SA-182/SA-182M by reference to SA-234/SA-234M and SA-961, to be used for valve parts such as valve bonnets and discs (plugs)? Reply (1): No. Question (2): May material that is used under the provisions of NB/NC/ND-2121 be of specifications other than those in Section II, Part A or Part B? Reply (2): Yes, provided all the requirements of NB/NC/ND-2121 are met.
8 Interpretation: III Subject: Division 2, CC-5520, Inspection of Welds (1998 Edition) File No.: Question (1): Is it the intent of CC-3841, CC-5521, and Fig. CC to require permanent structural attachment welds fillet welded to the containment liner or thickened liner plate of a reactor containment to be classified Category H? Reply (1): Yes. Question (2): Is it the intent of CC-3841, CC-5521, and Fig. CC to require all Category H welds connecting permanent structural attachments to the thickened liner plate to be examined by PT or MT regardless of their weld dimensions? Reply (2): No. Only Category H permanent structural attachment welds to the liner or thickened liner plate that are partial penetration welds having a groove depth or throat dimensions greater than 1 in. (25 mm) or fillet welds with throat dimensions of 0.5 in. (13 mm) or greater are required to be examined by the liquid penetrant or magnetic particle method for the full length of the weld. In addition, all Category H full penetration welds are required to be examined by the magnetic particle or ultrasonic method.
SECTION III DIVISIONS 1 AND 2
SECTION III DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, NB-4250(c) (1998 Edition)....III-1-13-24 13-796 Division 1, NB-6114.3....III-1-13-22 12-2288 Division 1, NB/NC/ND/NE/NF/NG/WB/WC-5500,
More informationSECTION III, DIVISIONS 1 AND 2
SECTION III, DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, Appendix I, Fig. I-9.1, Design Fatigue Curve for Martensitic Stainless Steel... III-1-13-48 12-1021 Division 1, NB-2223.3, Coupons
More informationSECTION III DIVISIONS 1 AND 2
SECTION III DIVISIONS 1 AND 2 Subject Interpretation File No. Division 1, NB-3222.4 and Code Case N-792-1... III-1-13-37 13-1824 Division 1, NB-3226, Testing Limits... III-1-13-33 13-894 Division 1, NB-3649
More informationSupporting New Build and Nuclear Manufacturing in South Africa
ASME Nuclear Codes and Standards Supporting New Build and Nuclear Manufacturing in South Africa Sandton, South Africa, October 7-8, 2008 Session 3 Section III - Component Design and Construction Ralph
More information1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.
1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can
More informationPMCap Local Thin Area Repair and Restoration Component. for Pressure Retaining Items
by Paul S. Manzon President and John K. Wiedemann Vice President, Engineering PMC Engineering Solutions, Inc. 272 Grubb Rd. Pottstown, PA 19465 ABSTRACT A common method of pressure boundary repair for
More informationWilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA
Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor
More informationBODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION 2015 (Replaces July 2013) API Authorized Piping Inspectors must have a broad knowledge base relating to maintenance, inspection,
More informationStructural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
More informationSTORAGE, INSTALLATION AND MAINTENANCE PROCEDURES
GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the
More informationWARNING! Failure to follow these inspection procedures can cause personal injury and property damage.
GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause
More informationTWI INDIA CSWIP COURSE AND EXAMINATION FEES 2016 Course / Examination description. CSWIP 3.2 Senior Welding Inspector
TWI INDIA CSWIP COURSE AND EXAMINATION FEES 2016 Course / Examination description FEE CSWIP 3.0 Visual Welding Inspector Course and Examination Package 61,200 Exam only 26,500 Course Only 44,800 3.0 Retest
More informationPressure vessel basics for all engineers
Pressure vessel basics for all engineers by Sharjeel Aslam Faiz 1. Contents 2. Preliminary Design... 3 3. Loads... 3 4. Detailed design... 3 5. Information in-flow to a fabrication drawing... 4 6. Information
More information11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
More informationBODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION
BODY OF KNOWLEDGE API-510 PRESSURE VESSEL INSPECTOR CERTIFICATION EXAMINATION May and September, 2016 and January 2017 (Replaces May 2015) API Authorized Pressure Vessel Inspectors must have a broad knowledge
More informationJames M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
More informationTO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1
ASSET INTEGRITY INTELLIGENCE Featured Article TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1 SERGE BISSON, GCM Consultants,
More informationSpecifications for Programs: 737, 747, 757, 767, 777, 787
= Performed by GKN BAC 5000 AN General Sealing 6-262, 6-265, 6-267, 6-270 PSD for 787 Only: 6-242, 6-269, 6-271 PSD for 777 Only: 6-261,6-264, 6-266, 6-269, 6-271 BAC 5004 L Installation of Permanent Fasteners
More informationStandard Pneumatic Test Procedure Requirements for Piping Systems
the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 0 Issued 2012-06-28 Table of Contents FOREWORD... 3 1.0 INTRODUCTION...
More informationTITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
More informationASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
More informationAPI Flanged Safety Relief Valves Series 526 CATALOG
API Flanged Safety Relief Valves Series 26 CATALOG The-Safety-Valve.com 1 Valve finder How to find the right product group High operating to set pressure ratio, high backpressure or low total height? Yes
More informationOil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
More informationOPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS. INTRODUCTION...1 Scope...1 Description...1 Valve Identification...
OPERATING and MAINTENANCE MANUAL SERIES 2700A CONTROL VALVE CONTENTS INTRODUCTION...1 Scope...1 Description...1 Valve Identification...2 1.0 VALVE INSTALLATION...2 2.0 VALVE MAINTENANCE...3 Actuator Disassembly...3
More informationJIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
More informationDESIGN PROCEDURE JOINT CONFIGURATION
QM Software DESIGN PROCEDURE JOINT CONFIGURATION Procedure No.: 4.4 Rev. no.: Project: Order: Section: Page: 1 of: 18 Target: Purpose: Scope: Responsibility: Reference: Design department Ensure that the
More informationVentilstandarder ett urval av standarder
EN 19:2002 EN 558:2008+A1:2011 EN 593:2009+A1:2011 EN 736-1:1995 EN 736-2:1997 EN 736-3:2008 EN 1074-1:2000 EN 1074-2:2000, A1:2004 EN 1074-3:2000 EN 1074-4:2000 EN 1075-5:2001 EN 1074-6:2008 EN 1171:2002
More informationPREPIPED LIQUID FUEL MANIFOLDS PLPM
PREPIPED LIQUID FUEL MANIFOLDS PLPM INSTRUCTIONS WARNING These instructions are intended for use only by experienced, qualified combustion start-up personnel. Adjustment of this equipment and its components,
More informationNDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationProduct Manual. CVS Type 67AFR Filter Regulator. Introduction. Installation. Description
Product Manual CVS Type 67AFR Filter Regulator Introduction This CVS Controls product manual includes instructions for the installation, adjustment, maintenance and parts ordering of the CVS Type 67AFR
More informationBODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)
BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors
More informationIndiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions
Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions What are the licensing requirements for boiler operators? Answer: Indiana statute (IC 22-15-6) and administrative rules (680
More informationSpecification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
More information2. System Based Design Descriptions and ITAAC AP1000 Design Control Document
2.3.2 Chemical and Volume Control System Design Description The chemical and volume control system (CVS) provides reactor coolant system (RCS) purification, RCS inventory control and makeup, chemical shim
More informationResponse to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37
Vito A. Kaminskas Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: kaminskasv@dteenergy.com DTE Ensergy- 10 CFR 54 September 24,
More information1805 Series Relief Valves
October 2011 1805 Series Relief Valves P1026 1805G Type 1805-2 Type 1805-4 Figure 1. Typical 1805 Relief Valves Introduction The 1805 Series relief valves are designed for use in farm tap applications
More informationNON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES
NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES RIGHT SERVICE MAXIMUM RETURN Whether it is in fabrication, pipe manufacturing, pipeline, plant construction, chemical, petrochemical plants,
More informationREGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.84 (Draft was issued as DG-1133, dated October 2006)
U.S. NUCLEAR REGULATORY COMMISSION October 2007 Revision 34 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.84 (Draft was issued as DG-1133, dated October 2006) DESIGN, FABRICATION,
More informationFlowserve - Edward Valves Quick Closing Isolation Valves -The Equiwedge Alternative
Flowserve - Edward Valves Quick Closing Isolation Valves -The Equiwedge Alternative Problem Fast isolation of a large bore main steam or feedwater line during a pipe rupture that seals flow in both directions.
More information\ srl High Technology Gear Reducers and Cardan Shafts CERTIFIED QUALITY SYSTEM: UNI ISO EN 9001:2008 ICIM 2779/2; IQNET N. IT-28236 UNIVERSAL SHAFT
UNIVERSAL SHAFT CAT CERTIFICATION CARDAN SHAFTS - COUPLINGS Alongside with the production of special gearboxes, our company has developed the production of Universal shafts, with the same high quality
More informationArt.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS
Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar
More informationQualification of In-service Inspections of NPP Primary Circuit Components
Qualification of In-service Inspections of NPP Primary Circuit Components ABSTRACT Matija Vavrouš, Marko Budimir INETEC Institute for nuclear technology Dolenica 28, 10250 Zagreb, Croatia matija.vavrous@inetec.hr,
More informationChapter 10. Flow Rate. Flow Rate. Flow Measurements. The velocity of the flow is described at any
Chapter 10 Flow Measurements Material from Theory and Design for Mechanical Measurements; Figliola, Third Edition Flow Rate Flow rate can be expressed in terms of volume flow rate (volume/time) or mass
More informationTraining Course Schedule
Training Course Schedule 2016 AINDT EXAMS HELD AT THE END OF ALL ISO 9712 COURSES. INITIAL EXAM COSTS INCLUDED IN COURSE FEES. Satisfactory completion of an ATTAR training course is only part of the process
More informationPLATE HEAT EXCHANGER. Installation Manual. Customer Name: Serial number: Purchase order number: Project:
PLATE HEAT EXCHANGER Installation Manual Customer Name: Serial number: Purchase order number: Project: Table of Contents ----------------------------------------------------------------- Page: 2 3 Name
More informationJoin the UK Nuclear Renaissance. Procurement & Quality Process
Join the UK Nuclear Renaissance Procurement & Quality Process 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1 The Process: AREVA Supply Chain Strategy Didier David
More informationOwner-User Pressure Equipment Integrity Management Requirements
the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management
More informationENGLISH FORK GUIDE 2013
FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,
More informationCaps STANDARD WEIGHT Inches / Pounds
Standard Caps you are here: Home > Weldbend Catalog > Fittings > Caps Caps STANDARD WEIGHT Inches / Pounds For Metric Units >Click Here Nominal Pipe Size Outside Inside Wall Thickness (T) Length (E) Pipe
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
More informationETC -SV. Class 0 oil-free compressed air through catalysis
Innovation QUALITy Reliability Worldwide ETC -SV Class 0 oil-free compressed air through catalysis The way to oil-free compressed air The ETC operating principle Through the process of catalytic oxidation,
More informationGUARDRAIL POST STEEL
GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating
More informationErgo-Pro Single Line Solar Station Installation and Operating Instructions
Rp 3/4 Ergo-Pro Single Line Solar Station Installation and Operating Instructions Item No Pump type 677.21.70 WILO ST 15/6 13 2 4 11 Technical Specifications Max. operating pressure: 6 bar Max. operating
More informationWelding Codes and How They're Used (DOD) (ANSI). (AWS), (ASME) (API). not American Welding Society AWS D1.1 AWS D1.2 AWS D1.3 AWS D1.4 AWS D1.
Welding Codes and How They're Used Almost all design, welding, fabrication, material, repair, testing, and inspection requirements are covered under three main governing organizations. Even the Department
More informationElektromotoren und Gerätebau Barleben GmbH
Elektromotoren und Gerätebau Barleben GmbH OPERATING INSTRUCTIONS Transformer Protection Relay (Buchholz principle) Elektromotoren und Gerätebau Barleben GmbH Table of contents Page 1 Safety instructions
More informationBLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
More informationConceptual Design of Buildings (Course unit code 1C2)
(Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical
More informationTraining: NDT Access Conditions
: NDT Access Conditions : MT, VT, PT Direct access to the course shall be granted if the candidate has passed both mathematics and science at Grade 10 (Proof of Grade 10 or equivalent such as N1; certificate
More informationPublished in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]
Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette
More informationM A N U A L 13-10-05
Documentation The following information sheets illustrate the description below: 12-WW01-4G-E Sectional view of the lance with main dimensions 12-W101-6G-E Sectional view of the head of the lance with
More informationGLOBAL ENGINEERING SPECIFICATION
GLOBAL ENGINEERING SPECIFICATION Material Requirements 4WGN-20002 Revision 3 17 October 2013 Page 1 of 6 RESPONSIBLE GROUP: Mechanical Engineering Denotes Revision 1. PURPOSE 1.1 This global engineering
More informationENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS
ENGINEERING SPECIFICATIONS FOR CO2 EXTINGUISHING AGENT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS SECTION 1 GENERAL SPECIFICATIONS I. SCOPE This specification outlines the requirements for a pre-engineered
More informationNON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS
NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS What is ASNT? What is ASNT? The American Society for Nondestructive Testing, Inc. What is ASNT? ASNT is the world's largest technical society for nondestructive
More informationNuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants
Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction
More informationFRONT SUSPENSION Click on the applicable bookmark to selected the required model year
FRONT SUSPENSION 33A-2 FRONT SUSPENSION General Information GENERAL INFORMATION 33200010105 The front suspension on 2WD vehicles is an independent suspension system having the double wishbone combined
More informationFIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
More informationCODE/NAME ENCL CODE/NAME ENCL
CATEGORY REGULORY INFORMATION DISTRIBUTi SYSTEM (RIDS) ACCESSION NBR:9804140321 DOC.DATE: 98/04/06 NOTARIZED: NO DOCKET # FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power Co. 05000269 50-270 '0conee
More informationThe Pipelines Regulations, 2000
PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not
More informationproper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity.
SGS NDT Training & Examination Centre Professional Services for Your Safety and Reputation ABOUT NON DESTRUCTIVE TESTING (NDT) About NDT NDT plays a key role in assessing conformity and reliability of
More information3.3 Welding and welded connections
3.3 Welding and welded connections Welding is the process of joining two pieces of metal by creating a strong metallurgical bond between them by heating or pressure or both. It is distinguished from other
More informationTUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion
B. J. Sanders Consultant 307 Meyer Street Alvin, Texas 77511 TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT After a decision has been made to use zirconium as the material of construction for a shell
More informationRules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations
VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 5 Guidelines for Design, Equipment and Testing of Gas Welding Installations on Seagoing Ships Edition
More informationLEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES API 598/API 6D/MSS SP-61/FCI 70-2
ADELAIDE BRISBANE PERTH LEAKAGE ACCEPTANCE RATES COMPARISON METAL & SOFT SEATED VALVES API 598/API 6D/MSS SP61/FCI TESTING & LEAKAGE RATES OVERVIEW From an engineering point of view, almost all valves
More information3/2-way Solenoid Valve, direct-acting, NC or NO
3/2-way Solenoid Valve, direct-acting, NC or NO Electrical connection cable plug, Form A With or without manual override as standard Threaded port and sub-base s Impulse optional Type 6014 can be combined
More informationLap Fillet Weld Calculations and FEA Techniques
Lap Fillet Weld Calculations and FEA Techniques By: MS.ME Ahmad A. Abbas Sr. Analysis Engineer Ahmad.Abbas@AdvancedCAE.com www.advancedcae.com Sunday, July 11, 2010 Advanced CAE All contents Copyright
More informationP O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l.
P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. c o m Determining Code Compliance and Pipe System Leak ing by William M.
More informationReach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com
Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center www.geinspectionacademy.com Sharing knowledge. Shaping technology. At GE, we know the value of investing in your
More informationMANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS
Health & Safety Services Unit name goes here Safety Code of Practice 46, Part 2 1st Edition, November 2009 MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS University of Reading 2015 Page 1 Contents
More informationNDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationHydraulic control unit series 0086-372-01
Technical Product Information No. 1290 EN Hydraulic control unit series 0086-372-01 Contents Page About this Technical Product Information (TPI) 2 The ORTLINGHAUS numbering system 2 About the product 3
More informationCURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS
A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME
More informationwww.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
More informationhttp://waterheatertimer.org/troubleshoot-rheem-tankless-water-heater.html
http://waterheatertimer.org/troubleshoot-rheem-tankless-water-heater.html TECHNICAL SERVICE DEPARTMENT Removal, Cleaning, & Reinstallation of the Burner Assembly For models 74 & GT199 Required tools -
More informationThe Unique Accelabar Flow Meter
The Unique Accelabar Flow Meter The Accelabar is a new and unique flow meter that combines two differential pressure technologies to produce operating ranges never before attainable in a single flow meter.
More informationMercedes 722.3 722.4
96 Mercedes 7. 7. 5 6 7 8 - Clutch K - Brake Band B - Disc Brake B - Wide Planet Pinion 5 - One-Way Clutch F 6 - Clutch K 7 - Brake Band B 8 - Narrow Planet Pinion Int. Band Fwd. Band Rev. Clutch Direct
More informationCourse available 24/7 for up to six months from the date of purchase or until completion
SPED ONLINE COURSE TRAINING Piper BootCamp and Process Plant Layout BOTH Piper BootCamp and Process Plant Layout online courses contain: Approximately 25 hours of online videos Printable notes Links to
More informationfor boilers From selecting the best NDT technique to monitoring inspection quality
Non-destructive testing for boilers From selecting the best NDT technique to monitoring inspection quality > Ensuring safe and efficient operation > Optimizing maintenance > Maximizing availability > Avoiding
More informationTechnical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories
ACCREDITATION SCHEME FOR LABORATORIES Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories Technical Notes NDT 001, Apr 14 The SAC Accreditation Programme is managed
More informationBackflush filter R8-30W
Backflush filter R8-30W With internal pressure segment cleaning, rated pressure to 40 bar (580 psi) Connection sizes: DN 200 to DN 500, welded design 1. Features Powerful, fully automatic filtration _
More informationDifferential Relations for Fluid Flow. Acceleration field of a fluid. The differential equation of mass conservation
Differential Relations for Fluid Flow In this approach, we apply our four basic conservation laws to an infinitesimally small control volume. The differential approach provides point by point details of
More informationMTU Maintenance Dallas, Inc. Integrated Management System. MM 03D-03 Capability List Manual
Chapter 0 Page 2 of 15 0.1 Table of Contents 0 Title Page... 1 0.1 Table of Contents... 2 0.2 List of Effective Pages... 3 0.3 Record of Revision... 4 0.4 Reserved.........5 0.5 Distribution List... 6
More informationCNG & Hydrogen Tank Safety, R&D, and Testing
> Powertech Labs Inc. CNG & Hydrogen Tank Safety, R&D, and Testing 012.10.2009 Presented by Joe Wong, P.Eng. PRESENTATION OBJECTIVES Present experience from CNG in-service tank performance. The process
More informationSummary Comparative Study on Pressure Equipment Standards
Summary Comparative Study on Pressure Equipment Standards European Commission, DG Enterprise, Contract N FIF.20030114 Contractors: TÜV Austria (Austria), CEC (Italy) July 2004 1. Introduction Starting
More informationRange Tribune HE Solar Unvented Direct and Indirect Cylinders
Range Tribune HE Solar Unvented Direct and Indirect Cylinders Range Tribune HE Solar cylinders have been designed specifically with Solar applications in mind and are based on the highly successful Range
More informationUltrasonic Technique and Device for Residual Stress Measurement
Ultrasonic Technique and Device for Residual Stress Measurement Y. Kudryavtsev, J. Kleiman Integrity Testing Laboratory Inc. 80 Esna Park Drive, Units 7-9, Markham, Ontario, L3R 2R7 Canada ykudryavtsev@itlinc.com
More informationCHAPTER 13 LOAD HOOKS
CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter
More informationTesting & Consulting Engineering. NDT Industrial Environmental D.O.T, Construction & Mechanical. www.unifiedtesting.com
Testing & Consulting Engineering NDT Industrial Environmental D.O.T, Construction & Mechanical www.unifiedtesting.com NONDESTRUCTIVE TESTING (NDT) SERVICES UTS Nondestructive Testing (NDT) Services provides
More informationTentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition
Tentative Interim Amendment NFPA 59A Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition Reference: Various TIA 16-1 (SC 15-12-4 / TIA Log #1187R) Note: Text
More informationEvaluation of recent findings on the integrity of pressurised components in nuclear power plants
4 Reactor safety analyses 4.1 Evaluation of recent findings on the integrity of pressurised components in nuclear power plants Dr. Frank Michel Hans Reck For more than 30 years, GRS has been concerned