LETBANE PÅ RING 3. Questions and Answer in relation to Prequalification

Size: px
Start display at page:

Download "LETBANE PÅ RING 3. Questions and Answer in relation to Prequalification"

Transcription

1 Questions and Answer in relation to Prequalification Document ID: L3-X-LB-PRE-0008 Version: 4.0 Issue date: Issued by: Ring 3 Letbane I/S Approved by: PAMA Patrik Magnusson Checked by: PAMA Patrik Magnusson Prepared by: CLA Carsten Larsen Pages: 14

2 Table of contents 1 Introduction 3 2 Questions and Answers 3 Revision summary Version Date Scope of revision Change description Released version Q/A No. 4 to 15 added Q/A No. 16 added Q/A No added Page: 2 of 14

3 1 Introduction The procurement process for Hovedstadens Letbane is ongoing. 6 Contract Notices for the following 8 contracts were published at TED: 2015/S for CW-I 2015/S common for CW-VBG and CW-RH 2015/S common for CW-G and CW-L 2015/S for the TS contract 2015/S for the CMC Building contract 2015/S for the O&M contract The present document answers questions raised by potential applicants of general interest for potential applicants. Questions are anonymised and numbered ongoing by Hovedstadens Letbane (HL). The document will be updated on a weekly basis with answers to received questions. 2 Questions and Answers Question 1: Under punkt IV.3.5) står sproget angivet som engelsk er de muligt at aflevere på dansk eller en kombination af dansk og engelsk? HL translation: In section IV.3.5 is language stated as English will it be possible to submit an application in Danish Language or in a combination of Danish and English? Answer 1: No, the application shall be worded in English. Page: 3 of 14

4 Question 2: Er det korrekt forstået at der kun skal afleveres én prækvalifikation uanfægtet om man kun søger én af hhv. CW-G, CW-L og CW-GL eller om man søger alle tre? HL translation: It is correctly understood that only one application is needed undisputed applying for one of the contracts CW-G, CW-L and CW-GL or applying for all three? Answer 2: Yes In the application shall be stated which contracts the applicant applies for, cf. section III.2.1, No 2. Please notice that the information required in relation to technical capacity shall be submitted for each of the contracts applying for; cf. section III.2.3 ( The above mentioned information in Nos 8 and 9 are required for each contract (CW-G, CW- L, CW-GL) the Applicant applies for ). The answer applies for application for CW-VBG, CW-RH and CW-VBGRH too, but is irrelevant for CW-I, TS, CMC and O&M. Question 3: Is an applicant obliged to include consultants in the organisation? Answer 3: The CW contracts, the TS contract and the CMC Building contract are design and build contracts. If an applicant for the above mentioned contracts does not have design experience in house the design experience must be documented otherwise by including third parties (e.g. consultants) in the organisation. The answer applies for all contracts except the O&M contract. Question 4: Bygherren bedes fremkomme med en udbudstidsplan hvoraf det fremgår, hvornår I oplyser de prækvalificerede for hver PQ, samt hvornår tilbudsdokumenterne tilgår de bydende på de enkelte entrepriser. HL translation: The Employer is asked to provide a tender time schedule stating the time for announcement of selected Tenderers for each contract and the time for releasing the tender documents for each contract. Page: 4 of 14

5 Answer 4: The required information is given in the information document, section 5: Announcement of selected Tenderers February 2016 Construction Law approved in Parliament April 2016 Release Tender Documents April 2016 The information document can be downloaded from Bascons homepage. Question 5: Bygherren bedes oplyse tilbudsterminer (start, slut og evt. forhandlingsmøder) for hver PQ, således de bydende har mulighed for at planlægge tilbudsarbejdet. Bygherren opfordres til ikke at placere alle tilbud samtidigt. HL translation: The Employer is asked to inform about the deadlines in the tender process (start, finished and negotiation meetings (if any)) for each contract making it possible for the Tenderers to plan tendering. The Employer is encouraged to differ in the deadlines for the different contracts. Answer 5: The required information is given partly in the information document mentioned above in section 5 and partly in section 8.4: Deadline first tender July/August 2016 HL wants to add that the expected deadline for submitting the first tender is July for the TS contract and the O&M contract and August for the rest of the contracts. It is planned for different dates for negotiation of the CW contracts (September/October) and for different dates for the TS and the O&M contracts (August/September). As the Employer decide on the number of rounds of negotiations during the process, cf. section 8.4 in the information document, it is not possible to inform further on the negotiation process at the moment. Page: 5 of 14

6 Question 6: Bygherren bedes fremlægge en overordnet udførelsestidsplan for hver entreprise, således de bydende har mulighed for at vurdere ressourceindsatsen. HL translation: The Employer is asked to provide an overall construction time schedule for each contract to make the Tenderers able to assess the needed resource deployment. Answer 6: The required information is given in the information document, section 5: Owner s approval April 2017 Construction start 2017 Start of commercial operation 2021 The tender documents will include a construction time schedule. HL does not want to detail any further at the moment. Question 7: Bygherren bedes oplyse om der udbetales udregningsvederlag for tilbuddet, hvis ja i hvilken størrelsesorden er det. HL translation: The Employer is asked to inform whether a tender fee will be paid; and if yes the magnitude of the tender fee? Answer 7: A tender fee will be paid to Tenderers submitting an original tender, which the Employer not are obliged to reject; cf. the contract notices section VI.3. The magnitude is not decided yet and will be given in the tender documents. The answer applies for all contracts except the O&M contract. Page: 6 of 14

7 Question 8: Regarding Ring 3 Light Rail Prequalification, the presentation brochure indicates a lump-sum cost of DKK 5.3 billion EUR 700 million (2013 prices) for the whole project. Is it possible to have a breakdown cost for each of the six contracts? Answer 8: HL does not wish to inform of the cost for each contract. Question 9: In item III.2.3) Technical Capacity in whichever of the Contract Notices is stated that HL wants a maximum of 10 references per company (company/companies forming the Applicant and every third party (if any). Each company is requested to choose his 10 most relevant references. Which of the following is correct? In case the PQ Applicant is a Consortium a) the maximum of 10 references applies to the Consortium as a whole (a total number of 10 projects regardless the number of companies and third parties that form the Consortium). b) the maximum of 10 references applies individually to each of the companies and third parties forming the Consortium (if the Consortium consist of two companies than the same could provide a maximum of 20 references) Answer 9: The maximum of 10 references applies for each company forming the applicant (Consortium / Joint Venture) and for every third party the applicant bases the application (third parties are not part of the companies forming the applicant as third parties are not part of the Consortium / Joint Venture). Example: A maximum of 40 references will apply for a consortium of two companies forming the applicant and with two consultants included as third parties. Page: 7 of 14

8 Question 10: Which of the following is correct? In case the PQ Applicant is a Consortium that wants to be prequalified for CW- VBGRH (CW-VBG and CW-RH in one combined contract). a) The references detailed in item III.2.3) Technical Capacity can be 10 (a mix of references for CW-VBG and CW-RH) b) The references detailed in item III.2.3) Technical Capacity can be 20 (10 for CW-VBG and 10 for CW-RH) Answer 10: A maximum of 10 references per company are required for each contract (CW-G, CW-L, CW-GL) the Applicant applies for. Example: A maximum of 40 references for each of the contracts (CW-G, CW-L, CW-GL) will apply for a consortium of two companies forming the applicant and with two consultants included as third parties. The chosen references for CW-GL do not need to be a mix of references submitted for CW-G and CW-L, but naturally will often be. The answer applies for CW-GL and CW-VBGRH. Question 11: We understand from the description that the CMC Contractor will be bound as nominated subcontractor to the TS Contractor. a) How can the TS contractor take over the responsibility for the correct and punctual execution of the work of a subcontractor he did not qualify and choose? Who will care the risk? b) Who will be responsilble for the correct design of the CMC Building? c) Is the CMC Contractor bound to Hovedstadens Letbane and the TS Contractor is executing the Management? d) How will the cost and the risk to supervise the CMC contractor be reimbursed? We understand from the description that the TS Contractor will be subcontractor of the Operations and Maintenance (O&M) Contractor for a part of the Maintenance Work. e) Which type of Maintenance has to be provided by the TS contractor and over which time? f) Who will be the contractual partner for the TS Contractor? Page: 8 of 14

9 Answer 11: a) The CMC contractor will be transferred to the TS contractor in the contract award process as a nominated subcontractor and after the transfer the CMC contractor will be a subcontractor as any other subcontractors. The risk is therefore on the TS contractor. The CMC contractor will be known to the TS contractor before signing a contract agreement and the released tender documents to the Tenderers for the TS contract will include the tender documents for the CMC contract. b) The TS contractor will be responsible for the design and work executed by the CMC contractor in relation to HL. The CMC contractor in relation to the TS contractor. The answers apply for the TS and the CMC contracts. c) Please refer to the answer above, 11 a) d) The cost for supervision the CMC contractor will be a part of the scope for the TS contractor and will be part of the competition with its own item(s) in the tender list. e) Please refer to the information document, section 4.2: The contract further includes part of maintenance of the TS equipment for a period of 15 years after start of commercial operation. The split will be detailed in the tender documents ; cf. also the answer to question 12. f) Hovedstadens Letbane will be the contractual partner for the TS Contractor until the TS Contractor is transferred to the O&M Contractor as a nominated subcontractor after substantial completion, cf. the information document, section 3.2: The TS Contractor will be transferred to the O&M contractor as a nominated subcontractor for part of the maintenance after substantial completion. The answers apply for the TS and the O&M contracts. Page: 9 of 14

10 Question 12: We understand from the description that the TS Contractor will be bound as nominated subcontractor to the O&M Contractor. a) What is the exact scope of maintenance to be provided by the TS Contractor? Track, trains, installations on the CMC,? b) Will Hovedstadens Letbane be responsible for the correct maintenance to be executed by the TS Contractor? c) Is the CMC Contractor bound to Hovedstadens Letbane and the TS Contractor is executing the Management? Answer 12: a) The exact scope of maintenance to be provided by the TS Contractor is not decided yet and will be detailed in the tender documents. The maintenance to be provided by the TS Contractor will be a part of the maintenance for selected subsystems including rolling stock. The part to be provided by the TS contractor will differ between subsystems; cf. also the answer to question 11. b) No The TS Contractor will be a nominated subcontractor to the O&M contractor after the TS Contractor is transferred to the O&M Contractor after substantial completion and the O&M contractor will be responsible for the TS contractor in the same way as for any other subcontractor or sub supplier. c) Please refer to the answer to question 11 c). The answer applies for the TS and the O&M contracts. Question 13: Question related to the TS contract: The type of works and deliveries of this contract are very different and require complete diverse profiles of the executing companies. Can these companies form a consortium or is the structure of a Joint Venture obligatory? Answer 13: The structure of a Joint Venture is not obligatory. Two or more companies may form a consortium; cf. section III.2.1 in the contract notices. The Joint Venture or the Consortium may include subcontractors and consultants as third parties. Page: 10 of 14

11 Question 14: Qeustion related to section III.2.3 in all contract notices: We would like to ask your confirmation for all lots in chapter III.2.3) Technical Capacity the sentence: HL wants a maximum of 10 references per company (company/companies forming the Applicant and every third party (if any)) has to be read: HL wants a maximum of 10 references per Applicant (company/companies forming the Applicant and every third party (if any)) Answer 14: WE can NOT confirm. Please refer to the answer to question No. 9 and 10. Question 15: We understand from the description that the CMC Contractor will be bound as nominated subcontractor to the TS Contractor. For evaluating the eventual risks out of this contractual relation, can you please confirm: a) The CMC contractor will have no contractual relation to Hovedstadens Letbane, only with the TS Contractor. b) All payments will be realized by the future TS Contractor c) The information for the design of the CMC can not be complete during tender phase, as in the moment the rolling stock provider, the railway specific equipment provided by the TS contractor and the final track design will not be known. How will this be solved to enable the CMC contractor to provide a correct offer? d) Who will take over the responsibility of the correctness of the information provided for the CMC building during the tender process? Does this remain with Hovedstadens Letbane? Page: 11 of 14

12 Answer 15: a) Yes, confirmed b) Yes, confirmed c) The tender documents will include a layout for the CMC building developed to almost a detailed design, which will be part of the project basis for the tendering for the CMC Building, the TS contract and the O&M contract. Project basis is requirements the tenderers are not allowed to change. d) The responsibility for information provided by HL during the tender process remains with HL: Question 16: Hvilket akseltryk forventes letbanen at blive konstrueret til? HL translation: Which axle load is expected for the construction of the light rail? Answer 16: The axle load is expected to be 12 ton, but will be defined finally in the tender documents. Question 17: Hereby we would like to ask following questions regarding the procurement No. 2015/S , Denmark-Copenhagen: Tramway works In requirement Technical capacity you require some specific key features, one of them is also f) Traffic management. What is considered under this concept? Answer 17: For this aspect, the Applicants have the possibility to state in the description of project whether traffic management activities has been part of the Applicant s role in the project and include a short description of the provided traffic management at the the project. For example, design or implementation for the management of vehicular, pedestrian and cycle traffic during the construction phase of a project. Page: 12 of 14

13 Question 18: Hereby we would like to ask following questions regarding the procurement No. 2015/S , Denmark-Copenhagen: Tramway works Each reference (maximum 10) must be accompanied by information about the applicant's approximate number of employees who have been involved in comparable assignments within the last 3 years. Is this meant the total number of employees in the whole company or only number of workers and engineers who has been involved in the reference project directly? Answer 18: The question seems to be due to a misunderstanding. The contract notice states: The request must be accompanied by information about the applicant's approximate number of employees who have been involved in comparable assignments within the last 3 years. The number we are looking for is the total number of employees in the company, which has been involved in comparable assignments within the last 3 years and not necessarily involved in the reference project submitted as answer to information on references. Question 19: Kan Hovedstadens Letbane venligst bekræfte, at det er tilladt at anvende "søster selskaber" som tredie part i forhold til "Økonomisk og finansiel kapacitet" samt "teknisk kapacitet". HL Translation: Hovedstadens Letbane is kindly requested to confirm that an application can be based on a sister company in relation to economic and financial capacity as well as technical capacity. Answer 19: Confirmed, in principle any company may be used as a third party. Please notice that the third party shall sign an availability declaration for the capacity, which the application is based, that it so say a declaration for both economic and financial capacity and technical capacity if the application is based on both capacities by the third party. Please also notice that a third party signing an availability declaration in relation to economic and financial capacity shall sign an unlimited surety bond (selvskyldnerkaution) if the Applicant is awarded the contract. Page: 13 of 14

14 Question 20: Is it allowed for a subconsultant to be subconsultant to more than one applicant? I.e. can a subconsultant be in more than one team? The question is regarding the Civil Works packages. Answer 20: Hovedstadens Letbane will not upfront reject applications from different applicants due to the fact that a company is included as third party in both applications. It will in general be allowed for different applicants to include the same subcontractor or consultant as a third party. In the situation where our obligation to uphold competition or to secure equal treatment are violated Hovedstadens Letbane may be obliged to reject such applications. Page: 14 of 14

LETBANE PÅ RING 3. Information about the public procurement process

LETBANE PÅ RING 3. Information about the public procurement process Information about the public procurement process Document ID: L3-X-LB-PRE-0001 Version: 2.0 Issue date: 2015-11-10 Issued by: Ring 3 Letbane I/S Approved by: AGF Anne-Grethe Foss Checked by: PAMA Patrik

More information

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services Architectural, construction, engineering and inspection services Info Versioon 4 URL http://com.mercell.com/permalink/41511843.aspx Väline hanke ID 270148-2014 Hanke liik Hanke aruanne Dokumendi liik Lepingu

More information

Business Opportunity. Title: Denmark-Ballerup: Lubricating preparations. Document Type: Contract Notice

Business Opportunity. Title: Denmark-Ballerup: Lubricating preparations. Document Type: Contract Notice Business Opportunity Title: Denmark-Ballerup: Lubricating preparations Document Type: Contract Notice Published By: Forsvarsministeriets Materiel- Og Indkøbsstyrelse (Danish Defence Acquisition An Date

More information

Informationsteknologi Serviceledelse Del 3: Vejledning i definition af emne og brug af ISO/IEC 20000-1

Informationsteknologi Serviceledelse Del 3: Vejledning i definition af emne og brug af ISO/IEC 20000-1 DS-information DS/ISO/IEC TR 20000-3 1. udgave 2009-10-21 Informationsteknologi Serviceledelse Del 3: Vejledning i definition af emne og brug af ISO/IEC 20000-1 Information technology Service management

More information

GUIDE to completion of the Excel spreadsheet

GUIDE to completion of the Excel spreadsheet GUIDE to completion of the Excel spreadsheet 1 S i d e 1 TABLE OF CONTENTS 1 TABLE OF CONTENTS... 2 1.1 Data Entry Generalities... 3 1.2 Prepare data... 5 1.3 Simple Data Entry (horizontal direction)...

More information

Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane

Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane Supplier Information Day October 19th 2015 Metroselskabet & Hovedstadens Letbane Read more about the individual projects on www.dinletbane.dk www.m.dk CEO Mr. Henrik Plougmann Olsen 2 WHO WE ARE METROSELSKABET

More information

Presentation of Semco Maritime

Presentation of Semco Maritime Søren Juel Nielsen Innovation Manager Erik Christensen Grønborg Key Account Manager Presentation of Semco Maritime Semco Maritime Dedicated people exceeding expectations...within projects, solutions and

More information

CAMP LOGOS administrated by Boligselskabet Sct. Jørgen (housing agency)

CAMP LOGOS administrated by Boligselskabet Sct. Jørgen (housing agency) CAMP LOGOS administrated by Boligselskabet Sct. Jørgen (housing agency) Camp Logos the buildings Camp Logos is the dorm across the street from The Animation Workshop. There are 4 buildings side by side

More information

Softwareudvikling Retningslinjer for anvendelse af ISO 9001:2008 til computersoftware

Softwareudvikling Retningslinjer for anvendelse af ISO 9001:2008 til computersoftware Dansk standard DS/ISO/IEC 90003:2015 2. udgave 2015-01-07 Softwareudvikling Retningslinjer for anvendelse af ISO 9001:2008 til computersoftware Software engineering Guidelines for the application of ISO

More information

Informationsteknologi Serviceledelse Del 4: Procesreferencemodel

Informationsteknologi Serviceledelse Del 4: Procesreferencemodel DS-information DS/ISO/IEC TR 20000-4 1. udgave 2010-12-14 Informationsteknologi Serviceledelse Del 4: Procesreferencemodel Information technology Service management Part 4: Process reference model DS/ISO/IEC

More information

Presentation. Morten Hvenegaard Project Sales

Presentation. Morten Hvenegaard Project Sales Presentation One sensor in each luminaire - efficient lighting control 25 % savings on seamless daylight adjustment. One sensor in each luminaire - efficient lighting control 25 % savings on seamless daylight

More information

COACH BOT Modular e-course with virtual coach tool support

COACH BOT Modular e-course with virtual coach tool support COACH BOT Modular e-course with virtual coach tool support LIFELONG LEARNING PROGRAM LEONARDO da VINCI Aarhus Social and Health Care College TRAINING FOR HEALTHCARE PROFESSIONALS AND HOME CARE PROVIDERS

More information

COWI s Role in the Copenhagen Metro Project

COWI s Role in the Copenhagen Metro Project COWI s Role in the Copenhagen Metro Project On the occasion of the award by the Copenhagen Cultural Foundation for COWI A/S part in the implementation of Phase 1 of the Copenhagen Metro 2 COWI s Role in

More information

Electronic signatures in Denmark: free for all citizens

Electronic signatures in Denmark: free for all citizens Article Electronic in Denmark: free for all citizens JAN HVARRE Both the Directive and the Danish Act establish general principles for the approval of electronic Historical background Early Danish start

More information

Terms and conditions for the invitation by the Danish Emergency Management Agency to submit tenders for a contract concerning the purchase of a mass

Terms and conditions for the invitation by the Danish Emergency Management Agency to submit tenders for a contract concerning the purchase of a mass Terms and conditions for the invitation by the Danish Emergency Management Agency to submit tenders for a contract concerning the purchase of a mass spectrometer system 1 May 2014 Table of contents 1.

More information

Bilag F: Beskrivelse af mobiltelefon (eng. MP)

Bilag F: Beskrivelse af mobiltelefon (eng. MP) Bilag F: Beskrivelse af mobiltelefon (eng. MP) OVERALL AIM OF EVALUATION Københavns Universitet 24/2 2003 Erik Frøkjær og Kasper Hornbæk Bilag til Det Fælles Usabilityprojekt The user interface that you

More information

Business development. Linnea Jacobsen. 1. semester 2014

Business development. Linnea Jacobsen. 1. semester 2014 Business development Linnea Jacobsen 1. semester 2014 v Business Models v Business Model Canvas v Groupwork Literature Alexander Osterwalder & Yves Pigneur: Business Model Generation: s. 14-47 + 76-103

More information

Packaging Linear bar code and twodimensional symbols for product packaging

Packaging Linear bar code and twodimensional symbols for product packaging Dansk standard DS/ISO 22742 1. udgave 2005-03-17 Emballage Lineær stregkode og todimensionelle symboler for emballage til produkter Packaging Linear bar code and twodimensional symbols for product packaging

More information

CONTRACTING AUTHORITY/ENTITY

CONTRACTING AUTHORITY/ENTITY CONTRACTING AUTHORITY/ENTITY Styrelsen for Slotte og Kulturejendomme, H.C. Andersens Boulevard 2, 1553 København V, Tlf: +45 3395 4200 Email slke@slke.dk / Danish Agency for Palaces and Cultural Properties,

More information

Nordic Built Active Roofs and Facades ELLEBO RENOVATION

Nordic Built Active Roofs and Facades ELLEBO RENOVATION 26/10 2015 Nordic Built Active Roofs and Facades ELLEBO RENOVATION CONCEPT & ACTIVE HOUSE EVALUATION ENVIRON MENT ENERGY WINTERGARDEN vs. SUMMERGARDEN COMFORT CONCEPT 26/10 2015 WINTER GARDEN FACADE 12

More information

OIOudvalget for e-handel. 14. September 2010 Ole Madsen

OIOudvalget for e-handel. 14. September 2010 Ole Madsen OIOudvalget for e-handel 14. September 2010 Ole Madsen ForsyningsSpecifikation UtilityStatement (UTS) En OIOUBL faktura/kreditnota kan nu have en reference til et (eller flere) UTS dokument(er) Det Offentlige

More information

Danish strategy for ITS THE NATIONAL ITS BOARD MARCH 2011

Danish strategy for ITS THE NATIONAL ITS BOARD MARCH 2011 Danish strategy for ITS THE NATIONAL ITS BOARD MARCH 2011 Introduction Traffic has increased dramatically in recent years. In the last 30 years the volume of traffic has doubled on the main roads leading

More information

Questionnaire #1: The Patient (Spørgeskema, må gerne besvares på dansk)

Questionnaire #1: The Patient (Spørgeskema, må gerne besvares på dansk) Table of Contents Questionnaire #1: The Patient... 2 Questionnaire #2: The Medical Staff... 4 Questionnaire #3: The Visitors... 6 Questionnaire #4: The Non-Medical Staff... 7 Page1 Questionnaire #1: The

More information

DK-Kastrup: enterprise resource planning software package 2010/S 57-085187 CONTRACT NOTICE - UTILITIES. Services

DK-Kastrup: enterprise resource planning software package 2010/S 57-085187 CONTRACT NOTICE - UTILITIES. Services 1/7 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:85187-2010:text:en:html DK-Kastrup: enterprise resource planning software package 2010/S 57-085187 CONTRACT NOTICE - UTILITIES Services

More information

UNIVERSITY OF OSLO. Faculty of Mathematics and Natural Sciences

UNIVERSITY OF OSLO. Faculty of Mathematics and Natural Sciences UNIVERSITY OF OSLO Faculty of Mathematics and Natural Sciences Exam: INF 4300 Digital image analysis Date: Friday December 11, 2009 Exam hours: 14.30-17.30 Number of pages: 7 pages plus 1 page enclosure

More information

Provision of Accounts Payable Service

Provision of Accounts Payable Service Oman LNG LLC Pre-Qualification of Tenderers NGF-14-761 Provision of Accounts Payable Service GUIDELINES Response to this questionnaire shall be completed in English by a senior member of your company.

More information

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no.

TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction. 23 March 2015 Case no. TENDER INSTRUCTIONS Consulting services and auction software in connection with the 1800 MHz auction 23 March 2015 Case no. 2015-2800 Table of contents List of annexes... 3 1. The overall framework for

More information

Den Danske Banekonference May 21st 2013 AARHUS LETBANE DETAILED PLANNING OF AARHUS LIGHT RAIL SYSTEM CLAUS REHFELD MOSHØJ CEO AARHUS LETBANE I/S

Den Danske Banekonference May 21st 2013 AARHUS LETBANE DETAILED PLANNING OF AARHUS LIGHT RAIL SYSTEM CLAUS REHFELD MOSHØJ CEO AARHUS LETBANE I/S Den Danske Banekonference May 21st 2013 AARHUS LETBANE DETAILED PLANNING OF AARHUS LIGHT RAIL SYSTEM CLAUS REHFELD MOSHØJ CEO AARHUS LETBANE I/S Content DISCLAIMER: Aarhus LRT is in the middle of a tender

More information

Sponsors ansvar ved outsourcing af en klinisk afprøvning. Dansk Selskab for GCP. Medlemsmøde 23 November 2010

Sponsors ansvar ved outsourcing af en klinisk afprøvning. Dansk Selskab for GCP. Medlemsmøde 23 November 2010 Sponsors ansvar ved outsourcing af en klinisk afprøvning Dansk Selskab for GCP Medlemsmøde 23 November 2010 Agenda Introduktion v/jane Arce, Formand for Dansk Selskab for GCP Lovgivning Hvorfor kontrol

More information

SUBCONTRACTOR PRE-QUALIFICATION APPLICATION

SUBCONTRACTOR PRE-QUALIFICATION APPLICATION APPLICATION SUBCONTRACTOR IDENTITY Date Submitted Company Name Complete Address Phone Number Contact Name Federal Tax ID # DUNS # Fax Number Email Address NAICS Code States Registered to do Business Include

More information

REPUBLIC OF KENYA MINISTRY OF FOREIGN AFFAIRS AND INTERNATIONAL TRADE PRE-QUALIFICATION/REGISTRATION OF SUPPLIERS FY-2015-2016/2016-2017

REPUBLIC OF KENYA MINISTRY OF FOREIGN AFFAIRS AND INTERNATIONAL TRADE PRE-QUALIFICATION/REGISTRATION OF SUPPLIERS FY-2015-2016/2016-2017 REPUBLIC OF KENYA MINISTRY OF FOREIGN AFFAIRS AND INTERNATIONAL TRADE PRE-QUALIFICATION/REGISTRATION OF SUPPLIERS FY-2015-2016/2016-2017 CATEGORY NO: A, B, C & D TENDER No. MFA&IT/PQ/01/2015-2017 For SUPPLY

More information

Skovbrugsmaskiner Sikkerhedskrav til og prøvning af motordrevne stangsave til beskæring Del 2: Maskiner med rygbåret energikilde

Skovbrugsmaskiner Sikkerhedskrav til og prøvning af motordrevne stangsave til beskæring Del 2: Maskiner med rygbåret energikilde Dansk standard DS/EN ISO 11680-2 3. udgave 2012-01-18 Skovbrugsmaskiner Sikkerhedskrav til og prøvning af motordrevne stangsave til beskæring Del 2: Maskiner med rygbåret energikilde Machinery for forestry

More information

Azfar Bassir. Summary. Experience. Developer at SHFT azbassir@gmail.com

Azfar Bassir. Summary. Experience. Developer at SHFT azbassir@gmail.com Azfar Bassir Developer at SHFT azbassir@gmail.com Summary I consider myself as a positive, happy, energetic and responsible person. I love challenges because I always want to improve my skills. I am ambitious

More information

Informationsteknologi Softwarestyring (software asset management) Del 1: Processer og niveaudelt overensstemmelsesvurdering

Informationsteknologi Softwarestyring (software asset management) Del 1: Processer og niveaudelt overensstemmelsesvurdering Dansk standard DS/ISO/IEC 19770-1 2. udgave 2012-08-02 Informationsteknologi Softwarestyring (software asset management) Del 1: Processer og niveaudelt overensstemmelsesvurdering Information technology

More information

Information og dokumentation Ledelsessystem for dokumentstyring Krav

Information og dokumentation Ledelsessystem for dokumentstyring Krav Dansk standard DS/ISO 30301 1. udgave 2011-11-22 Information og dokumentation Ledelsessystem for dokumentstyring Krav Information and documentation Management systems for records Requirements DS/ISO 30301

More information

Softwareudvikling Kvalitetskrav til og evaluering af softwareprodukter (SQuaRE) Fælles industriformat (CIF) til brugbare testrapporter

Softwareudvikling Kvalitetskrav til og evaluering af softwareprodukter (SQuaRE) Fælles industriformat (CIF) til brugbare testrapporter Dansk standard DS/ISO/IEC 25062 1. udgave 2008-05-08 Softwareudvikling Kvalitetskrav til og evaluering af softwareprodukter (SQuaRE) Fælles industriformat (CIF) til brugbare testrapporter Software engineering

More information

Hvis personallisten ikke er ført slik reglene sier, kan Skatteetaten ilegge overtredelsesgebyr.

Hvis personallisten ikke er ført slik reglene sier, kan Skatteetaten ilegge overtredelsesgebyr. Denne boken er utgitt av Skatteetaten og sendes gratis til alle som er pålagt å føre personalliste fra 1. januar 2014. Det vil si bransjene servering, frisør, skjønnhetspleie, bilpleie og bilverksted.

More information

What's Wrong with Project Management? Introduction. Welcome to the November 2009 INSIGHTS published by acumen7.

What's Wrong with Project Management? Introduction. Welcome to the November 2009 INSIGHTS published by acumen7. Welcome to the November 2009 INSIGHTS published by acumen7. The purpose of this newsletter is to bring you new perspectives on key subjects to stimulate your own thoughts and ideas. In each edition (which

More information

Naturgas Bestemmelse af sammensætning med defineret usikkerhed ved gaskromatografi Del 2: Usikkerhedsberegninger

Naturgas Bestemmelse af sammensætning med defineret usikkerhed ved gaskromatografi Del 2: Usikkerhedsberegninger Dansk standard DS/EN ISO 6974-2 2. udgave 2012-06-20 Naturgas Bestemmelse af sammensætning med defineret usikkerhed ved gaskromatografi Del 2: Usikkerhedsberegninger Natural gas Determination of composition

More information

Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 2: Maskinlæsbare teknologier

Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 2: Maskinlæsbare teknologier Dansk standard Rettelsesblad DS/ISO/IEC 18013-2/Corr. 1 1. udgave 2012-01-25 Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 2: Maskinlæsbare teknologier Information technology

More information

Contracting Practices in Mega Projects

Contracting Practices in Mega Projects CEM 520 Term Paper Contracting Practices in Mega Projects EPC and EPCM A L I A B D U L L A H A L - S A L E M 2 0 0 3 4 2 5 1 0 Outline Introduction Types of Contracts Contracting Strategies The Difference

More information

Skolestart. Solveig Gaarsmand Skole og Samfund Good ID 2007

Skolestart. Solveig Gaarsmand Skole og Samfund Good ID 2007 Skolestart Solveig Gaarsmand Skole og Samfund Good ID 2007 1 Præsentation Hvem er vi? Hvor skal vores børn gå i skole? The trainer welcomes parents, pedagogues and teachers present and invites everybody

More information

CALL FOR TENDERS Reference N HR/R3/PR/2014/083 JO 2015/S 108-195072 of 06/06/2015

CALL FOR TENDERS Reference N HR/R3/PR/2014/083 JO 2015/S 108-195072 of 06/06/2015 EN EUROPEAN COMMISSION DIRECTORATE-GENERAL HUMAN RESOURCES AND SECURITY Directorate HR.R - Shared Resource Services Finance and Internal Control CALL FOR TENDERS Reference N HR/R3/PR/2014/083 JO 2015/S

More information

Tender Documents. Procurement of Works Medium Contracts (LUMP SUM CONTRACTS)

Tender Documents. Procurement of Works Medium Contracts (LUMP SUM CONTRACTS) Tender Documents Procurement of Works Medium Contracts (LUMP SUM CONTRACTS) Public Procurement Board Accra, Ghana October 2003 Table of Contents Introduction...1 Invitation for Tenders...2 Table of Clauses...6

More information

Metode til beregning og deklaration af energiforbrug og emissioner af GHG (drivhusgassser) inden for transportsektoren (gods- og passagertransport)

Metode til beregning og deklaration af energiforbrug og emissioner af GHG (drivhusgassser) inden for transportsektoren (gods- og passagertransport) Dansk standard DS/EN 16258 1. udgave 2012-12-10 Metode til beregning og deklaration af energiforbrug og emissioner af GHG (drivhusgassser) inden for transportsektoren (gods- og passagertransport) Methodology

More information

Building and Planning

Building and Planning Description of Services Building and Planning 2012 Danish Association of Consulting Engineers The Danish Association of Consulting Engineers (FRI) and the Danish Association of Architectural Firms (DANSKE

More information

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya

International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya International Peace Support Training Centre Westwood Park P O Box 24232-00502 Karen, Kenya PRE-QUALIFICATION TENDER NO. IPSTC/PREQ/2014/2015/043 FOR PROVISION OF PLUMBING SERVICES FOR 2014/2015 July, 2014

More information

Procurement Routes. Curtin University of Technology

Procurement Routes. Curtin University of Technology Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants

More information

Søgeprotokol for Nationale Kliniske Retningslinjer

Søgeprotokol for Nationale Kliniske Retningslinjer Søgeprotokol for Nationale Kliniske Retningslinjer Projekttitel/aspekt NKR for OCD søgning på PICOs - sekundær litteratur Kontakt Fagkonsulent Anne Dorothee Müller / Betina Højgaard /projektleder Kontakt

More information

Olie- og naturgasindustrien Levetidsomkostninger Del 3: Retningslinier for implementering

Olie- og naturgasindustrien Levetidsomkostninger Del 3: Retningslinier for implementering Dansk Standard DS/ISO 15663-3 1. udgave 2001-11-20 Olie- og naturgasindustrien Levetidsomkostninger Del 3: Retningslinier for implementering Petroleum and natural gas industries Lifecycle costing Part

More information

Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 4: Prøvningsmetoder

Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 4: Prøvningsmetoder Dansk standard DS/ISO/IEC 18013-4 1. udgave 2012-01-11 Informationsteknologi Personlig identifikation ISO-overensstemmende kørekort Del 4: Prøvningsmetoder Information technology Personal identification

More information

Public Procurements. Where rules are defined. Tirana May27-28, 2013. ADRIARadNet 2nd Meeting

Public Procurements. Where rules are defined. Tirana May27-28, 2013. ADRIARadNet 2nd Meeting Where rules are defined Tirana May27-28, 2013 1 Suggested manuals INTERACT Point Vienna Public procurement in IPA cross-border cooperation programmes with EU Member States in shared management - Version

More information

Nordic Master in Didactics of Mathematics

Nordic Master in Didactics of Mathematics Nordic Master in Didactics of Mathematics NORDIMA Barbro Grevholm Seminar i Bergen den 7-8 september 2011 Nordic Master in Didactics of Mathematics Project number NMP-2009/10730 The Master Consortium consists

More information

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts)

STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT. (Works, Heavy Equipment, Supply and Installation Contracts) STANDARD PROCUREMENT PREQUALIFICATION DOCUMENT (Works, Heavy Equipment, Supply and Installation Contracts) Table of Contents Page INTRODUCTION 3 SECTION I - Invitation for prequalification... 4 SECTION

More information

Rubber condoms Guidance on the use of ISO 4074 in the quality management of natural rubber latex condoms

Rubber condoms Guidance on the use of ISO 4074 in the quality management of natural rubber latex condoms Dansk standard DS/ISO 16038 1. udgave 2005-11-14 Kondomer Vejledning i brug af ISO 4074 ved kvalitetsstyring af latexkondomer Rubber condoms Guidance on the use of ISO 4074 in the quality management of

More information

1) Testing of general knowledge 25%. Each right question counts 1. Each wrong counts 0.5. Empty

1) Testing of general knowledge 25%. Each right question counts 1. Each wrong counts 0.5. Empty 1 Exam 2 The exam consists of four parts: 1) Testing of general knowledge 25%. Each right question counts 1. Each wrong counts 0.5. Empty counts zero. See below note about Task 1. 2) Planning 20%. All

More information

Notice of Annual General Meeting of Directors and Shareholders and Complete Proposals

Notice of Annual General Meeting of Directors and Shareholders and Complete Proposals 3 April 2009 Notice of Annual General Meeting of Directors and Shareholders and Complete Proposals Enclosed please find the notice of and the complete proposals for the Annual General Meeting of directors

More information

Software- og systemudvikling Softwaretest Del 1: Begreber og definitioner

Software- og systemudvikling Softwaretest Del 1: Begreber og definitioner Dansk standard DS/ISO/IEC/IEEE 29119-1 1. udgave 2013-09-26 Software- og systemudvikling Softwaretest Del 1: Begreber og definitioner Software and systems engineering Software testing Part 1: Concepts

More information

Lær at spille din kort rigtigt, og få erhvervserfaring gennem AIESEC. Hvad er AIESEC? Vil du vide mere? Hvilke erfaringer kan du opnå i AIESEC?

Lær at spille din kort rigtigt, og få erhvervserfaring gennem AIESEC. Hvad er AIESEC? Vil du vide mere? Hvilke erfaringer kan du opnå i AIESEC? c Lær at spille din kort rigtigt, og få erhvervserfaring gennem AIESEC. Hvad er AIESEC? -International frivillig studenterorganisation -Hjælper studerende over hele verden med at finde globale udvekslingsmuligheder,

More information

PROVISION OF LEGAL SERVICES

PROVISION OF LEGAL SERVICES COUNTY GOVERNMENT OF WAJIR P.O BOX 9-70200. WAJIR,KENYA PRE QUALIFICATION DOCUMENT FOR PROVISION OF LEGAL SERVICES TENDER NUMBER WCG/PT/023/2016-2018 March, 2016 WAJIR COUNTY Page 1 of 17 Table of Contents

More information

Termisk isolering i bygninger Reflekterende isoleringsprodukter Bestemmelse af deklareret termisk ydeevne

Termisk isolering i bygninger Reflekterende isoleringsprodukter Bestemmelse af deklareret termisk ydeevne Dansk standard DS/EN 16012 1. udgave 2012-03-08 Termisk isolering i bygninger Reflekterende isoleringsprodukter Bestemmelse af deklareret termisk ydeevne Thermal insulation for buildings Reflective insulation

More information

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2

FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and

More information

Informationsteknologi til læring, uddannelse og oplæring Informationsmodel for kompetencer Del 2: Informationsmodel for kompetenceniveau

Informationsteknologi til læring, uddannelse og oplæring Informationsmodel for kompetencer Del 2: Informationsmodel for kompetenceniveau Dansk standard DS/ISO/IEC 20006-2:2015 1. udgave 2015-08-04 Informationsteknologi til læring, uddannelse og oplæring Informationsmodel for kompetencer Del 2: Informationsmodel for kompetenceniveau Information

More information

af oral antikoagulationsterapi

af oral antikoagulationsterapi Dansk standard DS/ISO 17593 1. udgave 2007-05-31 Klinisk laboratorieprøvning og in-vitro diagnostisk udstyr - Krav til in vitroovervågningssystemer til selvundersøgelse af oral antikoagulationsterapi Clinical

More information

Retningslinjer for implementering af kvalitet i mobilitetsledelse i små og mellemstore byer

Retningslinjer for implementering af kvalitet i mobilitetsledelse i små og mellemstore byer DS-information DS/CWA 16030 1. udgave 2009-10-30 Retningslinjer for implementering af kvalitet i mobilitetsledelse i små og mellemstore byer Code of practice for implementing quality in mobility management

More information

API PRO 8. Interface to ERP systems. The Efficient and Smarter Way to Asset Performance Improvement

API PRO 8. Interface to ERP systems. The Efficient and Smarter Way to Asset Performance Improvement 8 Interface to ERP systems The Efficient and Smarter Way to Asset Performance Improvement Interfaces til ERP systemer Hvorfor? Fordi: Det tekniske personale skal (helst) kun arbejde i ét system () Undgå

More information

How to join a waiting list at Findbolig.nu (including student housing)

How to join a waiting list at Findbolig.nu (including student housing) How to join a waiting list at Findbolig.nu (including student housing) 1 How to join a waiting list This guide shows you how to join a waiting list for a home or student housing. Preconditions The guide

More information

Informationsteknologi Prøvningsmetoder. (MRTD) og tilhørende udstyr Del 1: Fysiske prøvningsmetoder for pas (holdbarhed)

Informationsteknologi Prøvningsmetoder. (MRTD) og tilhørende udstyr Del 1: Fysiske prøvningsmetoder for pas (holdbarhed) Dansk standard DS/ISO/IEC 18745-1 1. udgave 2014-03-05 Informationsteknologi Prøvningsmetoder for maskinlæsbare rejsedokumenter (MRTD) og tilhørende udstyr Del 1: Fysiske prøvningsmetoder for pas (holdbarhed)

More information

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

More information

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670

2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info & on-line

More information

:: REQUEST FOR INFORMATION :: DEMOLITION SERVICES

:: REQUEST FOR INFORMATION :: DEMOLITION SERVICES :: REQUEST FOR INFORMATION :: DEMOLITION SERVICES 4200 Canal Street, Suite B New Orleans, LA 70119 PROPOSAL SUBMITTAL DEADLINE: Friday, June 15, 2012 @ 2:00pm NOTE: Proposal to be submitted in one (1)

More information

Sundhedsinformatik Kapacitetsbaseret roadmap for e-sundhedsarkitektur Del 1: Oversigt over nationale e-sundhedsinitiativer

Sundhedsinformatik Kapacitetsbaseret roadmap for e-sundhedsarkitektur Del 1: Oversigt over nationale e-sundhedsinitiativer DS-information DS/ISO/TR 14639-1 1. udgave 2012-10-11 Sundhedsinformatik Kapacitetsbaseret roadmap for e-sundhedsarkitektur Del 1: Oversigt over nationale e-sundhedsinitiativer Health informatics Capacity-based

More information

RHODE ISLAND CONSTRUCTION LAW PRIMER

RHODE ISLAND CONSTRUCTION LAW PRIMER RHODE ISLAND CONSTRUCTION LAW PRIMER By Chad L. Hershman, Esq. chershman@haslaw.com 617-378-4192 I. Introduction: As the construction industry continues to attempt to emerge from a period of decreased

More information

FORSLAG / DRAFT DSF/DS/EN 13200-6 DK NA:2014

FORSLAG / DRAFT DSF/DS/EN 13200-6 DK NA:2014 FORSLAG / DRAFT DSF/DS/EN 13200-6 DK NA:2014 Forslagsnr.: M287549 Draft no.: Forslaget er: The draft is: (IDT = identisk med/identical to - EQV = baseret på/equivalent to - MOD = modificeret/modified)

More information

Informationsteknologi Kodning af av-objekter Del 4: Overensstemmelsesprøvning

Informationsteknologi Kodning af av-objekter Del 4: Overensstemmelsesprøvning Dansk standard Rettelsesblad DS/ISO/IEC 14496-4/Corr. 1 + CD-rom 1. udgave 2007-11-22 Informationsteknologi Kodning af av-objekter Del 4: Overensstemmelsesprøvning Information technology Coding of audio-visual

More information

GB INTRODUCTION manual:

GB INTRODUCTION manual: GS - GS/L S2/S4 4 5 GB INTRODUCTION manual: Manufacturing Firm; The person responsible for the use of the fork truck must make sure that all of the safety rules in force in INSTRUCTIONS FOR USE 1) Do not

More information

SAMSØ PÅ GAS. Skibsteknisk Selskab København 8. September 2014

SAMSØ PÅ GAS. Skibsteknisk Selskab København 8. September 2014 SAMSØ PÅ GAS Skibsteknisk Selskab København 8. September 2014 Consulting Naval Architects OSK-ShipTech A/S Denmark World Wide Marine Consultancy Services Since 1966 Geography Kanhavekanalen Kanhavekanalen

More information

How To Write An International Safety Standard

How To Write An International Safety Standard Dansk standard DS/ISO 26262-6 1. udgave 2012-01-11 Motorkøretøjer Funktionssikkerhed Del 6: Produktudvikling på softwareniveau Road vehicles Functional safety Part 6: Product development at the software

More information

Attachment A. Application for Prequalification. General Contractors, Trade Subcontractors and Related Construction Service Providers.

Attachment A. Application for Prequalification. General Contractors, Trade Subcontractors and Related Construction Service Providers. Attachment A Application for Prequalification of General Contractors, Trade Subcontractors and Related Construction Service Providers Pre-Qualification Form 03.14.16 Page 1 of 15 Application for Pre-Qualification:

More information

Statistiske metoder i procesledelse Kapabilitet og performance Del 3: Analyse af maskinperformance for måleværdier på (diskrete) emner

Statistiske metoder i procesledelse Kapabilitet og performance Del 3: Analyse af maskinperformance for måleværdier på (diskrete) emner Dansk standard DS/ISO 22514-3 1. udgave 2008-05-08 Statistiske metoder i procesledelse Kapabilitet og performance Del 3: Analyse af maskinperformance for måleværdier på (diskrete) emner Statistical methods

More information

3 Year On-Call Steel Fabrication Inspection Services. Request for Proposal. Iowa Department of Transportation

3 Year On-Call Steel Fabrication Inspection Services. Request for Proposal. Iowa Department of Transportation 3 Year On-Call Steel Fabrication Inspection Services Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Materials is interested in Certified

More information

AN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS

AN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS The Associated General Contractors of America 333 John Carlyle Street Suite 200 Alexandria, VA 22314 AN OVERVIEW OF THE CONTRACT SURETY BOND CLAIMS PROCESS Developed by the Associated General Contractors

More information

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES

CONSTITUTION PART 4 CONTRACT PROCEDURE RULES CONSTITUTION PART 4 CONTRACT PROCEDURE RULES (last revised January 2016) A Brief Guide to the Contract Procedure Rules These Contract Procedure Rules promote good purchasing practice, public accountability

More information

Informationsteknologi Storage management Del 1: Oversigt

Informationsteknologi Storage management Del 1: Oversigt Dansk standard DS/ISO/IEC 24775-1 1. udgave 2014-11-13 Informationsteknologi Storage management Del 1: Oversigt Information technology Storage management Part 1: Overview DS/ISO/IEC 24775-1 København DS

More information

Facility management Del 7: Vejledning i benchmarking af præstationer

Facility management Del 7: Vejledning i benchmarking af præstationer Dansk standard DS/EN 15221-7 1. udgave 2012-11-06 Facility management Del 7: Vejledning i benchmarking af præstationer Facility Management Part 7: Guidelines for Performance Benchmarking DS/EN 15221-7

More information

Vejledning til en europæisk COREfaktura-datamodel. CII-retningslinjer for implementering Del 1: Introduktion

Vejledning til en europæisk COREfaktura-datamodel. CII-retningslinjer for implementering Del 1: Introduktion DS-information DS/CWA 16356-1 1. udgave 2011-11-09 Vejledning til en europæisk COREfaktura-datamodel med UN/CEFACT CII-retningslinjer for implementering Del 1: Introduktion Guide for a European CORE INVOICE

More information

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6 Related To FEWA Electricity Network (Transmission & Distribution) Version 1.0 December 2014 TABLE OF CONTENTS Page I. Introduction 3 II. Contractor Pre-Qualification Criteria 4 III. Procedure for Application

More information

Hvordan skriver man en god kravspecifikation? DAu konference den 28. august om projektstyring

Hvordan skriver man en god kravspecifikation? DAu konference den 28. august om projektstyring Hvordan skriver man en god kravspecifikation? DAu konference den 28. august om projektstyring Anders Vidstrup, Senior IT Quality SME, Quality & Security Kort fortalt NNIT er en af Danmarks fire største

More information

Dørsæt, vinduer, curtain walling, gitre og skodder Indbrudssikring Prøvningsmetode til bestemmelse af modstandsevne ved statisk belastning

Dørsæt, vinduer, curtain walling, gitre og skodder Indbrudssikring Prøvningsmetode til bestemmelse af modstandsevne ved statisk belastning Dansk standard DS/EN 1628 1. udgave 2011-06-01 Dørsæt, vinduer, curtain walling, gitre og skodder Indbrudssikring Prøvningsmetode til bestemmelse af modstandsevne ved statisk belastning Pedestrian doorsets,

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

Jordundersøgelser Prøvetagning Del 5: Vejledning i undersøgelse af jordforurening på bymæssige og industrielle grunde

Jordundersøgelser Prøvetagning Del 5: Vejledning i undersøgelse af jordforurening på bymæssige og industrielle grunde Dansk standard DS/ISO 10381-5 1. udgave 2005-11-09 Jordundersøgelser Prøvetagning Del 5: Vejledning i undersøgelse af jordforurening på bymæssige og industrielle grunde Soil quality Sampling Part 5: Guidance

More information

REPUBLIC OF KENYA OFFICE OF THE GOVERNOR NYERI COUNTY GOVERNMENT OF NYERI TENDER NO. CGN/49/2016-2018

REPUBLIC OF KENYA OFFICE OF THE GOVERNOR NYERI COUNTY GOVERNMENT OF NYERI TENDER NO. CGN/49/2016-2018 REPUBLIC OF KENYA OFFICE OF THE GOVERNOR NYERI COUNTY GOVERNMENT OF NYERI TENDER NO. CGN/49/2016-2018 PREQUALIFICATION OF BIDDERS FOR PROVISION OF SOFTWARE SYSTEM SERVICES, WEBSITE MANAGEMENT AND MAINTENACE

More information

Legal Guide to Forming a Corporation in Luxembourg

Legal Guide to Forming a Corporation in Luxembourg Legal Guide to Forming a Corporation in Luxembourg March 2008 Business in the Grand-Duchy of Luxembourg (the GDL ) may be carried out by individual trader(s) or by way of forming a corporate entity, whereby

More information

Doing business with the European Commission Tips for potential contractors

Doing business with the European Commission Tips for potential contractors Doing business with the European Commission Tips for potential contractors EUROPEAN COMMISSION Text A business opportunity for you C O N T E N T S Doing business with the European Commission Tips for potential

More information

OIO Dekstop applikation

OIO Dekstop applikation OIO Dekstop applikation 25-09-2009. Version 1.0 Sammendrag af ideer og dialog på møde d. 24-09-2009 mellem ITST, Trifork og Designit Under udarbejdelse Diagram Test applikation Grupper Digitaliser.dk Applikation

More information

Informationsteknologi Små computersystemers. Del 251: USB-fæstnet SCSI (UAS)

Informationsteknologi Små computersystemers. Del 251: USB-fæstnet SCSI (UAS) Dansk standard DS/ISO/IEC 14776-251 1. udgave 2014-05-27 Informationsteknologi Små computersystemers grænseflade (SCSI) Del 251: USB-fæstnet SCSI (UAS) Information technology Small computer system interface

More information

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects

ATTACHMENT A. Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Ozarks Technical Community College Pre-Established Criteria for Construction Management and Design Build Construction Projects Pursuant to Revised Statute of Missouri Section 8.250(3), Ozarks Technical

More information

Optimization on Home Care. Kirstine Thomsen

Optimization on Home Care. Kirstine Thomsen Optimization on Home Care Kirstine Thomsen Summary The purpose of this project is to investigate how methods from operational research can be applied in the home care sector. A problem very similar to

More information