1 Regulation of continuity of supply in the electricity sector and cost of energy not supplied Ilaria Losa - ERSE S.p.A. (mail to: [email protected]) Osvaldo Bertoldi - ENGINET S.r.L. Abstract The expectation of customers to be served by electric utilities with higher levels of continuity of supply becomes more stringent as long as the share of electricity to total energy consumption grows worldwide, and mostly in developed areas and countries. Indeed, electricity supply interruptions are less and less accepted by customers mainly because their social-economical effects become heavier and heavier. At the same time, in a liberalised electricity market, if continuity of supply is neither contractible nor incentivized, utilities could reduce investments aimed at guaranteeing adequate reliability standards, thus decreasing the levels of continuity of supply to final consumers (this trend has been demonstrated with practical experiences and theoretical analyses). Therefore incentive regulation for continuity of supply can ensure that cost cut policies driven by price-cap regimes are not achieved at the expense of continuity of supply. This paper shows and discusses the main results of a survey on methodologies and techniques used worldwide to assess the cost of electricity supply interruptions, as well as on the actions of European Regulators aimed at incentivizing the continuity of supply. The final target is to provide a reference framework to define economic indices to estimate the Cost of Energy Not Supplied (CENS), as well as to provide a reliable estimation of costs and benefits related to investments aimed at increasing the actual levels of reliability of electricity supply. Introduction One of the main tasks of the electricity industry is to provide reliable electricity to customers at a reasonable and competitive price. Since worldwide, and mostly in developed areas and countries, the share of electricity to total energy consumption grows, higher continuity levels of electricity supply become an unavoidable request to the utilities. Indeed supply interruptions, anyway theoretically possible, are less and less accepted by customers and society mainly because their socioeconomic effects are heavier and heavier. More in general, very severe outages and blackouts that occurred in the past years in the United States and in Europe clearly showed that, besides the price of electricity, continuity of service (in terms of reliability/continuity of supply) is also a very important issue for customers and society as a whole. Therefore, regulators and institutions are strongly promoting the improvement of continuity of service in the electricity sector. Then reliability of supply and its value are key factors for the decision making process underlying expansion plans not only of electricity generation systems but also of transmission and distribution networks. It is evident that low levels of investment can result in unreliable supply (unacceptable low continuity), while excessive investments can result in unnecessary expenditures with a resulting increase of the cost of electricity to customers. Following the radical changes occurred in the institutional framework of electricity supply industry since early 90 s of the past century, it is nowadays widely recognised that investments related to the provision of electricity continuity of service must be carefully evaluated through an explicit cost-benefit analysis that provides the basis for answering the economic question: How much reliability is adequate from the customer's perspective? [1] To answer this question it is necessary to move from a criteria-based planning approach to a value-based planning approach, by accounting for both utility s and customer s perspectives. Moreover, it has to be taken into account that the continuity of supply to the final consumers can not benefit anymore from the coordination among Generation, Transmission and Distribution sectors, as in the previous monopolistic and vertically integrated framework, because they are now unbundled and autonomous from both the regulatory and the economic point of view. Therefore, the investment optimisation process must be carried out separately for the G, T and D segments and so three independent optima are calculated, thus resulting in an overall quasi-optimum quality level for consumers. In a liberalised framework, optimisation of the quality level and of related investments can be based on the fact that, from the consumer's perspective, the total cost of the electric service consists of two components: cost of service received, proportional to the cost borne by utility, and the cost of service interruptions (that is the cost of unreliability), which are non linear functions of reliability level, as shown in Figure 1. The cost-of-service received, that is the cost in charge of the utility to provide customers with electric service at a given continuity level, rapidly increases as continuity grows while, on the contrary, customer s cost due to interruptions is very high when reliability level is low and it rapidly decreases as reliability grows. 1
2 continuity of supply, iv)-the available estimates of interruption unit costs in the European context. Figure 1: Adequacy optimization in a power system. (source [2]) Consumers are then best served when their total cost is minimized, that is in the condition defined by equating the marginal cost and the marginal value of service reliability. The assessment of the best compromise between additional investment costs and corresponding benefits to consumers needs to quantitatively determine the value of continuity. This is a very complex task and it cannot be implemented as a direct method mainly because no market exists for the continuity of electricity supply or, conversely, for interruptions of that supply. Currently, an usually adopted approach to get over this obstacle is to assess the reverse, that is the cost associated to lack of continuity. Anyway we must remark that the latter is not identical to the value of continuity although representative of it, perhaps a lower bound. In the framework of the SECURE project 1 a survey has been carried out aimed at investigating and discussing methodologies and techniques used worldwide to assess the cost incurred by customers due to supply interruptions and at collecting the results of their application to real power systems. This in order to provide a reference framework enabling to quantify the economic index Cost of Energy Not Supplied (CENS), also known as VOLL (Value Of Lost Load) or IEAR (Interrupted Energy Assessment Rate) to be adopted for future transmission network expansion studies in the pan-european area. To this aim, the study has been mainly focused on four topics: i)-the costs of interruptions and the relevant indicators, ii)-the approaches and methods to assess them, iii)-the regulation of the continuity of service and its impact on 1 SECURE is a research project funded by the European Commission under the Seventh Framework Programme with the scope of building a comprehensive framework that covers the issues related to security of supply inside and outside the EU. The project develops appropriate tools for evaluating the vulnerability of the EU to the different energy supply risks. SECURE develops energy security indicators for the major energy sources and technologies so as to identify risk factors and quantify EU exposure. Costs and benefits of energy security are evaluated for different energy demand scenarios to help policy-makers provide the most appropriate solutions. The cost of interruptions: indices and methods for their assessment Economic indices of interruption costs Useful indices to quantitatively represent the economic losses due to interruptions can be expressed in terms of /interruption, /kw of lost peak load, /kwh of annual energy consumed, /kwh of energy not supplied [5]. Three indices are most frequently used and referenced in the literature: IEAR (Interruption Energy Assessment Rate) is a system-wide interruption cost index expressed in /kwh. Together with the adequacy index EENS (Expected Energy Not Supplied per year), it provides an estimation of the expected annual economic damage incurred on average by customers due to interruptions. VOLL (Value Of Lost Load) whose prevailing meaning is conceptually equivalent to the IEAR, even though it is sometimes intended as the value (/kwh) an average consumer puts on an unsupplied kwh of energy, rather than the incurred cost [2], [3] [4], [5]. WTP (Willingness To Pay) represents the customer willingness to pay to improve its continuity of supply. It may be expressed in /kwh of consumed energy, if it represents the willingness of customers to pay for an increase of their electricity bills in order to have a given continuity improvement [6], or as /event, if the customer s goal is to reduce or to avoid interruptions at all [7]. Interruption cost indicators are not quantified as a single value, but rather they can imply a large range of values depending on the relative importance of three main factors [8]: kind of consumer, such as residential, industrial, commercial, etc. interruption characteristics, such as duration, extent, advance notification or not, time of occurrence, etc. perceived reliability level, that is strongly determined by the incidence of interruptions in the past and by the level of socioeconomic development and welfare. Methodologies and techniques to assess interruption cost indices The cost of supply interruptions is related to the economic consequences incurred by consumers when an electricity shortage occurs. Suitable approaches and methodologies have been developed in the last decades to assess interruption cost indices and are now available and used by institutional firms for regulatory purposes and by utilities for expansion planning studies. 2
3 Methodologies The methodologies used worldwide can be categorized into four typologies: a) Revealed preferences, whose main advantage is that relatively accurate data can be collected through observations and analysis of consumers market behaviour, while the main drawback is that only large consumers can provide suitable signals. b) Stated preferences, based on customer surveys. This approach has two main advantages: firstly, it provides utilities with interruption cost data suitable for planning purposes, and secondly, it is customer based / bottom-up, and therefore it directly incorporates customers preferences. The main drawback is the high cost to implement it. c) Proxy methods (including the production function approach), whose main advantage is that they are quite easy to apply, making use of readily available data, such as Gross National Product, total energy consumption, sector production functions, etc., and moreover they are practically inexpensive to implement. The main drawback is that most of them are based on limiting and some times unrealistic assumptions. d) Case studies, based on collection of as much data as possible immediately after the occurrence of large-scale power supply interruptions. Their main advantage is that interruption cost values are directly related to consumers experience of real interruptions, rather than hypothetical scenarios. The fundamental drawback is that the number of case studies and relevant data sets is very small and therefore the meaningfulness of the calculated interruption cost indices may be relatively poor. Computing techniques As far as the assessment of interruption cost indices is concerned, it has to be stressed that the Stated Preferences method is the most frequently used by utilities and regulators. On the basis of customer surveys, utilities usually collect cost data for each interruption type and duration. In this case, the assessment of system interruption cost indices in principle requires three computing steps: a) Processing of raw collected data, that mainly consists in normalisation of individual customer data either by annual consumed energy (MWh) or by peak load demand (MW), in order to make it possible and consistent the subsequent grouping or aggregation process into customer categories (sectors). b) Setting up of customer interruption cost models, usually based on Customer Damage Functions (CDF) that represent the normalized Cost of Interruptions as a function of outage duration and parameterised according to consumer and outage characteristics. CDFs are usually formulated at Consumer level (CDF), at Sector level (SCDF), by aggregating all consumers of the same sector and weighing the relevant CDFs, and finally at Composite Consumer level (CCDF), by weighing and combining the previously determined SCDFs. c) Computing of power system interruption cost indices, that involves the convolution of interruption cost models, of load models and of system model, concerning interruption statistics and power flows analysis. In particular, computing of interruption cost indices (3 rd step) requires the availability of both frequency and duration of interruptions and of the corresponding load shortages. Should an ex post interruption cost investigation be carried out, the system information on the frequency and duration of interruptions, as well as on the total energy not supplied due to outages of network components, can be obtained from recording and processing of operation data. When, on the contrary, an ex ante interruption cost analysis is requested, as in the case of network expansion planning, power system interruption indices must be assessed by using suitable network modelling and computing procedures, based on either state enumeration methods or on probabilistic simulations, such as Montecarlo sampling techniques. Regulation of continuity of electricity supply The key motivation for continuity regulation in the electricity sector mainly lies in the strong incentives to cost reduction by utilities, induced by privatisation and price capped tariffs. In this context, indeed, if continuity is not enforced or not incentivized, operators could reduce network investments, thus causing a lower continuity of service for the final consumers. Incentive regulation for continuity can ensure that cost cuts required by price-cap regimes are not achieved at the expense of continuity itself. In some European countries national regulatory authorities have started implementing continuity regulation schemes since the beginning of the present decade. The reference reliability indicators usually considered are SAIDI (System Average Interruption Duration Index), SAIFI (System Average Interruption Frequency Index) and ENS (Energy Not Supplied). As far as the distribution service is concerned, at the end of 2005 incentive/penalty schemes were in place in 8 countries out of the 19 surveyed by CEER [9] (Council of European Energy Regulators): Italy (from 2000), Norway and Ireland (from 2001), Great Britain (from 2002), Hungary and Portugal (from 2003), Sweden (from 2004), and Estonia (from 2005). Meanwhile, some other countries expressed interest for setting up an incentive scheme in the future, such as Finland, France, Lithuania, Poland, Spain, and Slovenia. The, beneficial effects on supply continuity indicators that have been experienced, are summarized below: SAIDI: GB: -19% (3 years), HU: -65 % (5 years), IT: -53% (5 years) 3
4 SAIFI: GB: -15% (3 years), IT: -34% (5 years) ENS: NO: -40% (4 years) Average Continuity: IE: +28% (5 years). The analysis of the adopted regulation schemes allows to obtain the VOLL values that have been either explicitly or implicitly assumed by Regulators for their formulation. According to the 3rd Benchmarking Report issued by CEER in 2005 and to British and Italian Regulators documents, the continuity incentive schemes adopted in six countries assume the values of VOLL shown in Table 1. Table 1: VOLL values adopted for continuity regulation schemes (source: [9]). Country Great Britain Consumer Sector /kwh not supplied All sectors /kw Interrupted Supply level Distribution Transmission Italy All sectors 15.0 Transmission Sweden Norway Urban Suburban Rural Resident. Commercial Industrial Distribution Distribution Ireland All sectors 7.2 Distribution Portugal All sectors 1.5 Distribution In the following paragraphs we report two examples of mechanisms of regulations of continuity of supply that have adopted a value based approach. In particular we focus on two examples that involve two large electric systems: Italy and England. In particular the latter is significant because it represent the first case of regulation of continuity of supply based on value based criteria ever applied. Instead the mechanism adopted in Italy is significant because it involves three different indicators that measure the performances of the transmission grid, that account for different requirements submitted by all the stakeholders of the electric system. The prevention and mitigation of major incidents (those outages that involve more than 250 MWh of energy not supplied for more than thirty minutes [11] [12]). The regulation scheme is based on a mechanism of incentives and penalties which are applied to TERNA, the Italian TSO, and are determined through three indices, described here below, that measure continuity of supply by accounting for the amount, the frequency and the territorial distribution of the outages. Indices of continuity of supply ENSS (Standard Energy Not Supplied) Following the indication of TERNA that declared to be available to be considered responsible for all the interruptions that occur on the transmission network (with the exception of those caused by natural catastrophes, by emergency reasons or by programmed disconnections) AEEG introduced the index ENSS that accounts for continuity of supply. It is a weighted average of the energy not supplied during ordinary outages and during major incidents. In order to mitigate the volatility that characterizes the latter ones, ENSS is assessed using average values calculated for three years periods and weighted with a limitation function that has a less than proportional trend. The main points defining the function are reported in Table 2. Table 2: Main points of the ENSS limitation function (source: [10]). Energy Not Supplied [MWh] Standard Energy Not Supplied [MWh] < ENS< Moreover, AEEG defined the following function: ENSS [MWh] = 250 [MWh] (ENS [MWh] / 250) 1/2 in order to calculate ENSS values from ENS values between 250 MWh and 2250 MWh. Figure 2 shows the resulting ENSS function. Case Study 1: Italy A price-cap regulation scheme for electricity transmission services has been introduced by the Italian Regulator (AEEG) for the third regulatory period , aimed at stimulating the recovery of the continuity of supply by means of economic incentives or penalties [10]. Regulation has two main objectives: The reduction of the ordinary outages that occur on the transmission network. 4
5 Standard Energy Not Supplied Function Incentives and penalties regarding ENSS are equal to: 875 ENSS [MWh] (LE ENSS - LO ENSS ) C ENSS where LE ENSS is the actual ENSS value, LO ENSS is the target level (its value ensures a reduction of ENSS equal to 2% per year) and C ENSS is the cost of energy not supplied. Incentives and penalties regarding NOU are equal to: ENS [MWh] Figure 2: ENSS limitation function (source: elaboration by CESI RICERCA according to guidelines described in [10]).). The domain of the limitation function varies from a minimum value of ENS equal to 0 MWh to a maximum value of MWh. For ENS values lower than 250 MWh, ENSS is considered to be equal to ENS. An event that causes an ENS greater than that MWh is excluded. In ENSS computation, the ENS due to outages occurred on foreign grids that affect the Italian transmission network is also included. The starting reference value of ENSS is the arithmetic average of three years averages calculated for years NOU (Number of Outages per Users) This index was introduced in order to foster the level of protection offered to the final customers also regarding short-lasting outages. It accounts for both short and long term outages and it is calculated for each category of final users of the transmission network and for each Operative Area identified by TERNA (AOT). It is expressed in terms of outages/user. AEEG chose, for the beginning of the regulatory period and for each AOT, a starting value equal to the average NOU calculated, in each area, during years 2006 and ACO (Amount of Customers without Outages) This index has been taken into account in order to introduce an asymmetry in penalties and incentives, to increase the influence of the latter. The starting reference value is equal, for each AOT, to the two years average value calculated in 2006 and in (LE NOU -LO NOU )*C NOU *P ij where LE NOU is the actual NOU value recorded on the transmission network, LO NOU is the target level, C NOU is the cost of energy not supplied during outages and P ij is the average power transmitted by AOT j during year i divided by the number of hours in a year. Finally, if TERNA meets both the ENSS and the NOU target standards, the above incentives are increased by a factor equal to: [1 + 2 max(le ACO LP ACO ; 0)], where LE ACO and LP ACO are the actual value and the starting value of the ACO index. The reference value for the ENSS index for years has been set equal to the starting value. For years it will be set equal to 98% of the value set for the previous years. The reference value for the NOU index, for each year and for all the AOTs, has been set equal to 0.18 outages/customer; if the starting value is greater than 0.18 outages/customer, the reference value is set equal to the starting value and every year it will decrease in order to reach the value of 0.18 outages/customer in year An unique target value of NOU for all the AOTs has been adopted to harmonize the continuity of supply all over the entire transmission network. In order to limit the exposure of the TSO to the financial risk, AEEG determined a maximum limit for incentives and penalties. The maximum amount of the penalties is equal to 1.5% of the revenues deriving from transmission service, while the maximum limit of the incentives is equal to 2%. These limitations have been introduced in order to test and refine the regulation, that will be enforced also in future regulatory periods. Evaluation of the cost of energy not supplied To assess the cost of energy not supplied (C ENSS ) AEEG tried to reach a compromise between two requirements: Economic impact of regulation Starting from 2010 AEEG will provide TERNA with an economic incentive in case it achieves the target levels of the indicators of continuity of supply. On the contrary, if the indicators is lower than the target levels TERNA shall pay a penalty. More in detail: the proposal submitted by TERNA that suggested to choose a value of the cost of outages that increases when ENSS decreases; the willingness to pay (WTP) principle, according to which the availability to pay for the improvement of any service decreases when the value of the continuity index increases. 5
6 In order to account for both requirements AEEG chose a fixed value of C ENSS equal to /MWh. Such a value is consistent with the result of a market survey carried out by Sintef on behalf of AEEG in 2003 among end users, aimed at determining the costs that they have to bear when an outage occurs. In Figure 3 the results of the market survey are reported (the Y axis shows the cost of energy not supplied in /kwh, while the X axis shows the different categories of end users: Domestici = Domestic, Totale Business = Total Business Users, Industria = Industry, Servizi = Services, Commercio = Commerce ). Economic impact of regulation The incentive scheme foresees a maximum incentive equal to 1.0% of the revenues of the TSO and a maximum penalty equal to 1.5%. In 2004 NGC s transmission revenues were around 900 millions (1323 millions, according to 2004 exchange rate [15]), which implied a maximum incentive of 9 millions (corresponding to 13.2 millions), and a maximum penalty of 13.5 millions (corresponding to 19.8 million). Index used to assess incentives The incentive arrangements are based on TSO s annual performance, measured using the cumulative amount of energy not supplied during the year taken into account. The target is set equal to the average annual performance calculated in the period , but excluding events that affect less than 4 customers, that according to the data published by Ofgem [15], is equal to 101 MWh per year. Incentives and penalties Figure 3: Outage costs for end users in Italy in year 2003 (source: [13]). According to Figure 3, the results of the survey have led to an average cost of interruptions equal to /MWh for domestic customers and equal to /MWh for non domestic ones. Case Study 2: Great Britain On 25 June 2004 the British Office of Gas and Electricity Markets (Ofgem) published a statement [14] about the transmission failures in London that, in its conclusions, acknowledged the need to introduce new incentive arrangements for Transmission System Operators (TSO) operating in Great Britain 2 in 2004, in order to improve reliability of supply. The main objective of such incentive arrangements is to provide Transmission System Operators with incentives aimed at maintaining and improving the reliability of transmission systems, with respect to the continuity of supply to consumers. The regulatory scheme introduced involves a performance incentive/penalty calculated on the basis of the energy not supplied due to outages occurred in the transmission grid during one year. Since 2005 Ofgem has been providing NGC with an economic incentive (or penalty) based on the index of continuity of supply. This mechanism compares the actual amount of energy not supplied with the corresponding target value. NGC will neither be rewarded nor penalized if it manages to maintain the annual energy not supplied within the range of ± 5% of the average level recorded between 1991 and 2004 (i.e. within the range MWh). NGC will be penalized for an annual level of energy not supplied that exceeds 274 MWh; on the contrary, it will be rewarded for an annual level of energy not supplied lower than 248 MWh. In Figure 4 incentives and penalties as a function of the energy not supplied for the first regulatory period are reported. The continuity of supply incentive scheme was enforced on 1 January 2005 and it was applied in the first regulatory period till 31 March 2006 (taking into account 125% of the annual target, since the period was 15 months long). The scheme was applied also in the second regulatory period, from 1/4/2006 to 31/3/2007 [15], [16]. 2 In 2004 there were three transmission licensees in Great Britain: National Grid Company (NGC) that operated in England and Wales; SP Transmission Limited (SPTL) that operated in the South of Scotland and Scottish Hydro Electric Transmission Limited (SHETL) that operated in the North of Scotland. 6
7 paid penalties. Based on this evaluation of asymmetry in grid performances it could be argued that the reason of the asymmetry of the thresholds of incentives and penalties (+1.0%; -1.5%) is the willingness to create a 0 regulation scheme without major impacts on tariffs for grid users. Figure 4: Incentives and penalties as a function of the energy not supplied (source Ofgem). According to the relation reported in Figure 4 we can estimate a value of the energy not supplied equal to /MWh, that corresponds to /MWh referred to 2004 currencies [17]. This value has been calculated as the slope of the function illustrated in Figure 4. In Table 3 a summary of the scheme for the two regulatory periods is reported. Table 3: Summary of the scheme for the two regulatory periods (source: [16]). Range of Energy Not Supplied Period 1: 1/1/2005 to 31/3/2006 (125% of annual targets) Range of incentives/penalties Reward MWh % of revenues Revenue neutrality MWh 0 Penalty >343 MWh % of revenues Period 2: 1/4/2006 to 31/3/2007 (100% of annual targets) Reward MWh 0-1.0% of revenues Revenue neutrality MWh 0 Penalty >275 MWh 0-1.5% of revenues Past performances of NGC transmission grid In Figure 5 we report the past performances of the NGC transmission grid during years and we try to assess the impact of the incentive regulation in case it were already enforced at that time. According to the performances shown in Figure 5, and according to the proposed incentive scheme, NGC would have received a financial reward for eight years. On the other hand, in the remaining 5 years NGC would have Figure 5: Energy not supplied in the England and Wales transmission system from 1991 to 2004 (source: Ofgem). Estimates of VOLL values For the period from 1991 to 2007 the survey allowed to obtain for some European countries the VOLL values shown in APPENDIX I [9]. In Table 5. we report results of a literature survey aimed at quantifying values of VOLL in different Countries. In particular we report values for Great Britain, Sweden, Norway, Netherlands, Finland, Ireland, Slovenia, Albania Bulgaria, Croatia and Romania. For each Country we specify the customer sector investigated (commercial, residential, industry ), the Value of VOLL identified by literature and the approaches used to assess them. As far as the worldwide estimates of VOLL at the horizon year 2030 are concerned, a research of University of Bath [18] suggests the values shown in Table 4. Table 4: Estimated VOLL values at year 2030 (maximum range and 90% confidence limit range) (source [18]). VOLL in US$(2007)/kWh Entire economy (all consumer s sectors) Developed countries Developing countries Maximum range 90% CL range
8 Conclusions The investigation on costs of electricity interruptions carried out in the framework of the SECURE Project focused both on the methodologies to assess the unit value of such costs and on the efforts done by Regulators in some countries to incentivize the improvement of continuity of electricity supply. The authors deem that the following conclusions can be drawn. As far as methodologies and techniques to assess the interruption costs, four types of methods are categorized in the literature: Revealed Preferences, Stated Preferences, Proxy methods, Case Study. On the basis of the analysis of relevant advantages and drawbacks and according to the existing worldwide experience, the Stated Preferences approach, based on the development of customer surveys, seems to be preferable, despite the overall costs necessary to implement it. Moreover, when an ex ante outage cost analysis is requested, as in the case of network expansion planning, power system interruption indices, such as SAIFI, SAIDI, ENS, are needed and they have to be assessed by using suitable network modelling and probabilistic methods. Due to non linearity of interruption costs w.r.t. their duration, it is suggested to prefer those methods (e.g. sequential Montecarlo probabilistic simulation) enabling to account for the statistical distribution of interruption durations rather than for their average value. Some values of VOLL available in the literature have been obtained through different approaches and computing methodologies and, moreover, they are expressed in different currencies and are referred to different years. Then, it is difficult to compare them to each other. However some general conclusions can be drawn: VOLL tends to be higher for developed countries than for developing ones, mainly depending on the respective shares of electricity to total energy consumption; such differences could be smoothed by expressing VOLL in PPP (Power Purchase Parity) rather than in US$ and current international exchange rates; in the long term (2030) it has been estimated that VOLL values (in /kwh) could lie in the intervals 5-25 and 2-5 for developed and developing countries respectively, with 90% confidence limit; the spread in VOLL values in absolute terms, and thus the risk for a high value of VOLL, is higher for more developed countries than for developing ones; in any case their distributions seem to be left-skewed so that median values are closer to lower bound than to upper bound of each relevant interval. Finally it has to be stressed that in the European context, regulation of electricity continuity of supply has started at the beginning of Currently, regulation of continuity of supply is in force in eight countries and it is based on incentives/penalties schemes. In Great Britain and in Italy regulators implemented specific schemes for transmission service continuity, too. In those countries where continuity incentive schemes have been adopted, remarkable beneficial effects on supply continuity indicators have been experienced. The content of this paper is the result of a study carried out in the frame of the SECURE project (Security of Energy Considering its Uncertainty, Risk and Economic implications) under grant agreement n SECURE is a research project funded by the European Commission under the Seventh Framework Program and coordinated by Fondazione Eni Enrico Mattei. The project aims at developing appropriate tools for evaluating the vulnerability of the EU to different energy supply risks, and for promoting the optimization of EU energy insecurity mitigation strategies. References [1]. Sanghvi A.P., Measurement of customer interruption cost/value of service for costbenefit reliability evaluation: some commonly raised issues. IEEE Transactions on Power Systems, Vol. 5, No. 4, pp , November [2]. CIGRE Task Force : Methods to consider customer interruption costs in power system analysis. Technical Brochure, August [3]. Kariuki K.K., Allan R.N., Evaluation of reliability worth and value of lost load. IEE Proc. Gener. Transm. Distrib., Vol. 143, No. 2, March [4]. ERI, Energy Research Institute, Electricity outage cost study. Chulalongkorn University, Thailand, 2001 [5]. Tol R.S.J., The value of Loss of Load. ESRI-Ireland, working paper 214, October 2007 [6]. Goett A.A., Hudson K., Train K.E., Customer s choice among retail energy suppliers: the Willingness-To-Pay for service attributes. Energy Journal, 2000, 21 (4): [7]. Carlsson F., Martinson P., Willingness to pay among Swedish households to avoid power outages: a Random Tobit Model approach. Elforsk report 05:04, February [8]. Tollefson G., Billinton R., Wacker G., Chan E. and Aweya J., A Canadian 8
9 customer survey to assess power system reliability worth. IEEE Transactions on Power Systems, Vol. 9, No. 1, February [9]. Council of European Energy Regulators CEER, Third benchmarking report on quality of electricity supply. 6 December [10]. Autorità per l Energia Elettrica e il Gas (AEEG), Decision n. 341/07 (in Italian) htm, 16 Feb [11]. Autorità per l Energia Elettrica e il Gas (AEEG), Decision n. 250/04 (in Italian) htm, 30 Dec [12]. Autorità per l Energia Elettrica e il Gas (AEEG), Decision n. 281/07 (in Italian) htm, 6 Dec [13]. Autorità per l Energia Elettrica e il Gas (AEEG), Annual Report 2005 (in Italian). 5/rel_ann2005.zip, 23 June [14]. Office of Gas and Electricity Markets (Ofgem), Statement by the Gas and Electricity Markets Authority, following an investigation into compliance by National Grid Company plc with its obligations under section 9(2)(a) of the Electricity Act 1989 and Special Licence Condition AA4.1 of its Electricity Transmission Licence in relation to a transmission failure in London and in relation to a transmission failure in Birmingham, June, Electricity transmission network reliability incentive schemes consultation document Office of Gas and Electricity Markets [15]. Office of Gas and Electricity Markets (Ofgem), NGC system operator incentive scheme from April Final proposals and statutory license consultation, 65/05, March [16]. Office of Gas and Electricity Markets (Ofgem), Electricity transmission network reliability incentive schemes. Final proposals. December 2004, London. [17]. European Central Bank, Bilateral exchange rates , [18]. WP5 Report on national and EU level estimates of energy supply externalities. Deliverable D.5.1 of Project No SES6, CASES (Cost Assessment of Sustainable Energy Systems). University of Bath (UK), 19th December [19]. Billinton R., Ali S.A., Wacker G., Reliability Worth Comparisons. IEEE Power Engineering Review, Vol. 21, May
10 APPENDIX I: ESTIMATIONS OF VALUES OF VOLL Table 5: VOLL values resulting from the literature survey ([9], [18]) Country Sector VOLL Great Britain Sweden Norway The Netherlands Residential Industrial All sectors All sectors Residential Commercial US$(2004)/kWh 4 10 US$(2004)/kWh 4 6 US$(1993)/kWh (1996)/kWh US$(2004)/kWh 49.0 US$(2004)/kWh Industry ,2 US$(2004)/kWh All sectors WTP per 1h outage: SEK(2004) Residential 1.0 US$(2004)/kWh Commercial All sectors All sectors 5.0 US$(2004)/kWh 3 4 US$(1991)/kWh 10.0 US$(2004)/kWh Adopted Approach Surveys Surveys Surveys Finland All sectors US$(1999)/kWh Survey Ireland Residential 62.0 (2007)/kWh Proxy Others 9.0 (2007)/kWh method Average 40.0 (2007)/kWh Slovenia All sectors (2007)/kWh SECI inquiry SEE Area: All sectors SECI Albania 0.5 (2007)/kWh inquiry Bulgaria 2.0 (2007)/kWh Croatia 2.56 (2007)/kWh Romania 0.8 (2007)/kWh UNMIK 0.4 (2007)/kWh Remarks Obtained from CDFs and SCDFs of 1993 survey. Expected VOLL through probability method and 1993 data. VOLL as a decreasing function of outage duration VOLL assessment by using linear production functions 10
ENERGY ADVISORY COMMITTEE. Electricity Market Review: Return on Investment
ENERGY ADVISORY COMMITTEE Electricity Market Review: Return on Investment The Issue To review the different approaches in determining the return on investment in the electricity supply industry, and to
Principles for application of international reference pricing systems
Principles for application of international reference pricing systems International reference pricing (IRP) is a widely used element of price regulation in the vast majority of EU and EFTA countries. While
Electricity, Gas and Water: The European Market Report 2014
Brochure More information from http://www.researchandmarkets.com/reports/2876228/ Electricity, Gas and Water: The European Market Report 2014 Description: The combined European annual demand for electricity,
COSTS AND BENEFITS OF THE ITALIAN SMART GAS METERING PROGRAMME
COSTS AND BENEFITS OF THE ITALIAN SMART GAS METER September 2011 IEFE- The Center for Research on Energy and Environmental Economics and Policy at Bocconi University Via Guglielmo Roentgen, 1 20136 Milano
Danish-German Energy Efficiency Summit. Cost effective policy instruments Obligations on Energy Companies
Danish-German Energy Efficiency Summit Cost effective policy instruments Obligations on Energy Companies Eoin Lees Senior Advisor RAP Europe 8 th February 2012 The Regulatory Assistance Project 48 Rue
European Distribution System Operators for Smart Grids
European Distribution System Operators for Smart Grids Integrating electricity storage in distribution grids May 2016 Introduction Since the start of mass-electrification, the electricity industry has
Implementation progress of the EASEE-gas Common Business Practices (CBP's)
1 Implementation progress of the EASEE-gas Common Business Practices (CBP's) 1. Introduction The European Association for the Streamlining of Energy Exchange-gas, or EASEE-gas, was established on March
Gas transport tariffs calculation
Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...
Report on the Possibility for Insurance Companies to Use Hedge Funds 1
CEIOPS-DOC-06/05 Rev.1 Report on the Possibility for Insurance Companies to Use Hedge Funds 1 December 2005 1. Introduction The purpose of this survey is to gather information at Community level on the
This document (E09-CEM-26-04) is an ERGEG status review of the definitions of vulnerable customer, default supplier and supplier of last resort.
Status review of the definitions of vulnerable customer, default supplier and supplier of last resort Ref: E09-CEM-26-04 16 July 2009 European Regulators Group for Electricity and Gas Contact: Council
5th CEER Benchmarking Report on the Quality of Electricity Supply
5th CEER Benchmarking Report on the Quality of Electricity Supply Energy Regulators......working through the Council of European Energy Regulators (CEER), aim to create wellfunctioning and competitive
GDP per capita, consumption per capita and comparative price levels in Europe
Economy and finance Author: Lars SVENNEBYE Statistics in focus 2008 GDP per capita, consumption per capita and comparative price levels in Europe Final results for 2005 and preliminary results for 2006
CUSTOMER OUTAGE COST EVALUATION IN ELECTRIC POWER SYSTEMS
CUSTOMER OUTAGE COST EVALUATION IN ELECTRIC POWER SYSTEMS J. Manikya Rao 1, P.V.N. Prasad 2 and G. Tulasi Ram Das 3 1 Transmission Corporation of Andhra Pradesh Ltd (APTRANSCO); Research Scholar in J.N.T.
SCENARIO OUTLOOK AND ADEQUACY FORECAST 2014-2030
SCENARIO OUTLOOK AND ADEQUACY 2 June 2014 1. Executive summary... 3 Main results load and generation... 3 Main results system adequacy... 7 Stakeholder Consultation Process on future ENTSO-E Adequacy Assessment...
Establishing Regulatory Incentives To Raise Service Quality in Electricity Networks
Establishing Regulatory Incentives To Raise Service Quality in Electricity Networks Author Rolf Adam June 2011 Cisco Internet Business Solutions Group (IBSG) Cisco IBSG 2011 Cisco and/or its affiliates.
400 billion of investment by 2020 2,400
Power Distribution in Europe Facts & Figures 400 billion of investment by 2020 2,400 electricity distribution companies 260million connected customers A EURELectric paper Electricity distribution is the
THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS
Flash Eurobarometer THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS REPORT Fieldwork: January February 2014 Publication: May 2014 This survey has been requested by the European Commission,
Paulo Santos Kim B. Wittchen. The price of energy performance certificates
Paulo Santos Kim B. Wittchen The price of energy performance certificates January 2011 www.epbd-ca.eu The price of energy performance certificates Authors: Paulo Santos Kim B. Wittchen January 2011 Executive
Reliability and security of electricity supply: the Italian blackout
Reliability and security of electricity supply: the Italian blackout Alessandro Ortis President AEEG The Regulatory Authority for Electricity and Gas of Italy 5th NARUC/CEER Energy Regulators Roundtable
Pan-European opinion poll on occupational safety and health
PRESS KIT Pan-European opinion poll on occupational safety and health Results across 36 European countries Press kit Conducted by Ipsos MORI Social Research Institute at the request of the European Agency
Status Review of End-User Price Regulation as of 1 January 2010 Ref: E10-CEM-34-03 8 September 2010
Status Review of End-User Price Regulation as of January 00 Ref: E0-CEM-34-03 8 September 00 Council of European Energy Regulators ASBL 8 rue le Titien, 000 Bruxelles Arrondissement judiciaire de Bruxelles
INNOBAROMETER 2015 - THE INNOVATION TRENDS AT EU ENTERPRISES
Eurobarometer INNOBAROMETER 2015 - THE INNOVATION TRENDS AT EU ENTERPRISES REPORT Fieldwork: February 2015 Publication: September 2015 This survey has been requested by the European Commission, Directorate-General
Summary of the Impact assessment for a 2030 climate and energy policy framework
Summary of the Impact assessment for a 2030 climate and energy policy framework Contents Overview a. Drivers of electricity prices b. Jobs and growth c. Trade d. Energy dependence A. Impact assessment
Regulatory aspects of Energy Investment Conditions in European Countries
CEER Memo on Regulatory aspects of Energy Investment Conditions in European Countries Ref: C14-IRB-23-03a 27-April-2015 Council of European Energy Regulators asbl Cours Saint-Michel 30a, Box F 1040 Brussels,
Wind energy scenarios for 2020. A report by the European Wind Energy Association - July 2014. Wind energy scenarios for 2020
A report by the European Wind Energy Association - July 2014 1 WIND ENERGY SCENARIOS FOR 2020 Content Background...3 Reasons for the new scenarios...3 Proposed new scenarios...3 Text and analysis: Jacopo
NETWORK OUTPUT MEASURES CONSULTATION
NETWORK OUTPUT MEASURES CONSULTATION Great Britain s electricity transmission network transmits high-voltage electricity from where it is produced to where it is needed throughout the country. It broadly
Regional characteristics of foreignborn people living in the United Kingdom
Regional characteristics of foreignborn people living in the United Kingdom By Alice Reid and Caroline Miller, Office for National Statistics Abstract This article examines the characteristics of foreign-born
2016 2020 Price Reset. Appendix H Service target performance incentive scheme
Appendix H Service target performance incentive scheme April 2015 Table of contents 1 SERVICE TARGET PERFORMANCE INCENTIVE SCHEME... 3 1.1 Reliability of supply targets... 3 1.2 SAIFI definition... 5 1.3
IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE?
IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? Rita Raudjärv, Ljudmilla Kuskova Energy is a resource without which it is hard to imagine life in today's world. People seem to take it for granted that energy
EBA REPORT ON THE BENCHMARKING OF DIVERSITY PRACTICES. EBA-Op-2016-10 08 July 2016
EBA REPORT ON THE BENCHMARKING OF DIVERSITY PRACTICES EBA-Op-2016-10 08 July 2016 BENCHMARKING OF DIVERSITY PRACTICES AT THE EU LEVEL Benchmarking of diversity practices at the European Union level List
Standard conditions of the Electricity Distribution Licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Statutory Consultation: 29 April 2008 SECTION A: STANDARD CONDITIONS FOR ALL ELECTRICITY
ERMInE Database. Presentation by Nils Flatabø SINTEF Energy Research. ERMInE Workshop 2 - Northern Europe Oslo, 1. November 2006
ERMInE Database Presentation by Nils Flatabø SINTEF Energy Research ERMInE Workshop 2 - Northern Europe Oslo, 1. November 26 Overview Content of the Ermine Database Electronic Questionnaire RTD&D Data
FEDERATION EUROPEENNE DES MEDECINS SALARIES EUROPEAN FEDERATION OF SALARIED DOCTORS
FEDERATION EUROPEENNE DES MEDECINS SALARIES EUROPEAN FEDERATION OF SALARIED DOCTORS Registered Office/Siège Social : 39, rue Victor Massé F-75009 Paris/France http://www.fems.net Presidency: Dr. Claude
PensionsEurope position paper on personal pension products
March 2014 PensionsEurope position paper on personal pension products About PensionsEurope PensionsEurope represents national associations of pension funds and similar institutions for workplace pensions.
CONSIDERATIONS WHEN CONSTRUCTING A FOREIGN PORTFOLIO: AN ANALYSIS OF ADRs VS ORDINARIES
THE APERIO DIFFERENCE. Authors Michael Branch, CFA Ran Leshem CONSIDERATIONS WHEN CONSTRUCTING A FOREIGN PORTFOLIO: AN ANALYSIS OF ADRs VS ORDINARIES U.S. investors can capture international equity exposure
ACCESSIBLE INFORMATION PROVISION FOR LIFELONG LEARNING KEY POLICY MESSAGES
ACCESSIBLE INFORMATION PROVISION FOR LIFELONG LEARNING KEY POLICY MESSAGES Introduction The purpose of this paper is to give an overview of the conclusions and recommendations of the European Agency for
Summary: Gas Balancing Study Austria
: On behalf of: Energie-Control Austria, Rudolfsplatz 13a, 1010 Wien, Austria Prepared by: KEMA Consulting GmbH, Kurt-Schumacher-Str. 8 53113 Bonn, Germany Bonn, May 2012 Copyright 2012, KEMA Consulting
RETAILERS ATTITUDES TOWARDS CROSS- BORDER TRADE AND CONSUMER PROTECTION
Eurobarometer RETAILERS ATTITUDES TOWARDS CROSS- BORDER TRADE AND CONSUMER PROTECTION REPORT Fieldwork: September - October 2012 Publication: June 2013 This survey has been requested by the European Commission,
The coverage rate of social benefits. Research note 9/2013
Research note 9/2013 SOCIAL SITUATION OBSERVATORY INCOME DISTRIBUTION AND LIVING CONDITIONS APPLICA (BE), EUROPEAN CENTRE FOR THE EUROPEAN CENTRE FOR SOCIAL WELFARE POLICY AND RESEARCH (AT), ISER UNIVERSITY
INTERNATIONAL COMPARISONS OF PART-TIME WORK
OECD Economic Studies No. 29, 1997/II INTERNATIONAL COMPARISONS OF PART-TIME WORK Georges Lemaitre, Pascal Marianna and Alois van Bastelaer TABLE OF CONTENTS Introduction... 140 International definitions
ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME
PRESS DOSSIER INDEX PRESS DOSSIER...1 INDEX...2 ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME...3 WHO CAN PARTICIPATE?...5 WHAT BENEFITS AND FOR WHOM?...6 HOW DOES IT WORK? STRUCTURE AND IMPLEMENTATION...7
International comparison of electricity and gas prices for commerce and industry
International comparison of electricity and gas prices for commerce and industry FINAL REPORT ON A STUDY PREPARED FOR CREG October 2011 Frontier Economics Ltd, London. October 2011 Frontier Economics
Primary law in the light of market analysis experiences, best practice and recommendations
Primary law in the light of market analysis experiences, best practice and recommendations Workshop on carrying out relevant market analysis following new EC Recommendation 4-5 June 2009 Emily O Reilly
Beer statistics. 2014 edition. The Brewers of Europe
Beer statistics 2014 edition The Brewers of Europe Beer statistics 2014 edition The Brewers of Europe Editor: Marlies Van de Walle 1st edition, October 2014 ISBN 978-2-9601382-3-8 EAN 9782960138238 1
The Quality of the Catalan and Spanish Education Systems: A Perspective from PISA
The Quality of the Catalan and Spanish Education Systems: A Perspective from PISA by Antonio Ciccone and Walter Garcia-Fontes* October 2008 * UPF AND ICREA (Ciccone) and UPF (Garcia-Fontes). Executive
Five Years of CAF 2006: From Adolescence to Maturity What Next?
Five Years of CAF 2006: From Adolescence to Maturity What Next? A study on the use, the support and the future of the Common Assessment Framework Executive Summary Patrick Staes, Nick Thijs, Ann Stoffels
FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry)
FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry) 1 Contents Executive Summary... 3 Background and Scope... 3 Company Background and Highlights... 3 Sample Risk Register...
Data Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: [email protected] Overview: The Data and Communications Company (DCC) is required
TRADING PLATFORM CLEARING AND SETTLEMENT MEMBERSHIP
TRADING PLATFORM CLEARING AND SETTLEMENT MEMBERSHIP TRADING PLATFORM Wilhelm Söderström, Nord Pool Spot Ante Mikulić, CROPEX European day ahead market A fair and transparent calculation of dayahead power
COMMITTEE OF EUROPEAN SECURITIES REGULATORS. Date: December 2009 Ref.: CESR/09-1026
COMMITTEE OF EUROPEAN SECURITIES REGULATORS Date: December 009 Ref.: CESR/09-06 Annex to CESR s technical advice on the level measures related to the format and content of Key Information Document disclosures
Energy prices in the EU Household electricity prices in the EU rose by 2.9% in 2014 Gas prices up by 2.0% in the EU
92/2015-27 May 2015 Energy prices in the EU Household electricity prices in the EU rose by 2.9% in 2014 Gas prices up by 2.0% in the EU In the European Union (EU), household electricity prices 1 rose by
Report on impacts of raised thresholds defining SMEs
Knowledge creating results--- DG Internal Market Report on impacts of raised thresholds defining SMEs Impact assessment on raising the thresholds in the 4th Company Law Directive (78/660/EEC) defining
Electricity and natural gas price statistics 1
Electricity and natural gas price statistics 1 Source: Statistics Explained (http://epp.eurostat.ec.europa.eu/statistics_explained/) - 21/11/2011-09:11:44 Electricity and natural gas price statistics Data
Panel: How broadband policy can contribute to deploy secured and universal broadband access. Presentation:
Panel: How broadband policy can contribute to deploy secured and universal broadband access Presentation: Initiatives to deploy broadband access in Europe Erik BOHLIN Chalmers University of Technology,
Retail Tariffs for Electricity in South East Europe
Retail Tariffs for Electricity in South East Europe Donald Hertzmark International Resources Group South East Europe Regional Energy Market Support Project (SEE REMS) June, 2006 Athens, Greece Retail Tariff
SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION. The current minimum training requirements for general care nurses
SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION This survey serves as a background document for the discussion of the Commission's legislative proposal to modernize the minimum requirements
Fourth study of the Solvency II standard approach
Solvency Consulting Knowledge Series Your contacts Kathleen Ehrlich Tel.: +49 (89) 38 91-27 77 E-mail: [email protected] Dr. Rolf Stölting Tel.: +49 (89) 38 91-52 28 E-mail: [email protected]
EUROPE 2020 TARGETS: RESEARCH AND DEVELOPMENT
EUROPE 2020 TARGETS: RESEARCH AND DEVELOPMENT Research, development and innovation are key policy components of the EU strategy for economic growth: Europe 2020. By fostering market take-up of new, innovative
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 25.9.2014 COM(2014) 592 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation in the period from 4 December 2011 until 31 December
Electricity & Gas Retail Markets Annual Report 2014
Electricity & Gas Retail Markets Annual Report 2014 DOCUMENT TYPE: REFERENCE: Information Paper CER/15/15112 DATE PUBLISHED: June 2015 QUERIES TO: [email protected] The Commission for Energy Regulation, The
Competition in British business energy supply markets An independent assessment for
Date: August 2015 Competition in British business energy supply markets An independent assessment for Prepared by: Anna Moss, Robert Buckley Cornwall Energy About Cornwall Energy Cornwall Energy s team
ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch
ESRI Research Note The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch Research Notes are short papers on focused research issues. They are subject
Early Childhood Education and Care
Early Childhood Education and Care Participation in education by three- and four-year-olds tends now to be high, though coverage is a third or less of the age group in several OECD countries. Early childhood
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2
UNCITRAL legislative standards on electronic communications and electronic signatures: an introduction
legislative standards on electronic communications and electronic signatures: an introduction Luca Castellani Legal Officer secretariat International harmonization of e-commerce law Model Law on Electronic
Status Review on Regulatory Aspects of Smart Metering (Electricity and Gas) as of May 2009 Ref: E09-RMF-17-03 19 October 2009
Status Review on Regulatory Aspects of Smart Metering (Electricity and Gas) as of May 2009 Ref: E09-RMF-17-03 19 October 2009 European Regulators Group for Electricity and Gas Contact: Council of European
European energy price development
Household Energy Price Index for Europe October 28th 2013 October Prices Just Released The most up-to-date picture of European household electricity and gas prices: VaasaETT and two leading European energy
The Economics of Regulated Prices: mapping the issue
The Economics of Regulated Prices: mapping the issue Catherine Waddams Centre for Competition Policy, University of East Anglia & Centre on Regulation in Europe CREG Annual Conference, Brussels, 28 th
SP Energy Networks 2015 2023 Business Plan
Environmental Discretionary Reward Scheme 1 SP Energy Networks 2015 2023 Business Plan Executive summary SP Distribution Ltd SP Manweb plc July 2013 RIIO ED1 Business Plan 2015 to 2023 2 A Message from
paragraph 3(e) introduces a new requirement upon the information licensee to provide the licensee s best view of the capacity, about the
Respondent details: Jonny Hosford, National Grid European Business Development Telephone: 07776 448231 email: [email protected] No. Condition number Condition name Page/Paragraph Ref Comments
INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS
Flash Eurobarometer INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS REPORT Fieldwork: February-March 22 Publication: June 22 This survey has been requested by the European Commission,
Electricity network services. Long-term trends in prices and costs
Electricity network services Long-term trends in prices and costs Contents Executive summary 3 Background 4 Trends in network prices and service 6 Trends in underlying network costs 11 Executive summary
DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response
DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response June 2003 Introduction Ofgem welcomes the DTI consultation on proposals for a special administrator
The River Devoll Project
EVN Hydropower Development in Albania The River Devoll Project Dr. Michael Laengle, CFO Agenda > EVN Overview and strategy > Albania Electricity market in SEE > The River Devoll project 2 Company profile
Standard conditions of the Electricity Distribution Licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Standard conditions of the Electricity Distribution Licence 30 October 2015 SECTION
SUPPLEMENTARY PROTECTION CERTIFICATES FOR MEDICINAL PRODUCTS
SUPPLEMENTARY PROTECTION CERTIFICATES FOR MEDICINAL PRODUCTS A Supplementary Protection Certificate (SPC) is an Intellectual Property right which can give up to five extra years of exclusivity after a
EXECUTIVE SUMMARY. Measuring money laundering at continental level: The first steps towards a European ambition. January 2011 EUROPEAN COMMISSION
MONEY LAUNDERING IN EUROPE Measuring money laundering at continental level: The first steps towards a European ambition EXECUTIVE SUMMARY January 2011 EUROPEAN COMMISSION DG HOME AFFAIRS FIGHT AGAINST
Rule change request. 18 September 2013
Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures
European Distribution System Operators for Smart Grids
European Distribution System Operators for Smart Grids Response to the European Commission s public consultation on a new energy market design October 2015 Executive summary The European Distribution System
This factsheet contains help and information for financial advisers who wish to advise their clients who live in Europe.
Financial Conduct Authority Factsheet No.025 Investment advisers Passporting This factsheet contains help and information for financial advisers who wish to advise their clients who live in Europe. Introduction
Trends in the European Investment Fund Industry. in the Fourth Quarter of 2015. Results for the Full Year of 2015
Quarterly Statistical Release February 2016, N 64 This release and other statistical releases are available on Efama s website (www.efama.org) Trends in the European Investment Fund Industry in the Fourth
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited
NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission PLC, Scottish Hydro Electric Transmission Limited TABLE OF CONTENTS 1.0 Purpose and Scope...2 1.1 Methodology Purpose...2 2.0
- Assessment of the application by Member States of European Union VAT provisions with particular relevance to the Mini One Stop Shop (MOSS) -
- Assessment of the application by Member States of European Union VAT provisions with particular relevance to the Mini One Stop Shop (MOSS) - BACKGROUND The information available on this website relates
Institute of Power Engineering
Research and Development Unit, Mikołaja Reja 27 Str. 80-870 Gdańsk e-mail: [email protected] ph: 058 349-81-00 fax: 058 341-76-85 GSM: 602 639 079 Reg. Number: OG-79/10 SMART METERING IN POLAND - IMPLEMENTATION
Regulation of the Energy Market in Finland, Nordic Countries and EU. Veli-Pekka Saajo Head of Economic Regulation Energy Market Authority
Regulation of the Energy Market in Finland, Nordic Countries and EU Veli-Pekka Saajo Head of Economic Regulation Energy Market Authority PROACTIVE MARKET SUPERVISION Energy Market Authority (EMV) supervises
Review of European Electricity Prices
On behalf of Union of the Electricity Industry EURELECTRIC Final Report Prepared by KEMA Consulting GmbH Bonn, Germany Disclaimer This report is based on empirical evidence and provides facts and observations