1 RUNNING 1. The threads and seal areas of the pipe and coupling must be clean, free from foreign matter or damage. Never use wire brushes for cleaning threads and seals. The couplings must be phosphated or copper plated (depends on the alloy). Pipes with an outer diameter 5" und >80 ksi need to have phosphated couplings and also phosphated pin threads. 2. When lifting the pipe into the derrick, the connections must not be damaged or soiled. Clean protectors should be applied to the threads & seals. 3. The thread compound to be used should be acc. to API RP 5A3 except when otherwise specified. Immediately before make up apply the thread dope thinly and evenly to the threads and seal areas of the coupling and pin As much as necessary, as little as possible! (see recommendation table 1). Attention: No foreign matter shall be applied to the threads or seal areas => keep the thread dope and the brushes clean. Table 1: Recommended thread compound quantity (cm³) Nom. OD 2 3/8 2 7/8 3 1/ / /2 6 5/ /8 8 5/8 9 5/8 10 3/4 11 3/4 13 3/8 BOX PIN The pin end of the pipe to be made up must be carefully lowered into the coupling, with the aid of a modern "Single Joint Weight Compensator" and "Stabbing Guide" and then be made up handtight by hand only. 5. When the pipe does not engage easily, then the alignment and compensator setup should be adjusted to better conditions. 6. The tongs of the bucking unit are not allowed to deform or seriously indent the pipe. They must also not be positioned too near to the threaded areas. 7. When making up a connection with different material grades or wall thickness, the recommended make up torque for the lower grade or wall thickness shall be used. 8. The bucking unit must not apply dangerous bending forces to the connection (the hang up line of the bucking unit shall be parallel to the centreline of hole - in working position, the tongs shall not be too far apart and the power tong lead line shall be set at the correct angle). QP 05-22E 09 1 of J.S. and A.K.
2 9. Each make up should be done using a modern computerized Torque - Turn Control system, together with a sensitive load cell and a fast dump valve. The capability of the bucking unit (size- and torque range) should be suitable for the actual running operation (e.g. do not use a 13 3/8 tong for a 5 ½ connection). The rotating speed has to be variable and shall not exceed 5 rpm until short distance to the seal area. The final rotating speed (seal area up to torque shoulder) should be 2-3 rpm. Equipment that records the torque has to be calibrated. The personnel should have experience resp. qualification in running of threaded and coupled gastight connections. This is to ensure that equipment and personnel will be able to apply the recommended torque. 10. The result of each make up is to be evaluated (the individual make ups should be recorded). A normal make up shows a shallow torque increase in the beginning of the thread make up. Then a short steep torque increase by seal make up followed by a very steep torque increase up to the required value while reaching the torque shoulder is observed. The torque (shallow area of the graph including the seal contact, shall be not less than 10 % of the minimum required torque (see sketches on page no. 5, Figure 4.2). The torque shoulder shall not be less than 50 % of the minimum required torque (see sketches on page no. 5, Figure 4.3). Should the make up not follow the described course, then the System should be controlled and optimised (correct thread doping, tong grip, angle of the load cell/lead line etc.). Connections which do not follow the correct course shall be broken out and inspected. When no damage or deformation is present, then after optimising the system the connection can be rerun. Depending on the type and set up of the bucking unit and the torque control system, the make up course can vary, for which reason it should only be evaluated by experienced resp. qualified personnel. The given torque values apply, when using API Modified Thread Compound. Should another thread dope be used, then the correction factor given by the thread dope manufacturer is to be taken into account, in agreement with TPS-Röhrenwerke OCTG. QP 05-22E 09 2 of J.S. and A.K.
3 11. At high-alloy tubes (chrome content 9%, 13% and higher, CRA = Corrosion Resistant Alloys) the following additional requirements should be considered for handling, transport and storage (suitable packaging material should be used) to avoid contact corrosion. Forklift forks should be protected with plastic, aluminium or wood Belt / sling Nylon or protected by plastic Storage separators use of hardwood or aluminium Impact protection bump rings (prevents clashing of tubes during rolling) Inspection benches plastic, aluminium or wood Drift mandrel plastic or aluminium Paint marking no fluorides permitted Mousehole (mouse hole) covered with plastic "V Door" protected with plastic or wood The additional equipment such as backup tong, power tong, tong jaws, Single Joint Weight Compensator ect. should be protected at all contact points and friction points to avoid any contact with carbon steel. QP 05-22E 09 3 of J.S. and A.K.
4 PULLING 1. Experience resp. qualification of personnel and the size- and range of the equipment used should be suitable for pulling the actual threaded and coupled gastight tubular goods. 2. The pipe to be broken out shall be correctly held by a modern "Single Joint Weight Compensator" and remove it by using a Stabbing Guide 3. The bucking unit tongs shall not deform or seriously indent the pipe. The back up tongs are to positioned on the coupling in the area, which is not to be broken out and must not look out over the end of the coupling. The power tongs must not be placed too near to the thread that is to be broken out. 4. The bucking unit must not apply dangerous bending forces to the connection (the hang up line of the bucking unit shall be parallel to the centre line of hole - in working position, tongs not too far apart, power tong lead line set at the correct angle ). 5. The connection is to be broken out until the torque has dropped. 6. The pipe is then to be disengaged (unscrewed) from hand only. Should it be difficult to unscrew the pipe by hand, then the compensator must be adjusted or the pipe correctly aligned in the derrick. 7. The disengaged pipe is to be pulled aligned and carefully out of the coupling, do not catch the threads. 8. Before the pipe is laid out on the rack or stacked the threads must be protected (eg. with thread protectors). If a thread inspection is not to be performed immediately the box thread is also to be protected. 9. When it is intended that the pipe shall be reused, then the pipe and threads shall be cleaned, neutralized, dried, greased and adequately protected during transport and storage to avoid corrosion or any kind of damage. 10. The pipes have to be stored in the stockyard with wooden layers in such way, that no damages through the fork-lift forks can occur. For stability-reasons, the timbers have to cover at least two bundles and to be available in a sufficient quantity (Range 1 at least two, Range 2 at least three, Range 3 at least five parallel timbers). The timbers of each bundle-layer have to be well aligned, so that the weight is evenly distributed from top to bottom (see sketch 2; pipe storage). QP 05-22E 09 4 of J.S. and A.K.
5 Sketch 1: Range of acceptable connection make up torque. Figure 4.1 Figure 4.2 Figure 4.3 Note : Previous issues may be used for traceability if needed, but not for application. QP 05-22E 09 5 of J.S. and A.K.
6 Sketch 2: Pipe storage QP 05-22E 09 6 of J.S. and A.K.
SEAL-LOCK HC, GS ANCILLARY SPECIFICATION
1.0 SCOPE 1.1 This document sets forth the procedure for the mill end make-up or bucking of SEAL-LOCK HC, GS casing connectors. 2.0 DEFINITION 2.1 Make-up shall be defined as the power tight application
More informationGB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION
GB Tubulars RECOMMENDED PRACTICE For Released: October, 2011 Revision: 1.0 APPROVED BY: Eugene J. Mannella, P.E., Vice President Engineering Page 2 of 10 TABLE OF CONTENTS 1.0 SCOPE... 3 2.0 APPLICABLE
More informationRunning Procedure for Casing with GB Drilling with Casing Connections
OVERVIEW This field running procedure applies to makeup of GB Drilling with Casing (GB DwC) Connections which include GB CD, GB WS, GB HB, GB CDE, GB WSE, and GB HBE Connections with GB Butt (Buttress),
More informationA =(4 WYLTP\T JVUULJ[PVUZ [\YU
A Vallourec brand Introduction Congratulations on selecting pipe threaded with VAM connections. This edition of the running book is a special one as we celebrate the 50th anniversary of VAM connections.
More information2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure
2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts
More informationTable of contents. 05. TenarisHydril 11. GENERAL GUIDELINES. 13. Quick Start Running Guidelines 15. Running and Handling Guidelines 33.
Table of contents 05 TenarisHydril 11 GENERAL GUIDELINES 13 Quick Start Running Guidelines 15 Running and Handling Guidelines 33 Technical Recommendations 35 Pipe Identification 45 Handling and Care of
More informationNORSOK Compact Flange Installation and Assembly Procedure
NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly
More informationFishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares
Fishing Jar Accessory Tools Fishing Jar The Gotco Hydraulic Fishing Jar is an easy-to-use accessory tool that assists in various operations such as fishing, testing, coring, reaming, and washover. Designed
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More information4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384.
User s Guide to: Phoenix Vessel Technology Limited 4-600, 1000 psi End port pressure vessels Model numbers: 1386, 1384. Phoenix Vessel Technology Limited Unit 2, The Old Bakery, Lower Tuffley Lane, Gloucester
More informationThe "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.
The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.com (c) 2/20/03 The David steam engine is a simple oscillating steam engine, many plans
More informationFigure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4
This specification covers the requirements for application of ELCON Drawer Series Connectors: True Hot Plug, Blind Mating Mixed Signal and Power Connectors. These connectors are designed for use in pluggable
More informationSunMor SM-V30 Solar Water Heater Installation Manual
SunMor SM-V30 Solar Water Heater Installation Manual Rev. 1.02 Congratulations on the purchase of your new SunMor SM-V30 from Nature s Comfort LLC! You must read this entire instruction manual before beginning
More information5800 Temperature Sensor Cable Assembly
5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the
More informationDrive shaft, servicing
Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,
More informationCAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.
CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT
More informationMETHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
More informationVrtné trubky Drill Pipe
Vrtné trubky Drill Pipe VRTNÉ ROURY - zušlechtěné závity - vysoká kvalita těla roury - svařeno třením - vysoká přímost vrtných tyčí - závity dle STN, API, DIN a GOST - délky dle přání zákazníka Průměr
More informationRebuild Instructions for 70001 and 70010 Transmission
Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before
More information16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F
More informationRAUFOSS EXPLOSIVE COMPRESSION FITTINGS
INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL
More informationCOATING & WRAPPING OF UNDERGROUND PIPING
CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification
More informationGK Packing System Welding Instructions
GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de Welding instructions
More informationCONGRATULATIONS! TABLE OF CONTENTS. 1 Safety Warnings 2 About Your Wheels 3 Setting Up Your Wheels 7 Care and Cleaning 8 Warranty
WHEEL MANUAL CONGRATULATIONS! Congratulations on your purchase of Oval Concepts Wheels. Developed to perform at a high level, it is important that you follow the operation and maintenance instructions
More information2006 HEADSHOK Service Video #1
LEFTY SPEED DLR DAMPING CARTRIDGE This document explains how to properly remove, disassemble, inspect, reassemble and reinstall the Lefty Speed DLR2 damping cartridge. It is a document to be used in conjunction
More information3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE
4 3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE A. Changing the Control Board B. Replacing a Heating Element C. Thermistor Replacement D. High Limit Switch Replacement E. Level Detector Replacement
More informationThe work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
More informationDANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information
Safety Safety Is Your Responsibility DANGER To avoid personal injury or death, carefully read and understand all instructions pertaining to the Anthony Liftgates product. Do not attempt to install, operate,
More informationVolkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
More informationCHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page
CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor
More informationSECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
More informationInstallation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...
Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information
More information1000-LB. TRAILER JACK OWNER S MANUAL
1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious
More informationINTELLISERV HANDBOOK. Handling and Best Practices
INTELLISERV HANDBOOK Handling and Best Practices IntelliServ Handling and Best Practices Handbook May 2013 D392005027-MKT-001 Rev. 02 Disclaimer National Oilwell Varco, Inc. and its associated and affiliated
More information300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS
Section: MOYNO 500 PUMPS Page: 1 of 8 Date: March 1, 1998 SERVICE MANUAL MOYNO 500 PUMPS 300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Mechanical Seal Models Packing Gland Models MODELS DESIGN FEATURES
More informationDive Rite 200 & 300 Bar Isolator Manifold Service Manual
Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Principal Photography and Text by Pete Nawrocky Copyright 2003 Lamartek Inc. D/B/A Dive Rite 0 Warning This manual is only to be used as a guide
More informationSTEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13
STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT
More informationPipe Valves, Fittings and Nipples Pressures to 15,200 psi
Pipe Valves, Fittings and Nipples MAXIMATOR has been designing and manufacturing high pressure equipment for more than thirty years and has a worldwide reputation for quality and reliability, backed by
More informationGAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today
More informationMachine needle shut-off nozzle type HP
Machine needle shut-off nozzle type HP pneumatically or hydraulically controlled Index of contents Chapter Page Safety instructions... 2 Installation instructions... 3 - Installation steps... 3 Initial
More information2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)
2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13) Exploded View Special Tools Required Ball joint remover, 28 mm 07MAC-SL0A202 Hub dis/assembly tool 07GAF-SD40100 Bearing driver attachment,
More informationPressure Vessel Assessment Report
Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899
More informationThese features have made Lo Torc valves the choice of high pressure plug value users, worldwide:
LO TORC Plug Valve The high value, dependable performance, and low maintenance requirements of Halliburton Lo Torc valves can help reduce overall operating costs and help cut downtime. These features have
More informationKAWAI VERTICAL PIANO REGULATION MANUAL
KAWAI VERTICAL PIANO REGULATION MANUAL Vol 1.0 2011 1 25 KAWAI MUSICAL INSTRUMENTS MFG. CO., LTD. 1 Regulation Process Index 1 Tighten Screws, Check Action, Strike Point, Hammer Blow P3 2 Keys P4 3 Travel,
More informationFJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions
FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.
More information1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.
MINI BIKE PLANS Page 1 INTRODUCTION Before starting to build your Mini-Bike, be sure that you have all the parts shown on the material list. You will note that tubing has been used in the construction.
More informationAWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller
January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:
More informationMetal Pressfitting Pipe Systems
VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing
More informationPrecision Miniature Load Cell. Models 8431, 8432 with Overload Protection
w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force
More informationMODEL 565E - 22 TON AIR/HYDRAULIC AXLE JACK
1 565AKHU HYDRAULIC 1.22 O-RING - 2 REQUIRED UNIT 1.23 O-RING COMPLETE 1.24 TEFLON O-RING 2 REQUIRED 1.3 EXTENSION SCREW 1.3A SPRING PIN 1.4 SPRING SUPPORT 1.5 SCREW BUSHING 1.6 Y SHAPE SEAL RING 1.7 HEAD
More informationService Manual Rol-Lift
R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing
More informationM113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS
M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS (SPLIT IDLER) 1 # TABLE OF CONTENTS List of parts and tools................................................3 Installation of complete kit...................................................5
More informationThe Ford Model A Water Pump
The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..
More informationSelect Radiators Installation Guide
Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall
More informationFRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware
More informationCataLoG No. weight o.d. i.d. GLaSSwaRe
Lead weights with Vikem Vinyl Coating Protect and Stabilize Expensive Glassware Stabilizes vessels in water baths and on benchtops Added insurance against tipping and possible chemical spills Closed ring
More informationAssembly and Usage Instructions
Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free
More informationInstallation Instructions
Installation Instructions S50-310 (Semi-Circular) S50-311 (Circular) Accu-Zone Infrared Control Conversion Kit for Terrazzo & Stainless Steel Classic Washfountains (Non-sectional) Table of Contents Pre-Installation
More informationDTU Animal Cart Programme
DTU Animal Cart Programme TECHNICAL 21 RELEASE PIPE AND ROLLER DONKEY CART AXLES Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)1203 523523
More informationTUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-1
Part #: HT-1 1965-82 CORVETTE O-RING CONVERSION front CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette
More informationMueller B-101 and A-3 Drilling and Tapping Machines
TM TM Mueller and Drilling and Tapping Machines A guide to selecting Mueller Equipment Mueller TM TM and Drilling and Tapping Machines When it comes to line stopping and drilling and tapping technology
More informationPVC Installation and Tapping For Potable Water and Sanitary Sewer. Handling and Installation Practices Manual
PVC Installation and Tapping For Potable Water and Sanitary Sewer Handling and Installation Practices Manual Table of Contents Introduction...1 Shipping and Handling...1 Handling and storage of pipe and
More informationLEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells
Engineering Production Sales LEAD CRYSTAL Valve-regulated lead-crystal batteries Energy storage Cells User Manual www.axcom-battery-technology.de info@.axcom-battery-technology.de Chapter 1: 1. Introduction
More informationGENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
More informationNEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE
B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY
More informationManual piston sampler...m 11
SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr
More informationFish Grader User Manual
Fish Grader User Manual 1400 Fish Grader Contents Basic Parts... 2 Set up... 3 Control board needs to be setup... 3 Adjustable legs... 3 Adjustable Inlet cute... 3 Motor... 3 Control-board... 4 Remote
More informationPAAM COMMERCIAL PRIVATE LIMITED
METAL PACKAGING We at Paam Group have been providing vast range of packaging products to our customers based on their preferences, needs and specifications. We provide all the materials required in metal
More informationCooling system components, removing and installing
Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,
More informationCLEAR-DIVISIONS VARIOFOLD
CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the
More informationABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions
4057250/8 IM-P405-16 AB Issue 8 ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Operation
More informationFigure 2. 1. Place selector lever on SAFE. If rifle is not cocked, selector lever cannot be pointed toward safe.
UNLOADING Figure 2 1. Place selector lever on SAFE. If rifle is not cocked, selector lever cannot be pointed toward safe. 2. Point rifle in a SAFE DIRECTION!! 3. Remove magazine by pressing magazine catch
More informationLK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.
LK Wallbox UNI Push Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push 16 Single Article no. 188 06 38 LK Wallbox UNI Push 20 Single Article no. 188 06 39 LK Distance template LK Wallbox UNI
More informationEnsco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.
Ensco 5002 NDT Inspection Handling Tools And Wall Thickness Survey Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.O nº 7302288 Client : Location : Ensco 5002 Project No.: NDT- IRM3019 Contents:
More information758 Heavy-duty Ratchet Guy Wire Cutter
INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product
More information14. Tools and Software
14. Tools and Software System overview: Geberit welding machine MEDIA 160 and tools... 364 System overview: Geberit welding machine UNIVERSAL 315 and tools... 365 14.1 Tools for Geberit Silent-db20 / Geberit
More informationAXLE SHAFTS - FRONT. 1998 Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION
AXLE SHAFTS - FRONT 1998 Pontiac Bonneville 1998-99 DRIVE AXLES FWD Axle Shafts - Cars - "C", "G" & "H" Bodies GM Aurora, Bonneville, Eighty Eight, LeSabre, LSS, Park Avenue, Regency, Riviera MODEL IDENTIFICATION
More informationAuto-belay Cable Replacement Process
Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationRoller Chain Coupling
Roller Chain Coupling Features 1. Simple structure A roller chain coupling consists of one duplex roller chain and two sprockets for a simplex chain. Handling is very simple as both the shafts (driving
More informationTrillium 40 Axis Spring Tensioner Wire Replacement Instructions
Trillium 40 Axis Spring Tensioner Wire Replacement Instructions 1 Overview The objective is to replace the broken axis spring tensioner wire. This requires the following tasks: 1. Remove the seismometer
More informationDo-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow
Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow This press can be built from readily available metal. Materials and dimensions need not be exactly what is shown here. Much of the material
More informationInstallation and Operating Instructions Installation Instructions for SS EPE-316L Series
INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This
More informationSERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A
PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510
More informationCLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
More informationRecommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013
Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044
More informationAMG Antrieb und Mechanik GmbH
AMG Antrieb und Mechanik GmbH Operating instructions Type SPS - single acting Summary table 1. Presentation 1.1 Description of SPS series actuators 1.2 Spring to open pneumatic actuators without manual
More informationMueller. Pipe Repair Products. A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION
Mueller Pipe Repair Products A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION MUELLER STAINLESS STEEL REPAIR CLAMPS Mueller offers a full line of stainless
More informationETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10
Color Light Streams Large Laminar Installation Manual (CLSLL) Input Power: Total Power: 12V AC 5W 4008814 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15152-00 Rev E2 9.14
More informationTrouble shooting guide
guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark
More informationfor Phoenix II-2 Human Cremation Retort
Installation Manual for Phoenix II-2 Human Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications
More informationAuxiliary Rams USERS MANUAL
Auxiliary Rams 2007 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc. warrants for one
More informationHow To Ensure Safety Of Lifting Equipment
1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES... 3 2.0 SCOPE... 3 3.0 DEFINITION OF TERMS... 3 3.2.1 Loose Lifting Tackle... 3 3.2.2 Examination... 4 3.2.3 Inspection... 4 4.0 RESPONSIBILITIES & AUTHORITIES...
More informationREPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)
Table of contents 1. Introduction... 3 1.1. Scope of use... 3 1.2. General remarks... 3 1.3. Contact Hyva... 3 1.4. Precautions... 4 1.5. Spare parts... 4 1.5.1. Prior to use... 4 1.6. Recycling and Reuse
More informationBUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.
BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof. 1155 & 4155 LCL: Applies to all freight in less than container load quantities.
More informationRIGGING HARDWARE ASME B30.26. Addresses detachable lifting hardware for lifting purposes
RIGGING HARDWARE ASME B30.26 Addresses detachable lifting hardware for lifting purposes Adjustable Hardware (Turnbuckles, Eye nuts, Swivel Hoist Rings and Eyebolts Compression Hardware (Wire Rope Clips
More informationFiberstars Lighted Laminar Flow Fountain Installation Manual
Fiberstars Lighted Laminar Flow Fountain Installation Manual 79-15037-00 REV Xx http://www.fiberstars.com Page 1 of 8 SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation
More information5.2. Overview. The better method to install solderless compression connectors on power cable
5.2 Overview The better method to install solderless compression connectors on power cable The Thomas & Betts method of installing compression connectors on power cables is designed to provide a high degree
More informationEngineering Specifications
PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press
More informationTUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-2
Part #: HT-2 1965-82 CORVETTE O-RING CONVERSION REAR CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette
More information