OCTG-Mill RUNNING AND PULLING PROCEDURE FOR TPS-TECHNISEAL TUBING AND CASING

Size: px
Start display at page:

Download "OCTG-Mill RUNNING AND PULLING PROCEDURE FOR TPS-TECHNISEAL TUBING AND CASING"

Transcription

1 RUNNING 1. The threads and seal areas of the pipe and coupling must be clean, free from foreign matter or damage. Never use wire brushes for cleaning threads and seals. The couplings must be phosphated or copper plated (depends on the alloy). Pipes with an outer diameter 5" und >80 ksi need to have phosphated couplings and also phosphated pin threads. 2. When lifting the pipe into the derrick, the connections must not be damaged or soiled. Clean protectors should be applied to the threads & seals. 3. The thread compound to be used should be acc. to API RP 5A3 except when otherwise specified. Immediately before make up apply the thread dope thinly and evenly to the threads and seal areas of the coupling and pin As much as necessary, as little as possible! (see recommendation table 1). Attention: No foreign matter shall be applied to the threads or seal areas => keep the thread dope and the brushes clean. Table 1: Recommended thread compound quantity (cm³) Nom. OD 2 3/8 2 7/8 3 1/ / /2 6 5/ /8 8 5/8 9 5/8 10 3/4 11 3/4 13 3/8 BOX PIN The pin end of the pipe to be made up must be carefully lowered into the coupling, with the aid of a modern "Single Joint Weight Compensator" and "Stabbing Guide" and then be made up handtight by hand only. 5. When the pipe does not engage easily, then the alignment and compensator setup should be adjusted to better conditions. 6. The tongs of the bucking unit are not allowed to deform or seriously indent the pipe. They must also not be positioned too near to the threaded areas. 7. When making up a connection with different material grades or wall thickness, the recommended make up torque for the lower grade or wall thickness shall be used. 8. The bucking unit must not apply dangerous bending forces to the connection (the hang up line of the bucking unit shall be parallel to the centreline of hole - in working position, the tongs shall not be too far apart and the power tong lead line shall be set at the correct angle). QP 05-22E 09 1 of J.S. and A.K.

2 9. Each make up should be done using a modern computerized Torque - Turn Control system, together with a sensitive load cell and a fast dump valve. The capability of the bucking unit (size- and torque range) should be suitable for the actual running operation (e.g. do not use a 13 3/8 tong for a 5 ½ connection). The rotating speed has to be variable and shall not exceed 5 rpm until short distance to the seal area. The final rotating speed (seal area up to torque shoulder) should be 2-3 rpm. Equipment that records the torque has to be calibrated. The personnel should have experience resp. qualification in running of threaded and coupled gastight connections. This is to ensure that equipment and personnel will be able to apply the recommended torque. 10. The result of each make up is to be evaluated (the individual make ups should be recorded). A normal make up shows a shallow torque increase in the beginning of the thread make up. Then a short steep torque increase by seal make up followed by a very steep torque increase up to the required value while reaching the torque shoulder is observed. The torque (shallow area of the graph including the seal contact, shall be not less than 10 % of the minimum required torque (see sketches on page no. 5, Figure 4.2). The torque shoulder shall not be less than 50 % of the minimum required torque (see sketches on page no. 5, Figure 4.3). Should the make up not follow the described course, then the System should be controlled and optimised (correct thread doping, tong grip, angle of the load cell/lead line etc.). Connections which do not follow the correct course shall be broken out and inspected. When no damage or deformation is present, then after optimising the system the connection can be rerun. Depending on the type and set up of the bucking unit and the torque control system, the make up course can vary, for which reason it should only be evaluated by experienced resp. qualified personnel. The given torque values apply, when using API Modified Thread Compound. Should another thread dope be used, then the correction factor given by the thread dope manufacturer is to be taken into account, in agreement with TPS-Röhrenwerke OCTG. QP 05-22E 09 2 of J.S. and A.K.

3 11. At high-alloy tubes (chrome content 9%, 13% and higher, CRA = Corrosion Resistant Alloys) the following additional requirements should be considered for handling, transport and storage (suitable packaging material should be used) to avoid contact corrosion. Forklift forks should be protected with plastic, aluminium or wood Belt / sling Nylon or protected by plastic Storage separators use of hardwood or aluminium Impact protection bump rings (prevents clashing of tubes during rolling) Inspection benches plastic, aluminium or wood Drift mandrel plastic or aluminium Paint marking no fluorides permitted Mousehole (mouse hole) covered with plastic "V Door" protected with plastic or wood The additional equipment such as backup tong, power tong, tong jaws, Single Joint Weight Compensator ect. should be protected at all contact points and friction points to avoid any contact with carbon steel. QP 05-22E 09 3 of J.S. and A.K.

4 PULLING 1. Experience resp. qualification of personnel and the size- and range of the equipment used should be suitable for pulling the actual threaded and coupled gastight tubular goods. 2. The pipe to be broken out shall be correctly held by a modern "Single Joint Weight Compensator" and remove it by using a Stabbing Guide 3. The bucking unit tongs shall not deform or seriously indent the pipe. The back up tongs are to positioned on the coupling in the area, which is not to be broken out and must not look out over the end of the coupling. The power tongs must not be placed too near to the thread that is to be broken out. 4. The bucking unit must not apply dangerous bending forces to the connection (the hang up line of the bucking unit shall be parallel to the centre line of hole - in working position, tongs not too far apart, power tong lead line set at the correct angle ). 5. The connection is to be broken out until the torque has dropped. 6. The pipe is then to be disengaged (unscrewed) from hand only. Should it be difficult to unscrew the pipe by hand, then the compensator must be adjusted or the pipe correctly aligned in the derrick. 7. The disengaged pipe is to be pulled aligned and carefully out of the coupling, do not catch the threads. 8. Before the pipe is laid out on the rack or stacked the threads must be protected (eg. with thread protectors). If a thread inspection is not to be performed immediately the box thread is also to be protected. 9. When it is intended that the pipe shall be reused, then the pipe and threads shall be cleaned, neutralized, dried, greased and adequately protected during transport and storage to avoid corrosion or any kind of damage. 10. The pipes have to be stored in the stockyard with wooden layers in such way, that no damages through the fork-lift forks can occur. For stability-reasons, the timbers have to cover at least two bundles and to be available in a sufficient quantity (Range 1 at least two, Range 2 at least three, Range 3 at least five parallel timbers). The timbers of each bundle-layer have to be well aligned, so that the weight is evenly distributed from top to bottom (see sketch 2; pipe storage). QP 05-22E 09 4 of J.S. and A.K.

5 Sketch 1: Range of acceptable connection make up torque. Figure 4.1 Figure 4.2 Figure 4.3 Note : Previous issues may be used for traceability if needed, but not for application. QP 05-22E 09 5 of J.S. and A.K.

6 Sketch 2: Pipe storage QP 05-22E 09 6 of J.S. and A.K.

SEAL-LOCK HC, GS ANCILLARY SPECIFICATION

SEAL-LOCK HC, GS ANCILLARY SPECIFICATION 1.0 SCOPE 1.1 This document sets forth the procedure for the mill end make-up or bucking of SEAL-LOCK HC, GS casing connectors. 2.0 DEFINITION 2.1 Make-up shall be defined as the power tight application

More information

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION

GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION GB Tubulars RECOMMENDED PRACTICE For Released: October, 2011 Revision: 1.0 APPROVED BY: Eugene J. Mannella, P.E., Vice President Engineering Page 2 of 10 TABLE OF CONTENTS 1.0 SCOPE... 3 2.0 APPLICABLE

More information

Running Procedure for Casing with GB Drilling with Casing Connections

Running Procedure for Casing with GB Drilling with Casing Connections OVERVIEW This field running procedure applies to makeup of GB Drilling with Casing (GB DwC) Connections which include GB CD, GB WS, GB HB, GB CDE, GB WSE, and GB HBE Connections with GB Butt (Buttress),

More information

A =(4 WYLTP\T JVUULJ[PVUZ [\YU

A =(4 WYLTP\T JVUULJ[PVUZ [\YU A Vallourec brand Introduction Congratulations on selecting pipe threaded with VAM connections. This edition of the running book is a special one as we celebrate the 50th anniversary of VAM connections.

More information

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure

2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure 2100 AD 015 0009 Mirror Elevator Ball Nut Replacement Procedure Derek Guenther 1/28/2015 Rev. Purpose The purpose of this document is to describe the procedure necessary to replace one of the ball nuts

More information

Table of contents. 05. TenarisHydril 11. GENERAL GUIDELINES. 13. Quick Start Running Guidelines 15. Running and Handling Guidelines 33.

Table of contents. 05. TenarisHydril 11. GENERAL GUIDELINES. 13. Quick Start Running Guidelines 15. Running and Handling Guidelines 33. Table of contents 05 TenarisHydril 11 GENERAL GUIDELINES 13 Quick Start Running Guidelines 15 Running and Handling Guidelines 33 Technical Recommendations 35 Pipe Identification 45 Handling and Care of

More information

NORSOK Compact Flange Installation and Assembly Procedure

NORSOK Compact Flange Installation and Assembly Procedure NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly

More information

Fishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares

Fishing Jar. Fishing Jar Accessory Tools. Assembly and Operation. Construction. Recommended Spares Fishing Jar Accessory Tools Fishing Jar The Gotco Hydraulic Fishing Jar is an easy-to-use accessory tool that assists in various operations such as fishing, testing, coring, reaming, and washover. Designed

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384.

4-600, 1000 psi. User s Guide to: Phoenix Vessel Technology Limited. End port pressure vessels Model numbers: 1386, 1384. User s Guide to: Phoenix Vessel Technology Limited 4-600, 1000 psi End port pressure vessels Model numbers: 1386, 1384. Phoenix Vessel Technology Limited Unit 2, The Old Bakery, Lower Tuffley Lane, Gloucester

More information

The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.

The DAVID Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering. The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering HTTP://WWW.HobbitEngineering.com Alan@HobbitEngineering.com (c) 2/20/03 The David steam engine is a simple oscillating steam engine, many plans

More information

Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4

Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4 This specification covers the requirements for application of ELCON Drawer Series Connectors: True Hot Plug, Blind Mating Mixed Signal and Power Connectors. These connectors are designed for use in pluggable

More information

SunMor SM-V30 Solar Water Heater Installation Manual

SunMor SM-V30 Solar Water Heater Installation Manual SunMor SM-V30 Solar Water Heater Installation Manual Rev. 1.02 Congratulations on the purchase of your new SunMor SM-V30 from Nature s Comfort LLC! You must read this entire instruction manual before beginning

More information

5800 Temperature Sensor Cable Assembly

5800 Temperature Sensor Cable Assembly 5800 Temperature Sensor Cable Assembly Removal and Replacement Instruction Sheet #60-4702-070 Revision D, January 14, 2013 Overview The 5800 has two refrigeration temperature sensors, one attached to the

More information

Drive shaft, servicing

Drive shaft, servicing Volkswagen Passat B6 - Drive shaft, servicing Стр. 1 из 41 40-7 Drive shaft, servicing Drive shafts, overview I - Assembly overview: Drive axle with CV joint VL100 40-7, Drive axle with CV joint VL100,

More information

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED. CAST IRON THE BASICS 1. DO NOT LIFT ON YOUR OWN. 2. ONLY LIFT THE RADIATOR VERTICALLY. 3. DO NOT LIFT MORE THAN 8/10 SECTIONS AT ANY ONE TIME. 4. POSITION THE RADIATOR BEFORE FINAL ASSEMBLY. 5. THIS PRODUCT

More information

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:

More information

Vrtné trubky Drill Pipe

Vrtné trubky Drill Pipe Vrtné trubky Drill Pipe VRTNÉ ROURY - zušlechtěné závity - vysoká kvalita těla roury - svařeno třením - vysoká přímost vrtných tyčí - závity dle STN, API, DIN a GOST - délky dle přání zákazníka Průměr

More information

Rebuild Instructions for 70001 and 70010 Transmission

Rebuild Instructions for 70001 and 70010 Transmission Rebuild Instructions for 70001 and 70010 Transmission Brinn, Incorporated 1615 Tech Drive Bay City, MI 48706 Telephone 989.686.8920 Fax 989.686.6520 www.brinninc.com Notice Read all instructions before

More information

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F

More information

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS INSTRUCTION MANUAL FOR RAUFOSS EXPLOSIVE COMPRESSION FITTINGS Box 7 2831 Raufoss Norway Tlf.: +47 61 15 17 87 Fax: +47 61 15 25 56 25 January 2013, rev 2 Available on www.vpmetall.no Page 1 CONTENTS GENERAL

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

GK Packing System Welding Instructions

GK Packing System Welding Instructions GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de Welding instructions

More information

CONGRATULATIONS! TABLE OF CONTENTS. 1 Safety Warnings 2 About Your Wheels 3 Setting Up Your Wheels 7 Care and Cleaning 8 Warranty

CONGRATULATIONS! TABLE OF CONTENTS. 1 Safety Warnings 2 About Your Wheels 3 Setting Up Your Wheels 7 Care and Cleaning 8 Warranty WHEEL MANUAL CONGRATULATIONS! Congratulations on your purchase of Oval Concepts Wheels. Developed to perform at a high level, it is important that you follow the operation and maintenance instructions

More information

2006 HEADSHOK Service Video #1

2006 HEADSHOK Service Video #1 LEFTY SPEED DLR DAMPING CARTRIDGE This document explains how to properly remove, disassemble, inspect, reassemble and reinstall the Lefty Speed DLR2 damping cartridge. It is a document to be used in conjunction

More information

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE 4 3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE A. Changing the Control Board B. Replacing a Heating Element C. Thermistor Replacement D. High Limit Switch Replacement E. Level Detector Replacement

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information

DANGER DANGER. General Information. Safety Is Your Responsibility. Ordering Parts. Contact Information Safety Safety Is Your Responsibility DANGER To avoid personal injury or death, carefully read and understand all instructions pertaining to the Anthony Liftgates product. Do not attempt to install, operate,

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

1000-LB. TRAILER JACK OWNER S MANUAL

1000-LB. TRAILER JACK OWNER S MANUAL 1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious

More information

INTELLISERV HANDBOOK. Handling and Best Practices

INTELLISERV HANDBOOK. Handling and Best Practices INTELLISERV HANDBOOK Handling and Best Practices IntelliServ Handling and Best Practices Handbook May 2013 D392005027-MKT-001 Rev. 02 Disclaimer National Oilwell Varco, Inc. and its associated and affiliated

More information

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS

300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Section: MOYNO 500 PUMPS Page: 1 of 8 Date: March 1, 1998 SERVICE MANUAL MOYNO 500 PUMPS 300 SERIES 331, 332, 333, 344, 356 AND 367 MODELS Mechanical Seal Models Packing Gland Models MODELS DESIGN FEATURES

More information

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual

Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Dive Rite 200 & 300 Bar Isolator Manifold Service Manual Principal Photography and Text by Pete Nawrocky Copyright 2003 Lamartek Inc. D/B/A Dive Rite 0 Warning This manual is only to be used as a guide

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

Pipe Valves, Fittings and Nipples Pressures to 15,200 psi

Pipe Valves, Fittings and Nipples Pressures to 15,200 psi Pipe Valves, Fittings and Nipples MAXIMATOR has been designing and manufacturing high pressure equipment for more than thirty years and has a worldwide reputation for quality and reliability, backed by

More information

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today

More information

Machine needle shut-off nozzle type HP

Machine needle shut-off nozzle type HP Machine needle shut-off nozzle type HP pneumatically or hydraulically controlled Index of contents Chapter Page Safety instructions... 2 Installation instructions... 3 - Installation steps... 3 Initial

More information

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13)

2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13) 2008 ACCORD - Front Knuckle/Hub/Wheel Bearing Replacement (page 18-13) Exploded View Special Tools Required Ball joint remover, 28 mm 07MAC-SL0A202 Hub dis/assembly tool 07GAF-SD40100 Bearing driver attachment,

More information

Pressure Vessel Assessment Report

Pressure Vessel Assessment Report Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899

More information

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide:

These features have made Lo Torc valves the choice of high pressure plug value users, worldwide: LO TORC Plug Valve The high value, dependable performance, and low maintenance requirements of Halliburton Lo Torc valves can help reduce overall operating costs and help cut downtime. These features have

More information

KAWAI VERTICAL PIANO REGULATION MANUAL

KAWAI VERTICAL PIANO REGULATION MANUAL KAWAI VERTICAL PIANO REGULATION MANUAL Vol 1.0 2011 1 25 KAWAI MUSICAL INSTRUMENTS MFG. CO., LTD. 1 Regulation Process Index 1 Tighten Screws, Check Action, Strike Point, Hammer Blow P3 2 Keys P4 3 Travel,

More information

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions

FJ2. 2 Ton Trolley Floor Jack Assembly & Operating Instructions FJ2 2 Ton Trolley Floor Jack Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT. This manual provides important information on proper operation & maintenance.

More information

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

1. Lay out 2 pieces of 7/8 tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1. MINI BIKE PLANS Page 1 INTRODUCTION Before starting to build your Mini-Bike, be sure that you have all the parts shown on the material list. You will note that tubing has been used in the construction.

More information

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:

More information

Metal Pressfitting Pipe Systems

Metal Pressfitting Pipe Systems VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing

More information

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force

More information

MODEL 565E - 22 TON AIR/HYDRAULIC AXLE JACK

MODEL 565E - 22 TON AIR/HYDRAULIC AXLE JACK 1 565AKHU HYDRAULIC 1.22 O-RING - 2 REQUIRED UNIT 1.23 O-RING COMPLETE 1.24 TEFLON O-RING 2 REQUIRED 1.3 EXTENSION SCREW 1.3A SPRING PIN 1.4 SPRING SUPPORT 1.5 SCREW BUSHING 1.6 Y SHAPE SEAL RING 1.7 HEAD

More information

Service Manual Rol-Lift

Service Manual Rol-Lift R 2000 Service Manual Rol-Lift Series: T and E Developed by Generic Parts Service This manual is intended for basic service and maintenance of the Rol-Lift pallet jack. The pallet jacks you are servicing

More information

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS

M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS SOUCY TRACK SYSTEM 04-M113-1ENS (SPLIT IDLER) Litho d in Canada 1 04-M113-1ENS M113 VEHICLE FAMILY RUBBER TRACK INSTALLATION INSTRUCTIONS (SPLIT IDLER) 1 # TABLE OF CONTENTS List of parts and tools................................................3 Installation of complete kit...................................................5

More information

The Ford Model A Water Pump

The Ford Model A Water Pump The Ford Model A Water Pump George Washington Chapter, Inc. 3903 Old Lee Highway Fairfax, VA 22030 1 Table of Contents Introduction/Specifications.. 3 1. Water Pump Inspection and Removal. 4 a. Removal..

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER

FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 FRONT BUMPER INSTALLATION INSTRUCTIONS 2007-2011 DODGE / MERCEDES SPRINTER Please read before beginning Stainless steel hardware

More information

CataLoG No. weight o.d. i.d. GLaSSwaRe

CataLoG No. weight o.d. i.d. GLaSSwaRe Lead weights with Vikem Vinyl Coating Protect and Stabilize Expensive Glassware Stabilizes vessels in water baths and on benchtops Added insurance against tipping and possible chemical spills Closed ring

More information

Assembly and Usage Instructions

Assembly and Usage Instructions Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free

More information

Installation Instructions

Installation Instructions Installation Instructions S50-310 (Semi-Circular) S50-311 (Circular) Accu-Zone Infrared Control Conversion Kit for Terrazzo & Stainless Steel Classic Washfountains (Non-sectional) Table of Contents Pre-Installation

More information

DTU Animal Cart Programme

DTU Animal Cart Programme DTU Animal Cart Programme TECHNICAL 21 RELEASE PIPE AND ROLLER DONKEY CART AXLES Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)1203 523523

More information

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-1

TUTORIAL. REbUILdING. front CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-1 Part #: HT-1 1965-82 CORVETTE O-RING CONVERSION front CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette

More information

Mueller B-101 and A-3 Drilling and Tapping Machines

Mueller B-101 and A-3 Drilling and Tapping Machines TM TM Mueller and Drilling and Tapping Machines A guide to selecting Mueller Equipment Mueller TM TM and Drilling and Tapping Machines When it comes to line stopping and drilling and tapping technology

More information

PVC Installation and Tapping For Potable Water and Sanitary Sewer. Handling and Installation Practices Manual

PVC Installation and Tapping For Potable Water and Sanitary Sewer. Handling and Installation Practices Manual PVC Installation and Tapping For Potable Water and Sanitary Sewer Handling and Installation Practices Manual Table of Contents Introduction...1 Shipping and Handling...1 Handling and storage of pipe and

More information

LEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells

LEAD CRYSTAL. User Manual. Valve-regulated lead-crystal batteries Energy storage Cells Engineering Production Sales LEAD CRYSTAL Valve-regulated lead-crystal batteries Energy storage Cells User Manual www.axcom-battery-technology.de info@.axcom-battery-technology.de Chapter 1: 1. Introduction

More information

GENERAL RUBBER LINING PRINCIPLES

GENERAL RUBBER LINING PRINCIPLES GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface

More information

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE

NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY

More information

Manual piston sampler...m 11

Manual piston sampler...m 11 SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr

More information

Fish Grader User Manual

Fish Grader User Manual Fish Grader User Manual 1400 Fish Grader Contents Basic Parts... 2 Set up... 3 Control board needs to be setup... 3 Adjustable legs... 3 Adjustable Inlet cute... 3 Motor... 3 Control-board... 4 Remote

More information

PAAM COMMERCIAL PRIVATE LIMITED

PAAM COMMERCIAL PRIVATE LIMITED METAL PACKAGING We at Paam Group have been providing vast range of packaging products to our customers based on their preferences, needs and specifications. We provide all the materials required in metal

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,

More information

CLEAR-DIVISIONS VARIOFOLD

CLEAR-DIVISIONS VARIOFOLD CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the

More information

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions

ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 4057250/8 IM-P405-16 AB Issue 8 ABV20 Air Actuated Boiler Blowdown Valve Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Operation

More information

Figure 2. 1. Place selector lever on SAFE. If rifle is not cocked, selector lever cannot be pointed toward safe.

Figure 2. 1. Place selector lever on SAFE. If rifle is not cocked, selector lever cannot be pointed toward safe. UNLOADING Figure 2 1. Place selector lever on SAFE. If rifle is not cocked, selector lever cannot be pointed toward safe. 2. Point rifle in a SAFE DIRECTION!! 3. Remove magazine by pressing magazine catch

More information

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X.

LK Wallbox UNI Push. Assembly. Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push Only intended for LK PE-X Universal Pipe X. LK Wallbox UNI Push 16 Single Article no. 188 06 38 LK Wallbox UNI Push 20 Single Article no. 188 06 39 LK Distance template LK Wallbox UNI

More information

Ensco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.

Ensco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P. Ensco 5002 NDT Inspection Handling Tools And Wall Thickness Survey Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.O nº 7302288 Client : Location : Ensco 5002 Project No.: NDT- IRM3019 Contents:

More information

758 Heavy-duty Ratchet Guy Wire Cutter

758 Heavy-duty Ratchet Guy Wire Cutter INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product

More information

14. Tools and Software

14. Tools and Software 14. Tools and Software System overview: Geberit welding machine MEDIA 160 and tools... 364 System overview: Geberit welding machine UNIVERSAL 315 and tools... 365 14.1 Tools for Geberit Silent-db20 / Geberit

More information

AXLE SHAFTS - FRONT. 1998 Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION

AXLE SHAFTS - FRONT. 1998 Pontiac Bonneville MODEL IDENTIFICATION DESCRIPTION & OPERATION TROUBLE SHOOTING REMOVAL & INSTALLATION AXLE SHAFTS - FRONT 1998 Pontiac Bonneville 1998-99 DRIVE AXLES FWD Axle Shafts - Cars - "C", "G" & "H" Bodies GM Aurora, Bonneville, Eighty Eight, LeSabre, LSS, Park Avenue, Regency, Riviera MODEL IDENTIFICATION

More information

Auto-belay Cable Replacement Process

Auto-belay Cable Replacement Process Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Roller Chain Coupling

Roller Chain Coupling Roller Chain Coupling Features 1. Simple structure A roller chain coupling consists of one duplex roller chain and two sprockets for a simplex chain. Handling is very simple as both the shafts (driving

More information

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions Trillium 40 Axis Spring Tensioner Wire Replacement Instructions 1 Overview The objective is to replace the broken axis spring tensioner wire. This requires the following tasks: 1. Remove the seismometer

More information

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow

Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow Do-It-Yourself- Hydraulic Press Make Your Own, by Marshel Rossow This press can be built from readily available metal. Materials and dimensions need not be exactly what is shown here. Much of the material

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12 DUAL BEVEL COMPOUND MITER SAW B27A PAGE 1 OF 6 BASE ASSEMBLY 00 0 EXAMPLE: Component Parts (Small #) Are Included When Ordering The Assembly (Large #). SPECIFY CATALOG NO. AND NO. WHEN ORDERING PARTS 1 02-80-0050 Thrust Bearing (1) 2 05-80-0510

More information

CLEAR-DIVISIONS CENTERFOLD

CLEAR-DIVISIONS CENTERFOLD CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in

More information

Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013

Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013 Recommended Minimum Training Guidelines for PE Pipe Butt Fusion Joining Operators for Municipal and Industrial Projects TN-42 / March 2013 105 Decker Court, Suite 825, Irving, TX 75062 P: 469-499-1044

More information

AMG Antrieb und Mechanik GmbH

AMG Antrieb und Mechanik GmbH AMG Antrieb und Mechanik GmbH Operating instructions Type SPS - single acting Summary table 1. Presentation 1.1 Description of SPS series actuators 1.2 Spring to open pneumatic actuators without manual

More information

Mueller. Pipe Repair Products. A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION

Mueller. Pipe Repair Products. A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION Mueller Pipe Repair Products A complete selection for all types of gas lines... all from a single source. GAS PRODUCTS DIVISION MUELLER STAINLESS STEEL REPAIR CLAMPS Mueller offers a full line of stainless

More information

ETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10

ETL listed for installations within 5 ft. (1.5M) of outer edge of water www.srsmith.com 79-15152-00 Rev E2 9.14 Page 1 of 10 Color Light Streams Large Laminar Installation Manual (CLSLL) Input Power: Total Power: 12V AC 5W 4008814 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15152-00 Rev E2 9.14

More information

Trouble shooting guide

Trouble shooting guide guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark

More information

for Phoenix II-2 Human Cremation Retort

for Phoenix II-2 Human Cremation Retort Installation Manual for Phoenix II-2 Human Cremation Retort Please Read Carefully Before Installing. Any Questions? Please Call! Failure to install properly may VOID your warranty. NOTICE: Specifications

More information

Auxiliary Rams USERS MANUAL

Auxiliary Rams USERS MANUAL Auxiliary Rams 2007 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc. warrants for one

More information

How To Ensure Safety Of Lifting Equipment

How To Ensure Safety Of Lifting Equipment 1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES... 3 2.0 SCOPE... 3 3.0 DEFINITION OF TERMS... 3 3.2.1 Loose Lifting Tackle... 3 3.2.2 Examination... 4 3.2.3 Inspection... 4 4.0 RESPONSIBILITIES & AUTHORITIES...

More information

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL)

REPAIR INSTRUCTIONS UNDER BODY CYLINDER (UM, UL) Table of contents 1. Introduction... 3 1.1. Scope of use... 3 1.2. General remarks... 3 1.3. Contact Hyva... 3 1.4. Precautions... 4 1.5. Spare parts... 4 1.5.1. Prior to use... 4 1.6. Recycling and Reuse

More information

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof.

BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof. BUILDING MATERIALS, Wood, Laminated (Page 1 of 3) Viz.: Rafters; Arches; Beams; Joists; Timbers or Planks, structural or roof. 1155 & 4155 LCL: Applies to all freight in less than container load quantities.

More information

RIGGING HARDWARE ASME B30.26. Addresses detachable lifting hardware for lifting purposes

RIGGING HARDWARE ASME B30.26. Addresses detachable lifting hardware for lifting purposes RIGGING HARDWARE ASME B30.26 Addresses detachable lifting hardware for lifting purposes Adjustable Hardware (Turnbuckles, Eye nuts, Swivel Hoist Rings and Eyebolts Compression Hardware (Wire Rope Clips

More information

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Fiberstars Lighted Laminar Flow Fountain Installation Manual Fiberstars Lighted Laminar Flow Fountain Installation Manual 79-15037-00 REV Xx http://www.fiberstars.com Page 1 of 8 SAVE THESE DIRECTIONS! These directions are provided to ensure the proper installation

More information

5.2. Overview. The better method to install solderless compression connectors on power cable

5.2. Overview. The better method to install solderless compression connectors on power cable 5.2 Overview The better method to install solderless compression connectors on power cable The Thomas & Betts method of installing compression connectors on power cables is designed to provide a high degree

More information

Engineering Specifications

Engineering Specifications PUREFLOW PEX PRODUCTS PART 1 GENERAL 1.1 SUMMARY 1.1.1 This specification covers Branch & Main, Parallel Water Distribution Systems (MANABLOC), Cross-linked Polyethylene tubing and fittings using PEX Press

More information

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-2

TUTORIAL. REbUILdING. REAR CALIpER O-RING CONVERSION CORVETTE 1965-82. Part #: HT-2 Part #: HT-2 1965-82 CORVETTE O-RING CONVERSION REAR CALIpER REbUILdING TUTORIAL Choosing a Brake Caliper Rebuild Kit Standard Lip Seals vs. O-Ring Seals Lip seal design seals are used on 1965-1982 Corvette

More information