Ensco NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.

Size: px
Start display at page:

Download "Ensco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P."

Transcription

1 Ensco 5002 NDT Inspection Handling Tools And Wall Thickness Survey Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.O nº

2 Client : Location : Ensco 5002 Project No.: NDT- IRM3019 Contents: NDT Inspection Handling Tools and Wall Thickness Survey 1. Executive Summary Report 2. Bail Link 3. Bowl Master Bushing 4. Drill Collar and casing slings 5. Drill Pipe drilling Tong 6. Drill Pipe Slips 7. Elevator 8. Giraffe s parts Defect on Shear Pin 9. Pedestal Elevator 10. ROV Pannel 11. Slips Wall Thickness Survey 12. Choke line 13. Kill Line IRM Services Documentation 14. Personnel Qualification 15. Equipment Certification 16. IRM Services Documentation PREPARED BY: Francis Lima POSITION: Supervisor SIGNATURE: REVIEWED BY: Felipe Oliveira POSITION: Report Analyst SIGNATURE: APPROVED BY: Barry Newman POSITION: Operations Manager SIGNATURE: DATE: November, 2011 DATE: November, 2011 DATE: November, 2011

3 Executive Summary Report Client: Ensco Location: Ensco 5002 Project: Technicians on Board: Client Representative: NDT Inspection Handling Tools and Wall Thickness Survey Francis Lima Royden Lown (Maintenance Coordinator.) Dates of Project: From October 15 th of 2011 to October 29 th of Project Work scope: IRM Services was requested to carry out a General NDT Inspection Handling Tools and Wall Thickness Survey. These services were carried out during the period October 15th of 2011 through October 29th of IRM Services would like to take this opportunity to thank all crew involved for their assistance during this busy period onboard. Project Summary: The General NDT Inspection was carried out on Handling Tools in all the equipments of Drill Tool Rig, Pieces of the " Giraffe " and Inspection of Wall Thickness Survey in the lines of Chock and Kill Line a Photograph Report. All of the services described above were carried out according to the client's needs, manufacturer's procedures or certifying authority specifications. Summary of Defective Items: It was found a defect on Shear Pin as described in report MT-IRM3019F-087 and in the contents.. Signed on Behalf of IRM Services: Francis Lima NDT Supervisor Date: October 29 th, 2011.

4 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-066 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bails Link (Top Drive). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : 815L and 815R Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011

5 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-066 Client : Ensco Details : Magnetic Particle Inspection Item: Bails Link (Top Drive). Serial No: 815L and 815R SN: 815L SN: 815R Date : 21/10/2011

6 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-001 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Bowl Master Bushing 37 ½. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : 1 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 20/10/2011

7 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-001 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 1 Date : 20/10/2011

8 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-002 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 2 Date : 20/10/2011

9 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-003 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 3 Date : 20/10/2011

10 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-004 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bowl Master Bushing 2 Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : P/16609 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011

11 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-004 Client : Ensco Item: Bowl Master Bushing 2 Details : Magnetic Particle Inspection Serial No: P/16609 Date : 21/10/2011

12 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-005 Client : Ensco Item: Bowl Master Bushing 1 Details : Magnetic Particle Inspection Serial No: P/N 6610 Date : 21/10/2011

13 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-006 Client : Ensco Item: Bowl Master Bushing 3 Details : Magnetic Particle Inspection Serial No: CR Date : 21/10/2011

14 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-069 Client : Ensco Item: Bowl Master Bushing Details : Magnetic Particle Inspection Serial No: BW 2 Date : 24/10/2011

15 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-070 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bowl Master Bushing Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 30 Quantity : 1 Identification / Serial No : BW 1 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. Corrosion in lateral of the equipment. Recommendations. No acceptable to Specification. Continuation attached : Yes Date : 24/10/2011

16 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-070 Client : Ensco Item: Bowl Master Bushing 2 Details : Corrosion in lateral of the equipment Serial No: BW 1 Date : 24/10/2011

17 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-007 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Casing Slips CMS XL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 20 Quantity : 26 Segments Identification / Serial No : N 21 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 19/10/2011

18 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-007 Client : Ensco Item: Casing Slips CMS XL. Details : Magnetic Particle Inspection Serial No: N 21 Date : 19/10/2011

19 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-008 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Drill Collar Slips DCS-R. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 ½ to 7 Quantity : 09 Segments Identification / Serial No : N6 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011

20 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-008 Client : Ensco Details : Magnetic Particle Inspection Item: Drill Collar Slips DCS-R. Serial No: N6 Date : 21/10/2011

21 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-009 Client : Ensco Item: Drill Collar Slips 9 ½ 12 Segments. Details : Magnetic Particle Inspection Serial No: N 13 Date : 21/10/2011

22 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-010 Client : Ensco Item: Casing Slips CMS-XL 13 3/8 18 Segments. Details : Magnetic Particle Inspection Serial No: N 24 Date : 21/10/2011

23 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-011 Client : Ensco Item: Casing Slips CMS-XL 9 5/8 14 Segments. Details : Magnetic Particle Inspection Serial No: N 23 Date : 21/10/2011

24 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-012 Client : Ensco Item: Drill Collar 9 1/2. Details : Magnetic Particle Inspection Serial No: XJ 51 Date : 21/10/2011

25 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-013 Client : Ensco Item: Drill Collar 6. Details : Magnetic Particle Inspection Serial No: 3504 Date : 21/10/2011

26 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-014 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Drill Collar Slips DCSL 6 ¾ to 8 ¼. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 6 ¾ to 8 ¼. Quantity : 11 Segments Identification / Serial No : N 10 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. Deformations in the 2nd and 3rd Segment of the Equipment. Recommendations. To remove the 2nd and 3rd Segment of the Equipment and to place 2 new segments. Continuation attached : Yes Date : 21/10/2011

27 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-014 Client : Ensco Details : Deformations in the 2nd and 3rd Segments. Item: Drill Collar Slips DCSL 6 ¾ to 8 ¼. Serial No: N 10 Date : 21/10/2011

28 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-015 Client : Ensco Item: Drill Collar Slips DCS-S 4 to 4 7/8 07 Seg. Details : Magnetic Particle Inspection Serial No: N 12 Date : 22/10/2011

29 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-016 Client : Ensco Item: Drill Pipe Slips Wooley 4 ½ 03 Seg. Details : Magnetic Particle Inspection Serial No: N 09 Date : 22/10/2011

30 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-017 Client : Ensco Item: Drill Collar Slips DCS-L 8 ½ to Seg. Details : Magnetic Particle Inspection Serial No: N 14 Date : 22/10/2011

31 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-018 Client : Ensco Item: Drill Collar Slips DCS-L 6 ¾ to 8 ¼ 11 Seg. Details : Magnetic Particle Inspection Serial No: N 15 Date : 22/10/2011

32 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-019 Client : Ensco Item: Drill Collar Slips 12 Seg. Details : Magnetic Particle Inspection Serial No: N 25 Date : 22/10/2011

33 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-020 Client : Ensco Item: Drill Pipe Slips 07 Seg. Details : Magnetic Particle Inspection Serial No: N 11 Date : 22/10/2011

34 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-021 Client : Ensco Item: Drill Collar Slips 15 Seg. Details : Magnetic Particle Inspection Serial No: N 26 Date : 22/10/2011

35 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-022 Client : Ensco Item: Drill Collar Slips 16 Seg. Details : Magnetic Particle Inspection Serial No: N 27 Date : 22/10/2011

36 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-023 Client : Ensco Item: Drill Collar 06 Seg. Details : Magnetic Particle Inspection Serial No: VM 13 Date : 22/10/2011

37 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-024 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Drill Pipe Drilling Tong Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : DT 54 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 20/10/2011

38 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-024 Client : Ensco Item: Drill Pipe Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 54 Date : 20/10/2011

39 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-025 Client : Ensco Item: Drill Pipe Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 55 Date : 20/10/2011

40 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-068 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Manual Drill Pipe Tong HT 65. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : DT 50 and DT 51 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 24/10/2011

41 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-068 Client : Ensco Item: Manual Drill Pipe Tong HT 65. Details : Magnetic Particle Inspection Serial No: DT 50 and DT 51 SN: DT 50 SN: DT 51 Date : 24/10/2011

42 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-072 Client : Ensco Item: Manual Casing Tong AAX. Details : Magnetic Particle Inspection Serial No: DT 41 Date : 24/10/2011

43 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-073 Client : Ensco Item: Manual Casing Tong AAX. Details : Magnetic Particle Inspection Serial No: DT 42 Date : 24/10/2011

44 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-075 Client : Ensco Item: Casing Manual Tong HT 50. Details : Magnetic Particle Inspection Serial No: DT 43 Date : 27/10/2011

45 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-076 Client : Ensco Item: Casing Manual Tong HT 50. Details : Magnetic Particle Inspection Serial No: DT 44 Date : 27/10/2011

46 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-090 Client : Ensco Details : Magnetic Particle Inspection Item: Mordents HT-10. Serial No: TC159695, TC162089, TC and TC Sn:TC Sn:TC Sn:TC Sn:TC Date : 28/10/2011

47 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-091 Client : Ensco Item: Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 53 Date : 28/10/2011

48 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-092 Client : Ensco Item: Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 52 Date : 28/10/2011

49 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-026 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Dill Pipe Slips SDXL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 01 Identification / Serial No : N 31 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 19/10/2011

50 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-026 Client : Ensco Item: Dill Pipe Slips SDXL 5. Details : Magnetic Particle Inspection Serial No: N 31 Date : 19/10/2011

51 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-027 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Dill Pipe Slips SDXL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 01 Identification / Serial No : N 7 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011

52 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-027 Client : Ensco Item: Dill Pipe Slips SDXL. Details : Magnetic Particle Inspection Serial No: N 7 Date : 21/10/2011

53 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-028 Client : Ensco Item: Dill Pipe Slips SDML 3 ½. Details : Magnetic Particle Inspection Serial No: N 18 Date : 21/10/2011

54 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-029 Client : Ensco Item: Dill Pipe Slips SDXL 5 ½. Details : Magnetic Particle Inspection Serial No: N 5 Date : 23/10/2011

55 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-074 Client : Ensco Item: Dill Pipe Slips SDML 3 ½. Details : Magnetic Particle Inspection Serial No: N 4 Date : 25/10/2011

56 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-075 Client : Ensco Item: Dill Pipe Slips. Details : Magnetic Particle Inspection Serial No: VM 34 Date : 25/10/2011

57 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-076 Client : Ensco Item: Dill Collar Slips 9 Segments. Details : Magnetic Particle Inspection Serial No: N 1 Date : 25/10/2011

58 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-084 Client : Ensco Item: Dill Pipe Slips. Details : Magnetic Particle Inspection Serial No: N 2 Date : 27/10/2011

59 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-085 Client : Ensco Item: Dill Pipe Slips SDXL 5. Details : Magnetic Particle Inspection Serial No: N 30 Date : 27/10/2011

60 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-030 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Single Joint Elevator SJL Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : EL 19 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 18/10/2011

61 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-030 Client : Ensco Item: Single Joint Elevator SJL Details : Magnetic Particle Inspection Serial No: EL 19 Date : 18/10/2011

62 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-031 Client : Ensco Item: Single Joint Elevator 20. Details : Magnetic Particle Inspection Serial No: EL 28 Date : 18/10/2011

63 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-032 Client : Ensco Item: Single Joint Elevator SJL Details : Magnetic Particle Inspection Serial No: EL 125 Date : 18/10/2011

64 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-033 Client : Ensco Item: Single Joint Elevator SJL - 7. Details : Magnetic Particle Inspection Serial No: EL 21 Date : 18/10/2011

65 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-034 Client : Ensco Item: Single Joint Elevator SJL 3 1/2. Details : Magnetic Particle Inspection Serial No: EL 300 Date : 18/10/2011

66 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-035 Client : Ensco Item: Single Joint Elevator SJL 7. Details : Magnetic Particle Inspection Serial No: EL 23 Date : 19/10/2011

67 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-074 Client : Ensco Item: Slips Elevator. Details : Magnetic Particle Inspection Serial No: TEL 15 Date : 19/10/2011

68 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-036 Client : Ensco Item: Slips Elevator YT 75 Ton. Details : Magnetic Particle Inspection Serial No: EL 13 Date : 19/10/2011

69 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-037 Client : Ensco Item: Slips Elevator YT 75 Ton. Details : Magnetic Particle Inspection Serial No: EL 14 Date : 19/10/2011

70 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-038 Client : Ensco Item: Side Door Csg Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 2 Date : 19/10/2011

71 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-039 Client : Ensco Item: Elevator Drill Pipe Air Oper Ton. Details : Magnetic Particle Inspection Serial No: EL 11 Date : 19/10/2011

72 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-040 Client : Ensco Item: Elevator 3 ½ DP MGG Ton. Details : Magnetic Particle Inspection Serial No: EL 10 Date : 18/10/2011

73 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-041 Client : Ensco Item: Elevator Drill Pipe 3 ½. Details : Magnetic Particle Inspection Serial No: EL 5 Date : 19/10/2011

74 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-042 Client : Ensco Item: Elevator Drill Pipe 3 ½. Details : Magnetic Particle Inspection Serial No: EL 7 Date : 19/10/2011

75 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-043 Client : Ensco Item: Side Door Csg Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 2 Date : 19/10/2011

76 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-044 Client : Ensco Item: Side Door Elevator 20. Details : Magnetic Particle Inspection Serial No: EL 119 Date : 19/10/2011

77 Customer : Ensco Location : Ensco P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-045 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Elevator Drill Pipe. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 1 Identification / Serial No : EL 30 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011

78 Continuation Report Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-045 Client : Ensco Item: Elevator Drill Pipe 5. Details : Magnetic Particle Inspection Serial No: EL 30 Date : 21/10/2011

79 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-046 Client : Ensco Item: Elevator Drill Pipe Air Oper 5. Details : Magnetic Particle Inspection Serial No: EL 8 Date : 21/10/2011

80 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-047 Client : Ensco Item: Elevator Drill Pipe 5. Details : Magnetic Particle Inspection Serial No: EL 12 Date : 21/10/2011

81 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-048 Client : Ensco Item: Single Joint Elevator SJL /8. Details : Magnetic Particle Inspection Serial No: EL 17 Date : 22/10/2011

82 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-049 Client : Ensco Item: Single Joint Elevator 3 ½. Details : Magnetic Particle Inspection Serial No: EL 24 Date : 22/10/2011

83 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-050 Client : Ensco Item: Elevator Drill Pipe Air Oper MGG ½ Details : Magnetic Particle Inspection Serial No: EL 1 Date : 22/10/2011

84 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-051 Client : Ensco Item: Elevator Drill Pipe Air Oper 3 ½ Details : Magnetic Particle Inspection Serial No: EL 6 Date : 22/10/2011

85 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-052 Client : Ensco Item: Single Joint Elevator 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 137 Date : 22/10/2011

86 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-053 Client : Ensco Item: Side Door Casing Elevator SLX - 7. Details : Magnetic Particle Inspection Serial No: EL 138 Date : 22/10/2011

87 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-054 Client : Ensco Item: Side Door Casing Elevator SLX - 7. Details : Magnetic Particle Inspection Serial No: EL 16 Date : 22/10/2011

88 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-055 Client : Ensco Item: Side Door Casing Elevator SLX 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 13 Date : 22/10/2011

89 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-056 Client : Ensco Item: Side Door Casing Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 15 Date : 22/10/2011

90 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-057 Client : Ensco Item: Side Door Casing Elevator SLX 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 14 Date : 22/10/2011

91 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-058 Client : Ensco Item: Side Door Casing Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 120 Date : 22/10/2011

92 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-059 Client : Ensco Item: Elevator Drill Pipe - Air Oper GG ½. Details : Magnetic Particle Inspection Serial No: EL 3 Date : 22/10/2011

93 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-060 Client : Ensco Item: Elevator Drill Pipe HGG - 5. Details : Magnetic Particle Inspection Serial No: EL 4 Date : 23/10/2011

94 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-061 Client : Ensco Item: Elevator Drill Pipe GG 4 ½. Details : Magnetic Particle Inspection Serial No: EL 51 Date : 23/10/2011

95 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-062 Client : Ensco Item: Tubing Elevator 3 ½. Details : Magnetic Particle Inspection Serial No: EL 9 Date : 23/10/2011

96 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-063 Client : Ensco Details : The inspection was made with shut elevator, in 50% of critical areas. Item: Spider Elevator 500 Tons. Serial No: EL 31 Date : 23/10/2011

97 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-064 Client : Ensco Details : The inspection was made with shut elevator, in 50% of critical areas. Item: Spider Elevator 500 Tons. Serial No: EL 30 Date : 23/10/2011

98 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-067 Client : Ensco Item: Side Door Elevator 30 Details : Magnetic Particle Inspection Serial No: EL 26 Date : 24/10/2011

99 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-083 Client : Ensco Item: Single Joint Elevator 20 Details : Magnetic Particle Inspection Serial No: EL 281 Date : 27/10/2011

100 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-086 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Adapter Plate (Giraffe). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : BABO46463 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 28/10/2011

101 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-086 Client : Ensco Details : Magnetic Particle Inspection Item: Adapter Plate (Giraffe). Serial No: BABO46463 Date : 28/10/2011

102 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-087 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Shear Pin (Giraffe). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : N/A Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. It was not found Crack, but Shear Pin crooked. Recommendations. No acceptable to Specification. Continuation attached : Yes Date : 28/10/2011

103 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-087 Client : Ensco Details : Shear Pin crooked. Item: Shear Pin (Giraffe). Serial No: N/A Crooked Angle. Date : 28/10/2011

104 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-088 Client : Ensco Details : Magnetic Particle Inspection Item: Racking Arm (Giraffe). Serial No: N/A Date : 28/10/2011

105 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-089 Client : Ensco Details : Magnetic Particle Inspection Item: Racking Arm Frame (Giraffe). Serial No: N/A Date : 28/10/2011

106 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-065 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Pedestal Elevator. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 3 Identification / Serial No : N/A Comments : Areas Inspected. Inspection of magnetic Particle was carried out in welds of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 23/10/2011

107 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-065 Client : Ensco Details : Magnetic Particle Inspection Item: Pedestal Elevator. Serial No: N/A Date : 23/10/2011

108 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-071 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : BOP ROV Panel Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : N/A Comments : Areas Inspected. Inspection of magnetic Particle was carried out in welds of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 24/10/2011

109 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-071 Client : Ensco Details : Magnetic Particle Inspection Item: BOP ROV Panel Serial No: On top BOP Mid BOB Date : 24/10/2011

110 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-077 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Slips 7 Spider Elevator 500 T. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : SA 36 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 27/10/2011

111 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-077 Client : Ensco Item: Slips 7 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 36 Date : 27/10/2011

112 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-078 Client : Ensco Item: Slips 7 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 38 Date : 27/10/2011

113 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-079 Client : Ensco Item: Slips 9 5/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 34 Date : 27/10/2011

114 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-080 Client : Ensco Item: Slips 9 5/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 35 Date : 27/10/2011

115 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-081 Client : Ensco Item: Slips 13 3/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 32 Date : 27/10/2011

116 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-082 Client : Ensco Item: Slips 13 3/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 33 Date : 27/10/2011

117 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Drill Floor Date : 26/10/2011 FIRM-167 Revisão.1

118 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Drill floor Date : 26/10/2011 FIRM-167 Revisão.1

119 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1

120 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1

121 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1

122 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool. 21 Date : 26/10/2011 FIRM-167 Revisão.1

123 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1

124 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1

125 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) UT-IRM /10/2011 Max Allow Diminuation (%) Test Point Type 1A 19,05 14,3 5" 29,4 0,0% 4,8 25,0% High Pressure 1B 19,05 14,3 5" 30,2 0,0% 4,8 25,0% High Pressure 1C 19,05 14,3 5" 31,3 0,0% 4,8 25,0% High Pressure 1D 19,05 14,3 5" 30,7 0,0% 4,8 25,0% High Pressure 2A 19,05 14,3 5" 31,2 0,0% 4,8 25,0% High Pressure 2B 19,05 14,3 5" 31,0 0,0% 4,8 25,0% High Pressure 2C 19,05 14,3 5" 30,7 0,0% 4,8 25,0% High Pressure 2D 19,05 14,3 5" 32,3 0,0% 4,8 25,0% High Pressure 3A 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 3B 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 3C 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 3D 19,05 14,3 5" 17,5 8,1% 4,8 25,0% High Pressure 4A 19,05 14,3 5" 17,1 10,2% 4,8 25,0% High Pressure 4B 19,05 14,3 5" 17,1 10,2% 4,8 25,0% High Pressure 4C 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 4D 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 5A 19,05 14,3 5" 40,5 0,0% 4,8 25,0% High Pressure 5B 19,05 14,3 5" 32,3 0,0% 4,8 25,0% High Pressure 5C 19,05 14,3 5" 35,0 0,0% 4,8 25,0% High Pressure 5D 19,05 14,3 5" 34,2 0,0% 4,8 25,0% High Pressure 6A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 6B 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 6C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 6D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1

126 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 7A 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 7B 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 7C 19,05 14,3 5" 15,6 18,1% 4,8 25,0% High Pressure 7D 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 8A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 8B 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 8C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 8D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 9A 19,05 14,3 5" 29,7 0,0% 4,8 25,0% High Pressure 9B 19,05 14,3 5" 33,2 0,0% 4,8 25,0% High Pressure 9C 19,05 14,3 5" 39,2 0,0% 4,8 25,0% High Pressure 9D 19,05 14,3 5" 39,0 0,0% 4,8 25,0% High Pressure 10A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 10B 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 10C 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 10D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 11A 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 11B 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 11C 19,05 14,3 5" 15,6 18,1% 4,8 25,0% High Pressure 11D 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 12A 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 12B 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 12C 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 12D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1

127 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 13A 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 13B 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 13C 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 13D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 14A 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 14B 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 14C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 14D 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 15A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 15B 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 15C 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 15D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 16A 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 16B 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 16C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 16D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 17A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 17B 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 17C 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 17D 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 18A 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 18B 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 18C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 18D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1

128 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 19A 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 19B 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 19C 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 19D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 20A 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 20B 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 20C 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 20D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 21A 19,05 14,3 5" 31,5 0,0% 4,8 25,0% High Pressure 21B 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 21C 19,05 14,3 5" 41,1 0,0% 4,8 25,0% High Pressure 21D 19,05 14,3 5" 38,6 0,0% 4,8 25,0% High Pressure 22A 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 22B 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 22C 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 22D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 23A 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 23B 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 23C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 23D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 24A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 24B 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 24C 19,05 14,3 5" 15,8 17,1% 4,8 25,0% High Pressure 24D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1

129 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 25A 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 25B 19,05 14,3 5" 43,6 0,0% 4,8 25,0% High Pressure 25C 19,05 14,3 5" 37,9 0,0% 4,8 25,0% High Pressure 25D 19,05 14,3 5" 36,8 0,0% 4,8 25,0% High Pressure 26A 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 26B 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 26C 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 26D 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 27A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 27B 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 27C 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 27D 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 28A 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 28B 19,05 14,3 5" 31,2 0,0% 4,8 25,0% High Pressure 28C 19,05 14,3 5" 41,3 0,0% 4,8 25,0% High Pressure 28D 19,05 14,3 5" 41,0 0,0% 4,8 25,0% High Pressure 29A 29B 29C 29D 30A 30B 30C 30D Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing 1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado

More information

11. NONDESTRUCTIVE TESTING

11. NONDESTRUCTIVE TESTING 11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive

More information

CHAPTER 13 LOAD HOOKS

CHAPTER 13 LOAD HOOKS CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter

More information

A World Class Manufacturer of Induction Bends

A World Class Manufacturer of Induction Bends A World Class Manufacturer of Induction Bends COFELY FABRICOM BENDING A leading position in bending High Flexibility and Close Tolerances As a world leading manufacturer of pipe bends, produced by induction

More information

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract NON-DESTRUCTIVE TESTING OF PIPELINES L. Annila Abstract This paper shall present different, contemporarily available non-destructive testing (NDT) methods of pipelines and compare them to each other from

More information

EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES

EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES Prepared for AIR LOGISTICS, INC. Azusa, California September 2005 Revision 1 STRESS ENGINEERING SERVICES, INC. Houston, Texas

More information

NON-DESTRUCTIVE TESTING OF DUPLEX STAINLESS STEEL

NON-DESTRUCTIVE TESTING OF DUPLEX STAINLESS STEEL NON-DESTRUCTIVE TESTING OF DUPLEX STAINLESS STEEL AUTHORS: Keith Doughten, District Manager, Magnetic Analysis Corporation, ASNT NDT Level III ET, UT David Bauer, Marketing and Training Manager, Magnetic

More information

Pipe Inspection Carbon Steel Trials

Pipe Inspection Carbon Steel Trials Pipe Inspection Carbon Steel Trials Client Innospection Limited Facility Head Office Aberdeen Item Inspected Pipe No 1 Inspection Method SLOFEC Date Commenced 01/01/2009 Date Completed 10/01/2009 Type

More information

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River

More information

TARIFF CODE and updates standard

TARIFF CODE and updates standard TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of

More information

Vrtné trubky Drill Pipe

Vrtné trubky Drill Pipe Vrtné trubky Drill Pipe VRTNÉ ROURY - zušlechtěné závity - vysoká kvalita těla roury - svařeno třením - vysoká přímost vrtných tyčí - závity dle STN, API, DIN a GOST - délky dle přání zákazníka Průměr

More information

OCTG-Mill RUNNING AND PULLING PROCEDURE FOR TPS-TECHNISEAL TUBING AND CASING

OCTG-Mill RUNNING AND PULLING PROCEDURE FOR TPS-TECHNISEAL TUBING AND CASING RUNNING 1. The threads and seal areas of the pipe and coupling must be clean, free from foreign matter or damage. Never use wire brushes for cleaning threads and seals. The couplings must be phosphated

More information

LOAD TESTING OF ACRO BUILDING SYSTEMS 12075 RAKE-EDGE GUARDRAIL SYSTEM

LOAD TESTING OF ACRO BUILDING SYSTEMS 12075 RAKE-EDGE GUARDRAIL SYSTEM 1049 Triad Court, Marietta, Georgia 30062 (770) 423-1400 Fax (770) 424-6415 LOAD TESTING OF ACRO BUILDING SYSTEMS 12075 RAKE-EDGE GUARDRAIL SYSTEM ATS JOB # D167754-1 PURCHASE ORDER # 22383 Prepared for

More information

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

WARNING! Failure to follow these inspection procedures can cause personal injury and property damage. GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause

More information

Calvert USA, Inc. Attic Stairs

Calvert USA, Inc. Attic Stairs Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,

More information

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified

More information

powered by ingenuity Corrosion Logging Well Integrity Measurement

powered by ingenuity Corrosion Logging Well Integrity Measurement powered by ingenuity Corrosion Logging Well Integrity Measurement Corrosion control in the oil industry is a matter of economics. Probe s corrosion logging tools offer a solution to predict and detect

More information

Pressure Vessel Assessment Report

Pressure Vessel Assessment Report Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899

More information

NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS

NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS What is ASNT? What is ASNT? The American Society for Nondestructive Testing, Inc. What is ASNT? ASNT is the world's largest technical society for nondestructive

More information

EAGLE ASSET TRACKING DATABASE

EAGLE ASSET TRACKING DATABASE EAGLE ASSET TRACKING DATABASE Eagle Inspection Technologies offers a user friendly Asset Tracking Database designed specifically for small industrial facilities (Power Plants, Chemical Plants, Tank Farms,

More information

all VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101

all VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101 ergonomic FORKLIFT vacuum ATTACHMENTs FOR ALL MATERIALS HANDLING FOR LIFTING METAL, WOOD, PLASTIC, STONE, CONCRETE, PAPER, AND MORE In Warehousing, Order Picking, Palletizing, Loading, Conveying, Production.

More information

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

One Source for Rig Handling Tools and Drilling Equipments Solution

One Source for Rig Handling Tools and Drilling Equipments Solution One Source for Rig Handling Tools and Drilling Equipments Solution Content Manual Tong Web Wilson Type AAX Manual Tong... 1 Web Wilson B Style & C Style Manual Tong... 3 Type B Manual Tong... 5 BJ Type

More information

External Visual Inspection Form

External Visual Inspection Form Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Mechanical Property Changes in Steel during the Pipe Making Process Brent Keil 1

Mechanical Property Changes in Steel during the Pipe Making Process Brent Keil 1 381 Mechanical Property Changes in Steel during the Pipe Making Process Brent Keil 1 Abstract Welded Steel Pipe (WSP) is arguably the most widely utilized pipe material for the transmission of water throughout

More information

CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES

CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES This chapter provides the requirements for below-the-hook lifting devices used in hoisting and rigging, such as spreader bars, lifting yokes, and lift fixtures.

More information

LiftAlloy Chain Slings

LiftAlloy Chain Slings CHAIN SLING BASICS Slings Lift-All chain slings meet or exceed all OSHA, ASME B30.9 and NACM standards and regulations. chain slings, available in 80 for 7/32" and 7/8"- /4" and 00 for 9/32"-3/4", are

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications

Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications Premium Tubular Solutions Innovative Tubes for Umbilical Applications Over 35 years of experience in Premium welded t ubular

More information

INNOVATIVE ELECTROMAGNETIC SENSORS

INNOVATIVE ELECTROMAGNETIC SENSORS Technical Progress on INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS Type of Report: Technical Progress Report Reporting Period Start Date: October 7, 2003 Reporting Period End Date: April 30,

More information

Pipe Handling Equipment

Pipe Handling Equipment Pipe Handling Equipment Blohm+Voss Repair GmbH Oil Tool Division Hermann-Blohm-Straße 2 20457 Hamburg, Germany Phone: +49-40-31 19-81 42 Fax: +49-40-31 19-34 00 E-mail: info@blohmvoss-oiltools.com www.blohmvoss-oiltools.com

More information

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories: CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations

More information

Ultrasonic Wave Propagation Review

Ultrasonic Wave Propagation Review Ultrasonic Wave Propagation Review Presented by: Sami El-Ali 1 1. Introduction Ultrasonic refers to any study or application of sound waves that are higher frequency than the human audible range. Ultrasonic

More information

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor. SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The

More information

Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com

Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center www.geinspectionacademy.com Sharing knowledge. Shaping technology. At GE, we know the value of investing in your

More information

QUALITY ENGINEERING & SERVICES W.L.L (A DIVISION OF QUALITY GROUP OF COMPANIES) ISO 9001 : 2008 CERTIFIED COMPANY COMPANY PROFILE

QUALITY ENGINEERING & SERVICES W.L.L (A DIVISION OF QUALITY GROUP OF COMPANIES) ISO 9001 : 2008 CERTIFIED COMPANY COMPANY PROFILE QUALITY ENGINEERING & SERVICES W.L.L (A DIVISION OF QUALITY GROUP OF COMPANIES) ISO 9001 : 2008 CERTIFIED COMPANY COMPANY PROFILE FABRICATION, MACHINING, METAL CASTING, LOAD TESTING, SAND BLASTING & PAINTING,

More information

LIEBERT VNSA Installation Sheet

LIEBERT VNSA Installation Sheet LIEBERT VNSA Installation Sheet Description The Liebert vnsa network switch is designed for connecting multiple Ethernet-ready devices and comes in various models. The unit may have: A Liebert icom display

More information

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04 BROWN MINNEAPOLIS TANK PAGE 1 OF 7 PURPOSE: Create and Drawing Uniformity Create, explain, and establish a standard bill of materials to be placed on every drawing (except the overall tank elevation and

More information

North American Stainless

North American Stainless North American Stainless Flat Products Stainless Steel Grade Sheet 310S (S31008)/ EN 1.4845 Introduction: SS310 is a highly alloyed austenitic stainless steel designed for elevated-temperature service.

More information

GUARDRAIL POST STEEL

GUARDRAIL POST STEEL GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating

More information

NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS.

NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS. NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS. Harry Bainbridge, Health & Safety Executive, Bootle Bernard McGrath, AEA Technology plc, Risley Crown Copyright 2001. Reproduced

More information

Nondestructive Testing: Why, When, What and How?

Nondestructive Testing: Why, When, What and How? : Why, When, What and How? Executive Summary Non-destructive testing (NDT) relates to the examination of materials for flaws without harming the object being tested. As an industrial test method, NDT provides

More information

NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES

NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES RIGHT SERVICE MAXIMUM RETURN Whether it is in fabrication, pipe manufacturing, pipeline, plant construction, chemical, petrochemical plants,

More information

Aker Drilling Riser Brazil

Aker Drilling Riser Brazil part of Aker Brazil Presenter Marcelo Coraça Project Manager June/2010 2010 Aker Solutions Aker Solutions Rio das Ostras Aker Riser workshop Aker Subsea workshop Aker MH workshop General Offices Meeting

More information

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding 7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:

More information

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1

16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

NDT Procedure for Liquid Penetrant Inspection

NDT Procedure for Liquid Penetrant Inspection NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified

More information

understanding medium frequency induction melting furnace and its components

understanding medium frequency induction melting furnace and its components understanding medium frequency induction melting furnace and its components 9 Spruce Street, Jersey City, NJ 07306 USA sales@electroheatinduction.com INDUCTION MELTING FURNACE AND ITS COMPONENTS The purpose

More information

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES

GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today

More information

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.

Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. OSNA -10 Copper-Nickel Lined Pipes Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. KME Germany AG & Co. KG Copper-Nickel Lined Pipes [GB] Member of the KME Group

More information

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS INSTRUCTION MANUAL IM042 Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TABLE OF CONTENTS SUBJECT PAGE Safety Instructions... 3 Descriptions and Specifications...

More information

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX -1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

Activity 2.3b Engineering Problem Solving Answer Key

Activity 2.3b Engineering Problem Solving Answer Key Activity.3b Engineering roblem Solving Answer Key 1. A force of 00 lbs pushes against a rectangular plate that is 1 ft. by ft. Determine the lb lb pressure in and that the plate exerts on the ground due

More information

Essentials Welding QA/QC Plan Sample

Essentials Welding QA/QC Plan Sample Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the

More information

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material

More information

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS

SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications

More information

TITANIUM FABRICATION CORP.

TITANIUM FABRICATION CORP. TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,

More information

DIAMOND Retractable Rodding Robot Model SPRAYROD-R

DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic

More information

HT-0095 Mini PV Receptacles 22-32 AWG Crimping Hand Tool. Tool P/N HT-0095

HT-0095 Mini PV Receptacles 22-32 AWG Crimping Hand Tool. Tool P/N HT-0095 HT-0095 Mini PV Receptacles 22-32 AWG Crimping Hand Tool Tool P/N HT-0095 FCI MANUAL P/N 415988-001 Issued: Date (03/12/99) Page 1 of 18 HT-0095 Issued: Date (03/12/99) Page 2 of 18 Introduction Table

More information

YOUR LOCAL SOURCE IN A GLOBAL WORLD GLOBAL OUTSOURCING

YOUR LOCAL SOURCE IN A GLOBAL WORLD GLOBAL OUTSOURCING GLOBAL OUTSOURCING Save from 30% to 75% on your components with fi nished machined components from China. In China there are millions of subcontractors but only a few of these are able to supply high-quality

More information

DCS Input/Output Relay Card Series

DCS Input/Output Relay Card Series Input/Output Relay Card Series I/O RELAY CARD (with loopback test function) 8N The 8N series I/O Relay Cards easily and quickly standardize and facilitate installation of the relay board. Loopback test

More information

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015 6.1.2.12 53-03-15 Referring to Section 6.1.2.12, can a surface BOP stack arrangement with one annular, one blind shear ram, and two pipe rams, with the fifth device being optional, be considered a Class

More information

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For:

TEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For: TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PRODUCT: Gorilla Column PVC Porch Post System with PVC Base / Cap Plates, PVC Bushings and 2-3/8 in Diameter and 3-1/2 in Diameter Galvanized

More information

Copper and Copper Alloy Tube, Pipe and Fittings

Copper and Copper Alloy Tube, Pipe and Fittings Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification

More information

North American Stainless

North American Stainless Introduction: North American Stainless Flat Products Stainless Steel Grade Sheet 309S (S30908)/ EN1.4833 SS309 is a highly alloyed austenitic stainless steel used for its excellent oxidation resistance,

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

European Welding Standards

European Welding Standards European Welding Standards John Dyson 15 th March 2004 European Standards Harmonised Standards Not all EN Standards are Harmonised, only those that are considered to satisfy relevant ESRs in product directives.

More information

Tubular solutions for the Solar Power Industry Rise in success with precision

Tubular solutions for the Solar Power Industry Rise in success with precision Tubular solutions for the Solar Power Industry Rise in success with precision A comprehensive offer Precision tubes designed for CSP industry applications Solar collectors q Tubes adapted for solar heat

More information

Metal Pressfitting Pipe Systems

Metal Pressfitting Pipe Systems VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing

More information

Pee Dee Empty Oil Storage Tank at

Pee Dee Empty Oil Storage Tank at Mechanical Integrity Report for the Pee Dee Empty Oil Storage Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 10 October 2012 Prepared by: George E. Matthews, E.I.T. Senior

More information

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall

PERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall PERFORMANCE TEST REPORT Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall Report No.: Test Dates: 04/17/12 Through: 04/18/12 Report Date: 06/13/12 130 Derry Court

More information

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use. Large Facility Fire Safety Checklists and Logs This package contains checklists to ensure that all fire and life safety equipment are properly inspected. There are also logs on which to record the inspections

More information

JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger

JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for exchanging heat

More information

Examination. Performance Test. Candidate Information Booklet

Examination. Performance Test. Candidate Information Booklet Examination Performance Test Candidate Information Booklet Name Test Site Test Date (Please Print) (City/State) CRAW-T Examiner CRAW-T NUmber (Please Print) 1 Table of Contents 1.0 Introduction and Purpose

More information

Slings, Rigging and Lifting Equipment

Slings, Rigging and Lifting Equipment A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: SLINGS, RIGGING AND LIFTING EQUIPMENT GM-11-038-02 Version Number: 13.0 Date Revised:

More information

EMF/EMR. Holder/Release Devices with Integral Door Closers

EMF/EMR. Holder/Release Devices with Integral Door Closers EMF/EMR Holder/Release Devices with Integral Door Closers EMR TECHNICAL DETAILS DORMA EMR SERIESHOLDER/RELEASE DEVICE The DORMA EMR Series holder/ release device incorporates a photoelectric detector and

More information

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs. FRAME PROFILE MASONRY FLUSH MASONRY KD MITER CORNER JOINT Bend Tabs Head #8 Screw (MS002485) Required on all fire rated KD frames Corner Assembly 2" (50.8) Head Jamb Head Break Away Corner Clip Spot Welds

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

All Allison Transmission, Inc. Commercial Transmissions and Torque Converters

All Allison Transmission, Inc. Commercial Transmissions and Torque Converters Revisions to this document are noted by a stripe in the left hand margin #1796, Rev. B Page 1 of 10 SUBJECT: Oil Analysis Test Recommendations SERIAL NUMBERS AFFECTED: All Allison Transmission, Inc. Commercial

More information

ALERT SERVICE BULLETIN NO.

ALERT SERVICE BULLETIN NO. DATE REV ALERT SERVICE BULLETIN NO. DATE PAGE 210-08-02 9/10/2008 1 of 8 MODEL AFFECTED: 210 SUBJECT: MAIN ROTOR GRIPS 204-011-121-009, ULTRASONIC INSPECTION OF. HELICOPTERS AFFECTED: All Model 210 Helicopters

More information

Conceptual Design of Buildings (Course unit code 1C2)

Conceptual Design of Buildings (Course unit code 1C2) (Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical

More information

proper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity.

proper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity. SGS NDT Training & Examination Centre Professional Services for Your Safety and Reputation ABOUT NON DESTRUCTIVE TESTING (NDT) About NDT NDT plays a key role in assessing conformity and reliability of

More information

1.02 SYSTEM DESCRIPTION

1.02 SYSTEM DESCRIPTION 1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall

More information

CABLE TRENCH INSTALLATION GUIDE

CABLE TRENCH INSTALLATION GUIDE 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard

More information

ALFRA Rotabest Piccolo 32/50 Weldon Metal Core Drilling Machine. Operation Manual

ALFRA Rotabest Piccolo 32/50 Weldon Metal Core Drilling Machine. Operation Manual ALFRA Rotabest Piccolo 32/50 Weldon Metal Core Drilling Machine Operation Manual 06/2005 1 1. Technical Data Prod. No.: 18550 Name : Rotabest Piccolo 32/50 Weldon Input: Load rpm: 1050 Watt 400 rpm Tool

More information

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST MODEL CHCRV-5 For Use with Bard CH Series 3, 4 & 5 Ton 2-Stage Wall Mount Heat Pumps AND W38H, W43H, W49H and W61H Single Stage Wall Mount

More information

Non-destructive Testing

Non-destructive Testing CLASSIFICATION NOTES No. 7 Non-destructive Testing MARCH 2012 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version

Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory

More information