Ensco NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.
|
|
- Regina Bryan
- 8 years ago
- Views:
Transcription
1 Ensco 5002 NDT Inspection Handling Tools And Wall Thickness Survey Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.O nº
2 Client : Location : Ensco 5002 Project No.: NDT- IRM3019 Contents: NDT Inspection Handling Tools and Wall Thickness Survey 1. Executive Summary Report 2. Bail Link 3. Bowl Master Bushing 4. Drill Collar and casing slings 5. Drill Pipe drilling Tong 6. Drill Pipe Slips 7. Elevator 8. Giraffe s parts Defect on Shear Pin 9. Pedestal Elevator 10. ROV Pannel 11. Slips Wall Thickness Survey 12. Choke line 13. Kill Line IRM Services Documentation 14. Personnel Qualification 15. Equipment Certification 16. IRM Services Documentation PREPARED BY: Francis Lima POSITION: Supervisor SIGNATURE: REVIEWED BY: Felipe Oliveira POSITION: Report Analyst SIGNATURE: APPROVED BY: Barry Newman POSITION: Operations Manager SIGNATURE: DATE: November, 2011 DATE: November, 2011 DATE: November, 2011
3 Executive Summary Report Client: Ensco Location: Ensco 5002 Project: Technicians on Board: Client Representative: NDT Inspection Handling Tools and Wall Thickness Survey Francis Lima Royden Lown (Maintenance Coordinator.) Dates of Project: From October 15 th of 2011 to October 29 th of Project Work scope: IRM Services was requested to carry out a General NDT Inspection Handling Tools and Wall Thickness Survey. These services were carried out during the period October 15th of 2011 through October 29th of IRM Services would like to take this opportunity to thank all crew involved for their assistance during this busy period onboard. Project Summary: The General NDT Inspection was carried out on Handling Tools in all the equipments of Drill Tool Rig, Pieces of the " Giraffe " and Inspection of Wall Thickness Survey in the lines of Chock and Kill Line a Photograph Report. All of the services described above were carried out according to the client's needs, manufacturer's procedures or certifying authority specifications. Summary of Defective Items: It was found a defect on Shear Pin as described in report MT-IRM3019F-087 and in the contents.. Signed on Behalf of IRM Services: Francis Lima NDT Supervisor Date: October 29 th, 2011.
4 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-066 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bails Link (Top Drive). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : 815L and 815R Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011
5 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-066 Client : Ensco Details : Magnetic Particle Inspection Item: Bails Link (Top Drive). Serial No: 815L and 815R SN: 815L SN: 815R Date : 21/10/2011
6 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-001 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Bowl Master Bushing 37 ½. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : 1 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 20/10/2011
7 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-001 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 1 Date : 20/10/2011
8 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-002 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 2 Date : 20/10/2011
9 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-003 Client : Ensco Item: Bowl Master Bushing 37 ½. Details : Magnetic Particle Inspection Serial No: 3 Date : 20/10/2011
10 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-004 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bowl Master Bushing 2 Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : P/16609 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011
11 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-004 Client : Ensco Item: Bowl Master Bushing 2 Details : Magnetic Particle Inspection Serial No: P/16609 Date : 21/10/2011
12 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-005 Client : Ensco Item: Bowl Master Bushing 1 Details : Magnetic Particle Inspection Serial No: P/N 6610 Date : 21/10/2011
13 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-006 Client : Ensco Item: Bowl Master Bushing 3 Details : Magnetic Particle Inspection Serial No: CR Date : 21/10/2011
14 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-069 Client : Ensco Item: Bowl Master Bushing Details : Magnetic Particle Inspection Serial No: BW 2 Date : 24/10/2011
15 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-070 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Bowl Master Bushing Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 30 Quantity : 1 Identification / Serial No : BW 1 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. Corrosion in lateral of the equipment. Recommendations. No acceptable to Specification. Continuation attached : Yes Date : 24/10/2011
16 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-070 Client : Ensco Item: Bowl Master Bushing 2 Details : Corrosion in lateral of the equipment Serial No: BW 1 Date : 24/10/2011
17 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-007 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Casing Slips CMS XL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 20 Quantity : 26 Segments Identification / Serial No : N 21 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 19/10/2011
18 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-007 Client : Ensco Item: Casing Slips CMS XL. Details : Magnetic Particle Inspection Serial No: N 21 Date : 19/10/2011
19 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-008 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Drill Collar Slips DCS-R. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 ½ to 7 Quantity : 09 Segments Identification / Serial No : N6 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011
20 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-008 Client : Ensco Details : Magnetic Particle Inspection Item: Drill Collar Slips DCS-R. Serial No: N6 Date : 21/10/2011
21 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-009 Client : Ensco Item: Drill Collar Slips 9 ½ 12 Segments. Details : Magnetic Particle Inspection Serial No: N 13 Date : 21/10/2011
22 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-010 Client : Ensco Item: Casing Slips CMS-XL 13 3/8 18 Segments. Details : Magnetic Particle Inspection Serial No: N 24 Date : 21/10/2011
23 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-011 Client : Ensco Item: Casing Slips CMS-XL 9 5/8 14 Segments. Details : Magnetic Particle Inspection Serial No: N 23 Date : 21/10/2011
24 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-012 Client : Ensco Item: Drill Collar 9 1/2. Details : Magnetic Particle Inspection Serial No: XJ 51 Date : 21/10/2011
25 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-013 Client : Ensco Item: Drill Collar 6. Details : Magnetic Particle Inspection Serial No: 3504 Date : 21/10/2011
26 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-014 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Drill Collar Slips DCSL 6 ¾ to 8 ¼. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 6 ¾ to 8 ¼. Quantity : 11 Segments Identification / Serial No : N 10 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. Deformations in the 2nd and 3rd Segment of the Equipment. Recommendations. To remove the 2nd and 3rd Segment of the Equipment and to place 2 new segments. Continuation attached : Yes Date : 21/10/2011
27 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-014 Client : Ensco Details : Deformations in the 2nd and 3rd Segments. Item: Drill Collar Slips DCSL 6 ¾ to 8 ¼. Serial No: N 10 Date : 21/10/2011
28 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-015 Client : Ensco Item: Drill Collar Slips DCS-S 4 to 4 7/8 07 Seg. Details : Magnetic Particle Inspection Serial No: N 12 Date : 22/10/2011
29 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-016 Client : Ensco Item: Drill Pipe Slips Wooley 4 ½ 03 Seg. Details : Magnetic Particle Inspection Serial No: N 09 Date : 22/10/2011
30 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-017 Client : Ensco Item: Drill Collar Slips DCS-L 8 ½ to Seg. Details : Magnetic Particle Inspection Serial No: N 14 Date : 22/10/2011
31 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-018 Client : Ensco Item: Drill Collar Slips DCS-L 6 ¾ to 8 ¼ 11 Seg. Details : Magnetic Particle Inspection Serial No: N 15 Date : 22/10/2011
32 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-019 Client : Ensco Item: Drill Collar Slips 12 Seg. Details : Magnetic Particle Inspection Serial No: N 25 Date : 22/10/2011
33 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-020 Client : Ensco Item: Drill Pipe Slips 07 Seg. Details : Magnetic Particle Inspection Serial No: N 11 Date : 22/10/2011
34 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-021 Client : Ensco Item: Drill Collar Slips 15 Seg. Details : Magnetic Particle Inspection Serial No: N 26 Date : 22/10/2011
35 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-022 Client : Ensco Item: Drill Collar Slips 16 Seg. Details : Magnetic Particle Inspection Serial No: N 27 Date : 22/10/2011
36 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-023 Client : Ensco Item: Drill Collar 06 Seg. Details : Magnetic Particle Inspection Serial No: VM 13 Date : 22/10/2011
37 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-024 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Drill Pipe Drilling Tong Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : DT 54 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 20/10/2011
38 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-024 Client : Ensco Item: Drill Pipe Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 54 Date : 20/10/2011
39 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-025 Client : Ensco Item: Drill Pipe Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 55 Date : 20/10/2011
40 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-068 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Manual Drill Pipe Tong HT 65. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : DT 50 and DT 51 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 24/10/2011
41 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-068 Client : Ensco Item: Manual Drill Pipe Tong HT 65. Details : Magnetic Particle Inspection Serial No: DT 50 and DT 51 SN: DT 50 SN: DT 51 Date : 24/10/2011
42 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-072 Client : Ensco Item: Manual Casing Tong AAX. Details : Magnetic Particle Inspection Serial No: DT 41 Date : 24/10/2011
43 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-073 Client : Ensco Item: Manual Casing Tong AAX. Details : Magnetic Particle Inspection Serial No: DT 42 Date : 24/10/2011
44 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-075 Client : Ensco Item: Casing Manual Tong HT 50. Details : Magnetic Particle Inspection Serial No: DT 43 Date : 27/10/2011
45 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-076 Client : Ensco Item: Casing Manual Tong HT 50. Details : Magnetic Particle Inspection Serial No: DT 44 Date : 27/10/2011
46 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-090 Client : Ensco Details : Magnetic Particle Inspection Item: Mordents HT-10. Serial No: TC159695, TC162089, TC and TC Sn:TC Sn:TC Sn:TC Sn:TC Date : 28/10/2011
47 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-091 Client : Ensco Item: Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 53 Date : 28/10/2011
48 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-092 Client : Ensco Item: Drilling Tong Details : Magnetic Particle Inspection Serial No: DT 52 Date : 28/10/2011
49 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-026 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Dill Pipe Slips SDXL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 01 Identification / Serial No : N 31 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 19/10/2011
50 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-026 Client : Ensco Item: Dill Pipe Slips SDXL 5. Details : Magnetic Particle Inspection Serial No: N 31 Date : 19/10/2011
51 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-027 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Dill Pipe Slips SDXL. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 01 Identification / Serial No : N 7 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011
52 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-027 Client : Ensco Item: Dill Pipe Slips SDXL. Details : Magnetic Particle Inspection Serial No: N 7 Date : 21/10/2011
53 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-028 Client : Ensco Item: Dill Pipe Slips SDML 3 ½. Details : Magnetic Particle Inspection Serial No: N 18 Date : 21/10/2011
54 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-029 Client : Ensco Item: Dill Pipe Slips SDXL 5 ½. Details : Magnetic Particle Inspection Serial No: N 5 Date : 23/10/2011
55 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-074 Client : Ensco Item: Dill Pipe Slips SDML 3 ½. Details : Magnetic Particle Inspection Serial No: N 4 Date : 25/10/2011
56 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-075 Client : Ensco Item: Dill Pipe Slips. Details : Magnetic Particle Inspection Serial No: VM 34 Date : 25/10/2011
57 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-076 Client : Ensco Item: Dill Collar Slips 9 Segments. Details : Magnetic Particle Inspection Serial No: N 1 Date : 25/10/2011
58 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-084 Client : Ensco Item: Dill Pipe Slips. Details : Magnetic Particle Inspection Serial No: N 2 Date : 27/10/2011
59 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-085 Client : Ensco Item: Dill Pipe Slips SDXL 5. Details : Magnetic Particle Inspection Serial No: N 30 Date : 27/10/2011
60 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-030 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110v Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural N/A Carbon Steel Clean and Metal Check Fluorescent Burmah Strip: Yes Artificial Yes without paint Batch No : 5949 Client : Ensco Item : Single Joint Elevator SJL Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Swl: N/A Quantity : 01 Identification / Serial No : EL 19 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 18/10/2011
61 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-030 Client : Ensco Item: Single Joint Elevator SJL Details : Magnetic Particle Inspection Serial No: EL 19 Date : 18/10/2011
62 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-031 Client : Ensco Item: Single Joint Elevator 20. Details : Magnetic Particle Inspection Serial No: EL 28 Date : 18/10/2011
63 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-032 Client : Ensco Item: Single Joint Elevator SJL Details : Magnetic Particle Inspection Serial No: EL 125 Date : 18/10/2011
64 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-033 Client : Ensco Item: Single Joint Elevator SJL - 7. Details : Magnetic Particle Inspection Serial No: EL 21 Date : 18/10/2011
65 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-034 Client : Ensco Item: Single Joint Elevator SJL 3 1/2. Details : Magnetic Particle Inspection Serial No: EL 300 Date : 18/10/2011
66 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-035 Client : Ensco Item: Single Joint Elevator SJL 7. Details : Magnetic Particle Inspection Serial No: EL 23 Date : 19/10/2011
67 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-074 Client : Ensco Item: Slips Elevator. Details : Magnetic Particle Inspection Serial No: TEL 15 Date : 19/10/2011
68 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-036 Client : Ensco Item: Slips Elevator YT 75 Ton. Details : Magnetic Particle Inspection Serial No: EL 13 Date : 19/10/2011
69 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-037 Client : Ensco Item: Slips Elevator YT 75 Ton. Details : Magnetic Particle Inspection Serial No: EL 14 Date : 19/10/2011
70 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-038 Client : Ensco Item: Side Door Csg Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 2 Date : 19/10/2011
71 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-039 Client : Ensco Item: Elevator Drill Pipe Air Oper Ton. Details : Magnetic Particle Inspection Serial No: EL 11 Date : 19/10/2011
72 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-040 Client : Ensco Item: Elevator 3 ½ DP MGG Ton. Details : Magnetic Particle Inspection Serial No: EL 10 Date : 18/10/2011
73 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-041 Client : Ensco Item: Elevator Drill Pipe 3 ½. Details : Magnetic Particle Inspection Serial No: EL 5 Date : 19/10/2011
74 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-042 Client : Ensco Item: Elevator Drill Pipe 3 ½. Details : Magnetic Particle Inspection Serial No: EL 7 Date : 19/10/2011
75 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-043 Client : Ensco Item: Side Door Csg Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 2 Date : 19/10/2011
76 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-044 Client : Ensco Item: Side Door Elevator 20. Details : Magnetic Particle Inspection Serial No: EL 119 Date : 19/10/2011
77 Customer : Ensco Location : Ensco P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-045 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Elevator Drill Pipe. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: 5 Quantity : 1 Identification / Serial No : EL 30 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 21/10/2011
78 Continuation Report Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-045 Client : Ensco Item: Elevator Drill Pipe 5. Details : Magnetic Particle Inspection Serial No: EL 30 Date : 21/10/2011
79 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-046 Client : Ensco Item: Elevator Drill Pipe Air Oper 5. Details : Magnetic Particle Inspection Serial No: EL 8 Date : 21/10/2011
80 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-047 Client : Ensco Item: Elevator Drill Pipe 5. Details : Magnetic Particle Inspection Serial No: EL 12 Date : 21/10/2011
81 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-048 Client : Ensco Item: Single Joint Elevator SJL /8. Details : Magnetic Particle Inspection Serial No: EL 17 Date : 22/10/2011
82 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-049 Client : Ensco Item: Single Joint Elevator 3 ½. Details : Magnetic Particle Inspection Serial No: EL 24 Date : 22/10/2011
83 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-050 Client : Ensco Item: Elevator Drill Pipe Air Oper MGG ½ Details : Magnetic Particle Inspection Serial No: EL 1 Date : 22/10/2011
84 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-051 Client : Ensco Item: Elevator Drill Pipe Air Oper 3 ½ Details : Magnetic Particle Inspection Serial No: EL 6 Date : 22/10/2011
85 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-052 Client : Ensco Item: Single Joint Elevator 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 137 Date : 22/10/2011
86 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-053 Client : Ensco Item: Side Door Casing Elevator SLX - 7. Details : Magnetic Particle Inspection Serial No: EL 138 Date : 22/10/2011
87 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-054 Client : Ensco Item: Side Door Casing Elevator SLX - 7. Details : Magnetic Particle Inspection Serial No: EL 16 Date : 22/10/2011
88 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-055 Client : Ensco Item: Side Door Casing Elevator SLX 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 13 Date : 22/10/2011
89 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-056 Client : Ensco Item: Side Door Casing Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 15 Date : 22/10/2011
90 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-057 Client : Ensco Item: Side Door Casing Elevator SLX 13 3/8. Details : Magnetic Particle Inspection Serial No: EL 14 Date : 22/10/2011
91 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-058 Client : Ensco Item: Side Door Casing Elevator SLX 9 5/8. Details : Magnetic Particle Inspection Serial No: EL 120 Date : 22/10/2011
92 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-059 Client : Ensco Item: Elevator Drill Pipe - Air Oper GG ½. Details : Magnetic Particle Inspection Serial No: EL 3 Date : 22/10/2011
93 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-060 Client : Ensco Item: Elevator Drill Pipe HGG - 5. Details : Magnetic Particle Inspection Serial No: EL 4 Date : 23/10/2011
94 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-061 Client : Ensco Item: Elevator Drill Pipe GG 4 ½. Details : Magnetic Particle Inspection Serial No: EL 51 Date : 23/10/2011
95 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-062 Client : Ensco Item: Tubing Elevator 3 ½. Details : Magnetic Particle Inspection Serial No: EL 9 Date : 23/10/2011
96 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-063 Client : Ensco Details : The inspection was made with shut elevator, in 50% of critical areas. Item: Spider Elevator 500 Tons. Serial No: EL 31 Date : 23/10/2011
97 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-064 Client : Ensco Details : The inspection was made with shut elevator, in 50% of critical areas. Item: Spider Elevator 500 Tons. Serial No: EL 30 Date : 23/10/2011
98 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-067 Client : Ensco Item: Side Door Elevator 30 Details : Magnetic Particle Inspection Serial No: EL 26 Date : 24/10/2011
99 Customer : Ensco Location : Ensco W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-083 Client : Ensco Item: Single Joint Elevator 20 Details : Magnetic Particle Inspection Serial No: EL 281 Date : 27/10/2011
100 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-086 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Adapter Plate (Giraffe). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : BABO46463 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 28/10/2011
101 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-086 Client : Ensco Details : Magnetic Particle Inspection Item: Adapter Plate (Giraffe). Serial No: BABO46463 Date : 28/10/2011
102 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-087 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Shear Pin (Giraffe). Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : N/A Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. It was not found Crack, but Shear Pin crooked. Recommendations. No acceptable to Specification. Continuation attached : Yes Date : 28/10/2011
103 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-087 Client : Ensco Details : Shear Pin crooked. Item: Shear Pin (Giraffe). Serial No: N/A Crooked Angle. Date : 28/10/2011
104 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-088 Client : Ensco Details : Magnetic Particle Inspection Item: Racking Arm (Giraffe). Serial No: N/A Date : 28/10/2011
105 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-089 Client : Ensco Details : Magnetic Particle Inspection Item: Racking Arm Frame (Giraffe). Serial No: N/A Date : 28/10/2011
106 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-065 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Pedestal Elevator. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 3 Identification / Serial No : N/A Comments : Areas Inspected. Inspection of magnetic Particle was carried out in welds of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 23/10/2011
107 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-065 Client : Ensco Details : Magnetic Particle Inspection Item: Pedestal Elevator. Serial No: N/A Date : 23/10/2011
108 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-071 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : BOP ROV Panel Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 2 Identification / Serial No : N/A Comments : Areas Inspected. Inspection of magnetic Particle was carried out in welds of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 24/10/2011
109 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-071 Client : Ensco Details : Magnetic Particle Inspection Item: BOP ROV Panel Serial No: On top BOP Mid BOB Date : 24/10/2011
110 P.O. No : W.I. No : IRM 3019 Report No : MT-IRM3019F-077 Procedure : QCP/MPI/010 Surface : Acceptable Equipment : HMM6 Electromagnet Equipment Serial No : Permanent Magnet / Pull 40lbs : N/A Magnetic Flow : Yes Coil : N/A Electromagnet / Pull 10lbs : Yes Voltage : 110V Current Flow : Yes Longitudinal : Yes Other : N/A Pole Spacing : 4 to 6 Circular : N/A Flux Indicator : Light Type : Background : Indicator : Berthold N/A Natural Yes Metal Check White Metal Check Red Burmah Strip: Yes Artificial N/A Batch No : Batch No : 9769 Client : Ensco 5002 Item : Slips 7 Spider Elevator 500 T. Drawing No : N/A Specification : ASTME 1444/709 Material : Carbon Steel Size: N/A Quantity : 1 Identification / Serial No : SA 36 Comments : Areas Inspected. Magnetic Particle Inspection was carried out in 100% of the aforementioned item. Results. No defects Injurious or were found. Recommendations. Acceptable to Specification. Continuation attached : Yes Date : 27/10/2011
111 Continuation Report W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-077 Client : Ensco Item: Slips 7 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 36 Date : 27/10/2011
112 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-078 Client : Ensco Item: Slips 7 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 38 Date : 27/10/2011
113 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-079 Client : Ensco Item: Slips 9 5/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 34 Date : 27/10/2011
114 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-080 Client : Ensco Item: Slips 9 5/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 35 Date : 27/10/2011
115 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-081 Client : Ensco Item: Slips 13 3/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 32 Date : 27/10/2011
116 W.O. No : W.I. No : IRM 3019 Report No :MT-IRM3019F-082 Client : Ensco Item: Slips 13 3/8 Spider Elevator 500 T. Details : Magnetic Particle Inspection Serial No: SA 33 Date : 27/10/2011
117 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Drill Floor Date : 26/10/2011 FIRM-167 Revisão.1
118 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Drill floor Date : 26/10/2011 FIRM-167 Revisão.1
119 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1
120 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1
121 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas in Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1
122 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool. 21 Date : 26/10/2011 FIRM-167 Revisão.1
123 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1
124 IRM Services Photographic Inspection Report Customer : Ensco Location : Ensco 5002 P.O. No : W.I. No : IRM 3019 Report No : UT-IRM Client : Ensco Item : Chock Line Details: Wall Thickness, Inspected areas Under Moon Pool Date : 26/10/2011 FIRM-167 Revisão.1
125 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) UT-IRM /10/2011 Max Allow Diminuation (%) Test Point Type 1A 19,05 14,3 5" 29,4 0,0% 4,8 25,0% High Pressure 1B 19,05 14,3 5" 30,2 0,0% 4,8 25,0% High Pressure 1C 19,05 14,3 5" 31,3 0,0% 4,8 25,0% High Pressure 1D 19,05 14,3 5" 30,7 0,0% 4,8 25,0% High Pressure 2A 19,05 14,3 5" 31,2 0,0% 4,8 25,0% High Pressure 2B 19,05 14,3 5" 31,0 0,0% 4,8 25,0% High Pressure 2C 19,05 14,3 5" 30,7 0,0% 4,8 25,0% High Pressure 2D 19,05 14,3 5" 32,3 0,0% 4,8 25,0% High Pressure 3A 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 3B 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 3C 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 3D 19,05 14,3 5" 17,5 8,1% 4,8 25,0% High Pressure 4A 19,05 14,3 5" 17,1 10,2% 4,8 25,0% High Pressure 4B 19,05 14,3 5" 17,1 10,2% 4,8 25,0% High Pressure 4C 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 4D 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 5A 19,05 14,3 5" 40,5 0,0% 4,8 25,0% High Pressure 5B 19,05 14,3 5" 32,3 0,0% 4,8 25,0% High Pressure 5C 19,05 14,3 5" 35,0 0,0% 4,8 25,0% High Pressure 5D 19,05 14,3 5" 34,2 0,0% 4,8 25,0% High Pressure 6A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 6B 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 6C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 6D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1
126 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 7A 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 7B 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 7C 19,05 14,3 5" 15,6 18,1% 4,8 25,0% High Pressure 7D 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 8A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 8B 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 8C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 8D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 9A 19,05 14,3 5" 29,7 0,0% 4,8 25,0% High Pressure 9B 19,05 14,3 5" 33,2 0,0% 4,8 25,0% High Pressure 9C 19,05 14,3 5" 39,2 0,0% 4,8 25,0% High Pressure 9D 19,05 14,3 5" 39,0 0,0% 4,8 25,0% High Pressure 10A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 10B 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 10C 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 10D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 11A 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 11B 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 11C 19,05 14,3 5" 15,6 18,1% 4,8 25,0% High Pressure 11D 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 12A 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 12B 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 12C 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 12D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1
127 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 13A 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 13B 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 13C 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 13D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 14A 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 14B 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 14C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 14D 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 15A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 15B 19,05 14,3 5" 16,8 11,8% 4,8 25,0% High Pressure 15C 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 15D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 16A 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 16B 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 16C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 16D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 17A 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 17B 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 17C 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 17D 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 18A 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 18B 19,05 14,3 5" 17,4 8,7% 4,8 25,0% High Pressure 18C 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 18D 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1
128 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 19A 19,05 14,3 5" 16,6 12,9% 4,8 25,0% High Pressure 19B 19,05 14,3 5" 17,0 10,8% 4,8 25,0% High Pressure 19C 19,05 14,3 5" 16,9 11,3% 4,8 25,0% High Pressure 19D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 20A 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 20B 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 20C 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 20D 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 21A 19,05 14,3 5" 31,5 0,0% 4,8 25,0% High Pressure 21B 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 21C 19,05 14,3 5" 41,1 0,0% 4,8 25,0% High Pressure 21D 19,05 14,3 5" 38,6 0,0% 4,8 25,0% High Pressure 22A 19,05 14,3 5" 16,3 14,4% 4,8 25,0% High Pressure 22B 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 22C 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 22D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 23A 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 23B 19,05 14,3 5" 16,7 12,3% 4,8 25,0% High Pressure 23C 19,05 14,3 5" 16,5 13,4% 4,8 25,0% High Pressure 23D 19,05 14,3 5" 16,4 13,9% 4,8 25,0% High Pressure 24A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 24B 19,05 14,3 5" 16,2 15,0% 4,8 25,0% High Pressure 24C 19,05 14,3 5" 15,8 17,1% 4,8 25,0% High Pressure 24D 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1
129 IRM Services Wall Thickness Pipe Line Survey Report Customer: W.I. No: Service: Inspector:: N Ensco Location: Ensco 5002 Report No: UT-IRM IRM3019 Location of Structure: Drill Floor and Under Drill Floor Class I.D No: Wall Thickness Survey Structural Member: Chock Line Surveyors Name: Francis Lima Inspectors Qualification: ASNT Level II Date: 26/10/2011 Original Thickness Class Minimum Thickness (mm) Test Point O.D Actual W.T. (2010) Diminuation (%) 2010 Actual W.T. (2011) Diminuation (%) 2011 Actual W.T. (2012) Diminuation (%) 2012 Max Allow Diminuation (mm) Max Allow Diminuation (%) Test Point Type 25A 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 25B 19,05 14,3 5" 43,6 0,0% 4,8 25,0% High Pressure 25C 19,05 14,3 5" 37,9 0,0% 4,8 25,0% High Pressure 25D 19,05 14,3 5" 36,8 0,0% 4,8 25,0% High Pressure 26A 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 26B 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 26C 19,05 14,3 5" 15,7 17,6% 4,8 25,0% High Pressure 26D 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 27A 19,05 14,3 5" 15,9 16,5% 4,8 25,0% High Pressure 27B 19,05 14,3 5" 15,5 18,6% 4,8 25,0% High Pressure 27C 19,05 14,3 5" 16,0 16,0% 4,8 25,0% High Pressure 27D 19,05 14,3 5" 16,1 15,5% 4,8 25,0% High Pressure 28A 19,05 14,3 5" 36,1 0,0% 4,8 25,0% High Pressure 28B 19,05 14,3 5" 31,2 0,0% 4,8 25,0% High Pressure 28C 19,05 14,3 5" 41,3 0,0% 4,8 25,0% High Pressure 28D 19,05 14,3 5" 41,0 0,0% 4,8 25,0% High Pressure 29A 29B 29C 29D 30A 30B 30C 30D Comments: Original Thickness and Max Allowance Diminuation not provide by client. Use ASME Pipe Schedule as reference. Inspector's Signature Surveyor's Signature Legend: Substantial Corrosion Below Class Minimum FIRM-161 Revisão. 1
STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing
1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado
More information11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
More informationCHAPTER 13 LOAD HOOKS
CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter
More informationA World Class Manufacturer of Induction Bends
A World Class Manufacturer of Induction Bends COFELY FABRICOM BENDING A leading position in bending High Flexibility and Close Tolerances As a world leading manufacturer of pipe bends, produced by induction
More informationNON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract
NON-DESTRUCTIVE TESTING OF PIPELINES L. Annila Abstract This paper shall present different, contemporarily available non-destructive testing (NDT) methods of pipelines and compare them to each other from
More informationEVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES
EVALUATION OF THE AQUA WRAP SYSTEM IN REPAIRING MECHANICALLY- DAMAGED PIPES Prepared for AIR LOGISTICS, INC. Azusa, California September 2005 Revision 1 STRESS ENGINEERING SERVICES, INC. Houston, Texas
More informationNON-DESTRUCTIVE TESTING OF DUPLEX STAINLESS STEEL
NON-DESTRUCTIVE TESTING OF DUPLEX STAINLESS STEEL AUTHORS: Keith Doughten, District Manager, Magnetic Analysis Corporation, ASNT NDT Level III ET, UT David Bauer, Marketing and Training Manager, Magnetic
More informationPipe Inspection Carbon Steel Trials
Pipe Inspection Carbon Steel Trials Client Innospection Limited Facility Head Office Aberdeen Item Inspected Pipe No 1 Inspection Method SLOFEC Date Commenced 01/01/2009 Date Completed 10/01/2009 Type
More informationWELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate
Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River
More informationTARIFF CODE and updates standard
TARIFF CODE and updates standard No HS CODE AHTN CODE PRODUCT DESCRIPTION PRODUCT TYPE STANDARDS IDENTIFIED 7207 Semi finished products of iron or non alloy steel Containing by weight less than 0.25% of
More informationVrtné trubky Drill Pipe
Vrtné trubky Drill Pipe VRTNÉ ROURY - zušlechtěné závity - vysoká kvalita těla roury - svařeno třením - vysoká přímost vrtných tyčí - závity dle STN, API, DIN a GOST - délky dle přání zákazníka Průměr
More informationOCTG-Mill RUNNING AND PULLING PROCEDURE FOR TPS-TECHNISEAL TUBING AND CASING
RUNNING 1. The threads and seal areas of the pipe and coupling must be clean, free from foreign matter or damage. Never use wire brushes for cleaning threads and seals. The couplings must be phosphated
More informationLOAD TESTING OF ACRO BUILDING SYSTEMS 12075 RAKE-EDGE GUARDRAIL SYSTEM
1049 Triad Court, Marietta, Georgia 30062 (770) 423-1400 Fax (770) 424-6415 LOAD TESTING OF ACRO BUILDING SYSTEMS 12075 RAKE-EDGE GUARDRAIL SYSTEM ATS JOB # D167754-1 PURCHASE ORDER # 22383 Prepared for
More informationWARNING! Failure to follow these inspection procedures can cause personal injury and property damage.
GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationNDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationpowered by ingenuity Corrosion Logging Well Integrity Measurement
powered by ingenuity Corrosion Logging Well Integrity Measurement Corrosion control in the oil industry is a matter of economics. Probe s corrosion logging tools offer a solution to predict and detect
More informationPressure Vessel Assessment Report
Project Information Client: Total Energy Location: Blackwell OK Date: 7/23/2013 Contact: Integrity Mgmt. Advisor: Chuck Easterbrooks - API 510 #2212 Cc: API / UT Inspector: Robert Van Pelt-API 510# 40899
More informationNON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS
NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS What is ASNT? What is ASNT? The American Society for Nondestructive Testing, Inc. What is ASNT? ASNT is the world's largest technical society for nondestructive
More informationEAGLE ASSET TRACKING DATABASE
EAGLE ASSET TRACKING DATABASE Eagle Inspection Technologies offers a user friendly Asset Tracking Database designed specifically for small industrial facilities (Power Plants, Chemical Plants, Tank Farms,
More informationall VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101
ergonomic FORKLIFT vacuum ATTACHMENTs FOR ALL MATERIALS HANDLING FOR LIFTING METAL, WOOD, PLASTIC, STONE, CONCRETE, PAPER, AND MORE In Warehousing, Order Picking, Palletizing, Loading, Conveying, Production.
More informationJIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
More informationHigh Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
More informationOne Source for Rig Handling Tools and Drilling Equipments Solution
One Source for Rig Handling Tools and Drilling Equipments Solution Content Manual Tong Web Wilson Type AAX Manual Tong... 1 Web Wilson B Style & C Style Manual Tong... 3 Type B Manual Tong... 5 BJ Type
More informationExternal Visual Inspection Form
Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationMechanical Property Changes in Steel during the Pipe Making Process Brent Keil 1
381 Mechanical Property Changes in Steel during the Pipe Making Process Brent Keil 1 Abstract Welded Steel Pipe (WSP) is arguably the most widely utilized pipe material for the transmission of water throughout
More informationCHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES
CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES This chapter provides the requirements for below-the-hook lifting devices used in hoisting and rigging, such as spreader bars, lifting yokes, and lift fixtures.
More informationLiftAlloy Chain Slings
CHAIN SLING BASICS Slings Lift-All chain slings meet or exceed all OSHA, ASME B30.9 and NACM standards and regulations. chain slings, available in 80 for 7/32" and 7/8"- /4" and 00 for 9/32"-3/4", are
More informationThe Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:
RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000
More informationPremium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications
Premium Tubular Solutions Super Duplex Welded Tubes for Umbilical Applications Premium Tubular Solutions Innovative Tubes for Umbilical Applications Over 35 years of experience in Premium welded t ubular
More informationINNOVATIVE ELECTROMAGNETIC SENSORS
Technical Progress on INNOVATIVE ELECTROMAGNETIC SENSORS FOR PIPELINE CRAWLERS Type of Report: Technical Progress Report Reporting Period Start Date: October 7, 2003 Reporting Period End Date: April 30,
More informationPipe Handling Equipment
Pipe Handling Equipment Blohm+Voss Repair GmbH Oil Tool Division Hermann-Blohm-Straße 2 20457 Hamburg, Germany Phone: +49-40-31 19-81 42 Fax: +49-40-31 19-34 00 E-mail: info@blohmvoss-oiltools.com www.blohmvoss-oiltools.com
More informationABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:
CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations
More informationUltrasonic Wave Propagation Review
Ultrasonic Wave Propagation Review Presented by: Sami El-Ali 1 1. Introduction Ultrasonic refers to any study or application of sound waves that are higher frequency than the human audible range. Ultrasonic
More informationContractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.
SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The
More informationReach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com
Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center www.geinspectionacademy.com Sharing knowledge. Shaping technology. At GE, we know the value of investing in your
More informationQUALITY ENGINEERING & SERVICES W.L.L (A DIVISION OF QUALITY GROUP OF COMPANIES) ISO 9001 : 2008 CERTIFIED COMPANY COMPANY PROFILE
QUALITY ENGINEERING & SERVICES W.L.L (A DIVISION OF QUALITY GROUP OF COMPANIES) ISO 9001 : 2008 CERTIFIED COMPANY COMPANY PROFILE FABRICATION, MACHINING, METAL CASTING, LOAD TESTING, SAND BLASTING & PAINTING,
More informationLIEBERT VNSA Installation Sheet
LIEBERT VNSA Installation Sheet Description The Liebert vnsa network switch is designed for connecting multiple Ethernet-ready devices and comes in various models. The unit may have: A Liebert icom display
More informationCALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04
BROWN MINNEAPOLIS TANK PAGE 1 OF 7 PURPOSE: Create and Drawing Uniformity Create, explain, and establish a standard bill of materials to be placed on every drawing (except the overall tank elevation and
More informationNorth American Stainless
North American Stainless Flat Products Stainless Steel Grade Sheet 310S (S31008)/ EN 1.4845 Introduction: SS310 is a highly alloyed austenitic stainless steel designed for elevated-temperature service.
More informationGUARDRAIL POST STEEL
GUARDRAIL POST STEEL Guardrail posts meeting materials certification are evaluated and checked for: 1. Dimensional acceptance 2. Physical test results a. Chemical b. Physical 3. Galvanized or painted coating
More informationNON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS.
NON-DESTRUCTIVE TESTING LEARNING FROM THE PAST, MAXIMISING FUTURE BENEFITS. Harry Bainbridge, Health & Safety Executive, Bootle Bernard McGrath, AEA Technology plc, Risley Crown Copyright 2001. Reproduced
More informationNondestructive Testing: Why, When, What and How?
: Why, When, What and How? Executive Summary Non-destructive testing (NDT) relates to the examination of materials for flaws without harming the object being tested. As an industrial test method, NDT provides
More informationNON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES
NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES RIGHT SERVICE MAXIMUM RETURN Whether it is in fabrication, pipe manufacturing, pipeline, plant construction, chemical, petrochemical plants,
More informationAker Drilling Riser Brazil
part of Aker Brazil Presenter Marcelo Coraça Project Manager June/2010 2010 Aker Solutions Aker Solutions Rio das Ostras Aker Riser workshop Aker Subsea workshop Aker MH workshop General Offices Meeting
More informationReproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding
7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:
More information16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F
More informationStructural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one
More informationNDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationunderstanding medium frequency induction melting furnace and its components
understanding medium frequency induction melting furnace and its components 9 Spruce Street, Jersey City, NJ 07306 USA sales@electroheatinduction.com INDUCTION MELTING FURNACE AND ITS COMPONENTS The purpose
More informationGAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today
More informationSeawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.
OSNA -10 Copper-Nickel Lined Pipes Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. KME Germany AG & Co. KG Copper-Nickel Lined Pipes [GB] Member of the KME Group
More informationINSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
INSTRUCTION MANUAL IM042 Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TABLE OF CONTENTS SUBJECT PAGE Safety Instructions... 3 Descriptions and Specifications...
More information-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
More informationIHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality
IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationActivity 2.3b Engineering Problem Solving Answer Key
Activity.3b Engineering roblem Solving Answer Key 1. A force of 00 lbs pushes against a rectangular plate that is 1 ft. by ft. Determine the lb lb pressure in and that the plate exerts on the ground due
More informationEssentials Welding QA/QC Plan Sample
Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the
More informationDoc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1
Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material
More informationPump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford
Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump
More informationSECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
More informationSECTION 08 5656 GUARDA SECURITY WINDOW SCREENS
Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications
More informationTITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
More informationDIAMOND Retractable Rodding Robot Model SPRAYROD-R
2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic
More informationHT-0095 Mini PV Receptacles 22-32 AWG Crimping Hand Tool. Tool P/N HT-0095
HT-0095 Mini PV Receptacles 22-32 AWG Crimping Hand Tool Tool P/N HT-0095 FCI MANUAL P/N 415988-001 Issued: Date (03/12/99) Page 1 of 18 HT-0095 Issued: Date (03/12/99) Page 2 of 18 Introduction Table
More informationYOUR LOCAL SOURCE IN A GLOBAL WORLD GLOBAL OUTSOURCING
GLOBAL OUTSOURCING Save from 30% to 75% on your components with fi nished machined components from China. In China there are millions of subcontractors but only a few of these are able to supply high-quality
More informationDCS Input/Output Relay Card Series
Input/Output Relay Card Series I/O RELAY CARD (with loopback test function) 8N The 8N series I/O Relay Cards easily and quickly standardize and facilitate installation of the relay board. Loopback test
More informationAPI Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015
6.1.2.12 53-03-15 Referring to Section 6.1.2.12, can a surface BOP stack arrangement with one annular, one blind shear ram, and two pipe rams, with the fifth device being optional, be considered a Class
More informationTEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For:
TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PRODUCT: Gorilla Column PVC Porch Post System with PVC Base / Cap Plates, PVC Bushings and 2-3/8 in Diameter and 3-1/2 in Diameter Galvanized
More informationCopper and Copper Alloy Tube, Pipe and Fittings
Copper and Copper Alloy Tube, Pipe and Fittings COPPER and COPPER ALLOY TUBE and PIPE Seamless Copper Pipe: Copper pipe is almost pure copper manufactured to the requirements of ASTM B 42 - Standard Specification
More informationNorth American Stainless
Introduction: North American Stainless Flat Products Stainless Steel Grade Sheet 309S (S30908)/ EN1.4833 SS309 is a highly alloyed austenitic stainless steel used for its excellent oxidation resistance,
More informationSelect Radiators Installation Guide
Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall
More informationEuropean Welding Standards
European Welding Standards John Dyson 15 th March 2004 European Standards Harmonised Standards Not all EN Standards are Harmonised, only those that are considered to satisfy relevant ESRs in product directives.
More informationTubular solutions for the Solar Power Industry Rise in success with precision
Tubular solutions for the Solar Power Industry Rise in success with precision A comprehensive offer Precision tubes designed for CSP industry applications Solar collectors q Tubes adapted for solar heat
More informationMetal Pressfitting Pipe Systems
VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing
More informationPee Dee Empty Oil Storage Tank at
Mechanical Integrity Report for the Pee Dee Empty Oil Storage Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 10 October 2012 Prepared by: George E. Matthews, E.I.T. Senior
More informationPERFORMANCE TEST REPORT. Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall
PERFORMANCE TEST REPORT Rendered to: FORMTECH ENTERPRISES, INC. SERIES/MODEL: Truline PRODUCT TYPE: PVC Seawall Report No.: Test Dates: 04/17/12 Through: 04/18/12 Report Date: 06/13/12 130 Derry Court
More informationDepending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.
Large Facility Fire Safety Checklists and Logs This package contains checklists to ensure that all fire and life safety equipment are properly inspected. There are also logs on which to record the inspections
More informationJIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger
JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for exchanging heat
More informationExamination. Performance Test. Candidate Information Booklet
Examination Performance Test Candidate Information Booklet Name Test Site Test Date (Please Print) (City/State) CRAW-T Examiner CRAW-T NUmber (Please Print) 1 Table of Contents 1.0 Introduction and Purpose
More informationSlings, Rigging and Lifting Equipment
A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: SLINGS, RIGGING AND LIFTING EQUIPMENT GM-11-038-02 Version Number: 13.0 Date Revised:
More informationEMF/EMR. Holder/Release Devices with Integral Door Closers
EMF/EMR Holder/Release Devices with Integral Door Closers EMR TECHNICAL DETAILS DORMA EMR SERIESHOLDER/RELEASE DEVICE The DORMA EMR Series holder/ release device incorporates a photoelectric detector and
More informationFRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.
FRAME PROFILE MASONRY FLUSH MASONRY KD MITER CORNER JOINT Bend Tabs Head #8 Screw (MS002485) Required on all fire rated KD frames Corner Assembly 2" (50.8) Head Jamb Head Break Away Corner Clip Spot Welds
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationWalking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
More informationAll Allison Transmission, Inc. Commercial Transmissions and Torque Converters
Revisions to this document are noted by a stripe in the left hand margin #1796, Rev. B Page 1 of 10 SUBJECT: Oil Analysis Test Recommendations SERIAL NUMBERS AFFECTED: All Allison Transmission, Inc. Commercial
More informationALERT SERVICE BULLETIN NO.
DATE REV ALERT SERVICE BULLETIN NO. DATE PAGE 210-08-02 9/10/2008 1 of 8 MODEL AFFECTED: 210 SUBJECT: MAIN ROTOR GRIPS 204-011-121-009, ULTRASONIC INSPECTION OF. HELICOPTERS AFFECTED: All Model 210 Helicopters
More informationConceptual Design of Buildings (Course unit code 1C2)
(Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical
More informationproper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity.
SGS NDT Training & Examination Centre Professional Services for Your Safety and Reputation ABOUT NON DESTRUCTIVE TESTING (NDT) About NDT NDT plays a key role in assessing conformity and reliability of
More information1.02 SYSTEM DESCRIPTION
1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall
More informationCABLE TRENCH INSTALLATION GUIDE
1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard
More informationALFRA Rotabest Piccolo 32/50 Weldon Metal Core Drilling Machine. Operation Manual
ALFRA Rotabest Piccolo 32/50 Weldon Metal Core Drilling Machine Operation Manual 06/2005 1 1. Technical Data Prod. No.: 18550 Name : Rotabest Piccolo 32/50 Weldon Input: Load rpm: 1050 Watt 400 rpm Tool
More informationINSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST
INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST MODEL CHCRV-5 For Use with Bard CH Series 3, 4 & 5 Ton 2-Stage Wall Mount Heat Pumps AND W38H, W43H, W49H and W61H Single Stage Wall Mount
More informationNon-destructive Testing
CLASSIFICATION NOTES No. 7 Non-destructive Testing MARCH 2012 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationInstructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version
instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory
More information