3. Onshore Gas Distribution Gas Compressors

Size: px
Start display at page:

Download "3. Onshore Gas Distribution Gas Compressors"

Transcription

1 1 3. Onshore Gas Distribution Gas Compressors 3.1 This Section This section covers the onshore gas distribution (gas compressors) sector ( Contract F ), as part of an overall project for DTI on EU Emissions Trading Scheme (ETS) Phase II UK New Entrants Spreadsheet revisions. The overall aim of this project is to validate and revise appropriately the existing New Entrants (NE) allocation spreadsheet. The following sub-sections present the findings for this sector. In particular, this section covers compressors in the gas distribution network. A separate onshore terminals section will cover activities (including compressors) related to gas storage, with consistency between these sections where appropriate. 3.2 Background and Sector Description Background The distribution of gas to end users and mains buffering within the UK is achieved by the transportation of natural gas in its gaseous state at ambient temperature. The gas could have either been directly imported under high pressure or have been converted from LNG at dedicated LNG storage facilities. The gas is then distributed around the UK by a network of high-pressure pipelines and compressors 1. The UK gas supply system 2 has been developed to make just in time use of the supplies from the UK continental shelf. These supplies are in decline and will be gradually replaced by pipeline imports from Eastern Europe 3 and LNG imports to purpose built terminals. The annual usage of gas is expected to rise by 16% over the next 7 years for domestic and business use 4 and to power around 40% of the nation s power stations. Presently the UK only has limited gas storage capacity, enough for approximately 14 days supply, when compared to other European countries where storage capacity is in the order of 80 days. The UK gas distribution and storage system is being developed and new import connectors built to improve its storage capacity and meet predicted rising demands in the future. Gas storage is being covered in the separate section onshore terminals. 1 Gas Delivery Network, 2 The Future of UK Gas Supplies, Postnote October 2004, Parliamentary Office of Science and Technology 3 DTI, 2005, EU Emissions Trading Scheme Benchmark Research 4 National Grid, 2005, Gas Transportation Ten Year Statement.

2 2 The compressors situated in the UK gas pipeline network operate as required by demand for gas across the UK. The compressors keep the pressure in the main 6,400 km of pipes at about 85 bar. It is important that the pressure of the mains is kept at the correct pressure for safety reasons. In order to prevent any problems with supply that could occur due to failure of compressor facilities the system has significant over-capacity. Each compressor station consists of two or more turbines of different ratings and these are switched in and out of use as required by the continuous monitoring of the mains gas pressure. As such, the operator has extremely limited control over the overall load factor of the compressors (amount of running hours and load). All operation is reactive and driven by security of supply and safety license obligations. The operating load will fluctuate with demand and network conditions such as ambient temperatures. This variation in load influences emissions as the emissions factor and efficiency of the compressors vary at different loads. Efficiency increases with load, although for some models the peak efficiency is at a load slightly lower than 100%. Load and operating hour variability may increase from 2007 as new LNG supplies and new interconnectors come on stream, providing greater supply uncertainty with more competition in the supply market and greater choice of entry point for the gas shipping market. Key parameters in the proposed allocation methodology include: Shaft output (kw) this is the amount of mechanical power required to drive the compressor, provided by the turbine. Net heat rate (kj/kwh) this is inversely proportional to the thermal efficiency of the turbine. Both of these parameters will vary when the turbine is operated at different loads. Industry standards are for turbine performance values to be given at idle, 50%, 75% and 100% load Phase I incumbent and new entrant installations Identification of how sector is covered under EU ETS The distribution of gas in the UK is driven by twenty-three compression stations, all operated by National Grid (formerly Transco) and included in this study. All of the sites are listed in the UK NAP allocation for Phase 1, and are covered under EU ETS as combustion installations with a rated thermal input exceeding 20 MW. The main feature of the compressor stations are the gas turbines which are the source of CO 2 emissions. The fuel used to power the gas compressors is the same natural gas that is being transported around the national transmission system. There are therefore no particular issues with fuel mix that need to be considered within the allocation methodology. CO 2 emissions from sector Total CO 2 emissions from the onshore gas distribution (gas compressors) sector in recent years is presented in Table 3.1.

3 3 Table 3.1 Total CO 2 emissions from the onshore gas distribution (gas compressors) sector Total emissions (tco 2) ,188,564 1,164,297 1,318,900 1,438,567 Source: NAP database Note: Excluding two BGE stations located in Southern Scotland as they are part of an interconnector pipeline to Ireland. There is also a similar interconnector station for the Belgium pipeline. These will be covered separately in the onshore terminals sector. Identification of Non-benchmarked incumbents, Benchmarked incumbents and New Entrants An indication of incumbent and new entrant gas compressor installations for onshore gas distribution in Phase I of the NAP is shown in Table 3.2. Table 3.2 Gas Compressors Phase I New Entrants and Incumbents Installation Status National Grid Compressor Station, Aberdeen Incumbent Operational National Grid Compressor Station, Alrewas Incumbent Operational National Grid Compressor Station, Aylesbury Incumbent Operational National Grid Compressor Station, Bathgate Incumbent Operational National Grid Compressor Station, Bishop Auckland Incumbent Operational National Grid Compressor Station, Cambridge Incumbent Operational National Grid Compressor Station, Carnforth Incumbent Operational National Grid Compressor Station, Chelmsford Incumbent Operational National Grid Compressor Station, Churchover Incumbent Operational National Grid Compressor Station, Diss Incumbent Operational National Grid Compressor Station, Hatton Incumbent Operational National Grid Compressor Station, Huntingdon Incumbent Operational National Grid Compressor Station, Kings Lynn Incumbent Operational National Grid Compressor Station, Kirriemuir Incumbent Operational National Grid Compressor Station, Moffat Incumbent Operational National Grid Compressor Station, Peterborough Incumbent Operational National Grid Compressor Station, Scunthorpe Incumbent Operational National Grid Compressor Station, St Fergus Incumbent Operational National Grid Compressor Station, Warrington Incumbent Operational

4 4 Installation Status National Grid Compressor Station, Wisbech. Incumbent Operational National Grid Compressor Station, Wooler Incumbent Operational National Grid Compressor Station, Wormington Incumbent Operational National Grid Compressor Station, Bathgate Nº2 Phase I new entrant Operational Note: The two BGE stations and compression stations used for gas storage are being covered in the onshore terminals section Possible types of new entrants in Phase II Brief description of known or likely new entrants and market developments Some key market developments are summarised in Section One form of new entrant would be additional compressor stations within National Grid s gas distribution network to supplement existing stations. From our discussions with the sector, it is considered possible that a small number of new compressor stations could be built during phase II. Furthermore, expansion of current gas compressor stations is also likely. Furthermore, with the increase in the number of potential gas storage facilities similar to those at Centrica s Rough Gas Facility, (whereby gas is taken out of the national grid at times of low gas price and demand to be stored under pressure until times of increased demand and price) new gas storage and compression facilities may also be commissioned. These facilities are being considered in the separate sector onshore terminals. Summary of possible types of New Entrants in Phase II A summary of possible types of New Entrants in Phase II is given in Table 3.3. Table 3.3 Summary of possible types of New Entrants in Phase II Type of New Entrant Is this type of New Entrant realistically possible in Phase II? Technology type Fuel type Examples (known or likely) Other relevant details New installation New piece of equipment to increase capacity at existing installation Yes, potentially new gas compressor stations Yes, considered to be most likely type of new entrant Gas turbine compressor Gas turbine compressor Natural gas Natural gas It is difficult to predict what capacity increases will come into force in Phase II as it is dependent upon performance in individual areas of the National Grid transmission system See above

5 5 Type of New Entrant Is this type of New Entrant realistically possible in Phase II? Technology type Fuel type Examples (known or likely) Other relevant details Extension to existing piece of equipment to increase capacity at existing installation No It is not likely that existing gas turbines will be modified to increase capacity 3.3 Review of Relevant Data Data sources National Grid have provided data for capacity, fuel use, CO 2 emissions and load factor for each site from the past 3 years of operation to inform the validation and assessment of the existing methodology. The data consulted included FES report and spreadsheet on NER allocations for gas compressor stations around the UK and Phase 1 NAP submissions for 22 gas compressor stations. No reference documents have been found which explicitly identify BAT or similar benchmarks for efficiency for turbines at compressor stations. However, recent ISO performance data for all available turbines is available in an annual publication Gas Turbine World Handbook 5. This is a bi-monthly industry publication, the annual Handbook is an associated reference publication which lists standard data for all gas turbines in production. Efficiency is one of the indicated values and the three models identified in the FES spreadsheet (Solar Titan, Alstom Cyclone and GE LM2500+) have been confirmed as the most efficient (BAT) for their respective capacity range. The general pattern is that larger turbines have higher efficiency. The turbine is at maximum efficiency near maximum load so instead of running a turbine at half load an installation will often have two sizes of turbine so that during times of low demand a small turbine can be run at high load and will be operating at higher efficiency than running the large turbine at part load. For this reason BAT should be identified for a number of capacity ranges. The choice of capacity of a turbine at a site is determined by the required shaft power of the compressor and by the demands of the grid. The size bands chosen for BAT level performance relate to turbine capacities at existing sites. These models can be categorised as either large or small turbines. For the large turbines (26-34 MW) there is one model which has a higher efficiency than other available models and therefore is identified as BAT for this range. In the small turbine range (10-15MW), of which there are a greater number installed, there is a high efficiency model in the upper and the lower part of the range. To determine the BAT efficiency for small turbines the average efficiency of these two models has been calculated. Further divisions in capacity are not considered necessary based upon trends in existing installations which will continue with new entrants. 5 Gas Turbine World, Handbook, Vol 24, Pequot Publication, USA

6 Benchmarks used in other contexts, including other Member States Investigations have been undertaken to try to identify benchmarking approaches for new entrants in other Member States. Overall, the extent of information available within the tight timescales of this study has been limited. Furthermore, information will tend to relate to Phase I approaches, and hence may not be indicative of approaches in Phase II, which this study is focussed on. Notwithstanding this, it is useful to consider these approaches, as briefly summarised below. Denmark The Danish NAP assumes an efficiency factor of 0.9 for new entrants but no distinction is made between sectors for this factor. No discussion of new entrant benchmarks or formula. Germany New entrants are granted allocation on BAT benchmarks. These benchmarks are established for installations with comparable products, and derived from BAT for new installations in that class. Also, each product category will have a benchmark. New entrants that don t have defined benchmarks will be granted allowance based on BAT. New entrant formula (industry non-specific); where Allocation i = C i U BAT, P i i C i is an index for the installation; is the installation-specific output capacity in MW; P U i is the projected utilisation or load factor by installation; and BAT BAT benchmark for emissions per output unit, here CO 2 /MW. Netherlands A i = E v P β C Where A i = Allocation (tco 2 /year); E v = Emissions from combustion averaged for 2001 to 2002 (tco 2 /year), information not readily available on the specific approach for new entrants operational after that time; P = Production growth as a factor for the total of the years (relative index); β = energy consumption of the world s best divided by the installation s actual energy consumption in the benchmark year 1999 (relative index); C = Allocation factor (relative index).

7 7 Sweden Allocation = k x Projected output x BM / BAT Where k = Scale factor applied to fuel-related emissions from combustion installations in the energy sector. For non energy sector sites, k = 1.0; Projected output = emissions in accordance with projected produced quantity of installation-specific product Only production based on fossil fuels is meant for electricity and heat production; BM = Benchmark emission factor; BAT = Corresponds to estimated specific emissions at installation (tco 2 /t product). Other Member States For a number of other Member States, the readily available information simply indicates that new entrant allocations are to be based on BAT levels of performance. This applies to Czech Republic, Ireland, Malta, Portugal (explicitly stating BAT Reference Documents), Slovenia (also referencing BAT Reference Documents), and Spain. 3.4 Review of Phase 1 Benchmarks Characterisation of existing New Entrant allocation benchmarks A characterisation of the existing New Entrant allocation spreadsheet is given in Table 3.4. Table 3.4 Characterisation of the existing New Entrant allocation spreadsheet Item Parameter value / details Justification for choice of parameter value / details given by FES Source of data Coverage of activities (how does the coverage of activities included in the spreadsheet compare to the activities in the sector that are covered by EU ETS) Good compressor stations use uniform technology Only relevant type of technology used at compressor stations National Grid Level of sector differentiation (Is there one set of formulae / parameter values for the whole sector, or are there separate formulae / parameter values for different technologies, fuels, products etc) High amount of differentiation in the makes and models of gas turbines. Otherwise all other parameters uniform BAT models used in FES methodology National Grid Degree of standardisation of formulae (i.e. what types of input parameters are required in the formulae?) Reliant upon operator for prediction of likely loads. Methodology only takes account of three specific models of turbine not useful for new entrants NOT using those specific models BAT models used in FES methodology although if turbine is not one of the three that are listed then reference is made to the offshore spreadsheet. Not specified

8 8 Item Parameter value / details Justification for choice of parameter value / details given by FES Source of data Technology / process types (What types of technologies / processes are used as the basis for the parameter values?) Uniform type of technology (gas turbine), but high number of models and makes of gas turbines Simple logical approach National Grid Fuels assumed (What types of fuels are used as the basis for the parameter values?) Natural gas single fuel Only relevant fuel National Grid Emission factors (What are the fuel CO 2 and Process CO 2 emission factors?) Emission factor for natural gas Reliable source of data DEFRA No process CO2 emissions. Capacity utilisation factors / load factors (What are the values for these factors?) Reliant upon operator predictions Justification not clear. Not specified Overall, the formulae that are used in the existing New Entrant allocation spreadsheet are: A = U j * EF t Allocation = Hours at specified load * Emissions Factor at specified load tco 2 Hours tco 2 / hour Where: Parameter / Variable U j idle U j 100% U j 75% U j 50% EF t idle EF t 100% EF t 75% EF t 50% Value hours at idle hours at 100% load hours at 75% load hours at 50% load tco 2/hr at idle for XXX turbine model tco 2/hr at 100% for XXX turbine model tco 2/hr at 75% for XXX turbine model tco 2/hr at 50% for XXX turbine model The operator selects their turbine models from drop down menus, which automatically populates a table with standard CO 2 emissions at 100%, 75%, 50% and idling loads for each model. In practise idle loads are not used since there is no useful output power at idle. The operator then enters predicted hours of operation for each turbine at each of the four loads. Results are then given for a total sum hours of operation, an annual CO 2 emissions value for each turbine, an annual energy allowance allocation and a total phase 1 allowance allocation.

9 Validation of Existing New Entrant Allocation Spreadsheet To attempt to validate the existing new entrant spreadsheet, emissions were calculated for the four sites which only have those turbines listed in the spreadsheet. Where there is more than one model at a site the mean emissions factor of the different models was used, this is a source of error as it is not known which turbines were running for how many hours. The number of hours at each load for each site was provided by the operator and used in the calculation. The existing methodology does not clearly indicate how calculations should be performed if the site includes other turbine models. The results of this validation exercise are presented in Table 3.5 below. Table 3.5 Validation of existing New Entrant allocation spreadsheet Site Reference Ratio of allocations if existing NE spreadsheet was applied / Actual Emissions in Specified Year(s) 2004 Data 2005 Data Average A 99% 120% 110% B 105% 121% 113% C 125% 122% 124% D n/a 90% 90% Average 110% 113% 109% This shows that the existing NE allocation spreadsheet appears to give a nine percent higher overall allocation of CO 2 emissions than is actually experienced. It should be noted that only four of the incumbent sites only make use of any of the three models of turbine specified in the benchmarking methodology. The spreadsheet cannot be used to calculate the allocation for the remaining sites as these installations include models outside the selection in the spreadsheet. This results in only a limited number of possible data points for the validation. Furthermore, the data provided by the operator grouped all operating hours together for all compressors at their sites; in other words, if there was more than one model and size of compressor at a site, the loads and operating hours provided were not specific to each individual compressor model but grouped together. This may introduce some uncertainty into the validation, although the extent of this is not known. Furthermore some uncertainty may be associated with how the spreadsheet simulates actual loads. The efficiency value used as BAT is based upon the ISO 100% load value, for some turbines the efficiency curve may show the best operating efficiency is achieved at a slightly lower operating load. In practise the operator may run at this load to achieve the higher efficiency. The standard rated operating values are divided into three steps. The reality is that the turbines can operate on a continuous load, so whilst running at 90% load the allocation would be based upon emissions associated with 100% load. The values used in the calculation are based upon ISO standards. The altitude, ambient temperature, inlet losses and exhaust losses of an actual installation will all alter the running conditions which may result in deviation from the standard figures.

10 10 Finally, there may be some difference between actual and assumed CO 2 emission factors. Within the national transmission system there are regional and seasonal variations of the gas composition and therefore emissions factor. The mean emissions factor for natural gas is used however there is a variation of around 5% in the calorific value, from which the emissions factor for the turbines is derived from. Overall, the abovementioned factors mean that it is difficult to draw any firm conclusions regarding the potential over / under allocation of the spreadsheet. 3.5 Assessment of Phase 1 Benchmarks and Proposed Revisions to these Benchmarks Key concerns raised relating to the Phase I methodology are that: there is only a limited number of compressor types specified in the allocation spreadsheet, so that any new entrant in Phase II could not necessarily be accommodated; and annual hours of operation for each turbine at given loads are user specified. However, given the uncertainties in operational hours at any one individual compressor station, it is not believed possible to predict this parameter over Phase II of the EU ETS with any accuracy; and verification of such a parameter would seem problematic. A more generic methodology has therefore been investigated, whereby irrespective of the make and model of the compressor, an allocation can be deduced. Any new methodology is also required to be repeatable and robust without requiring any complex calculations or hard-to-find parameters. Within this methodology, the user will enter their required shaft power input for their compressor at 100% load, this equates to the shaft output of the turbine and can be verified with a manufacturer s specification sheet. The shaft outputs for 75% and 50% load are calculated from the 100% load value. The entered capacity will fall into either the small or large turbine range. In each range the BAT net heat rate has been identified for each of 100%, 75% and 50% turbine loads. The hours of operation have been standardised for each load. This is based on a weighted average for hours at each load for all UK installations for multiplied by the average annual operating hours of each installed turbine. The annual operating hours have been calculated by taking a weighted average for the percentage of actual turbine running hours against maximum possible turbine hours (ie: all turbines running non stop) for all UK installations. The calculation is applied individually to each turbine (at each load) at the compressor station and then summed to give the total allocation for the installation.

11 11 A = C j * U * EF * HR * Con Allocation = tco 2 Capacity - Shaft output kw * Utilisation Hours per year * Emissions Factor kgco 2 / MJ * Net heat rate kj/kwh * Conversion factor Where: Parameter / Variable C i 100% C 75% C 50% U 100% U 75% U 50% EF HR 100% HR 75% HR 50% Value kw Turbine capacity (shaft output) at 100% load kw Turbine capacity (shaft output) at 75% load kw Turbine capacity (shaft output) at 50% load Hours per year at 100% load Hours per year at 75% load Hours per year at 50% load kg CO 2 / MJ (net) of heat input kj/kwh at 100% for turbine capacity range kj/kwh at 75% for turbine capacity range kj/kwh at 50% for turbine capacity range CO 2 emissions allocation is in tonnes per annum, with appropriate conversions of units in the formula to derive this. Three turbine models have been selected as these representing BAT levels of efficiency for different levels of output: up to and equal to kw - Solar Titan and Alstom (Siemens) Cyclone (SGT 400); outputs above kw - GE LM These models have been used to select the standardised heat rates for each operating load. The Cyclone and the Titan have similar heat rates and so the values used for the small turbine range are the average from these two models. The heat rate values for the LM2500+ have been derived from data in the Phase 1 spreadsheet as it has not been possible to obtain data from the manufacturer within the timescale of this project. For the other two models, heat rate values have been obtained from the manufacturer. The following table briefly considers the key elements of the existing NE allocation spreadsheet and summarises details of proposed revisions. The proposals are then justified against the agreed evaluation criteria in the following section.

12 12 Table 3.6 Summary assessment of existing New Entrant allocation spreadsheet and proposals for potential revision Tests to be applied to existing NE allocation spreadsheet Differentiation: should there be less or more differentiation within the sector (i.e. differentiating based on subproduct, raw materials, technology, fuel, efficiency etc)? If so, what should it be? Answer / Details of proposed revision There is insufficient accommodation for new entrants who do not operate the specific models of turbines specified in the existing methodology. A more universal method for determining the likely emissions is considered based upon two ranges of turbine capacity. As before, fuel is standardised on natural gas. Source of data Level at which benchmark is set is the emission factor consistent with sector best practice 6? If No, what should it be? The three specified turbines in the existing spreadsheet represent BAT levels of efficiency for different ranges of output. As such, the same turbines are used to determine the BAT efficiency for small and for large turbine output ranges for use in the revised spreadsheet. Efficiency data derived from the existing spreadsheet and obtained from published literature. is the load factor realistic for new entrants in that sector? If No, what should it be? In the existing spreadsheet the hours of operation at given loads are actually specified by the operator. It is considered difficult to predict with any accuracy the load factor of a new entrant turbine over the Phase II period. Installation specific data for existing turbines for most recent years (2004-5). As such, it is proposed that a revision is made to standardise hours of operation based on weighted average performance of existing installations using latest available (2004-5) data. 3.6 Evaluation of Proposed Benchmarks Feasibility The only user specified parameter is shaft output. This data should be readily obtainable from the equipment vendor, and should be straightforward to verify. The net heat rates are standardised and should be easy to replicate, as they are also based on vendor data. These correspond to BAT levels of emissions performance as the revised methodology selects the net heat rate data for the most efficient turbine at any level of shaft output. The methodology is standardised on gas. Hours of operation is standardised and is based on weighted average hours of operation, including hours at specific loads, for all existing UK compressor stations in the gas distribution network. This standardised approach is preferred to a user defined approach as it does not seem possible to predict the load factor of any one compressor station with any accuracy. 6 Interpreted as Best Available Techniques (BAT), as defined in the IPPC Directive. In practice, within the scope of this study it will only be possible to assess this in broad indicative terms at a sectoral level. It is clearly not within our scope to define BAT at the level of detail that would be required for a site specific PPC Permit.

13 13 Incentives for clean technology From the perspective of incentives, the key issue is to have as little differentiation as possible with regard to technology choice (including the type of fuel used). The proposed benchmark does not include technology or fuel as operator choice. It includes different efficiencies depending on the load. The only operator input is the capacity (in terms of shaft output power) for each level of load. Therefore, the proposed benchmark provides an incentive to choose the most energy efficient turbines. This contrasts with the existing spreadsheet which develops allocations based on the specific type of turbine. Competitiveness and impact on investment Objectives such as security of supply are likely to be important for establishing sufficient capacity in the distribution network to meet peak demand and to be able to manage supply in case of faults on a compressor station. How these concerns are included in the distributors contracts including tariff reviews etc. cannot be addressed here. The key issue in relation to the new entrants benchmark is that there is incentive to install the most energy efficient compressors and that is discussed above. The use of average loads seems to be the best possible way to give an overall allocation that meets the site s needs without too high a risk of either over or under allocation. The significant variations in loads imply however, that a new compressor station might deviate from the average load, therefore leading to a risk of either over or under allocation. There seems to be no way to avoid that and as already mentioned, this issue seems to be a matter for the regulator. If it is assumed for example that there will be 2 new compressor stations in Phase II (see Section 3.2.3), and the actual load factors of these are 50% higher than the weighted averages used in the proposed revision to the allocation method, the absolute quantity of underallocation would be approximately 50kt CO 2 7, or about 4% of the overall CO 2 emissions from all the compressor stations. This is relatively small in percentage emission terms and very small in terms of the expected value of the allowances to the turnover of National Grid. Consistency with incumbent allocations The emission factors implied by the revised approach should be consistent with best practice incumbent performance, assuming the incumbents are using the most efficient currently available turbines. Load factors are standardised (averaged) under the new approach and hence are likely to deviate from observed load factors at any one individual station. However, over a number of stations, the standardised load factor should approximate more closely to actual performance. It has not been possible to calculate allocations for incumbent sites using the revised methodology due to the time constraints of this project. 7 Assuming new compressor stations are of average size compared to existing ones.

Industrial Gas Turbines

Industrial Gas Turbines Industrial Power Industrial Gas Turbines The comprehensive product range from 5 to 50 megawatts Scan the QR code with the QR code reader in your mobile! siemens.com / energy / gasturbines Meeting your

More information

ENERGY EFFICIENCY IN POWER PLANTS

ENERGY EFFICIENCY IN POWER PLANTS Plenary session Producing more with less: Efficiency in Power Generation ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart, Wim Kok, Pierre Ploumen KEMA Power Generation & Sustainables ENERGY EFFICIENCY

More information

gasnetworks.ie Methodology for forecasting gas demand

gasnetworks.ie Methodology for forecasting gas demand gasnetworks.ie Methodology for forecasting gas demand 1 Contents 1 Introduction 2 1.1 Scope of the report 3 1.2 Use and publication of the forecasts 4 1.3 Structure of the document 5 2 Conceptual background

More information

Approved baseline and monitoring methodology AM0056

Approved baseline and monitoring methodology AM0056 Approved baseline and monitoring methodology AM0056 Efficiency improvement by boiler replacement or rehabilitation and optional fuel switch in fossil fuel-fired steam boiler systems I. SOURCE AND APPLICABILITY

More information

Wind Power and District Heating

Wind Power and District Heating 1 Wind Power and District Heating New business opportunity for CHP systems: sale of balancing services Executive summary - Both wind power and Combined Heat and Power (CHP) can reduce the consumption of

More information

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80 FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80 List of symbols T f average temperature at the flow header, C T r average temperature at the return header, C f average water

More information

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/SUNSTORE 4 Dipl.-Ing. Alfred Hammerschmid CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid BIOS BIOENERGIESYSTEME GmbH, Austria TEL.: +43 (316)

More information

English version. Manual for Determination of Combined Heat and Power (CHP)

English version. Manual for Determination of Combined Heat and Power (CHP) CEN/CENELEC WORKSHOP CWA 45547 September 2004 AGREEMENT ICS 27.100 English version Manual for Determination of Combined Heat and Power (CHP) This CEN/CENELEC Workshop Agreement has been drafted and approved

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

UNDERSTANDING ENERGY BILLS & TARRIFS

UNDERSTANDING ENERGY BILLS & TARRIFS UNDERSTANDING ENERGY BILLS & TARRIFS as part of the Energy Efficiency Information Grants Program Reading and understanding your energy and gas bills is a good first step to help you to identify where you

More information

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector

Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector Preparatory Paper on Focal Areas to Support a Sustainable Energy System in the Electricity Sector C. Agert, Th. Vogt EWE Research Centre NEXT ENERGY, Oldenburg, Germany corresponding author: Carsten.Agert@next-energy.de

More information

Value of storage in providing balancing services for electricity generation systems with high wind penetration

Value of storage in providing balancing services for electricity generation systems with high wind penetration Journal of Power Sources 162 (2006) 949 953 Short communication Value of storage in providing balancing services for electricity generation systems with high wind penetration Mary Black, Goran Strbac 1

More information

Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration

Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration H. Holttinen, P. Meibom, A. Orths, F. Van Hulle, C. Ensslin, L. Hofmann, J. McCann, J. Pierik,

More information

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels international energy agency agence internationale de l energie Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels IEA Information paper In Support of the G8 Plan of Action

More information

Annex 2C International comparisons of gas and electricity prices

Annex 2C International comparisons of gas and electricity prices Annex 2C International comparisons of gas and electricity prices Wholesale gas prices in the UK have risen between 23 and 24. This has caused industrial and domestic gas prices to increase and the gap

More information

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource

ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource NEW PO Box 11-595 ZEALAND GEOTHERMAL Tel: 64-9-474 2187 ASSOCIATION INC Geothermal Energy: New Zealand s most reliable sustainable energy resource Current Status, Costs and Advantages of Geothermal East

More information

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:

More information

Application of the distance method when estimating a lump-sum value for 900MHz spectrum

Application of the distance method when estimating a lump-sum value for 900MHz spectrum Application of the distance method when estimating a lump-sum value for 900MHz spectrum 13 June 2014 1 Introduction In January 2014, Analysys Mason Ltd (Analysys Mason) and Aetha Consulting Ltd (Aetha)

More information

System Access Planning

System Access Planning System Access ning Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Shipper Ops Forum, Feb 2016

More information

Key Solutions CO₂ assessment

Key Solutions CO₂ assessment GE Capital Key Solutions CO₂ assessment CO₂ emissions from company car fleets across Europe s major markets between 2008 and 2010 www.gecapital.eu/fleet Contents Introduction and key findings Reduction

More information

WP1 Task 1 The Drivers of Electricity Demand and Supply

WP1 Task 1 The Drivers of Electricity Demand and Supply PROJECT NO 518294 SES6 CASES COST ASSESSMENT OF SUSTAINABLE ENERGY SYSTEMS Observatoire Méditerranéen de l Energie WP1 Task 1 The Drivers of Electricity Demand and Supply Version April 2007 1. Drivers

More information

FACOGAZ Association of European Gas Meter Manufacturers

FACOGAZ Association of European Gas Meter Manufacturers Page 1 of 13 GAS SMART METERING SYSTEM DRAFT MARCOGAZ/FACOGAZ POSITION PAPER FINAL 1. Introduction Marcogaz Members representing more than 100 million installed domestic gas meter in Europe owned by Distribution

More information

Case Study 5 Use of Wind Turbine Technology

Case Study 5 Use of Wind Turbine Technology Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity

More information

CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2016

CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2016 CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2016 AUSTRIA A fuel consumption tax (Normverbrauchsabgabe or NoVA) is levied upon the first registration of a passenger car. It is calculated as follows: (CO2

More information

How To Make Money From Energy Storage

How To Make Money From Energy Storage Business Models for Energy Storage Michael Pollitt With thanks to Francisco Castellano Ruz and Karim Anaya Judge Business School University of Cambridge UKES 2015 University of Birmingham 26 November 2015

More information

Boiler efficiency for community heating in SAP

Boiler efficiency for community heating in SAP Technical Papers supporting SAP 2009 Boiler efficiency for community heating in SAP Reference no. STP09/B06 Date last amended 26 March 2009 Date originated 28 May 2008 Author(s) John Hayton and Alan Shiret,

More information

Why wind power works for Denmark

Why wind power works for Denmark Proceedings of ICE Civil Engineering 158 May 25 Pages 66 72 Paper 13663 Keywords electrical engineering & distribution; power stations (non-fossil fuel); weather Why wind power works for Denmark Hugh Sharman

More information

IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE?

IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? IS ENERGY IN ESTONIA CHEAP OR EXPENSIVE? Rita Raudjärv, Ljudmilla Kuskova Energy is a resource without which it is hard to imagine life in today's world. People seem to take it for granted that energy

More information

Domestic Energy Prices: Data sources and methodology

Domestic Energy Prices: Data sources and methodology Domestic Energy Prices: Data sources and methodology 1. Introduction 1.1 Background Domestic Energy Prices Statistics Domestic price statistics provide important information for monitoring the energy market.

More information

2012 Guidelines to Defra / DECC's GHG Conversion Factors for Company Reporting

2012 Guidelines to Defra / DECC's GHG Conversion Factors for Company Reporting 2012 Guidelines to Defra / DECC's Conversion Factors for Company Reporting Produced by AEA for the Department of Energy and Climate Change (DECC) and the Department for Environment, Food and Rural Affairs

More information

Electricity and natural gas price statistics 1

Electricity and natural gas price statistics 1 Electricity and natural gas price statistics 1 Source: Statistics Explained (http://epp.eurostat.ec.europa.eu/statistics_explained/) - 21/11/2011-09:11:44 Electricity and natural gas price statistics Data

More information

CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015

CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015 CO2 BASED MOTOR VEHICLE TAXES IN THE EU IN 2015 COUNTRY AT (AUSTRIA) BE (BELGIUM) BG (BULGARIA) CO2/FUEL CONSUMPTION TAXES A fuel consumption tax (Normverbrauchsabgabe or NoVA) is levied upon the first

More information

Fact Sheet on China s energy sector and Danish solutions

Fact Sheet on China s energy sector and Danish solutions Fact Sheet on China s energy sector and Danish solutions 1. EXPANSION WITH RENEWABLE ENERGY: China focuses on a massive expansion with non fossil energy that is renewable energy and nuclear energy. The

More information

Factsheet. FAQ s regarding ErP Directives. 1) What is ErP?

Factsheet. FAQ s regarding ErP Directives. 1) What is ErP? 1) What is ErP? ErP stands for Energy-related products and from the 26 th September 2015 under EU regulations heat pumps (as well as new boilers and water heaters) are required by law to have labels to

More information

The current electricity costs of energy-intensive industries in Germany

The current electricity costs of energy-intensive industries in Germany Memo From: Dr. Felix Christian Matthes Energy & Climate Division f.matthes@oeko.de Berlin, 23 June 2013 The current electricity costs of energy-intensive industries in Germany Background The electricity

More information

Gas Absorption Heat Pumps. Future proofing your heating and hot water

Gas Absorption Heat Pumps. Future proofing your heating and hot water Gas Absorption Heat Pumps Future proofing your heating and hot water Gas Absorption Heat Pumps 1 Contents Gas Absorption Heat Pumps (GAHPs) The heating solution What is a Gas Absorption Heat Pump? How

More information

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines

Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines 36 Energy Savings through Electric-assist Turbocharger for Marine Diesel Engines KEIICHI SHIRAISHI *1 YOSHIHISA ONO *2 YUKIO YAMASHITA *3 MUSASHI SAKAMOTO *3 The extremely slow steaming of ships has become

More information

T@W Good Practice Form

T@W Good Practice Form T@W Good Practice Form Setting Title: Public-private Partnership Leading to a New CHP Plant Utilising Fibre Sludge and Biomass Country: Location: Sweden Mariestad in West Sweden Region Start date: 1999

More information

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144

More information

Impacts of large-scale solar and wind power production on the balance of the Swedish power system

Impacts of large-scale solar and wind power production on the balance of the Swedish power system Impacts of large-scale solar and wind power production on the balance of the Swedish power system Joakim Widén 1,*, Magnus Åberg 1, Dag Henning 2 1 Department of Engineering Sciences, Uppsala University,

More information

Alcohol Consumption in Ireland 1986-2006 A Report for the Health Service Executive

Alcohol Consumption in Ireland 1986-2006 A Report for the Health Service Executive Alcohol Consumption in Ireland 1986-2006 A Report for the Health Service Executive Prepared by Dr. Ann Hope This report should be referenced: Hope, A. (2007). Alcohol consumption in Ireland 1986-2006.

More information

Comprehensive emissions per capita for industrialised countries

Comprehensive emissions per capita for industrialised countries THE AUSTRALIA INSTITUTE Comprehensive emissions per capita for industrialised countries Hal Turton and Clive Hamilton The Australia Institute September 2001 the Parties included in Annex I shall implement

More information

Safety Monitor Requirements. October 2015

Safety Monitor Requirements. October 2015 Introduction This document sets out Safety Monitors for the 2015/16 winter, pursuant to National Grid s obligations under the Uniform Network Code (UNC), Section Q. Safety Monitors were introduced in 2004

More information

6 CONSIDERATION OF ALTERNATIVES

6 CONSIDERATION OF ALTERNATIVES 6 CONSIDERATION OF ALTERNATIVES 6.1.1 Schedule 4 of the Town and Country Planning (Environmental Impact Assessment) (Scotland) Regulations 2011 sets out the information for inclusion in Environmental Statements

More information

Integrating 300 GW wind power in European power systems: challenges and recommendations. Frans Van Hulle Technical Advisor

Integrating 300 GW wind power in European power systems: challenges and recommendations. Frans Van Hulle Technical Advisor Integrating 300 GW wind power in European power systems: challenges and recommendations Frans Van Hulle Technical Advisor Worldbank, SDN Week, Washington, February 21-22, 2008 Leonard Crettaz What is the

More information

Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain

Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain 1 Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain Background This work is based on hourly time series for wind power output in Denmark, Germany, Ireland and Great

More information

RENEWABLE ENERGY IN AUSTRALIA

RENEWABLE ENERGY IN AUSTRALIA RENEWABLE ENERGY IN AUSTRALIA Increasing electricity generation from renewable energy sources is one of the main strategies to reduce greenhouse emissions from the power sector. Australia has historically

More information

GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 2013

GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 2013 GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 213 FACT PACK GUY TURNER HEAD OF ECONOMICS AND COMMODITIES APRIL 26, 213 GLOBAL RENEWABLE ENERGY MARKET OUTLOOK, 26 APRIL 213 1 INTRODUCTION This year s Global Renewable

More information

Electricity, Gas and Water: The European Market Report 2014

Electricity, Gas and Water: The European Market Report 2014 Brochure More information from http://www.researchandmarkets.com/reports/2876228/ Electricity, Gas and Water: The European Market Report 2014 Description: The combined European annual demand for electricity,

More information

Annual Electricity and Heat Questionnaire

Annual Electricity and Heat Questionnaire Annual Electricity and Heat Questionnaire IEA Statistics Course Pierre Boileau International Energy Agency OVERVIEW Global trends in electricity production 1973-2009 IEA Annual Electricity and Heat Questionnaire

More information

THM Gas Turbines Heavy duty gas turbines for industrial applications

THM Gas Turbines Heavy duty gas turbines for industrial applications THM Gas Turbines THM Gas Turbines Heavy duty gas turbines for industrial applications Combined advantages The THM 1304 heavy duty gas turbine family consists of two members with ISO power outputs of 10,500

More information

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center) International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center) Good morning. Sayin Bakanım. Members of Parliament. Ladies and Gentlemen. Slide 1: Opening

More information

THE TRADABLE VALUE OF DISTRIBUTED GENERATION

THE TRADABLE VALUE OF DISTRIBUTED GENERATION THE TRADABLE VALUE OF DISTRIBUTED GENERATION CONTRACT NUMBER: DG/DTI/00047 URN NUMBER: 05/1228 1 The DTI drives our ambition of prosperity for all by working to create the best environment for business

More information

ENERGY SECTOR JOBS TO 2030: A GLOBAL ANALYSIS

ENERGY SECTOR JOBS TO 2030: A GLOBAL ANALYSIS ENERGY SECTOR JOBS TO : A GLOBAL ANALYSIS Final report For Greenpeace International Authors Jay Rutovitz, Alison Atherton Institute for Sustainable Futures UTS 2009 Disclaimer While all due care and attention

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

Chapters 7. Performance Comparison of CI and SI Engines. Performance Comparison of CI and SI Engines con t. SI vs CI Performance Comparison

Chapters 7. Performance Comparison of CI and SI Engines. Performance Comparison of CI and SI Engines con t. SI vs CI Performance Comparison Chapters 7 SI vs CI Performance Comparison Performance Comparison of CI and SI Engines The CI engine cycle can be carried out in either 2 or 4 strokes of the piston, with the 4-cycle CI engine being more

More information

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant

Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Emissions Comparison for a 20 MW Flywheel-based Frequency Regulation Power Plant Beacon Power Corporation KEMA Project: BPCC.0003.001 May 18, 2007 Final Report with Updated Data Emissions Comparison for

More information

OFFSHORE WIND INDUSTRY IN DENMARK

OFFSHORE WIND INDUSTRY IN DENMARK OFFSHORE WIND INDUSTRY IN DENMARK ORGANIZATION AND DEVELOPMENT OF AN EMERGING BUSINESS SYSTEM Published in cooperation between Danish Wind Industry Association EXECUTIVE SUMMARY AND CONCLUSIONS Offshore

More information

PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS

PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS Michael Müller 1, Roland Bründlinger 2, Ortwin Arz 1, Werner Miller 1, Joachim Schulz 2, Georg Lauss 2 1. STECA ELEKTRONIK GMBH, Mammostr.

More information

What is Energy? Session 1

What is Energy? Session 1 What is Energy? Session 1 1 A word about multiplication factors Kilo (k) = 1,000 Mega (M) = 1,000,000 Giga (G) = 1,000,000,000 e.g. 1kW = 1,000W 1kWh = 1,000Wh etc 3 Converting J to kwh 1 kilowatt-hour

More information

GUIDANCE ON PROVISION OF UK NATURAL GAS SUPPLY QUALITY DATA RELEVANT TO THE EU EMISSIONS TRADING SCHEME FOR EMISSIONS PRIOR TO JANUARY 1 st 2013

GUIDANCE ON PROVISION OF UK NATURAL GAS SUPPLY QUALITY DATA RELEVANT TO THE EU EMISSIONS TRADING SCHEME FOR EMISSIONS PRIOR TO JANUARY 1 st 2013 GUIDANCE ON PROVISION OF UK NATURAL GAS SUPPLY QUALITY DATA RELEVANT TO THE EU EMISSIONS TRADING SCHEME FOR EMISSIONS PRIOR TO JANUARY 1 st 2013 1. INTRODUCTION In 2005 DEFRA requested from then UK Gas

More information

Carbon Price Transfer in Norway

Carbon Price Transfer in Norway Public ISDN nr. 978-82-93150-03-9 THEMA Report 2011-1 Carbon Price Transfer in Norway The Effect of the EU-ETS on Norwegian Power Prices Commissioned by Energy Norway, Federation of Norwegian Industries

More information

DOES WIND KILL THE ENERGY ONLY MARKET?

DOES WIND KILL THE ENERGY ONLY MARKET? DOES WIND KILL THE ENERGY ONLY MARKET? Oliver Brown, Stephen Poletti, David Young University of Auckland Economic Paradox Low-carbon power system High cap cost low and very low variable costs eg. Wind,

More information

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation

The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation PowerGen Europe, 9-11 June 2015 The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation Nicholas Muntz, Dr. Thorsten Krol Security classification Siemens AG 2015 All rights

More information

INVESTING IN A TRANSITIONING SECTOR

INVESTING IN A TRANSITIONING SECTOR INVESTING IN A TRANSITIONING SECTOR Eurelectric conference Jon Moore, CEO NEW INVESTMENT IN CLEAN ENERGY 24-14 ($BN) 32% 17% $318bn -7% $294bn 16% -9% $31bn.5% $272bn $268bn 17% 46% 36% $175bn $25bn $26bn

More information

Modeling the US Natural Gas Network

Modeling the US Natural Gas Network Modeling the US Natural Gas Network James Ellison Sandia National Laboratories, Critical Infrastructure Modeling and Simulation Group Abstract In order to better understand how the US natural gas network

More information

Renewable energy targets: the importance of system and resource costs

Renewable energy targets: the importance of system and resource costs Oxford Energy Comment February 2013 Renewable energy targets: the importance of system and resource costs Malcolm Keay Introduction Early decarbonisation of the electricity industry has been identified

More information

Scotland s Balance Sheet. April 2013

Scotland s Balance Sheet. April 2013 Scotland s Balance Sheet April 2013 Contents Executive Summary... 1 Introduction and Overview... 2 Public Spending... 5 Scottish Tax Revenue... 12 Overall Fiscal Position and Public Sector Debt... 18 Conclusion...

More information

Gas-Fired Power HIGHLIGHTS

Gas-Fired Power HIGHLIGHTS Gas-Fired Power HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Approximately 21% of the world s electricity production is based on natural gas. The global gas-fired generation capacity amounts to 1168 GW e (2007).

More information

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -

Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) - Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided

More information

Why Electric Compression or otherwise why still Gas Engine driven Compression

Why Electric Compression or otherwise why still Gas Engine driven Compression Why Electric Compression or otherwise why still Gas Engine driven Compression Gas/Electric Partnership Special Workshop Electric Compression Economics, August 27 2009, Houston MAN Turbo AG Schweiz mg,

More information

Draft consolidated baseline and monitoring methodology ACM00XX

Draft consolidated baseline and monitoring methodology ACM00XX Draft consolidated baseline and monitoring methodology ACM00XX Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

Indicator fact sheet Fishing fleet trends

Indicator fact sheet Fishing fleet trends Indicator fact sheet Fishing fleet trends Key message: The big EU 15 fishing fleet (1989 2000) has decreased in numbers of vessels (10 %), in tonnage (6 %) and power (12 %) The much smaller EFTA fishing

More information

Wind energy scenarios for 2020. A report by the European Wind Energy Association - July 2014. Wind energy scenarios for 2020

Wind energy scenarios for 2020. A report by the European Wind Energy Association - July 2014. Wind energy scenarios for 2020 A report by the European Wind Energy Association - July 2014 1 WIND ENERGY SCENARIOS FOR 2020 Content Background...3 Reasons for the new scenarios...3 Proposed new scenarios...3 Text and analysis: Jacopo

More information

Bergen Engines Products and Applications

Bergen Engines Products and Applications Bergen Engines Products and Applications 1 Since 1948 Bergen Engines, a Rolls-Royce Power Systems Company, has delivered more than 6,500 four-stroke medium-speed diesel and gas engines for power generation

More information

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS UNIT 61: ENGINEERING THERMODYNAMICS Unit code: D/601/1410 QCF level: 5 Credit value: 15 OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS 2 Be able to evaluate

More information

ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012

ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012 ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement

More information

Reported Road Accident Statistics

Reported Road Accident Statistics Reported Road Accident Statistics Standard Note: SN/SG/2198 Last updated: 24 October 2013 Author: Matthew Keep & Tom Rutherford Social and General Statistics Section This Note provides a range of data

More information

UK Energy Statistics, Q3 2015

UK Energy Statistics, Q3 2015 PRESS NOTICE STATISTICAL PRESS RELEASE Date: 22 December 2015 UK Energy Statistics, Q3 2015 Energy Trends and Energy Prices publications are published today 22 December 2015 by the Department of Energy

More information

Premium Data Centre Europe - 2012 Pricing, Business Model & Services

Premium Data Centre Europe - 2012 Pricing, Business Model & Services Premium Data Centre Europe - 2012 Pricing, Business Models & Services Premium Data Centre Europe - 2012 Pricing, Business Model & Services Table of Contents A list of figures used in this report 5 Methodology

More information

Pressure on Energy Prices

Pressure on Energy Prices Energy & Utilities Pressure on Energy Prices Successful Responses for Utilities Contents Executive summary... 1 A realistic perspective... 2 Effective responses... 3 A next step... 4 Contacts... 5 Cover

More information

The European Carbon Market: From theory to practice

The European Carbon Market: From theory to practice The European Carbon Market: From theory to practice Presented by Dr. Regina Betz CEEM, 2009 16th of June 2009, Market Engineering Lecture, University of Karlsruhe Content Emissions trading theory Market

More information

REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES)

REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES) PAGE: 1 REPORT TO: AUDIT AND PERFORMANCE REVIEW COMMITTEE ON 19 MARCH 2014 SUBJECT: BY: RENEWABLE ENERGY ACTION PLAN ACTING CORPORATE DIRECTOR (ENVIRONMENTAL SERVICES) 1. REASON FOR REPORT 1.1 To inform

More information

CRITICAL READING OF THE WUPPERTAL INSTITUTE STUDY

CRITICAL READING OF THE WUPPERTAL INSTITUTE STUDY University of Liège FACULTY OF APPLIED SCIENCES INDUSTRIAL CHEMISTRY LABORATORY PROFESSOR ALBERT GERMAIN CRITICAL READING OF THE WUPPERTAL INSTITUTE STUDY Greenhouse Gas Emissions from the Russian Natural

More information

Information Guide Domestic Air Source Heat Pumps

Information Guide Domestic Air Source Heat Pumps Information Guide Domestic Air Source Heat Pumps Issue 41 Domestic Air Source Heat Pumps This is an independent guide produced by Mitsubishi Electric to enhance the knowledge of its customers and provide

More information

Offshore wind power: big challenge, big opportunity. Maximising the environmental, economic and security benefits

Offshore wind power: big challenge, big opportunity. Maximising the environmental, economic and security benefits Offshore wind power: big challenge, big opportunity Maximising the environmental, economic and security benefits Table of Contents Preface 01 Executive summary 02 1 Implications of the 2020 EU Renewable

More information

Viking Link Interconnector

Viking Link Interconnector Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions

More information

THE COSTS OF DECARBONISING ELECTRICITY GENERATION

THE COSTS OF DECARBONISING ELECTRICITY GENERATION THE COSTS OF DECARBONISING ELECTRICITY GENERATION This technical annex to Building a low-carbon economy presents further details on the analysis underlying the estimates of the costs of decarbonising the

More information

Continuous flow direct water heating for potable hot water

Continuous flow direct water heating for potable hot water Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial

More information

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015

Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015 June 2015 Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015 This paper presents average values of levelized costs for generating technologies that

More information

Michael Colijn Project Development & Strategic Advice Energy Economics Environment

Michael Colijn Project Development & Strategic Advice Energy Economics Environment 1 ASUE Conference 23. v 2005 MicroCHP The Magic Boiler European Context on Developments & Changes Ltd 2005 2 Contents Was ist Mikro-KWK? Vorteile Marktgröße Mikro-KWK - Wahrheiten Projekte Conclusion Fundamentals:

More information

ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES

ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES by Kazuhiro Takeda Research Manager, Research and Development Center and Kengo Hirano Instrument and Control Engineer,

More information

Cost Benefit Analysis of Government Support Options for Offshore Wind Energy November 2002

Cost Benefit Analysis of Government Support Options for Offshore Wind Energy November 2002 Cost Benefit Analysis of Government Support Options for Offshore Wind Energy Sustainable Energy Ireland, formerly the Irish Energy Centre, is funded by the Irish Government under the National Development

More information

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group. industrial trucks. A brief guide for identification of noncompliant. - Exhaust Emission -

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group. industrial trucks. A brief guide for identification of noncompliant. - Exhaust Emission - FEDERATION EUROPEENNE DE LA MANUTENTION Product Group Industrial Trucks FEM A brief guide for identification of noncompliant industrial trucks 11.2010 (E) - Exhaust Emission - I n d e x 1 Introduction...

More information

Price Suppression and Emissions Reductions with Offshore Wind: An Analysis of the Impact of Increased Capacity in New England

Price Suppression and Emissions Reductions with Offshore Wind: An Analysis of the Impact of Increased Capacity in New England Price Suppression and Emissions Reductions with Offshore Wind: An Analysis of the Impact of Increased Capacity in New England Richard D. Tabors, Ph.D. Lorna Omondi Aleksandr Rudkevich Ph.D. Evgeniy Goldis

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Technologies for small scale Biomass CHP-Plants an actual survey

Technologies for small scale Biomass CHP-Plants an actual survey Technologies for small scale Biomass CHP-Plants an actual survey Risoe, May, 20th 2003 Dr.-Ing. J. Fischer Institute for Energy Economics and Rational Use of Energy, IER, University of Stuttgart Hessbrühlstr.

More information

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single

More information

Energy technology for the connected future

Energy technology for the connected future Energy technology for the connected future Flowgroup is an AIM listed company founded in 2006. It s made up of three parts. group battery Competitively-priced home energy supply Award-winning compressed

More information

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University

Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Grid requirements with scattered load balancing and an open electricity market Poul Alberg Østergaard * Aalborg University Abstract Denmark is in a situation with many scattered sources of electricity,

More information