Armstrong Do-It-Yourself Tile Installation System
|
|
|
- Roger Murphy
- 9 years ago
- Views:
Transcription
1 Armstrong Do-It-Yourself Tile Installation System What tools will I need to install my tile floor? You'll need just the basics: - floor tile (make sure you have enough tile to finish the job) - adhesive (not needed for self-adhering tile) - adhesive trowel (not needed for self-adhering tile) - underlayment or leveler (follow manufacturer's recommendations to determine quantity) - smooth-edge trowel (if using underlayment or leveler) - tape measure - pencil - chalk line and chalk - carpenter's square or metal ruler - sharp utility knife and - roller (kitchen rolling pin will do) Subfloor Prep Store tile in the room in which you plan to install for 48 hours. Keep room at minimum of 65 F (18 C) during that time and during installation. After installation, temperature should not fall below 65 F (18 C) for the first 48 hours, and not below 55 F (13 C) after that. If room is heated by radiant coils in the subfloor, the temperature of the floor surface should not exceed 85 F (29 C). Install over smooth, well-bonded resilient floors; dry concrete; and wood floors with a plywood overlay. Subfloor must be level, clean, and free of wax, grease, oil, or dust. If necessary, patch or fill any cracks with S-184 Fast-Setting Patch and Underlayment. Use Armstrong One-Part Embossing Leveler to smooth any texture or embossing on the old floor. What You Should Know About Existing Resilient Floor Covering Structures Some flooring materials and adhesives contain asbestos fibers. The presence of the asbestos in these products is not readily identifiable. Unless absolutely positive beyond any doubt that the product is a nonasbestos-containing material, always assume it does contain asbestos. Alternatives to the Removal of Existing Resilient Floor Covering Armstrong recommends that whenever possible you leave the existing resilient floor covering in place and go over the top with your new floor. Alternatives to the removal of an unsuitable resilient floor over approved subfloors are:
2 1. Installing directly over a single layer of existing resilient flooring. 2. Filling the embossing of the existing resilient flooring with S-199 Embossing Leveler or S-194 Patch, Underlayment and Embossing Leveler mixed with S-195 Underlayment Additive before installation (residential only). 3. Covering existing resilient flooring on an approved suspended wood subfloor with a recommended wood underlayment. WARNING! In-Place Resilient Floor Covering and Asphaltic Adhesives: DO NOT SAND, DRY sweep, dry scrape, drill, saw, beadblast, or mechanically chip or pulverize existing resilient flooring, backing, lining felt or asphaltic "cut-back" adhesives. These products may contain either asbestos fibers or crystalline silica. Avoid creating dust. Inhalation of such dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos fibers greatly increases the risk of serious bodily harm. Unless positively certain that the product is a nonasbestos-containing material, you must presume it contains asbestos. Regulations may require that material be tested to determine asbestos content and may govern the removal and disposal of material. Whenever possible, existing resilient flooring should be left in place and the new floor installed over the top. If you must remove the flooring material, contact your retailer or Armstrong Customer Response Center, P.O. Box 3001, Lancaster, PA 17604, for a copy of recommended work practices. These should be followed. Preparation Remove furniture and appliances (use a piece of hardboard to protect the floor). Remove baseboard molding. Undercut doorframes (optional) - this makes fitting tiles around doorframes easier. If subfloor is existing resilient vinyl: - Do not install over an existing "soft" or cushioned vinyl sheet flooring. - Do not install tile over existing tile over below-grade concrete. - Floor must be firmly bonded to the original subfloor. - Use Armstrong New Beginning to strip any polish or cleaning residues from the surface. - Use Armstrong S-199 Embossing Leveler to smooth any texture or embossing on the old floor. - When going over existing tile floors, seams should fall in the center of the tile. If subfloor is wood: - Check that the wood is firmly nailed to the original
3 subfloor. We recommend 1/4" minimum APA-rated plywood designed specifically for underlayment purposes. Whatever board you choose, make sure you get written instructions and a guarantee. - Repair any knotholes, indentations or open joints with Armstrong S-183, S-184 or S-194 Underlayment. - Use a belt sander or sanding block to smooth out any rough areas. - The prepared subfloor must be smooth, clean, dry and dust-free. If subfloor is concrete: - If the floor has been painted, make sure the paint is completely dry and firmly bonded to the floor. - NOTE: Only self-adhering tiles can be installed over a painted concrete floor. Tiles that require adhesive should not be used. - Fill low spots with Armstrong S-183, S-184 or S-194 Underlayment. - The prepared subfloor must be smooth, clean, dry and dust-free. Find the center point between the two longest parallel walls. Mark guidelines from centers of opposite walls. Without removing backing, lay rows of tiles in both directions from the center, adjusting to give the most balanced cutting at the borders. Spreading Adhesive (Skip if installing self-adhering tile.) Cover 1/4 of the room with Armstrong S-515 or S-750 Adhesive. Allow adhesive to "set" according to manufacturer's instructions. Laying Tile Peel the backing from self-adhering tile and place it at the center point. Starting where the perpendicular lines cross, firmly press the first tile into place. Make sure edges are flush with chalk lines. Make sure it's positioned correctly and then press down firmly.
4 Lay all full tiles in step fashion, starting in center of room. Position tiles so arrows on back all point in the same direction. CAUTION Do not stand or walk on release paper or a tile with release paper on the back as it is extremely slippery. Place it in a wastebasket immediately upon removal from tile. Fitting Partial Tiles To fit partial tiles, lay the tile to be cut exactly over the last full tile; place another full tile against the wall and mark the cutting line where the tiles overlap. Cut tile on line. Before peeling the backing paper of self-adhering tile, check that the cut tile fits. Do not force it into place. Install tile (removing paper from self-adhering tile), and press tile firmly into position. Fitting Around Pipes To fit around pipes, make a cardboard pattern as a guide and use to draw an outline on the tile. Cut to shape. Check fit before peeling backing paper. It should be snug but don't force into place. Finishing Up Remove any excess adhesive from the tile surface immediately after installation. Lightly dampen a clean, white cloth with mineral spirits, and wipe over the adhesive. Change the area of the cloth frequently as the adhsive is removed. When finished installing, roll the floor to make sure tiles are firmly stuck down. Replace baseboard molding. Carefully move furniture and appliances back into the room using hardboard panels to protect new floor. Don't wash wet the floor for 5 days.
5 Care Instructions Sweep or vacuum regularly. Wash regularly with a no-rinse floor cleaner such as Armstrong Once 'n Done Floor Cleaner. Do not use soap-based detergents, abrasive cleansers, or "mop and shine" products. They can leave a film on your floor. To restore the shine, polish with a liquid floor polish such as Armstrong Shinekeeper Floor Polish. Do not use paste wax or solvent-based polishes. Use floor protectors on chair and table legs to distribute furniture weight and protect against indentation damage. Use natural-fiber mats at outside doorways to reduce tracked-in dirt, stains and moisture. Do not use mats with rubber backing which can cause permanent discoloration.
Vinyl Composition Tile Installation System
Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION
Installation System. Existing Resilient Sheet Floors
Vinyl Composition Tile Installation System Product Adhesive/Full Spread Adhesive/Tile-On Comment Imperial Texture MultiColor RAVE Stonetex Companion Square Feature Tile/Strips ARTEFFECTS SAFETY ZONE Vinyl
ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products
ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) Menards Products THE ARMSTRONG LIFETIME LIMITED RESIDENTIAL WARRANTY FOR: Abingdon Adiamo Clear Creek
ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY)
ARMSTRONG RESIDENTIAL VINYL TILE FLOORING WARRANTY: Professionally Installed & Do It Yourself (DIY) THE ARMSTRONG LIFETIME LIMITED RESIDENTIAL WARRANTY FOR: Abingdon Adiamo Clear Creek Caliber Granville
Fiberglass-Reinforced Sheet Flooring Installation System
Fiberglass-Reinforced Sheet Flooring Installation System Product Adhesive Comments Residential Use Only CushionStep Value Good Better Best FlexStep Duality Premium Premium Plus Modified loose lay method
Aspect Metal Peel & Stick Tile Installation Guide
Aspect Metal Peel & Stick Tile Installation Guide Proper surface preparation is essential for a successful project Failure to follow recommended surface preparation instructions may void the warranty Read
Carpet Tile Installation Guidelines
NOTICE FAILURE TO FOLLOW THESE GUIDELINES CAN RESULT IN VOIDING THE CARPET WARRANTY. Installation Guidelines The following instructions should be reviewed prior to installation. Shaw Industries will not
How to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
How To Level A Subfloor
Skill Level: INTERMEDIATE Give these projects a try if you're a confident DIYer with a good working knowledge of a variety of tools. They can take a day or more to complete. If you can build a birdhouse
Fiberglass-Reinforced Sheet Flooring Installation System
RESIDENTIAL USE ONLY Fiberglass-Reinforced Sheet Flooring Installation System Product Gauge Comments FlexStep Value FlexStep Good 0.055" (1.4 mm) 0.065" (1.65 mm) Modified loose lay method: Acrylic double-faced
Laminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
VINYL CLICK FLOORING INSTALLATION GUIDE
VINYL CLICK FLOORING INSTALLATION GUIDE Owner/Installer Responsibility Prior to installing a single board, you or the installer must determine that the job-site environment and the sub-surfaces meet the
Installation Instructions for staple/nail down applications
Installation Instructions for staple/nail down applications General Notes Inspect all materials carefully before installation. Warranties do not cover materials with visible defects once they are installed.
BENTLEY ELEMENTS COLLECTION LVT
This document refers to the following products: Product Size Installation direction Seams treatment Elements Tiles See specifications 90 None Elements Planks See specifications Stair Step None Note: This
INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
How to Install Drop Ceiling Panels
How to Install Drop Ceiling Panels Both Ceilume s 0.013 thick Feather-Light and 0.030 thick Signature Ceiling Tiles can be installed in an approved ceiling suspension system using standard 15/16 face T-bar
HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY
HOW-TO HOW-TO LAY HARDBOARD OR PLYWOOD FLOOR OVERLAY Most floor coverings, if laid over uneven wooden floors, will wear unevenly and look unsightly. The answer is to cover the old boards with hardboard
Herringbone Pattern Flooring
Herringbone Pattern Flooring If it s not marked NOFMA, it s not certified. Handling, Storage, Installation and Tips Herringbone is generally manufactured from 3/4 x 2 ¼ or ¾ x 1-1/2 standard tongue & groove
Bella Cera Engineered Hardwood Flooring Installation Instructions. Check for Proper Color Selection Prior to Installation
Bella Cera Engineered Hardwood Flooring Installation Instructions Check for Proper Color Selection Prior to Installation 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully
Columbia flooring will resist fading from exposure to sunlight or artificial light.
LIMITED LIFETIME WARRANTY AND MAINTENANCE FOR RESIDENTIAL USE Columbia is so confident in the design and durability of our Columbia flooring products and accessories, that we back them with a Limited Lifetime
DIY CABINET REFACING INSTALLATION GUIDE
DIY CABINET REFACING INSTALLATION GUIDE CABINET REFACING INSTALLATION Are you ready to reface your outdated cabinets? This guide will show you how to install your new Facelifters Cabinet Refacing Products
Commercial/Residential Linoleum Sheet Installation System
Commercial/Residential Linoleum Sheet Installation System COMMERCIAL USE ONLY Product MARMORETTE GRANETTE COLORETTE UNI WALTON LINORETTE Gauge 0.080" (2.0 mm) 0.100" (2.5 mm) 0.125" (3.2 mm) 0.100" (2.5
Care and Maintenance for Wood Flooring
Care and Maintenance for Wood Flooring The finishing technology used for Tarkett wood floorings makes them the best choice for easy maintenance. To preserve all the beauty of your Tarkett wood flooring,
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue: All profiles Nail: 3/8", 1/2", 3/4" Staple: 3/8", 1/2" Float: 1/2" Engineered Planks and Strips can be installed over most subfloors, and are
installation Mannington Works. 800 241 2262 manningtoncommercial.com Mannington Commercial Luxury Vinyl Tile Installation Instructions GENERAL
GENERAL These instructions cover all fully adhered s of Mannington Commercial LVT; Assurance Squared, Create, Nature s Paths, Nature s Paths Select and Walkway luxury vinyl flooring. Nature s Paths LockSolid
Recommended Work Practices for Removal of Resilient Floor Coverings. Warning
Recommended Work Practices for Removal of Resilient Floor Coverings Warning Do not sand, dry sweep, dry scrape, drill, saw, beadblast, or mechanically chip or pulverize existing resilient flooring, backing,
VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised
Page 1 of 6 instructions VC 104+ Rigid Grade / VC 104+ Rigid Grade Imagine / (for the rest of this document referred to as VC 104) can be applied to new and used trucks and trailers with painted rigid
Grand Mesa Plus LAMINATE - WIRE BRUSHED. GAGVGM81012A Prairie. GAGVGM80012NA Colorado. GAGVGM84012A Pecan Rustic. GAGVGM85012A Saddle Walnut
MARCH 2015 Grand Mesa Plus LAMINATE - WIRE BRUSHED Specifications 12.3mm 6.5 wide x 47-13/16 long 19.42 sf/ctn 48 ctn/plt Triple Plate Embossing Wire Brushed Texture Micro-Bevel & Waxed Edges Warranty
DASH KIT INSTALLATION
ÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿ ÿÿÿÿÿ ÿÿ ÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿ ÿÿÿÿ ÿÿ ÿÿÿÿÿ ÿÿÿÿÿÿÿÿ PROUDLY MADE IN THE USA DASH KIT INSTALLATION These instructions are aimed at the do-it-yourself installer. Read
How To Warranty Shawfloors
HARD SURFACE WARRANTIES, CARE & MAINTENANCE LAMINATE shawfloors.com 1 CONTENTS LAMINATE Care & Maintenance 3 Warranty 4 Shaw represents a promise of outstanding performance, unique styling and overall
LAMINATE LAMINATE FLOOR CARE AND MAINTENANCE. Routine Maintenance. Minor Repair Instructions: Glueless Laminate Board Replacement Repairs
LAMINATE FLOOR CARE AND MAINTENANCE Routine Maintenance 1. Use a damp cloth to blot up spills as soon as they happen. Never allow liquids to stand on your floor. 2. For tough spots, such as oil, paint,
ENGINEERED FLOORING INSTALLATION
ENGINEERED FLOORING INSTALLATION ATTENTION! INSTALLER/OWNER RESPONSIBILITIES Beautiful hardwood floors are a product of nature and, therefore, they will show variations in color, grain, texture, and appearance.
ECOfit Interlocking Tile
ECOfit Interlocking Tile INSTALLATION AND MAINTENANCE MANUAL Manufactured in the U.S.A. by: Revised 09/04/2014 Supersedes all previous versions. Check website for updates. 877-258-0843 www.ecorecommercialflooring.com
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue: All profiles Nail: 3/8", 1/2", 3/4" Staple: 3/8", 1/2" Float: 1/2" Engineered Planks and Strips can be installed over most subfloors, and are
WATER AND WOOD DON T MIX KEEPING YOUR TRIÂNGULO HARDWOOD FLOOR BEAUTIFUL SCRATCHES, INDENTATIONS AND GOUGES
WATER AND WOOD DON T MIX Using any of the following items to maintain your wood floor will void all manufacturer warranties! Water Oil Soap Vinegar, Ammonia Household Detergent Wax Furniture Polish Dust
INSTALLATION IMPORTANT INSTALLER/OWNER RESPONSIBILITY TOOLS & EQUIPMENT NEEDED FOR INSTALLATION PRE-INSTALLATION PROCEDURES & JOBSITE CONDITIONS
IMPORTANT It is important that you read & understand the following information and instructions in their entirety before proceeding with installation. Please thoroughly inspect all Flooring products in
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Tip: Check for proper color selection and style prior to Installation. No claims will be accepted after installation Important Information before
Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in handling.
i This instruction sheet describes the proper methods for installing Eucatex decorative wall paneling. Eucaboard / Eucaplac/ Eucatile paneling is intended for dry interior use only and requires care in
Amtico and Spacia Commercial Maintenance Guidelines
Amtico and Spacia Commercial Maintenance Guidelines Amtico flooring along with all types of floor coverings require appropriate cleaning and maintenance in order to provide long term durability, safety
Acrylic Walls Installation Instructions
Acrylic Walls Installation Instructions IMPORTANT Please read carefully the following instructions before installing your shower acrylic walls. If you have any questions on this shower acrylic walls installation
Slip-Retardant sheet and tile
Slip-Retardant sheet and tile SAFEGUARD TM sheet SAFEGUARD Spa TM sheet SAFETY ZONE TM tile linoleum luxury vinyl tile commercial hardwood sheet vct specialty flooring accessories SAFEGUARD TM SAFEGUARD
Installation Systems. Chapter V Installation Systems
V Installation Systems Chapter V Installation Systems 81 ARSTRONG STRATEGIC ACCOUNTS RECOENDED SHEET FLOORING ADHESIVES AND INSTALLATION SYSTE Product Avantra Cambray Chelsea Corner Concerto Deco Collection
HARDWOOD WARRANTIES Limited Warranty for Prefinished Solid, Engineered, and Longstrip Floors Manufacturing Defects Finish Warranty
HARDWOOD WARRANTIES Limited Warranty for Prefinished Solid, Engineered, and Longstrip Floors Manufacturing Defects Mohawk* ("Mohawk") hereby warrants to the original buyer ("Buyer"), the goods to be free
INSTALLATION THE SIMPLIFIED VERSION
Fo Subfloor has to be flat, permanently dry, solid and clean. ng INSTALLATION THE SIMPLIFIED VERSION Floori rbo Adhésif Modul up pr é c o n is e Trim off over lengths leaving 1mm gap all around the walls.
RESIDENTIAL HARDWOOD WARRANTIES
RESIDENTIAL HARDWOOD WARRANTIES Limited Warranties for Prefinished Solid and Engineered Hardwood Floors Manufacturing Defects Century Flooring* ("Century") hereby warrants to the original buyer ("Buyer"),
Table of Contents Markers...1
Table of Contents Markers...1 Introduction...1 Color Surge Paper...2 Color Surge\Neon Explosion/Glow Board/Color Wave Markers...3 Dry Erase Markers...9 Erasable Markers...15 Ice Markers...23 Markers...34
Asbestos in Your Home
Asbestos in Your Home The following information below is taken largely from a document developed in 1990 entitled Asbestos in Your Home. However, this information is still of value to homeowners and renters.
How to Install GoBoard:
How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called
The Truth About Asbestos In Your Home
The Truth About Asbestos In Your Home A Complete Report For Anyone Starting A Home Repair Or Remodeling Project In this report you will find out: What asbestos is. What the dangers are of being exposed
Maintenance Guide. for your Mercier prefinished floor. 1-866-448-1785 www.mercierwoodflooring.com PRINTED IN CANADA SP-CAREGUBIL 10-12
PRINTED IN CANADA SP-CAREGUBIL 10-12 Maintenance Guide for your Mercier prefinished floor 1-866-448-1785 www.mercierwoodflooring.com For lasting satisfaction You have chosen the best prefinished flooring
Engineered Hardwood Flooring Installation Instructions
Engineered Hardwood Flooring Installation Instructions Glue Down / Float Engineered Planks can be installed over most subfloors, and are constructed to be dimensionally stable, making them suitable for
INSTALLATION INSTRUCTIONS
INSTALLER/OWNER RESPONSIBILITIES Hardwood flooring is a product of nature and its inherent beauty stems from the fact that each piece is unique with no two pieces the same. Due to the fact that this flooring
FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?
1. Where is the serial number of my tub located? 2. What can I use to clean my tub or shower? 3. What is an Above Floor Rough-in? 4. Can I replace my towel bar? 5. What are grommets? 6. Why do some bathing
Congratulations! Quality products for quality floors
Congratulations! By choosing Mirage hardwood flooring, you have made the best decision for your home. Thanks to Mirage s unparalleled quality, unique finishing process and your proper care, the beauty
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions
Prefinished 3/4 Solid (including various widths such as 3 1/4, 3 5/8, 4 3/4, 5 ) Nail-Down Installation Instructions Thank you for choosing ARK Floors Exotic Hardwood Flooring. In order to meet warranty
Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)
INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5
Division 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
How to Build a Poker Table
How to Build a Poker Table www.pokertablematerials.com 10-Person Poker Table- 96 x 48 These are step by step instructions for building a poker table. The table will measure 48" x 96" and have a 4" wide
Euro Oak Installation
STYLE TIMBER FLOOR Bring your life in style Euro Oak Installation Before Starting Installation Your floor has been manufactured with the best possible care. However we would still advise you to check the
Minor Cracks in Horizontal Surfaces
Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.
Asbestos in Your Home
Asbestos in Your Home You may have some asbestos in your home, but may not be sure what it is, what it looks like, or what to do about it. Just because asbestos is there doesn't mean there's a problem.
Installation guide. ENGINEERED and LOC. 1/2 in and 3/4 in (13 mm and 19 mm) INNOVATION TRADITION PERFECTION
Installation guide ENGINEERED and LOC 1/2 in and 3/4 in (13 mm and 19 mm) INNOVATION TRADITION PERFECTION It is important to read the installation instructions, maintenance guide and warranty document
Repairing Drywall Techniques for fixing everything from popped screws to big holes
Repairing Drywall Techniques for fixing everything from popped screws to big holes BY MYRON R. FERGUSON C racks or holes in drywall, wet or stained drywall, peeling joint tape, popped nails or screws.
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING
INSTALLATION INSTRUCTIONS FOR LAMINATE FLOORING Introduction Laminate flooring is designed to be a floating floor that may be installed over virtually any type of sub floor. It is not nailed or glued to
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS
QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine TM reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical
Slips, Trips and Falls Safety Meeting Handout
Slips, Trips and Falls Safety Meeting Handout The procedures and products used to clean and maintain floor surfaces are sometimes a direct cause of many "slip and fall" accidents. Maintenance staff may
Shower Walls and Tub Surrounds
Reverso en español TEC Skill Set How-To Project Guide Shower Walls and Tub Surrounds 3 Steps to a Beautiful Tile Surface! 1. Prepare the surface 2. Set the tile 3. Grout and caulk H.B. Fuller Construction
Installation Guidelines for Modular Carpet
Installation Guidelines for Modular Carpet Ecoflex Urethane Cushion Backed Carpet Tiles PVC Backed Carpet Tiles Thermoplastic Backed Carpet Tiles Self Lock Carpet Tiles 1975 West Oak Circle Field Services
Country Series. 12.3mm V-Groove Edge Engineered Laminate Flooring. Laminate Flooring Care and Maintenance. Routine Cleaning
Country Series 12.3mm V-Groove Edge Engineered Laminate Flooring Laminate Flooring Care and Maintenance Routine Cleaning Simply dust mop or vacuum with a soft brush or wood-floor accessory to keep your
Bathroom Installation Guide
Bathroom Installation Guide Step-by-step installation of your cabinets We do a lot of groundwork to make it as simple as possible for you to assemble and install your new bathroom furniture yourself. We
Cleaning guide for senior living facilities
Cleaning guide for senior living facilities Altro s recommended cleaning and maintenance guidelines for senior living facilities. Introduction Most senior living facilities require commercial cleaning
Installation instructions for all Egger floors with the glueless system JUST clic!
Installation instructions for all Egger floors with the glueless system JUST clic! OBLIGATORY TESTING AND EXERCISE OF DUE CARE/SUB-FLOORS 1. OBLIGATORY TESTING AND EXERCISE OF DUE CARE Laminate flooring
10 Year Guarantee. 15 Year Guarantee LAMINATE FLOORING
LAMINATE FLOORING GOOD TO KNOW Can be laid on existing floors, except on wall-to-wall carpet. When laying floors, always use NIVÅ floor lining (sold separately). When laying floors on concrete or stone,
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001).
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001). You will learn the: About the dangers of asbestos. How to identify asbestos. How to protect yourself
Selecting Vinyl Flooring
extension.usu.edu Smart Shopping for Home Furnishings Selecting Vinyl Flooring Dr. Leona Hawks Home Furnishings & Housing Specialist 1987 HI 03 Shopping for vinyl? There are many different varieties of
The length of this warranty varies by product. Please see product sample or your retailer for duration of this warranty on specific products.
RESIDENTIAL ENGINEERED HARDWOOD LIMITED WARRANTY Limited Warranties for Q Wood Brand Locking Engineered Hardwood Floors with Opulux Performance Enhanced Finish Manufacturing Defects Q Wood by Quick Step
KITCHEN INSTALLATION GUIDE
KITCHEN INSTALLATION GUIDE The step-by-step guide to installing your new kitchen right The materials and tools you ll need This brochure is your guide to preparing and installing your new kitchen. Inside
CLEANING PROCEDURES 1. DUSTING:
CLEANING PROCEDURES 1. DUSTING: Dust areas which have accumulated on shelving, furniture, top of lockers or desks, call attention to neglect of these areas. (Do not move staff member s belongings.) It
SOLID FLOORING 3/4 INSTALLATION GUIDELINES
SOLID FLOORING 3/4 INSTALLATION GUIDELINES Thank you for choosing Cikel Exotic Hardwood Flooring, a responsible choice. Please thoroughly review and adhere to the following installation instructions to
ASBESTOS IN THE HOME
ASBESTOS IN THE HOME This information will help you understand asbestos: what it is, its health effects, where it is in your home and what to do about it. Even if asbestos is present in your home, it is
Above Parr Hardwood Floors, Inc. www.aboveparr.com 303.333.PARR (7277) Serving Colorado since 1987. New Floor Installation. Sand, Fill and Refinish
Above Parr Hardwood Floors, Inc. www.aboveparr.com 303.333.PARR (7277) Serving Colorado since 1987 New Floor Installation Sand, Fill and Refinish Screen & Coat Water Damage & Repairs Stairs, Trim and Vents
Here is your set of Detailed Plans from Copyright 2004 All Rights Reserved
Here is your set of Detailed Plans from Copyright 2004 All Rights Reserved Materials for the House Here is the list of materials you will need to construct the basic house then to cover it with roofing
THINGS YOU SHOULD KNOW
INSTALLATION INSTRUCTIONS Value Sized Roll The quickest, easiest, cleanest way to install tile. No Mortar, No Mixing, No Mess Complete Your Project in a Day No Waiting Between Setting and Grouting THINGS
Choosing the Right Floor Protectors
Choosing the Right Floor Protectors You ve made the investment in new flooring for your home. So what can you do to help ensure your flooring stays looking like new? One of the biggest flooring maintenance
Asbestos. from the Home. Removing. Read this booklet for:
Removing Asbestos from the Home Read this booklet for: steps and care you should take if your home has asbestos-containing material (ACM) advice about protective gear. How to get ACM removed from your
Installation Instructions Waterproof Core Vinyl Planks
Installation Instructions Waterproof Core Vinyl Planks Products Included Approved Grade Levels Approved Installation Methods Waterproof Core Vinyl Planks Click Lock Joint Above Grade. On Grade. Below Grade.
TARKETT VINYL SHEET 2009 INSTALLATION MANUAL
Tarkett Felt En 09.qxd:Layout 1 3/12/09 2:02 PM Page 2 TARKETT VINYL SHEET 2009 INSTALLATION MANUAL Tarkett Felt En 09.qxd:Layout 1 3/12/09 2:02 PM Page 3 IMPORTANT NOTICE Safety is everyone s responsibility.
Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
Contents. Introduction...3. Determine the Type of Floor Finishing Project...4. Things to Think About Before You Start...5. Assemble Materials...
Contents Introduction....................................3 Determine the Type of Floor Finishing Project...........4 Things to Think About Before You Start............5 Assemble Materials.............................6
Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered
Staple-Down, Glue-Down and Floating Installation IndusParquet 1/2" Engineered Thank you for choosing IndusParquet ½" Engineered Hardwood Flooring. Protect your investment; review and adhere to the flooring
Composite Stone Veneer
Composite Stone Veneer Installation Guide Ver 1 Jun 2015 www.compstone.com Composite Stone Veneer Installation Guide Contents Introduction & Overview 3 Required Tools 4 Optional Tools 4 Attachment Guidelines:
KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE
KEEP THIS GUIDE ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET Asbestos could be in the house or building you are working on right now. Left alone, it isn t dangerous. However, once disturbed, tiny
Installation Instructions for Fletco Carpets
Table of Contents The backing is a very important part of a carpet, as well as the installation and the daily use are concerned, so therefore these installations instructions are based on the different
How to Install UnderDeck The Original.
How to Install UnderDeck The Original. TOOLS: Chalk Line Caulk Gun Garden hose or water bucket Gloves Hammer or Screw Gun Power Mitre Saw with OSB Blade Pencil Pliers Safety Glasses Straight Edge / Carpenter
FRAMED & MOUNTED TILE MURAL
Page 1 of 5 There is no denying that tile murals have taken the sublimation industry by storm. The unique ability to take a customer s artwork or high resolution photograph, tile it using your software
CONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
