Implementation Strategic Reserves. Task Force Implementation Strategic Reserves 16 April 2014
|
|
- Chastity King
- 8 years ago
- Views:
Transcription
1 Implementation Strategic Reserves Task Force Implementation Strategic Reserves 16 April 2014
2 Agenda (9h00-13h00) Location: Elia, Keizerslaan 20, 1000 Brussels Topic Presenter Time Approval of draft minutes 3 rd TF ISR 16/4/2014 Elia 10 minutes Status and planning update Elia 15 minutes Procedure to constitute the SR Consolidating feedback and highlighting recent evolutions, incl. calibration BREAK Market design Structural shortage, imbalance pricing, technical trigger Next steps Impacts on other elements (e.g. ARP contract) Elia Elia Elia 2 hours 20 minutes 15 minutes 50 minutes 10 minutes 2
3 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 9h10 Status and planning update 9h25 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure BREAK: 11h45 Coffee Break Market design ( functioning rules) Next steps 12h00 12h50 END: 13h00 3
4 Introduction Approval of minutes 3 rd TF ISR 19/3/2014 The draft minutes were distributed by prior to this meeting. No specific comments on the minutes have been received. 4
5 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 9h10 Status and planning update 9h25 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure BREAK: 11h45 Coffee Break Market design ( functioning rules) Next steps 12h00 12h50 END: 13h00 5
6 Introduction Update planning 2014/2015 The law amending the Law of 29 April 1999 on the organization of the electricity market, which provides for the establishment of a mechanism of strategic reserves has been published in the Belgisch Staatsblad / Moniteur Belge. Conform the approved transitional calendar, Elia has submitted to the AD Energy an analysis of the security of supply of the country, the AD Energy has delivered an advice to the Minister on the need to constitute a strategic reserve and the Minister has instructed Elia by Ministerial decree to constitute a strategic reserve of 800MW for the next three years. All these documents have been published on the website of the AD Energy. The next steps are the finalization of the public consultation on the procedure for constitution of strategic reserves, foreseen by April 25th. And the submission of the functioning rules of the strategic reserves for approval to the CREG, also foreseen for April 25th. 6
7 Introduction Volumes decided by the Minister The procedure for constitution of strategic reserves as sent for final consultation, has taken into account the Ministerial Decree of April 3rd. As described in point 2.5 of the procedure, art.1 of the Ministerial Decree stipulates that: - A volume of 800MW needs to be constituted as strategic reserves, for a period of three years and that this volume needs to be composed from capacity that would have been out of the market on November 1st 2014, if it weren t for the mechanism of strategic reserves. - Furthermore, demand capacity can only be contracted for one year, which is in derogation to production capacity, which can contribute to the determined volume for the three years. This is translated into the eligibility criteria, to be discussed in the part on Tender Design. - There is a possibility foreseen to increase the determined volume should there be credible indicators that D3/T2 would not be back to the market before the winter period. No new tender will be organized, but only non-selected offers to constitute the 800MW can be additionally contracted in this case. 7
8 Introduction Update on consultation planning Procedure for constitution of strategic reserves A draft version of this procedure was sent ta all taskforce members and is also available on our website for final consultation by all stakeholders (grid users, producers, the regulator, the energy administration,...) This version already takes into account all comments received during and in between the consultations that took place via the Taskforces for Implementation of Strategic Reserves. TF isr I 17/2 TF isr III 19/3 TF isr IV 16/4 TF isr V? 10/06 or 19/ feb mrt apr mei jun /2 TF isr II Today 05/5 Call For Candidates 10/6 Call For Tender Consultation process: Any comments are to be sent to Filip Carton no later than 25 April, 23h59; Unless stakeholders clearly indicate that comments are confidential these will be made public via our website; In case there are any comments to be made, they can also be discussed during today s Task Force; Prior to the call for candidates (actually planned to start on 5 May 2014) a final version will be published on our website in NL, FR and UK; 8
9 Questions 9
10 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 Status and planning update 9h10 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure 9h25 Coffee Break Market design ( functioning rules) Next steps BREAK: 11h45 12h00 12h50 END: 13h00 10
11 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 Status and planning update 9h10 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure 9h25 Coffee Break Market design ( functioning rules) Next steps BREAK: 11h45 12h00 12h50 END: 13h00 11
12 Content Part 1: Introduction Part 2: Parameters used for computation of total cost during selection Specific scenario of activations Part 3: SDR product design Nature of SDR Calibration of parameter Part 4: Ratio SDR/SGR 12
13 Content Part 1: Introduction Part 2: Parameters used for computation of total cost during selection Specific scenario of activations Part 3: SDR product design Nature of SDR Calibration of parameter Part 4: Ratio SDR/SGR 13
14 Introduction Volume for strategic reserves determined by Monte Carlo simulation. Simulation of available production versus predicted demand Available production - Installed capacity Taken into account - Solar/wind/hydro/import - Maintenance - Forced outages Predicted demand - Multiple timeseries Outcomes of simulations used as parameters: LOLE = Loss of Load expected = # hours during which the injection capacity (installed productions and imports) does not cover the load consumption ENS = Energy not Served during those moments Probability of activation Remark: for all parameters we distinguish Average values used for example for the determination of the selection scenario Extreme values used for the calibration of products: P95 example Average values of LOLE Extreme values of LOLE (P95 or LOLE95) representing worst case scenario s of the MC simulations 14
15 Content Part 1: Introduction Part 2: Parameters used for computation of total cost during selection Specific scenario of activations Part 3: SDR product design Nature of SDR Calibration of parameter Part 4: Ratio SDR/SGR 15
16 Parameters for computation of the total cost Specific scenario of activations In order to put all candidates (SDR and SGR) in competition during selection the total yearly cost (reservation and activation) is considered. Therefore a specific scenario of activations is used: number of activations & cumulated duration of activations used in that scenario are based on average values of MC simulations For the coming winters simulations show: average number of activations for SR: /2015: /2016: /2017: 28 average value of total cumulated activation duration /2015: 30h /2016: 63h /2017: 77h NB: Those are average values from simulations and do not represent a forecast of what would happen next winter 16
17 Content Part 1: Introduction Part 2: Parameters used for computation of total cost during selection Specific scenario of activations Part 3: SDR product design Nature of SDR Calibration of parameter Part 4: Ratio SDR/SGR 17
18 ENS [MWh for one hour of interruption] SDR is dimensioned to meet needs SDR is dimensioned to cope with more rare and extreme situations (peaks of ENS) SGR is dimensioned to cover a base-band (most of the situations) SDR is dimensioned for extreme needs (on the top of SGR) Example SDR ENS (average MWh/activation duration) 2016/2017 Example: this value means that the probability that the average ENS is 581 MWh is equal to 35,22% 581MWh SGR 0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1 35,22% Cumulative percentage REM: although SDR is dimensioned for extreme needs, in reality SDR could be used also without SGR, for instance for short duration needs in function of technico-economical activation criteria 18
19 SDR: product calibration How can we define the product Strategic demand reserve so that it is best fitted to our needs taking into account stakeholder s possibilities. Product design based on a probabilistic approach 1. Activation duration and frequency - When do we expect activations? - How long will an activation last? - What is the time between two activations? 2. Number of activations? 3. Total cumulated activation duration? Trade off between needs (taking into account that a base-band is covered by another product) and stakeholder s possibilities 19
20 Number of occurences SDR Activation duration and frequency Probability of SDR activation during the day Example for one winter Assuming 15% SDR 20% 15% 10% 5% A clear increase in probability to be activated in the morning and evening: - Morning peak: 9h-13h covers approximately Prob. 30% - Evening peak: 17h-21h covers approximately 40% 0% Historical values Morning peak without evening peak rarely happens SDR is calibrated to cover two peaks/day 0 Evening Morning M&E M\E Based on stakeholder s feedback Elia proposed two options: 1. SLA 4: ( 4hrs max/activation, 4hrs min between 2 activations) 2. SLA 12: ( 12 hrs max/activation, 12hrs min between 2 activations) 20
21 Number of activations and cumulated duration The product calibration is made to cover P95 situations and to provide a maximum flexibility to the operator: 100,00% 80,00% 60,00% 40,00% 20,00% 0,00% Example for one winter assuming 15% SDR Cumulated probability of yearly # of SDR activations With 40 activations 99,6% of the situations are covered Note that those values are independent from SLA (12/4) As most of the activations would have a duration 4hrs we calibrate 40 activations as a max for SLA4 As SLA12 is used to cover 2 peaks of 4 hours this led to 20 activations of SLA12 The cap on the total cumulated activation duration is based on the LOLE95: /2015: SR : 95 h SDR-30 % : 63 h SDR-50%: 71h /2016: SR : 165h SDR-30 % : 73 h SDR-50%: 93h /2017: SR : 175h SDR-30 % : 90 h SDR-50%: 130h Elia proposes a cap of 130 hours in the product design taking into account: the evolution of the needs (quid Doel 3 and Tihange 2?) the potential increase of SDR ratio on one hand stakeholder's feedback on the other (+/-100h) 21
22 Content Part 1: Introduction Part 2: Parameters used for computation of total cost during selection Specific scenario of activations Part 3: SDR product design Nature of SDR Calibration of parameter Part 4: Ratio SDR/SGR 22
23 Average LOLE (h) Ratio SDR/SGR Rationale: As SDR is calibrated for short duration needs and SGR for longer needs (eg 18h) The total SR is dimensioned in order to reduce the remaining average LOLE up to 3h The graph below gives the impact of the ratio SDR/SGR on the remaining average LOLE assuming that 1MW SDR = 1MW SGR Remaining average LOLE not covered by ration SDR12/SGR 6,00 5,00 4,00 3,00 2,00 1,00 Taking into account evolutions in needs and a necessary learning curve for SDR, Elia proposes 30 % for the first winter 2014/ / /2017 Limit 0,00 0,00% 5,00% 10,00% 15,00% 20,00% 25,00% 30,00% 35,00% 40,00% 45,00% 50,00% ratio SDR/SR In case that more than 30% SDR is selected, long duration needs would then have to be covered by SDR activated in series. (example 2 different SDR12 in order to cover an need of 18 hours). This implies that we would have to contract more SDR to cover an equal volume of SGR (ex: 1,5 times *1MW SDR12 in order to cover 1MW during 18 hours) 23
24 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 Status and planning update 9h10 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure 9h25 Coffee Break Market design ( functioning rules) Next steps BREAK: 11h45 12h00 12h50 END: 13h00 24
25 Draft procedure for constitution of SR Highlights or comments received (1/10) During the next slides we will go through the procedure for constitution of strategic reserves highlighting updates compared to previous presentations and/or items on which we already received comments 1. Plan Wathelet Scope of the procedure is limited to Strategic Reserves, one element out of a broader Plan Wathelet 2. Strategic Reserves 2.1 = Introduction to the modified Electricity law of 29 April 1999; 2.2 = Reference to planning agreed between the administration for energy, CREG and Elia; 2.3 = Explains the consultation of stakeholders via this taskforce; 2.4 = The procedure is applicable for the 2014 tendering and thus enters into force prior to the contract notice (5th of May 2014); 2.5 (NEW) = Explaining the hierarchy of documents. If there is a difficulty in interpretation or a contradiction between the constitutive elements of the relevant laws and regulations, this procedure, the SGR/SDR contract or the General Terms & Conditions, each document shall take precedence over the following one in the following order: - for the avoidance of doubt, the relevant laws and regulations will always prevail over the both this procedure and the SGR/SDR contract(s); - this procedure for constitution of strategic reserves; - the SGR/SDR contract(s) signed by ELIA and the supplier(s); - the General Terms & Conditions [i.e. for ancillary services]. 25
26 Draft procedure for constitution of SR Highlights or comments received (2/10) 2. Strategic Reserves (continued) 2.6 (NEW) = The Minister instructed ELIA by Ministerial Decree the 3th of April to launch a tender for 800MW per year of strategic reserves and this for three years, starting as from November 1st 2014: - It is stipulated that this volume needs to be constituted from capacity that would have been out of the market on the 1st of November Furthermore, demand capacity can only be contracted for one year, which is in derogation to production capacity, which can contribute to the determined volume for the three years. - Article two of the Ministerial Decree stipulates that concluding a contract with Elia does not impede CREG to adapt the functioning rules, which are according to the law of March 26th to be submitted by Elia for approval to the CREG. - Finally, should there exist reasonable indicators that the nuclear reactors of Doel 3 and Tihange 2 will not be available for the next winter period, there is the possibility that ELIA can be instructed to contract an additional volume of strategic reserves for a given period, and that this additional volume is to be contracted from the offers received via the tender which will be organized via this procedure. 3. Definitions For the avoidance of doubt some definitions have been added. 26
27 Draft procedure for constitution of SR Highlights or comments received (3/10) 4. Procedure for constitution of SR 4.1 = ELIA will organize a competitive negotiated tendering procedure. The process will thus be very similar to the ancillary services process. 4.2 = Contract notice. A prerequisite to participate in the call for tender is that candidates must pass a procedure for admission. All details are described in this chapter 4.2, worth mentioning: = Certification of SGR - Each Power Plant belonging to one of the three categories identified in art. 7 quinquies 2 of the law of March 26th, has the obligation to at least submit one offer for the entire capacity of the Power Plant. - (NEW) The Ministerial decree however, as summarized under point 2.6, stipulates that the volume of 800MW to be constituted by ELIA as of November 1st 2014, and for the next three years, needs to be composed out of capacity which will be out of market as of November 1st Only those Power Plant(s) that meet the above, legal, criteria will be certified to participate in the call for tender. Offers submitted based on non-certified Power Plant(s) will be discarded. Important notice: in no case the participation (or selection) in this tendering should accelerate the announced date of closure of a Power Plant; it is up to the producers to explicitly motivate the (in)eligibility of the concerned Power Plants at the call for candidates and/or when submitting an offer; in case of non-respect CREG may apply a penalty. 27
28 Draft procedure for constitution of SR Highlights or comments received (4/10) 4. Procedure for constitution of SR (continued) = Certification of SDR - In order to be eligible for SDR one should: 1. Be a (or an aggregated pool of) grid user(s) connected to the ELIA grid; 2. Comply with below exclusivity criteria: - the same access point(s) may not be used for R3_Dynamic Profile; - the same access point(s) may not be used for ICH; - combination with R1_Load will be subject to specific constraints, amongst others it must be proven that said R1_Load remains available even during an SDR activation. 3. Be a (pool of) grid user(s) whose consumption is high during the winter (from 01/11 until 31/03) peak s based on historical metering data from 3 previous years: - Average 15 minutes consumption Rref + SL - During 95% of peak periods* Rref + SL - During 95% outside peak periods 0,75 * (Rref+SL) - * Peak periods are defined as 09h00-13h00 and 17h00-21h00 of Working Days Exclusivity with ICH not acceptable for all stakeholders, however, the solution with 2 shedding limits is not accepted either Certification criteria are perceived as too severe => Elia is analyzing the feedbacks and doesn t exclude some modifications Unlike the call for candidates (that will be closed on 02 nd of June 2014) the specific process to certify Rref and SL will be opened until the end of the tendering procedure (4 th of July). Eventual periods that are not representative (incident, unforeseen maintenance, special holidays like Christmas) or evolutions of the profile due to new investments may be motivated. 28
29 Draft procedure for constitution of SR Highlights or comments received (5/10) 4.3 Terms of reference The SDR/SGR contract(s) will further clarify the terms of reference in this chapter. If there is a difficulty in interpretation or a contradiction between this chapter 4.3 and the SGR/SDR contract(s), the SGR/SDR contract(s) will take precedence. + (NEW) it s stipulated that in case the applicable legal and/or regulatory rules would require so that the contracts could be revised, etc Some updates in the terms of reference for SGR: By concluding an SGR contract the SGR supplier will undertake: - to provide the SGR service during the 5 months winter period(s); - to keep his SGR Power Plant(s) out of the market throughout the validity period of the contract. (NEW) For the avoidance of doubt: - it is stipulated that the validity of the SGR contract will be for 36 months, from 01/11/2014 until 31/10/2017; - the SGR supplier will be requested to list the conditions (and prices) under which the SGR Power Plant(s) can be activated outside the 5 month(s) winter period(s); Notification (warm-up) - verification & Injection is further clarified - The notification will always take place 5h30 in advance of the specified quarter-hour. - The verification will always take place 1h30 in advance of the specified quarter-hour. Elia receives feedback on these parameters and after analysis will take these into account to further fine-tune them in the final procedure 29
30 Draft procedure for constitution of SR Highlights or comments received (6/10) 4.3 Terms of reference (continued) Some updates in the terms of reference for SGR: ELIA will neutralize, on a quarter-hourly basis, all effectively measured injection (MW) at the access point of the concerned SGR Power Plant(s) in the perimeter of the ARP. Any measured offtake (MW) at the access point of the concerned SGR Power Plant(s) will be treated according to the normal procedures described in the ARP-Contract; (NEW) In the penalties for non-delivered energy we have added a term: - In case a Forced Outage occurs during a request for activation a forfeit price reduction = 3 day remunerations will be applied. Some updates in the terms of reference for SDR: The SDR contract will allow 2 products: - SDR_4: - Duration of an activation: up to 4 hours - Delay between 2 consecutive activations (end-start) : 4 hours - # activations/contract: 40 - Cap on cumulated duration of all activations: 130 hours - SDR_12: - Duration of an activation : up to 12 hours - Delay between 2 consecutive activations (end-start) : 12 hours - # activations/contract: 20 - Cap on cumulated duration of all activations: 130 hours Elia receives feedback on these parameters and after analysis will take these into account to further fine-tune them in the final procedure 30
31 Draft procedure for constitution of SR Highlights or comments received (7/10) 4.3 Terms of reference (continued) Some updates in the terms of reference for SDR: By concluding an SDR contract the SDR supplier will undertake to provide the SDR service during the 5 months winter period(s) throughout validity period of the contract. For the avoidance of doubt: - It is stipulated that the validity of the SDR contract will be for 5 months, from 01/11/2014 until 31/03/2015; Notification (warm-up) - verification & Injection is further clarified Elia receives feedback on these parameters and after analysis will take these into account to further fine-tune them in the final procedure - The notification will always take place 5h in advance of the specified quarter-hour. - The verification will always take place 1h in advance of the specified quarter-hour. ELIA will correct, on a quarter-hourly basis and for the access point(s) concerned by an SDR activation, the perimeter of the ARP by replacing the access point(s) offtake by the corresponding day ahead nomination. (NEW) In the penalties for non-delivered energy we have also added a term: - A forfeit price reduction (equal to 3 day remunerations) will also be applied in case the shedding limit is not achieved within the time limits provided by contract. 31
32 Draft procedure for constitution of SR Highlights or comments received (8/10) 4.4 Call for tender All selected candidates will receive the tendering specifications (= SDR or SGR contract), bidding sheet and bidding instructions. Chapter 4.4 explains all details about this call for tender: = Procedure = Composition of the offers = Data to be mentioned in the offer - (NEW) The SGR supplier(s) must list the conditions (and prices) under which the SGR Power Plant(s) can be activated outside the 5 month(s) winter period(s); = Validity of the offers - Candidates are bound by their offer until 31/10/ Award criteria At the latest by 25 July ELIA shall report on the offers received to the CREG and to the Minister, and shall include in its report a technical- economic proposal for combination of offers. Important notice: These rules for technical-economical combination of offers are subject to regulatory approval via the functioning rules for strategic reserves. As such, this chapter can only be considered as a draft proposal. ELIA reserves the right to change these rules when introducing its official proposal for functioning rules toward CREG. 32
33 Draft procedure for constitution of SR Highlights or comments received (9/10) 4.5 Award criteria (continued) The selection of strategic reserves happens on technical-economic basis. The selection of offers is done in a way that ensures that for the winter 2014/2015 the contracted volume for strategic reserves (SDR and SGR) covers at least the 800MW decided by Minster at the lowest possible total cost, taking into account: The conditions relating to the bids; The results of the certification process; Minimum 50MW of SDR should be selected; Cfr introduction, in case more then 30% of SDR would be selected a competition factor should be applied. Maximum 30% of the volume can be selected with SDR, thereby considering 1MW of SDR equal to 1MW of SGR; In order to compare offers, the total yearly cost will be considered; TC = Res + # Act A1 + A2 Act duration With: - C: Total cost [ ] => calculated for each bid - Res: Reservation cost [ ] = Reference Volume [MW] * Reservation Price [ /MW/h] * 3624 [h] - #Act: Average number of expected activations for next winter [n set at 9 activations for the 2014 tendering] - A1: Fixed activation cost (hot) [ /Activation] - A2: Hourly activation cost [ /h] = Reference Volume [MW] * Variable Activation cost [ /MWh] - Act_duration: Total average length of expected activations for next winter [set at 30h for the 2014 tendering] 33
34 Draft procedure for constitution of SR Highlights or comments received (10/10) 4.6 Contract preparation and signature Some clarification on the process for preparing and signing awarded contracts. 4.7 Contract award notice Once the contracts have been signed, ELIA will publish a contract award notice with the results of the tender procedure on the website 5. Rules regarding disputes Any remaining dispute regarding the interpretation or implementation of this procedure or subsequent agreements or operations that might arise therefrom shall be laid before the courts of Brussels. 6. Cancellation of the procurement ELIA reserves the right to cancel the tendering procedure, before the contract(s) is(are) signed, without the candidates or tenderers being entitled to claim any compensation. 6. Questions Questions relating to this tender should be addressed to: Mrs. Pauline Ottoy (pauline.ottoy@elia.be) cc: Mr. Filip Carton (filip.carton@elia.be) 34
35 Questions 35
36 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 9h10 Status and planning update 9h25 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure BREAK: 11h45 Coffee Break Market design ( functioning rules) Next steps 12h00 12h50 END: 13h00 36
37 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 9h10 Status and planning update 9h25 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure BREAK: 11h45 Coffee Break Market design ( functioning rules) Next steps 12h00 12h50 END: 13h00 37
38 Market design: overview The following topics are dealt with in the following slides: - Step 4: Injection and balancing Criterion for structural shortage Impact imbalance pricing - Step 2: Notification Activation rules - Step 1: Detection Technical trigger 38
39 MARKET DESIGN STEP 4 : INJECTION & BALANCING Two topics in the context of step 4: injection & balancing Criterion for structural shortage Impact imbalance pricing 39
40 Step 4: Injection & Balancing Basic principles Economic trigger: signal coming from BPX in DA, indicating that a volume of SR has to be provided for a certain period. Such a transaction can be sufficient and solve the (market) problem Technical trigger: decision Y hours in advance ( verification ) to inject SR energy to the system in order to avoid a risk of plan de sauvegarde. Preventive action The economic and/or technical trigger alone should not influence the imbalance prices. But a warning must be sent to the market in order to announce a risk of high prices for the coming hours. The imbalance prices should be high when one of those triggers is coupled with a Real Time Indicator that confirms the structural shortage. Transparent and clear criterion that can be followed by market. 40
41 Step 4: Injection & Balancing Structural shortage - Real Time Indicator Typical scenario of an adequacy problem: Total offtake > total injection (SI 0) and all units at their max Reserves (R2 + R3 + intertso) contracted for residual imbalances and FO 16h 22h Available Ibids SI Situation where the SI starts to crop the reserves which are dedicated for instantaneous deviations of the SI Real Time Indicator that confirms the structural shortage: SI Ibids Market parties will be able to follow the situation on the online Elia dashboard The activation of SR will be visible in the NRV The SI (situation of the zone if no action by Elia) as well as the remaining margin of the system (Ibids) are clearly indicated on the website 41
42 Step 4: Injection & Balancing Residual energy - impact on balancing (1/2) Situation 1: IF strategic reserves are activated, AND IF there is structural shortage, THEN the imbalance price should be very high (>> 3000 /MWh) Situation 2: IF strategic reserves are activated, AND there is NO structural shortage, THEN the imbalance price should be a proxy of what would have been the situation without residual energy
43 DETECTION Step 4: Injection & Balancing Imbalance princing in a world with SR Changes in imbalance pricing depend on two conditions: Has there been a trigger for strategic reserves? Is there (in real-time) structural shortage? No structural shortage REAL TIME INDICATOR Structural shortage SI - IBIDs No SR trigger Normal imbalance pricing SR trigger (econ. or tech.) Corrected price, reflecting situation without SR injection Based on ARC (Available Regulation Capacity) Strong (single) price signal >> /MWh Only when two conditions are fulfilled, a very high price will occur 43
44 Step 4: Injection & Balancing Residual energy - impact on balancing (2/2) Situation 2: IF strategic reserves are activated, AND there is NO structural shortage, THEN the imbalance price should be a proxy of what would have been the situation without residual energy. Considering the importance to have transparent prices and in order to limit (at least for the first year) developments required a solution is to use (public) Available Regulation Capacity publications: 44
45 Step 4: Injection & Balancing How much is >> 3000 /MWh in case of structural shortage? VOLL Estimates Belgian Planbureau (2004) 3 methods/proxies with various results 2001 Added-value method: 128 M / hour of curtailment /MWh 2003 US management method:50-88 M / hour of curtailment /MWh /MWh 2004 Dutch WTA-method: 57 M / hour of curtailment /MWh Remarks: Assuming 13 GW load at hours of structural shortage Up to 2001 values (above data are not indexed to 2014: CPI about +30% since 2001) Belgian Planbureau (2014) Austrian Blackout simulator: 120 M / hour of curtaiment /MWh Bbp-method 61 M / hour of curtailment /MWh Remark: Assuming 13 GW load at hours of structural shortage 2011 RTE-model: /MWh Revue-E paper by Tirez et al. (2013) /MWh, based on a study of RTE based on 2011 data London Economics for OFGEM & DECC (2013) High enough as incentive to keep the balance. But not too high resulting in over-rewarding and potential gaming Differentiated view: average VOLL-SME ( MWh) > average VOLL-Residential ( /MWh) > average VOLL industrials (1.400 /MWh) Load-share weighted average across domestic and SME users for winter, peak, weekday = /MWh A gradual introduction of a high price allowing market participants to learn and prepare themselves. Price signal should not equal VOLL, but should conceptually be one step below VOLL A price of /MWh is put forward in case of structural shortage. This price increases to /MWh over the next years. 45
46 MARKET DESIGN STEP 2 : NOTIFICATION One topic in the context of step 2: Notification Activation rules 46
47 Selection Basic principles and parameters Needs = Profile Means Available SGR Pmin -->Pmax variable volume Available SDR Nom-SL fixed volume (qh basis) Max Duration 4h or 12h remaining activations Technico Economic Selection min cost min market distortions example Taking into account : Terms of contract Physical System conditions 47
48 Selection Basic principles and parameters Peak or Base Load Profile? Profiles longer than 4h are considered as base load and would a priori be covered with SGR. Profiles shorter than 4h are considered as peak load and would a priori be covered either by SDR or SGR depending on total cost of activation. - Two consecutive peaks considered as separate if demand for SR is zero for more than 2h in-between those peaks. Parameters that will determine the selection of strategic reserves 1. Profile duration: The duration of the strategic reserves injection, from first injection until last moment of injection Base load or peak? Take into account sufficient margin in the duration. 2. Base load power: The minimum power defined by the need for strategic reserves. 3. Profile maximum power: The maximum requested power during the activation of strategic reserves
49 Activation Rules for strategic reserves 1. The base load will a priori be covered by SGR: a) Selection based on economic merit order ( = the cheapest (combination of) SGR unit ) b) Pmin of a unit can be higher than the base load power if: Lower total cost of selection and Spillover is limited to 50 MW c) If the spillover is too big, than a more expensive selection can be considered 2. The peak load will a priori be covered by SDR unless SGR is cheapest: a) Selection among SDR based on economic merit order Should two consecutive activations be needed, then the merit order is made between 2 X SLA 4 or 1 X SLA 12 b) If cost of activation SDR is too high consider additional/other SGR c) Taking into account remaining SDR activations 3. Final re-evaluation and specific cases: If the total profile can be covered by activating a SGR unit or a puzzle of SDR units then an economic optimization should be considered, taking into account the system situations, the period and SDR remaining activations. If the profile duration is small (<< 4h) and /or the maximum needed power is low (< Pmin SGR or PSDR) If the selection is done during the day-ahead preparation then a selection with the longest notification time will be considered. No activation at all can be considered 49
50 MARKET DESIGN STEP 1 : DETECTION One topic in the context of step 1: Detection Technical trigger 50
51 Detection - Technical trigger Technical trigger in DA The alarming system for the technical trigger is primarily based on a spinning reserve forecast. Spinning Reserve monitors and forecasts the system flexibility for the Elia Control Area. In case upward margin becoming too small/negative, the alarms can be launched by the system and the TSO considers all relevant information needed about the situation in order to complete the analysis and to confirm that the startup of strategic reserves will be triggered/necessary (technical trigger). When the alarming system is launched, the TSO assesses the following information to the extent available: - Measured and forecasted weather conditions (temperature, wind, solar, ) in BE, FR, NL & GE - Production situation (measured and forecasted) in Elia control area - Load situation (measured and forecasted) in Elia control area - Availability of slow start units - Availability of X-border capacities - North Border flow situation (measured and forecasted, N-1, PST,..) - South Border flow situation (measured and forecasted, N-1, PST, ) - Potential dynamic stability issues - Net position in BE, FR, NL & GE - Production situation in FR, NL & GE (renewable production, classical production, FO, maintenance, ) - Load situation in FR, NL, GE - Prices in BE, FR, NL & GE 51
52 Detection - Technical trigger Alarming system in DA S1 : Total Load forecast > Limit Up Free Bids There is a risk not to have enough flexibility to compensate residual imbalances S2 : Limit SoS Total Load Forecast < N-1 criterion There is a risk not to have enough margin to ensure the N- 1 criterion e.g too small forecasting from the ARP s nominations at the evening peak e.g inter-tso reserve unavailable, interruptible clients unavailable, 52
53 Back-up slides Technical trigger 53
54 Detection - Technical trigger Technical trigger in RT After the day-ahead check, a continuous monitoring takes place As seen on the previous slide, at the preparation for the next day (around 18h on D-1) a first explicit check is made but the alarming systems keep on running and monitoring in intraday into real-time, allowing for an alarm and potential consequent technical trigger anytime. Strategic reserves serve as last resort before launching the defense plan For the avoidance of doubt, Strategic reserves also serve as last resort in order to avoid launching the defense plan (reddingscode) for reason other than structural shortage (e.g. congestion issues, voltage problems,...) 54
55 Detection - Technical trigger Alarming system in Day Ahead 55
56 Detection - Technical trigger Alarming system - Definitions of the curves Total Production Forecast: Sum of forecasted productions on the TSO and DSO grid - Information from the market : Cross border exchanges DA and ID - Information from CIPU units : Nominations and IDPCR except for renewables - Information from Elia tools : Wind, solar and non CIPU forecasting tools for all renewables units (CIPU/non CIPU & TSO/DSO connected) and for all non CIPU units (TSO/DSO connected) Total Load Forecast: Tool giving the forecasted total load on the TSO and DSO grid - Collect and aggregate data sources (TIC / forecasting tools) to estimate total load - Collect meteo data - Using historical data of total load, historical and forecast meteo data from Meteo Service. If there is a difference between both curves, it could mean that - There is a difference between the Total load forecasted by Elia and the one forecasted by the producer - There is a difference between the renewables and decentralized production forecasted by Elia and the one forecasted by the producer 56
57 Detection - Technical trigger Alarming system - Definitions of the curves Limit Up Free Bids : a free margin available to manage inadequacy between load and production. Based on margin computed each quarter summing all the available coordinable power units in service which can provide I-bids using P max -P nom, excluding other specific contracted products. Limit Up Security of Supply: a contracted margin available to manage imbalances (due to forced Outages, forecasting errors, ). Note : available slow start margin is not included in the SoS curve but the TSO has to check the available possibilities before launching the technical trigger ( cf. information collection between alarming and launching the technical trigger) 57
58 Detection - Technical trigger Detection: At the preparation for the next day (around 18h on D-1) a first explicit check is made. In case upward margin becoming too small/negative, the alarms can be launched by the system and the TSO has to consider all information about the situation in order to complete the analysis and to confirm that the startup of strategic reserves will be triggered (technical trigger). Next, the monitoring systems keep on running in intraday into real-time, allowing for an alarm and potential consequent technical trigger anytime. A technical trigger can be considered to be called if the alarming system is launched. The alarming system is launched if : 1. Load forecast (Elia or ARP) > Limit Up Free Bids (S1) 2. Limit Up SoS Load Forecast < N-1 criterion (S2) 58
59 Detection - Technical trigger Alarming system in Intraday & RT The monitoring system also integrates the real-time measurements when they become available. 59
60 Market design Stakeholders feedbacks / questions After the 28/2 taskforce some questions where asked regarding the Market design: 1. Quid Economic Trigger in case of Belpex Decoupling procedures without real need for SR to be activated? The economic trigger will be activated and provide a counterparty for BE curtailed energy However, it is to be foreseen that in flagrant, obvious cases of no structural shortage threat, SR units will not be activated. 2. Quid intraday activations following technical trigger and notification delays? Contractual delays will always be respected. 3. Quid pre-notification period? The Elia traffic light system already provides a first indication. However, green light does not mean SR cannot be activated. Pre-notification would already influence the market and is therefore not foreseen. 4. Quid transparency technical trigger criteria? As suggested by the stakeholder asking the question, the regulatory approved functioning rules will provide sufficient transparency on this matter. 60
61 Questions 61
62 Back up slide 1 Structural Shortage When SR are activated but the Structural Shortage Indicator is not reached, Imbalance prices will be reconstituted in order to reflect the situation as if there was no SR running so that the surplus of energy gives not a false impression of a better situation. SR notified preventively by dispatching an inject between 16h and 22h 16h 22h Available Ibids SI SR running but no Structural Shortage confirmed: What would have been the price based on TF ISR the Ibids 16/4/2014 that would have been activated? SR running and Structural shortage confirmed in RT Prices >>> 62
63 Back up slide 2: SDR Design Capacity reservation 1. No fixed capacity obligation but commitment to lower the consumption at any moment under the SL Purpose: avoid incentive to consume in order to reach a fixed capacity obligation Candidates are grid users with a traditionally high consumption during critical periods a certification based on historical data will allow to confirm the proposed Rref (Reference reserve power) When the offtake is low, the GU contributes to avoid the structural shortage 2. Availability: Remuneration based on the available volume per quarter hour - available volume = min (Nomination, Rref, Pmesured) - An ex post comparison of the available volume and the contracted one could lead to a reduction of the last one for next winters. No incentive to Propose a too high Rref, over nominate or over consume contributes to avoid the problem Rref SL Contribution to the economic trigger - No firm SDR volumes can be determined before the economic trigger process. Therefore, For the first year, SDR volumes are not yet taken into account in the volumes that can be allocated by Belpex in the economic trigger. - Nevertheless Elia can decide afterwards to use a SDR volume in order to inject the energy sold; 63
64 Process of selection Different steps towards an activation: 1. First assessment in DA at ~18h The result of the assessment can be a profile of needed power Taking into account lead times of SR units the de notification deadline is defined 2. Second assesment a. At the max notification time or earlier if an alarm is triggered Does the selection still fit the need? If not, new selection b. Or (earlier) if an alarm (TT) is triggered (when situation is deteriorating) If new profile greater than initial one with at least 50MW If shift to an earlier moment of at least one hour 3. Verification Does the selection still fit the need? If not, new selection / keep warm/ stop 64
65 Agenda Approval of draft minutes TF ISR 19/3/ 14 START: 9h00 9h10 Status and planning update 9h25 Procedure to constitute the SR a) Parameter calibration b) Overview of the procedure BREAK: 11h45 Coffee Break Market design ( functioning rules) Next steps 12h00 12h50 END: 13h00 65
66 Next steps Save the date: 10 June (9h-13h) or 19 June (9h-13h) Goal: - Discuss more practical issues - Consult/inform on collateral impacts (e.g. ARP contract) Nature of the meeting: Whether this will be an official Task Force meeting or an information session or is to be determined once the exact scope is known. 66
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
More informationSpecific amendments to the Capacity Allocation and Congestion Management Network Code
Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several
More informationEURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015
EURELECTRIC presentation EURELECTRIC contribution to a reference model for European capacity markets DG COMP workshop 30 June 2015 EURELECTRIC believes that energy, flexibility and capacity are all needed
More informationSummary results Elia Febeliec EnergyVille Demand Response Survey
Elia Febeliec EnergyVille Demand Response Survey EnergyVille is an International Applied Research Centre for Advanced Energy Technology, a cooperation between VITO, KULeuven and IMEC. http://www.energyville.be
More informationCAPACITY MECHANISMS IN EU POWER MARKETS
CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind
More informationFRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS
BRIEFING FRANCE: UPDATE ON THE SUPPORT MECHANISM FOR RENEWABLE ENERGY PROJECTS SEPTEMBER 2015 ENERGY TRANSITION ACT ADOPTED ON 22 JULY 2015 NEW SUPPORT MECHANISM THE CONTRACT FOR DIFFERENCE CALCULATION
More informationCall for comments to ACER on the Network Code Emergency and Restoration. EURELECTRIC and VGB PowerTech comments
Call for comments to ACER on the Network Code Emergency and Restoration EURELECTRIC and VGB PowerTech comments April 2015 EURELECTRIC and VGB PowerTech (thereafter referred as VGB) welcome this opportunity
More informationMaking CfDs work for renewable generators
Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical
More informationmarket design policy paper
market design policy paper 15 September 2014 1 introduction Ensuring economic growth, jobs, secure coverage of basic needs at an affordable and competitive price, and sustainable use of limited resources
More informationOperational Security Network Code
Amstelveenseweg 998 1081 JS Amsterdam Phone: + 31 20 520 7970 Fax: + 31 346 283 258 Email: secretariat@efet.org Website: www.efet.org Operational Security Network Code Public consultation 3 November 2012
More informationANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000
ANCILLARY SERVICES A Paper for PPC Establishment Organisation and Pilot Operation of the HTSO 21 September 2000 TABLE OF CONTENTS 1. INTRODUCTION 1 2. SYSTEM TRADING ARRANGEMENTS 2 3. OPTIONS FOR PROCUREMENT
More informationOFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014
OFF-TAKE UNDER THE CFD - BUSINESS AS NORMAL? Electricity Market Reform: Edging Towards Delivery 24 September 2014 Statkraft providing Pure Energy Statkraft is Europe s largest generator of renewable energy
More informationCapacity mechanism. General Directorate for Energy and Climate August 30, 2012
Capacity mechanism General Directorate for Energy and Climate August 30, 2012 Ministère de l économie, des Finances et de l Industrie Ministère de l'écologie, du Développement durable, des Transports et
More informationConcepts and Experiences with Capacity Mechanisms
Concepts and Experiences with Capacity Mechanisms Manuel Baritaud, International Energy Agency Conference Capacity Mechanisms: Experiences in Various European Countries Bundesministerium fur Wirtschaft
More informationComments on Draft Deviation Settlement Mechanism and related matters Regulations, 2013
Comments on Draft Deviation Settlement Mechanism and related matters Regulations, 2013 Dr. Anoop Singh Associate Professor Department of Industrial and Management Engineering, Indian Institute of Technology
More informationDifferent types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example
Different types of electricity markets modelled using PLEXOS Integrated Energy Model The UK Balancing Market example Peny Panagiotakopoulou, Senior Power Systems Consultant, Energy Exemplar Europe Overview
More informationsink asset load power pool ISO pool participant bids operating constraints ancillary service declarations
G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset
More informationA new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)
A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION
More informationGLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1
PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public
More informationERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014
ERCOT Monthly Operational Overview (March 2014) ERCOT Public April 15, 2014 Grid Operations & Planning Summary March 2014 Operations The peak demand of 54,549 MW on March 3 rd was greater than the mid-term
More informationOverview of Reliability Demand Response Resource
Overview of Reliability Demand Response Resource Radha Madrigal Customer Service Department May 8, 2014 Agenda Product overview and purpose Define Reliability Demand Response Resource Agreements & registration
More informationENTSO-E Network Code on Emergency and Restoration
ENTSO-E Network Code on Emergency and Restoration Notice 25 March 2015 This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation
More informationTERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries
TERMS OF ELECTRICITY SALES 2010 as recommended by Finnish Energy Industries Content: A. General, concluding an electricity sale contract, the prerequisites for electricity sales, commencement of electricity
More informationImpact of Renewable generation
Impact of Renewable generation Workshop Greenpeace - Terna "Power30" ROME, October15 th 2014 Index - Innovative Solutions Implemented - Main changes in the last years From liberalization to nowadays Investments
More informationThe participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change
The participation of non-generation activities in the GB Capacity Market Department for Energy & Climate Change 22 January 2015 Presentation today 1 Environmental & Energy Aid Guidelines and nongeneration
More informationDemand Side Response How to value flexibility
Demand Side Response How to value flexibility Febeliec infosession : 10th June 2013 Geert Meynckens 1 About INEOS Global, vertically-integrated chemical company Founded in 98 - rapid growth by acquisitions
More informationWind and solar reducing consumer bills An investigation into the Merit Order Effect
Switch for Good Wind and solar reducing consumer bills An investigation into the Merit Order Effect Executive summary Concerns over the cost of renewable subsidy schemes have led to significant policy
More informationSTUDY (F)111208-CDC-1129
Commission for Electricity and Gas Regulation Nijverheidsstraat 26-38 1040 Brussels Tel.: 02/289.76.11 Fax: 02/289.76.09 COMMISSION FOR ELECTRICITY AND GAS REGULATION STUDY (F)111208-CDC-1129 on the relationship
More informationRules on Southern Companies Energy Auction Participation
Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies
More informationThe UK Electricity Market Reform and the Capacity Market
The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have
More informationGuidelines for Monthly Statistics Data Collection
Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter
More informationAnnex B: Strike price methodology July 2013
July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of
More informationRegional resource adequacy Cross-border trade of capacity. From implicit to explicit cross-border participation in capacity mechanisms
Regional resource adequacy Cross-border trade of capacity From implicit to explicit cross-border participation in capacity mechanisms Håkan FEUK Chairman of EURELECTRIC WG Wholesale Market Design IEA Expert
More informationENTSO-E Working Draft Network Code on Emergency and Restoration
ENTSO-E Working Draft Network Code on Emergency and Restoration DRAFT FOR THE FOURTH PUBLIC WORKSHOP Notice 22 January 2015 This document reflects the status of the work of Transmission System Operator
More informationACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures
ACCESS CODE FOR TRANSMISSION Attachment C.1: Operating Procedures Based on version approved by CREG on 1 of 32 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Table of Contents
More informationEuropean Distribution System Operators for Smart Grids. Flexibility: The role of DSOs in tomorrow s electricity market
European Distribution System Operators for Smart Grids Flexibility: The role of DSOs in tomorrow s electricity market 1 Executive summary A core element of the transformation of energy systems around Europe
More informationDraft law on Renewable Energy Sources - Update January 2014
Draft law on Renewable Energy Sources - Update January 2014 On 3 January 2014 another draft of new law on Renewable Energy Sources ( RES ) was published by the Polish Ministry of Economy ( MoE ). Additionally,
More informationPrice Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power
Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power Zhi Zhou, Audun Botterud Decision and Information Sciences Division Argonne National Laboratory zzhou@anl.gov,
More informationDemand Response Programs In Ontario. IESO Demand Response Working Group Public Session
Demand Response Programs In Ontario IESO Demand Response Working Group Public Session April 3, 2014 Outline of Presentation DR Program intent Evolution of DR programs in Ontario Program highlights Key
More informationESB NATIONAL GRID RESPONSE TO CER/03/266 INTERCONNECTOR TRADING PRINCIPLES IN THE MAE
ESB NATIONAL GRID RESPONSE TO CER/03/266 INTERCONNECTOR TRADING PRINCIPLES IN THE MAE ESB NATIONAL GRID PAGE 1 EXECUTIVE SUMMARY There are a number of considerations to be made in relation to interconnector
More informationPotential cross-border balancing cooperation between the Belgian, Dutch and German electricity Transmission System Operators
Potential cross-border balancing cooperation between the Belgian, Dutch and German electricity Transmission System Operators 50Hertz Transmission GmbH, Amprion GmbH, Elia System Operator NV, TenneT TSO
More informationYour Power. Traction energy
Your Power Traction energy Table of content 1. What is traction energy? 3 1.1 From producer to train 1.2 Advantages 1.3 Energy, voltage or current 1.4 Transport and distribution 1.5 Supply of traction
More informationBrief review of Spanish Ancillary services scheme Renewable energy in Spain today Challenges integrating renewable energy nowadays Wind forecast and
Ancillary Services in Spain: dealing with High Penetration of RES Ignacio de la Fuente Brief review of Spanish Ancillary services scheme Renewable energy in Spain today Challenges integrating renewable
More informationACER. oj L 211, 14.8.2009, p. 1. 20J L 211, 14.8.2009, p. 15. 3. RECOMMENDATION Of THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 02/2014
In THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS, ON THE NETWORK CODE ON FORWARD CAPACITY ALLOCATION 22 May 2014 RECOMMENDATION Of THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 02/2014 Page
More informationResource Monitoring and Deliverability Tool Paper
Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods
More informationEnvironment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer:
Environment and energy briefing from Burges Salmon published in the March 2014 issue of The In-House Lawyer: Electricity market reform: an update on contracts for difference Electricity market reform:
More informationVolatility, risk and risk premium in German and Continental power markets
Volatility, risk and risk premium in German and Continental power markets Stefan Judisch / Andree Stracke RWE Supply & Trading GmbH 22 nd January 2015 RWE Supply & Trading PAGE 0 Agenda 1. What are the
More informationTransmission Pricing. Donald Hertzmark July 2008
Transmission Pricing Donald Hertzmark July 2008 Topics 1. Key Issues in Transmission Pricing 2. Experiences in Other Systems 3. Pricing Alternatives 4. Electricity Market Structure and Transmission Services
More informationFrom: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Steve Berberich, Vice President of Technology and Corporate Services and Chief Financial Officer Date: September
More informationJune 2015. Position Paper Contribution to the debate on electricity market design and capacity markets
June 2015 Position Paper Contribution to the debate on electricity market design and capacity markets Eurogas is the association representing the European gas wholesale, retail and distribution sectors.
More informationDPM. Acquiring and terminating programme responsibility & financial consequences
DPM Acquiring and terminating programme responsibility & financial consequences Published by EDSN Author WMWG Version number 3.0 Version date 12 June 2013 Status Final Version management Versi Name Date
More informationPilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010
Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28 rue
More informationUnofficial translation. The Electricity (Capacity) Market Rules
Chapter I General Provisions Article 1. Scope of Activity Unofficial translation The Electricity (Capacity) Market Rules These Rules regulate: a) Functioning of Electricity and Guaranteed Capacity Market
More informationExplanatory Note settlement prices publication End-of-Day report
Explanatory Note settlement prices publication End-of-Day report At the end of each business day, ICE Endex establishes settlement prices for the markets it operates. These settlement prices are published
More informationProgress on market reform: EMR, the I-SEM and the TEM
Progress on market reform: EMR, the I-SEM and the TEM David Newbery Electricity Market Reform Belfast 28 th March 2014 http://www.eprg.group.cam.ac.uk 1 Disclaimer Although I am an independent member of
More informationNuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, zeljko.jurkovic@nek.si Abstract Various regulations and standards require from electrical power system of the
More informationONLINE AND TELECONFERENCE RESULTS PRESENTATION SEPTEMBER 2015
DATE: November 10, 2015 SUMMARY ONLINE AND TELECONFERENCE RESULTS PRESENTATION SEPTEMBER 2015 Good morning to everyone joining this teleconference. The idea is present you with the results of the third
More informationOptimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT
Optimizing Wind Generation in ERCOT Nodal Market Resmi Surendran ERCOT Chien-Ning Yu ABB/Ventyx Hailong Hui ERCOT FERC Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved
More informationECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104
PROMAX SHORT-TERM ENERGY & TRANSMISSION MARKET SIMULATION SOFTWARE PACKAGE ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 ECCO International, Inc. Copyright 2009 EXECUTIVE
More informationData Communications Company (DCC) price control guidance: process and procedures
Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required
More informationEMR Capacity Market Implementation Coordination Workshop
EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight
More informationTechnical Bulletin 2011-04-01. Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues. Market Issue
Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting for Delivered Minimum Load Energy Market Revenues Market Issue April 5, 2011 Technical Bulletin 2011-04-01 Bid Cost Recovery and Accounting
More informationMarket reference prices
Market reference prices CfD Expert Group workshop 27 September 2013 Agenda Introduction / aims of the session Quick overview (10.00 11.30) Setting the intermittent reference price Setting the baseload
More informationPJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013
PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity
More informationSouth East Europe (SEE) Implementation Manual
South East Europe (SEE) Implementation Manual Version 5.0 Date of approval (v1.2): 8 th May 2009 1 st amendment (v2.1): 7th July 2009 2 nd amendment (v3.1): 21 st January 2011 3 rd amendment (v3.2): 27
More informationDraft Service Level Agreement. for IT consultancy for advice, studies, software development and software maintenance Framework service contract
Draft Service Level Agreement for IT consultancy for advice, studies, software development and software maintenance Framework service contract Publication Reference: : OJ/25/06/2014-PROC/2014/023 TIME
More informationEnergy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England
Business Models for Transactive Energy in the Wholesale Market December 5, 2012 1:30 p.m. to 3:30 p.m. Irving, Texas Robert Burke, Principal Analyst ISO New England About ISO New England (ISO) Not-for-profit
More informationFOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
More informationNew Brunswick Electricity Business Rules
New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and
More informationQuantifying flexibility markets
Quantifying flexibility markets Marit van Hout Paul Koutstaal Ozge Ozdemir Ad Seebregts December 2014 ECN-E--14-039 Acknowledgement The authors would like to thank TenneT for its support of this project.
More informationMulti-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources
Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad
More informationStatus of Demand Response in Europe. Jessica Stromback, Smart Energy Demand Coalition EPFL Lausanne Switzerland Sept 10 th, 2015
Status of Demand Response in Europe Jessica Stromback, Smart Energy Demand Coalition EPFL Lausanne Switzerland Sept 10 th, 2015 The Smart Energy Demand Coalition (SEDC) is an European Industry Association
More informationBusiness Plan in 2015 of Organization for Cross-regional Coordination of Transmission Operators, Japan
Business Plan in 2015 of Organization for Cross-regional Coordination of Transmission Operators, Japan Version 1.0: 2016/1/21 This Organization has received an approval of establishment on August 22, 2014,
More informationSecurity of Supply Concept and Definition: On the Way to a Common Understanding?
Security of Supply Concept and Definition: On the Way to a Common Understanding? Presentation for French-German Conference on SoS Dr. Christoph Maurer Paris 21 May 2015 0 21.05.2015 Security of Supply
More informationDemand Response Market Overview. Glossary of Demand Response Services
Demand Response Market Overview Glossary of Demand Response Services Open Energi has partnered with Tarmac to provide Demand Response What s inside... Market Overview Balancing Electricity Supply and Demand
More informationBusiness and technical conditions of electricity supply for customers connected to the public distribution of LV electricity valid for the year 2005
Business and technical conditions of electricity supply for customers connected to the public distribution of LV electricity valid for the year 2005 ARTICLE I GENERAL PROVISIONS 1. These business and technical
More informationIMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014
IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 PÖYRY MANAGEMENT CONSULTING ENERGY Pöyry offices (c) grafikdienst.com Pöyry Management
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. ) ) ) ) ) ) Docket No. EL14- -000 COMPLAINT AND MOTION TO CONSOLIDATE
More informationHarmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise
Harmonisation of electricity generation transmission tariffs A EURELECTRIC contribution to ACER s scoping exercise December 2015 EURELECTRIC is the voice of the electricity industry in Europe. We speak
More informationAGCS Gas Clearing and Settlement AG
Annex to the General Terms and Conditions of the Balance Group Coordinator (GTC BGC) Balancing energy management in the Eastern distribution area V 5.0 Annex Balancing energy management Version 5.0 Page
More informationHow To Understand The Benefits Of The French Power Market Plan
Why Did the US (Mostly) Go With LMP? Benefits of Flow Based Allocation Benjamin F. Hobbs EPRG, University of Cambridge, UK DoGEE, Johns Hopkins University, USA Market Surveillance Committee, California
More informationWestern Power Networks Price Publication - Part E. Support Services Prices for the South West Interconnected System 1 July 2005 31 December 2005
Western Power Networks Price Publication - Part E Support Services Prices for the South West Interconnected System 1 July 2005 31 December 2005 Page 1 of 29 WESTERN POWER NETWORKS PRICING PUBLICATIONS
More informationTable of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure
No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time
More informationPower System Operation Procedure: Short Term Projected Assessment of System Adequacy (ST PASA)
ELECTRICITY INDUSTRY ACT ELECTRICITY INDUSTRY (WHOLESALE ELECTRICITY MARKET) REGULATIONS 2004 WHOLESALE ELECTRICITY MARKET RULES Power System Operation Procedure: Short Term Projected Assessment of System
More informationBusiness Requirements Specification
Business s Specification Version.16 October 19, 211 Revision History Date Version Description Author 6/8/211.8 Created the external business
More informationEcoGrid EU NEWSLETTER No 1
EcoGrid EU NEWSLETTER No 1 February 2012 EcoGrid EU POWER MARKET OPERATION IN REAL TIME The objective of EcoGrid EU is ambitious to develop a prototype of a European Smart Grid market platform. The demonstration
More informationNordic Balance Settlement (NBS)
Nordic Balance Settlement (NBS) Common Balance & Reconciliation Settlement Design December 22 nd, 2011 Content Terminology...4 Executive Summary...6 1 Introduction... 8 1.1 Scope of the Nordic Balance
More informationD 6.4 and D7.4 Draft topics of EEGI Implementation Plan 2016-2018 Revision: Definitive
Project no.: 282794 Project acronym GRID+ Project title: Supporting the Development of the European Electricity Grids Initiative (EEGI) Instrument: Coordination and support action Thematic priority: ENERGY.2011.7.3-1:
More informationCOMPETITIVE ELECTRIC ENERGY MARKET IN GREECE
NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) GREECE COMPETITIVE ELECTRIC ENERGY MARKET IN GREECE EVANGELOS DIALYNAS Professor NTUA Director of Electric Power Division 1 Competitive Electric European
More informationVersion 2.0. 7 October 2013 SEM-13-067
TRADING & SETTLEMENT CODE HELICOPTER GUIDE TRADING & SETTLEMENT CODE HELICOPTER GUIDE Version 2.0 7 October 2013 SEM-13-067 TABLE OF CONTENTS 1. INTRODUCTION 1 1.1 Purpose 1 1.2 Disclaimer 1 1.3 The TSC
More informationEnergie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles
Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal
More informationDemand Response FAQs
1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate
More informationTRADING PLATFORM CLEARING AND SETTLEMENT MEMBERSHIP
TRADING PLATFORM CLEARING AND SETTLEMENT MEMBERSHIP TRADING PLATFORM Wilhelm Söderström, Nord Pool Spot Ante Mikulić, CROPEX European day ahead market A fair and transparent calculation of dayahead power
More informationTitle 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network
Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model as amended in 2016 (2016 Gas Market Model Amendment Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz
More informationThe Status of the Wind Power Market in Egypt. Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA)
The Status of the Wind Power Market in Egypt Dr. Walid El-Khattam Ain Shams University (Cairo, Egypt) The Egyptian Electricity Regulator (EgyptERA) Berlin, June 11 th, 2013 1 Contents Key Challenges for
More informationContracts for Difference Round Guidance
30th June 2014 Contracts for Difference Round Guidance Contracts for Difference Allocation Round 1 2014 CFD Round Guidance 3 rd October 2014 National Grid Delivery Body Page 1 CFD Allocation Round Guidance
More informationStandard conditions of electricity supply licence
Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of electricity supply licence SECTION A: STANDARD CONDITIONS FOR ALL SUPPLIERS Standard conditions 1 to 6: General arrangements
More informationCALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market
CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive
More informationOpen call for tenders No 01/2102/12
The Court of Auditors of the European Union Directorate of Information and Technologies (DIT) Open call for tenders No 01/2102/12 Information Technology Helpdesk Services (ITHS) ANNEX 3 DRAFT SERVICE LEVEL
More informationPower to Gas: Electric Congestion
Power to Gas: Electric Congestion Cis Vansteenberge Power to Gas: Electric Congestion - 26/11/2014 1 Introduction Technical congestion Economic congestion Case study Zeebruges Conclusions Content Power
More information