1 CONTENTS Planning 1 Introduction Soil survey and analysis Identify potentially arable soil Investigation Select irrigable land Soil conservation Norms Climate Crop study Select crop Consultant approach Instruction approach Crop water requirement Crop factor Net irrigation requirement Planning models BEWAB Donkerhoek data irrigation scheduling program SWB VINET Water source survey and hydrological study Survey Source discharge Source share Available pressure Location Quality Water sources Perennial stream or river Stored natural run-off Water supply authority Borehole water Management aspects Selection of irrigation system Survey Irrigation requirement Net irrigation requirement System efficiency Gross irrigation requirement Water balance

2 11 Scheduling planning Planning diagram: Discussion of model and equations Net irrigation requirement Readily available water Cycle length Net irrigation requirement per cycle Gross irrigation requirement per cycle Standing time Emitter discharge Net application rate Gross application rate Planning diagram: Example Theoretical size of irrigation group System flow Number of emitters per group Area of group References All rights reserved Copyright 2003 ARC-Institute for Agricultural Engineering (ARC-ILI) ISBN

3 Planning Introduction Normally the grower approaches the designer with the problem: crops (often more than one) are to be planted (either simultaneously or as alternatives) on possibly arable soils, and must be irrigated from an existing or a potential water source. The planning stage of project design therefore actually commences before anything else has been done. In this process the project should be evaluated in its entirety. A survey of all relevant inputs must be done at first contact, including (especially!) managing aspects related to the final product. If the system is to be designed for small-scale or emerging farmers, a particular approach is required during the planning process. The reason therefore is that emerging farmers manage their production inputs and irrigation practices from a viewpoint where risk is limited to an acceptable minimum. They therefore often plant at lower densities than the commercial farmer and this can lead to lower peak water requirements. If the assumptions and relations used for designing economic systems for commercial farmers are applied at random on small-scale farmers, it can cause the planning to have an unfavourable outcome. It can also mean that the final system can result in extremely high repayment requirements for the farmer. It is therefore recommended that the WRC publication A review of planning and design procedures applicable to small-scale farmer irrigation projects (WRC report no. 578/2/0) is consulted if systems for small-scale farmers must be designed. The first step therefore is to conduct a survey of all factors which could affect the peak and seasonal water requirements of the crop(s), and whether the water source (taking all features into account) will be able to cope with all aspects of demand. At the same time it is vital that the management features of the operator be evaluated inconspicuously but effectively. Figure 11.1 : Planning diagram

4 11.2 Irrigation Design Manual Figure 11.2 : Plan of irrigation site

5 Planning 11.3 It is often possible (and necessary!) at this stage to roughly determine the water balance (refer section 10) before going about it in any detail. In the event of conspicuous problems, this step can eliminate a lot of unnecessary work. Even estimated data (areas, crop water requirement, water source discharge) can be utilised quite effectively for this purpose. If, however, there is any doubt at this stage, it will be necessary to proceed to compile all the physical details before making any decisions. A practical example will be shown on most pages as illustration. Example: A grower has approached the designer to supply a design for four different irrigation systems as shown in Figure 11.2: Planted pastures on that part of the land where the largest possible centre pivot can be operated. Melons, preferably under drip irrigation. Due to the fact that marketing can take place gradually over a fairly long period of time, and also due to crop rotation practices, provision must be made for four blocks of 1 ha each. These blocks must be irrigated either individually or in succession (all above ground equipment must therefore be identical and interchangeable). Citrus on an area of approximately 5 to 6 ha. The rest of the identified area will consist of pastures under a drag-line sprinkler irrigation system. The following five steps do not have to be executed in this particular order. Due to the interacting nature of the decision making process (refer Figure 11.1) execution can even take place simultaneously: Soil survey/analysis Climatic study Crop study Water source survey/hydrological study Management aspects 2 Soil survey and analysis (Consult Chapter 3 : Soil for more detail) 2.1 Identify potentially arable soil On farms with an abundance of available land, it is good practice to provisionally identify areas fit for crop cultivation under irrigation on a visual basis, especially with regard to the following considerations: Conspicuous quality aspects, especially e.g.: soil type, texture, etc. Positioning of new system, especially from logistic and economical view points Positioning in relation to existing irrigation or agricultural activities Topographical position with regard to water source (pump or gravity feed) Land gradient with regard to requirements and limitations of the type of irrigation system Natural and other obstructions and interruptions 2.2 Investigation The next step is to thoroughly investigate areas provisionally identified: Profile pits must be dug and a complete soil description done (note restrictive layers!). Samples taken must be analysed with respect to physical and chemical properties from an irrigation point of view.

6 11.4 Irrigation Design Manual 2.3 Select irrigable land Priorities must now be drawn up with respect to soil, water and crop properties in selecting the final irrigation area. 2.4 Soil conservation The Act on Conservation of Agricultural Resources (Act No 43 of 1983) requires certain control measures to be taken on cultivated land to protect such land against water and wind erosion and/or prevent or control waterlogging or brackishness. Furthermore the cultivation of new lands is subject to written permission by the Executive Official before any work commences. Designers must be aware that soil conservation forms an integral part of irrigation design. Soil conservation technicians from the Department of Agriculture s offices in the relevant area are usually available by appointment to lend assistance and advice in this regard. 2.5 Norms Potentially irrigable lands must conform to the SABI norms for soil choice in the particular area in which the system falls. Example (continued) In this particular case the area within the surrounding dotted line on the plan was identified as potentially irrigable land. Note: From 2.1: The serious limitations created by the network of high voltage power lines especially with respect to the centre pivot. (Two positions for the centre pivot were initially considered, but the full circle, as shown, proved to be both larger and less costly than the alternative semi-circle, further to the right.) The same powerline, however, offers pump-power points at both balancing dams. Roads, obviously poor and/or shallow soils, dongas and other obstructions determined the positions of the remaining boundaries. From 2.2: Soil analysis of 11 samples, originally taken from 13 profile pits, was done. Due to similarities, numbers 8 and 11 were combined with others. No physical or chemical restrictions were found. Water-holding capacity between -10 and -100 kpa (WHC 100 ) 120 mm/m. Infiltration rate 10 mm/h.

7 Figure 11.3 : Profile description Planning 11.5

8 11.6 Irrigation Design Manual From 2.3: The provisional suggested location of the different systems was based on: The unavoidable centre pivot position The expediency to operate the drag line system as a homogeneous unit The soil analysis showed that the best soils for the drip and micro sprinkler systems were in the region of especially profile pits 2 and 3. From 2.4: The farm in question is situated in the Eastern Cape Province and resorts under the Eastern Cape branch of SABI. The selected areas must therefore meet the "SABI norms for the choice of land for irrigation in the Eastern Cape region". 3 Climate (Consult Chapter 4: Crop-water relationships and climate for more detail) Weather data from the closest weather station to the particular irrigation system is now required. Careful selection will ensure that micro climatic differences are taken into account in making reasonably accurate data available. Example (continued) Due to the fact that no direct data for Cookhouse is readily available, data for Somerset East will be adapted for this purpose. Table 11.1: Adapted evaporation and rainfall records for Cookhouse Month Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Total A-pan evaporation (E o ) [mm] Average rainfall (R) [mm] Crop study (Consult Chapter 4: Crop-water relationships and climate for more detail) 4.1 Select crop There are two different approaches to crop selection Consultation approach The grower requests advice from a designer (possibly in conjunction with a crop expert). This method is seldom used.

9 Planning Instruction approach Normally, at this stage, the grower would already have determined the following: Marketability, profitability and logistics Compatibility to existing crops Availability and/or reliability of labour Existing cultivation and spraying equipment Local conditions like theft potential Personal preferences and/or limitations Therefore all that now remains is to determine if the particular crop is compatible to the: Soil (physically, chemically, limitations) Water (some crops are for example more tolerant to salt than others) Climate (frost resistance, heat, humidity, etc.) Example (continued) In this example, the grower has made the crop selection and merely informed the designer thereof: Citrus (approximately 5 to 6 ha) spaced 6 m 3 m in groups of approximately 1 to 1½ ha Tramway planted melons ( 4 1 ha blocks ), at 2,76 m row spacing (plants 0,3 m in row) Planted pastures (remaining area) 4.2 Crop water requirement Crop water requirement (CWR) [mm/period] is the depth of water required by the specific crop for evapotranspiration (ET) during a specific period. (This excludes system operating losses and is determined by the sum of the net irrigation requirement (NIR) and the effective rainfall (Re). 4.3 Crop factor The crop factor (f) is the relationship between crop evapotranspiration (ET c ) and pan evaporation (E o ) for a crop of a certain age, in a specific growth stage, with a certain amount of leaf cover, which is found in a specific climatic region. ET f E0 c (11.1) where ET c crop evapotranspiration [mm/period] E o pan evaporation [mm/period] f crop factor [fraction] Obtain the crop factors for the selected crops and/or cultivars from existing literature or other scientific sources. Alternatively, the crop evapotranspiration can be determined by means of SAPWAT (See Chapter 4: Crop water relationships and climate).

10 11.8 Irrigation Design Manual Example (continued) Table 11.2: Crop factors for pastures (Green book) Period Crop factor 1 July - 31 August 1 September - 30 September 1 October - 31 October 1 November - 31 March 1 April - 30 April 1 May - 31 May 1 June - 30 June 0,5 0,6 0,7 0,8 0,7 0,6 0,5 Table 11.3: Crop factors for citrus (Eastern and Western Cape) Period Crop factor July-November December January February March April May June 0,45 0,50 0,55 0,60 0,65 0,70 0,65 0,60 Crop factors for melons were less readily available. The growing season is approximately from October to December/January. Western Cape data is adapted for cultivar and plant density: Table 11.4: Adapted crop factors for melons Period Crop factor October November December January 0,3 0,5 0,7 0,6

11 Planning Net irrigation requirement Net irrigation requirement (NIR) [mm/period] is the depth of irrigation water required for the plants' evapotranspiration (ET) [mm/period] in its specific growth phase and during the specific period. The determination of ET may be done according to various methods as shown in Chapter 4: Crop water relationships and climate. As the A-pan evaporation and adapted crop factor method is presently the best known and most generally used, it will be used in the following example: Example (continued) The seasonal water requirement of the relevant crops will now be determined from the adapted climatic data and the applicable crop factors, as shown in Table 11.5 : Table 11.5: Calculation of net irrigation requirement Month Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Tota l 1 E o [mm] R [mm] f [frac] Pastures Citrus Melons ET [mm] Pastures Citrus Melons R e [mm] NIR[mm] Pastures Citrus Melons where All data monthly averages Row 1: E o A-pan evaporation Row 2: R rainfall Row 3: f crop factor Row 4: ET c evapotranspiration ( ET c f E o ) Row 5: R e effective rainfall ( R e ( R - 20 ) 2 ) Row 6: NIR nett irrigation requirement ( NIR ET - R e )

12 11.10 Irrigation Design Manual From the above the NIR of the relevant crops will be: Pastures: 998 mm/year Citrus: 712 mm/year Melons: 350 mm/year Normally, as a relatively conservative approach, ET figures are used to determine system capacity. 4.5 Planning models As described in the previous section, there is a worldwide trend to move away from the use of A-pan evaporation for determining irrigation requirements. In South Africa, the Department of Water Affairs and Forestry has identified the SAPWAT program as the official method for irrigation requirement planning. SAPWAT makes use of historical weather station data obtained from the South African Weather Service to calculate reference evapotranspiration by means of the Penman-Monteith equation and then calculating the irrigation requirement by means of adjustable crop coefficients. This method can be used as alternative in the planning diagram, (see Section 11.1 Planning diagram: Discussion of model and equations) for determining the crop evapotranspiration (ET c ) before consideration of rainfall. For a complete description of SAPWAT, as well as a series of tables with calculated irrigation requirements, see Chapter 4: Crop water relations and climate. There are other proven models to be used for planning and/or scheduling. A few of the models are discussed briefly and more information is available from the report An investigation into software for irrigation scheduling of the ARC-ILI (Jordaan, 2000) BEWAB BEWAB (Irrigation Water Management program), is a water balance model which uses research data to make irrigation recommendations. The water use of the crop is projected according to dayto-day irrigation requirement curves determined by historical measurements. Prof. A.T.P Bennie developed the BEWAB program on account of the Water Research Commission report, 'n Waterbalansmodel vir besproeiing gebaseer op profielwatervoorsieningstempo en gewasbehoeftes, (Bennie et al, 1988) Donkerhoek data irrigation scheduling program The Donderhoek Data Irrigation Scheduling Program makes use of up to date weather data, to make an irrigation recommendation on a daily basis, so that optimal irrigation can be done. The program contains a function that can control the opening and closing of valves in the field. The program was developed by Donkerhoek Data (Pty) Ltd and Mr. T. du Preez. The total development of the program was funded by Donkerhoek Data (Pty) Ltd. The program is used mainly by commercial farmers and consultants in the Western Cape and along the Orange River. The program contains an option for calculating a water budget for a season or part thereof. Historical data can be used for this purpose.

13 Planning SWB SWB (Soil Water Balance) is an irrigation scheduling model which uses current climatic data to simulate the salt balance and soil water balance of generic crops. With sufficient weather, soil and crop data, it gives a complete description of the soil-plant-atmosphere continuum. The model contains sufficient data and equations to simulate plant growth mathematically. SWB is based on the improved general crop reproduction of NEWSWB. The program was developed by the University of Pretoria s Plant Production and Soil Science Department and dr. N Benadé of NB Systems. The program was funded by the Water Research commission, the University of Pretoria, Chamber of Mines, Agricultural Research Council s Institute for Vegetable and Ornamental Plants, Potatoes, South Africa and Langeberg Foods. SWB is mainly used for actual current irrigation scheduling. Researchers, commercial farmers, irrigation officials and consultants are the main users of the program VINET 1.1 VINET 1.1 (Estimating Vineyard Evapotranspiration for Irrigation System Design and Scheduling) is designed to assist the producer with the decision-making process on when, how much and how long irrigation must be applied. In the past, decision-making was hampered due to the variation between vineyards because there are differences between foliage, soil and climatic factors. VINET 1.1 was developed by Dr. P.A. Myburgh and Mr. C. Beukes of the ARC-Nietvoorbij. The research was partly funded by Dried Fruit Technical Services, Deciduous Fruit Producer s Trust and Winetech. VINET 1.1 is currently used by commercial farmers, consultants, engineers and small farmers. 5 Water source survey and hydrological study (Consult Chapter 5: Water for more detail) 5.1 Survey A survey, regarding all aspects of the water source to be used for a specific system must be done. It broadly entails a study of: Source discharge Determine the nature and strength of the source discharge either in terms of volume, flow rate, stability, minimum delivery or continual availability Source share Is the grower the sole consumer of the source (river, stream, fountain, etc.) or are there others with shared rights to the same source? What is the grower's share? How is the sharing managed? Is the source shared between different irrigation systems on the same property? If so, in what proportion? How much water is available for this system?

14 11.12 Irrigation Design Manual Available pressure Does the source supply water under pressure? If so, what are the normal and minimum assured pressures? Location Is the source far away? Does this influence costs and/or practical operating aspects? Do transport losses occur, and to what extent (e.g. earth channels)? Are evaporation losses (e.g. dams) a factor, and to what extent? Does the topography influence the supply system and what are the practical implications? Quality (physical and chemical composition) Water quality must comply to requirements as stipulated in Chapter 5: Water. 5.2 Water sources This study is required for the following general sources: Perennial stream or river Water rights: Legal share of the source and limitations on its use Source stability: Tested delivery during normal dry cycle as well as during peak crop demand and especially long-term consistency Stored natural run-off Hydrological investigation of catchment area with the emphasis on long-term consistency Water yield (net i.e. after allowing for normal evaporation) and balancing ability of the storage facilities Water supply authority Allocation/listing: Maximum yearly volume (or volume/ha) available Delivery method: Constant withdrawal or in turn Discharge: Guaranteed flow rate Discharge pressure: Minimum pressure at which water is supplied from a pipe network Borehole water The discharge must be tested according to the norms as stipulated by the Borehole Association of Southern Africa in their publication "Minimum code of practice for borehole construction and pump installation" Balancing facilities should be supplied where limited pumping hours are used in the irrigation system, while withdrawing continuously from the borehole(s) Example (continued) In this case, the following data applies: Source: Orange/Fish River Scheme, Hougham-Abrahamson Irrigation Board. Delivery: Existing canal system Water rights: 420 ha

15 Existing systems: 310 ha Allocation: m 3 /ha per year (gross, measured on site) Discharge: On demand Balancing facilities: Two earth dams as shown on figure 11.2 ( m 3 each) Water quality: Tested and meets required standards Planning This indicates that: The balancing capacity, demand and discharge situation is endlessly adaptable for normal 5 or 6 or 7 days per week operating procedures due to the fact that discharge takes place on demand and that existing sufficient balancing capacity is likely. Balancing capacity should, however, be checked in the water balance Provision must be made in the water balance (section 10) for evaporation from the balancing dams 6 Management aspects No recommendation on an irrigation system can be made in the planning phase without determining the grower's management potential. While a designer may not consider this to be his function, it will be disastrous if a system is recommended (or even demanded by the grower), which requires management skills beyond the grower's ability. Although it cannot be expected of a designer to be an expert in social sciences as well as his field of expertise, a series of guided observations can be advantageous in the process of final system decision making. During a recent scientific study on this subject, an attempt was made (using the PC programme SAPFACT) to prioritise the important factors in a specific decision-making format. Information is discreetly obtained during the initial visit and conversation with the grower and even his family, later to be entered into an extremely user-friendly PC package. Entries may be edited at will, producing immediate results. Each of the six following identified aspects consists of eight factors as indicated. Irrigation management Use and maintenance of equipment, design and installation of equipment, annual water supply, regularity of water supply, understanding of irrigation, attitude towards water management, applicability of irrigation methods, scheduling practices. Crop profit potential Soil suitability, climate suitability, alternative crop possibilities, crop yield, production costs, gross margin potential, market and rate risks, production risks. General management Supervisory support, personal supervision, seasonal planning, recording system, receiving help and advice, management training and experience, management structure, long-term planning. Labour management Labour organisation, labour situation, attitude towards legislation, remuneration, development actions, training inputs, labour efficiency and supervisory contribution. Grower's personal aspects Life style, career stage, property plans, decision making, tension, family aspects, spouse support on farm, community involvement. Financial situation Accounting services, credit sources, accessibility to income, effect of inflation, marketability of farm, bond status, size of venture, income expectations. Each of these aspects are evaluated and the findings, although at times subjective, can form a good guideline for the process, if correctly combined. A study hereof, together with the PC programme SAPFACT, can make a valuable contribution to sensible decision making.

16 11.14 Irrigation Design Manual 7 Selection of irrigation system (Consult Chapter 10: Irrigation systems for more detail) The diagram as shown in Chapter 10 may be utilised to obtain an indication of how the selection process ought to take place. There are, however, practical considerations which may move the emphasis to a different choice from the initially logical one. Naturally the grower's priorities are to be considered in the process. Example (continued) Consideration: Pastures: Labour is scarce and unreliable mechanise therefore limiting drag-lines to a minimum centre pivot for the largest possible area Consideration: Melons (and some similar runner crops) are very dependent on pest and plague control substances which should not unnecessarily be washed from the leaves. Therefore drip irrigation seems appropriate (also from a labour point of view) Consideration: Citrus mostly performs as well under micro sprayers as with drip irrigation. However, due to the larger soil water reservoirs created by micro sprayers, they can be operated with a lower level of management inputs. Consideration: Consolidate control and filter installation in one place therefore drip and micro close together 8 Survey A contour plan of the potentially irrigable soil is required at this stage to provide the planner with an initial accurate account of especially relevant boundaries, restrictions, areas, slopes as well as location of water sources. As the same plan will later be used for detail design, the scale, contour intervals, detail and accuracy should be combined in such a way that the particular irrigation system required or recommended can easily and accurately be designed and that survey and design data can readily be recorded. Naturally a centre pivot survey may be considerably less accurate than one for a drip or micro sprayer system. For the latter system it is even required to be able to indicate each planting row (and also the number of plants per row) as equipment is supplied per plant unit. The design method for micro irrigation also requires high topographical accuracy. The following scale and contour interval combinations are generally used: Contour interval Smallest scale Micro irrigation : 0,5 m 1: 500 (narrow row spacing: 3 m ) 1,0 m 1: (wide row spacing: > 3 m ) Sprinkler irrigation : 1-2 m 1: Centre pivots : 2-5 m 1 : Flood irrigation : 0,5 m 1 : Example (continued) In this case the survey had to be done for approximately 10 ha of drip and micro systems for which the location had not yet been fixed. The whole area has a symmetrical shape and topography thereby making it possible (and necessary) to survey it to a level of accuracy which would make 0,5 m contour intervals possible.

17 Planning Irrigation requirement Subsequently the crop irrigation requirement must be determined. 9.1 Net irrigation requirement Net irrigation requirement (NIR) [mm/period] is determined as explained in Section 4.4. Example (continued) According to Table 11.5 in Section 4.4, the NIR of the relevant crops will be: Pastures : 998 mm / year Citrus : 712 mm / year Melons : 350 mm / year 9.2 System efficiency System efficiency ( s ) [% or fraction] is the efficiency with which water is delivered from the irrigation dam or supply point on the farm boundary through the irrigation system to the soil. Example (continued) According to the accepted SABI norms of the East-Cape, s [fraction] is: Centre pivot : 0,85 Sprinkler system : 0,80 (drag-line) Micro system : 0,85 Drip system : 0, Gross irrigation requirement Gross irrigation requirement (GIR) [mm/period] is the net irrigation requirement (NIR) of the crop plus the operating losses of the system (this does not include effective rainfall (R e )). NIR GIR s (11.2) Example (continued) The GIR of the relevant crops can now be calculated according to equation 11.2, with NIR's as determined in Section 9.1, and with system efficiencies according to Section 9.2: Pastures (centre pivot) 998/0, mm/year Pastures (drag-line) 998/0, mm/year Citrus (Micro) 712/0, mm/year Melons (Drip) 350/0, mm/year

18 11.16 Irrigation Design Manual 10 Water balance Subsequently it is necessary to check that the supply of irrigation water from the source is sufficient to satisfy the crop's total gross irrigation requirement. Consult Chapter 5: Water for more information. Example (continued) The GIR of the individual crops is now determined and converted to a volumetric basis. Thereafter, the sum of these results is added to the balancing dam evaporation (also volumetric) to obtain the total amount of water required per annum. This total is then compared to the total amount of water available for the irrigation system. Evaporation from the balancing dams which have a constant water level throughout the year is determined as follows: Evaporation A-pan evaporation [mm] dam area [ha] 10 0, ,5 10 0, m 3 per annum The amount of water available is determined as follows: Available water Allocation [m 3 /ha per annum] area [ha] , m 3 per annum The water balance is shown in Table Table 11.6 : Water balance Crop / system Area [ha] Total GIR [mm/ha per year] Total GIR [m 3 /ha per year] Total GIR [m 3 per year] Pastures / centre pivot Pastures / drag-line Citrus / micro Melons / drip Total GIR water required [m 3 /year] Evaporation : balancing dams [m 3 / y] Total volume of water required [m 3 / y] Total volume of water available [m 3 /y] Conclusion: With sound planning, high efficiency (systems) and good management and scheduling, this grower has sufficient water to meet his requirements. In addition, it appears that the soil, crops and management aspects satisfy the grower's instruction to the designer and that the scheduling planning can now begin.

19 Planning Scheduling planning The purpose of this study is to determine the quantity of water required by crops per cycle during peak demand periods and how often it is to be applied, taking practical operating practices into account. It is important to note that long-term data is used in providing average peak conditions, especially seeing that these calculations influence the determination of system capacity. In addition to a study of water sources, the four most important components of the scheduling function were considered, namely: Soil (refer to Section 2) Climate (refer to Section 3) Crop (refer to Section 4) Irrigation system (refer to Section 7) To this the management aspects of each of these components (as discussed in Section 6) are added. Inputs and aspects of all these components are integrated in compiling practical values for: Cycle length: The time lapse, during peak demand, between the start of consecutive irrigations, is based on the available water in the soil, the plants' requirement and its ability to utilise the available water. Gross irrigation requirement per cycle: This describes the amount of water to be applied by the system per cycle, to replace that used by the plant. Standing time: The irrigation time per cycle required to meet the GIR. It is very important to make the necessary adjustments so that practical irrigation activities will tie in with established farm practices. Emitter discharge: Emitter choice is an important part of the whole process. The discharge (at acceptable economical operating pressures) as well as distribution properties as regards crop and soil type, must inevitably meet all the above-mentioned requirements. All the inputs and aspects of the five main scheduling components consist of variables, some of which are "not negotiable", while others may be considered reasonably "variable". Careful and sensible application of variables can, however, ensure practically acceptable scheduling in virtually all cases. The composition of the respective components, the inputs regarding each one as well as the development of the required results are shown in Figure 11.3 which follows. The equations used in the integrated calculation process are shown in Figure 11.4 thereafter and a complete calculation is shown at the end of the chapter in Figure 11.5 as a practical example. The diagrams contained in the above figures are self explanatory. They are illustrated with a set of notes aimed at highlighting certain important concepts as well as supplying practical hints. Inputs as required from the main components (climate, crop, soil and irrigation system) are covered in detail in the specific chapters and a study thereof will contribute to better understanding of the diagrams.

20 11.18 Irrigation Design Manual Figure 11.4: Scheduling: The planning function (model)

21 Figure 11.5: Scheduling: The planning function (equations) Planning 11.19

22 11.20 Irrigation Design Manual 11.1 Planning diagram: Discussion of model and equations (refer Figures 11.3 and 11.4) All the main components, and the necessary inputs they supply, are arranged so that all inputs relating to each other for a specific function are placed adjacent to each other Net irrigation requirement (NIR) The inputs required for determining the crop water requirement (and their composition) are shown between the left border and the first vertical dotted line on Figure The only inputs required for this determination are all climatic factors and one crop input, namely crop coefficient. As described in Chapter 4: Crop water relationships and climate, NIR may be determined by a number of methods. In this case A-pan evaporation and crop factors are used. As an input, rainfall (R) is only used in determining effective rainfall (R e ). R e ( R - 20 ) 2 (11.3) where R e effective rainfall [mm/mo.] R measured rainfall [mm/mo.] Effective rainfall is only of importance in areas where its consistence justifies it as a factor. In by far the most cases rainfall is so unreliable that it is regarded as negligible in this example. Class A-pan evaporation (E o ) consists of long-term statistical data, based on average monthly values. Crop factors (f), obtained from reliable scientific sources, for the corresponding month of the E o data, are used. Note that crop factors do not necessarily follow the same pattern as evaporation and that data for both E o and f should be used for the specific month where the product of these two inputs is the highest. ET c is determined by these inputs. ET c f E o (11.1a) where ET c crop evapotranspiration [mm/mo.] f crop factor [fraction] E o class A-pan evaporation [mm/mo.] Alternatively the crop evapotranspiration can be calculated by means of the Penman-Monteith method, as described in Chapter 4: Crop water relationships and Climate. ET c k c ET o (11.1b) where ET c crop evapotranspiration [mm/period] k c crop coefficient [fraction] ET o reference evapotranspiration [mm/period]

23 Planning Net irrigation requirement per month (NIR m ) can therefore be determined from these inputs as well as net irrigation requirement per day (NIR d ). NIR m ET - R e (11.4) NIRm NIRd (11.5) n where NIR d net irrigation requirement per day [mm] NIR m net irrigation requirement per month [mm] n number of calender days in relevant month [d] The fact that the NIR d as calculated here, can be less than the actual maximum NIR d, must be taken note of. This can result in the system capacity being insufficient during a certain hot period and may lead to irreclaimable losses. The designer must therefore always compare the average NIR d with the reported daily values (based on historical weather data, if possible) and make the necessary adaptations. Equations 11.1 to 11.5 can therefore be combined as follows: Readily available water ETc - R e NIRd (11.6) n The inputs used to determine the quantity of ground water "readily" available to the crop, before replacement is necessitated, appear between the two dotted-line boundaries on the diagram. While most of these inputs are covered in detail in the relevant chapters, a few warrant further attention. Effective root depth is considered as the shallower of natural root depth (NRD) and effective soil depth (ESD) according to the following equation: ERD min ( NRD and ESD ) (11.7 where ERD effective root depth [m] NRD natural root depth [m] ESD effective soil depth [m] The combination of allowable water depletion () and the soil's water-holding capacity (WHC) is approached in practice according to two different methods. On the one hand (probably the popular method), use is made of laboratory determined water-holding capacity between -10 kpa and -100 kpa ( WHC 100 ) and a definite, adapted set of values for a specific crop. On the other hand the water-holding capacity between -10 kpa and kpa (WHC 1500 ) is used with a different set of values for the same crop. Note that, while both methods produce approximately the same results, care must be taken in using the relevant and WHC values so that those used are applicable to the particular calculation.

24 11.22 Irrigation Design Manual Percentage wetted area (W) is equally important. The soil water reservoir is often limited by properties of the specific irrigation method (especially features of emitters and their positioning), therefore the plant only has this limited supply to draw from. The limitation per plant is therefore determined by expressing the wetted area per plant as a percentage of the soil area occupied by the plant. This wetted area may vary from single wetted spots (drip system on citrus or single micro sprayers on large nut trees or avocados) or even wetted strips (drip systems on vineyards or e.g. strip wetting by means of micro sprayers on citrus). Available water (AW 100 ), and the applicable readily available water (RAW), can therefore be determined from the inputs in this section by means of the following equations : AW SWC ERD (11.8) where AW 100 available water in soil [mm] SWC 100 water capacity of soil between -10 kpa and -100 kpa [mm/m] ERD effective root depth [m] RAW 100 AW 100 (11.9) where RAW readily available water [mm] 100 allowable water depletion [%] Summarising: Equations 11.7 to 11.9 can therefore be combined as follows: 100 RAW SWC100 ERD 100 (11.10) Cycle length The cycle length (calendar days) is determined by dividing the plant's daily water requirement (NIR d ) into the total amount of readily available water (RAW) per cycle. The theoretical figure is therefore obtained from the inputs set out in and RAW W tc (11.11) NIR 100 d where t c cycle length [ calender days] RAW readily available water [mm] NIR d net irrigation requirement per day [mm/d] W wetted area as percentage of total soil area per emitter [%] Further considerations to produce a practical cycle are as follows: In practice most growers prefer to schedule their irrigation on a week-based system once per week (every 7 calendar days), twice per week (every 3½ calendar days), thrice per week (every 2,3 calendar days) and even daily irrigation (i.e. every calendar day).

25 Planning The shorter the cycle, the more difficult it becomes to manage sensibly when only a limited number of working days per week are used. It can only be run efficiently when use is made of a computerised irrigation control system. This aspect must be cleared up with the grower before a practical cycle length is chosen. The selected practical cycle length must then be thoroughly tested to the norms and limitations of all inputs possibly influenced by this alteration, especially where the practical cycle is longer than the theoretical figure. (The latter situation may cause serious problems in cases where water shortages, which may arise from such a decision, cannot be supplemented in time.) A process of multiple iteration may be used to re-assess some or all inputs Net irrigation requirement per cycle Net irrigation requirement per cycle (NIR c ) is purely the product of net irrigation requirement per day ( NIR d ) and cycle length ( t c ) as determined in and above. NIRc NIRd tc (11.12) where NIR c net irrigation requirement per cycle [mm] NIR d net irrigation requirement per day [mm/d] t c cycle length in calendar days [d] Gross irrigation requirement per cycle This figure is determined by incorporating system efficiency ( s ) with net irrigation requirement per cycle (NIR c ). 100 GIR c NIRc (11.13) s where GIR c gross irrigation requirement per cycle [mm] NIR c net irrigation requirement per cycle [mm] s system efficiency [%] At this stage it has been determined that a certain amount of water (GIR c ) must be applied every specific number of calendar days (t c ) Standing time The standing time per cycle (t s ), i.e. the number of hours during which irrigation must take place on every block during a cycle, must now be selected. This determination takes place in close consultation with the grower and the following facts must be thoroughly considered: The type of irrigation system (fixed lay-out or moveable) The availability of labour for moveable systems The minimum amount of daylight hours for moveable systems Stage of automation and/or computerisation Management aspects A few alternatives may be determined, of which the most acceptable will be used as an initial input in the next step of the process.

26 11.24 Irrigation Design Manual Emitter discharge Emitter discharge ( q e ) can therefore now be calculated according to the already known factors GIR c and t s. GIRc qe A (11.14) ts where q e emitter discharge [/h] GIR c gross irrigation requirement per cycle [mm] t s total standing time (or irrigation time) of emitter per cycle length [h] A total theoretical soil area served by one emitter [m 2 ] L d L e [m²] where L d lateral spacing [m] L e emitter spacing [m] Note that GIR c is calculated in terms of application over the entire soil area These results (theoretical) must be compared to practical aspects associated with available emitters (especially preferences regarding quality, service, material properties and composition, required or available operating pressure, distribution pattern, etc.) and altered if necessary. Alterations may be done both in the form of operating pressure (the same emitter) or reselection of alternative emitters available. Note, however, that any alteration to q e at this stage may require alterations in terms of emitter spacing (L e ) which can have a rippling effect on percentage wetted area (A) and eventually may possibly even influence cycle length (t c ). Smaller alterations, however, can possibly be absorbed in the process, in the parameters set for other inputs like allowable water depletion () and even water holding capacity (WHC) both of which should be considered with great caution! Net application rate The net application rate is now determined by comparing the final emitter discharge to the effective wetted area of the specific emitter, taking application efficiency into account. NAR q A b e a 100 (11.15) where NAR net application rate [mm/h] q e emitter discharge [/h] A b effective wetted area of emitter [m 2 ] a application efficiency [%] (system efficiency, excluding all transport losses) This result must now be checked with the infiltration rate of the soil.

27 Figure 11.6 : Scheduling : The planning function (example) Planning 11.25

28 11.26 Irrigation Design Manual Gross application rate The gross application rate is now determined by comparing the final emitter discharge to the effective wetted area of the specific emitter: GAR q A e b (11.16) where GAR gross application rate [mm/h] q e emitter discharge [/h] A b effective wetted area of emitter [m 2 ] This result must comply with the norms for minimum emitter application rate Planning diagram (refer to Figure 11.5) Example (continued) Figure 11.5 shows an example of scheduling planning, based on the citrus component of the continuous example used as practical illustration in this chapter. The inputs, as shown below, were continually accumulated during the planning process and are now combined to form a complete image. Information Climate: (refer to Table 11.1) Although rainfall is recorded for this month, it will not be taken into consideration for system capacity purposes From the data in this table, the average class A-pan evaporation for January is 213 mm Crop: (refer to Section 4.3) From the information in Table 11.3, the crop factor for January is 0.55 General crop knowledge determines that citrus can possibly withdraw 50% of WHC 100 without damage to plant or crop yield and that NRD is in the region of 0,6 m. A row spacing of 6 m, with 3 m between trees, is generally used in this area Soil: (refer to Section 2.2) No restrictive layer in the soil was encountered, therefore a nominal value of 1,0 m (deeper than NRD) will be entered for this purpose The soil analysis shows a WHC 100 of 120 mm/m System : (refer to Section 7) During the system selection process it was decided, due to a variety of relevant reasons, to make use of micro sprayers with the following limitations: Scarce and costly labour forces the system towards a cycle with approximately a week interval A reasonably large reservoir will therefore be strived after therefore aim at strip wetting of approximately 80% of the row width Computerisation is not being considered at this stage, therefore a maximum of three shifts per day can be made. Initially a standing time of 8 hours will be maintained, with three sets per day Emitter spacing can comfortably coincide with plant spacing as indicated above and following a product study it has provisionally been decided to use an emitter which will probably meet all the requirements in terms of spacing (6 m 3 m), gross application rate ( 3 mm/h), distribution pattern and radius (80% wetted strip width) According to Section 9.2 the system efficiency is 85%.

29 Planning Solution : Although all the individual calculation steps are shown in logical order on the diagram in Figure 11.5, only the summarising equations will be used in the solution. Net irrigation requirement per day According to equation 11.6 : NIR d f E o - Re n ( 0, ) ,8 mm/d Readily available water According to equation : SWC ERD ,6 100 RAW ,0 mm Cycle length According to equation : t c RAW W NIRd ,0 80 3, ,6 calender days This cycle length, however, is theoretically determined and must now be adapted to a more practical figure. The grower initially indicated that a weekly cycle would suit his operating system well. The practical solution would therefore now be to choose a cycle length of seven calendar days and then, by means of continuous iteration, determine firstly how inputs will be influenced by this decision and secondly if all requirements, norms and limitations are still met. In this particular case merely one calculation proved that only AWD () needs to be altered to a level of 46% a figure which is quite acceptable. Note two important aspects: Any of the more negotiable values (or even a combination thereof) may be tested and/or altered, within limits, for this purpose Potential danger lurks in the lengthening of practical cycle length above the theoretical figure. If it must be considered at all, it must be done with great caution, and management (skills) play a dominating role.

30 11.28 Irrigation Design Manual Gross irrigation requirement per cycle Substitute equation into equation 11.13, then: GIR c NIR d t c 3, mm(practical) s Note that the practical cycle length is incorporated in this equation. The GIR of 31 mm is therefore lower than the theoretical figure of 34 mm. Emitter discharge According to equation : q e GIRc A t s 31 6,0 3, /h This result was compared to the original emitter selection and found to be acceptable. The specific emitter meets all the requirements in terms of discharge, working pressure and wetted diameter (approximately 80% of the lateral spacing) and is also popular in the industry due to quality, cost and service aspects. At this stage, any alteration to selection will inevitably have to be checked against all other requirements by continuous iteration. For example, a different wetted diameter will influence the percentage wetted area (A), with the subsequent repercussions. Net application rate Net application rate is now calculated by means of equation : q e a NAR Ab ,8 3, ,1 mm/h Gross application rate Gross application rate is now calculated by means of equation : GAR q e Ab 70 4,8 3,0 4,9 mm/h This conforms to the general norm which requires that GAR 3 mm/h for micro sprayers.

31 Planning This illustrates the firm connection of all the inputs and an acceptable solution for each situation which may arise may be obtained by means of continuous iteration. Both the parameters in which inputs are limited and the spectrum that available equipment covers, allow sufficient room to accommodate the few fixed inputs, even if computerising the operation system is considered a "way out". 12 Theoretical size of irrigation group The ideal group size in any system is that area in which total emitter discharge is equal to the flow in the system System flow System flow (Q) is calculated as follows: Q GIRc t A T 10 (11.17) where Q total system flow per crop [m³/h] GIR c gross irrigation requirement per cycle [mm/cycle] A T total system area [ha] t operating hours per cycle [h] GIR c is determined by equation A T is the area of the total zone allocated to a crop or group of crops with identical physical layout and requirements. t is determined by taking the total number of working hours into account, which in turn depend on practical circumstances (grower, system, labour, etc.). t should therefore be in multiples of the standing time (t s ) Number of emitters per group The number of emitters per group (n e ) is calculated as follows: where n e number of emitters Q system flow [m³/h] q e emitter flow [/h] 12.3 Area of group Q ne 1000 (11.18) q The area of a group (A g ) is calculated as follows: e A g ne Ld L e (11.19) where A g area of group [ha] n e number of emitters L d lateral spacing [m] emitter spacing [m] L e

Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems

Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems Ali Ghadami Firouzabadi 1 and Majid Arabfard 2 1. Ali Ghadami

More information

Blaine Hanson Department of Land, Air and Water Resources University of California, Davis

Blaine Hanson Department of Land, Air and Water Resources University of California, Davis Blaine Hanson Department of Land, Air and Water Resources University of California, Davis Irrigation Water Management - Science, Art, or Guess? Irrigation water management: questions to answer When should

More information

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE >

< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > CASE PROFILE COLLECTION No 5 < SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > Stephen Foster September 2002 TASK MANAGERS: Gabriel Azevedo

More information

Lecture 12 Center Pivot Design & Operation. I. Introduction and General Comments

Lecture 12 Center Pivot Design & Operation. I. Introduction and General Comments Lecture 12 Center Pivot Design & Operation I. Introduction and General Comments Center pivots are used on about half of the sprinkler-irrigated land in the USA Center pivots are also found in many other

More information

Ponds- Planning, Design, Construction

Ponds- Planning, Design, Construction United States Department of Agriculture Soil Conservation Service Agriculture Handbook Number 590 Ponds- Planning, Design, Construction This handbook describes the requirements for building a pond. It

More information

Chapter D9. Irrigation scheduling

Chapter D9. Irrigation scheduling Chapter D9. Irrigation scheduling PURPOSE OF THIS CHAPTER To explain how to plan and schedule your irrigation program CHAPTER CONTENTS factors affecting irrigation intervals influence of soil water using

More information

College of Agriculture, P.O. Box 210036 Tucson, Arizona 85721-0036

College of Agriculture, P.O. Box 210036 Tucson, Arizona 85721-0036 Irrigating Citrus Trees ISSUED FEBRUARY 2000 BY: Glenn C. Wright Associate Specialist ag.arizona.edu/pubs/ crops/az1151.pdf This information has been reviewed by university faculty. COOPERATIVE EXTENSION

More information

Drip Irrigation for the Yard and Garden

Drip Irrigation for the Yard and Garden Drip Irrigation for the Yard and Garden R. Troy Peters, Ph.D. WSU Extension Irrigation Engineer Drip irrigation has many advantages over sprinklers. The application efficiency of sprinklers is typically

More information

Waterway Technote Planning

Waterway Technote Planning Waterway Technote Planning Contents Benefits to planning your waterway management 1 Prioritising waterway management where to start? 1 What are your priorities? 1 Start with the best areas or those at

More information

RETICULATED RECYCLED WATER SCHEMES OPERATIONAL CONSIDERATIONS. Duncan Wallis. RM Consulting Group

RETICULATED RECYCLED WATER SCHEMES OPERATIONAL CONSIDERATIONS. Duncan Wallis. RM Consulting Group RETICULATED RECYCLED WATER SCHEMES OPERATIONAL CONSIDERATIONS Paper Presented by: Duncan Wallis Author: Duncan Wallis, Senior Consultant, RM Consulting Group 72 nd Annual Water Industry Engineers and Operators

More information

Speaker Summary Note

Speaker Summary Note 2020 CONFERENCE MAY 2014 Session: Speaker: Speaker Summary Note Building Resilience by Innovating and Investing in Agricultural Systems Mark Rosegrant Director, Environment and Production Technology Division

More information

Water for services advanced study. Report on Grant Agreement No 71301.2006.002-2006.471

Water for services advanced study. Report on Grant Agreement No 71301.2006.002-2006.471 Report on Grant Agreement No 71301.2006.002-2006.471 Statistics Sweden 3(21) Contents Abstract 4 Background 5 The Project 5 Objective 5 Project plan 5 Methodology 6 Phase 1: Preparation of study 6 Defining

More information

SOILS AND AGRICULTURAL POTENTIAL FOR THE PROPOSED P166 ROAD, NEAR MBOMBELA, MPUMALANGA PROVINCE

SOILS AND AGRICULTURAL POTENTIAL FOR THE PROPOSED P166 ROAD, NEAR MBOMBELA, MPUMALANGA PROVINCE REPORT On contract research for SSI SOILS AND AGRICULTURAL POTENTIAL FOR THE PROPOSED P166 ROAD, NEAR MBOMBELA, MPUMALANGA PROVINCE By D.G. Paterson (Pr. Nat. Sci. 400463/04) October 2012 Report No. GW/A/2012/48

More information

World Water and Climate Atlas

World Water and Climate Atlas International Water Management Institute World Water and Climate Atlas Direct access to water and climate data improves agricultural planning The IWMI World Water and Climate Atlas provides rapid access

More information

DAIRY FARMING IN SOUTH AFRICA WHERE TO NOW? William Gertenbach Institute for Animal Production Western Cape Departement of Agriculture

DAIRY FARMING IN SOUTH AFRICA WHERE TO NOW? William Gertenbach Institute for Animal Production Western Cape Departement of Agriculture DAIRY FARMING IN SOUTH AFRICA WHERE TO NOW? William Gertenbach Institute for Animal Production Western Cape Departement of Agriculture INTRODUCTION The dominant variable in livestock farming is the supply

More information

FULL COVERAGE IRRIGATION for tree & vine crops the facts.

FULL COVERAGE IRRIGATION for tree & vine crops the facts. Handy Pocket Guide rotator technology save water, save energy and do a better job of irrigating. FULL COVERAGE IRRIGATION for tree & vine crops the facts. Copyright 2008 Nelson Irrigation Corporation 1

More information

Culture in field conditions - Challenges A South American point of view Roberto Campos Pura Natura, Argentina

Culture in field conditions - Challenges A South American point of view Roberto Campos Pura Natura, Argentina A South American point of view Roberto Campos Pura Natura, Argentina EUSTAS 6 th Stevia Symposium Leuven, July 3 rd and 4 th I. Area of cultivation II. Environment III. Production of seedlings IV. Planting

More information

Feasibility Study Mzimvubu Water Project

Feasibility Study Mzimvubu Water Project Feasibility Study Mzimvubu Water Project Newsletter 2/September 2013 Activities and Achievements to Date A Detailed Feasibility Study is underway in the Eastern Cape to investigate a potential site for

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

Managing the Root Zone in Soilless Culture

Managing the Root Zone in Soilless Culture Managing the Root Zone in Soilless Culture Author: Eyal Ronen Haifa Chemicals Chief Agronomist In solid growing media, there are five important parameters that should be monitored around the root zone

More information

Figure 1.1 The Sandveld area and the Verlorenvlei Catchment - 2 -

Figure 1.1 The Sandveld area and the Verlorenvlei Catchment - 2 - Figure 1.1 The Sandveld area and the Verlorenvlei Catchment - 2 - Figure 1.2 Homogenous farming areas in the Verlorenvlei catchment - 3 - - 18 - CHAPTER 3: METHODS 3.1. STUDY AREA The study area, namely

More information

SUPPLY, RESTRICTIONS AND WATER USE: A SURVEY AT THE WAIMAKARIRI IRRIGATION SCHEME

SUPPLY, RESTRICTIONS AND WATER USE: A SURVEY AT THE WAIMAKARIRI IRRIGATION SCHEME SUPPLY, RESTRICTIONS AND WATER USE: A SURVEY AT THE WAIMAKARIRI IRRIGATION SCHEME M S Srinivasan, M J Duncan National Institute of Water & Atmospheric Research Limited 1 Kyle Street, Christchurch m.srinivasan@niwa.co.nz

More information

Water Saving Technology

Water Saving Technology Water Saving Technology Water Demand & Irrigation Miguel Aguila aguila@gemuese-garten.com Prof. Dr. S. Kleisinger Project for Water and Fertilizer Use Efficiency November 6, 2009 EDUCATIONAL AND WORK HISTORY

More information

COTTON WATER RELATIONS

COTTON WATER RELATIONS COTTON WATER RELATIONS Dan R. Krieg 1 INTRODUCTION Water is the most abundant substance on the Earth s surface and yet is the most limiting to maximum productivity of nearly all crop plants. Land plants,

More information

NITROGEN MANAGEMENT WITH DRIP AND SPRINKLER IRRIGATION

NITROGEN MANAGEMENT WITH DRIP AND SPRINKLER IRRIGATION NITROGEN MANAGEMENT WITH DRIP AND SPRINKLER IRRIGATION Clinton C. Shock Malheur Experiment Station, Oregon State University Ontario, Oregon (541) 889-2174 Clinton.Shock@oregonstate.edu INTRODUCTION: EARLY

More information

Preparing A Cash Flow Statement

Preparing A Cash Flow Statement Preparing A Cash Flow Statement By: Norm Dalsted and Rod Sharp Colorado State University It is highly unlikely you would attempt to drive to Detroit, Michigan, without first consulting a road map. You

More information

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

MONITORING OF DROUGHT ON THE CHMI WEBSITE

MONITORING OF DROUGHT ON THE CHMI WEBSITE MONITORING OF DROUGHT ON THE CHMI WEBSITE Richterová D. 1, 2, Kohut M. 3 1 Department of Applied and Land scape Ecology, Faculty of Agronomy, Mendel University in Brno, Zemedelska 1, 613 00 Brno, Czech

More information

CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT

CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT Soil Water Balance in Southern California Cheng-Wei Yu Environmental and Water Resources Engineering Program Introduction Historical Drought Condition

More information

The Climate of Oregon Climate Zone 2 Willamette Valley

The Climate of Oregon Climate Zone 2 Willamette Valley /05 E-55 No. ci oi Unbound issue e2_, Does not circulate Special Report 914 May 1993 The Climate of Oregon Climate Zone 2 Property of OREGON STATE UNIVERSITY Library Serials Corvallis, OR 97331-4503 Agricultural

More information

Cultivating Agricultural Information Management System Using GIS Technology

Cultivating Agricultural Information Management System Using GIS Technology Hitachi Review Vol. 58 (2009), No. 6 265 Cultivating Agricultural Information Management System Using GIS Technology Improving Agricultural Efficiency through Information Technology Osamu Nishiguchi Noriko

More information

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

GRADATION OF AGGREGATE FOR CONCRETE BLOCK GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published

More information

THE ECOSYSTEM - Biomes

THE ECOSYSTEM - Biomes Biomes The Ecosystem - Biomes Side 2 THE ECOSYSTEM - Biomes By the end of this topic you should be able to:- SYLLABUS STATEMENT ASSESSMENT STATEMENT CHECK NOTES 2.4 BIOMES 2.4.1 Define the term biome.

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY M. Brito 1,3, K. Lobato 2,3, P. Nunes 2,3, F. Serra 2,3 1 Instituto Dom Luiz, University of Lisbon (PORTUGAL) 2 SESUL Sustainable Energy Systems at University of Lisbon (PORTUGAL) 3 FCUL, University of

More information

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS Before discussing the uses and importance of long-term water-level data, it is useful to review essential components of a water-level monitoring

More information

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be

More information

Rural Flooding: The Potential Role of Forestry

Rural Flooding: The Potential Role of Forestry Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland

More information

CALL VOLUME FORECASTING FOR SERVICE DESKS

CALL VOLUME FORECASTING FOR SERVICE DESKS CALL VOLUME FORECASTING FOR SERVICE DESKS Krishna Murthy Dasari Satyam Computer Services Ltd. This paper discusses the practical role of forecasting for Service Desk call volumes. Although there are many

More information

INDONESIA - LAW ON WATER RESOURCES,

INDONESIA - LAW ON WATER RESOURCES, Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in

More information

Development of Water Allocation Strategy to Increase Water Use Efficiency of Irrigation Project

Development of Water Allocation Strategy to Increase Water Use Efficiency of Irrigation Project Kasetsart J. (Nat. Sci.) 34 : 145-158 (2000) Development of Water Allocation Strategy to Increase Water Use Efficiency of Irrigation Project Varawoot Vudhivanich 1, Jesda Kaewkulaya 1, Ponsatorn Sopaphun

More information

EXAMPLE OF THE USE OF CROPWAT 8.0

EXAMPLE OF THE USE OF CROPWAT 8.0 EXAMPLE OF THE USE OF CROPWAT 8.0 1 1. INTRODUCTION This document shows in a practical way the use of CROPWAT 8.0 for design and management of irrigation schemes, taking the user, with the help of an actual

More information

Measuring Soil Moisture for Irrigation Water Management

Measuring Soil Moisture for Irrigation Water Management Measuring Soil Moisture for Irrigation Water Management FS 876 by Hal Werner, Extension irrigation engineer Irrigation water management requires timely application of the right amount of water. Competition

More information

INCOME TAX : INCOME TAX ACT, 1962 (the Act) : SECTION 10(1)(o)(ii) : EXEMPTION FROM INCOME TAX: FOREIGN EMPLOYMENT INCOME

INCOME TAX : INCOME TAX ACT, 1962 (the Act) : SECTION 10(1)(o)(ii) : EXEMPTION FROM INCOME TAX: FOREIGN EMPLOYMENT INCOME SOUTH AFRICAN REVENUE SERVICE INCOME TAX INTERPRETATION NOTE NO. 16 DATE: 27 March 2003 INCOME TAX ACT SECTION SUBJECT : INCOME TAX ACT, 1962 (the Act) : SECTION 10(1)(o)(ii) : EXEMPTION FROM INCOME TAX:

More information

CONSTRUCTION GENERAL PERMIT RISK ASSESSMENT R-FACTOR CALCULATION NOTIFICATION

CONSTRUCTION GENERAL PERMIT RISK ASSESSMENT R-FACTOR CALCULATION NOTIFICATION CONSTRUCTION GENERAL PERMIT RISK ASSESSMENT R-FACTOR CALCULATION NOTIFICATION NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION

More information

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

William Northcott Department of Biosystems and Agricultural Engineering Michigan State University. NRCS Irrigation Training Feb 2-3 and 9-10, 2010

William Northcott Department of Biosystems and Agricultural Engineering Michigan State University. NRCS Irrigation Training Feb 2-3 and 9-10, 2010 William Northcott Department of Biosystems and Agricultural Engineering Michigan State University NRCS Irrigation Training Feb 2-3 and 9-10, 2010 Irrigation Scheduling Process of maintaining an optimum

More information

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document

London Borough of Waltham Forest LOCAL FLOOD RISK MANAGEMENT STRATEGY. Summary Document LOCAL FLOOD RISK MANAGEMENT STRATEGY Summary Document October 2013 Local Flood Risk Management Strategy Summary 1 Introduction 2 Partner responsibilities 3 What do we know about flooding in the borough?

More information

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish Demand forecasting & Aggregate planning in a Supply chain Session Speaker Prof.P.S.Satish 1 Introduction PEMP-EMM2506 Forecasting provides an estimate of future demand Factors that influence demand and

More information

Water Resource. 1 Initiating and Sustaining Water Sector Reforms : A Synthesis World Bank in collaboration with the Government of India, Ministry of

Water Resource. 1 Initiating and Sustaining Water Sector Reforms : A Synthesis World Bank in collaboration with the Government of India, Ministry of WATER RESOURCES OF INDIA by Kalipada Chatterjee Climate Change Centre Development Alternatives Introduction Water is essential for human civilisation, living organisms, and natural habitat. It is used

More information

6. Base your answer to the following question on the graph below, which shows the average monthly temperature of two cities A and B.

6. Base your answer to the following question on the graph below, which shows the average monthly temperature of two cities A and B. 1. Which single factor generally has the greatest effect on the climate of an area on the Earth's surface? 1) the distance from the Equator 2) the extent of vegetative cover 3) the degrees of longitude

More information

MONTHLY COFFEE MARKET REPORT

MONTHLY COFFEE MARKET REPORT E MONTHLY COFFEE MARKET REPORT March 2013 Coffee prices stabilized in March 2013, with the monthly average of the ICO composite indicator price essentially unchanged on the previous month. Contrasting

More information

GROUNDWATER BANKING AN AGRICULTURAL SYSTEMS APPROACH FOR WATER SECURITY IN CALIFORNIA

GROUNDWATER BANKING AN AGRICULTURAL SYSTEMS APPROACH FOR WATER SECURITY IN CALIFORNIA GROUNDWATER BANKING AN AGRICULTURAL SYSTEMS APPROACH FOR WATER SECURITY IN CALIFORNIA Helen Dahlke Assistant Professor in Integrated Hydrologic Sciences LAWR, UC Davis FEBRUARY 13, 2015 EMAIL: hdahlke@ucdavis.edu

More information

Management Allowed Depletion Irrigation Scheduling. Doug Callison CID-CLIA Senior Product Manager

Management Allowed Depletion Irrigation Scheduling. Doug Callison CID-CLIA Senior Product Manager Management Allowed Depletion Irrigation Scheduling Doug Callison CID-CLIA Senior Product Manager Question? What irrigation controller program day cycle setting should I use? Custom, Odd, Odd31, Even, or

More information

An Approach for Water Cost of Cooling Water System in Oil Refinery

An Approach for Water Cost of Cooling Water System in Oil Refinery CHEMICAL ENGINEERING TRANSACTIONS Volume 21, 2010 Editor J. J. Klemeš, H. L. Lam, P. S. Varbanov Copyright 2010, AIDIC Servizi S.r.l., ISBN 978-88-95608-05-1 ISSN 1974-9791 DOI: 10.3303/CET1021018 103

More information

City of Fort Collins Water Supply and Demand Management Policy

City of Fort Collins Water Supply and Demand Management Policy City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management

More information

First Home Buyers: The Big Picture

First Home Buyers: The Big Picture First Home Buyers: The Big Picture April 2014 Key Points: There has been considerable coverage of late regarding the First Home Buyer (FHB) market share, with the widespread perception that this group

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

at a disposal site for which a permit has been issued; or

at a disposal site for which a permit has been issued; or Version 1/19 June 2000 INTERPRETATION OF THE DEFINITION OF DISPOSAL SITES WITH REGARD TO THE ISSUING OF PERMITS FOR WASTE INCINERATORS, WASTE MANAGEMENT FACILITIES AND OTHER ALTERNATIVE WASTE DISPOSAL

More information

Section 5 CLIMATE TABLES

Section 5 CLIMATE TABLES Section Section CLIMATE SOURCES OF DATA... -1 HISTORICAL CONTEXT... -1 PRECIPITATION... -2 TEMPERATURES... -3 EVAPOTRANSPIRATION... -3 WIND SPEED AND DIRECTION... -4 DEGREE DAYS...-4 CONCLUSIONS AND RECOMMENDATIONS...

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

Climate Change and Infrastructure Planning Ahead

Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports

More information

MICRO IRRIGATION A technology to save water

MICRO IRRIGATION A technology to save water MICRO IRRIGATION A technology to save water 1. Introduction Efficient utilization of available water resources is crucial for a country like, India, which shares 17% of the global population with only

More information

The Use of Netafim Hydrocalc Program Version 2.21, for Designing Drip Irrigation Arrangements

The Use of Netafim Hydrocalc Program Version 2.21, for Designing Drip Irrigation Arrangements The Use of Netafim Hydrocalc Program Version 2.21, for Designing Drip Irrigation Arrangements IOANA ALINA COSTESCU, MIRCEA CONSTANTIN ORLESCU, RAREŞ HĂLBAC- COTOARĂ-ZAMFIR, EMANUEL HAŢEGAN, GEORGE NARCIS

More information

Ghana's Economic Performance 2010

Ghana's Economic Performance 2010 GHANA STATISTICAL SERVICE (GSS) Statistics for Development and Progress Ghana's Economic Performance 21 i n f i g u r e s P.O. Box GP 198, Accra www. statsghana.gov.gh 211 Ghana's Economic Performance

More information

An Assessment of Prices of Natural Gas Futures Contracts As A Predictor of Realized Spot Prices at the Henry Hub

An Assessment of Prices of Natural Gas Futures Contracts As A Predictor of Realized Spot Prices at the Henry Hub An Assessment of Prices of Natural Gas Futures Contracts As A Predictor of Realized Spot Prices at the Henry Hub This article compares realized Henry Hub spot market prices for natural gas during the three

More information

ideas from RisCura s research team

ideas from RisCura s research team ideas from RisCura s research team thinknotes april 2004 A Closer Look at Risk-adjusted Performance Measures When analysing risk, we look at the factors that may cause retirement funds to fail in meeting

More information

Laundry Hot Water Systems

Laundry Hot Water Systems TECHNICAL BULLETIN HE-2020 Laundry Hot Water Systems Commercial/Institutional Applications using Helitherm Heat Exchangers AERCO INTERNATIONAL, INC. 159 PARIS AVE., NORTHVALE, NJ 07647 (201) 768-2400 FAX

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

IRRINET: IT Irrigation Advisory Services for Farm Water Management

IRRINET: IT Irrigation Advisory Services for Farm Water Management IRRINET: IT Irrigation Advisory Services for Farm Water Management 1. Water dynamics in soil...3 2. Crop growth...3 2.1. Crop development...3 2.2. Root system growth...3 3. Crop water requirements...4

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

HYDROLOGICAL CYCLE Vol. I - Anthropogenic Effects on the Hydrological Cycle - I.A. Shiklomanov ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE

HYDROLOGICAL CYCLE Vol. I - Anthropogenic Effects on the Hydrological Cycle - I.A. Shiklomanov ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE I.A. Shiklomanov Director, State Hydrological Institute, St. Petersburg, Russia Keywords: hydrological cycle, anthropogenic factors, afforestation, land

More information

AGRICULTURAL PROBLEMS OF JAPAN

AGRICULTURAL PROBLEMS OF JAPAN AGRICULTURAL PROBLEMS OF JAPAN Takeshi Kimura, Agricultural Counselor Embassy of Japan, Washington, D. C. I would like, first, to sketch the Japanese agricultural situation and, second, to review Japan's

More information

OPTIMAL POLYGEN COOLING CONCEPT FOR ST. OLAVS HOSPITAL IN TRONDHEIM, NORWAY

OPTIMAL POLYGEN COOLING CONCEPT FOR ST. OLAVS HOSPITAL IN TRONDHEIM, NORWAY 1st European Conference on Polygeneration OPTIMAL POLYGEN COOLING CONCEPT FOR ST. OLAVS HOSPITAL IN TRONDHEIM, NORWAY G. Eggen 1, A. Utne 2 1) COWI A/S, PB 2564 Sentrum, NO-7414 Trondheim, Norway, e-mail:

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

INTRODUCTION. The 3-year upper primary syllabus development was guided by the RNPE, 1994, which called for the review of the Primary curriculum.

INTRODUCTION. The 3-year upper primary syllabus development was guided by the RNPE, 1994, which called for the review of the Primary curriculum. INTRODUCTION The 3-year upper primary syllabus development was guided by the RNPE, 1994, which called for the review of the Primary curriculum. It followed the introduction of lower primary Environmental

More information

Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam

Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam ICON WATER AND QUEANBEYAN CITY COUNCIL Summary Report 8006314 25 June 2015 Initial Asssessment of Potential Flood

More information

GLOBAL CIRCULATION OF WATER

GLOBAL CIRCULATION OF WATER Global Circulation of Water MODULE - 8A 27 GLOBAL CIRCULATION OF WATER More than three-fourths of the earth s surface is covered by water. Water is an odorless, tasteless, substance than can naturally

More information

A Quick Start Guide to Establishing a Vineyard in Oregon Patty Skinkis, Ph.D.

A Quick Start Guide to Establishing a Vineyard in Oregon Patty Skinkis, Ph.D. A Quick Start Guide to Establishing a Vineyard in Oregon Patty Skinkis, Ph.D. When thinking of starting a vineyard, many questions come to mind: Would my land be suitable for growing grapes? What types

More information

Agri Credit Clinic. New Entrants Work-Shop. Moorepark 25 th April 2013. Bank of Ireland is regulated by the Central Bank of Ireland

Agri Credit Clinic. New Entrants Work-Shop. Moorepark 25 th April 2013. Bank of Ireland is regulated by the Central Bank of Ireland Agri Credit Clinic New Entrants Work-Shop Moorepark 25 th April 2013 Bank of Ireland is regulated by the Central Bank of Ireland Pillars of the credit application process Pillar 1 The Foundation Business

More information

Essential Water. Customer Charter

Essential Water. Customer Charter Essential Water Customer Charter Who is Essential Water? Essential Water is a division of Essential Energy and provides water supply services to over 20,000 people in Broken Hill, Menindee, Sunset Strip

More information

RICE CULTIVATION: ENVIRONMENTAL ISSUES AND WATER SAVING APPROACHES

RICE CULTIVATION: ENVIRONMENTAL ISSUES AND WATER SAVING APPROACHES RICE CULTIVATION: ENVIRONMENTAL ISSUES AND WATER SAVING APPROACHES Ragab Ragab 1 Introduction Globally, rice is the most important food crop with more than 90% produced in Asia. In most of Asian countries,

More information

How To Calculate Global Radiation At Jos

How To Calculate Global Radiation At Jos IOSR Journal of Applied Physics (IOSR-JAP) e-issn: 2278-4861.Volume 7, Issue 4 Ver. I (Jul. - Aug. 2015), PP 01-06 www.iosrjournals.org Evaluation of Empirical Formulae for Estimating Global Radiation

More information

Frequently Asked Questions (FAQs) on Hydropower

Frequently Asked Questions (FAQs) on Hydropower Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life

More information

IRRIGATION TECH SEMINAR SERIES

IRRIGATION TECH SEMINAR SERIES AGENDA: WATERIGHT Web-Based Irrigation Scheduling January 15, 2009 Work Shop Registration Welcome Introduction Overview of WATERIGHT Break Example Break More Examples Bill Green, CIT Pete Canessa, CIT

More information

Agricultural Water Conservation and Efficiency Potential in California

Agricultural Water Conservation and Efficiency Potential in California issue brief june 2014 IB:14-05-F Agricultural Water Conservation and Efficiency Potential in California Agriculture uses about 80 percent of California s developed water supply. As such a large user, it

More information

National Environment Awareness Campaign(NEAC) 2014-2015. Theme

National Environment Awareness Campaign(NEAC) 2014-2015. Theme National Environment Awareness Campaign(NEAC) 2014-2015. Theme COMBATING DESERTIFICATION, LAND DEGRADATION AND DROUGHT Background Note Desertification is about land degradation: the loss of the land s

More information

Cellulosic Feedstocks: Mitigating Risk and Cost Through a Portfolio Approach

Cellulosic Feedstocks: Mitigating Risk and Cost Through a Portfolio Approach Cellulosic Feedstocks: Mitigating Risk and Cost Through a Portfolio Approach World Congress on Industrial Biotechnology April 20, 2016 Sam Jackson, VP Business Development Genera Energy Privately held

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

DESIGN CONSIDERATIONS OF SSI SCHEMES FOR THEIR SUSTAINABILITY AND FARMERS MANAGEMENT SIMPLICITY

DESIGN CONSIDERATIONS OF SSI SCHEMES FOR THEIR SUSTAINABILITY AND FARMERS MANAGEMENT SIMPLICITY DESIGN CONSIDERATIONS OF SSI SCHEMES FOR THEIR SUSTAINABILITY AND FARMERS MANAGEMENT SIMPLICITY YUSUF KEDIR (Irrigation Engineer, M. Sc.): EARO TENA ALAMIREW (Ph. D): Alemaya University INTRODUCTION The

More information

The WOCAT Map Methodology, a Standardized Tool for Mapping Degradation and Conservation

The WOCAT Map Methodology, a Standardized Tool for Mapping Degradation and Conservation 12th ISCO Conference Beijing 2002 The WOCAT Map Methodology, a Standardized Tool for Mapping Degradation and Conservation Godert Van Lynden 1, Hanspeter Liniger 2 and Gudrun Schwilch 2 World Overview of

More information

Zhao et al. 2.2 Experimental Results in Winter Season The analysis given below was based on the data collected from Nov. 2003 to Mar. 15, 2004.

Zhao et al. 2.2 Experimental Results in Winter Season The analysis given below was based on the data collected from Nov. 2003 to Mar. 15, 2004. Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005 A Case Study of Ground Source Heat Pump System in China Jun Zhao, Chuanshan Dai, Xinguo Li, Qiang Zhu and Lixin Li College of

More information

El Niño-Southern Oscillation (ENSO): Review of possible impact on agricultural production in 2014/15 following the increased probability of occurrence

El Niño-Southern Oscillation (ENSO): Review of possible impact on agricultural production in 2014/15 following the increased probability of occurrence El Niño-Southern Oscillation (ENSO): Review of possible impact on agricultural production in 2014/15 following the increased probability of occurrence EL NIÑO Definition and historical episodes El Niño

More information

How To Recover From A Flood In Bundaberg

How To Recover From A Flood In Bundaberg BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Paper Presented by: Kym Kneebone Author: Kym Kneebone, Assistant Coastal Treatment Co-ordinator, Bundaberg Regional Council 37th Annual

More information

Rain on Planting Protection. Help Guide

Rain on Planting Protection. Help Guide Rain on Planting Protection Help Guide overview Rain on Planting Protection allows growers to protect themselves from losses if rain prevents planting from being completed on schedule. Coverage is highly

More information