1 Layher SpeedyScaf System Technical Brochure The standard system for scaffolding construction Made of hot-dip-galvanised steel or aluminium General construction approvals Z , Z and Z Certification according to DIN ISO 9001/EN by TÜV-CERT SpeedyScaf F a s t. S a f e. C o m p l e t e. Layher More Possibilities. The Scaffolding System.

2 More possibilities. With the original. Layher SpeedyScaf : So simple. The sum of all advantages cleverly combined: that s the secret behind the success of Layher SpeedyScaf and hence the secret behind the success of every single user every single day. the guard rail Simple technology with a convincing mix of perfected and detailed solutions: uncomplicated insertion system for fast and effortless assembly, just a few basic elements, logical expansion possibilities and rapid extendability, complete safety including during assembly, ergonomically advantageous and easy to handle, minimum maintenance. With just 6 basic elements and a few manual operations, this classic Layher equipment will speedily provide a secure platform for all work. Established on the market for several decades as the frame scaffolding equipment that leads the field, you can cater for almost every requirement with this unbeatably lightweight yet sturdy and stable system: With the maximum safety that comes from building authority approvals for SpeedyScaf 0.73 m wide in steel, SpeedyScaf 0.73 m wide in aluminium, SpeedyScaf 1.09 m wide in steel, in Germany and many other countries all over the world. the toe board the scaffolding deck In addition to the comprehensive engineering concept, perfected down to the last detail, and the proven precision production methods used by Layher, a delivery availability, stock capacity and after-sales service that are second to none will provide you with further support. the assembly frame the diagonal brace 2 the adjustable base plate

3 All Layher scaffolding decks which double as a work surface and as a dependable self-reinforcement always provide a safe working area even at highest heights and in difficult weather conditions. The firmly wedged diagonal provides the scaffolding with the necessary safety thanks to dependable bracing: simply insert it at the top and fix it at the bottom using the wedge coupler. Verticality is always quick to fix, though the inclination of the frame can be adjusted according to the building tolerances. 3

4 Layher SpeedyScaf : So variable. Layher SpeedyScaf, a perfected and complete system for all building requirements. That means safety and speed in any application, at any site and in any conditions. The assembly frames determine the scaffolding width, with the other system parts being suitable for all scaffolding widths and forming the basis for maximum versatility: Scaffolding, 0.73 m wide, steel, hot-dip-galvanised: As facade scaffolding for both scaffolding contractors and for craftsmen, for any jobs, outdoors or indoors. Scaffolding, 0.73 m wide, durable aluminium: As facade scaffolding for all professionals who like to have it easy. Lightweight scaffolding means fast and non-fatiguing assembly and dismantling, and transport using lighter vehicles. Scaffolding, 1.09 m wide, steel, hot-dip-galvanised: As facade scaffolding with frame 1.09 m wide for all jobs calling for wide scaffolding and high loadbearing capacities. The optimised-for use and sturdy scaffolding decks can be selected to suit your particular requirements from a wide range, to fit scaffolding bay lengths of 1.57 m, 2.07 m, 2.57 m, 3.07 m and 4.14 m (type-tested). 4

5 One of the main advantages of SpeedyScaf is the simplicity of its assembly and dismantling. Simplicity means time savings and hence cost savings and bigger profits. That's an effect much appreciated by scaffolding contractors and by craftsmen alike. The Layher scaffolding decks are simply hooked into the channel section on the frame; that means very fast assembly with optimum safety and there's a free choice of decks made from steel, aluminium and wood; for any application. The wedge locking system for the guard rails sits firmly, helps stiffen the structure, and enhances the feeling of safety. All the connections in the system are bolt-free just insert. That's economy in its purest form. 5

6 Layher SpeedyScaf : So perfect Perfect and efficient details are the trademark of Layher SpeedyScaf equipment: One-piece decks for the 0.73 m wide SpeedyScaf have 3 claws on each side. That ensures secure assembly. Diagonal braces are fitted in every fifth bay. For internal access, you can choose between decks with separate or integrated ladder. Rapid levelling thanks to easy-action adjustable base plate with self-cleaning thread and hand-friendly wing nut, with protection against spindle over-extension. Besides standard anchoring using the SpeedyScaf wall ties, additional ties can be provided to prevent lateral movement. Internal guard rails are quickly fitted using additional wedge housings. SpeedyScaf is also available with special brick guards, plus protective fans, brackets and so on, for time-saving extension measures and short-notice special solutions. SpeedyScaf can be easily widened inwards or outwards with brackets. Side protection and if necessary support struts for the bracket area are all standard parts. For individual solutions, tubes with couplers can be attached at any time to the assembly frame. Steel or aluminium lattice girders are available for bridging gaps in scaffolding. 6

7 for safe working. SpeedyScaf, 0.73 m wide, steel, hot-dip-galvanised. up to scaffolding group 3, as per DIN 4420 / HD Building authority approval under Z SpeedyScaf, 0.73 m wide, aluminium, up to scaffolding group 3, as per DIN 4420 / HD Building authority approval under Z SpeedyScaf, 1.09 m wide, steel, hot-dip-galvanised, for scaffolding groups 4 6, as per DIN 4420 / HD Building authority approval under Z According to German approval, an erection height of 24.4 m (platform height) is possible. Type tests have been passed for erection heights up to 80 m. Greater erection heights are covered with individual verification of structural strength. According to German approval, an erection height of m (platform height) is possible. Greater erection heights are covered with individual verification of structural strength. According to German approval, an erection height of 24.4 m (platform height) is possible. Greater erection heights are covered with type calculation or with individual verification of structural strength. Type testing, test No. Ty 9/96 Type testing by the Inspection Office for Structural Engineering Statics in Stuttgart relates to 10 standard versions of Layher SpeedyScaf 70 in steel with platform heights of up to 80 m. Structural calculations are available for other special extension versions. 7

8 SpeedyScaf System individual parts Assembly frames in practical dimensions form, together with user-friendly accessories, the SpeedyScaf system. All parts come from Layher's own certified production and are subject to continual quality checks in every production phase. Thanks to the large stocks kept at the plant and at the many delivery warehouses, dependable availability is assured. Assembly Frames Euro Assembly Frame, steel, hot-dip-galvanised 2.0 x 0.73 m (standard frame) 1.5 x 0.73 m (adjustment frame) 1.0 x 0.73 m (adjustment frame) 0.66 x 0.73 m (adjustment frame) Euro Assembly Frame, aluminium 2.0 x 0.73 m (standard frame) 1.0 x 0.73 m (adjustment frame) 0.66 x 0.73 m (adjustment frame) Euro Assembly Frame, steel, hot-dip-galvanised 2.0 x 1.09 m (standard frame) 1.5 x 1.09 m (adjustment frame) 1.0 x 1.09 m (adjustment frame) 0.66 x 1.09 m (adjustment frame) Euro Assembly Frame for balustrade, steel, hot-dip-galvanised 2.0 x 0.73 m Diagonal Braces Gantry frame, steel, hot-dip-galvanised 2.2 x 1.5 m Diagonal brace with wedge half-coupler for bay lengths of 2.07 m 3.07 m or with 2 half-couplers for bay lengths of 1.57 m, 4.14 m Detail of wedge half-coupler Euro Assembly Frame, steel, hot-dip-galvanised 2.0 x 0.36 m Base ledger with 2 wedge half-couplers for bay lengths of 2.07 m 3.07 m A complete list of all individual parts and further expansion parts can be found in our catalogues and price lists for SpeedyScaf and accessories for scaffolding construction. 8

9 Guard Rails, Toe Boards Scaffold Decks, Access Decks Single guardrail, steel Length 0.73 m 3.07 m Steel deck, 0.32 m wide Length 0.73 m 4.14 m Double guardrail, steel or aluminium Length 1.57 m 4.14 m Robust deck, 0.61 m wide Length 0.73 m 3.07 m Single end guardrail Length 0.73 m, 1.09 m Stalu deck, 0.61 m wide Length 1.57 m 3.07 m Double end guardrail Length 0.73 m, 1.09 m Laminated wood deck, 0.32 m wide Length 1.57 m 3.07 m Toe board, for longitudinal side Length 0.73 m 4.14 m Robust access deck, 0.61 m wide, with integrated access ladder Length 2.57 m, 3.07 m Toe board, for ends Length 0.73 m, 1.09 m Base Plates Robust access deck, 0.61 m wide Length 1.57 m 3.07 m Base plate, Height 0.11 m Adjustable base 60 Height 0.6 m Adjustable base 80 Height 0.8 m Adjustable base 60, swivelling Height 0.6 m Aluminium access deck, 0.61 m wide, with integrated ladder Length 2.57 m, 3.07 m Access ladder for access deck Length 2.15 m Adjustable base plate 150 Height 1.5 m Steel plank, 0.3 m wide Length 1.0 m 2.5 m; 45 mm high 9

10 SpeedyScaf System individual parts Console Brackets Protection Fans / Pedestrian Protection Console bracket Width 0.22 m Console bracket Width 0.36 m Console bracket Width 0.50 m SpeedyScaf Roof guard Height 1.0 m, length m Console bracket Width 0.73 m Console bracket, swivelling Width 0.73 m Protection net Height 2 m, length 10 m Console bracket Width 1.09 m Brick guard support 0.36 m / 0.5 m / 0.73 m Height 2 m, use on assembly frame 0.73 m and brackets 0.36 m, 0.5 m and 0.73 m Top Scaffold Level Top intermediate frame Width 0.73 m steel or aluminium Width 1.09 m steel Fan support Wrench size 19 or 22 mm Top end frame Width 0.73 m steel or aluminium Width 1.09 m steel Scaffold Anchoring Guardrail post, single, with guard rail wedge housing, for bracket, 0.36 m wide, steel or aluminium SpeedyScaf wall tie Length 0.69 m Wall tie Length 0.38 m, 0.95 m, 1.45 m 10

11 SpeedyScaf System general components Scaffold Couplers External Stairway Access Double coupler Swivel coupler Aluminium platform stairs for bay lengths 2.57 m and 3.07 m Squared timber coupler Clamp coupler Starter U-transom Length 0.73 m Scaffold Accessories Stair guardrail for bay lengths 2.57 m and 3.07 m Aluminium Bridging-ledger Length 2.57 m, 3.07 m Internal guardrail Intermediate transom Length 0.73 m, 1.09 m Intermediate transom Length 0.73 m Unit beams for general use U-transom with spigots and half-coupler Length 0.73 m Spigot Height 0.2 m Steel unit beam, 45 cm high Length 2.0 m Length 3.0 m, with type-testing Length 4.0 m, with type-testing Length 5.0 m, with type-testing Length 6.0 m, with type-testing Aluminium unit beam, 45 cm high Length 2.0 m Length 3.0 m Length 4.0 m Length 5.0 m Length 6.0 m Length 8.0 m Alu Stage 600 A complete list of all individual parts and further expansion parts can be found in our catalogues and price lists for SpeedyScaf and accessories for scaffolding construction. Alu Stage 600 Length 3.18 m Length 4.12 m Length 4.75 m Length 5.2 m Length 6.15 m Length 7.1 m Length 8.0 m Length 9.1 m Length 10.0 m Alu Stage 600, folding Length 5.1 m Length 7.3 m Length 9.15 m 11

12 General Component List Further accessories can be found in the SpeedyScaf Catalogue and in the Scaffolding Accessories Catalogue. Tab. 1 SpeedyScaf: General Component List Art. No. Designation H (L) x W [m] Weig. [kg] Euro Assembly Frame, steel 2.0 x x x x x Gantry frame 2.2 x Euro Speedy Frame, balustrade Guardrail Double guardrail, steel Double guardrail, aluminium Single end guardrail Double end guardrail Toe board, for longitudinal side 0.73 x x x x x x x Toe board, for ends 0.73 x x Diagonal brace Base ledger SpeedyScaf wall tie Wall tie Base plate Adjustable base Adjustable base Adjustable base 60, swivelling Adjustable base plate Steel deck 0.73 x x x x x x x Tab. 1 SpeedyScaf: General Component List Art. No. Designation H (L) x W [m] Weig. [kg] Robust deck 0.73 x x x x x x Stalu deck, unperforated 1.57 x x x x Laminated wood deck 1.57 x x x x Robust access deck, 2.57 x with integratedd access ladder x Robust access deck 1.57 x x x x Aluminium access 2.57 x with integrated ladder x Access ladder 2.15 x Console bracket Top intermediate frame, steel 1.0 x Top intermediate frame, aluminium 1.0 x Top intermediate frame, steel 1.0 x Top end frame, steel 1.0 x Top end frame, aluminium 1.0 x Top end frame, steel 1.0 x Guardrail post, single, steel 1.0 x Guardrail post, single, aluminium 1.0 x SpeedyScaf roof guard 1.0 x x x x Brick guard support 2.0 x Fan support Intermediate transom Intermediate transom U-transom with spigot and half-coupler SpeedyScaf bridging ledger Aluminium bridging ledger Spigot Aluminium platform stairs x Starter U-transom Stair guardrail Internal guardrail

13 Scaffolding Decks Tab. 2a Steel decks Scaffolding group as per DIN 4420 / HD 1000 Steel deck, 0.32 m Art. No Steel deck, 0.19 m Art. No perm.q 1) [kn/m 2 ] Roof brick guard and standard brick guard 1) Design load q R,d = perm. q x 1,5 (γ M = 1.1 is included in the values) Access steel deck Art. No Tab. 2b Robust decks Scaffolding group as per DIN 4420 / HD 1000 Robust deck, 0.61 m Art. No Robust deck, 0.32 m Art. No Robust access deck Art. Nos Roof brick guard and standard brick guard Tab. 2c Aluminium decks, Stalu decks Scaffolding group as per DIN 4420 / HD 1000 Aluminium deck, 0.32 m, perforated, Art. No Aluminium deck, 0.19 m Art. No Stalu deck, 0.61 m, perforated, Art. No / unperforated, Art. No Roof brick guard and standard brick guard Tab. 2d Laminated wood decks Scaffolding group as per DIN 4420 / Laminated wood deck, 0.32 m Art. No HD Roof brick guard and standard brick guard Approved for this scaffolding group. Not approved for this scaffolding group. 13

14 Assembly A few basic components, plus useful and well-designed accessories, form the basis for economical scaffolding construction. Since ergonomic aspects such as handiness and low weight for all components have an effect on the erection time, the load-bearing capacity and dead weight of the parts have been optimally matched to one another. Assembly with basic components 1 1 Base out by laying the guardrails alongside the facade; this marks the assembly position of the scaffolding. No measurement work for setting out is necessary. Place the adjustable base plates at the required distance from the wall on a load-distributing surface. Hang the U starter transom (only in the ladder access bay) from the adjustable base plates, then insert the deck. Set up the first two assembly frames and connect them to the guardrail. 2 2 Place the deck in these assembly frames. Using a spirit level on the guard rail, align the scaffolding bay longitudinally by appropriate spindle adjustment. Then vertically adjust the assembly frame in its axis. Insert and fix the diagonal brace. Aligning the wedge half-coupler with the marker hole (Euro Speedy Frame) achieves a perpendicular alignment transversely to the frame axis. A horizontal strut is needed only in the diagonal bay. Place the next assembly frame on the base plates, connect with the guard rail and insert the deck. 3 3 Next, assemble the adjacent scaffolding bays, with the sequence of the work always remaining the same: Place assembly frame on the base plates Attach guard rail Insert deck Align the scaffolding bays, beginning at the bay next to the already aligned first bay. Insert and fix the diagonal braces each further brace provides stiffening for 5 scaffolding bays as described, either in same direction or in zigzag form. 14

15 Assembly with basic components 4 4 In the next scaffolding level start with the first scaffolding bay. The further working steps are repeated on every scaffolding level: Set up assembly frame Attach guard rail Insert deck Insert toe board Insert and fix diagonal brace Ladders are arranged in an offset pattern. Construct the scaffolding level in the same way as the lower level. Install any anchoring necessary straight away. This is the only way to ensure the stability of the scaffolding during actual assembly. 5 5 On the top level, insert end guard rail supports and the three-piece side protection (guard rails and toe board). 6 6 Depending on local regulations, a guard rail must be provided ahead of the rest of the structure during assembly. This rail is assembled bay by bay from the already secured scaffolding level. 15

16 Assembly Standard assembly Simple, safe, fast and very strong those are the requirements placed on modern scaffolding: SpeedyScaf meets all these requirements. With its basic components assembly frame, adjustable base plates, scaffolding decks, guardrails, diagonal braces and toe boards scaffolding is assembled for the facade in a logical sequence. Depending on the roof projection, optimum adjustment is achieved using console brackets. 16

17 Gable scaffolding Alignment and assembly 7 7 For gable scaffolding, the middle scaffolding bays (preferably the access bays) are aligned with the ridge. Further assembly, usually symmetrical, follows on both sides. The scaffolding is optimally adjusted to the roof angle by appropriate selection of the bay lengths. Aluminium Bridging-ledger 8 For large roof overhangs, the installation of aluminium bridging ledgers is ideal. Spigots on aluminium bridging ledgers hold the assembly frames above them and permit a step-by-step reduction of the bay width. 8 9 Console bracket 0.5 m / 0.73 m 9a 9b 9 By installing 0.5 m (or 0.73 m brackets with bolted-on spigot), the existing bay width can be reduced by 0.5 m. 9a Reduction with 0.5 m bracket. 9b Alternative: Reduction with 0.73 m bracket and bolted-on spigot for channel section. 17

18 Assembly Outside corners The examples show the standard application. Any length adjustment needed is performed as shown on page For a gap-free transition at the corner the frames are positioned flush. Inside corners For a gap-free transition at the corner the frames are positioned flush. In the overlapping bay, side protection is afforded with a telescopic guard rail or tube and couplers, and with a correspondingly long toe board m bracket on the inside: The corner is closed by the fitting of a corner deck, 0,36 m (special part, Art. No ), which helps to maintain the permissible distance from the wall. 10a 10a View from above. 13a 13a View of corner area from below a 11 Widening at the top level is possible with the use of a swivelling and a fixed bracket together on one upright tube. This avoids any height mismatch in the scaffolding deck levels. 11a Scaffolding widening, view from below Version with 0.73 m bracket on the outside: If the scaffolding is widened with a 0.73 m bracket in the closing level, a flat and gap-free transition in the corner area is possible in conjunction with a 1.57 m long bay fitted at the end. 14a 14a Version as above, seen from below. 18

19 Height adjustment Length adjustment In the case of inclined terrain, assembly starts at the highest point. In conjunction with adjustment frames 0.66 m, 1.0 m and 1.5 m problem-free adjustment of the scaffolding to the lie of the ground is possible. The installation of the swivelling adjustable base 60 is recommended for even transmission of the loads. 17 Length adjustment in the middle of the scaffolding depending on bay lengths: The scaffolding is positioned left and right, with the fitted bay in approximately the centre of the scaffolding. In the adjustment bay, lapped steel planks or scaffolding boards are used for the deck, with telescopic guard rail or with tubes and couplers fitted as side protection. 16 If an assembly frame standard has to be extended, this is done by connecting a steel scaffolding tube using two swivel couplers with a spacing of at least 50 cm. For permissible loading as a function of the height h see table. 50 cm 18 h 16 Tab. 3 Permissible loading as a function of height h Height h [m] Perm. standard load [kn] Length adjustment at the scaffolding corner depending on the bay lengths: The scaffolding section with the fitted bay is assembled with the level offset by the deck thickness. The deck of the fitted bay is suspended on one side from the assembly frame and on the other side rests on the deck of the second scaffolding section. 19

20 Anchoring The anchoring of the scaffolding is in accordance with building authority approval or with the individual verification of structural strength or respective to local regulations. In addition to the required number of anchors, particular care must be taken that the wall inserts used are suitable for the base material. A pull-out test must be conducted and recorded in the appropriate form and for the application in question SpeedyScaf wall tie with double coupler 20 V-type wall tie with double coupler Wall tie with connector coupler 22 SpeedyScaf wall tie and inclined wall tie with double coupler 20

21 Allround ledger attached to scaffold with double couplers (wedge secures tie in ring) 24 Clamping coupler on steel support Anchoring with short wall tie 26 Physical tie on steel girder or concrete balustrade with scaffolding tube and double couplers 21

22 Application technology Scaffolding access 27 Internal ladder access 27 For scaffolding access, internal ladder access (standard solution), access decks with integrated or separate ladder, or external platform stairs are available. 28 The external platform stair access is the appropriate alternative when craftsmen of various trades are working on the scaffolding. Decks are provided in full for the working platform. 29 The SpeedyScaf stairway tower is the preferred access to higher working areas. The stairs are installed in parallel (Fig. 28) or alternating (Fig. 29) directions, and permit rapid and safe access to the working area. 28 External platform stair access (stairs in parallel direction) 29 SpeedyScaf stairway tower (stairs in alternating direction) 22

23 Brick guards Brick guards must be used when there is any risk of slipping on the roof. Either brick guards or protection nets can be attached to the brick guard support. 30 Building offset Facades with projections can be scaffolded when scaffolding sections are offset: The last assembly frame of the inner scaffolding section and the first frame of the outer section are 0.5 m apart. In this way the system lengths can be maintained. A bracket of the appropriate width is attached to the last-but-one assembly frame of the inner scaffolding section. The remaining inner gap between the assembly frame is covered by a lapped steel plank. 31 The deck in the assembly frame must be secured by a lock against lift-off m A fan provides protection against falling objects. The surfaces must be covered with system decks. 34 Projections, e.g. oriel windows or balconies, are easily provided with scaffolding using brackets of appropriate length. On the projecting sections decks of the required length (max m), cover the space between the brackets. 23

24 Application technology Dormers Dormers can be quickly and safely scaffolded with standard material; expensive structures using tubes and couplers can be dispensed with The assembly frames on the brackets must be secured with locking pins. 36 Connect lattice girders to the assembly frame and then fasten U transoms (with spigot and half-coupler Art. No ) to it. Secure the assembly frames of the last and last-but-one levels using locking pins The side walls of dormers are easily scaffolded using SpeedyScaf aluminium U-double transoms. Assembly frames from the last scaffolding level must be secured with locking pins. 38 SpeedyScaf and Allround scaffolding can be combined thanks to standardized dimensions. 24

25 Dormers The SpeedyScaf frame for balustrades in use for a dormer m Speedy Frames for balustrades are available for work on dormers and walls. Birdcage scaffolding Gantry frame The SpeedyScaf bridging ledger (special part Art. No ) of 2.57 m or 3.07 m length permits rapid and system-conforming construction of birdcage scaffolding. They offer a full-surface scaffolding deck and a permissible load-bearing capacity of 2.0 kn/m 2 over the entire surface Gantry frames are used to construct pedestrian passageways underneath scaffolding. Complete covering with scaffolding decks protects passers-by. The remaining construction can be continued with 0.73 m or 1.09 m wide scaffolding. Stiffening of the gantry frames and anchoring of the scaffolding should be in accordance with German approval m 1.09 m 42 An even and gap-free scaffolding deck surface can be obtained by placing 15 cm long butt tubes on the spigots of the top assembly frame. The lattice girders are attached to the butts and to the assembly frame standard using double couplers. In any case, structural strength verification is required for the supporting scaffolding underneath. Support and additional bracing must be provided in accordance with structural requirements and with local conditions. 25

26 Dead weights of the scaffolding Tab. 4 Dead weights of facade scaffolding per scaffolding bay Dead weights of facade scaffolding Bay length Bay height 2.00 m 2,07 m 2,57 m 3,07 m per level and standard per m 2 per level and standard per m 2 per level and standard per m 2 Deck/system Width Inner standard g i Outer standard g a visible area* Inner standard g i Outer standard g a visible area* Inner standard g i Outer standard g a visible area* [kg] [kg] [kg/m 2 ] [kg] [kg] [kg/m 2 ] [kg] [kg] [kg/m 2 ] SpeedyScaf, steel 0.73 m Robust deck 0.61 m Robust deck 0.32 m Steel deck 0.32 m Stalu deck 0.61 m Stalu deck 0.32 m Solid wood deck 0.32 m EuroSpeedy, steel 0.73 m Robust deck 0.61 m Robust deck 0.32 m Steel deck 0.32 m Stalu deck 0.61 m Stalu deck 0.32 m Solid wood deck 0.32 m Euro Speedy, aluminium 0.73 m Robust deck 0.61 m Robust deck 0.32 m Stalu deck 0.61 m Stalu deck 0.32 m SpeedyScaf, steel 1.09 m Steel deck 0.32 m Deck frame + deck 1.00 m * for the outer standard row Tab. 5 Scaffolding groups as per DIN 4420 / HD 1000 Fig. 1 Fig. 2 Scaffolding group Scaffolding group evenly distributed load p Conc. load Conc. load p 1 p x 0.5 m 0.2 x 0.2 m Partial area load Minimum width of deck surface pc Partial area [kn/m 2 ] [kn] [kn] [kn/m 2 ] [m 2 ] [m] not required ) not required ) not required ) (0.4 x A B ) 2) (0.4 x A B ) 2) (0.5 x A B ) 2) ) Toe board can be included in computation 2) A B = deck surface p Fig. 1 Fig pc I I perm. bend f I l / 100 perm. f { 2.50 cm b b 26

27 Erection height on cantilever brackets Tab. 6a Steel SpeedyScaf 0.73 m with 0.73 m bracket, scaffolding group 3: 2.0 kn/m 2 Type of strengthening Diagonal brace with swivel couplers, with section brace Deck Steel deck Alu deck, perforated Robust deck Solid wood frame board Bay width [m] Calculating the anchor forces* (working loads) simplified verification Q i Q a Number of levels Type of strengthening Scaffolding tube diag. brace with double couplers + longitudinal tube Deck Steel deck Alu deck, perforated Robust deck Solid wood frame board Bay width [m] Number of levels Type of strengthening Scaffolding tube diagonal brace with double coupler + outer coupler + longitudinal tube Deck Steel deck Alu deck, perforated Robust deck Solid wood frame board Bay width [m] Number of levels Z D For scaffolding group 3, the following applies: Z=D=Q a x 0.73 / 2 = kn Q a = G a + P a = kn 1) P a = 2.4 kn for L 3) = 2.57m 1) P a = 2.8 kn for L 3) = 3.07m G a = g a x n Tab. 6b Steel SpeedyScaf 1.09 m with 1.09 m bracket, scaffolding group 4: 3.0 kn/m 2 Type of strengthening Scaffolding tube diag. brace with double coupler + longitudinal tube Deck Steel deck Solid wood frame board Deck frame with wood deck Bay width [m] Number of levels For scaffolding group 4, the following applies: Q a = G a + P a = kn 2) P a = 3.6 kn for L 3) = 2.57m 2) P a = 4.2 kn for L 3) = 3.07m G a = g a x n Type of strengthening Scaffolding tube diagonal brace with double coupler + outer coupler + longitudinal tube Deck Steel deck Solid wood frame board Deck frame with wood deck Bay width [m] Number of levels g a as per table page 26 n number of levels on the bracket 1) P a useful load (2.0 kn/m 2 ) from loading on 1.5 levels 2) P a useful load (3.0 kn/m 2 ) from loading on 1.5 levels 3) L bay width The anchoring and the scaffolding underneath the bracket must in any case be structurally verified. * The calculated anchor forces result solely from the vertical load, without the additional influence of the wind load. Wind loadings also have to be considered. 27

28 Application technology Gable bridging with 0.45 m or 0.75 m lattice girder 44 Tab. 7a Lattice girder 0.45 m / 0.75 m Steel lattice girder 0.45 m with type-testing Heavy-duty lattice girder 0.75 m Spacing c [m] of lateral compression chord support Number of levels as a function of the span l lattice girder 1) l = 8.0 m (3 x 2.57 m) l = 10.5 m (4 x 2.57 m) Live load 2.0 kn/m 2 on 1.5 levels Lattice girder anchoring every 2.57 m Scaffolding anchoring according to approval c c 1) Above the bridging. 2) The scaffolding underneath the bridging must be design checked. Bridging with framework structure Tab. 7b Framework bridging I A B I 1,80 m Spacing c [m] of lateral compression chord support Span [m] m 1.2 m 1.2 m 1.2 m Number of levels 1) Detail A Section I I c c Detail B Supporting force of lattice girder [kn] (working load) Live load Lattice girder anchoring / top chord Scaffolding anchoring kn/m 2 on 1.5 levels every 2.57 m according to approval All connections as per details A and B with double and outer coupler. Version with type-tested steel lattice girders 0.45 m. 1) Above the bridging. 2) The scaffolding underneath the bridging must be design checked. Cable routing on SpeedyScaf scaffolding system 70 steel 46 Max. 11 m ca m Cable/line weight approx. 15 kg/m. Spread approx. 8 kn of ballast provided by others on each side of the road. Secure frame joints with locking pins. 2 lattice girders must be connected at their top chord with swivel couplers, and at the bottom chord with 1 m tubes and double couplers. 28

29 Alu Stage a 48a 48b 48b The Alu Stage 600 with a max. length of 10 m is used for bridging in work* 47 and safety 48 scaffolding structures. With a permissible loading capacity of 2.0 kn/m 2 up to 7 m and 1.5 kn/m 2 up to 10 m length it meets all the requirements placed on work and safety scaffolding. Up to 9.15 m length the staging is also available as a folding variant. * If only the top layer of the work scaffolding is used, the toe boards can be dispensed with in the lower levels; comply to local regulations. 48a Attachment of the brick guard support. 48b Alu stages are secured with squared-timber couplers against shifting and tilting. Removal or attachment of scaffolding bays 49a 49b 49c With SpeedyScaf, it is easy to attach or remove individual scaffolding bays. The scaffolding frame is, once the deck has been slightly lifted tilted slightly outwards and the deck to be removed is, while still suspended on the other side set down on the existing scaffolding deck. The deck can now be simply detached (Fig. 49d). Attachment is in the reverse sequence. 49d 29

30 Niche brackets, hook-over Use (vertically adjustable) of niche bracket, 0.73 m, hook over (Art. No ) Tab. 8a Scaffolding groups for arrangement A Bracket bay Bay length L F [m] length L K [m] A a L F 0.73 m a L K L K B L F a L F - L K m Tab. 8b Scaffolding groups for arrangements B and C Bracket bay Bay length L F [m] length L K [m] * * * 3 3 3** * * 3* * C a L K L K L F 0.73 m a = 0 * Scaffolding group 3 for arrangement B with a 30 cm and C. ** Scaffolding group 3 only permissible for arrangement C. Tab. 8c Scaffolding groups for arrangements E and F Bracket bay Bay length L F [m] length L K [m] Use of niche bracket, 0.36 m, hook over (Art. No ) D L K L F 0.36 m Arrangement D: For all combinations of bay lengths and the bracket bay length L K scaffolding group 3 applies. E L F a L K 0.36 m F L F 0.36 m L K 30

31 Niche brackets, curved Use of niche bracket, 0.73 m, curved (Art. No ) Tab. 8d Scaffolding groups for arrangement G Bracket bay Bay length L F [m] length L K [m] G a L F 0.73 m a L K H L K L F a L F - L K m Tab. 8e Scaffolding groups for arrangements H and I Bracket bay Bay length L F [m] length L K [m] * ** I a L K L K L F 0.73 m a = 0 * Scaffolding group 3 for arrangement H with a 40 cm and I. ** Scaffolding group 2 only permissible for arrangement I. Tab. 8f Scaffolding groups for arrangements K and L Bracket bay Bay length L F [m] length L K [m] Arrangement J: For all combinations of bay lengths and the bracket bay length L K scaffolding group 3 applies. Use of niche bracket, 0.36 m, curved (Art. No ) J K L K L F L F 0.36 m a L K 0.36 m L L F 0.36 m L K 31

32 Freestanding scaffolding Freestanding scaffolding is required when it cannot or may not be anchored to the facade. Here the basic rules of standard DIN 4420, Section 5.4, must be complied with. In the open: up to a maximum platform height of 12 m the ratio of height to smallest base side length must not exceed 3:1. In closed areas: up to a platform height of 20 m the ratio of height to smallest base side length must not exceed 4:1. 50a 50b 50c Section 50c Plan view The ratios quoted apply only for scaffolding with steel assembly frames. 51 Tab. 9 Basic rules for erection In the open H a 3 1 H max. = 12 m H 50a 50b 50c Tube raker Second scaffolding section as buttress Projecting scaffolding bay as buttress In closed areas H a 4 1 H max. = 20 m a L L a 32

33 Rolling towers as per DIN 4420 Rolling towers made of SpeedyScaf parts are assembled with steel or aluminium assembly frames, 52a by connecting together assembly frames using swivel couplers, or alternatively with tubes and couplers by connecting together assembly frames with lattice girders by using mobile beams (Art. No ) The permissible erection heights and any ballast necessary must be taken into account. 52a One-sided or two-sided widening with an assembly frame and swivel couplers. Tab. 10 Required number of ballast weights of 10 kg each In closed areas central lateral Platform height [m] In the open central lateral 0 10 x x x x x = not permissible The relevant safety rules must be complied with. 52b 52c 52d 52b Two scaffolding sections connected by tubes and couplers. 52c Two scaffolding sections connected by lattice girders, tubes and couplers 52d Scaffolding with mobile beam 3.2 m, adjustable (Art. No ) and spigot, adjustable (Art. No ). 33

34 Pallets Layher Pallets help to save labour and costs for storage, transport, assembly and inventory control. All pallet types have been developed on the basis of practical experience. A truck with a loading crane can handle the entire material transport work, including loading and unloading in the warehouse and at the sites. The warehouse is better organised and counting processes are speeded up, hence saving costs. The material is stored flat or upright, tidy and ready to hand, for availability at the installation site in the shortest possible time. The crane or the fork-lift can be used to move the filled pallets and shorten the transport distances. Scaffolding parts are removed from the pallets on site with a scaffolding hoist. The pallets may only be used close to the ground and must not be lifted above personnel. All pallets are suitable for fork-lift or crane transport, full pallets are stackable to save storage space. The Assembly Frame pin pallet is an optimised and low-cost solution for vertical palletising. It holds up to 20 assembly frames and is dimensioned such that 3 pallets 0.73 m in width can be placed side by side on the truck loading surface. Fork guides and a central rung ensure absolute safety against tilting during fork-lift transport. L x W 1.2 x 0.77 m for 0.73 m frames L x W 1.2 x 1.13 m for 1.09 m frames In the Universal pallet, either 12 assembly frames, 0.73 m, or 10 robust decks, 0.61 m, or 24 wide steel decks, 0.32 m, can be stored flat and transported and stacked by crane or fork-lifter. The pallet posts only have to be changed round when the stacked material changes. L x W 1.37 x 0.86 m, permissible load capacity 1.5 t The Logi pallet guarantees optimum transport and storage of frames, decks, guard rails, diagonal braces, toe boards, standards, ledgers, tubes and much else. The loaded pallet is lifted up with the fork-lift or crane, and the stacked material is taken directly from the pallet by the fork-lift. Up to five pallets can be stacked on top of one another on suitable ground. The tubes are stored in the lower pallet frame when the empty pallet is transported. The hot-dip-galvanised Skeleton box in standardised European dimensions is stackable with Euro pallets. The upper part has crane eyelets. A lateral opening allows stacked material to be removed even when several pallets are stacked one above the other. L x W x H 1.2 x 0.8 x 0.53, permissible load capacity 2 t L x W 1.37 x 0.97 m, permissible load capacity 1.5 t 34

35 Software Keeping costs under control means consistently cutting production and erection times and optimising the material use. There is further potential for rationalisation in logistics, in palletising, scaffolding hoists and the use of scaffolding-specific software. Here too Layher can offer convincing solutions. From the very beginning, Layher has sought to apply electronic data processing to reduce the work involved in scaffolding planning, organisation and accounting, and has developed practical programs. Scaffolding Planner With the Layher Scaffolding Planner, you can calculate in seconds how much material is needed for facade scaffolding using Layher SpeedyScaf components. With the optional equalizer module, photos taken with a digital camera can be imaged true to scale. The program proposes a structure, on the basis of your specifications, including anchoring, bracing and side protection, and in accordance with the approvals or type tests. The material list is created by the push of a key and can be printed out immediately together with the assembly sketch. Layher GBM For economical handling of technical and commercial tasks. Dimensioning, preparation of quotations, writing of invoices and printing out of accounts are the main areas covered by this program. Available only in German language. MAPMAX With MAPMAX, you create a three-dimensional model of the structure to be scaffolded, including walls, gables and balconies. MAPMAX is fast and simple, and offers new ways of for example directly shortening or extending scaffolding planes using the mouse. Even complex scaffolding structures can be created using this ambitious program. 35

36 SpeedyScaf in operation F a s t U s e a t t h e F a c a d e. Whatever the building which needs scaffolding looks like, whatever the angle at which the walls are to one another, with offset wall planes, oriel windows or gabled roof windows; with SpeedyScaf there's always an economical solution. Lattice girders are available for entrances or other building parts which have to be bridged. For heights up to 80 m, the 0.73 m wide scaffolding can be assembled in accordance with type test Ty 9/96, while greater heights required individual verification of structural strength. 36

37 Round scaffolding and towers R o u n d w e g o S p e e d y S c a f w i t h a d i f f e r e n c e. Round scaffolding is just as easy to put up using SpeedyScaf equipment. The assembly frames are connected to one another at the inner standard by swivel couplers. The bay lengths must be selected such that the permissible distances from the walls are not exceeded. Even complex tower buildings can be dependably scaffolded. Depending on the form and facade design, the scaffolding is supplemented with system-linked or system-free lattice girders. 37

38 Scaffolding for industry and refurbishment Safe working platforms quick to build. Scaffolding for industry frequently involves unusual requirements when it comes to load capacity and adaptability. Machines and plants have to be serviced and repaired, apparatus and equipment has to be fitted, and electrical units have to be replaced. With its permissible load capacities of up to 6.0 kn/m 2 and a large number of useful extras and accessories, SpeedyScaf permits economical use in this field too. 38

39 SpeedyScaf with Protect and roofs For environmental protection, w e a t h e r p r o t e c t i o n a n d n o i s e p r e v e n t i o n. SpeedyScaf in conjunction with Protect and roof systems provide perfect protection against the weather and for the environment. Cassette roofs afford dependable protection of the site from above and thus help to shorten building times. Repairs to roofs or the addition of new storeys to buildings can, particularly in conjunction with side coverings (Keder or Protect System) be performed regardless of weather conditions. The Protect System forms an effective cover. Fine facades are protected, and work is possible in contaminated areas too, for example in asbestos clearance. 39

40 We re there for you. Wherever and whenever you need us. Layher in Germany Branches and delivery warehouses nationwide. Layher International Subsidiaries: Argentina, Austria, Belgium, Canada, France, Hungary, Italy, The Netherlands, Poland, Spain, Sweden, Switzerland, United Kingdom, USA. Representatives: Chile, Croatia, Czech Republic, Denmark, Estonia, Finland, Greece, Hong Kong, Iceland, Japan, Kuwait, Latvija, Lebanon, Lithuania, Luxembourg, Mexico, New Zealand, Norway, Oman, Romania, Russia, Saudi-Arabia, Singapore, Slovakia, Slovenia, Ukraine, United Arab Emirates, Yugoslavia and many other countries. Wilhelm Layher GmbH & Co.KG Scaffolding Grandstands Ladders Post Box 40 D Güglingen-Eibensbach Phone: Fax: Web: Branch in the U.K.: Layher Ltd. Works Road Letchworth Hertfordshire SG61WL Phone: (+44) Fax: (+44) Web: Branch in the USA: Layher Inc Moffet Road Semmes, Alabama Postal address: P.O. Box 1335 Semmes, Alabama USA Phone: (+1) Fax: (+1) Web: The Layher Product Range Protective systems Event systems SpeedyScaf Allround scaffolding All dimensions and weights are guideline values. Subject to technical modifications. We shall make delivery exclusively on the basis of our currently valid general terms of business. Rolling towers Falsework Accessories Ladders More possibilities Edition:

Layher. Cassette Roof System. F a s t. U s e w i t h a n y s c a f f o d s y s t e m.

Layher. Cassette Roof System. F a s t. U s e w i t h a n y s c a f f o d s y s t e m. Roof technology for many uses, made from hot-dip galvanised steel Verified structural strength Certification as per DIN ISO 9001/EN 29 001 by TÜV-CERT Cassette Roof System F a s t. U s e w i t h a n y

More information

Layher. Keder Roof and Hall System. F a s t. L i g h t w e i g h t. C o s t e f f e c t i v e.

Layher. Keder Roof and Hall System. F a s t. L i g h t w e i g h t. C o s t e f f e c t i v e. Weather protection in lightweight design, made of aluminium Verified structural strength Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Keder Roof and Hall System F a s t. L i g h t w e

More information

Layher. Protective Systems. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use

Layher. Protective Systems. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use Layher Keder Roof and Keder Hall Instructions for Assembly and Use Quality management certified according to DIN EN ISO 9001:2000 by German TÜV-CERT Protective Systems Layher More Possibilities. The Scaffolding

More information

BRIO Modular scaffolding

BRIO Modular scaffolding BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 11 // Features BRIO Modular Scaffolding covers the different configurations

More information

Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment

Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment U K S Y S T E M S C A F F O L D Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment Why you should use UK System Scaffold Hire UK SYSTEM SCAFFOLD

More information

Welcome to the world of successful scaffolders. Layher. More Possibilities. The Scaffolding System.

Welcome to the world of successful scaffolders. Layher. More Possibilities. The Scaffolding System. Welcome to the world of successful scaffolders. Layher More Possibilities. The Scaffolding System. Layher scaffolding systems: Perfect for your success. Partnership and Advice. Approved safety. High quality

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and

More information

More than shelving & racking. All for your storage demands.

More than shelving & racking. All for your storage demands. More than shelving & racking. All for your storage demands. CONTENTS SELECTIVE PALLET RACKING A cost effective storage system providing direct access to all pallet. SLOTTED ANGLE SHELVING Simple, cost-effective

More information

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version

HS-Steel-Classic. Curing chambers for the concrete block industry in a proven steel version ANLAGENTECHNIK HS-Steel-Classic Curing chambers for the concrete block industry in a proven steel version + special galvanising + simple assembly due to snap-in connections and building kit system We build

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

SAFE ERECTION AND USE OF SCAFFOLDING

SAFE ERECTION AND USE OF SCAFFOLDING HEALTH AND SAFETY IN EMPLOYMENT ACT 1992 APPROVED CODE OF PRACTICE FOR THE SAFE ERECTION AND USE OF SCAFFOLDING OCCUPATIONAL SAFETY & HEALTH SERVICE DEPARTMENT OF LABOUR TE TARI MAHI ISSUED AND APPROVED

More information

BOSS MOBILE ALUMINIUM TOWER 1450/850 LADDERSPAN USER GUIDE

BOSS MOBILE ALUMINIUM TOWER 1450/850 LADDERSPAN USER GUIDE BOSS MOBILE ALUMINIUM TOWER 1450/850 LADDERSPAN USER GUIDE 3T - THROUGH THE TRAPDOOR METHOD AND BOSS ADVANCED GUARDRAIL SYSTEM December 2005 BOSS 1450/850 Ladderspan User Guide Introduction Please read

More information

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES

RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES RESIDENTIAL ROOF TRUSS INSTALLATION PROCEDURES Construction Safety Association of Ontario, October 2008 Prepared for the Low-Rise Residential Trade Labour-Management Health and Safety Committee CONTENTS

More information

SCAFFOLDING PRODUCT TECHNICAL GUIDE. Scaffold Couplers General Technical and Application Manual. Genuine Safety. Outstanding Service.

SCAFFOLDING PRODUCT TECHNICAL GUIDE. Scaffold Couplers General Technical and Application Manual. Genuine Safety. Outstanding Service. SCAFFOLDING PRODUCT TECHNICAL GUIDE Scaffold Couplers Genuine Safety. Outstanding Service. Introduction Scaffold couplers are essentially the fundamental component that is used to assemble tube-and-coupler

More information

INSTALLATION. General. Important Note. Design. Transport

INSTALLATION. General. Important Note. Design. Transport General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected

More information

Auxiliary Rams USERS MANUAL

Auxiliary Rams USERS MANUAL Auxiliary Rams 2007 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc. warrants for one

More information

Now available with full IP65 rating: Protection from dust and water jets NEW: K470 Plus covered containers

Now available with full IP65 rating: Protection from dust and water jets NEW: K470 Plus covered containers Now available with full IP65 rating: Protection from dust and water jets NEW: K470 Plus covered containers Universal container K 470 the original since 1950 Often copied but never equalled or bettered

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF 6023.6clear. max. hook height above ground. Data WOLFF 6023.6clear

WOLFFKRAN. 1 Schedule drawing. 1.1 Schedule drawing, WOLFF 6023.6clear. max. hook height above ground. Data WOLFF 6023.6clear 1 Schedule drawing 1.1 Schedule drawing, WOLFF 6023.6clear [X] max. hook height above ground Data WOLFF 6023.6clear Item Crane type Design Type of setup Basis of calculation Payload torque Hoist winch

More information

Layher. Allround Scaffolding System. Ingenious. Strong. Limitless. Layher Allround Scaffolding System

Layher. Allround Scaffolding System. Ingenious. Strong. Limitless. Layher Allround Scaffolding System Layher Allround Scaffolding System Catalogue 2008 Edition 01.03.2008 8116.218 Quality management certified according to ISO 9001: 2000 by German TÜV-CERT Allround Scaffolding System Ingenious. Strong.

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

TRIO 330 The framed panel formwork for heights of up to 3.30 m

TRIO 330 The framed panel formwork for heights of up to 3.30 m TRIO 330 The framed panel formwork for heights of up to 3.30 m product range 4.30 3.30 2 ties up to 3.30 m TRIO 330 The framed panel formwork for floor heights up to 3.30 m TRIO 330 is an independent formwork

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION

QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION QUESTIONS AND ANSWERS ON NEW FALL PROTECTION LEGISLATION 50.4(1) An owner of a place of employment, an employer and a contractor shall each ensure that each component of a fall-protection system is inspected

More information

MONDOATHENS BASKETBALL SET (Reference PK110)

MONDOATHENS BASKETBALL SET (Reference PK110) MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are

More information

Accuracy counts! SENSORS WITH ANALOG OUTPUT

Accuracy counts! SENSORS WITH ANALOG OUTPUT Accuracy counts! SENSORS WITH ANALOG OUTPUT OTHER APPLICATIONS: KEY ADVANTAGES: Distance measurement Positioning Profile detection Deformation monitoring Vibration monitoring Process monitoring Detection

More information

FRACASSO SCAFFOLDING PS 720

FRACASSO SCAFFOLDING PS 720 FRACASSO SCAFFOLDING PS 720 Characteristics Geometry Strengths PS 720 was designed and constructed in keeping with European regulations EN12810 and EN12811. 150 mm pin obtained by tapering the upright

More information

PUMP JACK SYSTEM AND ACCESSORIES

PUMP JACK SYSTEM AND ACCESSORIES Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair

More information

Scaffold Industry Association of Canada

Scaffold Industry Association of Canada Scaffold Industry Association of Canada CODES OF SAFCE PRACTICE ONTARIO 2011 www.scaffoldaccess.ca 1 CODE OF SAFE PRACTICE GENERAL -- ONTARIO - The following are some common sense rules designed to promote

More information

TÜV Middle East W.L.L. Welcome

TÜV Middle East W.L.L. Welcome TÜV Middle East W.L.L. Welcome TÜV NORD Group Key Data Foundation of TÜV Nord e.v.: 1869 Foundation of TÜV NORD Group: 2004 Number of employees: 8,000 + A Competent and International Service Partner Competence

More information

UBBINK SOLAR IN-ROOF SYSTEM

UBBINK SOLAR IN-ROOF SYSTEM UBBINK SOLAR IN-ROOF SYSTEM The integrated solar mounting system Installation guide UBBINK SOLAR IN-ROOF SYSTEM Table of contents Solar In-Roof System introduction System components Installation guide

More information

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS

7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS

More information

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges 7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience

More information

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU 6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety

More information

Elegant sculpture in flexible shoring

Elegant sculpture in flexible shoring Elegant sculpture in flexible shoring Edificio Ágora, Valencia, Spain In his hometown of Valencia, the Spanish star architect Santiago Calatrava has realized the Ciudad de las Artes y de las Ciencias.

More information

SCAFFOLDING AUGUST 2008. making a difference ERECTING, ALTERING AND DISMANTLING PART 1: PREFABRICATED STEEL MODULAR SCAFFOLDING

SCAFFOLDING AUGUST 2008. making a difference ERECTING, ALTERING AND DISMANTLING PART 1: PREFABRICATED STEEL MODULAR SCAFFOLDING ERECTING, ALTERING AND DISMANTLING SCAFFOLDING PART 1: PREFABRICATED STEEL MODULAR SCAFFOLDING INDUSTRY SAFETY STANDARD AUGUST 2008 making a difference New South Wales Government Disclaimer This publication

More information

a lift for the future

a lift for the future a lift for the future 2 Development brings opportunities The elderly population is increasing all the time and there are increasing demands for quality, safety and flexibility. We think this is a good

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50.

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50. Overall Results Climate Change Performance Index 2012 Table 1 Rank Country Score** Partial Score Tendency Trend Level Policy 1* Rank Country Score** Partial Score Tendency Trend Level Policy 21 - Egypt***

More information

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers

Cable Installation Accessories. Cable Hoisting and Attachment. Snap-In Hangers. SnapStak Hangers SnapStak Hangers New design increases stack height SnapStak hangers have become the industry standard for maximizing space utilization on crowded towers and now that utility is further expanded with the

More information

Preface nivtec.com 3

Preface nivtec.com 3 nivtec.com Preface nivtec.com 3 nivtec 4 nivtec.com Planning with an Eye for Details nivtec.com 5 prolight+sound 2012 6 nivtec.com Meeting Point Fair Booth nivtec.com 7 Our Preparations 8 nivtec.com Enable

More information

Exceptional Accuracy and Durability for Tough Industrial Environments INDUSTRIAL FLOOR SCALES. VERTEX Industrial Floor Scales Heavy-Duty Design

Exceptional Accuracy and Durability for Tough Industrial Environments INDUSTRIAL FLOOR SCALES. VERTEX Industrial Floor Scales Heavy-Duty Design VERTEX Industrial Floor Scales Heavy-Duty Design LOCATE HI-RES Exceptional Accuracy and Durability for Tough Industrial Environments INDUSTRIAL FLOOR SCALES METTLER TOLEDO VERTEX Floor Scales Heavy-Duty

More information

1 table. Unlimited possibilities. The multifunction table arguably the most versatile workbench in the world.

1 table. Unlimited possibilities. The multifunction table arguably the most versatile workbench in the world. 1 table. Unlimited possibilities. The multifunction table arguably the most versatile workbench in the world. Ready for use everywhere: the new MFT 3 For some people, simply a table. Practical for setting

More information

This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor.

This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor. Big Four Construction Hazards: Fall Hazards This material was produced under grant number SH-17792-08-60-F-48 Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily

More information

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales

Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500 Floor scales / Pit scales Contents

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

CUPLOK SCAFFOLD SYSTEM

CUPLOK SCAFFOLD SYSTEM CUPLOK SCAFFOLD SYSTEM Harsco Infrastructure is the world s largest access, formwork and industrial maintenance service provider. Operating in 43 countries, we provide innovative, engineered solutions

More information

Intexma Graphics (Pty) Ltd

Intexma Graphics (Pty) Ltd Intexma Graphics (Pty) Ltd Distributors for the complete supply of signage materials comprising of single and double roll up stands, banner walls, point of sale tables, signage boards and light boxes.

More information

Handling, Erection and Bracing of Wood Trusses

Handling, Erection and Bracing of Wood Trusses Handling, Erection and Bracing of Wood Trusses Follow these guidelines for safe installation of Wood Trusses. These guidelines should not be considered to be the only method for erecting and bracing of

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

ASSEMBLY INSTRUCTIONS Residential Roof solutions

ASSEMBLY INSTRUCTIONS Residential Roof solutions ASSEMBLY INSTRUCTIONS Residential Roof solutions CROSSRAIL System USA Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY TERMS AND CONDITIONS

More information

CABLE SUPPORT SYSTEMS

CABLE SUPPORT SYSTEMS CABLE SUPPORT SYSTEMS eaturing the CADDY CAT HP J-Hook System Why CADDY CAT HP? Why Choose CADDY CAT HP over tray? ast and Easy to Install Much faster installation compared to conventional cable or ladder

More information

World Consumer Income and Expenditure Patterns

World Consumer Income and Expenditure Patterns World Consumer Income and Expenditure Patterns 2014 14th edi tion Euromonitor International Ltd. 60-61 Britton Street, EC1M 5UX TableTypeID: 30010; ITtableID: 22914 Income Algeria Income Algeria Income

More information

Hanson Building Products. precast basement solutions

Hanson Building Products. precast basement solutions Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.

CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards. CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

RZ Guardrail System Installation Manual

RZ Guardrail System Installation Manual TM RZ Guardrail System Installation Manual RZ Guardrail System Compliance is based on OSHA standards: (Standards - 29 CFR) 1910.23 (e) and (Standards - 29 CFR) 1926.502 (b) Failure to read, understand

More information

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35

The entire document shall be read and understood before proceeding with a test. ISTA 3B 2013 - Page 1 of 35 Packaged-Products for Less-Than-Truckload (LTL) Shipment ISTA 3 Series General Simulation Performance Test PROCEDURE VERSION DATE Last TECHNICAL Change: NOVEMBER 2012 Last EDITORIAL Change: JANUARY 2013

More information

LIBERA USER S MANUAL

LIBERA USER S MANUAL USER S MANUAL 2002 Litec s.r.l. Italy All rights reserved. No parts of this manual can be reproduced, without permission of Litec s.r.l. Cod. Version 2 Pag. 2 di 23 INDICE 1. Introduction.... 3 2. The

More information

How To Build A Powerline Box Powerline Generator

How To Build A Powerline Box Powerline Generator Quick Reference Guide DYNAMIC Series Dynamic Series is a broad product family that provides connector solutions ranging from signal level circuitry through power circuit connectivity in a ruggedized, industrialized

More information

Fixed ladders. Fixed ladders. Shaft ladders

Fixed ladders. Fixed ladders. Shaft ladders Fixed ladders Fixed ladders Fixed ladders are perfect to provide safe and permanent access to buildings, equipment or machines also at great heights, e.g.: + + Ascent for inspection and maintenance work

More information

Make the invisible visible! SENSORS WITH EXCELLENT BACKGROUND SUPPRESSION

Make the invisible visible! SENSORS WITH EXCELLENT BACKGROUND SUPPRESSION Make the invisible visible! SENSORS WITH EXCELLENT BACKGROUND SUPPRESSION photoelectric sensors Thanks to its vision for innovation and technological enhancement, Contrinex keeps on setting new standards

More information

General Safety. Always do a risk assessment.

General Safety. Always do a risk assessment. recipitous.co.uk Access Equipment Call 020 8684 6999 Scaffold Towers Ladders & Steps Podiums Rigging Tube & Fittings New & Used Sales Hire Repair Manufacture The Skymaster Ladder is a 3 section combination

More information

E-82. Access Roads and Crane Platforms. 77m steel tower. 1 of 12. Specification Access Roads and Crane Platforms E-82/ 77m steel tower.

E-82. Access Roads and Crane Platforms. 77m steel tower. 1 of 12. Specification Access Roads and Crane Platforms E-82/ 77m steel tower. E82/ 77m steel tower 1 of 12 E82 77m steel tower PMCWSP023E8277m Zuwegung und Kranstellfläche Rev005gereng E82/ 77m steel tower 2 of 12 CONTENTS 1. Assembling the tower and wind energy converter 3 2. Crane

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

For ease of reference the clauses are arranged in 12 sections as follows:-

For ease of reference the clauses are arranged in 12 sections as follows:- NASC TERMS The general NASC terms under which members carry out their work are normally set out in their Standard Terms of Trading, often found on the reverse of their quotation form and referred to as

More information

Phoenix Solar AG. Phoenix TectoSun 3 Installation instructions

Phoenix Solar AG. Phoenix TectoSun 3 Installation instructions AG Phoenix TectoSun 3 Installation instructions 2 THE TECTOSUN 3 MOUNTING SYSTEM FROM PHOENIX SOLAR THE ADVANTAGES AT A GLANCE Tested by TÜV, RAL seal of uality for all components Quick and easy installation

More information

Wall braces with a swivel head are included to accommodate all roof pitches.

Wall braces with a swivel head are included to accommodate all roof pitches. ULTRA JACK MODEL # 2000 Wall braces with a swivel head are included to accommodate all roof pitches. Product Specifications Model # 2000 Description: Ultra Jack Unit Pack: Weight per Pack: 1 / Carton 32

More information

Manual tensioning and sealing Pneumatic tensioning and sealing

Manual tensioning and sealing Pneumatic tensioning and sealing Hand Tools for Steel Strapping Manual tensioning and sealing Pneumatic tensioning and sealing The Strapex Advantage Hand Tools, Strap and After-Sales Service as a total package The right tool The applications

More information

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

InForm Mobile Units. Selection. Equipment trolley, filing trolley Printer/PC trolley Overhead/demo trolley

InForm Mobile Units. Selection. Equipment trolley, filing trolley Printer/PC trolley Overhead/demo trolley Selection Equipment trolley, filing trolley Printer/PC trolley Overhead/demo trolley Basic mobile unit Basic mobile with vertical profiles Installation options Functional shelf, low Functional shelf, inclinable

More information

Universal Gauge Measuring System USERS MANUAL

Universal Gauge Measuring System USERS MANUAL Universal Gauge Measuring System 2002 Chief Automotive Technologies, Inc. Chief s Limited One-Year Warranty & Liability CHIEF'S LIMITED ONE-YEAR WARRANTY & LIABILITY Chief Automotive Technologies, Inc.

More information

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13

STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 STEADYfast Stabilizer Installation Notes Fifth Wheel and Travel Trailers 11/23/13 (See Supplemental Instructions for trailers with heavy duty round footplates and/or Power Leveling Systems) PHONE SUPPORT

More information

One-third of all fatalities in the U.S. construction

One-third of all fatalities in the U.S. construction Guardrail systems: Fall prevention for floor and wall openings and open-sided floors One-third of all fatalities in the U.S. construction industry result from falls from elevations. Falls from elevations

More information

HS-Alu-Premium. Curing chambers for the concrete industry in an innovative aluminium version

HS-Alu-Premium. Curing chambers for the concrete industry in an innovative aluminium version ANLAGENTECHNIK HS-Alu-Premium Curing chambers for the concrete industry in an innovative aluminium version + resistant to corrosion + low weight + simple assembly due to snap-in connections and building

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Brochure More information from http://www.researchandmarkets.com/reports/1339929/

Brochure More information from http://www.researchandmarkets.com/reports/1339929/ Brochure More information from http://www.researchandmarkets.com/reports/1339929/ The 2011 World Forecasts of Machine Tools That Remove Material by Laser or Light, Photon, Ultrasonic, Electro-Discharge,

More information

PRO PANELS. 1-800-525-4159 www.propanels.com. the artist s choice in display designed by artists, for artists. voice: 214-350-5765 fax: 214-350-7372

PRO PANELS. 1-800-525-4159 www.propanels.com. the artist s choice in display designed by artists, for artists. voice: 214-350-5765 fax: 214-350-7372 PRO PANELS by MD Enterprises the artist s choice in display designed by artists, for artists 1-800-525-4159 www.propanels.com voice: 214-350-5765 fax: 214-350-7372 MD Enterprises 1-800-525-4159 voice:

More information

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

The load carrier system designed for professionals

The load carrier system designed for professionals The load carrier system designed for professionals THULE PROFESSIONAL The rugged time-saving system Thule Professional is a load carrier system from the world leader in utility transportation. Every aspect

More information

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition:

The following symbol denotes a generally compliant condition: The following symbol denotes a generally noncompliant condition: This guide provides compliance information to help the metal and nonmetal mining industry comply with the requirements of the Mine Safety and Health Administration s (MSHA s) ladder standards. This document

More information

Appendix 1: Full Country Rankings

Appendix 1: Full Country Rankings Appendix 1: Full Country Rankings Below please find the complete rankings of all 75 markets considered in the analysis. Rankings are broken into overall rankings and subsector rankings. Overall Renewable

More information

UNIVERSAL RAILING, STEEL

UNIVERSAL RAILING, STEEL RAILINGS Page Universal Railing, steel 108-109 Large Module Railing, steel 110-111 Allround Railing, aluminium 112-113 Module Railing, aluminium 114-115 Standard Type Railing, aluminium 116-117 107 UNIVERSAL

More information

A Member of the Constructor Group STORAGE SOLUTIONS. Clever Thinking Inside the Box

A Member of the Constructor Group STORAGE SOLUTIONS. Clever Thinking Inside the Box A Member of the Constructor Group STORAGE SOLUTIONS Clever Thinking Inside the Box Dexion Storage Solutions Thinking Inside the Box Cutting Costs, Reducing Inventory, Saving Space and Saving Time 2 Increasing

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER

METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER Page 1 of 6 FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER 0 Issued for Review & Comments Rev. Date Description Eng. A.H Prepared by Checked by Approved by Page 2 of 6 REVISION CONTROL SHEET REV. NO. DATE

More information

Chapter 3: Fall Protection/ Scaffolding Safety

Chapter 3: Fall Protection/ Scaffolding Safety Chapter 3: Fall Protection/ Scaffolding Safety Learning Objectives In this chapter you will learn to: recognize the hazards commonly associated with work on or around scaffolds; be aware of common scaffold-related

More information

Horizontal Anchorage Device

Horizontal Anchorage Device Horizontal Anchorage Device The Law requires protection against falling from height Building owners and managers must provide safe systems of work! Why fall protection? Gravity kills! Falls from height

More information

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace DSV Air & Sea, Inc. Aerospace Sector DSV Air & Sea, Inc. Aerospace Introduction to DSV DSV is a global supplier of transport and logistics services. We have offices in more than 70 countries and an international

More information

RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN 05.2015 www.rehau.com/relazzo

RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN 05.2015 www.rehau.com/relazzo Construction Automotive Industry RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE REHAU R20680 EN 05.2015 www.rehau.com/relazzo Scan the QR code and learn more: RELAZZO DECKING THE TERRACE. Installation

More information

Söll GlideLoc Aluminium Ladders. Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073

Söll GlideLoc Aluminium Ladders. Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073 Söll GlideLoc Aluminium Ladders Vertical fall protection system Certified according to EN 353-1:2002 and CNB/P/11.073 7 Söll GlideLoc Aluminium ladders Y-spar Profile 52 x 51 mm With connector Mounting

More information

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS EUROPEAN COMMISSION CONSUMERS, HEALTH AND FOOD EXECUTIVE AGENCY Consumers and Food Safety Unit RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS CONSUMER PROGRAMME

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: [email protected] Planning and Development Services Department Residential Decks

More information

Archive Solutions. BRUYNZEEL Solutions for an efficient archive

Archive Solutions. BRUYNZEEL Solutions for an efficient archive BRUYNZEEL Solutions for an efficient archive Bruynzeel Customer satisfaction is our goal. To achieve this, we team up with our clients and develop a solution that suits them in every detail. A solution

More information

8/18/14. Introduction to. Framing. Terminology and Concepts

8/18/14. Introduction to. Framing. Terminology and Concepts 8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb

More information