1 Highway Asset Management Quick Start Guidance Note Life Cycle Planning

2 Table of Contents 1 Introduction The Life Cycle Process Objective and Policies Inventory and Condition Data Cost of Maintaining Each Group of Assets Performance Gaps Demands and Risks Investment Strategy Appendix A Carriageway, Leicestershire County Council December Appendix B Structures, Surrey County Council March Appendix C Footway, Newcastle City Council October Appendix D Traffic Signal & Management Systems, Staffordshire County Council October Contributing Authors: Paul Boss Andrew Molyneux Mark Stephenson Staffordshire County Council Leeds City Council Cornwall County Council

3 1 Introduction 1 Lifecycle Management Plans form a key part of an Authority s Highways Asset Management Plan (HAMP). Lifecycle planning is listed in the DfT s Start Up Guide as an activity under Growing your Asset Management practices. Effective lifecycle planning therefore requires several fundamental asset management activities to have been carried out and considerable asset knowledge to have been established. Without this knowledge, lifecycle plans will not target the effective maintenance and renewal of assets, leading to either premature maintenance or deterioration and possible safety risks to road, and non-road users, and to roadworkers. Figure 1 (from CSS) provides an overview of the asset management process. This guidance note focuses on life cycle planning, with additional notes available giving and overview of the whole process, and further details on boxes 2 and 4. Figure 1 Overview of Asset Management Processes

4 2 Effective lifecycle planning is about making the right investment at the right time to ensure that the asset delivers the requisite level of service over its full expected life, at the minimum cost. However, the lack of knowledge should not stop a local authority from starting these plans as they will, at least, document the status quo for the asset type or grouping, and help to identify the data required for effective decision making i.e. the plans should basically describe in detail how each asset is currently managed, and how investment decisions are made. Figure 2 below illustrates the typical whole life process for managing assets with particular emphasis on the deterioration maintenance cycle. This is where asset lifecycle planning will have the most significant impact on your authority. Figure 2 Typical Whole Life and Deterioration/Maintenance Process A lifecycle plan is required for each asset type, or for a group of assets, using a fairly generic template to help pose questions and steer thinking, without providing the answers. Remember that there are not any right or wrong answers. The plans (and HAMP/TAMP) should reflect what is appropriate for the particular authority but the rationale should be documented. It is important that the people actually involved with the asset management should write the specific asset lifecycle plan. It will probably take about 3 days of a person s time to write an initial plan once the template is established. This need for ownership is essential, but experience is that it is very difficult to get staff to devote time to this process. If consultants do need to be used, then it is certainly important that they interview the relevant people, and ensure that the appropriate people sign-off each specific plan. The plan should describe the decision making processes associated with that particular asset grouping, at each stage of its lifecycle, from Creation or Acquisition through to Disposal. Although, in the case of highways, roads themselves are rarely fully decommissioned, individual asset components are constantly being decommissioned, and may or may not be replaced, depending on current demand. The other phases in the lifecycle to consider are: Routine Maintenance, Renewal or Replacement and Upgrading.

5 3 The plan should start with a general description of the asset or asset grouping, and then document the inventory, condition, and performance so as to identify the funding required for the current and future needs of the asset. As a starting point, the following groupings are suggested to help cover the major highway assets although, in many cases, little will be known about some of the individual elements within these groupings: Roads Footways & Cycleways Bridges & Structures Drainage Public Rights of Way Street Lighting Signs & Street Furniture Environmental Assets CCTV It is important to remember that you can t do everything at once, and that the lifecycle plans can be added to, and expanded over time. As a service related to highway activities, winter service should be included within the plans, albeit not specific to the management of an individual asset. Lifecycle plans need to capture on a robust, consistent basis, all the relevant costs involved in maintaining the asset over the cycle to the chosen service performance. This information, when spread appropriately over the duration of the cycle, provides the basis for financial planning and budgeting, and for measuring asset depreciation. The forthcoming CIPFA Code of guidance will provide further advice on the development of financial information for these purposes. When lifecycle plans have been developed for all asset groups or at least the main asset groups, objective decisions can be made regarding the proportion of funding that can be allocated for each group to finance the most efficient and effective use of current and future funding. The options within each lifecycle plan should ensure that where the optimum proportion of funding is not available, the next or further best option can be assessed in competition with the options contained in the plans for other asset groups. As far as possible, selection of options should attempt to minimise lifecycle costs.

6 4 2 The Life Cycle Process Each local authority will have its own established asset and maintenance investment practices and a view of what processes and activities will make an effective lifecycle plan, tailored to their own asset hierarchy. This guide sets out the basic activities to establish an initial generic lifecycle plan following the process in Figure 3. Feedback and improvement loops at all stages are important but have not been shown for clarity. Set Objectives & Policies Collect Inventory & Condition Data Assess Demands & Risks Produce Investment Strategy Collect Maintenance Costs Assess Performance Gaps Figure 3 Generic Asset Management Lifecycle Process

7 5 3 Objective and Policies Each local authority will also have their own objectives and policies that determine the priorities of the authority, and these should be listed in the HAMP and TAMP. These can be included as part of an introduction to the lifecycle plan and considered when determining the options for various asset groups. For example, if an authority has a priority of improving the condition of roads then carriageways could be a priority for funding. However, if an objective is to improve the safety for pedestrians then footways or pedestrian signal facilities may take a priority. The underlying statements as to the priorities of the authority will generally include improving the safety and condition of highways and decisions will therefore be based on the economics and risk of maintaining each asset group, using proportions of available funding in accordance with the options contained in the lifecycle plans. Reference to objectives can therefore be a paragraph or list of priorities at the front end of the lifecycle plan, or as a general statement in an introduction to a group of plans. It is also useful for the lifecycle plan to set out the consequences of not achieving the objectives and highlight the impact of for example lack of investment or ill-informed maintenance interventions.

8 6 4 Inventory and Condition Data It is important to understand the type and quality of asset inventory and condition data required to measure performance, and decide on investment options to support the HAMP and other objectives. A data specification should therefore be established at the outset of lifecycle planning. This should set out the hierarchy, detail and priority of data attributes. If there are any gaps in what is collected, these should be fed back into the inspection and survey programme as a business case for future collection. All local authorities have a record of the highways they manage. For roads this can be found in the R199b form that is received from DfT each year. Due to the need to report Best Value Performance Indicators (BVPI s) to 2007/08 *, all authorities also have easily available condition data for carriageways and a small proportion of footways that can be used as the basis for initial lifecycle plans. Due to planned cyclical lamp changes, all authorities should have good inventory and age related information for their street lighting, illuminated traffic signs and traffic management systems that is readily available. The problem areas with regard to inventory are therefore carriageway widths, total footway; and the lower value assets such as signs, safety fences, trees etc along with the usually unknown underground highway drainage systems. With the exception of drainage, information from authorities that have already collected inventory data should be available through regional highway groups, e.g. The Midland Service Improvement Group (MSIG) and can be used as an initial estimate for use in an authority s lifecycle plan, based on the respective lengths of each authority s network. Drainage inventory and condition is more difficult to establish as few, if any authorities have an accurate record of their highway drainage systems. A business case should be made for collecting this data against the consequential risk of impact to asset performance and HAMP objectives. Where condition data is not available, a coarse assessment should be made using knowledge within the authority. This can be refined over time. *BVPI is quoted to 2007/08 as at the time of issue this was the last year there was a requirement for full survey coverage i.e. including unclassified roads. Checks should be made for any more recent updates for current requirements.

9 7 5 Cost of Maintaining Each Group of Assets A specification for the collection of maintenance costs for the purposes of lifecycle planning should be established. This will identify the priorities, boundaries and ownership of cost data specifically for this process. Significant overlap is likely to exist with the cost data collected for maintenance benchmarking purposes, but may require additional manipulation for use in lifecycle planning. The costs of maintaining assets should be based on contract rates for reactive and planned works and take into account inflation and/or uplifts within contracts to ensure future projections are as realistic as possible. The life expectancy of various treatments or procedures undertaken should be based on internal and industry knowledge if possible to determine realistic service lives in addition to design lives. The determination of a basket of generic treatments will allow the sustainability of each to be considered and taken into account within the overall strategy derived from service options identified. With some asset groups such as carriageways, information will again be available through regional highway groups. Recording systems should be put in place to allow the refinement of maintenance cost data over time and hence the updating of projections on an annual basis. For example, the historical information that is built up within a pavement management system and the continued development of deterioration modelling software will then refine and increase the reliance that can be placed upon investment strategies.

10 8 6 Performance Gaps Once asset inventory, condition and cost data has been collected the performance of each asset or asset group should be calculated and compared to the desired or target level. Care should be taken when relying on historic performance data and appropriate levels of confidence should be established. Performance gaps will exist in most if not all of the asset groups, and there will be a number of gaps between the current performance of the asset and the level of performance that is desired. These should be documented within the plan and then considered within the context of demand and risk as below. Where there is an identified need to change and improve the way that assets are managed, these changes should also be described in the lifecycle plans and form part of the overall Improvement Plan, and a business case developed for the changes. The desired performance levels are defined in national, industry standards, Codes of Practice and procedures, as well as local standards of the authority. These can also be defined in terms of business objectives, demands and aspirations. The current performance is usually established through application of different types of performance assessment methods. These typically are represented by a formal regime of inspection and surveys. In reality, although performance is mainly measured according to BVPI results achieved, prioritisation to improve BVPI s is not necessarily commensurate with good asset management practice. A balanced view therefore needs to be taken when formulating an investment strategy to ensure good long term asset management planning is not sacrificed in the quest for improved PI results in the short term. As well as condition monitoring measures, other local performance indicators may be useful to establish the health of the asset groups. These include monitoring the frequency of high priority condition based defects i.e. those caused by a lack of maintenance; monitoring the volume of medium priority asset defects, which provides an indication of asset deterioration and the success of reactive maintenance; and monitoring the % of assets that are renewed annually, which can be compared to service life predictions. It is important to capture the lessons learnt from poor performance internally within asset maintenance practices and for setting revised HAMP and data collection targets. Performance should, ideally, also include some form of stakeholder satisfaction survey and, perhaps, a less systematic, ad-hoc reporting approach based on feedback from accidents and incidents of complaints (which link to Demands and Risk). There are two categories of performance gaps: Where the condition of an asset component is below that desired, and Where the level of service provided to the users of the highway is below that desired The Lifecycle Management Plans should set out details of the authority s current Service Standards and Performance Assessment Methods, as well as the processes for managing the assets.

11 9 7 Demands and Risks Lifecycle plans will need to identify and reflect the demands placed upon the asset and the risks involved in not maintaining the asset in the correct manner. Demands will be stated in the authorities HAMP and TAMP and reflect the priority values to which assets are expected to perform. These usually relate to safety, capacity, disruption, accessibility, amenity and environment/sustainability. The start up guide on Risk Management provides an appreciation of typical asset risks that require consideration. For example, a carriageway may have the demands of heavy vehicles placed upon it, but the risk of not maintaining it correctly may be mainly economic i.e. the carriageway may need reconstructing in a few years time whereas correctly maintained it may require more economic resurfacing at a much lower long term cost. The economic cost of not correctly maintaining a footway for example may be relatively small i.e. reconstructing rather than resurfacing, but the third party liability cost could be very high if users of the footway were to suffer personal injury.

12 10 8 Investment Strategy An investment strategy for each asset group in addition to a strategy for the overall highway asset will need to be derived from the information within the lifecycle plans. These will typically be based on maintaining or enhancing the highway asset to achieve a desired standard and translated into a forward programme of works. The typical stages of asset maintenance and the financial impact that these have over time is illustrated in Figure 4. Figure 4 Typical lifecycle maintenance interventions over time A good starting point for the investment strategy is to consider the total finance available for highway assets and then apportion this in accordance with service options and their consequences, identified in each of the lifecycle plans. Although this may not establish the investment required to meet desired service standards, it will provide a necessary base case. In the medium to long term future the use of refined deterioration modelling information can then be used to prove the investment requirements to achieve defined service standards and hence match the total finance to those standards or levels of service. It is important to regularly monitor the impact that an investment strategy has on asset performance and the support to lifecycle objectives. Example Lifecycle Plans Examples of Lifecycle Plans developed by authorities to date are attached as the following appendices: Appendix A Carriageway, Leicestershire County Council December 2007 Appendix B Structures, Surrey County Council March 2008 Appendix C Footway, Newcastle City Council October 2006 Appendix D Traffic Signal & Management Systems, Staffordshire County Council October 2008

13 Appendix A Carriageway, Leicestershire County Council December

14 12 Appendix A Carriageway Lifecycle Plan Leicestershire County Council Introduction 1. The background to lifecycle plans and the format of each are described in Section 5. This appendix provides the lifecycle plan for carriageways. 2. For management purposes, carriageways have been defined in categories 2 to 4b as shown in the table below. This is based on the national code of practice Well Maintained Highways. These categories reflect the type and use of different carriageways and so will form the basis for sound asset management. National funding and financial reporting is however based on the national classifications (A, B, C and unclassified). Cat. Hierarchy Type of Road Detailed Description 1 Motorways Motorway N/A 2 Strategic Routes Trunk and primary A Roads. Routes between primary destinations. 3a Main Distributor Non primary A roads and important or heavily trafficked B roads. Routes between strategic routes and linking urban centres to the strategic network. Annual average daily traffic: Urban >30,000 (1500 HGV) Rural >12,000 (1000 HGV) 3b Secondary Distributor B roads and heavily trafficked C roads. In rural areas link larger villages to strategic/ main distributor network. In urban areas usually have a 30 mph speed limit and high levels of pedestrian usage. 4a 4b Locally Important Roads All other metalled Roads Routes linking into the main/ secondary distributor network, normally C class, with greater local significance in rural areas; plus heavily trafficked unclassified roads. All other C roads and majority of unclassified network. Annual average daily traffic: Urban >20,000 (300 HGV) Rural > 7,000 (150 HGV) In rural areas provide inter-village links and connect to distributor network. In urban areas residential or industrial interconnecting roads. Annual average daily traffic: Urban >15,000 (150 HGV) Rural >5000 (100 HGV) In rural areas serve smaller villages and provide access to limited number of properties and land. In urban areas predominately residential.

15 13 Levels of Service 3. The desirable levels of service for this asset category are set out in the table below (see section 2 of main document). These levels of service would fully meet all aspirations whilst minimising whole-life costs. This lifecycle plan, in later sections, shows how different levels of available funding will influence the extent to which these desirable levels of service can be achieved. Attribute Desired Standard Performance measure Safety Availability Serviceability Condition Road surface of appropriate skid resistance and profile to minimise risk of loss of control accidents. All roads available for use at all times bar periods of essential roadworks Good standard surface without unevenness or potholes affecting vehicle ride quality At a level consistent with achieving minimum whole life cost, that is BV223 between 3 and 5%, 224a and 224b between 10 and 12%. Measures to be developed for second edition TAMP BV100 surveys for traffic sensitive streets CVI surveys MORI surveys BVPI surveys 4. It will be noted that the levels of service above take a restricted look at, particularly, safety and serviceability. Wider attributes, including alignment, safety of junctions and other aspects currently dealt with under the Council s improvements programme, will be considered for inclusion in future editions of the TAMP. 5. Failure to respond adequately to any of these four dimensions of level of service will produce risk to the authority. The table below, which details the main risks, underlines the importance of responding properly to each. Risk type Physical Business Financial Corporate image Environmental Network Description example Accidents caused by asset defects Legal proceedings for failure in duty of care Reduction in net book value of the asset because of poor maintenance practice; increased compensation payments following legal action; Poor condition roads reflect on the overall image of the County Council More premium aggregate, natural resources and energy per kilometre of treated network will be used in reconstruction and shorter life materials as opposed to longer life materials, resurfacing and overlay. More disruption to pedestrians and others because of emergency unplanned maintenance following poor maintenance practice

16 14 Asset base and characteristics 6. The extent of carriageways in four categories is shown in the table below: A Road B Road C Road UC Road km km Km Km Urban Rural Asset Condition and Assessment 7. To assess the extent to which the desirable levels of service are met requires measurements covering the four dimensions of safety, availability, serviceability and condition. Where measures currently exist for availability and serviceability they are inadequate and will be considered further in the second edition of the TAMP. 8. The condition of A, B and C roads is assessed annually by SCANNER surveys. A proportion of the unclassified network is assessed annually by (Coarse Visual Inspection) CVI survey. CVI surveys are also done on proportions of A, B and C roads to check trends. Deflectograph surveys are carried out on proportions of A and B roads. Griptester surveys are done on a proportion of A roads and on a site specific basis on other roads. NRMCS surveys are also carried out on the numbers of sites required by DfT. This requirement is likely to be dropped for A, B and C roads from A Roads B & C Roads Unclassified SCANNER 100% (in one direction) surveyed annually 100% (in one direction) surveyed annually Not surveyed Deflectograph GRIPTESTER 20% surveyed annually 33% of network surveyed annually 20% surveyed annually Not surveyed Site specific surveys only Not surveyed CVI 20% surveyed annually 50% surveyed annually( may reduce to 20% in future) 25% surveyed annually NRMCS 50 Sites 110 Sites 90 Sites

17 15 9. The Council has set its own standards for the frequency of its highway safety inspections. These take into account national guidelines, issued in the latest Code of Practice for Maintenance Management Well Maintained Highways (July 2005): Feature Reference Category Frequency of Inspection Carriageways 2 Strategic Routes 1 month 3(a) Main Distributors 1 month 3(b) Secondary Distributors 1 month 4(a) Locally Important Roads 3 months 4(b) All other metalled Roads 1 year 10. There are national Best Value Performance Indicators (BVPI) for all categories of carriageway. Best Value Performance Indicators BVPI 223 and BVPI 224 are a direct application of the Road Condition Index (RCI) from the current UKPMS default rule set. For unclassified roads the emphasis is on a range of condition indices relevant to rural and urban roads Principal roads ( A roads) BV223 (BV96) Non Principal Classified (B & C roads) BV224a (BV 97a) Unclassified (un-numbered minor roads) BV224b (BV 97b) The overall condition of the roads in Leicestershire has shown a gradual improvement, reflected in Table 4 below which details the BVPI results in recent years: Table 4 BVPI RESULTS (Highlighted cells signify reported figures) All figures are % s 01/02 02/03 03/04 04/05 05/06 06/07 BVPI 96 Deflectograph Survey. BVPI 96 Condition of Principal road network based on CVI Visual Survey. BVPI 223 Condition of Principal road network based on SCANNER Survey. BVPI 97a Condition of Non-Principal Classified road network by CVI BVPI 224a Condition of Non-Principal Classified road network by SCANNER BVPI 97b Condition of (Non-Principal) Unclassified road network based on CVI N/A N/A N/A % 4yr av (10% 1yr)

18 16 Asset Valuation 11. The initial gross replacement cost for the carriageway asset is 2.5 billion. The depreciation is approximately 40 million, which means that the net value is approximately 2.46 billion. Future Changes in Demand 12. Major new development is planned in the county over the next twenty years as part of the Regional Spatial Strategy. This expansion will bring substantial lengths of new carriageway in new housing and employment areas, and will also intensify the use of existing carriageways. The increase in the extent of the asset will, in the long term, produce a requirement for additional maintenance expenditure. The likely impact on maintenance expenditure, and on government funding for this, has not at this stage been quantified. Treatment options and costs 13. Road surfaces can be renewed, retextured, protected or repaired. Renewal involves replacing the top layer and will normally require replacement, or patching, of parts of the underlying layer. Retexturing increases the serviceable life of the surface course and restores a consistent level of grip. Protection treatments, such as surface dressing, restore the skid resistance and seal the surface of the road which prevents moisture getting into the surface and further oxidation of the binder. Repairs are treatments like patching, filling potholes, crack sealing and resetting ironwork. Treatment Expected Treatment Life (yrs) Average treatment cost Reactive Pothole repair 4 months per repair Reactive Odd kerb / iron work 2 years Kerb Gully Manhole Reactive Patching 3 years 30 40/m² Preventative Surface dressing 7-10 years 2.25/m² Planned Haunching 7-10 years 80.00/m Planned Kerbing 10 + years 20.00/m Planned Resurfacing 7-30 years 10.00/m² Planned Overlay years /m² Planned Renewal years /m² 14. A typical stretch of road might be maintained as follows, following the laying of a new surface: Inspect at required frequencies looking for potential potholes, problems around and concerning ironwork; reset ironwork and fill potholes;

19 17 Empty gullies and catch pits; sweep channels and hatched areas; weed spray to channels; Patch and seal areas to restore surface, especially in channels and around gullies; Consider surface dressing after 12 to 15 years, depending on road category and usage; more highly stressed areas, like junctions will be resurfaced if necessary, rather than dressed; Consider more significant roads for resurfacing earlier in their lives; less significant and less heavily trafficked roads may be surface dressed twice or more times before resurfacing. 15. The current levels of capital funding have only been available to the whole of the County network since The significant improvement in the condition of every category has been achieved using a mixture of resurfacing, surface dressing and revenue-funded patching. The programme has been determined on a worse-first basis, because of the initial poor condition and the available capital and revenue funding, rather than a justified asset management approach. Management strategy for minimising whole-life costs 16. Whole life costs include not only the direct costs of works, design and supervision and surveys, but also the indirect costs caused by sub-optimal maintenance regimes, including inconvenience to users, environmental impacts and third party claims. The main factors which will affect the whole life cost of an individual carriageway are: Type and quality of construction Degree and type of damage and degradation Type and volume of traffic Speed and quality of response to damage and degradation Timing of intervention and quality of medium and long term treatments 17. At present the links between these have not been fully quantified. This is an important area for research and progress nationally will be used to inform future editions of the TAMP. This will be a significant exercise, involving renewals, preventative work and reactive maintenance. 18. Historically, the Council s strategy for maintaining carriageways has been: to specify a high standard of initial construction to undertake timely reactive maintenance in order to keep carriageways in a safe condition and prevent short term deterioration, to have a programme of preventative maintenance to prevent deterioration of the surface and lower layers and to extend the life of the carriageway at minimum cost to resurface carriageways (using recycling techniques where possible) when reactive and preventative work is uneconomic to renew carriageways which are uneconomic to treat by other means. 19. This strategy is based on good practice but there has been no rigorous financial evaluation of the approach or testing of alternatives, for example the timing of the various interventions. The strategy is accepted as best practice for this version of the TAMP but further investigation of alternatives will be undertaken for the second version.

20 18 Options and targets within the management strategy 20. The analysis which follows analyses levels of capital spending against predicted outcomes for carriageway condition. Similar analysis in future editions of the TAMP will need to analyse in more detail the impact of revenue spending on condition, and also assess whether other aspects of conditions of service need similar consideration. It should be noted that the causal link between capital spend and resulting condition is complicated and not necessarily fully explained by the headline figures; this is another area for further investigation in future editions of the TAMP. LTP proposals 21. The second Local Transport Plan reviewed the correlation between the achievement of condition targets and proposed overall spending, within the indicative government allocations. This capital spending on resurfacing and reconstruction was to be supported by continued revenue spending on reactive maintenance at a level predicted to be approximately 5m a year in real terms through the five year period. The table below shows the LTP predicted spending and targets (targets for principal roads are for deflectograph surveys and non-principal classified and unclassified roads are for CVI surveys) 000s 06/07 07/08 08/09 09/10 10/11 Principal road carriageways 5 Year Total Target condition 10.8% 10.6% 10.4% 10.2% 10% Non-principal classified road c/ways Target condition 11.3% 11% 10.6% 10.3% 10% Unclassified road c/ways Target condition <10% <10% <10% <10% <10% 22. On the basis of further annual results becoming available using SCANNER data, the 2010/11 targets in the 2007/08 Departmental Service Plan are:- Principal roads 4% by SCANNER; Non-principal classified roads 9% by SCANNER; Unclassified - <10% by CVI surveys. 23. The SCANNER results are not directly comparable with those for deflectograph, and neither is directly comparable with those for CVI surveys. The targets for principal and nonprincipal roads (SCANNER) are assessed as being close to those which reflect minimum, perceived whole-life cost. That for unclassified roads (CVI) is still some way off that figure and there needs to be a consistent further improvement over a number of years, down to a figure closer to that for non-principal roads.

21 19 Alternative options 24. The reduced allocations for maintenance announced by the Department for Transport in late 2006, coupled with uncertainties over the likely outcome of the autumn 2007 government comprehensive spending review, mean that the targets must be reviewed. The revised spending for 07/08, 08/09 and 09/10, based on the reduced DfT allocations, was determined as follows: s 07/08 08/09 09/10 Principal road carriageways 1,415 1,410 1,610 Non-principal classified road c/ways 2,835 2,535 3,060 Unclassified road c/ways 1,065 1,020 1, However, these allocations would have resulted in an unacceptable worsening in the condition of category 3 and 4 footways. An adjustment was therefore made to allocate more spending for these, achieved by reducing the spending on principal road carriageways by 250,000 a year from 08/09. The revised table is shown below: s 07/08 08/09 09/10 Principal road carriageways 1,415 1,160 1,360 Non-principal classified road c/ways 2,835 2,535 3,060 Unclassified road c/ways 1,065 1,020 1, The reduced spend will result in some deterioration. This is not significant over the three year period in the context of experimental error in measurement, but if uncorrected in the longer term could lead to significant problems. The next edition TAMP will examine this further. Roads 2007/ / /10 Principal roads BV % 3.5% 3.6% Non-principal classified CVI 10.4% 10.3% 10.6% Unclassified roads BV 224b 9.2% 9.5% 9.8% 27. These options for carriageways are assessed in Section 6 against similar options for other asset categories, to produce the best overall balance within available funding against desired levels of service.

22 20 Lifecycle action plan 28. Most of the actions to deliver this lifecycle plan are, for this first edition of the TAMP, contained within the wider summary of development contained in Section 9. A separate action plan is therefore not included here, though it will be in future editions of the TAMP. Risks 29. The risks involved in implementing the lifecycle action plan have been assessed against the council s standard grid of likelihood versus impact and are detailed in the table below, with an outline of the mitigation to be planned. The red risks from each lifecycle plan are listed in section 7 of the main TAMP document. Impact of effects Severe A Significant B 1,5,6 Moderate C 2,3,4 Minor D Very Un- Likely Not Very Likely Quite Likely Likelihood of causes Very Likely Risk Level Mitigation (for red risks) Responsible 1. Insufficient staff resources for analytical work, particularly given structural change in the department 2B Ensure prioritised within group local action plan GM(Network Management) 2. Insufficient staff resources for customer attitude work 2C 3. Insufficient progress nationally and in the region to support changes in practice 2C 4. Materials/ labour/ plant/ staff costs 2C 5. Reduced capital funding 2B Review allocation between asset categories to minimise overall deterioration GM(Network Management) 6. Reduced revenue funding 2B Ditto ditto

23 Appendix B Structures, Surrey County Council March

24 SURREY HIGHWAYS STRUCTURES GROUP TRANSPORTATION ASSET MANAGEMENT STRUCTURES ASSET MANAGEMENT PLANNING

25 Project Title: Bridge Management Document Title: Transportation Asset Management Structures Asset Management Planning Client Reference: S/TAA/8 Date: 14 March 2008 Prepared By: Print Hugh Brooman Sign... Authorised By: Print Graham Cole Sign... Amendment List Iss. / Rev. Iss. / Rev Date Remove Insert Page Iss. / Rev. Page Iss. / Rev. Issue 00 July 2004 All pages 00 All pages SF10 07/08/02 Filename: S:\GENERAL\AMG\Structures\\lifecycle.doc Issue No.1 Page 23 of 101 Document No. 2227/17

26 Contents 1 Introduction 2 Strategic Goals and Objectives. 3 Asset Inventory 4 Current Performance 5 Future Demand 6 Performance Targets and Levels of Service 7 Performance Gaps 8 Lifecycle Plans 9 Value Management and Risk Management 10 Asset Valuation 11 Work Plan and Financial plan 12 Sustainable Development 13 Improvement Plan 14 References Issue No.1 Page 24 of 101 Document No. 2227/17

27 25 1 INTRODUCTION The Structures Group of the Surrey Highways Service undertakes the management of the highway structure asset. Highway structures are defined as any bridge or other structure that impinges in any way within the footprint of the highway or that materially affects the support of the highway or land immediately adjacent to it that meets certain dimensional criteria. Highway structures include bridges, culverts, subways, footbridges and retaining walls. An important Structures Group goal is to: document that the assets for which it is responsible are being preserved at, or above, a series of key performance indicators originally established for the assets We will do this by preparing and working to the Asset Management Planning process that is set out in this document. This is the second edition of this document the first was prepared in July It is recognised that the preparation of an Asset Management Plan is a continuous improvement process and it is anticipated that further versions of this Asset Management Planning document will be issued on an ongoing basis. It is widely recognised that a well managed transport infrastructure is vital to the economic stability, growth and social well being of a country. Bridges and other highway structures are fundamental to the transport infrastructure because they form essential links in the highway network. It is not therefore in the public interest to allow highway structures to deteriorate in a way that compromises the functionality of the highway network, be it through restrictions or closures caused by unsafe structures or the disruption of traffic through poor planning of maintenance work. [Ref 1] This Asset Management Planning document is based on the format recommended by the Code of Practice for the Management of Highway Structures (the Code) [Ref.1]. This document is part of a suite of resource management plans that support the corporate objectives of the County Council and the operational priorities of the Group: Surrey Highways Service Business Plan Annual Group Management Plan Quality Management System (QMS) documentation The relationship between these various documents is shown in Figure 1. The overall process involved in the Management of Highway Structures is shown in Figure 2. A comprehensive review of the work of the Structures Group was carried out in the first quarter of 2008 and some of these processes will change in the near future. Issue No.01 Document No. 2227/17

28 Fig.1 Key Documentation Fig. 2 The Management of Highway Structures Start DCP and other urgent safety issues Local Input (LTD Schemes) Assessment Results Condition Survey Improvements Collation into a list of tasks Technical Prioritisation Performance Monitoring (KPIs) Cost Options Programme Reporting Rolling Programme Update Records Unfunded Bid Budget Allocation Funded Annual Programme Construct Note: Damage to County Property (DCP) Issue No. 01 Document No. 2227/17

29 2 STRATEGIC GOALS AND OBJECTIVES The overall policies and aims of the County Council are currently set out in the Manual of Policies and Standards (Maps) document. In addition, the Local Transport Plan (LTP) also sets out various criteria and objectives within the Planning and Maintaining the Highway Network chapter. Successful management of the bridge stock is fundamental to the implementation of the LTP. There are five main themes within the LTP and the Structures Group contributes to these as follows: Economy: the strategy takes account of the business needs of local communities in prioritising bridge management activities. Where weak bridges are on routes which provide access to business parks etc. weight restrictions would have a detrimental effect on the economy, so strengthening schemes receive a high priority rating. Safety: the strategy principally contributes to this objective by ensuring that minimum levels of safety are maintained. In maintenance, the repair of safety-related defects and damages takes priority. In bridge strengthening schemes, highway safety improvements are included where possible. Integration: a robust bridge stock is needed to deliver network flexibility requirements and accommodate bus routes which may be introduced to improve transport integration. Accessibility: in strengthening and refurbishing, accessibility for vulnerable users is improved by adding footpaths and increasing width whenever possible. The maintenance of subway pumps, anti-slip surfacing, handrails and graffiti clearance are important to provide a pleasant environment, so that pedestrians are encouraged to use subways and footbridges. The 2002 Audit Commission Best Value inspection of the Transportation Service commended the Structures Group on the inclusion of parapet enhancement measures in bridge strengthening schemes. Environment: environmental considerations, heritage value and conservation are taken into account in the selection of materials and methods of working for strengthening and reconstruction projects. The Highways Service priorities for 2007/08 include to Improve the Highway Network, Improve Road Safety and Security, Enhance the Environment and Quality of Life and to Provide Services to People and Communities in a Way that Meets their Needs. The work of the Structures Group contributes to all of these Service wide priorities. The Highways Act 1980 requires that roads are maintained to allow the passage of all Construction and Use vehicles i.e. those up to 40/44 tonnes. Therefore, the primary service standard is to maintain bridges to allow the passage of such vehicles, including smaller vehicles with 11.5 tonnes axles, unless a permanent weight restriction has been imposed at a particular bridge. In particular, Section 41 (1) of the Highways Act states: The Authority who are for the time being the highway authority for a highway maintainable at the public expense are under a duty,, to maintain the highway. The Act includes provisions for enforcing liability for maintenance (Section 56) that can be determined by a magistrates court. The Act provides a general power to improve highways (Section 62) including the provision of subways (Section 69), footbridges (Section 70) and the Issue No. 01 Document No. 2227/17

30 construction and reconstruction of bridges (Sections 91 and 92). More detailed sections of the Act grant the power to construct bridges over navigable water courses (Section 106). The Act grants the power to remove unauthorised structures (Section 143), to licence the construction of a bridge over the highway (Section 176) and to control the construction of scaffolding (Section 169) and cellars (Section 179). The Act also grants powers to control the construction of retaining walls near streets (Section 167). Furthermore, bridgeworks shall not be carried out unless approved by the county council (Section 195), a duty delegated to the Technical Approval Authority. The serviceability standards for the bridge stock will be maintained by seeking to achieve average and critical values of between 90 and 94 in accordance with the CSS Bridge Condition Indicator system [Ref. 2]. This reflects the usual practice of adopting a good standard as an optimum level of service determination [Ref. 3]. Service standards will be further developed as the family of national performance indicators described below is implemented. General consultation with the public regarding their interest in highway matters rarely includes reference to highway structures. Public consultation, which supported the development of the first edition of the Hertfordshire Asset Management Plan, showed that maintaining the safety of the bridge stock was a primary public objective and Surrey residents are unlikely to have different views. Local scheme specific consultations show that the public are rightly concerned about the way works are carried out and how they are involved in the process. We have local performance indicators that seek to address this matter. 3 ASSET INVENTORY This asset grouping comprises bridges (both vehicular and pedestrian), culverts, subways (and their associated pumps) and retaining walls. Bridges are of various types and spans but their construction is mainly concrete, steel or masonry / brick. The asset group includes right of way structures as well as those on main roads. In particular, highway structures are specifically defined as: Bridges, culverts, chambers or subways under or over the highway with a composite span of 0.9 metres or more. Retaining walls, where the height of retained fill measured between lower ground level and upper ground level is 1.37 metres (4 6 ) or more. Miscellaneous structures: Reinforced earth embankments 1.37 metres or more in height and where the angle of the side slopes is greater than the natural angle of repose of the embankment material High mast lighting columns 20 metres or more in height Structural aspects of sign and signal gantries as defined in HA Standard BD63 Structural aspects of traffic signal mast arm assemblies as described in HA Standard BD88 We carry out inspections of all SCC owned highway structures. Within the County there are also a significant number of structures carrying highways and other transport systems that are owned by other statutory bodies such as the Highways Agency, Network Rail and utility companies. We carry out superficial inspections of these structures, where appropriate, to safeguard highway users. Issue No. 01 Document No. 2227/17

31 Details of the asset are recorded on the Bridge Management System (BMS), supplied by Futuris, and known as Bridgestation. Much of this data is readily accessible via the County GIS system or by SAMS. The extent of the current inventory is indicated in Tables 1, 2 and 3. An indication of construction materials and year of construction are included in Tables 4 and 5. The Project Manager makes additions and changes to the asset inventory following significant maintenance work, completion of developer schemes, creation of new assets or discovery of an existing bridge or retaining wall. The inspection process is also used to check the validity of data held on individual structures. Details of the attributes recorded during the inspection process are included in section 4.1. The reliability of bridge data is high but there is still a need to improve the extent of the data regarding retaining walls. Monies had been allocated in 2007/08 to continue additional survey work for this asset sub-group but have now been withdrawn. Table 1 Asset by Type and District (all owners) Bridge Culvert Footbridge Subway Ret Wall Other Total Elmbridge Epsom and Ewell Guildford Mole Valley Reigate and Banstead Runnymede Spelthorne Surrey Heath Tandridge Waverley Woking Source: Bridge Management System (May 2007) Table 2 Asset by Type and Road Hierarchy (all owners) Bridge Culvert Footbridge Subway Ret Wall Other Total Primary Principal Non Principal Unclassified Row Private Other Source: Bridge Management System (May 2007) Issue No. 01 Document No. 2227/17

32 Table 3 Asset by Type and Owner Bridge Culvert Footbridge Subway Ret Wall Other Total SCC (Structures) Network Rail Other Source: Bridge Management System (May 2007) Table 4 SCC Asset by Construction Material (approximate) Prestressed Reinforced Concrete Metal Troughing Steel Composite Lattice Plate and Steel Girders Masonry Arches Timber Source: Adapted from Ref.4 Table 5 SCC Asset by Year of Construction (approximate) Pre Source: Adapted from Ref. 4 Issue No. 01 Document No. 2227/17

33 4 CURRENT PERFORMANCE 4.1 Condition Monitoring Measures The condition of all structures is monitored through general and principal inspections as shown in Table 6. A separate programme of special inspections is carried out for those structures that have been shown to be sub-standard following strength assessments (see below). Ad-hoc special inspections are also carried out following specific events such as vehicle impact or flooding. Inspection activities are detailed in Figure 3. Fig. 3 Bridge Inspection Process Map Inspection programme produced by PM and agreed by TAA BMS produces schedule of bridges to be inspected and type of inspection required Annually Inspection & risk assessment forms issued to PEs Annually PEs agree programme with inspectors and monitors programme Monthly Structure inspected Completed risk assessment forms returned to PM Completed inspection report returned to PE Schedule updated and PM informed of progress Monthly Approved Inspection data entered in BMS Approved inspection report (incl Risk Assessment) placed on Bridge File Source: QMS Process TS14-02 Issue No. 01 Document No. 2227/17

Highway Asset Management Strategy

Highway Asset Management Strategy 1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate

More information

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022

eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 Contents Foreword... 1 Introduction... 3 Asset Management Framework... 6 Strategy for Main Asset Groups... 8 Data Management... 22 Best Practice

More information

Highway Infrastructure Asset Management Strategy

Highway Infrastructure Asset Management Strategy Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...

More information

Wiltshire Highways Asset Management Strategy

Wiltshire Highways Asset Management Strategy Wiltshire Highways Asset Management Strategy May 2015 1 Wiltshire Highways Asset Management Strategy Contents 1. Introduction 3 The Importance of Highway Infrastructure to Wiltshire 3 Contribution of Highways

More information

2016-2021 Highway Asset Management Strategy

2016-2021 Highway Asset Management Strategy 2016-2021 Highway Asset Management Strategy Barnsley MBC 2016-2021 v0.1 0 BARNSLEY COUNCIL ASSET MANAGEMENT IMPLEMENTATION STRATEGY Contents 1.0 Introduction 2 Page 2.0 Legislative Requirements 2 3.0 Planning

More information

Arriving at Depreciated Replacement Cost. Supported by HAMFIG

Arriving at Depreciated Replacement Cost. Supported by HAMFIG Arriving at Depreciated Replacement Cost Supported by HAMFIG What is DRC? a method of valuation which provides the current cost of replacing an asset with its modern equivalent asset less deductions for

More information

Business Life Insurance Procurement Plans - County Level Planning

Business Life Insurance Procurement Plans - County Level Planning Signs & Street Furniture Lifecycle Management Plan Contents: 13.1 Introduction 13.2 Inventory 13.3 Condition Assessment 13.4 Service Standards (Maintenance Management) 13.5 Performance Monitoring 13.6

More information

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3

Transport Asset Management Plan. Worcestershire Local Transport Plan 3. Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Worcestershire Local Transport Plan 3 Transport Asset Management Plan Find out more online: www.worcestershire.gov.uk/ltp3 Definition of Transport Asset Management...

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY

HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY HIGHWAY INFRASTRUCTURE ASSET MANAGEMENT STRATEGY 16 November 2015 Highway Infrastructure Asset Management Strategy Contents Introduction 1.0 The Need for Asset Management 1.1. Background 1.2. Aims and

More information

Highway Asset Management Strategy

Highway Asset Management Strategy September 2015 SECTION DESCRIPTION 1 Foreword by Councillor Simon Jones, Portfolio Holder for Highways and Transport. PAGE 3 2 ASSET MANAGEMENT POLICY 3 3 ALIGNMENT TO SHROPSHIRE CORPORATE OBJECTIVES 5

More information

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management

Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management Hampshire s Highway Asset Management Strategy 1 Implementing Effective Asset Management 1.1 Hampshire County Council recognises the importance of the highway infrastructure in the context of the well being

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

11. Managing our Transport Assets

11. Managing our Transport Assets 11. Managing our Transport Assets 11.1 The Need for an Asset Management Plan 11.1.1 A key challenge is to make transport assets work for the city in a way which fully contributes to the delivery of corporate

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Whole Life Costing for Option Appraisal of Maintenance Schemes for Local Highway Authorities. June 2011

Whole Life Costing for Option Appraisal of Maintenance Schemes for Local Highway Authorities. June 2011 Whole Life Costing for Option Appraisal of Maintenance Schemes for Local Highway Authorities June 2011 Whole Life Costing for Option Appraisal of Maintenance Schemes for Local Highway Authorities ii Contents

More information

CGAM022.1/12/10. Asset Management Improvement Strategy 2010

CGAM022.1/12/10. Asset Management Improvement Strategy 2010 Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT

More information

Highway Asset Management Strategy 2014-2019

Highway Asset Management Strategy 2014-2019 MK Highways Highway Asset Management Strategy 2014-2019 www.milton keynes.gov.uk/highways Final October 2015 Distribution The master copy of this document is held by MKC Highway electronically, a signed

More information

Highway Asset Management Strategy

Highway Asset Management Strategy Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset

More information

Section Description Page

Section Description Page Foreword This Transport Asset Management Plans (TAMP) sets out the County Council's proposed 15 year strategy to maintain and improve the transport asset network in Lancashire between now and 2029. Lancashire

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Transport and Highways June 2013 Asset Management Strategy (June 2013) Page 1 of 10 CONTENTS INTRODUCTION 3 SECTION 1: WHY ASSET MANAGEMENT 4 1.1 Background 4 1.2 Strategic Framework

More information

LIFECYCLE PLAN: STREET FURNITURE

LIFECYCLE PLAN: STREET FURNITURE LIFECYCLE PLAN: STREET FURNITURE Version Date Signed Checked Status 0.1 April 2011 Draft 0.2 February 2012 2 nd Draft Table of Contents 1. Current Status (February 2012)... 2 1.1. Current Issues... 2 1.2.

More information

4 Adoption of Asset Management Policy and Strategy

4 Adoption of Asset Management Policy and Strategy 4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are

More information

Highway Asset Management Plan Summary Document

Highway Asset Management Plan Summary Document Highway Asset Management Plan Summary Document www.bolton.gov.uk BOLTON S HIGHWAY ASSET MANAGEMENT PLAN Foreword by the Executive Member, Councillor Nicholas Peel: SUMMARY AND IMPROVEMENT ACTIONS The highways

More information

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY

APPENDIX K: HIGHWAY MAINTENANCE STRATEGY APPENDIX K: HIGHWAY MAINTENANCE STRATEGY K1 1. INTRODUCTION 2. VISION HIGHWAY MAINTENANCE STRATEGY 2004-2011 3. EXECUTIVE SUMMARY 4. OBJECTIVES 5. HIGHWAY AUTHORITY OBLIGATIONS 5.1 Legislation 5.2 Transport

More information

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee

Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy. Highways and Transport Scrutiny Committee Agenda Item 9 Policy and Scrutiny Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Date: 01 June 2015 Subject: Decision Key decision? Reference: Summary:

More information

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents 10.0 ASSET MANAGEMENT PRACTICES Table of Contents 10.0 ASSET MANAGEMENT PRACTICES... 119 10.1 Current Asset Management Practices... 120 10.2 Asset Management Processes... 120 10.2.1 Attribute data collection

More information

Highway Asset Management Strategy

Highway Asset Management Strategy w Highway Asset Management Strategy May 2014 - Version 2 Page 5 Surrey County Council Asset Management Strategy 1 Priorities, Vision and Objectives 1.1 Surrey County Council (SCC) recognises the importance

More information

Transport Asset Management Plan. 2nd Edition

Transport Asset Management Plan. 2nd Edition Transport Asset Management Plan 2nd Edition Contents 1 Chapter 1 Introduction 6 1.1 Background 6 1.2 Goals And Objectives 7 1.3 What Is Asset Management 8 1.4 Why Do We Need A TAMP 9 1.5 Where We Are Now

More information

Highway Asset Management Quick Start Guidance Note. Getting Started

Highway Asset Management Quick Start Guidance Note. Getting Started Highway Asset Management Quick Start Guidance Note Getting Started Table of Contents 1 Getting Started with Asset Management... 1 2 What is Asset Management?... 3 3 Getting Started Checklist... 6 4 Getting

More information

NOTES ON CORPORATE REPORTING PROCESS

NOTES ON CORPORATE REPORTING PROCESS NOTES ON CORPORATE REPORTING PROCESS 1 Outcomes and Indicators to be reported at 4 monthly intervals: Appendix A (1) April to July reported end of August. (2) August to November reported at the end of

More information

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services

TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION. Residents & Visitor Services TRANSPORT ASSET MANAGEMENT PLAN STRATEGIC VERSION Foreword I am very pleased to be able to introduce Torbay Council s first published Strategic dealing with the Highway Asset which records our strategies

More information

ROADING ASSET MANAGEMENT PLAN

ROADING ASSET MANAGEMENT PLAN ROADING ASSET MANAGEMENT PLAN 1 EXECUTIVE SUMMARY 1.1 Overview This Roading Asset Management Plan (RAMP) follows the format recommended by the National Asset Management Steering Group (NAMS) and is largely

More information

Highway Asset Management Strategy 2014-15

Highway Asset Management Strategy 2014-15 Highway Asset Management Strategy 2014-15 - 0 - P a g e Record of Amendments Issue No.: 6.0/2015 Status: Final Date: January 2015 Author: Reviewed by: Mark Evans (Asset Management Engineer) David Kinsey

More information

Asset Lifecycle Plans. December 2010

Asset Lifecycle Plans. December 2010 Asset Lifecycle Plans December 2010 Lifecycle Plan Summary December 2010 P a g e 2 A s s e t L i f e cy c l e P l a n Contents: 1 Introduction to Lifecycle Planning...4 1.1 Primary Purpose of Lifecycle

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Fig. 4 Railway incursion prioritisation process 128

Fig. 4 Railway incursion prioritisation process 128 9 Chapter 9 Structures Lifecycle Management Plan Fig. 4 Railway incursion prioritisation process g 128 Chapter 9 Structures Lifecycle Management Plan 9 Fig. 5 Strengthening Prioritisation Process 129 9

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy The vision, scope and context of Asset Management of the Highways and Transport Infrastructure for Community and Customer Services. Version 1 Highways and Transport

More information

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY

More information

WILTSHIRE TRANSPORT ASSET MANAGEMENT PLAN

WILTSHIRE TRANSPORT ASSET MANAGEMENT PLAN WILTSHIRE TRANSPORT ASSET MANAGEMENT PLAN 0.1 Executive Summary WILTSHIRE TRANSPORT ASSET MANAGEMENT PLAN EXECUTIVE SUMMARY Wiltshire County Council (WCC) has developed a Transport Asset Management Plan

More information

Transport Asset Management Plan. Suffolk County Council

Transport Asset Management Plan. Suffolk County Council Transport Asset Management Plan 2011 2024 Suffolk County Council Contents 1 Introduction p.3 2 Key Asset Performance Measures p.5 3 Policy Context p.12 4 Asset management in Suffolk p.17 5 Data management

More information

Performance Monitoring

Performance Monitoring 7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5

More information

Infrastructure Asset Management Strategy

Infrastructure Asset Management Strategy Infrastructure Asset Management Strategy Strategy Owner Manager Parks and Assets Engineering and Infrastructure Creation Date 27 March 2006 Revision Date 4 March 2015 Please check Council s Intranet to

More information

APPENDIX A: ASSET INFORMATION STRATEGY

APPENDIX A: ASSET INFORMATION STRATEGY APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Page 1 of 15 TABLE OF CONTENTS 1. INTRODUCTION...3 2. THE ASSET LIFECYCLE...3 2.1 Asset Planning...5 2.2 Asset Creation / Acquisition...6 2.3 Asset Operations...7 2.4 Asset Maintenance...7

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015

Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 Highway Asset Management Strategy Growth & Neighbourhoods Directorate December 2015 V2.0 Table of Contents Record of Amendments... 3 Introduction... 4 1 The Importance of Highway Infrastructure to Manchester...

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupo District Council (TDC) currently uses to determine long term maintenance, renewal

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Activity Management Plan Overview

Activity Management Plan Overview Trevor Kerr Timaru District Council Activity Management Plan Overview 2012 2022 Transport Table of Contents 1. What we do now?... 5 1.1. Transport Assets... 5 1.2. Transport Activities... 5 2. Key Network

More information

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan Rotherham Metropolitan Borough Council Appendix A Street Lighting Sustainable Energy Action Plan October 2010 Streetpride Service Summary Modern street lighting provides many benefits to the community

More information

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy

DRAFT V5. PFSC 16/05/2014 Appendix 1. Outline Plan to deliver the County Council s investment property Strategy PFSC 16/05/2014 Appendix 1 Outline Plan to deliver the County Council s investment property Strategy 1. Strategic Drivers 1.1 The County Council s property investment strategy sets out how its property

More information

2010 Transport Asset. Management Plan 2010 WWW.SOMERSET.GOV.UK

2010 Transport Asset. Management Plan 2010 WWW.SOMERSET.GOV.UK 2010 Somerset Transport County Council Asset Transport Asset Management Plan 2010 WWW.SOMERSET.GOV.UK Somerset Transport Asset Management Plan 2010 Contents Page 1 Executive summary... 3 2 Introduction.

More information

Strategy. Strategy for Lorry Parking Provision in England

Strategy. Strategy for Lorry Parking Provision in England Strategy Strategy for Lorry Parking Provision in England Contents 1 Introduction 1 2 Strategic Objectives 3 3 Action Plan 5 4 Action Plan Matrix 17 Disclaimer: While the Department for Transport (DfT)

More information

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3

1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 ASSET MANAGEMENT STRATEGY 2010-2020 November 2009 1. INTRODUCTION... 1 2. PURPOSE OF THE ASSET MANAGEMENT STRATEGY... 2 3. ASSET MANAGEMENT... 3 4. WESTERN AUSTRALIAN ASSET MANAGEMENT IMPROVEMENT PROGRAM

More information

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document)

SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW. (reproduced review document) SD10: HIGHWAY NETWORK MANAGEMENT BEST VALUE REVIEW (reproduced review document) Highway Network Management Best Value Review Report of the Member Panel Summary of Key Findings Leicestershire County Council

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

A Code of Practice for Highway Structures An Asset Management Approach

A Code of Practice for Highway Structures An Asset Management Approach A Code of Practice for Highway Structures An Asset Management Approach Dick Feast Principal Consultant Whole Life Asset Management Amey Infrastructure Services The Code of Practice Code of Practice for

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

2014/15 Performance Measures and Targets

2014/15 Performance Measures and Targets Surface Transport Panel Date: 9 April 2014 Item 6: formance Measures and Targets This report will be considered in public 1 Summary 1.1 The purpose of this paper is to provide the Panel with an overview

More information

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Glenorchy City Council Asset Management Strategy for Infrastructure Assets Glenorchy City Council Asset Strategy for Infrastructure Assets 2014/15 to 2017/18 Version 1.3 June 2014 Glenorchy City Council Asset Strategy for Infrastructure Assets Document Control Document Control

More information

Campbelltown City Council Asset Management Strategy 2012-2022

Campbelltown City Council Asset Management Strategy 2012-2022 Campbelltown City Council Asset Management Strategy 2012-2022 Disclaimer This document was first published on 1 July 2012. The information contained in this document is to be considered general in nature

More information

Data Quality Report. February 2008. Data Quality Report. Croydon London Borough Council. Audit 2007/08

Data Quality Report. February 2008. Data Quality Report. Croydon London Borough Council. Audit 2007/08 Data Quality Report February 2008 Data Quality Report Audit 2007/08 External audit is an essential element in the process of accountability for public money and makes an important contribution to the stewardship

More information

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD

ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD ROADS ALLIANCE ASSET MANAGEMENT COMMUNIQUÉ AUGUST 2010 LOCAL GOVERNMENT ASSOCIATION OF QUEENSLAND LTD Contents 4 Glossary 6 Background 9 Purpose of Communiqué 9 Australian and State Government Drivers

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN

SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN SUMMARY: LAND TRANSPORT ASSET MANAGEMENT PLAN Introduction This Asset Management Plan (AMP) for Land Transport Network 2012 describes in detail how the District s land transport network will be managed

More information

Roads and Footpaths Infrastructure Asset Management Plan

Roads and Footpaths Infrastructure Asset Management Plan Roads and Footpaths Infrastructure Asset Management Plan Version 2a November 2012 This page is left blank intentionally Prepared By: Rob Damhuis Senior Transport Asset Management Consultant Opus International

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY SHIRE OF BODDINGTON ASSET MANAGEMENT STRATEGY Version 1 January 2014 Asset Management Strategy Document Control Rev No Date Revision Details Author Reviewer Approver 1 January 2014 Draft Strategy T McCarthy

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Version 3 - Final Adopted 19 February 2013 NAMS.PLUS Burnie City Council Asset Strategy Document Control Document Control NAMS.PLUS Asset www.ipwea.org.au/namsplus Document ID:

More information

H: Road Asset Management Plan February 2015

H: Road Asset Management Plan February 2015 H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee

More information

VEHICLE CROSSOVER INFORMATION PACK

VEHICLE CROSSOVER INFORMATION PACK VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)

More information

Road asset management project Data template guidance notes

Road asset management project Data template guidance notes Road asset management project Data template guidance notes If you cannot see these notes in full please click on View Zoom and select 'Fit selection' (Excel 2003) or View Zoom to selection (Excel 2007/10)

More information

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME

EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The

More information

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL

Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL -- South Africa COTO Committee of Transport Officials Draft TMH 22 ROAD ASSET MANAGEMENT MANUAL M a r c h 2013 C ommittee of Transport Officials Contents Background Process Contents of Manual Quo Vadis

More information

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy

GLAMORGAN SPRING BAY COUNCIL. Asset Management Strategy GLAMORGAN SPRING BAY COUNCIL Asset Management Strategy Table of Contents Introduction... 3 Vision... 3 Objective of the Asset Management Strategy... 4 Aim of the Asset Management Strategy... 4 Links to

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

Cathkin Relief Road Planning Statement

Cathkin Relief Road Planning Statement Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide

More information

City of Canning. Asset Management Strategy 2015 2018

City of Canning. Asset Management Strategy 2015 2018 City of Canning Asset Management Strategy 2015 2018 Document Control Version No Version Date Description TRIM Reference 1.0 11 December 2012 Asset Management Strategy D12/68776 2.0 23 September 2015 Updated

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX C - 59 Speed Limit Policy Isle of Wight Council June 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1

More information

Long-Term Asset Management Plan 2011-2021

Long-Term Asset Management Plan 2011-2021 Long-Term Asset Management Plan 2011-2021 Contents Introduction...3 A shared vision...4 Strategic planning to achieve our goals...4 Towards 2031...5 A long-term vision, communicated by our community...5

More information

Appendix 6 Project Risk Register Local Highways Challenge Fund Bid

Appendix 6 Project Risk Register Local Highways Challenge Fund Bid Appendix 6 Page 1 of 5 B10. Management Case - Risk Management The following top five risks specific risk have been highlighted Description of Risk Underlying drainage issues, that have and will lead to

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Predictive Modeling of Bridges

Predictive Modeling of Bridges Predictive Modeling of Bridges transport community industrial & mining carbon & energy Prepared for: Small Bridge Conference 2015 Date: 23 November 2015 Rev00 Table of Contents Synopsis... i Authors Biography...

More information

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 Florentina Mihai, BEng, GDipMgt, MIEAust Main Roads Western Australia Neville Binning,

More information

Preparing a maintenance plan

Preparing a maintenance plan The maintenance series Information sheet 1.1 Preparing a maintenance plan Introduction The regular expenditure of a small amount of maintenance funds is much better for a building, and more cost effective,

More information

Birmingham Highways Maintenance and Management Service CIHT Northern Ireland

Birmingham Highways Maintenance and Management Service CIHT Northern Ireland Birmingham Highways Maintenance and Management Service CIHT Northern Ireland 21 st November 2011 Birmingham Highways Maintenance and Management Service (PFI) Mike Notman AMEY PROJECT DIRECTOR Amey Today

More information

10.0 ASSET MANAGEMENT PRACTICES

10.0 ASSET MANAGEMENT PRACTICES 10.0 ASSET MANAGEMENT PRACTICES 10.1 Current Asset Management Practices This section outlines the decision making tools Taupō District Council (TDC) currently uses to determine long term maintenance, renewal

More information

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy Section 8 Output monitoring Inputs Customer requirements Safety standards Outputs and funding SRA and Government Policy Network stewardship strategy Asset and operational policies Maintenance & renewal

More information

TREE RISK MANAGEMENT DOCUMENT

TREE RISK MANAGEMENT DOCUMENT TREE RISK MANAGEMENT DOCUMENT INTRODUCTION The Council has a statutory duty of care under the Health and Safety at Work Act 1974 and the Occupiers Liability Act 1999 to ensure that members of the public

More information

REVIEW OF AS5100.1 SCOPE AND GENERAL PRINCIPLES

REVIEW OF AS5100.1 SCOPE AND GENERAL PRINCIPLES REVIEW OF AS5100.1 SCOPE AND GENERAL PRINCIPLES Nigel Powers, VicRoads, Australia Frank Rapattoni, Parsons Brinckerhoff, Australia ABSTRACT AS5100, the Australian Bridge Design Code, is currently under

More information

ASSET MANAGEMENT STRATEGY

ASSET MANAGEMENT STRATEGY ASSET MANAGEMENT STRATEGY Adopted May 2011 Table of Contents Page 1. Introduction 3 2. Purpose 4 3. Asset Register System 4 4. Asset Management Working Group 4 5. Asset Management Plans 5 6. Condition

More information

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07

Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07 Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob

More information

STRATEGIC ASSET MANAGEMENT PLAN

STRATEGIC ASSET MANAGEMENT PLAN STRATEGIC ASSET MANAGEMENT PLAN (As at ) Strategic Asset Management Plan Version 7 Document Control Document ID: Rev No Date Revision Details Author Reviewer Approver 1 April 2010 Draft Asset and Infrastructure

More information

V1.0 - Eurojuris ISO 9001:2008 Certified

V1.0 - Eurojuris ISO 9001:2008 Certified Risk Management Manual V1.0 - Eurojuris ISO 9001:2008 Certified Section Page No 1 An Introduction to Risk Management 1-2 2 The Framework of Risk Management 3-6 3 Identification of Risks 7-8 4 Evaluation

More information

ALARM. Annual Local Authority Road Maintenance Survey. Publication embargo: 00.01 23 March 2016

ALARM. Annual Local Authority Road Maintenance Survey. Publication embargo: 00.01 23 March 2016 ALARM Annual Local Authority Road Maintenance Survey 2016 Publication embargo: 00.01 23 March 2016 About the ALARM survey Each year the Asphalt Industry Alliance (AIA) commissions an independent survey

More information

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage

Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage Pavement Asset Management Guidance Section 5.3: Condition Surveying and Rating - Drainage December 2014 Document Information Title Author Description Pavement Asset Management Guidance, Section 5.3: Condition

More information